RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | $13,062,193.05 |
$26,043,617.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | $1,776,566.99 |
$4,114,999.99 |
|
California | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | 4R - Added Capacity | $5,904,857.00 |
$7,381,071.00 |
|
California | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Preliminary Engineering | $5,602,266.12 |
$7,006,499.99 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | $1,100,000.00 |
$1,375,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | 4R - Added Capacity | $3,853,073.02 |
$4,816,342.00 |
|
California | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Construction Engineering | $4,476,983.99 |
$6,055,096.00 |
|
California | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Preliminary Engineering | $3,019,999.99 |
$5,524,028.00 |
|
California | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Right of Way | $160,000.00 |
$1,561,507.00 |
|
California | Los Angeles | >= 200,000 | N/A | SECTION 149(B) | 4R - Added Capacity | $1,097,400.00 |
$1,371,750.00 |
|
California | Los Angeles | >= 200,000 | N/A | SECTION 149(D) | 4R - Added Capacity | $658,440.00 |
$823,050.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,460,000.00 |
$12,639,700.00 |
|
California | Los Angeles | >= 200,000 | N/A | URBAN ACCESS/URBAN MOBILITY | 4R - Added Capacity | $6,925,543.00 |
$8,656,929.00 |
|
California | Los Angeles | >= 200,000 | N/A | URBAN ACCESS/URBAN MOBILITY | Construction Engineering | |||
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,606,134.00 |
$50,906,682.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,697,107.00 |
$94,540,981.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,406,444.00 |
$14,181,146.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,295,778.00 |
$7,636,002.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $6,615,000.00 |
||
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $53,760.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $65,728,813.86 |
$70,815,173.48 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $123,286.14 |
$132,826.52 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,752.68 |
$15,969.59 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,865,247.32 |
$8,514,030.41 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,187.07 |
$13,179.19 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $12.93 |
$20.81 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,679,569.77 |
$4,747,130.82 |
|
California | Tuolumne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $18,302,330.23 |
$18,566,569.18 |
|
California | Tuolumne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $178,817.66 |
$178,817.66 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,831,182.34 |
$1,831,182.34 |
|
California | San Diego | >= 200,000 | N/A | COORD BORDER INFRA PROGRAM | Construction Engineering | $3,350,000.00 |
$19,050,000.00 |
|
California | San Diego | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $49,280,000.00 |
$107,457,700.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $13,384,807.50 |
$15,483,800.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $13,384,807.50 |
$15,483,800.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,273,885.00 |
$2,600,000.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,875,500.00 |
$2,150,000.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,250.00 |
$3,700.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,250.00 |
$3,700.00 |
|
California | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,898,800.00 |
$5,938,000.00 |
|
California | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $12,622,600.00 |
$21,494,200.00 |
|
California | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $11,400.00 |
$12,900.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $39,600,000.00 |
||
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,640,000.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,695,616.00 |
$67,364,819.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,800,000.00 |
$10,194,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $23,844.00 |
$26,040.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $41,240,700.00 |
$264,472,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,000,000.00 |
$37,153,107.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,337,500.00 |
$2,675,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $17,803,300.00 |
$19,442,300.00 |
|
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $64,074,100.00 |
$227,064,300.00 |
|
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,644,700.00 |
$9,289,400.00 |
|
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,742,500.00 |
$41,995,000.00 |
|
California | San Diego | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $12,837,000.00 |
$12,837,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,097,600.00 |
$49,388,391.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $5,037,100.00 |
$5,500,889.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,992,300.00 |
$8,001,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $25,300.00 |
$27,720.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $57,892,200.00 |
$63,237,000.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,842,050.00 |
$8,564,000.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $14,200.00 |
$15,600.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $3,476,726.00 |
$3,796,795.92 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,369,974.00 |
$24,638,704.08 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,571,200.00 |
$3,900,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,600.00 |
$6,200.00 |
|
California | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $27,219,965.00 |
$98,595,684.00 |
|
California | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $8,343,423.00 |
$14,789,352.00 |
|
California | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Rail/Hwy Crossing | $1,135,449.00 |
$1,326,600.00 |
|
California | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Training | $22,596.00 |
$26,400.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,350,000.00 |
$8,302,271.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $246,097.00 |
$277,982.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $1,640,653.00 |
$1,853,217.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,802,230.00 |
