RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $2,712,183.91 |
$3,390,229.89 |
|
Tennessee | Cannon | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $2,727,816.09 |
$3,409,770.11 |
|
Tennessee | Cannon | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Utilities | $100,688.51 |
$125,860.64 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Utilities | $100,111.49 |
$125,139.36 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $221,760.92 |
$277,201.15 |
|
Tennessee | Cannon | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $79,866.34 |
$99,832.85 |
|
Tennessee | Cannon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,175,521.62 |
$1,469,401.53 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,659,917.38 |
$2,074,896.47 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $11,066,114.18 |
$13,832,642.48 |
|
Tennessee | Cannon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,836,808.82 |
$9,796,010.52 |
|
Tennessee | Cannon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $649,275.86 |
$811,594.83 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $442,724.14 |
$553,405.17 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $13,747,582.00 |
$13,747,582.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $1,698,939.00 |
$1,698,939.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $3,233,375.00 |
$3,270,599.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,136,000.00 |
$2,670,000.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,244,000.00 |
$4,055,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | $1,405,809.22 |
$1,757,262.00 |
|
Tennessee | Shelby | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $3,270,000.00 |
$6,540,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Restoration & Rehabilitation | $30,000,000.00 |
$30,000,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,688,122.00 |
||
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,288,356.00 |
||
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $21,680,000.00 |
$27,100,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,155,452.00 |
||
Tennessee | Shelby | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,594,190.78 |
$10,742,739.00 |
|
Tennessee | Shelby | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,720,000.00 |
$3,400,000.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $22,133,027.00 |
$27,666,284.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,137,486.00 |
$2,671,858.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $100,000.00 |
$125,000.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,515,243.00 |
$10,005,296.00 |
|
Tennessee | Williamson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,636,000.00 |
$2,045,000.00 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $198,949.26 |
$248,686.57 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $17,465,486.00 |
$21,831,857.00 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,213,118.00 |
$2,766,397.00 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $563,000.00 |
$703,750.00 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,499,600.00 |
$1,874,500.00 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,181,837.00 |
$1,520,046.00 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $538,347.00 |
$672,934.00 |
|
Tennessee | Anderson | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | $3,822,487.00 |
$4,778,109.00 |
|
Tennessee | Macon | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $19,781,434.08 |
$20,174,970.37 |
|
Tennessee | Macon | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,821,374.53 |
$1,821,374.53 |
|
Tennessee | Macon | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $823,169.00 |
$1,028,961.25 |
|
Tennessee | Macon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $490,968.16 |
$613,710.20 |
|
Tennessee | Macon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,252,576.10 |
$1,565,720.13 |
|
Tennessee | Macon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $382,172.57 |
$477,715.71 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $33,401,253.00 |
$41,751,566.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,392,093.00 |
$5,490,117.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $19,112,000.00 |
$23,890,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $10,446,629.00 |
$18,559,603.00 |
|
Tennessee | Shelby | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $160,000.00 |
$200,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $52,656,880.00 |
$65,821,100.00 |
|
Tennessee | Shelby | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,515,280.00 |
$5,644,100.00 |
|
Tennessee | Shelby | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $3,188,480.00 |
$3,985,600.00 |
|
Tennessee | Shelby | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $15,915,325.60 |
$19,894,157.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $124,800.00 |
$156,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $800,000.00 |
$1,000,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $80,000.00 |
$100,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $20,000.00 |
$25,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $1,624,614.00 |
$2,030,767.00 |
|
Tennessee | Shelby | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $14,992,831.00 |
$18,618,048.00 |
|
Tennessee | Shelby | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,582,706.00 |
$19,478,382.00 |
|
Tennessee | Shelby | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,738,176.00 |
$3,422,720.00 |
|
Tennessee | Shelby | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $31,200,245.00 |
$39,000,306.00 |
|
Tennessee | Shelby | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,068,025.00 |
$3,835,031.00 |
|
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,600,349.21 |
$2,000,436.51 |
|
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,046,211.05 |
$1,307,763.81 |
|
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $12,000.00 |
$15,000.00 |
|
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $26,694,500.56 |
$33,368,125.70 |
|
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,723,381.67 |
$2,154,227.09 |
|
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Landscaping and Other Scenic Beautification | $7,553.21 |
