RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
California | IN LONG BEACH, ON STATE RTE 47 AT OCEAN BLVD, CONSTRUCT INTERCHANGE | $26,345,883.16 | $44,546,187.98 | |
California | ALAMEDA ST: DEL AMO BLVD TO RTE 91, WIDEN FROM 4 TO 6 LANES, CONST | $24,751,440.00 | $42,823,402.00 | |
California | SR60/SR91/I-215 TO ORANGE SHOW ROAD I/C NORTH OF THE I-215/I-10, CONSTRUCT HOV LANES IN EACH DIRECTION (TC) | $14,005,463.00 | $173,933,571.00 | |
California | ON I-205 AND I-580 FROM SAN JOAQUIN COUNTY LINE TO GREENVILLE ROAD OVERHEAD. RESURFACE AND RESTORE PAVEMENT ON THE MAINLINE AND RAMPS. (TC) | $73,740,300.00 | $79,491,200.00 | |
California | TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER R | $24,991,900.00 | $25,323,700.00 | |
California | IN AND NEAR SAN DIEGO AT ROUTE 905/125/11 SEPARATION (SEGMENT 4) AND ON ROUTE 11 FROM 0.1 MILE WEST OF ENRICO FERMI DRIVE TO 1.2 MILE EAST OF ENRICO | $52,630,000.00 | $126,507,700.00 | |
California | IN THE CITY OF SACRAMENTO, AT SACRAMENTO RIVER BRIDGE NO. 24-0053 AND NORTH SACRAMENTO UNDERCROSSING NO. 24-0111L; ALSO IN SAN JOAQUIN COUNTY, AT MOK | $30,925,500.00 | $35,725,000.00 | |
California | IN SAN DIEGO COUNTY AND IMPERIAL COUNTY ON VARIOUS ROUTES AT VARIOUS LOCATIONS INSTALL FIBER OPTIC CABLE ALONG THE I-5, I-805, AND SR-905, CONNECT AL | $16,532,800.00 | $27,445,100.00 | |
California | IN VAR COUNTIES, ON VARIOUS ROUTES AT VARIOUS LOCATIONS A DESIGN BUILD PROJECT TO UPGRADE THE CONTROLLER IN VEHICLE DETECTION AND TRAFFIC SIGNAL. | $46,240,000.00 | ||
California | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO REPLACE BRIDGE, RAMP, IC, BUTTRESS, BIKE TRL | $11,519,460.00 | $77,584,859.00 | |
California | IN SAN DIEGO COUNTY ON INTERSTATE 5 AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF SAN ELIJO LAGOON BRIDGE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD OVE | $59,240,700.00 | $301,625,107.00 | |
California | I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE | $97,602,100.00 | $300,466,000.00 | |
California | CONSTRUCT HOV LANES, AUXILARY LANES, AND ITS (CMGC) IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILES NOR | $52,989,300.00 | $75,755,000.00 | |
California | IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVE | $65,748,450.00 | $71,816,600.00 | |
California | IN SANTA FE SPRINGS, DOWNEY, AND COMMERCE, FROM SOUTH OF ROUTE 5 TO NORTH OF ATLANTIC BOULEVARD REPLACE CONCRETE SLABS AND MEDIAN BARRIER, AND OVERLA | $29,423,500.00 | $32,341,700.00 | |
California | ON ROUTE 5 FROM ALONDRA BLVD(KP 2.9/PM 1.8) TO SHOEMAKER AVE(KP 4.0/PM 3.1) INTERSECTION IMPROVEMENTS | $45,958,183.00 | $125,171,506.00 | |
California | IN LA CTY IN LAMIRADA, SANTA FE SPRINGS, NORWALK & DOWNEY FROM OC TO LA CTY WIDEN FREEWAY, RECONSTRUCT OH (TC) | $7,379,087.00 | $112,841,043.00 | |
California | IN LOS ANGELES COUNTY IN LAMIRADA FROM ARTESIA BLVD TO NORTH FORK COYOTE CREEK OVERCROSSING WIDEN AND REALIEGN FREEWAY TO ADD ONE MIXED FLOW LANE AND | $46,056,500.00 | $60,409,800.00 | |
California | NEAR CASTAIC, FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY. REPLACE APPROACH SLABS, UPGRADE DRAINAGE SYSTEMS, UPGRADING | $32,231,900.00 | $35,454,200.00 | |
California | IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES & MODIFICATION AND ROADWAY REHABILITATION BASED ON THE CHA | $103,745,612.00 | $324,615,854.00 | |
California | IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN | $179,000,000.00 | $533,596,550.00 | |
California | IN KERN COUNTY NEAR KETTLEMEN CITY FROM 0.6 MILE SOUTH OF TWISSLEMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE. REHABILITATE AND | $44,002,460.97 | $48,424,800.00 | |
California | IN AND NEAR LEBEC FROM LOS ANGELES COUNTY LINE TO GRAPEVINE CREEK. NORTHBOUND ONLY PAVEMENT REHABLILITATION (2R) | $25,800,100.00 | ||
California | MERCED COUNTY 0.4 MILE NORTH OF THE FRESNO COUNTY LINE AT THE JOHN "CHUCK" ERRECA SAFETY ROADSIDE REST AREA REPLACE SAFETY ROADSIDE REST AREA (SRRA) | $32,520,700.00 | $32,568,000.00 | |
California | FRESNO COUNTY FROM 1.2 MILES SOUTH OF KAMM AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF PANOCHE ROAD OVERCROSSING PAVEMENT REHABILITATION, REPAIR CULVERT | $32,319,900.00 | $35,581,000.00 | |
California | IN SACRAMENTO, FROM 1.1 MILES SOUTH OF ELK GROVE BLVD OC TO AMERICAN RIVER BRIDGE CORRIDOR ENHANCEMENT - CONSTRUCT HOV LANE, ROADWAY REHABILITATION, | $89,834,291.57 | $354,596,700.00 | |
California | IN SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILE SOUTH OF ARENA BLVD OVERCROSSING TO 0.4 MILE SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILE NO | $30,669,800.00 | $34,808,000.00 | |
California | IN SAN JOAQUIN COUNTY, IN AND NEAR STOCKTON, FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE. REHABILITATE ROADWAY, UPGRAD | $117,685,040.00 | ||
California | IN SHA CO NR LAKEHEAD AT SACTO RVR,BR#06-0089 (TC) REPLACE BRIDGE (TC) | $186,149,723.43 | $186,149,723.43 | |
California | IN SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING. WIDENING TO 6 LANES, BRIDGE REP | $112,782,153.00 | $150,659,000.00 | |
California | IN SHASTA COUNTY ABOUT 6 MILES NORTH OF SHASTA LAKE CITY FROM PIT RIVER BRIDGE TO 1.2 MILES SOUTH OF DOG CREEK BRIDGE. REPLACE AC SURFACING, RHMA-G, | $33,772,100.00 | ||
California | IN SISKIYOU COUNTY AT AND NEAR DUNSMUIR FROM CENTRAL DUNSMUIR UNDERCROSSING TO BLACK BUTTE OVERHEAD. PAVEMENT REHABILITATION AND DECK REPLACEMENT | $151,443,200.00 | $165,737,100.00 | |
California | IN SISKIYOU COUNTY ABOUT 5 MILES NORTH OF WEED FROM NORTH EDGEWOOD OVERHEAD TO 0.2 MILE NORTH OF GRENADA OVERCROSSING. PAVEMENT REHABILITATION | $27,864,800.00 | ||
California | IN SAN DIEGO COUNTY NEAR ALPINE ON INTERSTATE 8 FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE. PLACE CRCP, HMA, RSC, MGS, AND WATER POLLUITION | $47,769,700.00 | $52,554,000.00 | |
California | IN IMPERIAL COUNTY IN EL CENTRO FROM 0.4 MILE WEST OF IMPERIAL AVENUE OVERCROSSING TO 0.1 MILE EAST OF 8TH STREET OVERCROSSING RECONSTRUCT INTERCHANG | $29,696,160.26 | $32,828,160.26 | |
California | IN LA COUNTY IN CITY OF BALDWIN PARK AND WEST COVINA FR PUENTE AVE TO CITRUS ST CONSTRUCT HOV LANES AND SOUNDWALLS (TC) | $40,140,000.00 | $157,866,051.00 | |
California | ROUTE 10 HOV LANES FROM CITRUS ST T ROUTE 57 IN LA COUNTY/CITRUS ST TO RTE 57 HOV, WIDENING, AND REALIGN (TC) | $78,553,900.00 | $233,907,500.00 | |
California | LA, 10, PM: 14-19 IN THE CITY OF LOS ANGELES AT SANTA MONICA VIADUCT (BR. NO. 53-1301). PAINT AND REHABILITATE BRIDGE. THE PURPOSE OF THIS PROJECT IS | $42,788,000.00 | $43,233,200.00 | |
California | LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALON | $56,227,400.00 | $62,034,000.00 | |
California | IN SAN BERNARDINO COUNTY IN
YUCAIPA FROM 0.2 MILE WEST OF LIVE OAK CANYON ROAD TO COUNTY LINE ROAD UNDERCROSSING PAVEMENT REHABILITATION AND CONTINO |
$18,144,700.00 | $36,589,100.00 | |
California | IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR | $139,502,033.00 | $168,718,000.00 | |
California | IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR | $62,041,969.00 | $117,755,000.00 | |
California | RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS | $96,572,664.00 | $220,014,800.00 | |
California | IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS | $303,757,711.00 | $326,730,500.00 | |
California | ON I-10 IN INDIO BETWEEN WASHINGTON ST & MONROE ST AT JEFFERSON ST INTERCHANGE RECONSTRUCT/REALIGN EXISTING INTERCHANGE | $33,310,000.00 | $56,760,364.00 | |
California | RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. RE | $100,000,000.00 | $215,896,600.00 | |
California | IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS | $280,830,500.00 | ||
California | ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY IN AND NEAR VICTORVILLE *** ROADWAY RECONSTRUCTION (TC) | $98,451,300.00 | $102,718,300.00 | |
California | IN SAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF CLEGHORN RD. UNDERCROSSING TO 0.5 MILE SOUTH OF ROUTE 138 AND FROM 0.5 MILE SOUTH OF TRUCK SAFETY CHE | $21,042,000.00 | $33,251,200.00 | |
California | ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY *** I 15 JOINT POINT OF ENTRY (SCALE - CVEF) (TC) | $12,573,994.00 | $52,150,417.00 | |
California | IN SAN DIEGO AND RIVERSIDE COUNTY IN AND NEAR TEMECULA FROM 0.1 MILE SOUTH OF SAN DIEGO COUNTY LINE TO 0.1 MILE NORTH OF TEMECULA RIVER BRIDGE REPLAC | $34,015,553.51 | $37,620,800.00 | |
California | IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATIONTO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERC | $57,403,900.00 | $63,222,100.00 | |