$96,019,303.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $576,857.00 |
$16,675,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $117,700.00 |
||
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $29,040.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $25,722,800.00 |
$25,722,800.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,333,700.00 |
$34,687,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $23,750,600.00 |
$26,192,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,360,900.00 |
$2,578,300.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,107,700.00 |
$6,670,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $12,700.00 |
$13,900.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $38,225,000.00 |
$46,413,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $3,559,000.00 |
$8,000,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $13,170,512.00 |
$32,587,725.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,842,247.00 |
$41,827,292.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $1,426,844.00 |
$1,558,200.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $26,493,000.00 |
$194,197,957.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $29,009.00 |
$31,680.00 |
|
California | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Traffic Management/Engineering - HOV | $179,000,000.00 |
$533,596,550.00 |
|
California | Kings | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | $271,734.52 |
$296,750.60 |
|
California | Kern | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | $4,739,762.79 |
$5,176,108.75 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $30,691,979.55 |
$33,851,577.99 |
|
California | Kings | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,485,984.11 |
$3,844,062.66 |
|
California | Kings | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $354,243.87 |
$386,866.67 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,445,756.13 |
$4,855,133.33 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,700.00 |
$12,870.00 |
|
California | Kings | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,300.00 |
$1,430.00 |
|
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $22,792,500.00 |
||
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,000,000.00 |
||
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $7,600.00 |
||
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $28,238,294.22 |
$28,285,594.22 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,150,000.00 |
$3,150,000.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $17,600.00 |
$17,600.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Maintenance Resurfacing | $1,114,805.78 |
$1,114,805.78 |
|
California | Fresno | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $21,975,799.00 |
$23,998,906.85 |
|
California | Fresno | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,761,600.00 |
$5,200,000.00 |
|
California | Fresno | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Training | $3,800.00 |
$4,200.00 |
|
California | Fresno | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $5,578,701.00 |
$6,377,893.15 |
|
California | Sacramento | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $432,600.00 |
$472,500.00 |
|
California | Sacramento | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $575,800.00 |
$630,100.00 |
|
California | Sacramento | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $91.57 |
$100.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,000,000.00 |
$19,657,092.93 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $19,576,226.00 |
$21,378,476.00 |
|
California | Sacramento | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $34,850,600.00 |
||
California | Sacramento | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,763,800.00 |
$4,140,700.00 |
|
California | Sacramento | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $37,679,300.00 |
$258,474,407.07 |
|
California | Sacramento | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,779,674.00 |
$14,960,024.00 |
|
California | Sacramento | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $26,800.00 |
$32,700.00 |
|
California | Sacramento | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $27,449,900.00 |
$31,291,000.00 |
|
California | Sacramento | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $3,204,800.00 |
$3,500,000.00 |
|
California | Sacramento | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $15,100.00 |
$17,000.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $102,242,000.00 |
||
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,459,800.00 |
||
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,953,000.00 |
||
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $30,240.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $131,904,723.43 |
$131,904,723.43 |
|
California | Shasta | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $35,267,400.00 |
$35,267,400.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $13,015,000.00 |
$13,015,000.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $5,962,600.00 |
$5,962,600.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $34,965,196.00 |
$35,290,196.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | $6,177,833.00 |
$6,177,833.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | $22,034,804.00 |
$22,034,804.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $8,700,000.00 |
$8,700,000.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,553,725.00 |
$7,259,204.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $20,296,750.00 |
$40,751,100.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,939,493.00 |
$3,641,567.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $75,911.00 |
$82,900.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $9,543,585.00 |
$16,586,196.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,550,000.00 |
$9,100,000.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $930,992.00 |
$1,016,700.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $13,864.00 |
$18,500.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $30,117,000.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,650,000.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,100.00 |
||
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $106,749,000.00 |
$116,892,500.00 |
|
