U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Tennessee

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Tennessee
0001150
Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way
$2,712,183.91
$3,390,229.89
Tennessee
0001150
Cannon >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way
$2,727,816.09
$3,409,770.11
Tennessee
0001150
Cannon >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Utilities
$100,688.51
$125,860.64
Tennessee
0001150
Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Utilities
$100,111.49
$125,139.36
Tennessee
0001150
Warren >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$221,760.92
$277,201.15
Tennessee
0001150
Cannon >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$79,866.34
$99,832.85
Tennessee
0001150
Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,175,521.62
$1,469,401.53
Tennessee
0001150
Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,659,917.38
$2,074,896.47
Tennessee
0001150
Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$11,066,114.18
$13,832,642.48
Tennessee
0001150
Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$7,836,808.82
$9,796,010.52
Tennessee
0001150
Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$649,275.86
$811,594.83
Tennessee
0001150
Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$442,724.14
$553,405.17
Tennessee
0001298
Roane >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$13,747,582.00
$13,747,582.00
Tennessee
0001298
Roane >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering
$1,698,939.00
$1,698,939.00
Tennessee
0001298
Roane >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities
$3,233,375.00
$3,270,599.00
Tennessee
0001298
Roane >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,136,000.00
$2,670,000.00
Tennessee
0001298
Roane >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,244,000.00
$4,055,000.00
Tennessee
0004008
Shelby >= 200,000 State DONOR STATE BONUS 4R - Added Capacity
$1,405,809.22
$1,757,262.00
Tennessee
0004008
Shelby >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$3,270,000.00
$6,540,000.00
Tennessee
0004008
Shelby >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Restoration & Rehabilitation
$30,000,000.00
$30,000,000.00
Tennessee
0004008
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$5,688,122.00
Tennessee
0004008
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$6,288,356.00
Tennessee
0004008
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$21,680,000.00
$27,100,000.00
Tennessee
0004008
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$8,155,452.00
Tennessee
0004008
Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$8,594,190.78
$10,742,739.00
Tennessee
0004008
Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$2,720,000.00
$3,400,000.00
Tennessee
0006083
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$22,133,027.00
$27,666,284.00
Tennessee
0006083
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,137,486.00
$2,671,858.00
Tennessee
0006083
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$100,000.00
$125,000.00
Tennessee
0006083
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$6,515,243.00
$10,005,296.00
Tennessee
0006083
Williamson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$1,636,000.00
$2,045,000.00
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering
$198,949.26
$248,686.57
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$17,465,486.00
$21,831,857.00
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,213,118.00
$2,766,397.00
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$563,000.00
$703,750.00
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,499,600.00
$1,874,500.00
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,181,837.00
$1,520,046.00
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity
$538,347.00
$672,934.00
Tennessee
0009066
Anderson >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity
$3,822,487.00
$4,778,109.00
Tennessee
0010024
Macon >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE 4R - No Added Capacity
$19,781,434.08
$20,174,970.37
Tennessee
0010024
Macon >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Construction Engineering
$1,821,374.53
$1,821,374.53
Tennessee
0010024
Macon >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$823,169.00
$1,028,961.25
Tennessee
0010024
Macon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$490,968.16
$613,710.20
Tennessee
0010024
Macon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$1,252,576.10
$1,565,720.13
Tennessee
0010024
Macon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$382,172.57
$477,715.71
Tennessee
0011081
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$33,401,253.00
$41,751,566.00
Tennessee
0011081
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$4,392,093.00
$5,490,117.00
Tennessee
0011081
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$19,112,000.00
$23,890,000.00
Tennessee
0011081
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$10,446,629.00
$18,559,603.00
Tennessee
0014046
Shelby >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$160,000.00
$200,000.00
Tennessee
0014046
Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$52,656,880.00
$65,821,100.00
Tennessee
0014046
Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$4,515,280.00
$5,644,100.00
Tennessee
0014046
Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering
$3,188,480.00
$3,985,600.00
Tennessee
0014046
Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$15,915,325.60
$19,894,157.00
Tennessee
0014046
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$124,800.00
$156,000.00
Tennessee
0014046
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$800,000.00
$1,000,000.00
Tennessee
0014046
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$80,000.00
$100,000.00
Tennessee
0014046
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$20,000.00
$25,000.00
Tennessee
0014062
Shelby >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$1,624,614.00
$2,030,767.00
Tennessee
0014062
Shelby >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$14,992,831.00
$18,618,048.00
Tennessee
0014062
Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$15,582,706.00
$19,478,382.00
Tennessee
0014062
Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,738,176.00
$3,422,720.00
Tennessee
0014063
Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$31,200,245.00
$39,000,306.00
Tennessee
0014063
Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$3,068,025.00
$3,835,031.00
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$1,600,349.21
$2,000,436.51
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,046,211.05
$1,307,763.81
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$12,000.00
$15,000.00
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$26,694,500.56
$33,368,125.70
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$1,723,381.67