||
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $7,505,886.30 |
$9,399,997.87 |
|
Tennessee | Wayne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $489,702.53 |
$1,424,203.44 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | $697,820.42 |
$872,275.53 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,811,404.00 |
$54,764,255.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,539,632.00 |
$4,424,539.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $160,000.00 |
$200,000.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $463,216.00 |
$622,650.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $3,022,400.00 |
$3,778,000.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $1,439,280.00 |
$1,799,100.00 |
|
Tennessee | Haywood | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $16,000,000.00 |
$20,000,000.00 |
|
Tennessee | Haywood | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,306,906.00 |
$4,133,632.00 |
|
Tennessee | Haywood | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,278,035.00 |
$2,847,544.00 |
|
Tennessee | Haywood | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,244,582.00 |
$4,747,128.00 |
|
Tennessee | Haywood | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $50,787.00 |
$63,484.00 |
|
Tennessee | Haywood | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $69,196.58 |
$86,496.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $21,278,151.00 |
$26,597,690.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,470,010.00 |
$3,087,513.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $3,300,071.00 |
$4,155,558.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $97,500.00 |
$121,876.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,347,758.88 |
$1,684,698.60 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $49,092,656.00 |
||
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,665,794.00 |
||
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $280,000.00 |
$350,000.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,044,000.00 |
$13,844,587.50 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,174,720.00 |
$16,323,145.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $27,614.84 |
$34,518.55 |
|
Tennessee | Fentress | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $658,877.27 |
$823,596.59 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $827,150.00 |
$1,033,937.50 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $55,800.00 |
$69,750.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,977,911.19 |
$2,472,388.99 |
|
Tennessee | Fentress | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $627,304.81 |
$784,131.01 |
|
Tennessee | Fentress | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,134,673.82 |
||
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $55,836,819.18 |
||
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,585,341.73 |
||
Tennessee | Fentress | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,499,671.27 |
||
Tennessee | Fentress | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,389,732.62 |
$2,987,165.78 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,610,267.38 |
$2,012,834.22 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $212,906.95 |
$282,726.75 |
|
Tennessee | Fentress | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $211,093.05 |
$4,125,899.25 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,402,742.00 |
$29,253,427.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,709,274.00 |
$2,136,593.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $23,200.00 |
$29,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $13,600.00 |
$17,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $982,709.30 |
$1,228,386.75 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $480,000.00 |
$600,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $910,216.00 |
$1,137,770.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $800.00 |
$1,000.00 |
|
Tennessee | Union | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,140,154.00 |
$1,425,193.00 |
|
Tennessee | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,184,310.16 |
$41,244,340.00 |
|
Tennessee | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,022,448.00 |
$5,028,060.00 |
|
Tennessee | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,799,046.00 |
$5,998,807.00 |
|
Tennessee | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $13,910,066.74 |
$17,601,245.00 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $26,956.82 |
$33,696.03 |
|
Tennessee | Cocke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,274,551.18 |
$6,593,188.97 |
|
Tennessee | Cocke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $50,202,496.47 |
$62,753,120.59 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $256,571.53 |
$320,714.41 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $23,277.97 |
$29,097.46 |
|
Tennessee | Cocke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,554,722.03 |
$5,693,402.54 |
|
Tennessee | Cocke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $238,779.66 |
$298,474.58 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,220.34 |
$1,525.42 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $17,923.12 |
$23,027.22 |
|
Tennessee | Cocke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,506,959.88 |
$4,505,662.78 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $3,258,671.00 |
$3,258,671.00 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $31,900,046.00 |
$31,900,046.00 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $686,225.00 |
$717,016.00 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $26,284,946.56 |
$32,856,183.20 |
|
Tennessee | Sevier | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $23,292,897.44 |
$29,116,121.80 |
|
Tennessee | Sevier | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,513,196.24 |
$3,141,495.30 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,678,867.76 |
$3,348,584.70 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $490,855.42 |
$629,658.85 |
|
Tennessee | Sevier | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,823,090.58 |
$2,298,836.15 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $29,537,877.00 |
