U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Texas

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
PROJECT TITLE
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Texas
0095022-02
VARIOUS LOCATIONS IN TARRANT COUNTY, CONGESTION MITIGATION & AIR QUALITY
$21,301,440.00
$26,626,800.00
Texas
0108184
IH 10 FROM  W OF ADAMS BAYOU, EAST TO  W OF SABINE RIVER BRIDGE RECONSTRUCT MAIN LANES OF EXISTING 4 LANE FREEWAY
$15,079,960.37
$55,519,614.93
Texas
0303125
CONSTRUCT ONE-WAY FRONTAGE ROADS, ENTRANCE AND EXIT RAMPS AND REPLACE BRIDGE AT FM 989 ON IH 30.
$55,333,461.40
$68,545,021.19
Texas
0354235
IH 35 FROM  FALLS COUNTY LINE TO  WOODLAWN RD RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE CONGESTION AND ENHANCE SAFETY
$121,454,076.60
$138,025,677.73
Texas
0355152
IH 35W FROM IH 820 TO IH 30. RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES
$220,313,023.61
$294,794,414.93
Texas
0356438
IH 35E FROM SANDY LAKE RD/WHITLOCK LN TO LOOP 288. RECONST 6 LN TO 8 MAINLANES, 4 CONCURRENT MANAGED/HOV AND FR
$397,540,702.04
$1,049,891,743.18
Texas
0451346
IH 45 FROM AT IH 610 S TO CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB
$22,644,369.15
$28,472,662.26
Texas
1102054
US 190 FR. 0.20 MI E OF FM 3470 TO 0.30 MI W OF FM 2410 FR. 3470 TO ROY REYNOLDS . CONSTRUCT OVERPASS AND WIDEN FR 2 TO 4 LNS W/CO
$8,142,854.66
$25,842,684.00
Texas
1102319
SH 242 FROM  AT IH 45 TO  . CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH 242 TO SB IH 45 & NB IH 45 TO WB SH 242 (
$1,480,218.39
$31,278,253.00
Texas
1102493
FROM IH 20 TO FM 700. CONSTRUCT NEW RELIEF ROUTE
$63,362,556.40
$79,120,364.25
Texas
1402016
RECONSTRUCT CLINTON DRIVE
$15,711,497.00
$31,121,001.72
Texas
1402081
IH 69 FR W OF FM 762 TO 0.31 MI W OF FM 2759. WIDEN TO 8 ML, FRTG RDS, ITS, TMS, CONST 2-WAY HOV LNS & INT IMPRVS AT FM 762.
$130,353,034.39
$183,422,238.85
Texas
1402183
IH 45 FROM SP 5 TO US 59.  CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE EXISTING US 59 NB AND SB DIRECT CONNECTORS.
$31,042,363.63
$38,802,954.54
Texas
1502464
US 83 FROM 0.28 MI WEST OF SHOWERS RD TO 0.85 MI E OF FM 886(EL FARO RD). CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY
$21,812,000.00
$67,039,536.19
Texas
1502521
IH35 FR N. STASSNEY LN TO S. WILLIAM CANNON DR ADD SHLDERS, AUX LNS, RAMP IMPRVMTS, PAV REHAB, BIKE & PED IMPRVM, FRT RD INTSE IMP
$31,332,261.92
$77,852,159.34
Texas
1502531
ON IH 35E FR US 77 S OF WAXAHACHIE TO US 77 N OF WAXAHACHIE. RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES
$114,751,988.92
$149,428,506.15
Texas
1502613
FM 1626 LANE RECONSTRUCTION
$6,668,421.60
$25,689,139.16
Texas
1602247
IH 410 AT US 90. RECONSTRUCT INTERCHANGE AND OPERATIONAL IMPROVEMENTS
$73,498,308.65
$81,664,787.39
Texas
1602259
SH 358 FROM NILE STREET TO AYERS STREET.  RAMP REVERSAL PHASE II-A, SOUTH SIDE ONLY.
$43,526,406.49
$54,408,008.11
Texas
1602427
CONSTRUCT 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND SIDEWALKS ON IH 20
$12,625,395.26
$70,512,006.15
Texas
1602470
WIDEN EXISTING FOUR LANE TO SIX LANE ON IH 10
$42,969,591.46
$53,711,989.33
Texas
1602671
SH 288 AT BW 8 INTERCHANGE.  CONSTRUCT 8 DIRECT CONNECTORS
$1,802,655.00
$100,253,318.00
Texas
1702007
IH 10 ADDITIONAL LANE CONSTRUCTION
$153,348,307.03
$192,080,905.63
Texas
1702355
CONSTRUCT 4 LANE BRIDGE AND RAMP MODIFICATIONS ON SH 114
$26,585,626.44
$46,732,033.06
Texas
1702416
FM 521 - WIDEN TO 4-LANE DIVIDED SECTION AND CONSTRUCT GRADE SEPARATION AT UNION PACIFIC RAIL ROAD
$20,458,196.69
$25,684,230.42
Texas
1702473
SL 335- CONSTRUCT FRONTAGE ROADS.
$19,184,316.02
$31,420,395.03
Texas
1702490
CONSTRUCT AUXILIARY LANES AND RAMP REVERSAL ON US 181
$9,796,239.63
$26,321,299.53
Texas
1702501
IH 10 INTERCHANGE IMPROVEMENTS
$14,441,495.74
$32,825,598.60
Texas
1702506
IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES
$94,615,640.22
$118,269,550.27
Texas
1702559
CONSTRUCT 4-LANE DIVIDED URBAN STREET FACILITY ON NEW LOCATION ON AIRPORT BOULEVARD
$18,329,372.16
$25,388,422.00
Texas
1702626
RECONSTRUCTION OF DIRECT CONNECTOR ON IH 69
$8,882,098.06
$26,244,997.85
Texas
1702631
CONSTRUCT DIRECT CONNECTOR AND HOV ACCESS TO UPTOWN TRANSIT CENTER ON IH 610
$56,915,556.97
$68,253,926.76
Texas
1702633
IH 610 RECONSTRUCTION
$99,874,189.06
$113,882,432.29
Texas
1702650
IH 35 OPERATIONAL IMPROVEMENTS
$116,699,570.90
$138,606,189.90
Texas
1702696
WIDEN FREEWAY ON IH 45
$105,278,702.00
$131,598,377.51
Texas
1702730
FM 2181. WIDEN ROADWAY
$4,949,755.09
$35,864,685.70
Texas
1702818
RECONSTRUCT ROADWAY AT BUFFALO SPEEDWAY
$9,796,640.00
$27,975,271.62
Texas
1702839
CONSTRUCT 4 LANE TOLLWAY IN SECTIONS ON SH 249
$154,400,000.00
$309,757,180.00
Texas
1702842
CONVERT REVERSIBLE HOV TO REVERSIBLE EXPRESS LANES, RECONSTRUCT AND WIDEN MAINLANES AND FRONTAGE ROADS ON IH35 E AND US 67
$317,248,899.00
$624,975,805.00
Texas
1802175
IH 610 - RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS AT CAMBRIDGE STREET/ALMEDA ROAD/UNION PACIFIC RAILROAD
$69,000,000.00
$84,448,793.58
Texas
1802325
ROADWAY WIDEN TO A MODIFIED SUPER 2 ON US 67.
