RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Texas | VARIOUS LOCATIONS IN TARRANT COUNTY, CONGESTION MITIGATION & AIR QUALITY | $21,301,440.00 |
$26,626,800.00 |
|
Texas | IH 10 FROM W OF ADAMS BAYOU, EAST TO W OF SABINE RIVER BRIDGE RECONSTRUCT MAIN LANES OF EXISTING 4 LANE FREEWAY | $15,079,960.37 |
$55,519,614.93 |
|
Texas | CONSTRUCT ONE-WAY FRONTAGE ROADS, ENTRANCE AND EXIT RAMPS AND REPLACE BRIDGE AT FM 989 ON IH 30. | $55,333,461.40 |
$68,545,021.19 |
|
Texas | IH 35 FROM FALLS COUNTY LINE TO WOODLAWN RD RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE CONGESTION AND ENHANCE SAFETY | $121,454,076.60 |
$138,025,677.73 |
|
Texas | IH 35W FROM IH 820 TO IH 30. RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES | $220,313,023.61 |
$294,794,414.93 |
|
Texas | IH 35E FROM SANDY LAKE RD/WHITLOCK LN TO LOOP 288. RECONST 6 LN TO 8 MAINLANES, 4 CONCURRENT MANAGED/HOV AND FR | $397,540,702.04 |
$1,049,891,743.18 |
|
Texas | IH 45 FROM AT IH 610 S TO CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB | $22,644,369.15 |
$28,472,662.26 |
|
Texas | US 190 FR. 0.20 MI E OF FM 3470 TO 0.30 MI W OF FM 2410 FR. 3470 TO ROY REYNOLDS . CONSTRUCT OVERPASS AND WIDEN FR 2 TO 4 LNS W/CO | $8,142,854.66 |
$25,842,684.00 |
|
Texas | SH 242 FROM AT IH 45 TO . CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH 242 TO SB IH 45 & NB IH 45 TO WB SH 242 ( | $1,480,218.39 |
$31,278,253.00 |
|
Texas | FROM IH 20 TO FM 700. CONSTRUCT NEW RELIEF ROUTE | $63,362,556.40 |
$79,120,364.25 |
|
Texas | RECONSTRUCT CLINTON DRIVE | $15,711,497.00 |
$31,121,001.72 |
|
Texas | IH 69 FR W OF FM 762 TO 0.31 MI W OF FM 2759. WIDEN TO 8 ML, FRTG RDS, ITS, TMS, CONST 2-WAY HOV LNS & INT IMPRVS AT FM 762. | $130,353,034.39 |
$183,422,238.85 |
|
Texas | IH 45 FROM SP 5 TO US 59. CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE EXISTING US 59 NB AND SB DIRECT CONNECTORS. | $31,042,363.63 |
$38,802,954.54 |
|
Texas | US 83 FROM 0.28 MI WEST OF SHOWERS RD TO 0.85 MI E OF FM 886(EL FARO RD). CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY | $21,812,000.00 |
$67,039,536.19 |
|
Texas | IH35 FR N. STASSNEY LN TO S. WILLIAM CANNON DR ADD SHLDERS, AUX LNS, RAMP IMPRVMTS, PAV REHAB, BIKE & PED IMPRVM, FRT RD INTSE IMP | $31,332,261.92 |
$77,852,159.34 |
|
Texas | ON IH 35E FR US 77 S OF WAXAHACHIE TO US 77 N OF WAXAHACHIE. RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES | $114,751,988.92 |
$149,428,506.15 |
|
Texas | FM 1626 LANE RECONSTRUCTION | $6,668,421.60 |
$25,689,139.16 |
|
Texas | IH 410 AT US 90. RECONSTRUCT INTERCHANGE AND OPERATIONAL IMPROVEMENTS | $73,498,308.65 |
$81,664,787.39 |
|
Texas | SH 358 FROM NILE STREET TO AYERS STREET. RAMP REVERSAL PHASE II-A, SOUTH SIDE ONLY. | $43,526,406.49 |
$54,408,008.11 |
|
Texas | CONSTRUCT 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND SIDEWALKS ON IH 20 | $12,625,395.26 |
$70,512,006.15 |
|
Texas | WIDEN EXISTING FOUR LANE TO SIX LANE ON IH 10 | $42,969,591.46 |
$53,711,989.33 |
|
Texas | SH 288 AT BW 8 INTERCHANGE. CONSTRUCT 8 DIRECT CONNECTORS | $1,802,655.00 |
$100,253,318.00 |
|
Texas | IH 10 ADDITIONAL LANE CONSTRUCTION | $153,348,307.03 |
$192,080,905.63 |
|
Texas | CONSTRUCT 4 LANE BRIDGE AND RAMP MODIFICATIONS ON SH 114 | $26,585,626.44 |
$46,732,033.06 |
|
Texas | FM 521 - WIDEN TO 4-LANE DIVIDED SECTION AND CONSTRUCT GRADE SEPARATION AT UNION PACIFIC RAIL ROAD | $20,458,196.69 |
$25,684,230.42 |
|
Texas | SL 335- CONSTRUCT FRONTAGE ROADS. | $19,184,316.02 |
$31,420,395.03 |
|
Texas | CONSTRUCT AUXILIARY LANES AND RAMP REVERSAL ON US 181 | $9,796,239.63 |
$26,321,299.53 |
|
Texas | IH 10 INTERCHANGE IMPROVEMENTS | $14,441,495.74 |
$32,825,598.60 |
|
Texas | IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES | $94,615,640.22 |
$118,269,550.27 |
|
Texas | CONSTRUCT 4-LANE DIVIDED URBAN STREET FACILITY ON NEW LOCATION ON AIRPORT BOULEVARD | $18,329,372.16 |
$25,388,422.00 |
|
Texas | RECONSTRUCTION OF DIRECT CONNECTOR ON IH 69 | $8,882,098.06 |
$26,244,997.85 |
|
Texas | CONSTRUCT DIRECT CONNECTOR AND HOV ACCESS TO UPTOWN TRANSIT CENTER ON IH 610 | $56,915,556.97 |
$68,253,926.76 |
|
Texas | IH 610 RECONSTRUCTION | $99,874,189.06 |
$113,882,432.29 |
|
Texas | IH 35 OPERATIONAL IMPROVEMENTS | $116,699,570.90 |