$29,537,877.00 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $3,715,496.00 |
$3,715,496.00 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $7,552,906.00 |
$7,617,086.00 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $184,000.00 |
$230,000.00 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,742,000.00 |
$4,677,500.00 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $700,000.00 |
$875,000.00 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $980,215.67 |
$1,225,270.00 |
|
Tennessee | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $385,600.00 |
$482,000.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,994,674.00 |
$2,493,343.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $18,542,043.00 |
$23,177,553.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $738,000.00 |
$922,500.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,435,569.00 |
$5,755,872.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $5,200,000.00 |
$6,500,000.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,240,000.00 |
$1,550,000.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $4,662,400.00 |
$5,828,000.00 |
|
Tennessee | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $699,926.00 |
$874,908.00 |
|
Tennessee | Coffee | >= 50,000 AND < 200,000 | State | EQUITY BONUS - CHARGED TO LIM | Preliminary Engineering | $332,000.00 |
$415,000.00 |
|
Tennessee | Coffee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,878,833.00 |
$13,598,542.00 |
|
Tennessee | Coffee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,403,528.00 |
$1,754,411.00 |
|
Tennessee | Coffee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $138,710.31 |
$173,387.89 |
|
Tennessee | Coffee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $899,166.00 |
$1,123,958.00 |
|
Tennessee | Coffee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,208,555.00 |
$7,775,868.00 |
|
Tennessee | Coffee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $244,000.00 |
$305,000.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $3,200,000.00 |
$4,000,000.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $412,894.00 |
$516,118.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,097,104.00 |
$2,621,380.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $1,055,000.00 |
$1,318,750.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | $865,000.00 |
$1,081,250.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Utilities | $160,000.00 |
$200,000.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $4,599,198.74 |
$5,748,999.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,399,814.90 |
$22,165,215.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,450,405.41 |
$1,813,008.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $335,000.00 |
$418,750.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $25,000.00 |
||
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $105,792.00 |
$132,240.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $15,808.00 |
$19,760.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $83,200.00 |
$104,000.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $556,800.00 |
$696,000.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $348,000.00 |
$435,000.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $52,000.00 |
$65,000.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $209,144.00 |
$261,430.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $1,399,656.00 |
$1,749,570.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $1,245,840.00 |
$1,557,300.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $186,160.00 |
$232,700.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $1,429,883.52 |
$1,787,354.40 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $9,569,220.48 |
$11,961,525.60 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,216,480.11 |
$1,520,599.92 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $181,772.89 |
$227,216.08 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $354,735.55 |
$488,055.75 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $2,373,999.45 |
$3,266,219.25 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $938,208.00 |
$1,172,760.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $140,192.00 |
$175,240.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $416,000.00 |
$520,000.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,784,000.00 |
$3,480,000.00 |
|
Tennessee | DeKalb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $278,400.00 |
$348,000.00 |
|
Tennessee | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,600.00 |
$52,000.00 |
|
Tennessee | Bradley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,275,067.38 |
$44,483,551.00 |
|
Tennessee | Bradley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,399,237.00 |
||
Tennessee | Bradley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $12,436,600.00 |
$15,545,750.00 |
|
Tennessee | Bradley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,763,400.00 |
$11,713,062.00 |
|
Tennessee | Knox | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $4,112,114.00 |
$5,140,143.00 |
|
Tennessee | Knox | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Safety | $120,000.00 |
$150,000.00 |
|
Tennessee | Knox | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $1,617,237.00 |
$2,021,546.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,400,000.00 |
$37,541,350.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,845,000.00 |
||
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,181,861.81 |
$1,477,327.26 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,093,576.00 |
||
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,527,492.77 |
$1,909,366.70 |
|
Tennessee | Claiborne | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | 4R - Added Capacity | $23,288,882.00 |
$23,288,882.00 |
|
Tennessee | Claiborne | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Construction Engineering | $2,579,541.00 |
$2,579,541.00 |
|
Tennessee | Claiborne | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Preliminary Engineering | $2,394,400.00 |
$2,993,000.00 |
|
Tennessee | Claiborne | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Utilities | $2,490,423.00 |
$2,506,532.00 |
|