California | IN SAN BERNARDINO COUNTY IN FONTANA AND NEAR DEVORE FROM 0.3 MILE SOUTH OF SIERRA AVENUE UNDERCROSSING TO GLEN HELEN PARKWAY UNDERCROSSING. REPLACE P | $26,479,014.50 | $29,213,800.00 | |
California | IN RIVERSIDE COUNTY IN CORONA AND EASTVALE, FROM 0.5 MILE SOUTH OF ONTARIO AVENUE UNDERCROSSING TO ROUTE 60/15 SEPARATION CONCRETE PAVEMENT SLAB REP | $27,724,600.00 | $30,738,200.00 | |
California | IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT | $146,988,600.00 | $159,553,000.00 | |
California | IN SAN BERNARDINO COUNTYNEAR LUDLOW FROM 0.3 MILE EAST OF CRUCERO ROAD TO 0.4 MI W/O BADGER WASH REGRADE MEDIAN CROSS SLOPE (TC) | $41,220,800.00 | $41,550,100.00 | |
California | IN SAN BERNARDINO COUNTY AT NEWBERRY SPRINGS AND LUDLOW FROM 1.6 MILES EAST OF FORT CADY ROAD OVERCROSSING TO CRUCERO ROAD UNDERCROSSING REGRADE MEDI | $36,883,600.00 | $40,671,800.00 | |
California | IN SAN BERNARDINO COUNTY AT ESSEX FROM 1.1 MILES EAST OF ESSEX ROAD OVERCROSSING TO 0.5 MILE EAST OF HALFWAY HILLS WASH BRIDGE. REPLACE BRIDGES AND R | $24,134,400.00 | $26,693,800.00 | |
California | IN SAN BERNARDINO COUNTY ABOUT 36 MILES WEST OF NEEDLES FROM 2.1 MILES TO 1.3 MILES WEST OF GOFFS ROAD UNDERCROSSING RECONSTRUCT 2 SAFETY ROADSIDE RE | $43,556,000.00 | ||
California | IN ALAMEDA COUNTY IN BERKELEY FROM 0.6 MILE NORTH OF UNIVERISTY AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF GILMAN STREET UNDERCROSSING CONSTRUCTION PED | $17,156,901.41 | $25,127,200.00 | |
California | THE CITY AND COUNTY OF SAN FRANCISCO FROM 16TH STREET TO 4TH STREET. PAINT STEEL STRUCTURE | $28,697,100.00 | $31,725,500.00 | |
California | ALAMEDA COUNTY IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD E | $21,662,500.00 | $30,787,200.00 | |
California | CONTRA COSTA COUNTY IN HERCULES AND CROCKETT FROM ROUTE 80/4 SEPARATION TO 0.1 MIWEST OF CROCKETT VIADUCT REMOVE PCC AND AC; PLACE PCP AND AC RESURFA | $55,212,820.00 | $57,068,900.00 | |
California | ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CON | $67,347,000.00 | $67,806,900.00 | |
California | SOLANO COUNTY IN FAIRFIELD AND VACAVILLE FROM 1.0 MILE WEST OF RED TOP ROAD UNDER CROSSING TO 0.4 MILE EAST OF LEISURE TOWN ROAD CROSSING HIGHWAY WID | $6,859,000.00 | $26,800,000.00 | |
California | IN SACRAMENTO AND WEST SACRAMENTO FROM 80/84 SEPARATION TO WATT AVENUE OVERCROSS CONST. HOV LANES & REHAB. ROADWAY - (TC) | $73,653,185.91 | $127,190,346.57 | |
California | IN YOLO AND SACRAMENTO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF REED AVENUE UNDERCROSSING TO 0.1 MILE EAST OF SACRAMENTO RIVE | $23,617,000.00 | $26,080,200.00 | |
California | PLACER COUNTY IN AND NEAR ROSEVILLE AND ROCKLIN FROM 0.1 MILE WEST OF RIVERSIDE AVENUE OVERCROSSING TO ROCKLIN ROAD UNDERCROSSING. ROADWAY EXCAVATION | $17,932,000.00 | $46,059,100.00 | |
California | NEAR COLFAX ON RTE 80FROM LONG RAVINE RD TO EAST OF MAGRA RD OC TRUCK CLIMBING LANE (TC) | $53,853,566.28 | $54,063,366.28 | |
California | N PLACER COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL SPRINGS ROAD OVERCROSSING TO CISCO OVERCROSSING. REPLACE BRIDGES AT FOUR LOCATIONS (#19-0112, #19-0 | $35,132,780.00 | $38,644,500.00 | |
California | NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSINGTO ROUTE 89/267 SEPARATION ROADWAY EXCAVATION, JPCP AND FURNISH POLYE | $23,893,800.00 | $26,427,000.00 | |
California | PLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILES WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILES EAST OF DRUM FOREBAY OVERCROSSING RDWY EXC | $131,272,100.00 | ||
California | PLACER AND NEVADA COUNTIES NEAR KINGVALE FROM 0.3 MILE WEST OF TROY UNDERCROSSING TO 0.2 MILE EAST OF SODA SPRINGS OVERCROSSING. RDWAY EXC, PLACE HMA | $88,447,000.00 | ||
California | LA-110 - IN AND NEAR THE CITIES OF LOS ANGELES AND CARSON, FROM GAFFEY STREET TO COLLEGE STREET, EXTEND SERVICE LIFE OF EXISTING PAVEMENT AND INSTALL | $39,412,800.00 | $39,631,200.00 | |
California | SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD CONSTRUCT TUNNELS, APPROACH RO | $498,208,501.51 | $502,429,051.04 | |
California | AT RTE 76/15 SEP & ON RTE 76 FR SOUTH MISSION RD TO 76/15 SEP CONSTRUCT 4 LANE HIGHWAY | $300,000.00 | $100,146,000.00 | |
California | SAN JOAQUIN COUNTY IN AND NEAR TRACY FROM JANNEY OVERHEAD TO 1.3 MILES EAST OF MACARTHUR DRIVE OVERCROSSING WIDENING BRIDGES, RAMPS AND ROADWAY | $24,325,800.00 | $27,002,000.00 | |
California | IN SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET BRIDGE OVERCROSSING REMOVE AND REPLACE EXISTING WASHINGTON STREET BRIDGE OVERCROSSING AND UPG | $22,562,345.06 | $25,347,790.00 | |
California | IN RIVERSIDE COUNTY IN MURIETTA AND MENIFEE FROM 1 MILE NORTH OF CLINTON KEITH ROAD TO 1 MILE NORTH OF NEWPORT ROAD. REHABILITATE PAVEMENT, REPLACE S | $31,827,000.00 | ||
California | IN VENTURA COUNTY, SOUTH OF POINT MUGU STATE PARK (PM 4.0) AND SYCAMORE CANYON ROAD (PM 4.2). CONSTRUCT SECANT WALLS AT TWO LOCATIONS AS A PERMANENT | $49,537,700.00 | $56,254,100.00 | |
California | SANTA CLARA AND SAN MATEO COUNTIES IN LOS ALTOS HILLS AND MENLO PARK FROM FOOTHILL EXPRESSWAY UNDERCROSSING TO 0.5 MILE NORTH OF SAND HILL ROAD ROADW | $53,402,900.00 | $58,733,100.00 | |
California | N SANTA CLARA IN SAN JOSE ON ROUTE 280 FROM ROUTE 680 TO ROUTE 87/101 SEPARATION TO 0.2 MILE WEST OF BIRDAVENUE OVERCROSSING REHABILITATE PAVEMENT, U | $31,993,000.00 | ||
California | SANTA CLARA AND SAN MATEO COUNTIES AT VARIOUS LOCATIONS DRAINAGE, EROSION CONTROL, ROCK SLOPE PROTECTION AND HMA | $22,676,100.00 | $25,870,100.00 | |
California | IN MENDOCINO CO. NEAR WESTPORT, FROM 0.6 TO 1.4 MI NORTH OF BLUE SLIDE GULCH BRIDGE. EMERGENCY RELIEF - RECONSTRUCT ROADWAY | $34,216,844.96 | $38,650,000.00 | |
California | IN TRINITY CO., NEAR DEL LOMA AT BIG FRENCH CREEK ROAD EMERGENCY RELIEF - EMERGENCY OPENING STORM DAMAGE REPAIRS. | $43,231,326.00 | $43,853,000.00 | |
California | BUTTE COUNTY NEAR PARADISE FROM 0.8 MILE WEST OF SHADY REST AREA TO 0.2 MILE EAST OFSHADY REST AREA. RAISE ALIGNMENT. PLACE HMA, STRUCTURAL CONCRETE | $31,450,700.00 | $35,868,800.00 | |
California | MONTEREY COUNTY, NEAR POSTS, AT
PFEIFFER CANYON BRIDGE, NO. 44-0060 EMERGENCY PROJECT - EMERGENCY
OPENING REMOVE AND REPLACE DAMAGED BRIDGE, RESTORE |
$23,899,700.00 | $26,996,626.00 | |
California | MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REM | $84,480,300.00 | $94,217,533.34 | |
California | IN PLUMAS COUNTY AT VARIOUS LOCATIONS FROM BUTTE COUNTY LINE TO 3.1 MILES WEST OF ROUTE 89 REPAIR ROCK SLOPE PROTECTION AND STABILIZE ROADWAY EMBANKM | $27,666,717.60 | $31,457,822.20 | |
California | MEN CO;NR LEGGETT;S/O TO N/O RED MTN CK NEW FWY;2 BRIDGES;RET WALLS;PA | $65,894,389.11 | $75,220,031.78 | |
California | IN BUTTE COUNTY ON ROUTE 32, 70, 99, 149, AND 191 AT VARIES POSTMILE REMOVING/DISPOSING/CHIPPING HAZARD TREE AND DEBRIS; INSTALL EROSION CONTROL ON S | $20,635,300.00 | $26,250,000.00 | |
California | TOWN OF PARADISE - APPROXIMATELY 57 LOCATIONS DUE TO BURNT OUT CARS. PAVEMENT IMPROVEMENT OF 32 MILES OF ROADWAY. REPARING DAMAGED SECTIONS OF ROADW | $41,717,997.99 | $55,439,200.00 | |
California | ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI | $248,784,900.00 | ||
California | IN ORANGE COUNTY ON ROUTE 405 FROM STATE ROUTE 73 TO I-605 ADD ONE MIXED FLOW AND TOLL EXPRESS LANE IN EACH DIRECTION WITH OTHER OPERATIONAL IMPROVEM | $67,153,262.66 | $1,900,000,000.00 | |
California | I-405 AT CRENSHAW BLVD. RAMP IMPROVEMENT; IN LOS ANGELES COUNTY, IN THE CITY OF TORRANCE BETWEEN WESTERN AVENUE AND WEST 182ND STREET / CRENSHAW BLVD. | $10,989,400.00 | $66,756,000.00 | |
California | FROM PM 0.43 S/O LA-10 TO VENTURA BL. WIDEN FOR HOV LANE | $222,428,625.26 | $827,217,719.00 | |
California | IN AND NEAR THE CITY OF LOS ANGELES, FROM WILSHIRE BOULEVARD TO VICTORY BOULEVARD. REHABILITATE ROADWAY, REHABILITATE CULVERTS, REPLACE BRIDGE APPROA | $121,765,981.00 | ||
California | WEST MISSION BAY DRIVE OVER THE SAN DIEGO RIVER BRIDGE REPLACEMENT, BR. NO. 57C-0023 | $111,602,564.60 | $146,919,728.00 | |
California | HYPERION VIADUCT OVER LA RIVER BRIDGE # 53C-1881 BRIDGE REHABILITATION AND SEISMIC RETROFIT | $5,148,407.00 | $77,336,126.00 | |
California | N. SPRING ST. BRDG OVR L.A. RVR, BRIDGE # 53C0859 BRIDGE REHABILITATION/WIDENING | $36,048,438.00 | $45,996,471.46 | |
California | FIRST ST. OVER L.A. RIVER BRIDGE # 53C-1166 BRIDGE REHABILITATION | $58,331,222.66 | $66,314,332.22 | |