$138,606,189.90 |
|
Texas | WIDEN FREEWAY ON IH 45 | $105,278,702.00 |
$131,598,377.51 |
|
Texas | FM 2181. WIDEN ROADWAY | $4,949,755.09 |
$35,864,685.70 |
|
Texas | RECONSTRUCT ROADWAY AT BUFFALO SPEEDWAY | $9,796,640.00 |
$27,975,271.62 |
|
Texas | CONSTRUCT 4 LANE TOLLWAY IN SECTIONS ON SH 249 | $154,400,000.00 |
$309,757,180.00 |
|
Texas | CONVERT REVERSIBLE HOV TO REVERSIBLE EXPRESS LANES, RECONSTRUCT AND WIDEN MAINLANES AND FRONTAGE ROADS ON IH35 E AND US 67 | $317,248,899.00 |
$624,975,805.00 |
|
Texas | IH 610 - RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS AT CAMBRIDGE STREET/ALMEDA ROAD/UNION PACIFIC RAILROAD | $69,000,000.00 |
$84,448,793.58 |
|
Texas | ROADWAY WIDEN TO A MODIFIED SUPER 2 ON US 67. | $5,000,000.00 |
$53,396,420.94 |
|
Texas | EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 | $50,100,000.00 |
$200,648,881.31 |
|
Texas | US 82 - ADD TWO LANES WITH SHOULDERS AND WIDEN FROM 2 LANE TO 4 LANE | $65,155,054.86 |
$81,538,975.57 |
|
Texas | CONSTRUCT MAIN LANES, OVERPASSES, FRONTAGE ROADS AND STRUCTURES ON US 77 | $32,383,849.12 |
$40,479,811.40 |
|
Texas | US 69 - WIDEN FREEWAY FROM 4 TO 6 LANES | $27,865,125.15 |
$34,831,406.44 |
|
Texas | IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES | $112,175,146.80 |
$140,218,933.50 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 97 | $59,295,842.78 |
$70,119,828.47 |
|
Texas | WIDEN TO SIX MAIN LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING; INTELLIGENT TRANSPORTATION SYSTEM ON IH 10 | $125,000,000.00 |
$373,870,824.61 |
|
Texas | REPLACE BRIDGE AND APPROACHES ON IH 35. | $33,459,856.53 |
$37,217,355.86 |
|
Texas | CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION ON US 377 | $35,668,539.46 |
$56,399,568.86 |
|
Texas | WIDEN 2 TO 4 LANE DIVIDED ON FM 156. | $45,803,593.63 |
$57,254,492.03 |
|
Texas | CONSTRUCT GRADE SEPARATION ON US 181 | $23,905,793.48 |
$29,882,241.85 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 36 | $7,000,000.00 |
$98,644,061.78 |
|
Texas | FM 2221. CONSTRUCT CONTROLLED ACCESS FACILITY. | $91,218,763.56 |
$114,516,232.45 |
|
Texas | CONSTRUCT RAMPS ON IH 35. | $67,188,251.91 |
$74,730,485.49 |
|
Texas | REHABILITATIONS AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 85. | $10,000,000.00 |
$40,682,774.72 |
|
Texas | REHABILITATION OF EXISTING ROAD ON SH 123. | $21,394,897.17 |
$26,752,645.11 |
|
Texas | CONSTRUCT 4 LANE DIRECT CONNECTION (FUTURE I-69) ON US 59. | $60,440,799.99 |
$92,628,331.74 |
|
Texas | IH 45 WIDEN ROAD ADD LANES | $142,813,404.19 |
$179,214,098.64 |
|
Texas | REHABILITATION OF EXISTING ROAD ON US 183 | $22,000,000.00 |
$28,720,936.06 |
|
Texas | FM 2100 WIDEN TO 4 LANE DIVIDED | $25,281,834.67 |
$31,684,149.84 |
|
Texas | INTERCHANGE IMPROVEMENT ON SL 12 AND SS 482. | $271,498,670.57 |
$341,709,166.57 |
|
Texas | WIDEN ROAD AND ADD LANES ON IH 410 | $64,126,345.37 |
$84,896,921.79 |
|
Texas | WIDEN FROM 2 LANE TO 4 LANE WITH A CONTINUOUS LEFT TURN LANE; REPLACE BRIDGE AT SAND CREEK | $26,277,322.57 |
$35,502,514.54 |
|
Texas | HAZARD ELIMINATION AND SAFETY | $27,232,864.76 |
$30,258,738.61 |
|
Texas | CONSTRUCT NEW ROADWAY LANES ON US 281 | $66,747,449.27 |
$83,434,311.59 |
|
Texas | WIDEN FREEWAY - ADD LANES ON IH 10. | $80,492,432.23 |
$100,790,599.37 |
|
Texas | SH 87 - FERRY OPERATION PROJECTS | $21,874,049.60 |
$27,342,562.00 |
|
Texas | WIDEN FREEWAY ON IH 635. | $1,077,601,060.72 |
$1,720,223,200.00 |
|
Texas | CONSTRUCT INTERCHANGE ON IH 2 AND IH 69C. | $139,446,264.76 |
$300,051,164.00 |
|
Texas | STATEWIDE, STATE INFRASTRUCTURE BANK -ADV CAP | $71,726,747.00 |
$192,462,886.00 |
|
Texas | IH 30 FROM EAST OF SYLVAN AVE TO IH 35E. WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV. | $36,234,552.00 |
$112,449,552.20 |
|
Texas | US CUSTOMS PORT OF ENTRY EXIT TO US 281. CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF) | $33,146,456.76 |
$36,270,895.40 |
|
Texas | US 82 FROM US 82 AT US 281 TO .. CONSTRUCT DIRECT CONNECT INTERCHANGE | $31,139,709.00 |
||
Texas | IH 635 FROM WEBB CHAPEL TO WEST OF US 75 (MERIT DR). IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV/MANAGED LANES | $346,160,303.95 |
$930,082,152.42 |
|