Tennessee | Claiborne | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | 4R - Added Capacity | $121,081.54 |
$121,081.54 |
|
Tennessee | Campbell | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | 4R - Added Capacity | $20,408,097.46 |
$20,408,097.46 |
|
Tennessee | Campbell | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Construction Engineering | $2,336,585.01 |
$2,336,585.01 |
|
Tennessee | Claiborne | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Construction Engineering | $13,862.99 |
$13,862.99 |
|
Tennessee | Claiborne | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Utilities | $15,043.76 |
$17,548.39 |
|
Tennessee | Campbell | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Utilities | $2,535,601.24 |
$2,957,752.61 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $888,259.65 |
$1,110,324.56 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $3,232,567.00 |
$4,040,709.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $2,263,759.00 |
$2,829,698.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,071,682.00 |
$22,589,602.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $344,000.00 |
$430,000.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,159,920.00 |
$3,949,900.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,779,648.00 |
$5,991,491.00 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $1,472,957.00 |
$1,841,196.00 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | $9,728,384.05 |
$12,160,479.31 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $1,945,370.43 |
$2,431,713.29 |
|
Tennessee | Hamblen | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $2,524,243.57 |
$3,155,303.71 |
|
Tennessee | Hamblen | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $797,377.05 |
$996,721.31 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $319,771.95 |
$498,526.69 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $4,720.78 |
$5,900.98 |
|
Tennessee | Hamblen | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,435,118.22 |
$1,793,898.02 |
|
Tennessee | Hamblen | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,740,311.34 |
$4,675,389.43 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $12,303.66 |
$15,379.57 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,048,427.91 |
$5,060,534.38 |
|
Tennessee | Hamblen | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $33,235,074.09 |
$41,543,842.62 |
|
Tennessee | Hamblen | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $282,072.13 |
$352,590.16 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $87,327.87 |
$109,159.84 |
|
Tennessee | Jefferson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $696.72 |
$1,220.05 |
|
Tennessee | Hamblen | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $211,804.28 |
$370,896.95 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $720,000.00 |
$900,000.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NAT'L COOR INF IM PROGRAM | Right of Way | $2,446,400.00 |
$3,058,000.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NAT'L COOR INF IM PROGRAM | Utilities | $575,514.00 |
$719,392.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,848,971.00 |
$4,811,214.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $39,222,291.00 |
$49,043,464.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,322,572.00 |
$1,995,075.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,666,156.00 |
$7,082,695.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $56,152,852.00 |
$70,191,065.00 |
|
Tennessee | Obion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $508,704.00 |
$635,880.00 |
|
Tennessee | Loudon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $890,000.00 |
$1,112,500.00 |
|
Tennessee | Loudon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $55,887,609.00 |
$69,859,511.00 |
|
Tennessee | Loudon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,805,283.00 |
$6,006,604.00 |
|
Tennessee | Loudon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $323,842.00 |
$1,475,225.00 |
|
Tennessee | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,799,080.00 |
$27,248,850.00 |
|
Tennessee | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,378,760.00 |
$2,973,450.00 |
|
Tennessee | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $240,000.00 |
$300,000.00 |
|
Tennessee | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,934,800.00 |
$3,668,500.00 |
|
Tennessee | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,561,720.00 |
$3,202,150.00 |
|
Tennessee | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $851,200.00 |
$1,064,000.00 |
|
Tennessee | Carroll | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $50,787.00 |
$63,483.75 |
|
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,810,224.00 |
$23,512,780.00 |
|
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,294,166.00 |
$2,867,707.00 |
|
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,898,851.00 |
$5,964,283.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,485,832.00 |
$19,357,290.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,880,159.00 |
$2,350,199.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $11,618,000.00 |
$14,522,500.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $5,412,092.00 |
$7,157,193.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $60,945.00 |
$76,181.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | $497,940.00 |
$622,425.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $16,477,075.00 |
$20,596,344.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,061,074.00 |
$2,576,343.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,708,800.00 |
$8,386,000.00 |
|
Tennessee | Cumberland | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $6,740,855.00 |
$8,909,481.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,274,724.00 |
$17,843,405.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,596,931.00 |
$1,996,164.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $212,000.00 |
$265,000.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,445,200.00 |
$8,318,889.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,626,579.00 |
$9,546,232.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $660,000.00 |