California | SIXTH STREET VIADUCT OVER LA RIVER AND EAST SANTA ANNA FREEWAY, 53C1880 REPLACE STRUCT DEFICIENT VIADUCT WITH NEW (TC) | $134,675,809.05 | $148,909,901.00 | |
California | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 CMGC PA | $28,978,113.00 | $33,088,934.00 | |
California | SIXTH STREET VIADUCT OVER LA
RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS
BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 THIS I |
$26,125,154.00 | $29,509,945.00 | |
California | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595THIS PRO | $182,083,341.00 | $230,364,054.00 | |
California | IN THE PORT OF LOS ANGELES, TERMINAL ISLAND TERMINAL ISLAND RAILYARD ENHANCEMENT PROJECT: THIS PROJECT ENTAILS THE ADDITION OF 5 STAGING/STORAGE TRAC | $21,645,000.00 | $55,650,000.00 | |
California | LAKE MERRITT CHANNEL BRIDGE (BR.NO.33C-0030) REPLACE BRIDGE (PER SEISMIC STRATEGY) | $27,595,632.00 | $31,446,836.00 | |
California | 12TH & 14TH ST BRIDGES 33C0181 & 33C0182 BRIDGE REPLACEMENT (SEISMIC) | $11,060,488.42 | $55,410,000.00 | |
California | MURRAY ST BRIDGE 36C-0108 SEISMIC RETROFIT AND BARRIER RAILING | $283,827.00 | $30,047,512.00 | |
California | STATE ROUTE 132 FROM NORTH DAKOTA AVE TO THE NEEDHAM STREET OVERCROSSING INCLUDING THE 132 / 99 INTERCHANGE. CONSTRUCT TWO-LANE EXPRESSWAY / HIGHWAY | $22,101,971.00 | $33,360,766.00 | |
California | VETERANS BLVD./SH99/GOLDEN STATE BLVD. (PHASE 3) VETERANS BLVD./SH99 INTERCHANGE; NORTHERLY JUG HANDLE; VETERANS BLVD. OVERCROSSING OF GOLDEN STATE | $10,540,582.00 | $59,151,158.00 | |
California | VACAVILLE: (PHASE 1B) LEISURE TOWN RD FROM ELMIRA RD TO SOUTH SIDE OF UTATIS CREEK WIDEN TO 4 LANES WITH CENTER MEDIAN; ADD WEST LINEAR SETBACK, MULT | $12,441,046.63 | $25,128,641.42 | |
California | AUTO CENTER DRIVE AT BNSF RAILROAD SOUTH OF RAILROAD STREET, NEW OVERHEAD | $8,061,892.00 | $32,238,599.00 | |
California | GERALD DESMOND BRIDGE BR# 53C0065 BRIDGE REPLACEMENT | $187,531,794.92 | $1,150,803,000.00 | |
California | SR58: FROM 0.60 MILE E/O COFFEE RD OVERCROSSING TO TRUXTUN AVE UNDERCROSSING, ELEMENT OF THE CITY OF BAKERSFIELD CENTENNIAL CORRIDOR PROJECT. CONSTRU | $113,362,209.00 | $127,729,712.00 | |
California | 24TH/23RD STREETS (SR178) FROM 0.1 MI WEST OF SR99 (W/O KERN RIVER BR.) TO 0.2 MI EAST OF "M" STREET ROADWAY WIDENING AND INTERSECTION IMPROVEMENTS | $23,540,432.70 | $44,294,976.43 | |
California | KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 99 FROM 0.3 MI SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 FROM | $4,280,000.00 | $36,549,100.00 | |
California | SR99/ SR58 CONNECTOR, SR99 FROM BELLE TERRACE TO MING AVE. IMPROVEMENTS ON SR99/ SR58 CONNECTOR INCLUDING THE CONSTRUCTION OF A COLLECTOR-DISTRIBUTOR | $11,122,638.65 | $58,633,355.00 | |
California | CENTENNIAL CORRIDOR CONNECTOR: WESTSIDE PARKWAY(WSP) AT KERN RIVER BR. TO SR58 SR99 NEW ROAD: CONSTRUCT NEW CENTENNIAL CORRIDOR MAINLINE AND INTERCH | $97,719,464.10 | $156,024,110.25 | |
California | 5TH STREET AT 2ND STREET AND 5TH STREET OVER FEATHER RIVER BRIDGE REPLACEMENT (TC) | $76,942,547.91 | $79,048,216.00 | |
California | BON AIR BRIDGE (BON AIR RD OVER CORTE MADERA CREEK). BR.# 27C0028 BRIDGE REPLACEMENT | $34,075,884.01 | $39,867,829.13 | |
California | FAIR OAKS AVE OVER CALTRAIN & UPRR, BRIDGE # 37C0765 BRIDGE REHABILITATION | $27,292,518.00 | $31,323,553.00 | |
California | AVENUE 44 OVER THE COACHELLA VALLEY STORM CHANNEL, LWC 00L0056 REPLACE LOW WATER CROSSING WITH A FOUR-LANE BRIDGE | $2,614,291.00 | $30,197,257.00 | |
California | INDIAN CANYON DRIVE OVERHEAD AT THE UNION PACIFIC RAILROAD SOUTH OF GARNET AVENUE, BR. NO. 56C-0025 BRIDGE WIDENING TO SIX LANES | $12,268,036.03 | $27,146,723.00 | |
California | IN FOLSOM ON WHITE ROCK RD FROM PRAIRIE CITY RD TO EAST BIDWELL ST. CONSTRUCT 4 LANE ROAD WITH 8 FOOT SHOULDERS. (CLASS 1 TRAIL TO BE BUILT IN LATER | $15,750,000.00 | $25,750,000.00 | |
California | GREEN TREE BOULEVARD FROM HESPERIA ROAD TO RIDGECREST BOULEVARD EXTENSION OF 4-LANE ROAD WITH NEW OVERHEAD | $25,696,701.07 | $46,469,279.91 | |
California | VIA VERA CRUZ, BRDG NO. 57C0780 REPLACE 2-LANE BRIDGE WITH 4-LANE BRIDGE | $24,522,102.00 | $32,885,590.00 | |
California | I-15/SR 79 INTERCHANGE FROM 0.4 MILES SOUTH OF SR 79 TO 0.6 MILES NORTH OF THE I-15/SR 79 SEPARATION IN THE CITY OF TEMECULA WIDEN INTERCHANGE RAMPS | $14,415,839.50 | $27,271,373.50 | |
California | I-15 FROM WINCHESTER RD IC LOOP ENTRY RAMPS TO JEFFERSON AVE. WINCHESTER RD IC NB ENTRY RAMP POST MILES: BEGIN 6.40 END 9.70 FRENCH VALLEY PKWY IC/AR | $51,439,839.50 | $97,791,086.90 | |
California | I-215 / CLINTON-KEITH ROAD INTERCHANGE , RECONSTRUCT INTERCHANGE | $9,999,452.00 | $26,437,922.00 | |
California | AUBURN BLVD, FROM RUSCH PARK TO NORTHERN CITY LIMITS UPGRADE INFRASTRUCTURE FOR MIXED USE, IMPRV BIKE/P | $15,064,155.00 | $36,290,243.00 | |
California | HOLLISTER AVENUE BRIDGE #51C0027 BRIDGE REPLACEMENT | $20,363,269.00 | $56,979,558.00 | |
California | ON I-580 IN ALAMEDA COUNTY NEAR LIVERMORE 1 MILE EAST OF NORTH FLYNN ROAD CONSTRUCT RETAINING WALL AND CLIMBING LANE (TC) | $54,650,575.64 | $55,173,423.64 | |
California | ISABEL AVEN (LIVERMORE) TO FOOTHILL (DUBLIN) CONSTRUCT A WESTBOUND HOV LANE | $9,609,605.39 | $51,907,082.00 | |
California | ALAMEDA COUNTY FROM ROUTE 580/ROUTE 238 SEPERATION TO FRUITEVALE AVENUE UNDERCROSSING TO REPLACE SLAPBS, RESURFACE SHLDS & RAMPS, & CONSTRUCT MGS, & | $39,410,700.00 | $43,446,500.00 | |
California | JELLYS FERRY RD OVER SACRAMENTO RIVER BRIDGE (BR. #08C0043) BRIDGE REPLACEMENT ON NEW ALIGNMENT | $47,664,831.00 | $54,384,007.00 | |
California | MIDWAY RD @ BUTTE CREEK 3.9 MILES SOUTH OF NELSON RD. BRIDGE NO. 12C0052 & 12C0053 BRIDGE REPLACEMENT | $24,076,840.00 | $27,196,250.00 | |
California | MOSQUITO RD OVER SOUTH FORK AMERICAN RIVER 5.7 MILES NORTH OF US 50 BR#25C0061 BRIDGE REPLACEMENT (TC) | $65,514,000.00 | $102,243,888.00 | |
California | MCHENRY AVENUE OVER STANISLAUS RIVER (BRIDGE 38C0032) BRIDGE REPLACEMENT | $22,651,344.00 | $25,943,318.00 | |
California | 2ND STREET FROM MARKET TO KING BICYCLE & PED IMPROVEMENTS, REPAVE | $11,116,386.00 | $25,883,895.00 | |
California | IN SAN FRANCISCO, ON 3RD STREET, CROSSING OVER THE MISSION CREEK CHANNEL BETWEEN BERRY STREET AND TERRY A FRANCOIS BOULEVARD; BR. # 34C0025 BRIDGE RE | $32,060,268.00 | $36,214,015.00 | |
California | MARKET STREET, 5TH STREET TO 8TH STREET. WORK MAY EXTEND OFF MARKET STREET, UP TO 50 FEET AT INTERSECTIONS. ROADWAY IMPROVEMENTS, INCLUDING ROADWAY R | $3,436,626.52 | $60,528,815.00 | |
California | CROWS LANDING ROAD OVER SAN JOAQUIN RIVER (BRIDGE 38C0010) REPLACE BRIDGE (SEISMIC) | $25,700,260.00 | $29,034,243.09 | |
California | UNION RD @ SAN BENITO RIVER (BR# 43C0002) BRIDGE REPLACEMENT | $20,362,701.00 | $48,240,893.00 | |
California | 66TH AVENUE FROM EAST OF STATE ROUTE 86 TO DALE KILER ROAD IN THE COMMUNITY OF MECCA NEW OVERHEAD | $24,479,641.00 | $47,974,058.00 | |
California | HAMNER AVENUE OVER SANTA ANA RIVER, BR. NO. 56C-0446 REPLACE 2-LANE BRIDGE WITH 6-LANE BRIDGE | $55,527,410.00 | $69,888,540.00 | |
California | GOLDEN GATE BRIDGE. BR. # 27 0052 SUICIDE DETERRENT SYSTEM (TC) | $133,050,000.00 | $204,092,868.00 | |
California | IN LOS ANGELES COUNT ON ROUTE 605 FROM TELEGRAPH ROAD TO ROUTE 10 (POSTMILES R10.2 TO 20.2). REHABILITATE ROADWAY, APPLY HIGH FRICTION SURFACE TREAT | $201,097,748.00 | ||
California | US 395 FROM PALMDALE ROAD (SR 18) IN PALMDALE TO CHAMBERLAINE WAY IN ADELANTO, PHASE 1 WIDEN HIGHWAY FROM TWO TO FOUR LANES (TC) | $8,027,804.64 | $40,003,413.00 | |
California | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN | $234,239,922.00 | $303,904,508.00 | |
California | STATE ROUTE 71/91 INTERCHANGE REPLACE CONNECTOR & RECONSTRUCT RAMP (TC) | $34,362,820.55 | $174,729,970.32 | |
California | I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 60 IN THE CITIES OF EASTVALE AND JURUPA VALLEY CONSTRUCT TOLL EXPRESS LANES IN EACH DIREC | $115,355,343.35 | $389,133,618.00 | |
California | STATE ROUTE 60 FROM GILMAN SPRINGS ROAD TO 1.37 MILES WEST OF JACK RABBIT TRAIL CONSTRUCT EASTBOUND AND WESTBOUND TRUCK LANES | $45,401,000.00 | $126,645,000.00 | |
California | I-405 NB HOV LANE, WIDENING: I-10 TO I-101 ROAD WIDENING FOR HOV LANE | $92,600,000.00 | $104,597,312.00 | |
California | NORTHERN LOS ANGELES COUNTY FROM I-5/SR14 JCT. TO PARKER ROAD. THE INTERSTATE 5 (I-5) GOLDEN STATE CHOKEPOINT RELIEF PROJECT (THE PROJECT) OFFERS A C | $47,000,000.00 | $533,596,550.00 | |