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $30,383,900.00 |
$33,216,800.00 |
|
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,275,700.00 |
$15,590,000.00 |
|
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $34,600.00 |
$37,800.00 |
|
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,614,800.00 |
||
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,250,000.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $42,514,500.00 |
$46,814,900.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,241,400.00 |
$5,724,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,800.00 |
$15,100.00 |
|
California | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,568,100.00 |
$17,377,000.00 |
|
California | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,618,760.26 |
$9,434,360.26 |
|
California | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,494,000.00 |
$6,000,000.00 |
|
California | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $15,300.00 |
$16,800.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $34,744,384.00 |
$114,585,783.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,395,616.00 |
$43,223,068.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $57,200.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $28,967,500.00 |
$35,053,500.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $49,525,700.00 |
$198,793,300.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $60,700.00 |
$60,700.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $34,932,900.00 |
$35,378,100.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,024,000.00 |
$7,024,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $826,900.00 |
$826,900.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,200.00 |
$4,200.00 |
|
California | Los Angeles | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $2,954,270.38 |
$3,226,242.64 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $45,526,729.62 |
$50,348,057.36 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,732,100.00 |
$8,444,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $14,300.00 |
$15,700.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $15,365,283.21 |
$31,030,166.42 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,610,000.00 |
$5,220,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,400.00 |
$10,900.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $164,016.79 |
$328,033.58 |
|
California | San Bernardino | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $104,315,784.00 |
$117,831,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,186,249.00 |
$50,887,000.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $7,270,969.00 |
$8,213,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $49,271,000.00 |
$98,542,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,500,000.00 |
$11,000,000.00 |
|
California | Riverside | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $86,956,900.00 |
$202,637,500.00 |
|
California | Riverside | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $3,173,564.00 |
$10,342,000.00 |
|
California | Riverside | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $32,300.00 |
$35,300.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,409,900.00 |
$7,000,000.00 |
|
California | Riverside | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $78,735,500.00 |
$80,000,000.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $100,536,580.00 |
$110,784,500.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $34,346,900.00 |
$37,509,000.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $29,200.00 |
$31,900.00 |
|
California | Riverside | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | $90,109,531.00 |
$98,405,100.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $33,310,000.00 |
$56,760,364.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $100,000,000.00 |
$200,444,100.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,400,000.00 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $52,500.00 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $250,293,600.00 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $30,509,000.00 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $27,900.00 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $64,158,700.00 |
$68,425,700.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,000,000.00 |
$20,000,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,280,000.00 |
$14,280,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $12,600.00 |
$12,600.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $17,346,700.00 |
$29,215,600.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,693,000.00 |
$4,033,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,300.00 |
$2,600.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,823,283.00 |
$11,725,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $21,870.00 |
$21,870.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Vehicle Weight Enforcement Program | $9,728,841.00 |
$40,403,547.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $795,558.67 |
$881,845.74 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $28,082,306.62 |
$31,128,140.89 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,633,764.88 |
$5,060,398.10 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,488.63 |
$4,901.90 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $209.37 |
$231.41 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,390.63 |
$8,168.59 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $478,285.12 |
$522,316.39 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $13,549.59 |
$14,796.98 |
|
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $47,312,900.00 |
$52,202,000.00 |
|
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,067,200.00 |
$10,994,000.00 |
|
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $23,800.00 |
$26,100.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $23,416,000.00 |
$25,868,700.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,053,814.50 |
$3,335,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,200.00 |
$10,100.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,916,397.00 |
$21,118,963.76 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,426,400.00 |
$4,834,000.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,500.00 |
$12,600.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $4,370,303.00 |