$2,154,227.09
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Landscaping and Other Scenic Beautification
$7,553.21
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$7,505,886.30
$9,399,997.87
Tennessee
0015106
Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities
$489,702.53
$1,424,203.44
Tennessee
0015108
Hardin >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Right of Way
$697,820.42
$872,275.53
Tennessee
0015108
Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$43,811,404.00
$54,764,255.00
Tennessee
0015108
Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,539,632.00
$4,424,539.00
Tennessee
0015108
Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$160,000.00
$200,000.00
Tennessee
0015108
Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$463,216.00
$622,650.00
Tennessee
0015108
Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$3,022,400.00
$3,778,000.00
Tennessee
0015108
Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities
$1,439,280.00
$1,799,100.00
Tennessee
0019053
Haywood >= 5,000 AND < 50,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$16,000,000.00
$20,000,000.00
Tennessee
0019053
Haywood >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$3,306,906.00
$4,133,632.00
Tennessee
0019053
Haywood >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,278,035.00
$2,847,544.00
Tennessee
0019053
Haywood >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$3,244,582.00
$4,747,128.00
Tennessee
0019053
Haywood >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$50,787.00
$63,484.00
Tennessee
0019053
Haywood >= 5,000 AND < 50,000 State REPURPOSED SPECIAL 4R - Added Capacity
$69,196.58
$86,496.00
Tennessee
0026076
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$21,278,151.00
$26,597,690.00
Tennessee
0026076
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$2,470,010.00
$3,087,513.00
Tennessee
0026076
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$3,300,071.00
$4,155,558.00
Tennessee
0026076
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$97,500.00
$121,876.00
Tennessee
0028031
Cumberland >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$1,347,758.88
$1,684,698.60
Tennessee
0028031
Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$49,092,656.00
Tennessee
0028031
Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,665,794.00
Tennessee
0028031
Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$280,000.00
$350,000.00
Tennessee
0028031
Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$11,044,000.00
$13,844,587.50
Tennessee
0028031
Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$5,174,720.00
$16,323,145.00
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$27,614.84
$34,518.55
Tennessee
0028038
Fentress >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$658,877.27
$823,596.59
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$827,150.00
$1,033,937.50
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$55,800.00
$69,750.00
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,977,911.19
$2,472,388.99
Tennessee
0028038
Fentress >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$627,304.81
$784,131.01
Tennessee
0028038
Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$21,134,673.82
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$55,836,819.18
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$5,585,341.73
Tennessee
0028038
Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,499,671.27
Tennessee
0028038
Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,389,732.62
$2,987,165.78
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$1,610,267.38
$2,012,834.22
Tennessee
0028038
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$212,906.95
$282,726.75
Tennessee
0028038
Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$211,093.05
$4,125,899.25
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$23,402,742.00
$29,253,427.00
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,709,274.00
$2,136,593.00
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$23,200.00
$29,000.00
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$13,600.00
$17,000.00
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$982,709.30
$1,228,386.75
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$480,000.00
$600,000.00
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$910,216.00
$1,137,770.00
Tennessee
0029072
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities
$800.00
$1,000.00
Tennessee
0033055
Union >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$1,140,154.00
$1,425,193.00
Tennessee
0033055
Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$17,184,310.16
$41,244,340.00
Tennessee
0033055
Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$4,022,448.00
$5,028,060.00
Tennessee
0033055
Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$4,799,046.00
$5,998,807.00
Tennessee
0033055
Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$13,910,066.74
$17,601,245.00
Tennessee
0035038
Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$26,956.82
$33,696.03
Tennessee
0035038
Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,274,551.18
$6,593,188.97
Tennessee
0035038
Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$50,202,496.47
$62,753,120.59
Tennessee
0035038
Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$256,571.53
$320,714.41
Tennessee
0035038
Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$23,277.97
$29,097.46
Tennessee
0035038
Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$4,554,722.03
$5,693,402.54
Tennessee
0035038
Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$238,779.66
$298,474.58
Tennessee
0035038
Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$1,220.34
$1,525.42
Tennessee
0035038
Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$17,923.12
$23,027.22
Tennessee
0035038
Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$3,506,959.88
$4,505,662.78
Tennessee
0035064
Jefferson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering
$3,258,671.00
$3,258,671.00
Tennessee
0035064
Jefferson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP New Construction Roadway
$31,900,046.00
$31,900,046.00
Tennessee
0035064
Jefferson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities
$686,225.00
$717,016.00
Tennessee
0035075
Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$26,284,946.56
$32,856,183.20
Tennessee
0035075
Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$23,292,897.44
$29,116,121.80
Tennessee
0035075
Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,513,196.24
$3,141,495.30
Tennessee
0035075
Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,678,867.76
$3,348,584.70
Tennessee
0035075
Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$490,855.42
$629,658.85
Tennessee
0035075
Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,823,090.58