Texas | FM 1314 FROM 1.0 MI S OF SH 242 TO 2.6 MILE NW OF LOOP 494 WIDEN TO 4 LANE DIVIDED RURAL ROAD AND LENGTHEN OR REPLACE | $33,034,515.63 |
$46,093,270.00 |
|
Texas | FM 1484 FROM FM 3083 TO FM 2432. WIDEN TO 4 LANE DIVIDED | $18,508,072.78 |
$33,997,859.93 |
|
Texas | FM 1488 FROM EAST OF FM 149 AT MOSTYN TO FM 2978. WIDEN 2 LANES TO 4-LANE DIVIDED (PTF) | $26,026,471.13 |
$36,148,371.04 |
|
Texas | SS 601 FROM US 54 (PATRIOT FREEWAY) TO LOOP 375 (PURPLE HEART FREEWAY). CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES | $244,634,419.55 |
$359,350,000.00 |
|
Texas | EXTEND CONFLANS RD FROM W OF SH 161 TO VALLEY VIEW LANE IN CITY OF IRVING. NEW LOCATION CITY STREET - 4 LANE DIVIDED | $14,808,588.00 |
$37,987,724.28 |
|
Texas | FM 3407 FROM RM 12 TO RM 2439 CONSTRUCT 4-LN DIVIDED ROADWAY | $32,415,232.10 |
$41,732,542.58 |
|
Texas | ON SH 199 AT BYPASS CHANNEL IN FTW TO NEAR CBD & TRINITY RIVER. CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL. | $36,982,949.80 |
$48,967,209.40 |
|
Texas | US 79 FROM 79-B E OF TAYLOR TO E OF FM 1063. UPGRADE TO 4-LN DIVIDED RDWY | $19,865,925.86 |
$28,636,441.29 |
|
Texas | IH 20 FROM SH 171; IN WEATHERFORD TO FM 2552; ON EAST AND WEST BOUND FRONTAGE ROADS. RECONSTRUCT AND EXTEND FRONTAGE ROAD. | $19,196,974.61 |
$35,689,114.71 |
|
Texas | FM 646 FROM FM 517 TO FM 1764. WIDEN FROM 2 LANES TO 4-LANE DIVIDED (PTF) | $18,042,196.30 |
$26,866,332.00 |
|
Texas | ENGINEERING, ROW, & CONSTRUCTION OF DFW CONNECTOR ON SH 114 AND SH 121. RECONSTRUCT FREEWAY, FRONTAGE ROADS AND RAMPS | $607,149,857.90 |
$696,394,133.00 |
|
Texas | ENGINEERING, ROW AND CST OF DFW CONNECTOR ON SH 121 AND SH 114. RECONST FRWY 4 TO 6 W/AUX LNS,FR RDS & RAMPS & ADD COLLECTOR | $591,539,254.30 |
$739,424,067.78 |
|
Texas | IH 820 FROM IH 35W TO SH 121/SH 183. RECONSTRUCT 4 TO 10 W/ HOV/MANAGED LANE, INTERCHANGE AND CONNECTORS | $421,105,616.27 |
$526,087,354.64 |
|
Texas | US 271 FROM 0.3 MI. NORTH OF US 67 TO .7MI SOUTH OF FM 3417. CONSTRUCT FIRST PHASE OF ULTIMATE 4-LANE DIVIDED FREEWAY | $53,582,610.43 |
$87,852,142.31 |
|
Texas | IH 610 FROM TC JESTER TO N OF IH 10 ON IH 610 AND TO 34TH ST ON US 290. RECONSTR US290/IH610 IC, CONSTR INTERCHANGE W/ DC'S W/ TWO | $36,665,773.00 |
$171,036,404.00 |
|
Texas | LP 363 FROM IH 35 NORTH OF TEMPLE TO SH 53. CONSTRUCT NORTHBOUND FRONTAGE ROAD TO PROVIDE INTERIM 4-LANE | $24,784,256.30 |
$35,527,847.63 |
|
Texas | SH 550 @ US 77/83 TO 0.53 MI E OF OLD ALICE RD. CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES | $2,300,000.00 |
$34,495,766.00 |
|
Texas | US 290 FROM WEST OF RM 1826 TO SL 1; RECONSTRUCT 4-LANE TO 6-LANE CONTROLLED ACCESS HIGHWAY AND FRONTAGE ROADS | $21,468,853.91 |
$146,578,873.54 |
|
Texas | US 59 - WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS | $84,105,000.00 |
$120,120,653.85 |
|
Texas | IH 35 FROM S LP 363 IN TEMPLE TO NUGENT AVE. RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES. | $233,750,004.59 |
$275,865,720.60 |
|
Texas | RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE ON MEDICAL DISTRICT DRIVE. | $19,376,490.00 |
$27,202,300.29 |
|
Texas | ON IH 610 FROM W OF W 34TH ST ON US 290 TO N AND S OF US 290 ON IH 610.RECONSTRUCT US 290/IH 610 INCLUDING IH10 TO US 290 OUTBOUND | $99,132,093.21 |
$124,346,658.20 |
|
Texas | IH 45 FROM 0.9884 MILES SOUTH OF FM 2351 TO SOUTH OF MEDICAL CENTER DRIVE. WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3-LANE FR | $85,185,107.91 |
$106,749,097.46 |
|
Texas | CONSTRUCT FOUR LANE FREEWAY AT DIBOLL (FUTURE I-69) | $14,237,000.00 |
$171,923,286.00 |
|
Texas | HIGHWAY IMPROVEMENT ON US 59. | $2,813,685.77 |
$101,174,791.48 |
|
Texas | IH 10 AT SH 87 AND T&NO RR. REPLACE BRIDGE AND APPROACHES | $24,578,123.17 |
$30,722,653.80 |
|
Texas | SH183 FROM FM157 TO I35E; LP12 FROM SH183 TO I35E; AND SH114 FROM SH97 TO SH183. RECONSTRUCT & ADD MANAGED LANES | $576,221,762.15 |
$809,451,840.03 |
|
Texas | US 82 FROM FM 1840 TO SH 98. RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES | $9,992,256.47 |
$27,294,014.40 |
|
Texas | ON SH 365 FROM FM 396 TO US 281. CONSTRUCT 4-LANE CONTROLLED ACCESS TOLLED FACILITY | $33,756,881.00 |
$155,435,862.00 |
|
Texas | CONSTRUCT 6-LANE DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY WITH AUTO PUMP STATION AND RAILROAD LINE WITH UNDERPASSES ON HEMPSTEAD ROAD | $34,192,164.82 |