$5,000,000.00
$53,396,420.94
Texas
1802390
EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281
$50,100,000.00
$200,648,881.31
Texas
1802395
US 82 - ADD TWO LANES WITH SHOULDERS AND WIDEN FROM 2 LANE TO 4 LANE
$65,155,054.86
$81,538,975.57
Texas
1802404
CONSTRUCT MAIN LANES, OVERPASSES, FRONTAGE ROADS AND STRUCTURES ON US 77
$32,383,849.12
$40,479,811.40
Texas
1802412
US 69 - WIDEN FREEWAY FROM 4 TO 6 LANES
$27,865,125.15
$34,831,406.44
Texas
1802413
IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES
$112,175,146.80
$140,218,933.50
Texas
1802439
WIDEN ROAD - ADD LANES ON SH 97
$59,295,842.78
$70,119,828.47
Texas
1802497
WIDEN TO SIX MAIN LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING; INTELLIGENT TRANSPORTATION SYSTEM ON IH 10
$125,000,000.00
$373,870,824.61
Texas
1802535
REPLACE BRIDGE AND APPROACHES ON IH 35.
$33,459,856.53
$37,217,355.86
Texas
1802546
CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION ON US 377
$35,668,539.46
$56,399,568.86
Texas
1802552
WIDEN 2 TO 4 LANE DIVIDED ON FM 156.
$45,803,593.63
$57,254,492.03
Texas
1802558
CONSTRUCT GRADE SEPARATION ON US 181
$23,905,793.48
$29,882,241.85
Texas
1902002
WIDEN ROAD - ADD LANES ON SH 36
$7,000,000.00
$98,644,061.78
Texas
1902056
FM 2221. CONSTRUCT CONTROLLED ACCESS FACILITY.
$91,218,763.56
$114,516,232.45
Texas
1902057
CONSTRUCT RAMPS ON IH 35.
$67,188,251.91
$74,730,485.49
Texas
1902060
REHABILITATIONS AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 85.
$10,000,000.00
$40,682,774.72
Texas
1902063
REHABILITATION OF EXISTING ROAD ON SH 123.
$21,394,897.17
$26,752,645.11
Texas
1902081
CONSTRUCT 4 LANE DIRECT CONNECTION (FUTURE I-69) ON US 59.
$60,440,799.99
$92,628,331.74
Texas
1902105
IH 45 WIDEN ROAD ADD LANES
$142,813,404.19
$179,214,098.64
Texas
1902107
REHABILITATION OF EXISTING ROAD ON US 183
$22,000,000.00
$28,720,936.06
Texas
1902182
FM 2100 WIDEN TO 4 LANE DIVIDED
$25,281,834.67
$31,684,149.84
Texas
1902201
INTERCHANGE IMPROVEMENT ON SL 12 AND SS 482.
$271,498,670.57
$341,709,166.57
Texas
1902215
WIDEN ROAD AND ADD LANES ON IH 410
$64,126,345.37
$84,896,921.79
Texas
1902268
WIDEN FROM 2 LANE TO 4 LANE WITH A CONTINUOUS LEFT TURN LANE; REPLACE BRIDGE AT SAND CREEK
$26,277,322.57
$35,502,514.54
Texas
1902275
HAZARD ELIMINATION AND SAFETY
$27,232,864.76
$30,258,738.61
Texas
1902299
CONSTRUCT NEW ROADWAY LANES ON US 281
$66,747,449.27
$83,434,311.59
Texas
1902314
WIDEN FREEWAY - ADD LANES ON IH 10.
$80,492,432.23
$100,790,599.37
Texas
1902343
SH 87 - FERRY OPERATION PROJECTS
$21,874,049.60
$27,342,562.00
Texas
1902389
WIDEN FREEWAY ON IH 635.
$1,077,601,060.72
$1,720,223,200.00
Texas
1902417
CONSTRUCT INTERCHANGE ON IH 2 AND IH 69C.
$139,446,264.76
$300,051,164.00
Texas
1996001
STATEWIDE, STATE INFRASTRUCTURE BANK -ADV CAP
$71,726,747.00
$192,462,886.00
Texas
2002040
IH 30 FROM EAST OF SYLVAN AVE TO IH 35E. WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV.
$36,234,552.00
$112,449,552.20
Texas
2002632
US CUSTOMS PORT OF ENTRY EXIT TO US 281. CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF)
$33,146,456.76
$36,270,895.40
Texas
2005862
US 82 FROM US 82 AT US 281 TO .. CONSTRUCT DIRECT CONNECT INTERCHANGE  
$31,139,709.00
Texas
2005994
IH 635 FROM WEBB CHAPEL TO WEST OF US 75 (MERIT DR). IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV/MANAGED LANES
$346,160,303.95
$930,082,152.42
Texas
2007405
FM 1314 FROM 1.0 MI S OF SH 242 TO 2.6 MILE NW OF LOOP 494 WIDEN TO 4 LANE DIVIDED RURAL ROAD AND LENGTHEN OR REPLACE
$33,034,515.63
$46,093,270.00
Texas
2007688
FM 1484 FROM FM 3083 TO FM 2432. WIDEN TO 4 LANE DIVIDED
$18,508,072.78
$33,997,859.93
Texas
2007717
FM 1488 FROM EAST OF FM 149 AT MOSTYN TO FM 2978. WIDEN 2 LANES TO 4-LANE DIVIDED (PTF)
$26,026,471.13
$36,148,371.04
Texas
2007869
SS 601 FROM US 54 (PATRIOT FREEWAY) TO LOOP 375 (PURPLE HEART FREEWAY). CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES
$244,634,419.55
$359,350,000.00
Texas
2007886
EXTEND CONFLANS RD FROM W OF SH 161 TO VALLEY VIEW LANE IN CITY OF IRVING. NEW LOCATION CITY STREET - 4 LANE DIVIDED
$14,808,588.00
$37,987,724.28
Texas
2007913
FM 3407 FROM  RM 12 TO  RM 2439 CONSTRUCT 4-LN DIVIDED ROADWAY
$32,415,232.10
$41,732,542.58
Texas
2008345
ON SH 199 AT BYPASS CHANNEL IN FTW TO NEAR CBD & TRINITY RIVER. CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL.