$2,298,836.15
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$29,537,877.00
$29,537,877.00
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering
$3,715,496.00
$3,715,496.00
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Utilities
$7,552,906.00
$7,617,086.00
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$184,000.00
$230,000.00
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$3,742,000.00
$4,677,500.00
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$700,000.00
$875,000.00
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering
$980,215.67
$1,225,270.00
Tennessee
0050027
Marshall >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$385,600.00
$482,000.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,994,674.00
$2,493,343.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$18,542,043.00
$23,177,553.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$738,000.00
$922,500.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$4,435,569.00
$5,755,872.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway
$5,200,000.00
$6,500,000.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,240,000.00
$1,550,000.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$4,662,400.00
$5,828,000.00
Tennessee
0054026
Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities
$699,926.00
$874,908.00
Tennessee
0055006
Coffee >= 50,000 AND < 200,000 State EQUITY BONUS - CHARGED TO LIM Preliminary Engineering
$332,000.00
$415,000.00
Tennessee
0055006
Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$10,878,833.00
$13,598,542.00
Tennessee
0055006
Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,403,528.00
$1,754,411.00
Tennessee
0055006
Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$138,710.31
$173,387.89
Tennessee
0055006
Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$899,166.00
$1,123,958.00
Tennessee
0055006
Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$6,208,555.00
$7,775,868.00
Tennessee
0055006
Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$244,000.00
$305,000.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way
$3,200,000.00
$4,000,000.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$412,894.00
$516,118.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$2,097,104.00
$2,621,380.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$1,055,000.00
$1,318,750.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Right of Way
$865,000.00
$1,081,250.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Utilities
$160,000.00
$200,000.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$4,599,198.74
$5,748,999.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$14,399,814.90
$22,165,215.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,450,405.41
$1,813,008.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$335,000.00
$418,750.00
Tennessee
0056029
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$25,000.00
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$105,792.00
$132,240.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$15,808.00
$19,760.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity
$83,200.00
$104,000.00
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity
$556,800.00
$696,000.00
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$348,000.00
$435,000.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$52,000.00
$65,000.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way
$209,144.00
$261,430.00
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way
$1,399,656.00
$1,749,570.00
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities
$1,245,840.00
$1,557,300.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities
$186,160.00
$232,700.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$1,429,883.52
$1,787,354.40
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$9,569,220.48
$11,961,525.60
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$1,216,480.11
$1,520,599.92
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$181,772.89
$227,216.08
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$354,735.55
$488,055.75
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$2,373,999.45
$3,266,219.25
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$938,208.00
$1,172,760.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$140,192.00
$175,240.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$416,000.00
$520,000.00
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,784,000.00
$3,480,000.00
Tennessee
0056039
DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$278,400.00
$348,000.00
Tennessee
0056039
Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$41,600.00
$52,000.00
Tennessee
0060013
Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$15,275,067.38
$44,483,551.00
Tennessee
0060013
Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,399,237.00
Tennessee
0060013
Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$12,436,600.00
$15,545,750.00
Tennessee
0060013
Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,763,400.00
$11,713,062.00
Tennessee
0062034
Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$4,112,114.00
$5,140,143.00
Tennessee
0062034
Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Safety
$120,000.00
$150,000.00
Tennessee
0062034
Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities
$1,617,237.00
$2,021,546.00
Tennessee
0062034
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$10,400,000.00
$37,541,350.00
Tennessee
0062034
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,845,000.00
Tennessee
0062034
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,181,861.81
$1,477,327.26
Tennessee
0062034
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$9,093,576.00
Tennessee
0062034
Knox >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$1,527,492.77
$1,909,366.70
Tennessee
0063006
Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity
$23,288,882.00
$23,288,882.00
Tennessee
0063006
Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering
$2,579,541.00
$2,579,541.00
Tennessee
0063006
Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering
$2,394,400.00
$2,993,000.00
Tennessee
0063006
Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities
$2,490,423.00
$2,506,532.00
Tennessee
0063055
Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity
$121,081.54
$121,081.54
Tennessee
0063055
Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity
$20,408,097.46
$20,408,097.46
Tennessee
0063055
Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering
$2,336,585.01
$2,336,585.01
Tennessee
0063055
Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering
$13,862.99
$13,862.99
Tennessee
0063055
Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities
$15,043.76
$17,548.39
Tennessee
0063055
Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities
$2,535,601.24
