RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Tennessee | SR-1, Near SR-281 in Cannon County to Centertown in Warren County - Construction New | $28,772,789.26 |
$35,965,985.00 |
|
Tennessee | SR-1, From East of Kingston Avenue to SR-382 - Widen from 2 lanes to 5 lanes | $24,059,896.00 |
$25,442,120.00 |
|
Tennessee | SR-4 (US-78), From the Mississippi State Line to South of Shelby Drive - Widen from 4-Lane to 6-Lane | $67,670,000.00 |
$99,671,931.00 |
|
Tennessee | SR-6, From South of SR-441(Moores Lane) to SR-253 (Concord Road) in Brentwood - Reconstruction and Widen | $32,521,756.00 |
$42,513,438.00 |
|
Tennessee | SR-9 (US-25W) - Bridge over Clinch River in Clinton LM 10.71 - Bridge Replacement | $27,482,824.26 |
$34,396,279.57 |
|
Tennessee | SR-10, South of Goose Creek to SR-52 in Lafayette - Widen | $24,551,694.44 |
$25,682,452.19 |
|
Tennessee | SR-11, North of Mill Creek to Near SR-254(Old Hickory Boulevard) - Reconstruct and Widen | $67,351,975.00 |
$89,691,286.00 |
|
Tennessee | SR-14, Bridges over CNIC Railroad and Nonconnah Creek, LM 7.13 - Bridge Replacement | $77,460,765.60 |
$96,825,957.00 |
|
Tennessee | SR-14, East of Old Covington Pike to SR-385 (Paul Barrett Parkway) - Widen to 5-Lanes | $34,938,327.00 |
$43,549,917.00 |
|
Tennessee | SR-14(Austin Peay Highway), From SR-385 to East of Kerrville-Rosemark Road (IA) - Reconstruction - Widen from 2-lane to 4-lane divided typical section | $34,268,270.00 |
$42,835,337.00 |
|
Tennessee | SR-15, From Mill Springs Branch to the Waynesboro Bypass - Widen | $39,072,031.32 |
$49,677,307.63 |
|
Tennessee | SR-15, From Firetower Road to west of Bigbee Branch - Widen | $53,133,752.42 |
$66,460,819.53 |
|
Tennessee | SR-19 (Brownsville Bypass), From East of SR-87 to West of Windrow Road (IA) - Widen from 2-lane to 4-lane divided | $24,949,506.58 |
$31,878,284.00 |
|
Tennessee | SR-26 (Nashville Hwy), From near SR-53 to near SR-96 - Reconstruction | $27,145,732.00 |
$33,962,637.00 |
|
Tennessee | SR-28(US 127), North of I-40 to Near Potato Farm Road | $17,846,478.88 |
$86,960,881.10 |
|
Tennessee | SR-28, From near North Lowe Road to near Little Road, north of SR-62 | $8,598,658.11 |
$99,683,454.64 |
|
Tennessee | SR-29, Olgiati Bridge over Tennessee River - Widen | $27,522,541.30 |
$34,403,176.75 |
|
Tennessee | SR-33, Knox County Line to South of SR-144 Left - Reconstruction | $41,056,024.90 |
$71,297,645.00 |
|
Tennessee | SR-35(Newport Bypass), From SR-9 to Saint Tide Hollow Road - Construction - New | $64,103,459.00 |
$80,251,910.00 |
|
Tennessee | SR-35 - Intersection of SR-92 / Dickey Road to Grapevine Hollow Road - Construction - New - Construct 5th Lane on 4-Lane Divided Road | $35,844,942.00 |
$35,875,733.00 |
|
Tennessee | SR-35(Newport Highway), From near Sims Road in Sevier County to near SR-92 in Jefferson County (IA) | $57,083,854.00 |
$71,390,880.00 |
|
Tennessee | SR-50, SR-106(US-431, Franklin Pike) to SR-11(US-31A, Verona Avenue) in Lewisburg - Reconstruction | $46,798,094.67 |
$48,360,229.00 |