$63,002,913.46 |
|
Texas | REHABILITATION OF EXISTING ROADWAY AND INTERCHANGE IMPROVEMENTS ON US 175 AND SH 310. | $24,046,844.68 |
$47,565,481.66 |
|
Texas | US 290 FR W OF PINEMONT TO W OF 34TH ST. RECONSTRUCT & WIDEN TO 8 MN LNS WITH 3 REV MANAGED LNS, AUX LNS; 2-2 LN FRTG RDS. | $50,797,182.77 |
$176,239,844.19 |
|
Texas | US 290 - RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES AND TWO 2-LANE FRONTAGE ROADS | $91,276,521.07 |
$195,462,373.84 |
|
Texas | ON US 290 FR E OF W LITTLE YORK TO W OF PINEMONT. RECONSTRUCT & WIDEN TO 8 MN LNS, 3 REV MNG LNS, AUX LNS; 2 2-LN FRTG RDS, GRD SE | $102,778,084.87 |
$189,407,321.74 |
|
Texas | REPLACE BRIDGE AND APPROACHES ON FM 1495. | $26,727,976.27 |
$33,415,139.89 |
|
Texas | CONSTRUCT NEW ROAD ON LP 375. | $29,427,716.36 |
$36,784,645.46 |
|
Texas | US 290 FROM E OF MUESCHKE RD TO E OF TELGE RD. RECON AN WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MAIN LANES, AUX LANES AND 2-LN FR | $37,362,073.98 |
$98,369,741.82 |
|
Texas | CONSTRUCT DIRECT CONNECTOR ON IH 45 AT IH 610 E. | $55,043,017.24 |
$57,720,972.39 |
|
Texas | IH 610 FROM W OF 34TH ST ON US 209 TO IH 610. RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS AND 3-LANE REVERSIBLE | $2,830,000.00 |
$181,761,983.83 |
|
Texas | FM 1957 FROM SH 211 TO LOOP 1604. EXPAND FROM 2 LANES TO 4 LANE DIVIDED. | $7,528,667.31 |
$37,501,000.00 |
|
Texas | ON US 59 FROM SP 10 TO W OF FM 762. WIDEN TO 6-LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM W/ GRADE SEPARATION | $135,932,655.18 |
$167,412,867.49 |
|
Texas | CONSTRUCT NEW ROAD ON MCHARD ROAD. | $23,966,629.04 |
$29,959,286.30 |
|
Texas | WIDEN ROAD, ADD LANES, AND SHOULDERS ON US 69 | $33,829,736.79 |
$42,287,170.98 |
|
Texas | SH 105 FROM AT THE BRAZOS RIVER TO . REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, STRUCTURES, BASE AND SURFACE | $28,167,790.30 |
$35,209,737.90 |
|
Texas | AT WHITE SETTLEMENT RD IN FTW. CONST 4 LN BRIDGE AT NEW LOC OF PROPOSED BYPASS CHANNEL FOR TRINITY RIVER NEAR CBD OF FTW | $6,200,000.00 |
$33,796,872.18 |
|
Texas | ON IH 30 AT FM 3549. RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS AND RAMPS CONSTRUCTION. | $16,709,036.80 |
$26,585,311.57 |
|
Texas | ADD SHOULDERS, AUXILLARY LNS, RAMP IMPROVEMENTS, PAVEMENT REHAB, BIKE AND PED IMPROVEMENTS & FRONTAGE ROAD INTERSECTION IMPROVEMENTS ON IH 35 | $45,111,638.29 |
$50,136,042.54 |
|
Texas | ON IH30 FR 1.0 MI W OF SH360 TO GREAT SOUTHWEST PKWY; AT SIX FLAGS DR. CONST DIR CONN INTCHG AT SH360 & TMS & RECONSTR BRIDGE. | $49,671,949.79 |
$268,872,798.96 |
|
Texas | IH 20. REALIGN EXISTING ROADWAY INCLUDING GRADING, PAVEMENT DRAINAGE, SIGNING, AND ILLUMINATION. | $80,121,825.43 |
$89,828,148.68 |
|
Texas | EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 | $78,000,000.00 |
$199,577,086.75 |
|
Texas | WIDEN FREEWAY FROM FOUR TO SIX LANES ON US 67 | $3,022,594.50 |
$66,270,431.33 |
|
Texas | WIDEN ROADWAY INCLUDING FRONTAGE ROADS, STRIPING AND SIGNING ON IH 45 | $63,259,215.23 |
$94,794,666.94 |
|
Texas | CONSTRUCT RELIEF ROUTE AROUND DRISCOLL ON US 77. | $40,000,000.00 |
$98,921,208.78 |
|
Texas | IH 820 AND SH 121. RECONSTRUCTION AND WIDENING. | $134,591,824.21 |
$168,259,780.27 |
|
Texas | DEDICATED BUS LANE ON IH 610 | $30,768,692.13 |
$67,075,598.13 |
|
Texas | FM 762 AND FM 2759 - WIDEN TO 4 LANES DIVIDED | $27,554,687.76 |
$34,539,569.58 |
|
Texas | US 377 AT LAKE TEXOMA. BRIDGE REPLACEMENT. | $5,000,000.00 |
$35,234,013.62 |
|
Texas | CITY STREET FROM MARSALIS AVENUE TO EWING AVENUE. CONSTRUCT LOCAL ENHANCEMENTS. | $16,000,000.00 |
$39,388,000.00 |
|
Texas | US 285. ROADWAY WIDENING TO A MODIFIED SUPER 2 | $34,325,994.90 |
$43,366,955.49 |
|
Texas | WIDEN FROM 2 LANES TO 4 LANE ON US 69 | $52,977,757.81 |
$66,222,197.26 |
|
Texas | UPGRADE FROM 4-LANE DIVIDED HWY TO 4-LANE FREEWAY WITH FRONTAGE ROAD BY CONSTRUCTING 4 MAINLANES, INTERCHANGES, AND FRONTAGE ROADS AT SH 44 | $26,238,131.10 |
$32,797,663.88 |
|
Texas | WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES ON SH 146 | $81,128,000.00 |
$253,240,692.19 |
|
Texas | SH 242 AT FM 1314. CONSTRUCT GRADE SEPARATION. | $21,168,947.40 |
$26,532,973.00 |
|
Texas | REHAB AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16 | $17,100,000.00 |