$4,772,636.24 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $123,425,800.00 |
$133,820,900.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Rail/Hwy Crossing | $51,900.00 |
$56,700.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $31,500.00 |
$34,400.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $9,385,900.00 |
$10,250,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,093,500.00 |
$15,391,000.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $4,974,000.00 |
$4,974,000.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $36,246,000.00 |
$36,575,300.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $800.00 |
$800.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $3,250,700.00 |
$3,550,000.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $33,631,400.00 |
$37,120,100.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $1,500.00 |
$1,700.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $19,364,300.00 |
$21,484,500.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $4,761,600.00 |
$5,200,000.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $8,500.00 |
$9,300.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,722,000.00 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $36,818,800.00 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $15,200.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $15,064,100.00 |
$22,828,700.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,082,001.41 |
$2,286,700.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,800.00 |
$11,800.00 |
|
California | San Francisco | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $11,886,968.25 |
$13,367,700.00 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $9,942,431.75 |
$10,857,800.00 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,867,700.00 |
$7,500,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,169,800.00 |
$27,425,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,481,500.00 |
$3,347,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,200.00 |
$15,200.00 |
|
California | Contra Costa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $40,490,420.00 |
$40,490,420.00 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $7,597,621.07 |
$8,797,650.00 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,868,600.00 |
$7,501,000.00 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $14,500.00 |
$15,900.00 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $241,678.93 |
$263,930.00 |
|
California | Contra Costa | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $3,772,389.92 |
$3,772,389.92 |
|
California | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $3,554,610.08 |
$3,554,610.08 |
|
California | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $29,112,290.48 |
$29,335,405.69 |
|
California | Contra Costa | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $30,895,909.52 |
$31,132,694.31 |
|
California | Contra Costa | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $6,075.37 |
$6,075.37 |
|
California | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $5,724.63 |
$5,724.63 |
|
California | Solano | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $1,859,000.00 |
$1,859,000.00 |
|
California | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,000,000.00 |
$24,941,000.00 |
|
California | Sacramento | >= 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS | 4R - Restoration & Rehabilitation | $56,028,625.00 |
$56,733,175.00 |
|
California | Sacramento | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Construction Engineering | $3,850,624.20 |
$3,850,624.20 |
|
California | Yolo | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Construction Engineering | $642,870.80 |
$642,870.80 |
|
California | Yolo | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $357,685.99 |
$357,685.99 |
|
California | Sacramento | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $2,142,314.01 |
$2,142,314.01 |
|
California | Sacramento | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $9,091,669.27 |
$13,376,334.04 |
|
California | Yolo | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $1,517,875.64 |
$2,233,210.53 |
|
California | Sacramento | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Rail/Hwy Crossing | $1,575,000.00 |
||
California | Sacramento | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Traffic Management/Engineering - HOV | $46,243,852.00 |
||
California | Sacramento | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Training | $21,521.00 |
$35,280.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $7,995,778.09 |
$8,851,499.83 |
|
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $11,311,521.91 |
$12,522,100.17 |
|
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,306,853.76 |
$2,519,230.77 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,630,646.24 |
$1,780,769.23 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $324,563.00 |
$354,472.80 |
|
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $25,937.00 |
$28,327.20 |
|
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,605.80 |
$1,761.20 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $20,094.20 |
$22,038.80 |
|
California | Placer | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $14,176,600.00 |
$39,065,100.00 |
|
California | Placer | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $2,118,000.00 |
$5,345,000.00 |
|
California | Placer | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $5,216.00 |
$16,816.00 |
|
California | Placer | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $1,632,184.00 |
$1,632,184.00 |
|
California | Placer | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - No Added Capacity | $1,237,337.00 |
$1,237,337.00 |
|
California | Placer | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $3,368,384.39 |
$3,368,384.39 |
|
California | Placer | >= 200,000 | N/A | INTERSTATE MAINT DISC | Right of Way | $1,581,615.61 |
$1,581,615.61 |
|
California | Placer | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $7,718,572.00 |
$7,718,572.00 |
|
California | Placer | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $8,695,900.00 |
$8,700,000.00 |
|
California | Placer | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $570,000.00 |
$570,000.00 |
|
California | Placer | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $40,000.00 |