|
Tennessee | SR-54, Near Rison Street to Near Smith Road - Construction - Widen from 2-Lane to 5-Lane | $37,512,612.00 |
$47,102,176.00 |
|
Tennessee | First Avenue to SR-16 (US-41A, N Jackson Street), in Tullahoma - Widen | $20,104,792.31 |
$25,146,166.89 |
|
Tennessee | SR-56, South of SR-288 Near Magness Road to East Bryant Street in Smithville - Widen 5 Lanes | $28,574,417.05 |
$39,908,470.00 |
|
Tennessee | SR-56, South of Warren/Dekalb County Line to Near Magness Road - Reconstruction | $23,926,892.00 |
$30,251,971.00 |
|
Tennessee | SR-60, From 4-Lane North of I-75 (Westlake Drive) to SR-306 - Reconstruction and Widening | $29,475,067.38 |
$77,141,600.00 |
|
Tennessee | SR-62 (Western Avenue), From Texas Avenue to Major Avenue in Knoxville - Reconstruction - Widen 2 Lane to 5 Lane | $18,958,705.58 |
$61,178,308.96 |
|
Tennessee | SR-63, From Campbell County Line to Hall Lane - Widen | $30,753,246.00 |
$31,367,955.00 |
|
Tennessee | SR-63(General Carl W. Stiner Highway), From Near Frontier Road/Woodson Lane to Near Claiborne County Line - Widen from 2-Lane to 5-Lane | $25,430,272.00 |
$25,854,928.00 |
|
Tennessee | SR-65 - From Old Hwy 431 to Walling Road - Reconstruction | $32,739,835.65 |
$40,941,724.56 |
|
Tennessee | SR-66REL, North of I-81 at SR-341 in Jefferson County to SR-160 in Morristown - Construction - New | $59,845,961.05 |
$75,012,752.31 |
|
Tennessee | I-69 PROP, From South of SR-3(US-51) to South of SR-5 - Construction - New | $48,135,748.00 |
$60,527,145.00 |
|
Tennessee | I-69PROP - From West of SR-21 to SR-3(US-51) Near Mayberry Road (IA) - Construction - New 4-Lane Divided Limited Access Interstate Highway | $62,327,712.00 |
$77,909,640.00 |
|
Tennessee | SR-73, From SR-2 (US-11) to East of Little Tennessee River (Ft Loudoun/Tellico Canal) - Reconstruction | $61,906,734.00 |
$78,453,840.00 |
|
Tennessee | SR-76, From West of Cades-Atwood Road to East of SR-77 - Reconstruction | $30,816,347.00 |
$38,520,433.75 |
|
Tennessee | SR-99 (New Salem Highway), From Cason Lane to I-24 in Murfreesboro - Widen | $25,003,241.00 |
$32,344,770.00 |
|
Tennessee | SR-101, From Firetower Road to East of Lakeview Drive - Reconstruction - Widen from Two Lanes to Multi-Lane Facility | $34,396,083.00 |
$43,387,182.00 |
|
Tennessee | SR-101(Peavine Road), From Lakeview Drive to East of Westchester Drive / Catoosa Boulevard in Fairfield Glade - Reconstruction | $32,546,689.00 |
$41,166,774.00 |
|
Tennessee | SR-109, From North of SR-24(US-70) to South of Dry Fork Creek - Reconstruction | $30,815,434.00 |
$38,794,690.00 |
|
Tennessee | SR-109, From South of Dry Fork Creek to South of Cumberland River - Reconstruction | $39,853,985.00 |
$50,974,068.50 |
|
Tennessee | SR-112, From SR-12 (Ashland City Highway) to SR-155 (Briley Parkway) -Reconstruction, Widen, Curb and Gutter, Sidewalk, Signalization | $39,064,420.26 |
$51,005,040.00 |
|
Tennessee | SR-115, South of Topside Road to North of Maloney Road - Widen | $63,031,188.00 |
$78,877,045.00 |
|