$2,957,752.61
Tennessee
0065010
Robertson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$888,259.65
$1,110,324.56
Tennessee
0065010
Robertson >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$3,232,567.00
$4,040,709.00
Tennessee
0065010
Robertson >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering
$2,263,759.00
$2,829,698.00
Tennessee
0065010
Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$18,071,682.00
$22,589,602.00
Tennessee
0065010
Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$344,000.00
$430,000.00
Tennessee
0065010
Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,159,920.00
$3,949,900.00
Tennessee
0065010
Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$4,779,648.00
$5,991,491.00
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Construction Engineering
$1,472,957.00
$1,841,196.00
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION New Construction Roadway
$9,728,384.05
$12,160,479.31
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$1,945,370.43
$2,431,713.29
Tennessee
0066044
Hamblen >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$2,524,243.57
$3,155,303.71
Tennessee
0066044
Hamblen >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Utilities
$797,377.05
$996,721.31
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Utilities
$319,771.95
$498,526.69
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$4,720.78
$5,900.98
Tennessee
0066044
Hamblen >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$1,435,118.22
$1,793,898.02
Tennessee
0066044
Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$3,740,311.34
$4,675,389.43
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$12,303.66
$15,379.57
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$4,048,427.91
$5,060,534.38
Tennessee
0066044
Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$33,235,074.09
$41,543,842.62
Tennessee
0066044
Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$282,072.13
$352,590.16
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$87,327.87
$109,159.84
Tennessee
0066044
Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$696.72
$1,220.05
Tennessee
0066044
Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$211,804.28
$370,896.95
Tennessee
0069053
Obion >= 5,000 AND < 50,000 State NAT'L COOR INF IM PROGRAM New Construction Roadway
$720,000.00
$900,000.00
Tennessee
0069053
Obion >= 5,000 AND < 50,000 State NAT'L COOR INF IM PROGRAM Right of Way
$2,446,400.00
$3,058,000.00
Tennessee
0069053
Obion >= 5,000 AND < 50,000 State NAT'L COOR INF IM PROGRAM Utilities
$575,514.00
$719,392.00
Tennessee
0069053
Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,848,971.00
$4,811,214.00
Tennessee
0069053
Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$39,222,291.00
$49,043,464.00
Tennessee
0069053
Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,322,572.00
$1,995,075.00
Tennessee
0069097
Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,666,156.00
$7,082,695.00
Tennessee
0069097
Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$56,152,852.00
$70,191,065.00
Tennessee
0069097
Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$508,704.00
$635,880.00
Tennessee
0073050
Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$890,000.00
$1,112,500.00
Tennessee
0073050
Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$55,887,609.00
$69,859,511.00
Tennessee
0073050
Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$4,805,283.00
$6,006,604.00
Tennessee
0073050
Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Utilities
$323,842.00
$1,475,225.00
Tennessee
0076065
Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$21,799,080.00
$27,248,850.00
Tennessee
0076065
Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,378,760.00
$2,973,450.00
Tennessee
0076065
Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$240,000.00
$300,000.00
Tennessee
0076065
Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,934,800.00
$3,668,500.00
Tennessee
0076065
Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$2,561,720.00
$3,202,150.00
Tennessee
0076065
Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$851,200.00
$1,064,000.00
Tennessee
0076065
Carroll >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$50,787.00
$63,483.75
Tennessee
0099048
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$18,810,224.00
$23,512,780.00
Tennessee
0099048
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,294,166.00
$2,867,707.00
Tennessee
0099048
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,898,851.00
$5,964,283.00
Tennessee
0101016
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$15,485,832.00
$19,357,290.00
Tennessee
0101016
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,880,159.00
$2,350,199.00
Tennessee
0101016
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$11,618,000.00
$14,522,500.00
Tennessee
0101016
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$5,412,092.00
$7,157,193.00
Tennessee
0101017
Cumberland >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity
$60,945.00
$76,181.00
Tennessee
0101017
Cumberland >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity
$497,940.00
$622,425.00
Tennessee
0101017
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$16,477,075.00
$20,596,344.00
Tennessee
0101017
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,061,074.00
$2,576,343.00
Tennessee
0101017
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$6,708,800.00
$8,386,000.00
Tennessee
0101017
Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$6,740,855.00
$8,909,481.00
Tennessee
0109031
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$14,274,724.00
$17,843,405.00
Tennessee
0109031
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,596,931.00
$1,996,164.00
Tennessee
0109031
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$212,000.00
$265,000.00
Tennessee
0109031
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$6,445,200.00
$8,318,889.00
Tennessee
0109031
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$7,626,579.00
$9,546,232.00
Tennessee
0109031
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$660,000.00
$825,000.00
Tennessee
0109032
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$20,952,500.00
$26,190,626.00
Tennessee
0109032
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,477,039.00
$3,096,299.00
Tennessee
0109032
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$400,000.00
$500,000.00
Tennessee
0109032
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$8,817,600.00
$11,090,787.50
Tennessee
0109032
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$6,346,846.00
$9,021,356.00
Tennessee
0109032
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$860,000.00
$1,075,000.00
Tennessee
0112006
Davidson >= 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$312,000.00
$390,000.00
Tennessee
0112006