$825,000.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,952,500.00 |
$26,190,626.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,477,039.00 |
$3,096,299.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $400,000.00 |
$500,000.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $8,817,600.00 |
$11,090,787.50 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,346,846.00 |
$9,021,356.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $860,000.00 |
$1,075,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $312,000.00 |
$390,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $492,000.00 |
$615,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $793,311.26 |
$991,640.00 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,394,936.00 |
$22,993,671.00 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,619,711.00 |
$3,274,640.00 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $904,800.00 |
$1,131,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,751,200.00 |
$8,439,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $8,796,462.00 |
$13,170,089.00 |
|
Tennessee | Knox | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $400,000.00 |
$500,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,944,492.00 |
$59,930,616.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,159,021.00 |
$6,448,777.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,610,000.00 |
$2,012,500.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $432,000.00 |
$540,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,828,800.00 |
$2,286,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,656,875.00 |
$7,159,152.00 |
|
Tennessee | Knox | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Preliminary Engineering | $323,500.00 |
$404,375.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $93,212,800.00 |
$116,516,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,184,000.00 |
$12,730,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,304,000.00 |
$4,130,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $10,240,000.00 |
$12,800,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,544,744.00 |
$12,095,100.00 |
|
Tennessee | Knox | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Utilities | $609,451.00 |
$761,814.00 |
|
Tennessee | Knox | >= 200,000 | State | REPURPOSED SPECIAL | Right of Way | $3,300,000.00 |
$4,125,000.00 |
|
Tennessee | Knox | >= 200,000 | State | REPURPOSED SPECIAL | Utilities | $979,399.00 |
$1,224,249.00 |
|
Tennessee | Knox | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $525,000.00 |
$656,250.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $67,120,000.00 |
$83,900,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,675,535.00 |
$7,094,419.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,025,365.00 |
$5,666,149.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $525,000.00 |
$656,250.00 |
|
Tennessee | Blount | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,433,656.00 |
$33,042,070.00 |
|
Tennessee | Blount | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,143,736.00 |
$3,929,670.00 |
|
Tennessee | Blount | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,563,200.00 |
$11,954,000.00 |
|
Tennessee | Blount | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $14,549,512.00 |
$18,691,520.00 |
|
Tennessee | Blount | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $365,669.00 |
$457,087.00 |
|
Tennessee | Blount | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $3,023,172.00 |
$3,778,965.00 |
|
Tennessee | Blount | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $16,414,000.00 |
||
Tennessee | Blount | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $145,969,000.00 |
||
Tennessee | Blount | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $18,169,450.19 |
||
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $23,747,040.00 |
$29,683,800.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,374,720.00 |
$2,968,400.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $524,000.00 |
$655,000.00 |
|
Tennessee | Hardin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $160,000.00 |
$200,000.00 |
|
Tennessee | Putnam | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $21,436,413.27 |
$26,795,518.00 |
|
Tennessee | Putnam | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $3,168,212.00 |
$3,960,266.00 |
|
Tennessee | Putnam | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Right of Way | $8,146,390.00 |
$10,182,988.00 |
|
Tennessee | Putnam | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Utilities | $7,369,806.00 |
$12,807,139.00 |
|
Tennessee | Putnam | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,242,000.00 |
$2,802,500.00 |
|
Tennessee | Putnam | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $624,409.00 |
$780,512.00 |
|
Tennessee | Putnam | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $5,065,280.00 |
$6,331,600.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $16,500,828.00 |
$20,626,036.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $467,580.35 |
$584,475.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,884,296.00 |
$4,855,370.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,591,158.00 |
$3,238,947.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,071,320.00 |
$3,061,150.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $6,929,795.00 |
$10,298,921.00 |
|
Tennessee | Montgomery | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $3,073,392.00 |
$3,841,740.00 |
|
Tennessee | Montgomery | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,296,000.00 |
$2,870,000.00 |
|
Tennessee | Montgomery | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $151,728.00 |
$189,660.00 |
|
Tennessee | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $11,249,303.55 |
$11,249,303.55 |
|
Tennessee | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $6,517,142.00 |
$6,517,142.00 |
|
Tennessee | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $3,805,336.00 |
$4,078,374.00 |
|
Tennessee | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $4,056,693.00 |
$5,070,867.00 |
|
Tennessee | Montgomery | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $8,389,541.00 |
$10,486,927.00 |
|