$40,000.00 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,380,991.00 |
$10,586,691.00 |
|
California | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $250,666.28 |
$250,666.28 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,100.00 |
$10,100.00 |
|
California | Placer | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | 4R - No Added Capacity | $20,000,000.00 |
$20,000,000.00 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $22,407,902.00 |
$24,686,022.92 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,452,298.00 |
$7,108,277.08 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,401,252.29 |
$1,530,265.02 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,852,927.71 |
$5,299,734.98 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $14,286.28 |
$15,683.84 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,113.72 |
$4,516.16 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,357,000.00 |
$2,584,000.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $19,241,400.00 |
$21,336,200.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,289,200.00 |
$2,500,000.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,200.00 |
$6,800.00 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $118,247,400.00 |
||
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,000,000.00 |
||
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $24,700.00 |
||
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $79,420,900.00 |
||
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,000,000.00 |
||
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $26,100.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $33,665,200.00 |
$33,883,600.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,740,000.00 |
$5,740,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,600.00 |
$7,600.00 |
|
California | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $88,528,052.90 |
$88,528,052.90 |
|
California | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $230,066,617.95 |
$233,687,517.95 |
|
California | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $9,928,083.47 |
$9,928,083.47 |
|
California | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $125,139,954.62 |
$125,139,954.62 |
|
California | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | Construction Engineering | $73,290.83 |
$129,805.36 |
|
California | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | Construction Engineering | $34,800,000.00 |
$34,800,000.00 |
|
California | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $7,501,321.74 |
$8,044,456.74 |
|
California | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | Training | $48,800.00 |
$48,800.00 |
|
California | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF(P.L.101-130) | 4R - Restoration & Rehabilitation | $2,122,380.00 |
$2,122,380.00 |
|
California | San Diego | >= 200,000 | N/A | FREIGHT INTERMODAL GRANT PRG | 4R - Added Capacity | $300,000.00 |
$100,146,000.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,309,400.00 |
$20,431,600.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,008,800.00 |
$6,562,000.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,600.00 |
$8,400.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $17,276,100.00 |
$19,574,690.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,273,245.06 |
$5,758,800.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,000.00 |
$14,300.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $27,645,000.00 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,182,000.00 |
||
California | Ventura | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $44,971,200.00 |
$51,095,900.00 |
|
California | Ventura | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $4,562,800.00 |
$5,154,000.00 |
|
California | Ventura | >= 200,000 | State | EMERGENCY RELIEF | Training | $3,700.00 |
$4,200.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $21,457,122.00 |
$23,846,234.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,036,300.00 |
$5,500,000.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,800.00 |
$8,600.00 |
|
California | Santa Clara | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | $26,901,678.00 |
$29,378,266.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $29,038,600.00 |
||
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,946,000.00 |
||
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,400.00 |
||
California | Fresno | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $1,327,950.00 |
$1,500,000.00 |
|
California | San Mateo | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $1,327,950.00 |
$1,500,000.00 |
|
California | San Mateo | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Other | $10,007,500.00 |
$11,432,100.00 |
|
California | Santa Clara | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Other | $10,007,500.00 |
$11,432,100.00 |
|
California | Santa Clara | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Training | $2,600.00 |
$2,950.00 |
|
California | San Mateo | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Training | $2,600.00 |
$2,950.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $30,188,729.97 |
$34,100,000.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $3,983,849.99 |
$4,500,000.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Right of Way | $44,265.00 |
$50,000.00 |
|
California | Trinity | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $40,023,086.00 |
$40,553,000.00 |
|
California | Trinity | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Construction Engineering | $3,208,240.00 |
$3,300,000.00 |
|
California | Butte | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $27,018,000.00 |
$30,861,700.00 |
|
California | Butte | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $4,426,500.00 |
$5,000,000.00 |
|
California | Butte | >= 200,000 | State | EMERGENCY RELIEF | Training | $6,200.00 |
$7,100.00 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Bridge Replacement - No Added Capacity | $19,317,000.00 |
$21,820,000.00 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $2,700,000.00 |
$3,049,900.00 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $1,183,400.00 |
$1,336,726.00 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Right of Way | $699,300.00 |
$790,000.00 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $75,348,300.00 |