Davidson >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$492,000.00
$615,000.00
Tennessee
0112006
Davidson >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$793,311.26
$991,640.00
Tennessee
0112006
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$18,394,936.00
$22,993,671.00
Tennessee
0112006
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,619,711.00
$3,274,640.00
Tennessee
0112006
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$904,800.00
$1,131,000.00
Tennessee
0112006
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$6,751,200.00
$8,439,000.00
Tennessee
0112006
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$8,796,462.00
$13,170,089.00
Tennessee
0115027
Knox >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$400,000.00
$500,000.00
Tennessee
0115027
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$47,944,492.00
$59,930,616.00
Tennessee
0115027
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,159,021.00
$6,448,777.00
Tennessee
0115027
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,610,000.00
$2,012,500.00
Tennessee
0115027
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$432,000.00
$540,000.00
Tennessee
0115027
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,828,800.00
$2,286,000.00
Tennessee
0115027
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$5,656,875.00
$7,159,152.00
Tennessee
0115029
Knox >= 200,000 State EXTENSION OF ALLOC PROGRAMS Preliminary Engineering
$323,500.00
$404,375.00
Tennessee
0115029
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$93,212,800.00
$116,516,000.00
Tennessee
0115029
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$10,184,000.00
$12,730,000.00
Tennessee
0115029
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,304,000.00
$4,130,000.00
Tennessee
0115029
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$10,240,000.00
$12,800,000.00
Tennessee
0115029
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$9,544,744.00
$12,095,100.00
Tennessee
0115029
Knox >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Utilities
$609,451.00
$761,814.00
Tennessee
0115029
Knox >= 200,000 State REPURPOSED SPECIAL Right of Way
$3,300,000.00
$4,125,000.00
Tennessee
0115029
Knox >= 200,000 State REPURPOSED SPECIAL Utilities
$979,399.00
$1,224,249.00
Tennessee
0115029
Knox >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$525,000.00
$656,250.00
Tennessee
0115054
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$67,120,000.00
$83,900,000.00
Tennessee
0115054
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,675,535.00
$7,094,419.00
Tennessee
0115054
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,025,365.00
$5,666,149.00
Tennessee
0115054
Knox >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$525,000.00
$656,250.00
Tennessee
0115057
Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$26,433,656.00
$33,042,070.00
Tennessee
0115057
Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,143,736.00
$3,929,670.00
Tennessee
0115057
Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$9,563,200.00
$11,954,000.00
Tennessee
0115057
Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$14,549,512.00
$18,691,520.00
Tennessee
0115057
Blount >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$365,669.00
$457,087.00
Tennessee
0115057
Blount >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$3,023,172.00
$3,778,965.00
Tennessee
0115065
Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$16,414,000.00
Tennessee
0115065
Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$145,969,000.00
Tennessee
0115065
Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$18,169,450.19
Tennessee
0128029
Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$23,747,040.00
$29,683,800.00
Tennessee
0128029
Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$2,374,720.00
$2,968,400.00
Tennessee
0128029
Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering
$524,000.00
$655,000.00
Tennessee
0128029
Hardin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$160,000.00
$200,000.00
Tennessee
0136008
Putnam >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$21,436,413.27
$26,795,518.00
Tennessee
0136008
Putnam >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering
$3,168,212.00
$3,960,266.00
Tennessee
0136008
Putnam >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Right of Way
$8,146,390.00
$10,182,988.00
Tennessee
0136008
Putnam >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Utilities
$7,369,806.00
$12,807,139.00
Tennessee
0136008
Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,242,000.00
$2,802,500.00
Tennessee
0136008
Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$624,409.00
$780,512.00
Tennessee
0136008
Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$5,065,280.00
$6,331,600.00
Tennessee
0141016
Wilson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$16,500,828.00
$20,626,036.00
Tennessee
0141016
Wilson >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$467,580.35
$584,475.00
Tennessee
0141016
Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,884,296.00
$4,855,370.00
Tennessee
0141016
Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,591,158.00
$3,238,947.00
Tennessee
0141016
Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,071,320.00
$3,061,150.00
Tennessee
0141016
Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$6,929,795.00
$10,298,921.00
Tennessee
0149012
Montgomery >= 200,000 State EQUITY BONUS SP LIMITATION Utilities
$3,073,392.00
$3,841,740.00
Tennessee
0149012
Montgomery >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$2,296,000.00
$2,870,000.00
Tennessee
0149012
Montgomery >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities
$151,728.00
$189,660.00
Tennessee
0149012
Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$11,249,303.55
$11,249,303.55
Tennessee
0149012
Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering
$6,517,142.00
$6,517,142.00
Tennessee
0149012
Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities
$3,805,336.00
$4,078,374.00
Tennessee
0149012
Montgomery >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$4,056,693.00
$5,070,867.00
Tennessee
0149012
Montgomery >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$8,389,541.00
$10,486,927.00
Tennessee
0149012
Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$12,335,746.11
$41,849,898.00
Tennessee
0149012
Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$57,001.00
Tennessee
0243090
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$1,718,303.00
$1,909,226.00
Tennessee
0243090
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$21,721,758.00
$24,135,287.00
Tennessee
0243090
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,879,531.00
$3,199,479.00
Tennessee
0243090
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,150,000.00
$3,500,000.00
Tennessee
0243090