$36,982,949.80
$48,967,209.40
Texas
2008654
US 79 FROM 79-B E OF TAYLOR TO E OF FM 1063. UPGRADE TO 4-LN DIVIDED RDWY
$19,865,925.86
$28,636,441.29
Texas
2008830
IH 20 FROM SH 171; IN WEATHERFORD TO FM 2552; ON EAST AND WEST BOUND FRONTAGE ROADS. RECONSTRUCT AND EXTEND FRONTAGE ROAD.
$19,196,974.61
$35,689,114.71
Texas
2009235
FM 646 FROM FM 517 TO FM 1764. WIDEN FROM 2 LANES TO 4-LANE DIVIDED (PTF)
$18,042,196.30
$26,866,332.00
Texas
2009513
ENGINEERING, ROW, & CONSTRUCTION OF DFW CONNECTOR ON SH 114 AND SH 121. RECONSTRUCT FREEWAY, FRONTAGE ROADS AND RAMPS
$607,149,857.90
$696,394,133.00
Texas
2009753
ENGINEERING, ROW AND CST OF DFW CONNECTOR ON SH 121 AND SH 114. RECONST FRWY 4 TO 6 W/AUX LNS,FR RDS & RAMPS & ADD COLLECTOR
$591,539,254.30
$739,424,067.78
Texas
2009919
IH 820 FROM IH 35W TO SH 121/SH 183. RECONSTRUCT 4 TO 10 W/ HOV/MANAGED LANE, INTERCHANGE AND CONNECTORS
$421,105,616.27
$526,087,354.64
Texas
2011591
US 271 FROM 0.3 MI. NORTH OF US 67 TO .7MI SOUTH OF FM 3417. CONSTRUCT FIRST PHASE OF ULTIMATE 4-LANE DIVIDED FREEWAY
$53,582,610.43
$87,852,142.31
Texas
2011998
IH 610 FROM TC JESTER TO N OF IH 10 ON IH 610 AND TO 34TH ST ON US 290. RECONSTR US290/IH610 IC, CONSTR INTERCHANGE W/ DC'S W/ TWO
$36,665,773.00
$171,036,404.00
Texas
2012125
LP 363 FROM IH 35 NORTH OF TEMPLE TO SH 53. CONSTRUCT NORTHBOUND FRONTAGE ROAD TO PROVIDE INTERIM 4-LANE
$24,784,256.30
$35,527,847.63
Texas
2012221
SH 550 @ US 77/83 TO 0.53 MI E OF OLD ALICE RD. CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES
$2,300,000.00
$34,495,766.00
Texas
2012232
US 290 FROM WEST OF RM 1826 TO SL 1; RECONSTRUCT 4-LANE TO 6-LANE CONTROLLED ACCESS HIGHWAY AND FRONTAGE ROADS
$21,468,853.91
$146,578,873.54
Texas
2012594
US 59 - WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS
$84,105,000.00
$120,120,653.85
Texas
2012691
IH 35 FROM S LP 363 IN TEMPLE TO NUGENT AVE. RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES.
$233,750,004.59
$275,865,720.60
Texas
2012805
RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE ON MEDICAL DISTRICT DRIVE.
$19,376,490.00
$27,202,300.29
Texas
2013136
ON IH 610 FROM W OF W 34TH ST ON US 290 TO N AND S OF US 290 ON IH 610.RECONSTRUCT US 290/IH 610 INCLUDING IH10 TO US 290 OUTBOUND
$99,132,093.21
$124,346,658.20
Texas
2013163
IH 45 FROM 0.9884 MILES SOUTH OF FM 2351 TO SOUTH OF MEDICAL CENTER DRIVE. WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3-LANE FR
$85,185,107.91
$106,749,097.46
Texas
2013218
CONSTRUCT FOUR LANE FREEWAY AT DIBOLL (FUTURE I-69)
$14,237,000.00
$171,923,286.00
Texas
2013221
HIGHWAY IMPROVEMENT ON US 59.
$2,813,685.77
$101,174,791.48
Texas
2013226
IH 10 AT SH 87 AND T&NO RR. REPLACE BRIDGE AND APPROACHES
$24,578,123.17
$30,722,653.80
Texas
2013292
SH183 FROM FM157 TO I35E; LP12 FROM SH183 TO I35E; AND SH114 FROM SH97 TO SH183. RECONSTRUCT & ADD MANAGED LANES
$576,221,762.15
$809,451,840.03
Texas
2013400
US 82 FROM FM 1840 TO SH 98. RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES
$9,992,256.47
$27,294,014.40
Texas
2013420
ON SH 365 FROM FM 396 TO US 281. CONSTRUCT 4-LANE CONTROLLED ACCESS TOLLED FACILITY
$33,756,881.00
$155,435,862.00
Texas
2013567
CONSTRUCT 6-LANE DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY WITH AUTO PUMP STATION AND RAILROAD LINE WITH UNDERPASSES ON HEMPSTEAD ROAD
$34,192,164.82
$63,002,913.46
Texas
2013596
REHABILITATION OF EXISTING ROADWAY AND INTERCHANGE IMPROVEMENTS ON US 175 AND SH 310.
$24,046,844.68
$47,565,481.66
Texas
2013737
US 290 FR W OF PINEMONT TO W OF 34TH ST. RECONSTRUCT & WIDEN TO 8 MN LNS WITH 3 REV MANAGED LNS, AUX LNS; 2-2 LN FRTG RDS.