$43,749,069.95 |
|
Texas | ROADWAY WIDENING TO A MODIFIED SUPER 2 ON US 285 | $34,066,526.95 |
$42,583,158.69 |
|
Texas | RECONSTRUCT INTERSECTION ON IH 35. | $23,445,433.99 |
$26,050,482.21 |
|
Texas | CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE ON IH 10 | $27,763,717.15 |
$34,704,646.44 |
|
Texas | RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS ON IH 45 | $200,501,389.55 |
$251,138,652.59 |
|
Texas | SL 1604 - EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY | $43,095,149.12 |
$53,905,944.44 |
|
Texas | REHABILITATE EXISTING ROADWAY ON US 83. | $58,274,022.74 |
$72,871,466.30 |
|
Texas | REHABILITATION OF EXISTING HIGHWAY ON US 83. | $9,000,000.00 |
$65,135,678.13 |
|
Texas | BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONS AT INTERSECTIONS ON US 62. | $25,000,000.00 |
$172,354,438.05 |
|
Texas | RECONSTRUCT EXISTING 4-LANE UNDIVIDED ROADWAY TO A 4-LANE DIVIDED ROADWAY ON US 290. | $31,604,453.80 |
$36,332,955.39 |
|
Texas | US 54 FROM LOOP 375, INTERCHANGE IMPROVEMENTS. | $91,653,201.39 |
$114,650,417.14 |
|
Texas | WIDEDN FROM 4 TO 6 LANES ON SL 375. | $95,362,990.82 |
$116,103,738.53 |
|
Texas | REHABILITATION AND WIDEN ROADWAY TO PROVIDE PASSSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16. | $20,517,490.45 |
$25,646,863.06 |
|
Texas | RECONSTRUCTION ON 1H 35 TO INCLUDE WIDENING FROM 6 TO 8 LANES. | $185,035,000.00 |
$374,225,164.70 |
|
Texas | US 54, CONVERT TO SUPER 2 HIGHWAY | $19,000,000.00 |
$38,238,067.66 |
|
Texas | CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY ON SL 335. | $41,103,841.85 |
$51,379,802.32 |
|
Texas | CONSTRUCT FRONTAGE ROADS ON US 59. | $17,000,000.00 |
$38,337,252.61 |
|
Texas | RAMP REVISIONS,INTERSECTION AND FRONTAGE ROAD OPERATIONAL IMPROVEMENTS ON IH 35. | $7,000,000.00 |
$27,154,425.57 |
|
Texas | WIDEN NON-FREEWAY 2 LANES TO 5 LANES ON CITY STREET. | $6,273,579.54 |
$27,516,669.27 |
|
Texas | WIDEN NON-FREEWAY FROM 2 LANE TO 4 LANE ON US 190 | $36,488,767.18 |
$86,376,750.15 |
|
Texas | RECONSTRUCT EXISTING 4 LANE UNDIVIDED ROADWAY TO A 4 LANE DIVIDED ROADWAY ON US 290. | $25,471,516.09 |
$31,918,362.62 |
|
Texas | US 60 TO WEST OF BOVINA. REHAB OF EXISTING ROADWAY. | $16,623,689.65 |
$28,667,631.21 |
|
Texas | CONSTRUCT TWO NEW COLORADO RIVER 2-LANE FRONTAGE ROAD BRIDGES ON SH 21. | $16,000,000.00 |
$44,777,398.93 |
|
Texas | FM 2100 - WIDEN TO 4-LANE DIVIDED | $4,000,000.00 |
$48,685,047.79 |
|
Texas | WIDEN ROAD AND ADD LANES ON US 190. | $25,295,020.86 |
$31,618,776.07 |
|
Texas | REPLACE BRIDGES AND APPROACHES ON SH 8. | $26,204,446.57 |
$38,992,035.00 |
|
Texas | SH 242 - WIDEN FROM 2 TO 4 LANES | $49,090,877.55 |
$73,431,751.26 |
|
Texas | WIDEN FREEWAY ON IH 35E | $101,800,943.70 |
$128,702,705.70 |
|
Texas | INTERCHANGE IMPROVEMENT ON IH 45. | $2,151,964.14 |
$39,810,234.26 |
|
Texas | BASE REPAIR, SEAL COAT, OVERLAY, AND PAVEMENT MARKINGS ON MAINLANES ON IH 35 AND IH 37. | $24,673,647.89 |
$27,450,088.16 |
|
Texas | SH 242 - WIDEN FROM 2 TO 4 LANES | $33,206,352.62 |
$41,541,414.96 |
|
Texas | FM 3005 - INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL IMPROVEMENTS, APPROX 12 INCH OVERLY AND STRIPING. | $17,627,032.68 |
$39,141,429.85 |
|
Texas | CONSTRUCT NEW SAFETY REST AREA ON IH 10 | $32,490,259.77 |
$36,612,824.72 |
|
Texas | CONSTRUCT BRIDGE AT RM 620. | $23,128,441.18 |
$28,958,721.48 |
|
Texas | US 75 AT US 82 SOUTH OF CENTER STREET WIDEN ROAD. | $14,000,000.00 |
$169,147,954.04 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 36 | $33,833,597.74 |
$51,291,997.17 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 36 | $64,840,000.00 |
$91,254,896.60 |
|
Texas | WIDEN ROAD AND ADD LANES ON IH 10 | $20,000,000.00 |
$164,781,261.91 |
|
Texas | WIDEN ROAD ADD LANES AND SHOULDERS ON CR 8082. | $17,192,757.01 |
$64,333,827.10 |
|
Texas | RECONSTRUCT INTERCHANGE AND CONSTRUCT FRONTAGE ROAD ON IH 35. | $47,558,158.59 |
$59,510,187.06 |
|
Texas | WIDEN ROAD - ADD LANES ON FM 2218 | $46,532,842.75 |
$58,166,053.43 |
|
Texas | OSTOS ROAD WIDEN ROAD, ADD LANES, AND SHOULDERS. | $19,265,984.48 |
$26,303,348.60 |
|
Texas | CONSTRUCT NEW ROAD ON PELLICANO DRIVE AT JOE BATTLE BOULEVARD TO DARRINGTON AT BERRYVILLE STREET. | $18,464,800.00 |