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$315,000.00
$350,000.00
Tennessee
0243090
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,434,523.00
$2,705,026.00
Tennessee
0243090
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$4,621,613.00
$5,960,277.00
Tennessee
0243097
Hamilton >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$287,489.64
$319,433.44
Tennessee
0243097
Hamilton >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering
$95,681.25
$106,313.00
Tennessee
0243097
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$29,625,431.00
$32,917,146.00
Tennessee
0243097
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,962,543.00
$3,291,716.00
Tennessee
0243097
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,061,000.00
$2,290,000.00
Tennessee
0243097
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$180,000.00
$200,000.00
Tennessee
0243097
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$900,000.00
$1,000,000.00
Tennessee
0247009
Williamson >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$24,953,207.27
$24,953,207.27
Tennessee
0247009
Williamson >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering
$3,224,152.22
$3,224,152.22
Tennessee
0247009
Williamson >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities
$732,356.01
$2,940,814.92
Tennessee
0247009
Williamson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$204,584.90
$255,731.12
Tennessee
0247009
Williamson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,667,693.92
$2,084,617.38
Tennessee
0247009
Williamson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$1,528,995.84
$1,911,244.80
Tennessee
0247009
Williamson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$402,604.37
$2,512,659.77
Tennessee
0249079
Davidson >= 200,000 State DONOR STATE BONUS 4R - No Added Capacity
$646,878.02
$718,753.36
Tennessee
0249079
Davidson >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$2,972,855.00
$3,303,172.22
Tennessee
0249079
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$20,525,135.00
$25,406,142.32
Tennessee
0249079
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,604,865.00
$2,894,294.00
Tennessee
0249079
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$4,876,631.00
$5,418,479.00
Tennessee
0266013
Rutherford >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$3,100,000.00
$3,875,000.00
Tennessee
0266013
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$20,400,000.00
$40,938,635.00
Tennessee
0266013
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$5,921,754.00
Tennessee
0266013
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,436,000.00
$1,795,000.00
Tennessee
0266013
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,270,000.00
$2,837,500.00
Tennessee
0266013
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,472,704.00
$18,744,780.00
Tennessee
0269020
Shelby >= 200,000 State GRANTS SUP PLAN SECTION 117 New Construction Roadway
$491,964.00
$491,964.00
Tennessee
0269020
Shelby >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$1,836,590.00
$2,295,738.00
Tennessee
0269020
Fayette >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$431,158.00
$538,948.00
Tennessee
0269020
Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$800,000.00
$1,000,000.00
Tennessee
0269020
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$1,916,400.00
$2,395,500.00
Tennessee
0269020
Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$3,402,641.00
$4,253,302.00
Tennessee
0269020
Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$828,738.00
$1,035,922.00
Tennessee
0269020
Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway
$5,524,917.00
$6,906,146.00
Tennessee
0269020
Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway
$20,028,742.07
$25,041,734.59
Tennessee
0317017
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$62,606,769.00
$78,258,462.00
Tennessee
0317017
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$7,448,072.00
$9,310,091.00
Tennessee
0317017
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$6,384,800.00
$7,981,000.00
Tennessee
0317017
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$16,483,472.00
$22,450,444.00
Tennessee
0374010
Montgomery >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$406,300.00
$507,875.00
Tennessee
0374010
Montgomery >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$131,562.80
$164,453.50
Tennessee
0374010
Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$15,371,592.25
$20,714,490.06
Tennessee
0374010
Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,722,049.00
$2,152,561.00
Tennessee
0374010
Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$948,449.92
$1,185,562.39
Tennessee
0374010
Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$316,215.71
$395,269.63
Tennessee
0374010
Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$4,299,247.60
$6,797,304.83
Tennessee
0396004
Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,800,000.00
$3,500,000.00
Tennessee
0396004
Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$13,707,686.00
$17,134,608.00
Tennessee
0396004
Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,600,000.00
$2,000,000.00
Tennessee
0396004
Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing
$40,000.00
$50,000.00
Tennessee
0396004
Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$7,160,000.00
$8,950,000.00
Tennessee
0396004
Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$800,000.00
$1,000,000.00
Tennessee
0397010
Williamson >= 200,000 State EQUITY BONUS EXEMPT LIM Right of Way
$105,702.64
$132,129.00
Tennessee
0397010
Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS New Construction Roadway
$320,000.00
$400,000.00
Tennessee
0397010
Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS Right of Way
$6,838,686.00
$8,548,357.00
Tennessee
0397010
Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS Utilities
$402,400.00
$503,000.00
Tennessee
0397010
Williamson >= 200,000 State GRANTS SUP PLAN SECTION 117 Right of Way
$983,928.00
$983,928.00
Tennessee
0397010
Williamson >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$2,051,772.00
$2,564,715.00
Tennessee
0397010
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,609,808.00
$4,512,261.00
Tennessee
0397010
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$31,599,158.00
$40,748,948.00
Tennessee
0397010
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$2,156,490.00
$5,432,129.00
Tennessee
0397010
Williamson >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway
$650,080.00
$812,600.00
Tennessee
0397010
Williamson >= 200,000 State REPURPOSED SPECIAL New Construction Roadway
$103,140.92
$128,926.00
Tennessee
0401348
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$56,644,708.65
$70,805,885.81
Tennessee
0401348
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$4,816,612.00
$6,020,765.00
Tennessee
0401348