Tennessee | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,335,746.11 |
$41,849,898.00 |
|
Tennessee | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $57,001.00 |
||
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,718,303.00 |
$1,909,226.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,721,758.00 |
$24,135,287.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,879,531.00 |
$3,199,479.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,150,000.00 |
$3,500,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $315,000.00 |
$350,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,434,523.00 |
$2,705,026.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,621,613.00 |
$5,960,277.00 |
|
Tennessee | Hamilton | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $287,489.64 |
$319,433.44 |
|
Tennessee | Hamilton | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $95,681.25 |
$106,313.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $29,625,431.00 |
$32,917,146.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,962,543.00 |
$3,291,716.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,061,000.00 |
$2,290,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $180,000.00 |
$200,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $900,000.00 |
$1,000,000.00 |
|
Tennessee | Williamson | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $24,953,207.27 |
$24,953,207.27 |
|
Tennessee | Williamson | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $3,224,152.22 |
$3,224,152.22 |
|
Tennessee | Williamson | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $732,356.01 |
$2,940,814.92 |
|
Tennessee | Williamson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $204,584.90 |
$255,731.12 |
|
Tennessee | Williamson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,667,693.92 |
$2,084,617.38 |
|
Tennessee | Williamson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,528,995.84 |
$1,911,244.80 |
|
Tennessee | Williamson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $402,604.37 |
$2,512,659.77 |
|
Tennessee | Davidson | >= 200,000 | State | DONOR STATE BONUS | 4R - No Added Capacity | $646,878.02 |
$718,753.36 |
|
Tennessee | Davidson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $2,972,855.00 |
$3,303,172.22 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,525,135.00 |
$25,406,142.32 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,604,865.00 |
$2,894,294.00 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,876,631.00 |
$5,418,479.00 |
|
Tennessee | Rutherford | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $3,100,000.00 |
$3,875,000.00 |
|
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $20,400,000.00 |
$40,938,635.00 |
|
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,921,754.00 |
||
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,436,000.00 |
$1,795,000.00 |
|
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,270,000.00 |
$2,837,500.00 |
|
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,472,704.00 |
$18,744,780.00 |
|
Tennessee | Shelby | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | New Construction Roadway | $491,964.00 |
$491,964.00 |
|
Tennessee | Shelby | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,836,590.00 |
$2,295,738.00 |
|
Tennessee | Fayette | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $431,158.00 |
$538,948.00 |
|
Tennessee | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $800,000.00 |
$1,000,000.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $1,916,400.00 |
$2,395,500.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,402,641.00 |
$4,253,302.00 |
|
Tennessee | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $828,738.00 |
$1,035,922.00 |
|
Tennessee | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $5,524,917.00 |
$6,906,146.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $20,028,742.07 |
$25,041,734.59 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $62,606,769.00 |
$78,258,462.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,448,072.00 |
$9,310,091.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,384,800.00 |
$7,981,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $16,483,472.00 |
$22,450,444.00 |
|
Tennessee | Montgomery | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $406,300.00 |
$507,875.00 |
|
Tennessee | Montgomery | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $131,562.80 |
$164,453.50 |
|
Tennessee | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,371,592.25 |
$20,714,490.06 |
|
Tennessee | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,722,049.00 |
$2,152,561.00 |
|
Tennessee | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $948,449.92 |
$1,185,562.39 |
|
Tennessee | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $316,215.71 |
$395,269.63 |
|
Tennessee | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,299,247.60 |
$6,797,304.83 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,800,000.00 |
$3,500,000.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $13,707,686.00 |
$17,134,608.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,600,000.00 |
$2,000,000.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $40,000.00 |
$50,000.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $7,160,000.00 |
$8,950,000.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $800,000.00 |
$1,000,000.00 |
|
Tennessee | Williamson | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $105,702.64 |
$132,129.00 |
|
Tennessee | Williamson | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | New Construction Roadway | $320,000.00 |
$400,000.00 |
|
Tennessee | Williamson | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Right of Way | $6,838,686.00 |
$8,548,357.00 |
|
Tennessee | Williamson | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Utilities | $402,400.00 |
$503,000.00 |
|
Tennessee | Williamson | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | Right of Way | $983,928.00 |
$983,928.00 |
|
Tennessee | Williamson | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,051,772.00 |
$2,564,715.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,609,808.00 |
$4,512,261.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $31,599,158.00 |