California | I-210 FREEWAY FROM 0.2 MILES WEST OF MARENGO AVE TO W ILSON AVE IN THE CITY OF PASADENA AND APPROXIMATELY 1.5 MILES OF SOUNDWALLS FROM BALDWIN AVE TO | $48,649,000.00 | $48,649,000.00 | |
California | IN LOS ANGELES COUNTY, SR-57/60 PROJECT IS IN DIAMOND BAR AND CITY OF INDUSTRY. ON SR-60 FROM EB 60 TO SB 57 CONNECTOR OVERCROSSING TO NEAR GOLDEN SP | $27,000,000.00 | $338,900,000.00 | |
California | THE I-605 PROJECT BEVERLY INTERCHANGE PROJECT IN THE CITIES OF PICO RIVERA AND WHITTIER, PM R14.0/R14.6 SB I-605 LOOP ON AND OFF RAMP REMOVAL AND REC | $16,976,220.00 | $27,142,375.00 | |
California | FROM 32ND STREET TO PARK BOULEVARD AND THE WATERFRONT PROMENADE ADJACENT TO HARBOR DRIVE IN THE CITY OF SAN DIEGO (BARRIO LOGAN SEGMENT) 2.5 MILE CLA | $23,337,000.00 | $26,514,741.00 | |
California | VARIOUS LOCATIONS IN SAN DIEGO COUNTY REGIONAL RIDESHARE PROGRAM-COMPONENT OF OVERALL TDM (TC) | $27,753,200.00 | $27,753,200.00 | |
California | INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION | $1,000.00 | $1,900,000,000.00 | |
California | STATE ROUTE 55 FROM INTERSTATE 405 TO INTERSTATE 5 ADD ONE MIXED-FLOW AND HIGH-OCCUPANCY LANE IN EACH DIRECTION AND REPAIR CHOKEPOINTS (TC) | $161,008,875.00 | $231,469,718.00 | |
California | ALONG THE WHITEWATER RIVER STORM CHANNEL FROM THE CITY OF PALM SPRINGS TO THE CITY OF COACHELLA, PHASE 1, SEGMENT 1 CONSTRUCT 13.47 MILES OF NEW BIKE | $18,655,000.00 | $33,009,000.00 | |
California | EASTERN RIVERSIDE COUNTY (18 CORRIDORS): MONTEREY, COOK, PALM DR, BOB HOPE, FRED WARING, DINAH SHORE, GENE AUTRY, DATE PALM, INDIO BLVD, JEFFERSON, P | $56,456,868.00 | $86,704,609.00 | |
California | HWY 299 BETWEEN TRINITY & SHASTA COUNTIES; APPROX 20 MILES WEST OF REDDING, HWY REALIGNMENT (TC) | $839,440.00 | $30,298,000.00 | |
California | SR-99 FROM ASH ST TO RAMSDELL DR STREETSCAPE IMPROVEMENTS (TC) | $10,810,000.00 | $39,563,000.00 | |
California | RECONFIGURE I-80/SR-65 I/C & WIDEN NB SR-65 FROM I-80 WB RAMP TO PLEASANT GROVE BL RECONFIGURE I-80/SR-65 INTERCHANGE AND WIDEN SR-65 | $6,830,000.00 | $43,180,600.00 | |
California | SR-49 FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK REHABILITATE PAVEMENT (TC) | $2,338,000.00 | $36,052,100.00 | |
California | NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. PM23.50 CONSTRUCT AN UNDERCROSSING AND A | $6,091,900.00 | $30,688,902.12 | |
California | ON I-5 IN SACRAMENTO COUNTY, FROM 0.2 MILE SOUTH OF ARENA BLVD INTERCHANGE TO 0.4 MILE SOUTH OF YOLO COUNTY LINE. CONSTRUCT ITS INFRASTRUCTURE, ACCEL | $696,000.00 | $31,366,491.19 | |
California | IN ROCKLIN: BETWEEN SR-65 (PM 4.1) AND ROCKLIN RD. (PM 6.0); CONSTRUCT I-80 EASTBOUND AUXILIARY LANE, INCLUDING TWO-LANE OFF-RAMP. IN ROSEVILLE: BET | $4,632,588.00 | $37,478,000.00 | |
California | US 101 BROADWAY INTERCHANGE IN BURLINGAME RECONSTRUCT INTERCHANGE INCLUDE BIKE/PED FACILITY | $3,559,977.49 | $50,043,250.63 | |
California | WB I-80 TO SR12 CONNECTOR INTERCHANGE RECONSTRUCTION (TC) | $999,962.00 | $52,215,503.00 | |
California | US 101 MARIN SONOMA NARROWS; NEAR PENTALUMA .8MIL S. TO 2MIL N. OF MARIN-SON LNS REALIGN US101 & CONSTRUCT WIDENING FOR HOV (TC) | $127,845.25 | $55,486,000.00 | |
California | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PH II CONCESSIONARE PMTS P3 (TC) | $34,000,000.00 | $34,000,000.00 | |
California | US 101 MARIN & SONOMA CO. BETWEEN KASTANIA RD. & SOUTH OF MARIN/SONOMA COUNTY LINE CONSTRUCT HOV LANES (TC) | $32,200,000.00 | $38,368,000.00 | |
California | ON I-80 THROUGH THE CITIES OF FAIRFIELD AND VACAVILLE IN SOLANO COUNTY, FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVER | $63,464,510.00 | $178,700,000.00 | |
California | ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. | $75,651,097.00 | $103,646,000.00 | |
California | STATE HWY 46 CORRIDOR SAN LUIS OBISPO COUNTY ROAD WIDENING | $14,137,682.65 | $25,269,482.46 | |
California | ROUTE 46 CORRIDOR, ROAD WIDENING | $2,477,410.47 | $63,244,534.42 | |
California | IN SANTA BARBARA COUNTY, IN AND NEAR SUMMERLAND FROM 0.2 MI NORTH OF PADARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. RECONSTRUCT PAVEMENT WITH C | $3,098,688.99 | $127,191,000.00 | |
California | NEAR THE CITY OF SANTA CRUZ AND CAPITOLA ON HIGHWAY 1, FROM 41ST AVENUE TO SOQUEL AVENUE CONSTRUCT AUXILIARY LANES AND CONSTRUCT BICYCLE/PEDESTRIAN O | $1,640,000.00 | $28,110,000.00 | |
California | ON SR156 IN SAN JUAN BAUTISTA, FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH ST. ROADWAY WIDENING | $404,017.00 | $58,711,000.00 | |
California | IN SANTA BARBARA COUNTY ON ROUTE 101, 0.1 MILES SOUTH OF THE SAN YSIDRO AVENUE OVERCROSSING TO 0.1 MILES NORTH OF THE OLIVE MILL OVERCROSSING. CONSTR | $9,411,498.00 | $63,659,000.00 | |
California | ROUTE 99 FROM GOSHEN TO KINGSBURG WIDEN FROM 4-LANE TO 6-LANE | $6,987,904.14 | $99,254,688.29 | |
California | ROUTE 99 FROM GOSHEN TO KINGSBURG WIDEN FROM 4-LANE TO 6-LANE | $5,822,225.77 | $99,383,881.20 | |
California | SR 46 FROM THE INTERSECTION OF LOST HILLS ROAD TO 0.9 MI. E OF I5 WIDENING FROM 2 TO 4 LANES | $17,701,000.00 | $49,972,000.00 | |
California | KINGS CANYON EXPRESSWAY SEGMENT 3, ON SR 180 FROM WEST OF SMITH AVENUE TO EAST OF FRANKWOOD AVENUE, PM R74.1/R78.6 CONSTRUCT 4 LANE EXPRESSWAY | $2,666,318.70 | $53,598,170.00 | |
California | KERN 46, WIDEN APPROXIMATELY 5.3 MILE SEGMENT OF ROUTE 46 FROM TWO TO FOUR LANES DIVIDED EXPRESSWAY PROJECT WILL BE CONSTRUCTED IN TWO PHASES, PHASE | $30,517,400.00 | $58,129,567.37 | |
California | ON SR-99 AT COMMERCIAL AVE: BETWEEN 0.9 MI N/O AVE 200 OC AND PAIGE AVE OC CONSTRUCT NEW INTERCHANGE AND CONSTRUCT NORTH AND SOUTHBOUND AUXILLARY LA | $16,000,000.00 | $57,398,000.00 | |
California | IN NORWALK AND SANTA FE SPRING(CARMENITA INT), INTERCHANGE RECONSTRUTION | $98,527,001.00 | $179,624,855.00 | |
California | I-5/SR-14 SEPARATION NR CITY OF SANTA CLARITA CONSTR. 2 LANE ELEV. HOV CONNE | $116,062,579.72 | $164,015,944.00 | |
California | I-5 : FROM RTE 134 TO MAGNOLIA BLVD HOV LANES | $72,706,000.00 | $113,213,945.00 | |
California | ROUTE 10: PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES AND SOUNDWALLS (TC) | $128,404,889.00 | $187,554,889.00 | |
California | SR-138, SEGMENT 6, (IN LITTLEROCK FROM 87TH ST E TO 96 ST. E) WIDENING OF SR-138 FROM 2 LANES TO 4 LANES (TC) | $25,130,000.00 | $25,130,000.00 | |
California | ROUTE 005: (SEG. 5) ARTESIA BLVD. TO 0.4 MILE NORTH OF SAN GABRIEL RIVER BRIDGE WIDEN I-5 WITH HOV MIXED FLOW LANES ETC. (TC) | $96,114,000.00 | $124,714,000.00 | |
California | RT. 10 : FROM CITRUS AVE. TO RT. 57 CONSTRUCT HOV LANE IN BOTH DIRECTIONS. (TC) | $162,885,020.00 | $237,395,520.00 | |
California | IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD. TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES AND IC MODIFICATIONS | $31,544,000.00 | $327,293,000.00 | |
California | I-5 CARPOOL LANE-ORANGE COUNTY
LINE TO I-605 (SEGMENT 2) IN LA MIRADA WIDEN HOV LOCATION DETAILS SEGMENT 2.: IN LA MIRADA FROM ARTESIA BL TO NOR |
$100,079,000.00 | $199,898,000.00 | |
California | STATE ROUTE 91 FROM ADAMS STREET TO THE 60/91/215 INTERCHANGE HOV LANES | $57,796,950.00 | $181,141,569.00 | |
California | I-215: ORANGE SHOW RD. - RIALTO AVE. (SEG. 3) , CONSTRUCT HOV & MIXED-FLOW LANES | $46,940,000.00 | $87,997,100.00 | |
California | I-15/I-215 INTERCHANGE S/O GLEN HELEN PARKWAY TO KENWOOD & I-215 S/O DEVORE ROAD RECONSTRUCT INTERCHANGE, ADD MIXED-FLOW LANES (TC) | $65,343,355.96 | $272,428,491.96 | |
California | SR 91 FROM SPRUCE ST. IN RIVERSIDE TO I-215 AT ORANGE SHOW RD. IN SAN BERNARDINO HOV LANES, BRIDGE REPLACEMENT, ROAD REHABILITATION | $42,081,275.38 | $177,601,275.38 | |
California | I-215 INTERCHANGE AT BARTON ROAD IN THE CITY OF GRAND TERRACE RECONSTRUCT OVERCROSSING AND RAMPS (TC) | $18,756,086.83 | $65,708,645.83 | |
California | I-15 FROM 0.5 MILES N/O MOJAVE DRIVE TO 1.5 MILES N/O STODDARD WELLS ROAD RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS (TC) | $3,637,000.00 | $84,990,000.00 | |
California | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 QUALIT | $23,300,000.00 | $99,197,577.00 | |
California | I15-PM R46.2/R46.8 & SR76-PM R12.1/R17.7 INTERCHANGE SR76 EAST - ROADWAY WIDENING FROM 2 TO 4 LANES | $86,750,801.30 | $121,682,757.37 | |
California | IN SAN DIEGO COUNTY IN SAN DIEGO ON I-5 FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO THE SORRENTO VALLEY OVERHEAD REPLACE BRIDGE, RAMP, IC, BUTTRESS, BI | $50,929,838.10 | $70,925,715.00 | |
California | I-805 SOUTH FROM PALOMAR STREET TO SR54 CONSTRUCT NOISE WALL (TC) | $31,302,000.00 | $32,092,210.06 | |