Madison >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$1,700,000.00
$2,125,000.00
Tennessee
0401358
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$30,705,264.00
$38,381,580.00
Tennessee
0401358
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,070,528.00
$3,838,160.00
Tennessee
0402337
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$52,800,000.00
$91,736,000.00
Tennessee
0402337
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$8,799,062.00
Tennessee
0402337
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,118,400.00
$2,648,000.00
Tennessee
0402337
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$279,200.00
$349,000.00
Tennessee
0402337
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$20,000.00
$25,000.00
Tennessee
0402337
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$800.00
$1,000.00
Tennessee
0402337
Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,048,000.00
$1,310,000.00
Tennessee
0405140
Wilson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Added Capacity
$40,042,890.00
$44,492,100.00
Tennessee
0405140
Wilson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Construction Engineering
$4,195,259.00
$4,661,399.00
Tennessee
0405140
Wilson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$6,390,000.00
$7,100,000.00
Tennessee
0405140
Wilson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Utilities
$900,001.00
$1,000,001.00
Tennessee
0405142
Wilson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$600,000.00
$750,000.00
Tennessee
0405142
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$30,426,408.00
$38,033,009.00
Tennessee
0405142
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,069,801.00
$3,837,252.00
Tennessee
0405142
Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$949,600.00
$1,187,000.00
Tennessee
0405142
Wilson >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$104,826.00
$131,033.00
Tennessee
0405142
Wilson >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$17,181.31
$21,477.00
Tennessee
0405146
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$61,057,410.00
$79,649,099.00
Tennessee
0405146
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$6,493,854.00
$8,117,318.00
Tennessee
0405146
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$4,000,000.00
$5,000,000.00
Tennessee
0405146
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,019,604.00
$2,524,505.00
Tennessee
0405146
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,958,683.00
$2,580,319.00
Tennessee
0406173
Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF 4R - No Added Capacity
$32,116,631.14
$35,685,145.72
Tennessee
0406173
Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Construction Engineering
$3,654,000.00
$4,060,000.00
Tennessee
0406173
Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Preliminary Engineering
$1,902,332.00
$2,111,992.00
Tennessee
0406173
Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Safety
$96,600.00
$105,000.00
Tennessee
0406173
Roane >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$333,000.00
$370,000.00
Tennessee
0406173
Roane >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$4,907,894.28
Tennessee
0459010
Henderson >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway
$237,313.19
$296,642.00
Tennessee
0459010
Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,895,896.00
$3,619,870.00
Tennessee
0459010
Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$29,653,508.00
$37,066,885.00
Tennessee
0459010
Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$2,428,128.00
$3,035,160.00
Tennessee
0460010
Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,377,512.00
$2,971,890.00
Tennessee
0460010
Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$21,922,504.00
$27,403,130.00
Tennessee
0460010
Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,852,608.00
$2,315,760.00
Tennessee
0551119
Shelby >= 200,000 State INTERSTATE 4R Preliminary Engineering
$66,681.75
$74,091.00
Tennessee
0551119
Shelby >= 200,000 State INTERSTATE MAINT DISC Preliminary Engineering
$940,419.00
$1,044,910.00
Tennessee
0551119
Shelby >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$3,141,394.63
$3,490,440.00
Tennessee
0551119
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$87,217,470.00
$96,908,300.00
Tennessee
0551119
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$8,870,238.00
$9,855,820.00
Tennessee
0551119
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,625,000.00
$2,916,667.00
Tennessee
0551119
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,386,632.00
$2,651,813.00
Tennessee
0551119
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$2,449,068.00
$2,733,137.00
Tennessee
0551119
Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$386,013.81
$428,903.00
Tennessee
0551135
Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$3,724,034.40
$4,655,043.00
Tennessee
0551135
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$21,583,552.00
$49,244,157.00
Tennessee
0551135
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,845,520.00
$3,556,900.00
Tennessee
0551135
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,188,880.00
$2,736,100.00
Tennessee
0551135
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$339,648.00
$424,560.00
Tennessee
0551135
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$318,400.00
$398,000.00
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$4,197,308.00
$4,197,308.00
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Added Capacity
$1,222,037.67
$1,357,819.63
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$921,076.43
$1,023,419.22
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$21,684,179.07
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,793,143.00
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$512,640.00
$569,600.00
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,367,787.00
$1,519,763.00
Tennessee
0652096
Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,762,653.00
$2,650,624.00
Tennessee
0652113
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$4,736,081.00
$5,920,101.00
Tennessee
0652113
Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,192,016.00
$2,740,020.00
Tennessee
0652113
Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity
$16,780,000.00
$33,082,597.00
Tennessee
0652113
Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering
$2,100,000.00
$3,544,763.00
Tennessee
0652113
Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Preliminary Engineering
$4,120,000.00
$9,212,519.00
Tennessee
0652113
Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way
$1,000,000.00
$2,000,000.00
Tennessee
0652113
Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Utilities
$1,000,000.00
$1,300,000.00
Tennessee
0653128
Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$111,423,412.00
$139,279,265.00
Tennessee
0653128
Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$11,159,717.00
$13,949,647.00
Tennessee
0653128
Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$4,920,000.00
$6,150,000.00
Tennessee
0653128
Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$43,440.00
$217,204.00
Tennessee
0751131
Hamilton >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$64,178,842.00
$71,309,825.00
Tennessee
0751131
Hamilton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$3,000,000.00
$3,333,334.00
Tennessee
0751131
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$45,846,158.00
$50,940,175.00
Tennessee
0751131
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$12,600,000.00
$14,000,000.00
Tennessee
0751131
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$7,200,000.00
$8,000,000.00
Tennessee
0751131
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$18,610.00
$20,678.00
Tennessee
0751131
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$4,032,648.00
$4,480,720.00
Tennessee
0751144
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$38,614,546.00
$70,949,479.00
Tennessee
0751144
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$6,385,453.00
$7,094,948.00
Tennessee
0751144
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$4,500,000.00
$5,000,000.00
Tennessee
0751144
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,179,001.00
$1,310,001.00
Tennessee
0751144
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,350,000.00
$1,500,000.00
Tennessee
0751155
Hamilton >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$52,375,726.64
$58,195,252.99
Tennessee
0751155
Hamilton >= 200,000 State FAST ACT NATIONAL FREIGHT Preliminary Engineering
$5,508,000.00
$6,120,000.00
Tennessee
0751155
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$55,229,143.00
$61,365,715.00
Tennessee
0751155
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,720,000.00
$7,150,000.00
Tennessee
0751155
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,144,000.00
$2,680,000.00
Tennessee
0751155
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$800,000.00
$1,000,000.00
Tennessee
0751155
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$75,000.00
$100,000.00
Tennessee
0751155
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,100,000.00
$1,500,000.00
Tennessee
0983028
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,413,722.00
$1,767,153.00
Tennessee
0983028
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$18,137,218.00
$22,671,523.00
Tennessee
0983028
Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering
$81,354.00
$101,692.00
Tennessee
0983028
Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Traffic Management/Engineering - HOV
$813,535.00
$1,016,918.00
Tennessee
0983030
Rutherford >= 200,000 State CONGESTION AIR QUALITY Traffic Management/Engineering - HOV
$9,092,526.15
$11,365,660.77
Tennessee
0983030
Davidson >= 200,000 State CONGESTION AIR QUALITY Traffic Management/Engineering - HOV
$5,581,836.29
$6,977,297.23
Tennessee
0983030
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,538,502.70
Tennessee
0983030
Rutherford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,506,142.30
Tennessee
0983030
Rutherford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$7,283,130.66
$13,695,762.88
Tennessee
0983030
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$4,471,061.42
$8,407,730.12
Tennessee
0983030
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$109,376.41
Tennessee
0983030
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$178,168.59
Tennessee
0983030
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,933,213.91
$2,416,517.39
Tennessee
0983030
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,186,786.09
$1,483,482.61
Tennessee
0983030
Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$1,093,764.50
Tennessee
0983030
Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$1,781,686.50
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$107,566,095.00
$134,457,619.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$7,522,220.00
$9,402,775.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$144,000.00
$180,000.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$308,000.00
$385,000.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$396,424.00
$499,868.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$2,500,000.00
$3,125,000.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$6,460,538.00
$8,075,672.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$4,760,000.00
$5,950,000.00
Tennessee
1243081
Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities
$1,906,640.00
$2,383,300.00
Tennessee
2401290
Shelby >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity
$1,439,842.00
$1,799,802.00
Tennessee
2401290
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$6,521,500.00
$8,151,875.00
Tennessee
2401290
Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$31,044,283.00
$38,939,086.00
Tennessee
2401290
Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$4,872,618.00
$6,090,773.00
Tennessee
4404084
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$105,800,000.00
$132,250,000.00
Tennessee
4404084
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$6,400,000.00
$8,000,000.00
Tennessee
4404084
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$11,080,000.00
$13,850,000.00
Tennessee
4404084
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$160,000.00
$200,000.00
Tennessee
4404084
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$10,541,200.00
$13,176,500.00
Tennessee
4404084
Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$18,800.00
$23,500.00
Tennessee
6407161
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$19,589,490.00
$21,766,100.00
Tennessee
6407161
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,912,940.00
$3,236,600.00
Tennessee
6407161
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$483,200.00
$604,000.00
Tennessee
6407161
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,620,000.00
$3,275,000.00
Tennessee
6407161
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$8,000.00
$10,000.00
Tennessee
6407161
Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$2,235,515.00
$2,681,200.00
Tennessee
6407161
Knox >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,094,000.00
$1,367,500.00
Tennessee
8300070
Sumner >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$3,409,605.00
$4,262,006.00
Tennessee
8300070
Sumner >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$20,962,727.00
$28,011,063.00
Tennessee
8300070
Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$700,098.00
$875,123.00
Tennessee
8300070
Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing
$180,000.00
$225,000.00
Tennessee
8300070
Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,203,360.00
$2,754,200.00
Tennessee
8300070
Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$980,000.00
$1,225,000.00