$50,797,182.77
$176,239,844.19
Texas
2013740
US 290 - RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES AND TWO 2-LANE FRONTAGE ROADS
$91,276,521.07
$195,462,373.84
Texas
2013741
ON US 290 FR E OF W LITTLE YORK TO W OF PINEMONT. RECONSTRUCT & WIDEN TO 8 MN LNS, 3 REV MNG LNS, AUX LNS; 2 2-LN FRTG RDS, GRD SE
$102,778,084.87
$189,407,321.74
Texas
2013874
REPLACE BRIDGE AND APPROACHES ON FM 1495.
$26,727,976.27
$33,415,139.89
Texas
2013875
CONSTRUCT NEW ROAD ON LP 375.
$29,427,716.36
$36,784,645.46
Texas
2013983
US 290 FROM E OF MUESCHKE RD TO E OF TELGE RD. RECON AN WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MAIN LANES, AUX LANES AND 2-LN FR
$37,362,073.98
$98,369,741.82
Texas
2013984
CONSTRUCT DIRECT CONNECTOR ON IH 45 AT IH 610 E.
$55,043,017.24
$57,720,972.39
Texas
2013991
IH 610 FROM W OF 34TH ST ON US 209 TO IH 610. RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS AND 3-LANE REVERSIBLE
$2,830,000.00
$181,761,983.83
Texas
2013996
FM 1957 FROM SH 211 TO LOOP 1604. EXPAND FROM 2 LANES TO 4 LANE DIVIDED.
$7,528,667.31
$37,501,000.00
Texas
2014211
ON US 59 FROM SP 10 TO W OF FM 762. WIDEN TO 6-LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM W/ GRADE SEPARATION
$135,932,655.18
$167,412,867.49
Texas
2014326
CONSTRUCT NEW ROAD ON MCHARD ROAD.
$23,966,629.04
$29,959,286.30
Texas
2014444
WIDEN ROAD, ADD LANES, AND SHOULDERS ON US 69
$33,829,736.79
$42,287,170.98
Texas
2014643
SH 105 FROM  AT THE BRAZOS RIVER TO  . REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, STRUCTURES, BASE AND SURFACE
$28,167,790.30
$35,209,737.90
Texas
2014669
AT WHITE SETTLEMENT RD IN FTW. CONST 4 LN BRIDGE AT NEW LOC OF PROPOSED BYPASS CHANNEL FOR TRINITY RIVER NEAR CBD OF FTW
$6,200,000.00
$33,796,872.18
Texas
2015062
ON IH 30 AT FM 3549. RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS AND RAMPS CONSTRUCTION.
$16,709,036.80
$26,585,311.57
Texas
2016108
ADD SHOULDERS, AUXILLARY LNS, RAMP IMPROVEMENTS, PAVEMENT REHAB, BIKE AND PED IMPROVEMENTS & FRONTAGE ROAD INTERSECTION IMPROVEMENTS ON IH 35
$45,111,638.29
$50,136,042.54
Texas
2016183
ON IH30 FR 1.0 MI W OF SH360 TO GREAT SOUTHWEST PKWY; AT SIX FLAGS DR. CONST DIR CONN INTCHG AT SH360 & TMS & RECONSTR BRIDGE.
$49,671,949.79
$268,872,798.96
Texas
2017368
IH 20. REALIGN EXISTING ROADWAY INCLUDING GRADING, PAVEMENT DRAINAGE, SIGNING, AND ILLUMINATION.
$80,121,825.43
$89,828,148.68
Texas
2017592
EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281
$78,000,000.00
$199,577,086.75
Texas
2017887
WIDEN FREEWAY FROM FOUR TO SIX LANES ON US 67
$3,022,594.50
$66,270,431.33
Texas
2017906
WIDEN ROADWAY INCLUDING FRONTAGE ROADS, STRIPING AND SIGNING ON IH 45
$63,259,215.23
$94,794,666.94
Texas
2018201
CONSTRUCT RELIEF ROUTE AROUND DRISCOLL ON US 77.
$40,000,000.00
$98,921,208.78
Texas
2018321
IH 820 AND SH 121. RECONSTRUCTION AND WIDENING.
$134,591,824.21
$168,259,780.27
Texas
2018375
DEDICATED BUS LANE ON IH 610
$30,768,692.13
$67,075,598.13
Texas
2018416
FM 762 AND FM 2759 - WIDEN TO 4 LANES DIVIDED
$27,554,687.76
$34,539,569.58
Texas
2018434
US 377 AT LAKE TEXOMA. BRIDGE REPLACEMENT.
$5,000,000.00
$35,234,013.62
Texas
2018627
CITY STREET FROM MARSALIS AVENUE TO EWING AVENUE.  CONSTRUCT LOCAL ENHANCEMENTS.
$16,000,000.00
$39,388,000.00
Texas
2018774
US 285. ROADWAY WIDENING TO A MODIFIED SUPER 2
$34,325,994.90
$43,366,955.49
Texas
2018811
WIDEN FROM 2 LANES TO 4 LANE ON US 69
$52,977,757.81
$66,222,197.26
Texas
2018842
UPGRADE FROM 4-LANE DIVIDED HWY TO 4-LANE FREEWAY WITH FRONTAGE ROAD BY CONSTRUCTING 4 MAINLANES, INTERCHANGES, AND FRONTAGE ROADS AT SH 44
$26,238,131.10
$32,797,663.88
Texas
2018852
WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES ON SH 146
$81,128,000.00
$253,240,692.19
Texas
2018858
SH 242 AT FM 1314. CONSTRUCT GRADE SEPARATION.
$21,168,947.40
$26,532,973.00
Texas
2018873
REHAB AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16
$17,100,000.00
$43,749,069.95
Texas
2018882
ROADWAY WIDENING TO A MODIFIED SUPER 2 ON US 285
$34,066,526.95
$42,583,158.69
Texas
2018907
RECONSTRUCT INTERSECTION ON IH 35.