California | IN IMPERIAL COUNTY IN THE CITY OF EL CENTRO AT I-8 AND IMPERIAL AVE INTERCHANGE RECONSTRUCTION OF INTERCHANGE (TC) | $2,399,999.74 | $31,342,999.74 | |
California | IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS ALONG 1-5 FROM LOMAS SANTA FE DRIVE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD REPLACE THE SAN ELIJO LAGOON B | $186,740,594.00 | $246,122,594.00 | |
California | INTERSTATE 805 FROM 0.2 MILE NORTH OF THE PALOMAR STREET OVERCROSSING IN THE CITY OF CHULA VISTA TO 0.4 MILE SOUTH OF ROUTE 805/54 SEPARATION IN THE | $15,429,885.80 | $41,354,940.80 | |
California | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.6 MILE NORTH FROM DEL MAR HEIGHTS ROAD OVERCROSSING TO VILLA DE LA VALLE OVERCROSSING. RESTORE WETLANDS AT SA | $43,967,313.00 | $82,422,068.00 | |
California | INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION | $36,130,000.00 | $256,189,516.00 | |
California | INTERSTATE 5 FROM STATE ROUTE 73 TO OSO PARKWAY, SEGMENT 1 ADD MIXED-FLOW LANES IN EACH DIRECTION AND RECONSTRUCT THE I-5 INTERCHANGE INTERCHANGE (TC | $19,848,000.00 | $87,810,000.00 | |
California | INTERSTATE 5 FROM OSO CREEK TO ALICIA PARKWAY CONSTRUCT ONE GENERAL PURPOSE LANE ON EACH DIRECTION, RECONSTRUCT LA PAZ ROAD INTERCHANGE AND ADD AUXIL | $44,930,000.00 | $159,080,000.00 | |
California | INTERSTATE 5 FROM ALICIA PARKWAY TO EL TORO ROAD (SEGMENT 3) ADD GENERAL PURPOSE LANE, EXTEND 2ND HOV LANE IN BOTH DIRECTIONS, AND ADD AUXILIARY LANE | $44,915,000.00 | $149,817,000.00 | |
California | YERBA BUENA ISLAND EASTSIDE WESTBOUND ON & OFF RAMPS RECONST EXISTING WB ON & OFF RAMPS ON EAST OF YBI | $75,747,201.00 | $85,581,736.00 | |
California | ON TREASURE ISLAND ROAD, FROM NORTH SIDE OF SAN FRANCISCO-OAKLAND BAY BRIDGE (SFOBB) TO 2,000 FEET NORTH OF SFOBB BRIDGE REHABILITATION AND REPLACEME | $25,426,782.00 | $124,289,288.00 | |
California | ON YERBA BUENA ISLAND, SAN FRANCISCO - I-80 ON AND OFF RAMPS APPROACH ROADWAY REALIGNMENTS | $32,520,148.00 | $49,895,730.00 | |
California | NOGALES ST. AT UPRR IN THE CITY OF INDUSTRY , GRADE SEPARATION ON NOGALES ST. | $40,069,700.95 | $50,129,010.95 | |
California | RAMONA ST, MISSION RD, DEL MAR AVE, SAN GABRIEL BL UPTO WALNUT GROVE AVE W/UPRR, CONST. 2.6M LONG RAILROAD TRENCH | $12,404,576.45 | $399,597,000.00 | |
California | DURFEE AVENUE AT UPRR (LA SUBDIVISION) IN CITY OF PICO RIVERA CONSTRUCTION OF RAIL ROAD GRADE SEPARATION | $19,737,808.21 | $78,030,062.20 | |
California | FOLSOM STREET BETWEEN 2ND STREET AND 11TH STREET IN SAN FRANCISCO, CA THE FOLSOM STREETSCAPE PROJECT INCLUDES A BUILD OUT OF MAJOR ELEMENTS AND COMMU | $15,039,000.00 | $35,652,004.00 | |
California | IN THE CITY OF OAKLAND, WITHIN THE PORT OF OAKLAND'S SEAPORT FACILITIES AND ADJACENT AREA IN THE CITY OF OAKLAND ALONG WEST GRAND AVE., MARITIME HAR | $9,741,364.11 | $28,562,849.11 | |
California | MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT | $132,790,871.00 | $229,198,603.00 | |
California | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN | $23,433,140.00 | $34,301,075.00 | |
California | N 1ST AVENUE OVER BNSF RY, UP RR, AMTRAK, 0.2 MI N MAIN ST IN BARSTOW, BR. NO. 54C-0088 REPLACE EXISTING 2 LANE BRIDGE WITH 2 LANE BRIDGE, EXISTING B | $5,900,000.00 | $47,748,316.00 | |
California | IN FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING. ROADWAY REHABILITATION, BRIDGE REPLACEMENT, RETAINING WALLS, | $32,796,100.00 | $145,178,000.00 | |
California | IN FREMONT FROM SOUTH OF SCOTT CREEK ROAD TO AUTO MALL PARKWAY. RAMP METERING (TC) | $27,415,200.00 | $27,916,900.00 | |
California | CONTRA COSTA COUNTY ON I-680 FROM NORTH MAIN STREET TO LIVORNA IN THE SOUTHBOUND DIRECTION. CONSTRUCT AN HOV LANE | $14,210,480.71 | $75,747,180.71 | |
California | ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA | $74,992,200.00 | $82,130,000.00 | |
California | ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON FROM KOOPMANN ROADUNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING PRECA | $86,874,100.00 | $239,081,500.00 | |
California | IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE BRIDGE REPLACEMENT | $394,303,000.00 | $836,532,728.00 | |
California | IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . | $112,901,800.00 | $113,434,400.00 | |
California | IN SAN DIEGO COUNTY IN CHULA VISTA AND NATIONAL CITY FROM 0.2 MILE SOUTH OF SWEETWATER RIVER BRIDGE TO ROUTE 805/54 SEPARATION. UPGRADE BRIDGE RAILS, | $25,209,100.00 | ||
California | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE NORTH OF ROUTE 805/52 SEPARATION TO 0.3 MILE SOUTH OF NOBEL DRIVE OVERCROSSING. EXTEND EXISTING AUXILI | $26,353,800.00 | ||
California | I-880 AT COLEMAN AVENUE INTERCHANGE , RECON 880/COLEMAN____(2004A GARVEE) | $71,460,660.00 | ||
California | IN OAKLAND FROM SOUTH OF 29TH AVENUE TO NORTH OF 23RD AVENUE IMPROVE ON AND OFF RAMPS (TC) | $78,497,887.00 | $79,331,752.00 | |
California | IN AND NEAR FREMONT, UNION CITY, HAYWARD, SAN LEANDRO, AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET SEPARATION AN | $61,935,300.00 | $64,663,400.00 | |
California | IN ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILENORTH OF FREMONT BOULEVARD OVERCROSSING COLD PLANE PAVEMENT, OVERLAY | $91,572,500.00 | ||
California | WALERGA RD AT DRY CREEK BR #19C-159 BRIDGE REPLACEMENT | $31,231,307.00 | $36,721,268.00 | |
California | IN MARIPOSA COUNTY ABOUT 8 MILES WEST OF EL PORTAL FROM 1.2 MILES WEST OF SOUTH FORK MERCED RIVER BRIDGE TO 0.5 MILE WEST OF SOUTH FORK MERCED RIVER | $26,862,300.00 | $30,717,000.00 | |
California | DUNE PALMS ROAD OVER COACHELLA VALLEY STORMWATER CHANNEL (WHITEWATER RIVER), LWC #00L0070 REPLACE LOW WATER CROSSING WITH A 4-LANE BRIDGE | $11,166,826.00 | $28,234,409.00 | |
California | MEN CO;NR FORT BRAGG;N & S OF TEN MILE RV BR , REPLACE BRIDGE, REALIGN ROADWAY | $18,939,549.00 | $54,949,796.00 | |
California | SLO CO ABOUT 9 MI N OF SAN SIMEON FR PIEDRAS BLANCAS LIGHTHOUSE RD TO ARROYO... CONSTRUCT 3 BRIDGES & REALIGN 2 LANE HIGHWAY (TC) | $30,723,700.00 | $30,908,500.00 | |
California | MONTEREY COUNTY FROM TORRE CANYON BRIDGE NEAR BIG SUR TO SAN LUIS AVENUE IN CARMEL. RHMA OVERLAY ON EXISTING ROADWAY AND UPGRADE GUARDRAIL. | $24,668,600.00 | $28,328,000.00 | |
California | SANTA CRUZ COUNTY IN AND NEAR CITY OF CAPITOLA FROM 0.2 MILE SOUTH OF 41ST AVENUE OVERCROSSING TO 0.2 MILE NORTH OF SOQUEL DRIVE OVERCROSSING. CONSTR | $7,684,400.00 | $35,196,100.00 | |
California | ORANGE COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL HEIGHTS DRIVE TO LOS ANGELES/ORANGE COUNTY LINE COLD PLANE, PLACE RHMA AND MODIFY CURB RAMPS AND ELEC | $47,248,100.00 | ||
California | LA-001-PM 37.7/62.9 - IN THE CITIES OF LOS ANGELES AND MALIBU, FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TOVENTURA COUNTY LINE; ALSO IN VENTURA COU | $36,787,600.00 | ||
California | IN THE CITIES OF LONG BEACH, LOS ANGELES, LOMITA, AND TORRANCE, FROM ORANGE COUNTY LINE TO PASEO DE LAS DELICIAS. UPGRADE AMERICANS WITH DISABILITIES | $50,537,000.00 | ||
California | MARIN COUNTY IN AND NEAR POINT REYES STATION FROM FIVE BROOKS TO 1.9 MILES NORTH OFCYPRESS ROAD AND IN AND NEAR TOMALES FROM 0.2 MILES SOUTH OF TOMAL | $25,503,000.00 | ||
California | N THE CITIES OF TORRANCE, REDONDO BEACH, HERMOSA BEACH, MANHATTAN BEACH, EL SEGUNDO, AND LOS ANGELES, FROM PASEO DE LAS DELICIAS TO DEWEY STREET. UPG | $69,408,229.00 | ||
California | IN AND NEAR THE CITY OF LOS ANGELES, FROM CENTINELA AVENUE TO COTNER AVENUE, NORTH LA BREA AVENUE TO NORTH OXFORD AVENUE AND NORTH HOLLYWOOD BOULEVAR | $31,875,000.00 | ||
California | CONTRA COSTA COUNTY IN AND NEAR CONCORD AND PITTSBURG FROM 0.3 MILES EAST OF PERALTA ROAD UNDERCROSSING TO LOVERIDGE ROAD OVERCROSSING INDIVIDUAL CON | $48,404,000.00 | $55,171,100.00 | |
California | SAN JOAQUIN COUNTY IN STOCKTON AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF ROUTE 4/5SEPARATION TO 0.4 MILE WEST OF ROUTE 4/99 SEPARATION INSTALL RAMP | $1,619,237.00 | $37,990,100.00 | |
California | CONTRA COSTA COUNTY, IN HERCULES AND CONCORD, FROM SAN PABLO AVENUE TO ROUTE 4/242SEPARATION REPLACE ASPHALT CONCRETE SURFACING AND INSTALL MGS | $59,122,000.00 | ||
California | IN SAN DIEGO COUNTY NEAR SAN DIEGO AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING. OTAY MESA EAST PORT OF ENTRY SITE PREPARATION, DRAINAGE, AND UTIL | $35,706,100.00 | $35,706,100.00 | |
California | IN NAPA COUNTY FROM STATE ROUTE 29 TO 0.1 MILE WEST OF SOLANO COUNTY LINE WIDEN HWY TO 4 LANES AND CONSTR RET WALLS | $15,382,680.87 | $35,313,384.15 | |