$26,520,124.43 |
|
Texas | BRIDGE REPLACEMENT ON US 271 | $20,034,841.22 |
$25,043,551.51 |
|
Texas | WIDEN ROAD ADD LANES AND SHOULDERS TO IH 30. | $76,946,054.15 |
$97,568,095.52 |
|
Texas | WIDEN FREEWAY ON SH 199. | $95,997,373.38 |
$120,008,399.33 |
|
Texas | WIDEN FREEWAY ON SH 170. | $86,961,277.60 |
$108,701,597.00 |
|
Texas | CONVERT NON-FREEWAY ON US 59. | $31,025,623.18 |
$184,672,286.36 |
|
Texas | HIGHWAY IMPROVEMENT ON IH 40. | $23,985,598.98 |
$30,019,157.31 |
|
Texas | REHABILITATION OF EXISTING ROAD ON SH 302 | $54,969,534.96 |
$62,962,918.69 |
|
Texas | CONSTRUCT NEW INTERCHANGE AT NORTH SL 338 AT US 385 | $22,601,183.03 |
$28,615,588.78 |
|
Texas | HIGHWAY IMPROVEMENT ON US 67 | $20,844,562.25 |
$26,153,506.33 |
|
Texas | REHABILITATION OF EXISTING ROAD ON FM 2119 | $27,000,000.00 |
$66,252,295.96 |
|
Texas | CONSTRUCT BRIDGE ON IH 20 | $30,674,839.02 |
$40,343,548.78 |
|
Texas | CONSTRUCT BRIDGE ON SH 302. | $25,000,000.00 |
$60,650,012.18 |
|
Texas | CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 | $50,681,059.16 |
$63,385,134.88 |
|
Texas | WIDEN NON-FREEWAY FACILITY ON FM 2818 | $38,019,405.83 |
$48,166,546.29 |
|
Texas | ADD PASSING LANES ON US 83. | $21,996,924.75 |
$27,552,731.94 |
|
Texas | SURFACING AND ROADWAY RESTORATION ON SH 137 | $47,303,780.32 |
$57,214,901.80 |
|
Texas | WIDEN ROAD - ADD LANES ON IH 10. | $46,028,828.08 |
$57,536,035.10 |
|
Texas | WIDEN ROAD - ADD LANES ON SL 121 | $26,337,010.89 |
$33,070,636.82 |
|
Texas | REHABILITATION OF EXISTING ROAD ON FM 2004 | $21,477,838.44 |
$31,453,621.29 |
|
Texas | BRIDGE REPLACEMENT ON SH 198. | $12,000,000.00 |
$33,166,851.37 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 72. | $8,000,000.00 |
$50,911,818.47 |
|
Texas | WIDEN ROAD AND ADD LANES ON IH 35. | $85,000,000.00 |
$235,087,606.29 |
|
Texas | CONSTRUCT DIRECT CONNECTORS ON IH 410 | $84,762,682.49 |
$105,987,638.80 |
|
Texas | US 59. HIGHWAY IMPROVEMENT. | $57,844,043.02 |
$72,330,053.77 |
|
Texas | WIDEN ROAD-ADD LANES ON SL 1604 | $5,000,000.00 |
$163,323,331.38 |
|
Texas | WIDEN ROAD - ADD LANES ON FM 1463 | $7,000,000.00 |
$60,122,177.87 |
|
Texas | HIGHWAY IMPROVEMENT ON IH 27. | $22,188,679.24 |
$28,052,631.54 |
|
Texas | CONSTRUCT NEW ROADWAY LANES AND INSTALL ILLUMINATION ON US 380. | $122,194,673.77 |
$153,203,526.72 |
|
Texas | CONSTRUCT AND WIDEN ROAD ON FM 60. | $8,000,000.00 |
$39,536,156.51 |
|
Texas | RECONSTRUCT AND WIDEN ROADWAYS ON SH 242 | $19,897,876.80 |
$35,019,355.32 |
|
Texas | CONVERT NON-FREEWAY ON FM 1585 | $7,856,000.00 |
$170,958,500.84 |
|
Texas | HIGHWAY IMPROVEMENT ON SL 1604 AT FM 2696 | $8,125,762.13 |
$40,359,224.86 |
|
Texas | WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. | $50,288,838.00 |
$226,609,058.80 |
|
Texas | WIDEN ROAD AND ADD LANES ON US 82 | $43,727,125.65 |
$54,658,907.06 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 36. | $54,784,000.00 |
$109,072,964.81 |
|
Texas | CONSTRUCT NEW ROAD AT KENNY FORT BOULEVARD. | $28,369,555.49 |
||
Texas | CONSTRUCT NEW ROAD ON JUPITER DRIVE | $13,238,558.40 |
$33,932,592.00 |
|
Texas | RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES ON FM 2100. | $35,214,056.19 |
$61,888,437.27 |
|
Texas | CONSTRUCT FRONTAGE ROADS ON SL 9 AND BI 45J | $21,069,697.99 |
$30,125,121.77 |
|
Texas | CONSTRUCT FRONTAGE ROADS ON SL 9. | $40,738,586.18 |
$50,948,232.73 |
|
Texas | WIDEN ROAD - ADD SHOULDERS ON US 287 | $29,081,956.02 |
$36,459,683.01 |
|
Texas | CONSTRUCT RAMPS ON SH 6. | $48,337,354.80 |
$60,671,693.50 |
|
Texas | WIDEN ROAD-ADD LANES ON IH 45. | $75,000,000.00 |
$227,644,053.26 |
|
Texas | HIGHWAY IMPROVEMENT ON US 69. | $58,983,111.83 |
$78,831,618.79 |
|
Texas | CONSTRUCT NEW ROADWAY LANES AND RECONSTRUCT EXISTING ROADWAY ON IH 35E | $623,356,560.75 |
$668,302,241.00 |
|
Texas | WIDEN FREEWAY ON IH 10 | $166,260,971.09 |
$237,039,820.10 |
|
Texas | EXPAND FROM 8 LANES TO 14 LANES ON IH 35. EXPRESSWAY-ADD 6 NEW EXPRESS LANES | $65,570,351.00 |
$1,783,218,521.00 |
|
Texas | CONSTRUCT FRONTAGE RAODS ALONG IH 20. | $15,000,000.00 |
$91,848,786.31 |
|
Texas | CONSTRUCT BRIDGE ON SL 360 | $43,713,793.38 |
$68,642,241.73 |
|
Texas | WIDEN ROAD AND ADD LANES ON US 83. | $22,284,686.94 |
$27,965,109.25 |
|