Tennessee | SR-115, From Woodson Drive to Cherokee Trail - Widen from 4-Lane to 6-Lane | $132,222,894.00 |
$165,442,788.00 |
|
Tennessee | SR-115, From North of Maloney Road to Woodson Drive - Widen from 4 to 6 Lanes | $74,345,900.00 |
$97,316,818.00 |
|
Tennessee | SR-115 - (Relocated Alcoa Highway), From SR-35 (Hall Road), South of Airport Road to Proposed Interchange at Tyson Boulevard - Widen | $57,078,945.00 |
$71,853,312.00 |
|
Tennessee | SR-115(Relocated Alcoa Highway), from Proposed Interchange at Tyson Blvd to Existing SR-115 at South Singleton Station Road - Stage 1 | $180,552,450.19 |
||
Tennessee | SR-128, Bridge Over Pickwick Dam - Bridge Rehabilitation | $26,805,760.00 |
$33,507,200.00 |
|
Tennessee | SR-136, SR-111 to I-40 - Widen | $48,052,510.27 |
$63,660,523.00 |
|
Tennessee | SR-141(Hartsville Pike), North of Lovers Lane To SR-26(US-70) - New Construction / Widen | $32,444,977.35 |
$42,664,899.00 |
|
Tennessee | SR-149, From River Road to SR-13; SR-13, SR-149 to Zinc Plant Road - Widen to 5 Lanes | $51,874,881.66 |
$86,210,912.55 |
|
Tennessee | I-24, Interchanges at SR-2(Broad Street) and SR-58(Market Street) in Chattanooga - Interchange Modification | $36,840,728.00 |
$41,759,295.00 |
|
Tennessee | I-24, Bridges over Germantown Road, LM 12.08 and Belvoir Avenue, 12.59 in East Ridge - Bridge Replacement | $36,112,144.89 |
$40,124,608.44 |
|
Tennessee | SR-247(Duplex Road), SR-6 (US-31, Main Street) in Spring Hill to Near I-65 - Widen 2-3 lanes, Correct Vertical Allignment | $32,713,594.53 |
$37,882,427.48 |
|
Tennessee | I-24, Interchange modification at Hickory Hollow Parkway - Modify Interchange | $31,626,364.02 |
$37,740,840.90 |
|
Tennessee | SR-266 (Jefferson Pike), From SR-102 to East of I-840 - Widen | $30,678,704.00 |
$74,112,669.00 |
|
Tennessee | I-269PROP(Paul Barret Parkway), From North of SR-57 in Fayette County to South of Raleigh-Lagrange Road - Stage Construction - New | $35,261,150.07 |
$43,959,254.59 |
|
Tennessee | SR-317, SR-321(Ooltewah-Ringgold Road) to Near Layton Lane - Reconstruction and Widen from 2 Lanes to 5 Lanes | $92,923,113.00 |
$117,999,997.00 |
|
Tennessee | SR-374 (Warfield Blvd), South of Dunbar Cave Road to West of Stokes Road, in Clarksville - Widen | $23,195,417.28 |
$31,917,516.41 |
|
Tennessee | SR-396(Saturn Parkway Extension), From SR-6 to SR-247; SR-247, From Cleburne Rd to Town Center Pkwy; and SR-6, Intersection at Stephen P Yokich Pkwy | $26,107,686.00 |
$32,634,608.00 |
|
Tennessee | SR-397 (Mack Hatcher Parkway West) - From S of SR-96 W of Franklin to E of SR-106 N of Franklin - Construction - New | $48,821,165.56 |
$64,766,993.00 |
|
Tennessee | I-40, From West of SR-186 (US-45 ByPass) to East of SR-5 (North Highland Avenue) - Widen | $63,161,320.65 |
$78,951,650.81 |
|
Tennessee | I-40, From West of SR-20 (US-412, Hollywood Drive) to West of SR-186 (US-45 ByPass) (IA) - Widen | $33,775,792.00 |
$42,219,740.00 |
|
Tennessee | I-40, From East of SR-5(US-45) to East of SR-1(US-70) in Jackson - Widen from 4-Lane to 6-Lane on existing alignment | $56,266,400.00 |