California | IN NAPA AND SOLANO COUNTIES FROM 0.5 MILE WEST OF NAPA CO LINE TO RED TOP ROAD. WIDEN RTE 12 FROM 2 TO 4 LANE CONV HWY | $7,172,513.69 | $53,837,664.39 | |
California | SONOMA COUNTY FROM LLANO ROAD TO FARMERS LANE RESURFACE PAVEMENTS, REPLACE GUARDRAILS, APPORACH SLABS AND SIGNS. | $23,892,800.00 | $27,218,500.00 | |
California | IN KERN COUNTY AT AND NEAR ROSAMOND AND MOJAVE FROM 1.4 MILES SOUTH OF DAWN ROAD OVERCROSSING TO 0.5 MILE NORTH OF SILVER QUEEN ROAD OVERCROSSING. CO | $44,616,500.00 | $50,941,700.00 | |
California | LOS ANGELES COUNTY, ROUTE 14, POSTMILE R60.7/R77.0. IN AND NEAR PALMDALE AND LANDCASTER, FROM AVENUE P-8 TO THE KERN COUNTY LINE. REPLACE DISTRESSED | $169,300,900.00 | $191,597,100.00 | |
California | SANTA CLARA COUNTY IN AND NEAR LOS GATOS AND SAN JOSE FROM HEBARD ROAD TO ROUTE 17/280 SEPERATION COLD PLAN AND PAVE AC, REMOVE AND INSTALL CULVERTS, | $51,614,800.00 | $58,733,500.00 | |
California | NEAR YUBA CITY, FROM EAST END OF SUTTER BYPASS TO LYTLE ROAD. REHABILITATE ROADWAY, WIDEN SHOULDERS, AND REPLACE WADSWORTH CANAL BRIDGE NO.I8-0003. T | $23,097,900.00 | $26,246,200.00 | |
California | NEAR SMARTSVILLE, FROM THE YUBA RIVER BRIDGE TO EAST OF SMARTSVILLE ROAD. REALIGN AND WIDEN ROADWAY. THE NEED FOR THE FOLLOWING IMPROVEMENTS ARE ANAL | $39,900,700.00 | $44,855,100.00 | |
California | NEAR MARYSVILLE, FROM MARYSVILLE ROAD TO YUBA RIVER (PARKS BAR) BRIDGE. REHABILITATE ROADWAY. EXTEND SERVICE LIFE OF PAVEMENT, BRING HIGHWAY GEOMETRI | $43,232,870.00 | $49,400,100.00 | |
California | NEVADA COUNTY NEAR OMEGA AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CONSERVATION ROAD (WASHINGTON RIDGE ROAD) TO 1.2 MILES WEST OF ZIEBRIGHT ROAD. RO | $40,457,623.50 | $45,301,625.00 | |
California | IN MENDOCINO COUNTY NEAR UKIAH FROM 0.3 MILE WEST OF RUSSIAN RIVER BRIDGE AND OVERHEAD TO 0.4 MILE EAST OF COUNTY ROAD 144 REPLACE TWO BRIDGES | $32,273,900.00 | $36,949,000.00 | |
California | IN VENTURA COUNTY, ON STATE ROUTE 23, PM R3.3/R11.5. IN AND NEAR CITIES OF THOUSAND OAKS AND MOORPARK, FROM ROUTE 101 TO ROUTE 118. REHABILITATE PAVE | $91,342,600.00 | ||
California | RT 24 FROM CALDECOTT TUNNEL TO EL CURTOLA O/C, ROADWAY REHABILITATION | $41,284,906.00 | $46,634,305.00 | |
California | IN LAKE COUNTY NEAR KELSEYVILLE ON RTE 29 FROM 0.6 MI TO 3.7 MILES NORTH OF RTE 281 AND ON RTE 175 FROM SOUTH JCT RTE 29 TO 0.3 MI EAST OF SO JCT RTE | $60,679,000.00 | $68,278,700.00 | |
California | IN LASSEN COUNTY ABOUT 9 MILES EAST OF OLD STATION FROM SHASTA COUNTY LINE TO ROUTE 36. PAVEMENT REHABILITATION AND CURVE IMPROVEMENT | $39,650,100.00 | ||
California | IN SAN LUIS OBISPO COUNTY NEAR SHANDON FROM 0.2 MILE EAST OF SHANDON SAFETY ROADSIDEREST AREA TO 0.1 MILE WEST OF DAVIS ROAD CONVERT TO A FOUR LANE E | $119,580,400.00 | $135,441,000.00 | |
California | LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) | $368,659,356.00 | $368,785,856.00 | |
California | LOS ANGELES, SR 47, 0.3/08, MODIFY THE EXISTING ONRAMPS AND OFFRAMPS TO IMPROVE SAFETY, ACCESS, AND THE EFFICIENT OPERATION OF SR 47/FRONT STREET/HAR | $74,326,666.00 | ||
California | IN AUBURN, FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK ROAD. REHABILITATE PAVEMENT | $33,926,043.29 | $38,894,100.89 | |
California | PLACER COUNTY NEAR AUBURN FROM 0.3 MILE SOUTH OF LORENSEN ROAD/FLORENCE LANE TO 0.4 MILE NORTH OF LONE STAR ROAD CONC BARRIER, JPCP, HMA, RDWY EXC, R | $31,876,600.00 | ||
California | (03-4E620) NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. INSTALL MEDIAN BARRIER, WIDEN | $27,348,100.00 | $36,018,900.00 | |
California | IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB. | $54,496,300.00 | $434,546,200.00 | |
California | SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD. DREDGE, CONSTRUCT IN-WATER FOUNDATI | $53,284,500.00 | $60,427,100.00 | |
California | SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO | $167,530,400.00 | ||
California | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILE WEST OF CONVOY STREET OVERCROSSING TO 0.3 MILE EAST OF SANTO ROAD OVERCROSSING ROADWAY REHABILITATION | $55,394,000.00 | ||
California | IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT | $62,156,048.00 | $75,201,631.00 | |
California | LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANG | $73,371,600.00 | $83,316,400.38 | |
California | IN LOS ANGELES COUNTY. ROUTE 57/60 CONFLUENCE CHOKEPOINT RELIEF PROGRAM. RECONSTRUCT GRAND AVENUE OVERCROSSING. RECONSTRUCT NORTHBOUND SR-57 CONNECTO | $99,000,000.00 | $308,401,800.00 | |
California | ON STATE ROUTE 58 IN SAN BERNARDINO COUNTY A HENKLEY *** RECONSTRUCTION (2 LANE TO 4 LANE EXPRESSWAY) (TC) | $139,313,220.00 | $139,827,720.00 | |
California | NEAR BAKERSFIELD FROM COTTONWOOD ROAD UNDERCROSSING TO 0.3 MILE EAST OF ROUTE 58/184 SEPARATION. CONSTRUCT CRCP, HMA PAVEMENT, MGS, AND MODIFYING ELE | $39,401,100.00 | $39,628,100.00 | |
California | IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O | $207,775,600.00 | $208,375,000.00 | |
California | KERN COUNTY IN BAKERSFIELD FROM RTE 58/99 SEPARATION TO COTTONWOOD ROAD UNDERCROSSING REPLACE LANES AND SHOULDERS WITH CONTINUOUSLY REINFORCED CONCRE | $28,516,300.00 | $29,022,400.00 | |
California | IN SAN BERNARDINO COUNTY IN AND
NEAR CHINO AT VARIOUS LOCATIONS FROM 0.1 MI WEST OF PIPELINE AVE OC TO 0.1 MI EAST OF BENSON AVE OC REMOVE AND REPLA |
$26,041,300.00 | ||
California | IN RIVERSIDE COUNTY NEAR BEAUMONT ON SR 60 FROM GILMAN SPRINGS ROAD OVERCROSSING TO 1.4 MILES WEST OF JACK RABBIT TRAIL. CONSTRUCT A TRUCK CLIMBING L | $62,120,400.00 | $121,915,500.00 | |
California | IN SAN BERNARDINO AND RIVERSIDE COUNTIES IN ONTARIO, JURUPA VALLEY AND RIVERSIDE, FROM EUCLID AVENUE UNDERCROSSING TO ROUTE 60/91/215 SEPARATION. REP | $162,158,000.00 | ||
California | IN SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE ADD WEST BOUND AUXILIARY LANE, ADD EAST-BOUND DEC | $30,244,000.00 | $34,606,300.00 | |
California | IN RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR YUCCA VALLEY AND IN TWENTYNINE PALMS FROM 0.2 MILE NORTH OF INDIAN CANYON DRIVE TO 0.6 MILE WEST | $30,577,900.00 | $32,746,700.00 | |
California | IN AND NEAR ROSEVILLE AND ROCKLIN, FROM ROUTE 80 TO 0.5 MILES SOUTH OF PLEASANT GROVE OVERCROSSING INCLUDING WIDENING OF THE GALLERIA BLVD/STANFORD R | $24,480,600.00 | $43,180,600.00 | |
California | NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE NO. I 6-00 I 9. REPL | $45,899,180.00 | $52,445,800.00 | |
California | IN YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD WIDEN ROADW | $43,145,400.00 | $48,518,000.00 | |
California | YUBA COUNTY NEAR MARYSVILLE FROM 0.2 MILE NORTH OF LAURELLEN ROAD TO SOUTH HONCUT CREEK BRIDGE WIDEN SHOULDERS AND IMPROVE CLEAR RECOVERY ZONE. | $64,896,000.00 | $72,938,200.00 | |
California | IN PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE. 3R ROADWAY REHABILITATION | $101,936,400.00 | ||
California | ORANGE COUNTY FROM 0.3 MILE SOUTH OF S73-S5 CONNECTOR VIADUCT IN SAN JUAN CAPISTRANO TO 0.1 MILE NORTH OF N73-N405 CONNECTOR OVERCROSSING IN COSTA ME | $23,158,500.00 | $26,065,700.00 | |
California | IN RIVERSIDE COUNTY ON ROUTE 74 FROM 0.6 MILES EAST OF ROUTE 215 TO 0.8 MILES WEST OF ACACIA AVENUE IN THE CITY OF HEMET CONSTRUCT RAISED CURB MEDIAN | $25,824,020.00 | $29,030,900.00 | |
California | ORANGE COUNTY NEAR SAN JUAN CAPISTRANO FROM 1.0 MILE WEST OF SAN JUAN HOT SPRINGS ROAD TO ORANGE COUNTY LINE APPLY HFST, OVERLAY OGAC AND INSTALL MGS | $25,766,000.00 | $29,137,100.00 | |
California | IN RIVERSIDE COUNTY IN AND NEAR HEMET FROM WINCHESTER ROAD TO FAIRVIEW AVENUE REHAB PAVEMENT, INSTALL FO/ VDS/ UPGRADE ADA RAMPS | $39,130,200.00 | $44,684,100.00 | |
California | SANTA CLARA COUTY, AT VARIOUS LOCATIONS FROM KNICKERBOCKER DRIVE TO SAN MATEO COUNTY LINE IN PALO ALTO COLD PLANE AC, RHMA, SLAB REPL, CURB RAMPS, AN | $30,989,400.00 | $35,330,300.00 | |
California | IN/NEAR LIVERMORE & PLEASANTON FROM S/O RUBY HILL DRIVE TO N/O CONCANNON BLVD WIDEN AND UPGRADE 2.8 MILES OF SR 84 (TC) | $46,709,000.00 | $53,248,900.00 | |
California | ALAMEDA COUNTY NEAR FREMONT AT ALAMEDA CREEK BRIDGE REPLACE BR PAVING, SOIL NAIL WALL, DRAINAGE & CHANNEL RESTORATION | $22,824,900.00 | $26,321,800.00 | |
California | ALAMEDA COUNTY IN FREMONT FROM ROUTE 238 TO ROUTE 680 REPLACE STR CONC BR, HMA, ROADWAY EXC AND INSTALL SIGNAL AND LIGHTING. | $24,031,450.00 | $27,015,200.00 | |
California | SAN MATEO COUNTY IN WOODSIDE AND REDWOOD CITY, ON ROUTE 84, FROMROUTE 280 TO ROUTE 101 REPLACE AC SURFACING,UPGRADE CURB RAMPS, REPLACE MBGR WITH MGS | $25,312,000.00 | ||