Texas | WIDEN ROAD - ADD LANES ON IH 35 | $230,962,376.23 |
$578,235,425.65 |
|
Texas | INTERCHANGE IMPROVEMENT ON IH 20 | $60,596,223.58 |
$78,885,163.03 |
|
Texas | CONSTRUCT PEDESTRIAN INFRASTRUCTURE- SS 366. | $36,497,175.30 |
$50,837,003.05 |
|
Texas | CONSTRUCT DIRECT CONECTORS ON IH 10 | $371,758,985.06 |
$465,977,872.27 |
|
Texas | WIDEN FREEWAY ON IH 35 | $64,290,303.62 |
$611,370,697.88 |
|
Texas | BRIDGE REPLACEMENT ON SH 21 | $25,053,360.94 |
$31,316,701.18 |
|
Texas | BRIDGE REPLACEMENT ON SH 174 | $21,462,755.43 |
$26,828,444.29 |
|
Texas | ROADWAY WIDENING TO A SUPER 2 HIGHWAY ON SH 302 | $32,788,970.36 |
$41,101,212.96 |
|
Texas | WIDEN ROAD ADD LANES ON SH 36. | $19,666,299.25 |
$62,508,840.91 |
|
Texas | WIDEN ROAD - ADD LANES ON FM 723. | $59,585,528.00 |
$94,662,922.43 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 36 | $47,347,344.38 |
$59,184,180.49 |
|
Texas | CONSTRUCT INSPECTION STATION AT ANZALDUAS INTERNATIONAL BRIDGE PORT OF ENTRY. | $28,160,000.00 |
$67,928,007.06 |
|
Texas | CONSTRUCT BRIDGE ON SH 288. | $46,405,417.74 |
$58,053,752.52 |
|
Texas | WIDEN BRIDGE ON SH 146 | $79,350,980.45 |
$100,076,331.92 |
|
Texas | SAFTETY IMPROVEMENT ON SH 115 AT FM 181. | $24,877,979.85 |
$39,516,973.36 |
|
Texas | ROADWAY REHABILITATION ON SH 18. | $5,196,460.67 |
$40,565,620.66 |
|
Texas | PREVENTIVE MAINTENANCE - BI 20-E | $20,787,686.83 |
$26,149,033.06 |
|
Texas | WIDEN ROAD - ADD LANES AND SHOULDERS ON SH 302. | $27,961,047.38 |
$35,061,309.22 |
|
Texas | ROADWAY REHABILITATION ON SH 18. | $28,651,646.01 |
$35,814,557.51 |
|
Texas | ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY ON US 67. | $23,400,589.18 |
$29,250,736.48 |
|
Texas | INTERCHANGE IMPROVEMENT ON US 75. | $40,557,316.64 |
$50,710,215.40 |
|
Texas | BRIDGE REPLACEMENT ON SH 7 | $22,917,104.57 |
$28,647,410.21 |
|
Texas | WIDEN ROAD - ADD LANES ON IH 20 | $122,886,166.68 |
||
Texas | WIDEN FREEWAY IN VARIOUS LOCATIONS IN THE FORT WORTH DISTRICT TO INCLUDE IH 820, IH 20, US 287 | $357,830,773.05 |
$1,637,220,287.00 |
|
Texas | INTERCHANGE IMPROVEMENT ON US 59. | $53,707,623.07 |
$93,422,800.16 |
|
Texas | RECONSTRUCT EXISTING ROADWAY AND BRIDGE REPLACEMENT ON US 80. | $32,728,746.00 |
$137,278,786.45 |
|
Texas | WIDEN ROAD - ADD LANES ON FM 16 | $16,788,271.47 |
$49,908,063.76 |
|
Texas | WIDEN ROADS AND ADD LANES TO SH 46. | $31,467,502.00 |
$64,037,567.08 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 105. | $74,143,317.18 |
$95,118,054.42 |
|
Texas | CONSTRUCT BRIDGE ON SH 288. | $24,984,371.85 |
$31,230,464.81 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 99 | $70,083,917.31 |
$87,604,896.65 |
|
Texas | HIGHWAY IMPROVEMENT ON SL 378 | $32,252,864.29 |
$40,316,080.37 |
|
Texas | SURFACING AND ROADWAY RESTORATION ON IH 35 AND IH 10 | $24,460,605.31 |
$27,335,849.36 |
|
Texas | WIDEN ROAD - ADD LANES ON FM 2642 | $22,619,255.70 |
$28,290,034.63 |
|
Texas | RESURFACE ROADWAY ON US 90 | $24,326,575.20 |
$30,814,434.99 |
|
Texas | REPLACE BRIDGE AND APPROACHES ON SH 155. | $33,679,487.92 |
$50,299,359.90 |
|
Texas | WIDEN FREEWAY ON IH 30 | $40,000,000.00 |
$386,910,587.24 |
|
Texas | CONSTRUCT NEW ROADWAY LANES ON SH 5. | $35,402,104.26 |
$44,674,434.76 |
|
Texas | CONSTRUCTION OF EAST-WEST CONNECTOR AT SH 360, 20TH AVENUE AND RENTAL CAR DRIVE. | $22,643,504.80 |
$32,838,616.86 |
|
Texas | HIGHWAY IMPROVEMENT ON CR 861. | $25,511,817.69 |
||
Texas | FREEWAY OPERATIONAL IMPROVEMENTS- IH 45 | $20,277,013.98 |
$25,390,767.48 |
|
Texas | INTERCHANGE IMPROVEMENT ON IH 35 EAST. | $81,808,137.42 |
$122,383,413.50 |
|
Texas | WIDEN ROAD AND ADD LANES ON FM 521 | $61,205,326.40 |
$77,018,958.44 |
|
Texas | WIDEN ROAD - ADD LANES ON SH 6 | $23,075,560.68 |
$28,967,288.84 |
|
Texas | RAILROAD CROSSING IMPROVEMENTS ON SH 183 | $27,113,208.01 |
$34,285,760.02 |
|
Texas | ROADWAY REHABILITATION AND RECONSTRUCTION WITH NO ADDED CAPACITY ON FM 1450. | $70,888,304.86 |
$88,610,381.07 |
|
Texas | CONSTRUCT BRIDGE ON UA 90 | $37,632,095.20 |
$53,506,311.85 |
|
Texas | HIGHWAY IMPROVEMENT ON SH 137 | $26,376,161.39 |
||
Texas | WIDEN ROAD ON US 83. | $29,829,993.07 |
$37,307,686.44 |
|
Texas | WIDEN ROAD AND ADD LANES ON FM 2252 | $35,067,079.31 |
$55,521,412.57 |
|
Texas | INTERCHANGE IMPROVEMENT ON IH 30 | $138,436,799.60 |