$23,445,433.99
$26,050,482.21
Texas
2018953
CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE ON IH 10
$27,763,717.15
$34,704,646.44
Texas
2018963
RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS ON IH 45
$200,501,389.55
$251,138,652.59
Texas
2018973
SL 1604 - EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY
$43,095,149.12
$53,905,944.44
Texas
2019047
REHABILITATE EXISTING ROADWAY ON US 83.
$58,274,022.74
$72,871,466.30
Texas
2019048
REHABILITATION OF EXISTING HIGHWAY ON US 83.
$9,000,000.00
$65,135,678.13
Texas
2019063
BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONS AT INTERSECTIONS ON US 62.
$25,000,000.00
$172,354,438.05
Texas
2019106
RECONSTRUCT EXISTING 4-LANE UNDIVIDED ROADWAY TO A 4-LANE DIVIDED ROADWAY ON US 290.
$31,604,453.80
$36,332,955.39
Texas
2019166
US 54 FROM LOOP 375, INTERCHANGE IMPROVEMENTS.
$91,653,201.39
$114,650,417.14
Texas
2019168
WIDEDN FROM 4 TO 6 LANES ON SL 375.
$95,362,990.82
$116,103,738.53
Texas
2019274
REHABILITATION AND WIDEN ROADWAY TO PROVIDE PASSSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16.
$20,517,490.45
$25,646,863.06
Texas
2019312
RECONSTRUCTION ON 1H 35 TO INCLUDE WIDENING FROM 6 TO 8 LANES.
$185,035,000.00
$374,225,164.70
Texas
2019409
US 54, CONVERT TO SUPER 2 HIGHWAY
$19,000,000.00
$38,238,067.66
Texas
2019411
CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY ON SL 335.
$41,103,841.85
$51,379,802.32
Texas
2019437
CONSTRUCT FRONTAGE ROADS ON US 59.
$17,000,000.00
$38,337,252.61
Texas
2019507
RAMP REVISIONS,INTERSECTION AND FRONTAGE ROAD OPERATIONAL IMPROVEMENTS ON IH 35.
$7,000,000.00
$27,154,425.57
Texas
2019518
WIDEN NON-FREEWAY 2 LANES TO 5 LANES ON CITY STREET.
$6,273,579.54
$27,516,669.27
Texas
2019599
WIDEN NON-FREEWAY FROM 2 LANE TO 4 LANE ON US 190
$36,488,767.18
$86,376,750.15
Texas
2019609
RECONSTRUCT EXISTING 4 LANE UNDIVIDED ROADWAY TO A 4 LANE DIVIDED ROADWAY ON US 290.
$25,471,516.09
$31,918,362.62
Texas
2019611
US 60 TO WEST OF BOVINA. REHAB OF EXISTING ROADWAY.
$16,623,689.65
$28,667,631.21
Texas
2019613
CONSTRUCT TWO NEW COLORADO RIVER 2-LANE FRONTAGE ROAD BRIDGES ON SH 21.
$16,000,000.00
$44,777,398.93
Texas
2019626
FM 2100 - WIDEN TO 4-LANE DIVIDED
$4,000,000.00
$48,685,047.79
Texas
2019651
WIDEN ROAD AND ADD LANES ON US 190.
$25,295,020.86
$31,618,776.07
Texas
2019689
REPLACE BRIDGES AND APPROACHES ON SH 8.
$26,204,446.57
$38,992,035.00
Texas
2019797
SH 242 - WIDEN FROM 2 TO 4 LANES
$49,090,877.55
$73,431,751.26
Texas
2019834
WIDEN FREEWAY ON IH 35E
$101,800,943.70
$128,702,705.70
Texas
2019859
INTERCHANGE IMPROVEMENT ON IH 45.
$2,151,964.14
$39,810,234.26
Texas
2019900
BASE REPAIR, SEAL COAT, OVERLAY, AND PAVEMENT MARKINGS ON MAINLANES ON IH 35 AND IH 37.
$24,673,647.89
$27,450,088.16
Texas
2019952
SH 242 - WIDEN FROM 2 TO 4 LANES
$33,206,352.62
$41,541,414.96
Texas
2019988
FM 3005 - INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL IMPROVEMENTS, APPROX 12 INCH OVERLY AND STRIPING.
$17,627,032.68
$39,141,429.85
Texas
2019990
CONSTRUCT NEW SAFETY REST AREA ON IH 10
$32,490,259.77
$36,612,824.72
Texas
2019996
CONSTRUCT BRIDGE AT RM 620.
$23,128,441.18
$28,958,721.48
Texas
2020008
US 75 AT US 82 SOUTH OF CENTER STREET WIDEN ROAD.
$14,000,000.00
$169,147,954.04
Texas
2020056
WIDEN ROAD - ADD LANES ON SH 36
$33,833,597.74
$51,291,997.17
Texas
2020057
WIDEN ROAD - ADD LANES ON SH 36
$64,840,000.00
$91,254,896.60
Texas
2020115
WIDEN ROAD AND ADD LANES ON IH 10
$20,000,000.00
$164,781,261.91
Texas
2020122
WIDEN ROAD ADD LANES AND SHOULDERS ON CR 8082.
$17,192,757.01
$64,333,827.10
Texas
2020185
RECONSTRUCT INTERCHANGE AND CONSTRUCT FRONTAGE ROAD ON IH 35.
$47,558,158.59
$59,510,187.06
Texas
2020303
WIDEN ROAD - ADD LANES ON FM 2218
$46,532,842.75
$58,166,053.43
Texas
2020314
OSTOS ROAD WIDEN ROAD, ADD LANES, AND SHOULDERS.
$19,265,984.48
$26,303,348.60
Texas
2020432
CONSTRUCT NEW ROAD ON PELLICANO DRIVE AT JOE BATTLE BOULEVARD TO DARRINGTON AT BERRYVILLE STREET.
$18,464,800.00
$26,520,124.43
Texas
2020451
BRIDGE REPLACEMENT ON US 271
$20,034,841.22
$25,043,551.51
Texas
2020455
WIDEN ROAD ADD LANES AND SHOULDERS TO IH 30.
$76,946,054.15
$97,568,095.52
Texas
2020489
WIDEN FREEWAY ON SH 199.
$95,997,373.38
$120,008,399.33
Texas
2020493
WIDEN FREEWAY ON SH 170.
$86,961,277.60
$108,701,597.00
Texas
2020496
CONVERT NON-FREEWAY ON US 59.