$40,748,948.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,156,490.00 |
$5,432,129.00 |
|
Tennessee | Williamson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $650,080.00 |
$812,600.00 |
|
Tennessee | Williamson | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $103,140.92 |
$128,926.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $56,644,708.65 |
$70,805,885.81 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,816,612.00 |
$6,020,765.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,700,000.00 |
$2,125,000.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,705,264.00 |
$38,381,580.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,070,528.00 |
$3,838,160.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $52,800,000.00 |
$91,736,000.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,799,062.00 |
||
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,118,400.00 |
$2,648,000.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $279,200.00 |
$349,000.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $20,000.00 |
$25,000.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $800.00 |
$1,000.00 |
|
Tennessee | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,048,000.00 |
$1,310,000.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $40,042,890.00 |
$44,492,100.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $4,195,259.00 |
$4,661,399.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $6,390,000.00 |
$7,100,000.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $900,001.00 |
$1,000,001.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $600,000.00 |
$750,000.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,426,408.00 |
$38,033,009.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,069,801.00 |
$3,837,252.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $949,600.00 |
$1,187,000.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $104,826.00 |
$131,033.00 |
|
Tennessee | Wilson | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $17,181.31 |
$21,477.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $61,057,410.00 |
$79,649,099.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,493,854.00 |
$8,117,318.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,000,000.00 |
$5,000,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,019,604.00 |
$2,524,505.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,958,683.00 |
$2,580,319.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | 4R - No Added Capacity | $32,116,631.14 |
$35,685,145.72 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $3,654,000.00 |
$4,060,000.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $1,902,332.00 |
$2,111,992.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Safety | $96,600.00 |
$105,000.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $333,000.00 |
$370,000.00 |
|
Tennessee | Roane | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,907,894.28 |
||
Tennessee | Henderson | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $237,313.19 |
$296,642.00 |
|
Tennessee | Henderson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,895,896.00 |
$3,619,870.00 |
|
Tennessee | Henderson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $29,653,508.00 |
$37,066,885.00 |
|
Tennessee | Henderson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,428,128.00 |
$3,035,160.00 |
|
Tennessee | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,377,512.00 |
$2,971,890.00 |
|
Tennessee | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $21,922,504.00 |
$27,403,130.00 |
|
Tennessee | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,852,608.00 |
$2,315,760.00 |
|
Tennessee | Shelby | >= 200,000 | State | INTERSTATE 4R | Preliminary Engineering | $66,681.75 |
$74,091.00 |
|
Tennessee | Shelby | >= 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $940,419.00 |
$1,044,910.00 |
|
Tennessee | Shelby | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,141,394.63 |
$3,490,440.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $87,217,470.00 |
$96,908,300.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,870,238.00 |
$9,855,820.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,625,000.00 |
$2,916,667.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,386,632.00 |
$2,651,813.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,449,068.00 |
$2,733,137.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $386,013.81 |
$428,903.00 |
|
Tennessee | Shelby | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $3,724,034.40 |
$4,655,043.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $21,583,552.00 |
$49,244,157.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,845,520.00 |
$3,556,900.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,188,880.00 |
$2,736,100.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $339,648.00 |
$424,560.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $318,400.00 |
$398,000.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $4,197,308.00 |
$4,197,308.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $1,222,037.67 |
$1,357,819.63 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $921,076.43 |
$1,023,419.22 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,684,179.07 |
||
Tennessee | Maury | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,793,143.00 |
||
Tennessee | Maury | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $512,640.00 |
$569,600.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,367,787.00 |
$1,519,763.00 |
|
Tennessee | Maury | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,762,653.00 |
$2,650,624.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,736,081.00 |
$5,920,101.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,192,016.00 |
$2,740,020.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $16,780,000.00 |
$33,082,597.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,100,000.00 |
$3,544,763.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $4,120,000.00 |
$9,212,519.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $1,000,000.00 |
$2,000,000.00 |
|
Tennessee | Williamson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $1,000,000.00 |
$1,300,000.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $111,423,412.00 |