$84,086,200.00 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $68,574.09 |
$77,458.60 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $4,962,025.91 |
$5,467,574.74 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $1,089,900.00 |
$1,186,300.00 |
|
California | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Right of Way | $3,011,500.00 |
$3,400,000.00 |
|
California | Plumas | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $24,721,446.14 |
$28,130,843.02 |
|
California | Plumas | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $558,871.46 |
$631,279.18 |
|
California | Plumas | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Construction Engineering | $2,377,900.00 |
$2,686,000.00 |
|
California | Plumas | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Training | $8,500.00 |
$9,700.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | EMERGENCY RELIEF | Construction Engineering | $10,367,253.60 |
$11,813,266.21 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | EMERGENCY RELIEF | New Construction Roadway | $28,549,824.02 |
$32,248,755.89 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | New Construction Roadway | $17,282,178.22 |
$20,206,768.10 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | EMERGENCY RELIEF | Training | $20,361.00 |
$23,000.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $9,674,772.27 |
$10,928,241.58 |
|
California | Plumas | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $97,672.64 |
$123,923.19 |
|
California | Butte | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $17,439,127.36 |
$22,126,076.81 |
|
California | Butte | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $3,081,242.65 |
$3,977,721.67 |
|
California | Plumas | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Construction Engineering | $17,257.35 |
$22,278.33 |
|
California | Butte | >= 200,000 | N/A | EMERGENCY RELIEF | 4R - No Added Capacity | $34,023,105.97 |
$45,213,429.88 |
|
California | Butte | >= 200,000 | N/A | EMERGENCY RELIEF | Construction Engineering | $5,058,132.02 |
$6,721,770.12 |
|
California | Butte | >= 200,000 | N/A | EMERGENCY RELIEF | Preliminary Engineering | $2,636,760.00 |
$3,504,000.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $231,784,900.00 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $17,000,000.00 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $48,808,637.00 |
$1,879,966,554.92 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $18,344,625.66 |
$20,033,445.08 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,000.00 |
$54,756,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,988,400.00 |
$12,000,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Construction Engineering | $5,000,000.00 |
$5,000,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Traffic Management/Engineering - HOV | $188,547,625.26 |
$188,547,626.00 |
|
California | Los Angeles | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Traffic Management/Engineering - HOV | $18,781,000.00 |
$20,509,993.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,000,000.00 |
$28,000,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $5,100,000.00 |
$585,160,100.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $107,452,681.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,281,000.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $32,300.00 |
||
California | San Diego | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $4,040,000.00 |
$5,050,000.00 |
|
California | San Diego | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $400,000.00 |
$500,000.00 |
|
California | San Diego | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $2,200,000.00 |
$2,750,000.00 |
|
California | San Diego | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $44,135,752.76 |
$49,854,008.00 |
|
California | San Diego | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $527,567.03 |
$595,918.93 |
|
California | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $51,856,390.02 |
$66,073,601.00 |
|
California | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,886,844.00 |
$15,738,449.07 |
|
California | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $680,000.00 |
$850,000.00 |
|
California | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $132,795.00 |
$150,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $4,743,215.79 |
$5,357,751.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $360,555.69 |
$450,694.61 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $80,000.00 |
$100,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $1,205,200.00 |
$1,506,500.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $69,050,000.00 |
||
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,000,000.00 |
||
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,262,332.31 |
$2,827,915.39 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,240,319.00 |
$1,401,016.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $18,503,075.00 |
$22,448,413.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $2,714,560.00 |
$4,069,806.50 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $2,568,082.06 |
$3,210,103.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $5,434,238.03 |
$6,138,299.98 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $20,985.52 |
$26,232.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $1,410,932.42 |
$1,763,665.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM | Right of Way | $165,258.97 |
$186,670.02 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,984,818.00 |
$5,433,071.99 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $729,821.00 |
$824,375.97 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,516,667.00 |
$1,895,834.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $7,845,610.97 |
$8,862,092.31 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $1,327,950.00 |
$1,500,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $29,128,327.00 |
$32,902,211.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Construction Engineering | $3,559,313.00 |
$4,020,460.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $1,134,400.00 |
$1,418,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Right of Way | $8,645,240.25 |
$9,765,311.48 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $2,400,000.00 |
$3,000,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,290,381.44 |