$31,025,623.18
$184,672,286.36
Texas
2020549
HIGHWAY IMPROVEMENT ON IH 40.
$23,985,598.98
$30,019,157.31
Texas
2020573
REHABILITATION OF EXISTING ROAD ON SH 302
$54,969,534.96
$62,962,918.69
Texas
2020649
CONSTRUCT NEW INTERCHANGE AT NORTH SL 338 AT US 385
$22,601,183.03
$28,615,588.78
Texas
2020652
HIGHWAY IMPROVEMENT ON US 67
$20,844,562.25
$26,153,506.33
Texas
2020751
REHABILITATION OF EXISTING ROAD ON FM 2119
$27,000,000.00
$66,252,295.96
Texas
2020863
CONSTRUCT BRIDGE ON IH 20
$30,674,839.02
$40,343,548.78
Texas
2020864
CONSTRUCT BRIDGE ON SH 302.
$25,000,000.00
$60,650,012.18
Texas
2020871
CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77
$50,681,059.16
$63,385,134.88
Texas
2020879
WIDEN NON-FREEWAY FACILITY ON FM 2818
$38,019,405.83
$48,166,546.29
Texas
2020944
ADD PASSING LANES ON US 83.
$21,996,924.75
$27,552,731.94
Texas
2020950
SURFACING AND ROADWAY RESTORATION ON SH 137
$47,303,780.32
$57,214,901.80
Texas
2020966
WIDEN ROAD - ADD LANES ON IH 10.
$46,028,828.08
$57,536,035.10
Texas
2021093
WIDEN ROAD - ADD LANES ON SL 121
$26,337,010.89
$33,070,636.82
Texas
2021189
REHABILITATION OF EXISTING ROAD ON FM 2004
$21,477,838.44
$31,453,621.29
Texas
2021213
BRIDGE REPLACEMENT ON SH 198.
$12,000,000.00
$33,166,851.37
Texas
2021310
WIDEN ROAD - ADD LANES ON SH 72.
$8,000,000.00
$50,911,818.47
Texas
2021327
WIDEN ROAD AND ADD LANES ON IH 35.
$85,000,000.00
$235,087,606.29
Texas
2021404
CONSTRUCT DIRECT CONNECTORS ON IH 410
$84,762,682.49
$105,987,638.80
Texas
2021440
US 59. HIGHWAY IMPROVEMENT.
$57,844,043.02
$72,330,053.77
Texas
2021488
WIDEN ROAD-ADD LANES ON SL 1604
$5,000,000.00
$163,323,331.38
Texas
2021492
WIDEN ROAD - ADD LANES ON FM 1463
$7,000,000.00
$60,122,177.87
Texas
2021518
HIGHWAY IMPROVEMENT ON IH 27.
$22,188,679.24
$28,052,631.54
Texas
2021536
CONSTRUCT NEW ROADWAY LANES AND INSTALL ILLUMINATION ON US 380.
$122,194,673.77
$153,203,526.72
Texas
2021543
CONSTRUCT AND WIDEN ROAD ON FM 60.
$8,000,000.00
$39,536,156.51
Texas
2021547
RECONSTRUCT AND WIDEN ROADWAYS ON SH 242
$19,897,876.80
$35,019,355.32
Texas
2021576
CONVERT NON-FREEWAY ON FM 1585
$7,856,000.00
$170,958,500.84
Texas
2021615
HIGHWAY IMPROVEMENT ON SL 1604 AT FM 2696
$8,125,762.13
$40,359,224.86
Texas
2021616
WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281.
$50,288,838.00
$226,609,058.80
Texas
2021704
WIDEN ROAD AND ADD LANES ON US 82
$43,727,125.65
$54,658,907.06
Texas
2021728
WIDEN ROAD - ADD LANES ON SH 36.
$54,784,000.00
$109,072,964.81
Texas
2021745
CONSTRUCT NEW ROAD AT KENNY FORT BOULEVARD.  
$28,369,555.49
Texas
2021787
CONSTRUCT NEW ROAD ON JUPITER DRIVE
$13,238,558.40
$33,932,592.00
Texas
2021840
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES ON FM 2100.
$35,214,056.19
$61,888,437.27
Texas
2021858
CONSTRUCT FRONTAGE ROADS ON SL 9 AND BI 45J
$21,069,697.99
$30,125,121.77
Texas
2021859
CONSTRUCT FRONTAGE ROADS  ON SL 9.
$40,738,586.18
$50,948,232.73
Texas
2021864
WIDEN ROAD - ADD SHOULDERS ON US 287
$29,081,956.02
$36,459,683.01
Texas
2021943
CONSTRUCT RAMPS ON SH 6.
$48,337,354.80
$60,671,693.50
Texas
2022009
WIDEN ROAD-ADD LANES ON IH 45.
$75,000,000.00
$227,644,053.26
Texas
2022013
HIGHWAY IMPROVEMENT ON US 69.
$58,983,111.83
$78,831,618.79
Texas
2022027
CONSTRUCT NEW ROADWAY LANES AND RECONSTRUCT EXISTING ROADWAY ON IH 35E
$623,356,560.75
$668,302,241.00
Texas
2022053
WIDEN FREEWAY ON IH 10
$166,260,971.09
$237,039,820.10
Texas
2022076
EXPAND FROM 8 LANES TO 14 LANES ON IH 35. EXPRESSWAY-ADD 6 NEW EXPRESS LANES
$65,570,351.00
$1,783,218,521.00
Texas
2022153
CONSTRUCT FRONTAGE RAODS ALONG IH 20.
$15,000,000.00
$91,848,786.31
Texas
2022160
CONSTRUCT BRIDGE ON SL 360
$43,713,793.38
$68,642,241.73
Texas
2022185
WIDEN ROAD AND ADD LANES ON US 83.
$22,284,686.94
$27,965,109.25
Texas
2022340
WIDEN ROAD - ADD LANES ON IH 35
$230,962,376.23
$578,235,425.65
Texas
2022356
INTERCHANGE IMPROVEMENT ON IH 20
$60,596,223.58
$78,885,163.03
Texas
2022386
CONSTRUCT PEDESTRIAN INFRASTRUCTURE- SS 366.