$104,868,062.00 |
|
Tennessee | I-40, From West of SR-171 to East of SR-109 - Widen | $51,528,150.00 |
$57,253,500.00 |
|
Tennessee | I-40, From East of SR-109 to East of I-840 - Widen, HOV Lanes, Shoulders, Bridge Widening | $35,167,816.31 |
$43,959,771.00 |
|
Tennessee | I-40, Donelson Pike Interchange (includes Donelson Pike relocation from taxiway bridges over Donelson Pike to I-40) -Modify Interchange | $75,529,551.00 |
$97,871,241.00 |
|
Tennessee | I-40, Westbound near MM 342 to near MM 344 - Slope Stabilization and Resurfacing | $38,102,563.14 |
$47,240,032.00 |
|
Tennessee | SR-459(Lexington Bypass), From SR-20(US-412) West of Lexington to Near SR-22 South of Lexington - New - Super 2-lane bypass on new alignment | $35,214,845.19 |
$44,018,557.00 |
|
Tennessee | SR-460PROP (Somerville Beltway), From Near SR-15 (US-64) West of Somerville to Near SR-76 South of Somerville - Stage Construction - New | $26,152,624.00 |
$32,690,780.00 |
|
Tennessee | I-55 at Crump Boulevard in Memphis - Modify Interchange | $108,082,917.19 |
$120,104,081.00 |
|
Tennessee | I-55 exit Ramp to SB SR-14, Bridge over SR-14, LM 7.46; and SR-14, Bridge over I-55, LM 7.44 | $31,000,034.40 |
$61,014,760.00 |
|
Tennessee | I-65, Interchange at SR-99 (US-412) in Columbia - Modify Interchange | $9,983,502.10 |
$35,795,855.92 |
|
Tennessee | I-65, Interchange at Buckner Road in Spring Hill (Design Build) - New Interchange | $31,928,097.00 |
$57,800,000.00 |
|
Tennessee | I-65, From near SR-25 (Main Street) to near SR-109 - Section 4 - Widen | $127,546,569.00 |
$159,596,116.00 |
|
Tennessee | I-75, Interchange at I-24 - Modify Interchange | $136,876,258.00 |
$152,084,732.00 |
|
Tennessee | I-75, Interchange Modifications at Hamilton Place Mall - Modify Interchange | $52,029,000.00 |
$85,854,428.00 |
|
Tennessee | I-75, Interchange at I-24, Phase 2 (IA) - Modify Interchange | $122,951,869.64 |
$138,110,967.99 |
|
Tennessee | SMART Corridor (Phase I), I-24, From I-440 (Exit 53) to SR-10 (Exit 81 / US-231); and SR-1 from I-24 to SR-10 and various connector routes - ITS | $20,445,829.00 |
$25,557,286.00 |
|
Tennessee | I-24 SMART Corridor (Phase II), From I-440 (Exit 53) to SR-10 (Exit 81 / US-231) in Murfreesboro and SR-1 from I-24 to SR-10 in Murfreesboro - ITS | $29,548,554.52 |
$51,554,092.00 |
|
Tennessee | I-124, From the I-24 Interchange to South of the Tennessee River Bridge - Widen - Add Lanes | $131,563,917.00 |
$164,459,234.00 |
|
Tennessee | I-240, From North of SR-385 (South of Poplar Avenue) to North of Walnut Grove Road - Widen | $43,878,243.00 |
$54,981,536.00 |
|
Tennessee | I-440, From I-40 to I-24 - Reconstruction | $134,000,000.00 |
$167,500,000.00 |
|
Tennessee | I-640, Interchange at North Broadway (Phase II) in Knoxville - Reconstruction and Relocation of Ramps | $28,943,145.00 |
$32,940,400.00 |
|
Tennessee | Albert Gallatin Ave/Hatten Track Rd Ext, From SR-109 to SR-174 - New Construction | $28,435,790.00 |
$37,352,392.00 |