$4,846,257.43 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $17,706,000.00 |
$20,000,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $67,527,371.73 |
$67,909,312.12 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Right of Way | $5,677.96 |
$5,677.96 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $12,468,102.36 |
$12,468,102.36 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $4,577,975.00 |
$8,507,400.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $624,269.00 |
$768,850.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,452,625.00 |
$5,029,510.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $27,313,788.00 |
$34,221,048.56 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $25,893,786.00 |
$29,605,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,084,327.00 |
$3,483,934.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $22,859,510.00 |
$25,821,202.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,265,644.00 |
$3,688,743.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $325,944.91 |
$368,174.53 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $1,767,112.78 |
$1,996,060.95 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $17,588,592.51 |
$19,867,381.41 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $38,220,897.00 |
$43,172,819.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $644,294.71 |
$727,769.94 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $104,294,499.09 |
$130,819,700.99 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,000,000.00 |
$19,425,697.94 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $10,242,000.00 |
$11,568,959.67 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,417,489.57 |
||
California | Los Angeles | >= 200,000 | N/A | FAST ACT NATIONAL FREIGHT | Construction Engineering | $2,000.00 |
$4,050,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | FAST ACT NATIONAL FREIGHT | New Construction Roadway | $21,643,000.00 |
$51,600,000.00 |
|
California | Alameda | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $208,000.00 |
$260,000.00 |
|
California | Alameda | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $741,600.00 |
$927,000.00 |
|
California | Alameda | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM | Preliminary Engineering | $1,032,468.00 |
$1,321,825.00 |
|
California | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,511,120.00 |
$7,354,706.00 |
|
California | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,146,214.00 |
$1,295,430.00 |
|
California | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $15,572,888.00 |
$17,595,745.00 |
|
California | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,123,950.00 |
$2,399,130.00 |
|
California | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $259,392.00 |
$293,000.00 |
|
California | Alameda | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $7,067,125.00 |
||
California | Alameda | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $1,060,488.42 |
$5,041,300.00 |
|
California | Alameda | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM (PLUS) | Bridge Replacement - No Added Capacity | $10,000,000.00 |
$43,301,575.00 |
|
California | Santa Cruz | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $26,206,770.00 |
||
California | Santa Cruz | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,520,142.00 |
||
California | Santa Cruz | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $151,032.00 |
$170,600.00 |
|
California | Santa Cruz | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $132,795.00 |
$150,000.00 |
|
California | Stanislaus | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $3,357,834.00 |
$4,197,293.00 |
|
California | Stanislaus | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $3,395,081.00 |
$4,243,851.00 |
|
California | Stanislaus | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $9,000,000.00 |
$11,250,000.00 |
|
California | Stanislaus | >= 200,000 | N/A | REPURPOSED SPECIAL | Right of Way | $132,800.00 |
$166,000.00 |
|
California | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,135,256.00 |
$8,263,680.00 |
|
California | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,081,000.00 |
$5,239,942.00 |
|
California | Fresno | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $9,023,058.00 |
||
California | Fresno | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $10,540,582.00 |
$50,128,100.00 |
|
California | Solano | >= 200,000 | N/A | CONGESTION AIR QUALITY | 4R - Added Capacity | $3,064,000.00 |
$3,460,974.00 |
|
California | Solano | >= 200,000 | N/A | REPURPOSED SPECIAL | 4R - Added Capacity | $81,046.63 |
$11,167,271.42 |
|
California | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,296,000.00 |
$10,500,396.00 |
|
California | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | $933,400.00 |
$2,306,128.00 |
|
California | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Preliminary Engineering | $1,000,000.00 |
$1,400,000.00 |
|
California | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Rail/Hwy Crossing | $4,353,992.00 |
$22,747,855.61 |
|
California | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Right of Way | $1,100,000.00 |
$2,570,455.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Rail/Hwy Crossing | $674,500.00 |
$3,214,160.39 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $88,529,900.00 |
$603,034,003.00 |
|
California | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $6,197,100.00 |
$107,200,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $18,814,000.00 |
$21,251,553.00 |
|
California | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Bridge Replacement - Added Capacity | $14,416,794.92 |
$262,403,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,315,000.00 |
$12,780,978.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $48,259,000.00 |
$144,133,466.00 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Other | $40,614,648.00 |
$45,876,707.00 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Preliminary Engineering | $60,830,983.00 |
$68,712,282.00 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Utilities | $7,020,000.00 |
$7,020,000.00 |
|
California | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | $4,896,578.00 |
$6,120,723.00 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | 4R - Added Capacity | $10,786,138.36 |