California | IN SANTA CLARA COUNTY, IN CITY OF SAN JOSE, FROM ROUTE 85 TO WEST JULIAN STREET REHABILITATE ROADWAY, UPGRADE CONCRETE BARRIER, REPLACE DAMAGED SLABS | $55,691,200.00 | $63,381,300.00 | |
California | IN THE CITY OF CORONA AT THE JUNCTION OF SR-91 AND SR-71 NEAR THE ORANGE COUNTY LINE. REPLACE THE EB 91 TO NB 71 CONNECTOR WITH A DIRECT CONNECTOR AN | $10,069,000.00 | $151,327,818.00 | |
California | LOS ANGELES COUNTY; STATE ROUTE 91; DEVELOP AND IMPLEMENT AN AUXILIARY LANE TO ENHANCE SAFETY CONDITIONS, REDUCE CONGESTION, AND IMPROVE FREEWAY OPER | $48,332,000.00 | $87,133,000.00 | |
California | STANISLAUS COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF MERCED STANISLAUS COUNTY LINE TO 0.2 MILE SOUTH OF STANISLAUS SAN JOAQUIN COUNTY LINE C | $13,985,600.00 | $28,348,000.00 | |
California | MADERA COUNTY IN AND NEAR MADERA FROM AVENUE 12 OVERCROSSING TO 0.9 MILE NORTH OF AVENUE 17 OVERCROSSING REHABILITATE PAVEMENT AND CONSTRUCT NEW LANE | $58,293,200.00 | $65,925,900.00 | |
California | KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LAN | $58,859,700.00 | $71,341,800.00 | |
California | IN GALT, FROM THE SAN JOAQUIN COUNTY LINE TO SIMMERHOM ROAD; ALSO, IN THE CITIES OF ELK GROVE AND SACRAMENTO, FROM 0.7 MILE SOUTH OF ELK GROVE BOULEV | $35,473,568.00 | $40,312,800.00 | |
California | MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUE OVERCROSSING TO STANISLAUS COUNTY LINE NORTHBOUND LANE WIDENING FROM 2 TO | $29,716,313.95 | $42,425,300.00 | |
California | FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILES SOUTH OF SECOND STREET UNDERCROSSING. REPLACE CONCRETE AND AS | $35,418,100.00 | $40,420,100.00 | |
California | MERCED COUNTY IN AND NEAR ATWATER FROM 0.4 MILE SOUTH OF BUHACH OVERCROSSING TO 0.8 MILE NORTH OF WEST ATWATER OVERHEAD REPLACE CONCRETE AND ASPHALT | $1,396,600.00 | $72,340,200.00 | |
California | IN SUTTER COUNTY, IN AND NEAR LIVE OAK, FROM SOUTH OF COLEMAN AVENUE TO NEVADA STREET (NORTH INTERSECTION). REHABILITATE PAVEMENT, IMPROVE PEDESTRIAN | $25,499,860.73 | $37,162,000.00 | |
California | KERN COUNTY, IN AND NEAR BAKERSFIELD, FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRE | $54,176,800.00 | $61,831,100.00 | |
California | MERCED COUNTY IN MERCED FROM 0.2 MILE SOUTH OF CHILDS AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF FRANKLIN ROAD OVERCROSSING RECONSTRUCT PAVEMENT | $58,143,700.00 | $65,929,100.00 | |
California | IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE | $73,158,900.00 | ||
California | TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES | $59,190,000.00 | $67,376,000.00 | |
California | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PA | $71,509,800.00 | $81,481,800.00 | |
California | SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROADOVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD BRIDGE REPLACEMENT AND B | $50,329,800.00 | $57,173,100.00 | |
California | IN MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING. REPLACE BRIDGES AND CONSTRUC | $26,510,300.00 | $30,461,200.00 | |
California | MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUEOVERCROSSING TO STANISLAUS COUNTY LINE WIDEN CONCRETE PAVEMENT LANES AND BR | $29,454,200.00 | $34,102,100.00 | |
California | SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.1 MILE SOUTH OF ELK GROVE BOULEVARD OVERCROSSING TO CALVINE ROAD OVERCROSSING CONSTRUCT TWO AUX LANES, | $25,095,700.00 | ||
California | IN SAN DIEGO COUNTY IN AN NEAR LEMON GROVE FROM 0.3 MILE SOUTH OF ELKELTON PLACE UNDERCROSSING TO 0.2 MILE SOUTH OF ROUTE 125/94 SEPARATION PAVEMENT | $42,799,997.00 | ||
California | ORANGE COUNTY IN IRVINE, FROM ROUTE 133/405 SEPARATION TO IRVINE CENTER DRIVEOVERCROSSING CONSTRUCT AUXILIARY LANE | $30,385,000.00 | ||
California | IN LOS ANGELES COUNTY IN CITIES OF LOS ANGELES, BURBANK, GLENDALE AND PASADENA FROM 0.0 MILE EAST OF ROUTE 101/134 SEPARATION TO JUNCTION OF ROUTE 21 | $43,941,600.00 | $47,748,300.00 | |
California | IN SAN BERNARDINO COUNTY ON STATE ROUTE 138 NEAR PHELAN *** ROADWAY RECONSTRUCTION (ADDED CAPACITY) (TC) | $63,153,528.00 | $63,678,528.00 | |
California | NEAR HESPERIA FROM 1.9 MI E/O RTE 15 TO 0.1 MI W/O SUMMIT POST OFFICE ROAD REALIGN AND CONSTRUCT 2-LANE PAVED SECTION WITH OUTSIDE SHOULDERS, 3 WILDL | $22,313,821.36 | $32,688,059.01 | |
California | MARIPOSA COUNTY FROM WHITLOCK ROAD NEAR MIDPINES TO YOSEMITE NATIONAL PARK COLD PLANE EXISTING PAVEMENT AND RESURFACE WITH HMA. | $26,977,400.00 | $30,830,100.00 | |
California | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE | $73,479,500.00 | $100,737,200.00 | |
California | GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY | $86,174,263.80 | $98,818,100.00 | |
California | IN SAN BERNARDINO COUNTY IN SAN BERNARDINO, HIGHLAND, AND REDLANDS FROM 0.1 MILE WEST OF DEL ROSA AVENUE TO LUGONIA AVENUE BASELINE INTERCHANGE IMPRO | $49,830,394.95 | $160,080,310.00 | |
California | IN SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE REPLACE BRIDGE | $36,820,300.00 | ||
California | IN SHASTA COUNTY ABOUT 20 MILES WEST OF REDDING FROM 0.3 MILE EAST OF TRINITY COUNTY LINE TO 0.9 MILES WEST OF CRYSTAL CREEK ROAD. HIGHWAY REALIGNMEN | $44,998,502.00 | $45,932,442.00 | |
California | NEAR WILLOW CREEK, FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 0.2 MILE EAST OF EAST FORK WILLOW CREEK BRIDGE. WIDEN SHOULDERS AND IMPROVE CURVES AT TH | $25,196,100.00 | $28,509,500.00 | |
California | IN SBD COUNTY FR 7.9 MI N/O SR-18 TO 10.4 MI S/O KRAMER JCT (RTE)58 WIDEN MEDIAN & SHOULDERS, CONSTRUCT TURNOUTS (TC) | $31,415,318.00 | $32,032,678.00 | |
California | IN SAN BERNARDINO COUNTY IN ADELANTO AND IN VICTORVILLE ON ROUTE 395 FROM ROUTE 18-PALMDALE ROAD TO CHAMBERLAINE WAY WIDEN HIGHWAY FROM TWO TO FOUR L | $9,547,000.00 | $31,613,553.00 | |
California | IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE E | $76,343,500.00 | $86,360,100.00 | |
California | IN SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM ROUTE 15/395 SEPARATION TO 3.1 MILES NORTH OF ROUTE 58/395 SEPARATION REHABILITATE PAVEMENT (PM R3 | $40,519,400.00 | ||
California | SF ON RTE 101 FROM PM 8.8-9.2, DOYLE DR REPL REPLACE/REHABILITATE ROADWAY | $123,144,367.50 | $167,542,429.38 | |
California | IN SAN MATEO COUNTY ON US 101 IN THE CITY OF BURLINGAME RECONFIGURE THE BROADWAY INTERCHANGE (TC) | $19,850,958.37 | $60,085,142.37 | |
California | MRN & SON COUNTIES ON US 101 SAN ANTONIO CURVE CORRECTION (TC) | $75,275,041.00 | $75,791,241.00 | |
California | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE RECONSTRUCT 3 BRIDGES, CONSTRUCT 1 BRIDG | $54,846,100.00 | $80,591,000.00 | |
California | SAN LUIS OBISPO AND MONTEREY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING. | $69,860,400.00 | $70,452,900.00 | |
California | MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE P | $81,681,100.00 | $105,748,900.00 | |
California | MONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD RECONSTRUCT, CRACK AND SEAT PAVEMENT AND RECONSTR | $42,871,362.17 | $48,556,500.00 | |
California | MONTEREY COUNTY NEAR CHUALAR FROM 0.5 MILE NORTH OF NORTH GONZALES OVERCROSSING TO EAST MARKET STREET UNDERCROSSING REPLACE CONCRETE PANEL AND RESURF | $25,205,874.86 | $28,613,883.79 | |
California | SONOMA COUNTY IN PETALUMA FROM ROUTE 101/116 SEPERATION TO 0.4 MILE NORTH OF CORONA ROAD OVERCROSSING ROADWAY, BRIDGES, RETAINING WALLS, SOUND WALL A | $104,750,100.00 | ||
California | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING; UPGRADE MEDIAN CONCRETE BARRIER TO MEET THE | $43,822,300.00 | $44,130,700.00 | |
California | SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION. CRACK, SEAT AND OVERLAY, AND REHABILITATE AND REPLACE | $87,903,000.00 | ||
California | THE CITY AND COUNTY OF SAN FRANCISCO AT ALEMANY CIRCLE UNDERCROSSING REPLACE BRIDGE DECK | $37,085,782.50 | $43,170,200.00 | |
California | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE. CONSTRUCT HOV LANES AN | $48,147,600.35 | $108,459,352.52 | |
California | CITY AND COUNTY OF SAN FRANCISCO FROM THE SAN MATEO COUNTY LINE TO THE BAYSHORE VIADUCT COLD PLANE AND OVERLAY WITH RHMA. REPLACE EXISTING PCC SLAB. | $22,612,400.00 | $25,361,400.00 | |
California | SANTA BARBARA COUNTY IN AND NEAR SUMMERLAND FROM 0.2 MILE NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. CONSTRUCT NEW HOV LANES AND | $39,857,600.00 | $127,191,000.00 | |