$139,279,265.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,159,717.00 |
$13,949,647.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,920,000.00 |
$6,150,000.00 |
|
Tennessee | Robertson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $43,440.00 |
$217,204.00 |
|
Tennessee | Hamilton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $64,178,842.00 |
$71,309,825.00 |
|
Tennessee | Hamilton | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,000,000.00 |
$3,333,334.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $45,846,158.00 |
$50,940,175.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,600,000.00 |
$14,000,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,200,000.00 |
$8,000,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $18,610.00 |
$20,678.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,032,648.00 |
$4,480,720.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $38,614,546.00 |
$70,949,479.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,385,453.00 |
$7,094,948.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,500,000.00 |
$5,000,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,179,001.00 |
$1,310,001.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,350,000.00 |
$1,500,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $52,375,726.64 |
$58,195,252.99 |
|
Tennessee | Hamilton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | $5,508,000.00 |
$6,120,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $55,229,143.00 |
$61,365,715.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,720,000.00 |
$7,150,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,144,000.00 |
$2,680,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $800,000.00 |
$1,000,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $75,000.00 |
$100,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,100,000.00 |
$1,500,000.00 |
|
Tennessee | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,413,722.00 |
$1,767,153.00 |
|
Tennessee | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $18,137,218.00 |
$22,671,523.00 |
|
Tennessee | Statewide | N/A | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $81,354.00 |
$101,692.00 |
|
Tennessee | Statewide | N/A | State | REDISTRIBUTION OF CERTAIN AUTH | Traffic Management/Engineering - HOV | $813,535.00 |
$1,016,918.00 |
|
Tennessee | Rutherford | >= 200,000 | State | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | $9,092,526.15 |
$11,365,660.77 |
|
Tennessee | Davidson | >= 200,000 | State | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | $5,581,836.29 |
$6,977,297.23 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,538,502.70 |
||
Tennessee | Rutherford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,506,142.30 |
||
Tennessee | Rutherford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $7,283,130.66 |
$13,695,762.88 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $4,471,061.42 |
$8,407,730.12 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $109,376.41 |
||
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $178,168.59 |
||
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,933,213.91 |
$2,416,517.39 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,186,786.09 |
$1,483,482.61 |
|
Tennessee | Davidson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,093,764.50 |
||
Tennessee | Rutherford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,781,686.50 |
||
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $107,566,095.00 |
$134,457,619.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,522,220.00 |
$9,402,775.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $144,000.00 |
$180,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $308,000.00 |
$385,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $396,424.00 |
$499,868.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $2,500,000.00 |
$3,125,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $6,460,538.00 |
$8,075,672.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $4,760,000.00 |
$5,950,000.00 |
|
Tennessee | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $1,906,640.00 |
$2,383,300.00 |
|
Tennessee | Shelby | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,439,842.00 |
$1,799,802.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,521,500.00 |
$8,151,875.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $31,044,283.00 |
$38,939,086.00 |
|
Tennessee | Shelby | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,872,618.00 |
$6,090,773.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $105,800,000.00 |
$132,250,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,400,000.00 |
$8,000,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $11,080,000.00 |
$13,850,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $160,000.00 |
$200,000.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $10,541,200.00 |
$13,176,500.00 |
|
Tennessee | Davidson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $18,800.00 |
$23,500.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,589,490.00 |
$21,766,100.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,912,940.00 |
$3,236,600.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $483,200.00 |
$604,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,620,000.00 |
$3,275,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $8,000.00 |
$10,000.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,235,515.00 |
$2,681,200.00 |
|
Tennessee | Knox | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,094,000.00 |
$1,367,500.00 |
|
Tennessee | Sumner | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,409,605.00 |
$4,262,006.00 |
|
Tennessee | Sumner | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $20,962,727.00 |
$28,011,063.00 |
|
Tennessee | Sumner | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $700,098.00 |
$875,123.00 |
|
Tennessee | Sumner | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $180,000.00 |
$225,000.00 |
|
Tennessee | Sumner | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,203,360.00 |
$2,754,200.00 |
|
Tennessee | Sumner | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $980,000.00 |
$1,225,000.00 |