$209,051,709.54 |
|
Texas | INTERCHANGE IMPROVEMENT AND CONSTRUCT RAMPS ON IH 20. | $45,944,416.61 |
$57,430,520.75 |
|
Texas | REHABILITATE EXISTING ROADWAY ON IH 820. | $30,483,204.05 |
$33,923,136.73 |
|
Texas | INTERCHANGE IMPROVEMENT ON US 175. | $35,862,120.71 |
$44,836,215.96 |
|
Texas | INTERCHANGE IMPROVEMENT ON US 69. | $33,586,055.44 |
$41,982,569.31 |
|
Texas | WIDEN ROAD AND ADD LANES ON FM 2493. | $33,266,441.03 |
||
Texas | HIGHWAY IMPROVEMENT ON US 277 AND SH 70 | $34,564,485.65 |
||
Texas | HIGHWAY IMPROVEMENT ON US 59 | $113,482,130.28 |
||
Texas | HIGHWAY IMPROVEMENT ON IH 820 | $361,127,200.00 |
$451,409,000.00 |
|
Texas | WIDEN ROAD AND ADD LANES ON FM 1516 | $22,587,200.00 |
$49,657,076.64 |
|
Texas | BRIDGE REPLACEMENT, BRIDGE MAINTENANCE ON IH 20. | $29,110,609.22 |
$32,345,121.32 |
|
Texas | WIDEN ROAD - ADD LANES ON IH 10 | $177,118,161.14 |
$237,633,605.92 |
|
Texas | WIDEN ROAD - ADD LANES ON FM 1518 | $16,128,953.20 |
$84,291,980.46 |
|
Texas | WIDEN ROAD AND ADD LANES ON SL 1604 | $48,533,389.41 |
$61,465,144.62 |
|
Texas | CONVERT NON-FREEWAY ON US 59 | $72,977,567.10 |
$91,221,958.87 |
|
Texas | RESURFACE ROADWAY ON IH 10. | $29,390,168.61 |
$32,662,086.22 |
|
Texas | REHABILITATE EXISTING ROADWAY ON US 60. | $35,297,551.62 |
$44,121,939.53 |
|
Texas | HIGHWAY IMPROVEMENT ON US 75 | $52,403,437.51 |
$66,024,375.27 |
|
Texas | HIGHWAY IMPROVEMENT ON SH 204 | $25,136,162.52 |
||
Texas | WIDEN ROAD - ADD LANES ON SL 1604 | $111,220,148.99 |
$140,287,950.42 |
|
Texas | WIDEN ROAD - ADD LANES ON IH 20 | $168,334,403.70 |
||
Texas | CONSTRUCT SUPER 2, GRADING, BASE, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKING ON US 281. | $21,058,021.44 |
$26,322,526.81 |
|
Texas | WIDEN ROAD AND INSTALL SIGNS ON SH 114. | $25,977,982.83 |
$35,472,478.54 |
|
Texas | INFRASTRUCTURE IMPROVEMENTS ON SL 375 | $33,600,250.88 |
$42,000,313.61 |
|
Texas | CONSTRUCT NEW ROADWAY LANES ON IH 37. | $14,000,000.00 |
$69,791,097.00 |
|
Texas | WIDEN ROAD AND ADD LANES ON IH 45 | $78,971,131.75 |
$98,859,273.45 |
|
Texas | NEW LOCATION FREEWAY AND INTERSECTION IMPROVEMENTS ON AVONDALE-HASLET ROAD, HASLET PARKWAY AND FM 156. | $33,556,556.01 |
$49,088,603.58 |
|
Texas | HIGWAY IMPROVEMENT ON SH 302. | $9,000,000.00 |
$47,343,520.93 |
|
Texas | WIDEN ROAD (ADD LANES) ON FM 2478. | $23,494,713.75 |
$29,368,392.19 |
|
Texas | SH 121 - CONSTRUCT NEW ROADWAY LANES. | $52,019,160.00 |
$101,958,550.50 |
|
Texas | HIGHWAY IMPROVEMENT ON SH 128. | $29,560,475.28 |
$36,950,594.10 |
|
Texas | INTERCHANGE IMPROVEMENT ON IH 30. CONSTRUCT NEW ROAD ON IH30. BRIDGE REPLACEMENT ON IH30 | $14,333,323.45 |
$146,504,004.18 |
|
Texas | WIDEN ROAD - ADD LANES ON US 75 | $127,344,172.66 |
$161,403,712.00 |
|
Texas | WIDEN ROAD AND ADD LANES ON US 59 AND US 77. | $44,322,205.21 |
$55,447,918.74 |
|
Texas | WIDEN ROAD AND ADD LANES ON SH 72. | $53,599,723.30 |
||
Texas | CONSTRUCT TRADE PROCESSING CENTER ON CR 31. | $22,954,504.09 |
$28,454,504.09 |
|
Texas | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59 | $34,575,035.73 |
$43,321,215.90 |
|
Texas | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59 | $63,480,781.46 |
$79,500,461.13 |
|
Texas | RECONSTRUCT EXISTING ROADWAY ON US 59 | $99,989,233.38 |
$118,868,594.54 |
|
Texas | WIDEN ROAD - ADD LANES -ON SH 359 | $9,015,384.62 |
$55,794,058.30 |
|
Texas | BRIDGE REPLACEMENT ON IH 20. | $28,619,156.45 |
$35,773,945.56 |
|
Texas | SEAL COAT ON US 87,SH 354,BI 40D,US 60,US 385,IH 40,SH 207,SH 70,SH 15,SH 136,FM 119,FM 293,FM 1913,FM 2219, AND RM 2381 | $6,900,374.00 |
$25,674,308.09 |
|
Texas | STATEWIDE INVENTORY AND INSPECTION OF ON AND OFF-SYSTEM BRIDGES FOR FISCAL YEARS 2019 AND 2020 | $52,800,000.00 |
$66,000,000.00 |
|
Texas | FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - ON SYSTEM | $25,600,000.00 |
$32,000,000.00 |
|
Texas | FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - OFF SYSTEM | $25,600,000.00 |
$32,000,000.00 |
|
Texas | STATEWIDE, STATE INFRASTRUCTURE BANK-ADV CAP. | $99,562,057.00 |
$285,168,019.00 |
|
Texas | US 181; FROM N. OF THE CORPUS CHRISTI SHIP CHANNEL TO S. OF THE CORPUS CHRISTI SHIP CHANNEL. CONST NEW HARBOR BR OVER SHIP CHANNEL | $723,123,258.92 |
$852,451,051.55 |