$36,497,175.30
$50,837,003.05
Texas
2022402
CONSTRUCT DIRECT CONECTORS ON IH 10
$371,758,985.06
$465,977,872.27
Texas
2022437
WIDEN FREEWAY ON IH 35
$64,290,303.62
$611,370,697.88
Texas
2022446
BRIDGE REPLACEMENT ON SH 21
$25,053,360.94
$31,316,701.18
Texas
2022480
BRIDGE REPLACEMENT ON SH 174
$21,462,755.43
$26,828,444.29
Texas
2022496
ROADWAY WIDENING TO A SUPER 2 HIGHWAY ON SH 302
$32,788,970.36
$41,101,212.96
Texas
2022509
WIDEN ROAD ADD LANES ON SH 36.
$19,666,299.25
$62,508,840.91
Texas
2022510
WIDEN ROAD - ADD LANES ON FM 723.
$59,585,528.00
$94,662,922.43
Texas
2022512
WIDEN ROAD - ADD LANES ON SH 36
$47,347,344.38
$59,184,180.49
Texas
2022572
CONSTRUCT INSPECTION STATION AT ANZALDUAS INTERNATIONAL BRIDGE PORT OF ENTRY.
$28,160,000.00
$67,928,007.06
Texas
2022575
CONSTRUCT BRIDGE ON SH 288.
$46,405,417.74
$58,053,752.52
Texas
2022576
WIDEN BRIDGE ON SH 146
$79,350,980.45
$100,076,331.92
Texas
2022582
SAFTETY IMPROVEMENT ON SH 115 AT FM 181.
$24,877,979.85
$39,516,973.36
Texas
2022583
ROADWAY REHABILITATION ON SH 18.
$5,196,460.67
$40,565,620.66
Texas
2022584
PREVENTIVE MAINTENANCE - BI 20-E
$20,787,686.83
$26,149,033.06
Texas
2022590
WIDEN ROAD - ADD LANES AND SHOULDERS ON SH 302.
$27,961,047.38
$35,061,309.22
Texas
2022591
ROADWAY REHABILITATION ON SH 18.
$28,651,646.01
$35,814,557.51
Texas
2022599
ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY ON US 67.
$23,400,589.18
$29,250,736.48
Texas
2022615
INTERCHANGE IMPROVEMENT ON US 75.
$40,557,316.64
$50,710,215.40
Texas
2022632
BRIDGE REPLACEMENT ON SH 7
$22,917,104.57
$28,647,410.21
Texas
2022634
WIDEN ROAD - ADD LANES ON IH 20  
$122,886,166.68
Texas
2022675
WIDEN FREEWAY IN VARIOUS LOCATIONS IN THE FORT WORTH DISTRICT TO INCLUDE IH 820, IH 20, US 287
$357,830,773.05
$1,637,220,287.00
Texas
2022745
INTERCHANGE IMPROVEMENT ON US 59.
$53,707,623.07
$93,422,800.16
Texas
2022793
RECONSTRUCT EXISTING ROADWAY AND BRIDGE REPLACEMENT ON US 80.
$32,728,746.00
$137,278,786.45
Texas
2022811
WIDEN ROAD - ADD LANES ON FM 16
$16,788,271.47
$49,908,063.76
Texas
2022901
WIDEN ROADS AND ADD LANES TO SH 46.
$31,467,502.00
$64,037,567.08
Texas
2022926
WIDEN ROAD - ADD LANES ON SH 105.
$74,143,317.18
$95,118,054.42
Texas
2022929
CONSTRUCT BRIDGE ON SH 288.
$24,984,371.85
$31,230,464.81
Texas
2022936
WIDEN ROAD - ADD LANES ON SH 99
$70,083,917.31
$87,604,896.65
Texas
2022950
HIGHWAY IMPROVEMENT ON SL 378
$32,252,864.29
$40,316,080.37
Texas
2023047
SURFACING AND ROADWAY RESTORATION ON IH 35 AND IH 10
$24,460,605.31
$27,335,849.36
Texas
2023058
WIDEN ROAD - ADD LANES ON FM 2642
$22,619,255.70
$28,290,034.63
Texas
2023121
RESURFACE ROADWAY ON US 90
$24,326,575.20
$30,814,434.99
Texas
2023154
REPLACE BRIDGE AND APPROACHES ON SH 155.
$33,679,487.92
$50,299,359.90
Texas
2023166
WIDEN FREEWAY ON IH 30
$40,000,000.00
$386,910,587.24
Texas
2023167
CONSTRUCT NEW ROADWAY LANES ON SH 5.
$35,402,104.26
$44,674,434.76
Texas
2023253
CONSTRUCTION OF EAST-WEST CONNECTOR AT SH 360, 20TH AVENUE AND RENTAL CAR DRIVE.
$22,643,504.80
$32,838,616.86
Texas
2023274
HIGHWAY IMPROVEMENT ON CR 861.  
$25,511,817.69
Texas
2023277
FREEWAY OPERATIONAL IMPROVEMENTS- IH 45
$20,277,013.98
$25,390,767.48
Texas
2023340
INTERCHANGE IMPROVEMENT ON IH 35 EAST.
$81,808,137.42
$122,383,413.50
Texas
2023494
WIDEN ROAD AND ADD LANES ON FM 521
$61,205,326.40
$77,018,958.44
Texas
2023497
WIDEN ROAD - ADD LANES ON SH 6
$23,075,560.68
$28,967,288.84
Texas
2023505
RAILROAD CROSSING IMPROVEMENTS ON SH 183
$27,113,208.01
$34,285,760.02
Texas
2023524
ROADWAY REHABILITATION AND RECONSTRUCTION WITH NO ADDED CAPACITY ON FM 1450.
$70,888,304.86
$88,610,381.07
Texas
2023557
CONSTRUCT BRIDGE ON UA 90
$37,632,095.20
$53,506,311.85
Texas
2023570
HIGHWAY IMPROVEMENT ON SH 137  
$26,376,161.39
Texas
2023629
WIDEN ROAD ON US 83.
$29,829,993.07
$37,307,686.44
Texas
2023675
WIDEN ROAD AND ADD LANES ON FM 2252
$35,067,079.31
$55,521,412.57
Texas
2023679
INTERCHANGE IMPROVEMENT ON IH 30
$138,436,799.60
$209,051,709.54
Texas
2023693
INTERCHANGE IMPROVEMENT AND CONSTRUCT RAMPS ON IH 20.