California | VEN-101- IN VENTURA COUNTY, ON STATE ROUTE 101, PM R36.3/R40.6. NEAR SEA CLIFF, FROM 0.4 MILE SOUTH OF PADRE JUAN CANYON ROAD OVERCROSSING TO 0.3 MIL | $38,098,900.00 | $43,287,200.00 | |
California | THE CITY AND COUNTY OF SAN FRANCISCO FROM 17TH STREET TO SOUTH VAN NESS AVENUE CLEAN AND PAINT STEEL STRUCTURE | $33,735,800.00 | $38,493,100.00 | |
California | IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY | $53,118,000.00 | $60,653,600.00 | |
California | SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE | $99,251,600.00 | $193,632,000.00 | |
California | IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE | $87,802,500.00 | $99,920,000.00 | |
California | IN HUMBOLDT COUNTY IN AND NEAR TRINIDAD FROM 1.3 MILES SOUTH OF SCHOOL ROAD OC TO 0.4 MILE NORTH OF BIG LAGOON BRIDGE CAPITAL PREVENTATIVE MAINTENANC | $29,786,600.00 | $33,880,100.00 | |
California | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEADTO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE CIP BRIDGES, CONSTRUCT R | $1,014,700.00 | $91,663,300.00 | |
California | SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARKTO OLD COAST HIGHWAY REHABILITATE PAVEMENT | $50,327,900.00 | $57,298,500.00 | |
California | SANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE. REPLACE BRIDGES. | $22,739,100.00 | $26,096,900.00 | |
California | IN MONTEREY COUNTY AT AND NEAR PRUNEDALE AND SALINAS FROM 0.3 MILE NORTH OF BORONDA ROAD OVERCROSSING TO 0.4 MILE NORTHOF CRAZY HORSE CANYON ROAD OVE | $38,690,000.00 | $44,107,200.00 | |
California | SAN MATEO COUNTY IN REDWOOD CITY AND SAN CARLOS FROM 0.3 MILE SOUTH OF CORDILLERAS CREEK BRIDGE TO 0.1 MILES SOUTH OF OF PULGAS CREEK BRIDGE REPLACE | $26,483,900.00 | $30,355,400.00 | |
California | NEAR WILLITS, FROM 1.1 MILES NORTH OF WEST ROAD TO 0.6 MILE SOUTH OF HAEHL CREEK BRIDGE. REHABILITATE PAVEMENT, REPLACE CONCRETE MEDIAN BARRIER, REHA | $25,591,900.00 | $29,190,200.00 | |
California | IN SANTA BARBARA COUNTY IN AND NEAR SANTA BARBARA ON ROUTE 101 FROM 0.3 MILES SOUTH OF THE SAN YSIDRO ROAD OVERCROSSING TO 0.1 MILES NORTH OF THE OLI | $61,223,000.00 | ||
California | SAN MATEO COUNTY FROM SAN MATEO COUNTY LINE IN EAST PALO ALTO TO WHIPPLE AVENUE INREDWOOD CITY. REHABILITATE PAVEMENT,COLD PLANE AC PVMNT, RHMA OVERL | $52,438,000.00 | ||
California | IN AND NEAR THE CITY OF LOS ANGELES, FROM PACIFIC COAST HIGHWAY (ROUTE 1) TO DEVONSHIRE STREET. GRIND AND OVERLAY ASPHALT PAVEMENT, AND UPGRADE CURB | $52,699,665.00 | ||
California | IN LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD. REHABILITATE ROADWAY AND REPLACE | $35,410,962.60 | $40,244,808.00 | |
California | HUMBOLDT COUNTY AT AND NEAR BRIDGEVILLE FROM 3.4 MILES WEST OF GRIZZLY CREEKBRIDGE TO 0.8 MILE EAST OF SOUTH FORK VAN DUZEN RIVER COLD PLANE AND OVER | $36,573,400.00 | ||
California | IN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE/RIVERSIDE COUNTY LINE TO MONTE VISTA STREET WIDEN EXISTING LANES TO PROVIDE 12' LANES, 4' SHOULDER | $49,413,060.00 | $55,533,500.00 | |
California | IN RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD CONSTRUCT SHOULDERS & RUMBLE STRIP | $65,504,100.00 | ||
California | IN SAN JOSE RT 87 FROM JULIAN ST TO 280 U/C , WIDEN FWY (4 TO 6)___(2004A GARVEE) | $27,948,674.00 | ||
California | IN FRESNO COUNTY ABOUT 8.4 MILES EAST OF FRESNO FROM 0.7 MILE WEST OF SMITH AVENUE TO 0.7 MILE EAST OF FRANKWOOD AVENUE. CONSTRUCT 4 LANE EXPRESSWAY | $39,274,300.00 | $65,206,600.00 | |
California | HUM CO;NR MCKIN'LYVL;SR-101;FR 0.2 KM S/O * REPLACE BRIDGES | $44,444,818.04 | $50,203,116.96 | |
California | KERN COUNTY NEAR INDIAN WELLS ON ROUTE 14 FROM 2.4 MILES SOUTH OF JUNCTION ROUTE 178 TO 1.7 MILES NORTH OF JUNCTION ROUTE 178 AND ON ROUTE 178 FROM R | $27,853,200.00 | $28,251,600.00 | |
California | KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 | $34,259,394.00 | $40,522,000.00 | |
California | KERN COUNTY IN BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUEOVERCROSSING TO BEARSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEPAR | $41,904,800.00 | $84,744,700.00 | |
California | KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 58 AND RTE 99 FROM 0.1 MILE WEST OF RTE 99 TO 0.2 MILE EAST OF RTE 99 AND FROM 0.3 MILE SOUTH OF MING A | $25,000,000.00 | $58,633,355.00 | |
California | KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 58 FROM 0.1 MILE WEST OF MOHAWK STREET TO COTTONWOOD ROAD AND ROUTE 99 FROM 0.8 MILE SOUTH OF ROUTE 5 | $186,679,411.00 | ||
California | IN LOS ANGELES COUNTY IN AND NEAR CARSON ON ROUTE 110 FROM 0.2 MILE NORTH OF TORRANCE BLVD UC TO 190TH STREET UC AND ON ROUTE 405 FROM MAIN STREET UC | $25,656,200.00 | $25,930,700.00 | |
California | IN LOS ANGELES COUNTY ON ROUTES 2, 5, 10, 47, 90, 91, 105, 110, 405, 605 AND 710 REPAIR AND REPLACE THE PROJECT WILL IS MAXIMIZE THE USE OF THE EXI | $29,044,200.00 | $29,044,200.00 | |
California | IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 | $154,604,749.00 | $175,051,477.00 | |
California | IN LOS ANGELES COUNTY, AT VARIOUS LOCATIONS UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATION SYSTEM UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATIO | $33,916,000.00 | $38,613,000.00 | |
California | IN VARIOUS CITIES, FROM ORANGE COUNTY LINE TO 0.1 MILE NORTH OF TELEGRAPH ROAD; ALSO ON ROUTE 91 FROM 0.2 MILE WEST OF ROUTE 605TO ROUTE 605 (PM R16. | $64,570,600.00 | $71,217,600.00 | |
California | NAPA COUNTY NEAR NAPA ON ROUTE 29 FROM 0.7 MILES SOUTH TO 0.5 MILES NORTH OF ROUTE 221 AND ON ROUTE 221 FROM 0.2 MILES NORTH OF ROUTE 29 TO ROUTE 29 | $18,797,500.00 | $42,523,300.00 | |
California | IN ORANGE COUNTY AT VARIOUS LOCATIONS UPGRADE AND INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) ELEMENTS. | $21,837,800.00 | $25,171,300.00 | |
California | CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERC | $196,429,800.00 | $255,018,400.00 | |
California | ORANGE COUNTY AT VARIOUS LOCATIONS REHABILITATE PVMT BY REPAIR BROKE CONC SLABS & REPLACE AC W/ RHMA-G | $47,322,500.00 | ||
California | IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTES 15 AND 215 * 1-15/1-215 DEVORE INTERCHANGE IMPROVEMENT ** | $134,351,000.00 | $266,213,136.00 | |
California | IN SAN BERNARDINO COUNTY ON ROUTE 62 FROM 3.8 MILES WEST OF ROUTE 95 TO ARIZONA STATE LIN AND ON ROUTE 95 FROM ROUTE 62 TO 2.0 MILES SOUTH OF TURTLE | $24,047,800.00 | $27,490,700.00 | |
California | IN SAN DIEGO COUNTY ON ROUTE 94 FROM E94 / N125 SEPARATION IN LEMON GROVE TO 0.1 MILE EAST OF SPRING STREET UNDERCROSSING IN LA MESA AND ON ROUTE 125 | $31,740,800.00 | $36,216,100.00 | |
California | SF 101/1 SEPARATION TO GOLDEN GATE TOLL PLAZA REPLACE/REHABILITATE ROADWAY | $82,124,382.00 | $104,451,807.00 | |
California | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PHASE II CONCESSIONAIRE PMTS P3 (TC) | $220,121,856.16 | $731,328,837.00 | |
California | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PARK PRESIDIO P3, DEPT DIRECTED CHANGES& SUPPT(TC) | $156,252,688.00 | $169,572,970.00 | |
California | SJ CO RTE205 IN TRACY 0.6KM W/11TH ST OC RTE5 WIDEN 4 LANE TO 6 LANE FREEWAY | $72,879,005.00 | $90,778,579.00 | |
California | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 FROM 0.2 MILE EAST OF FRESNO AVENUE TO EL DORADO STREET AND ON ROUTE 5 FROM TAYLOR STREET OVERHEAD TO STOC | $28,499,000.00 | $37,712,800.00 | |
California | IN SAN LUIS OBISPO COUNTY AT AND NEAR CHOLAME ON ROUTE 41 FROM ROUTE 41/46 SEPARATION TO 0.8 MILE NORTH OF ROUTE 41/46 SEPARATION AND ON ROUTE 46 FRO | $100,924,800.00 | $171,419,900.00 | |
California | IN SHASTA COUNTY IN AND NEAR REDDING ON ROUTE 273 FROM 0.5 MILE NORTH OF SULPHUR CREEK BRIDGE TO 0.2 MILE SOUTH OF TWIN VIEW BOULEVARD AND ON ROUTE 2 | $37,124,200.00 | ||
California | IN SISKIYOU COUNTY IN YREKA ON ROUTE 3 FROM 0.4 MILE NORTH OF LAURA LANE TO JUNIPER DRIVE AND ON ROUTE 263 FROM ROUTE 3 TO 1.0 MILE SOUTH OF LONG GUL | $71,721,200.00 | $81,293,400.00 | |
California | IN FAIRFIELD AT I-80 AND SR 12 CONSTRUCT A TWO-LANE WB I-80/WB SR 12 (TC) | $19,569,973.18 | $61,959,006.00 | |
California | IN AND NEAR THE CITY OF MODESTO ON SR 132 NEAR NORTH DAKOTA AVE TO NEAR 6TH ST AND ON SR 99 FROM 0.5 M SOUTH OF TUOLUMNE RIVER BRIDGE TO 0.1 M NORTH | $38,923,100.00 | $103,335,641.00 | |
California | ON ROUTE 101, BETWEEN LOS ANGELES / VENTURA COUNTY LINE AND OLD PACIFIC COAST HIGHWAY (POSTMILE 0.2 / 40.8 AND ON ROUTE 23, BETWEEN ROUTE 23 AND 101 | $30,010,700.00 | $33,724,200.00 | |
California | YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE | $259,320,300.00 |