$45,944,416.61
$57,430,520.75
Texas
2023694
REHABILITATE EXISTING ROADWAY ON IH 820.
$30,483,204.05
$33,923,136.73
Texas
2023704
INTERCHANGE IMPROVEMENT ON US 175.
$35,862,120.71
$44,836,215.96
Texas
2023722
INTERCHANGE IMPROVEMENT ON US 69.
$33,586,055.44
$41,982,569.31
Texas
2023723
WIDEN ROAD AND ADD LANES ON FM 2493.  
$33,266,441.03
Texas
2023767
HIGHWAY IMPROVEMENT ON US 277 AND SH 70  
$34,564,485.65
Texas
2023773
HIGHWAY IMPROVEMENT ON US 59  
$113,482,130.28
Texas
2023837
HIGHWAY IMPROVEMENT ON IH 820
$361,127,200.00
$451,409,000.00
Texas
2023874
WIDEN ROAD AND ADD LANES ON FM 1516
$22,587,200.00
$49,657,076.64
Texas
2023933
BRIDGE REPLACEMENT, BRIDGE MAINTENANCE ON IH 20.
$29,110,609.22
$32,345,121.32
Texas
2023947
WIDEN ROAD - ADD LANES ON IH 10
$177,118,161.14
$237,633,605.92
Texas
2023954
WIDEN ROAD - ADD LANES ON FM 1518
$16,128,953.20
$84,291,980.46
Texas
2023958
WIDEN ROAD AND ADD LANES ON SL 1604
$48,533,389.41
$61,465,144.62
Texas
2023992
CONVERT NON-FREEWAY ON US 59
$72,977,567.10
$91,221,958.87
Texas
2024004
RESURFACE ROADWAY ON IH 10.
$29,390,168.61
$32,662,086.22
Texas
2024033
REHABILITATE EXISTING ROADWAY ON US 60.
$35,297,551.62
$44,121,939.53
Texas
2024041
HIGHWAY IMPROVEMENT ON US 75
$52,403,437.51
$66,024,375.27
Texas
2024335
HIGHWAY IMPROVEMENT ON SH 204  
$25,136,162.52
Texas
2024530
WIDEN ROAD - ADD LANES ON SL 1604
$111,220,148.99
$140,287,950.42
Texas
2024562
WIDEN ROAD - ADD LANES ON IH 20  
$168,334,403.70
Texas
2B20004
CONSTRUCT SUPER 2, GRADING, BASE, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKING ON US 281.
$21,058,021.44
$26,322,526.81
Texas
2B20006
WIDEN ROAD AND INSTALL SIGNS ON SH 114.
$25,977,982.83
$35,472,478.54
Texas
2B20010
INFRASTRUCTURE IMPROVEMENTS ON SL 375
$33,600,250.88
$42,000,313.61
Texas
2B20015
CONSTRUCT NEW ROADWAY LANES ON IH 37.
$14,000,000.00
$69,791,097.00
Texas
2B20048
WIDEN ROAD AND ADD LANES ON IH 45
$78,971,131.75
$98,859,273.45
Texas
2B20200
NEW LOCATION FREEWAY AND INTERSECTION IMPROVEMENTS ON AVONDALE-HASLET ROAD, HASLET PARKWAY AND FM 156.
$33,556,556.01
$49,088,603.58
Texas
2B20250
HIGWAY IMPROVEMENT ON SH 302.
$9,000,000.00
$47,343,520.93
Texas
2B20255
WIDEN ROAD (ADD LANES) ON FM 2478.
$23,494,713.75
$29,368,392.19
Texas
2B20260
SH 121 - CONSTRUCT NEW ROADWAY LANES.
$52,019,160.00
$101,958,550.50
Texas
2B22010
HIGHWAY IMPROVEMENT ON SH 128.
$29,560,475.28
$36,950,594.10
Texas
2B22018
INTERCHANGE IMPROVEMENT ON IH 30. CONSTRUCT NEW ROAD ON IH30. BRIDGE REPLACEMENT ON IH30
$14,333,323.45
$146,504,004.18
Texas
2B23048
WIDEN ROAD - ADD LANES ON US 75
$127,344,172.66
$161,403,712.00
Texas
2B23079
WIDEN ROAD AND ADD LANES ON US 59 AND US 77.
$44,322,205.21
$55,447,918.74
Texas
2B23121
WIDEN ROAD AND ADD LANES ON SH 72.  
$53,599,723.30
Texas
2B23122
CONSTRUCT TRADE PROCESSING CENTER ON CR 31.
$22,954,504.09
$28,454,504.09
Texas
2B23149
INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59
$34,575,035.73
$43,321,215.90
Texas
2B23150
INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59
$63,480,781.46
$79,500,461.13
Texas
2B23151
RECONSTRUCT EXISTING ROADWAY ON US 59
$99,989,233.38
$118,868,594.54
Texas
2B23273
WIDEN ROAD - ADD LANES -ON SH 359
$9,015,384.62
$55,794,058.30
Texas
2B23276
BRIDGE REPLACEMENT ON IH 20.
$28,619,156.45
$35,773,945.56
Texas
2B23294
SEAL COAT ON US 87,SH 354,BI 40D,US 60,US 385,IH 40,SH 207,SH 70,SH 15,SH 136,FM 119,FM 293,FM 1913,FM 2219, AND RM 2381
$6,900,374.00
$25,674,308.09
Texas
NBIS019
STATEWIDE INVENTORY AND INSPECTION OF ON AND OFF-SYSTEM BRIDGES FOR FISCAL YEARS 2019 AND 2020
$52,800,000.00
$66,000,000.00
Texas
NBIS022
FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - ON SYSTEM
$25,600,000.00
$32,000,000.00
Texas
NBIS023
FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - OFF SYSTEM
$25,600,000.00
$32,000,000.00
Texas
SB97001
STATEWIDE, STATE INFRASTRUCTURE BANK-ADV CAP.
$99,562,057.00
$285,168,019.00
Texas
X597001
US 181; FROM N. OF THE CORPUS CHRISTI SHIP CHANNEL TO S. OF THE CORPUS CHRISTI SHIP CHANNEL. CONST NEW HARBOR BR OVER SHIP CHANNEL
$723,123,258.92
$852,451,051.55