$29,888,227.76 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Preliminary Engineering | $4,957,680.00 |
$5,600,000.00 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Right of Way | $7,619,554.34 |
$8,606,748.67 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Utilities | $177,060.00 |
$200,000.00 |
|
California | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | $3,080,000.00 |
$3,850,000.00 |
|
California | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Other | $1,200,000.00 |
$32,699,100.00 |
|
California | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | $1,000.27 |
$5,500,000.00 |
|
California | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Other | $11,121,638.38 |
$53,133,355.00 |
|
California | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $259,334.78 |
$324,168.48 |
|
California | Kern | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $50,000,000.00 |
$62,500,000.00 |
|
California | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $47,351,086.38 |
$93,063,638.09 |
|
California | Kern | >= 200,000 | N/A | REPURPOSED EARMARKS EXEMPT | New Construction Roadway | $381.00 |
$476.25 |
|
California | Kern | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | $64,593.62 |
$80,742.03 |
|
California | Kern | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $44,068.32 |
$55,085.40 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $3,919,346.00 |
$3,919,346.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $44,732,475.00 |
$44,910,343.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,727,254.00 |
$5,749,937.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $192,914.00 |
$217,908.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $166,168.00 |
$166,168.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | $2,450,791.00 |
$2,936,572.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | REPURPOSED SPECIAL | Construction Engineering | $313,783.91 |
$367,585.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $11,912,993.00 |
$12,654,027.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,015,730.00 |
$2,119,501.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,826,283.00 |
$4,322,019.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,564,810.00 |
$1,564,810.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $120,000.00 |
$120,000.00 |
|
California | Marin | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $1,306,238.04 |
$1,632,797.55 |
|
California | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $25,381,629.79 |
$29,429,683.56 |
|
California | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,457,346.68 |
$5,173,434.70 |
|
California | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $536,561.96 |
$670,702.45 |
|
California | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $73,796.08 |
$83,357.14 |
|
California | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $187,111.46 |
$211,353.73 |
|
California | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,133,200.00 |
$2,666,500.00 |
|
California | Santa Clara | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $2,603,667.00 |
$2,941,000.00 |
|
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $17,466,615.00 |
$20,224,600.00 |
|
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,773,106.00 |
$4,261,953.00 |
|
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,691,809.00 |
$1,911,000.00 |
|
California | Santa Clara | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,757,321.00 |
$1,985,000.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $23,758,819.00 |
||
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,485,438.00 |
||
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,507,666.00 |
$1,703,000.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $663,975.00 |
$750,000.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $442,650.00 |
$500,000.00 |
|
California | Riverside | >= 200,000 | N/A | BRIDGE REP & REHAB-15% OFF SYS | Preliminary Engineering | $173,991.00 |
$237,500.00 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM | Preliminary Engineering | $80,000.00 |
$100,000.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $7,616,595.00 |
$8,603,406.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,383,405.00 |
$2,692,200.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,173,602.10 |
$1,325,655.00 |
|
California | Riverside | >= 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | $50,835.28 |
$523,056.00 |
|
California | Riverside | >= 200,000 | N/A | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | $1,460.75 |
$523,055.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $146,000.00 |
$12,185,506.00 |
|
California | Riverside | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $623,202.00 |
$934,945.19 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $18,944.90 |
$21,399.81 |
|
California | Sacramento | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,765,000.00 |
$23,439,650.00 |
|
California | Sacramento | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,985,000.00 |
$2,310,350.00 |
|
California | San Bernardino | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | New Construction Roadway | $65,378.54 |
$65,378.54 |
|
California | San Bernardino | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | $2,892,156.46 |
$2,892,156.46 |
|
California | San Bernardino | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $8,627,382.00 |
$9,745,151.03 |
|
California | San Bernardino | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | New Construction Roadway | $230,000.00 |
$230,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | Right of Way | $760,000.00 |
$1,922,710.00 |
|
California | San Bernardino | >= 200,000 | N/A | REPURPOSED SPECIAL | Construction Engineering | $6,126,359.40 |
||
California | San Bernardino | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | $4,219,198.07 |
$5,650,048.07 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,902,586.00 |
$19,837,476.41 |
|
California | San Diego | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $442,650.00 |
$500,000.00 |
|
California | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $18,978,088.00 |
$25,974,990.00 |
|
California | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,711,054.00 |
$3,710,600.00 |
|
California | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,505,010.00 |
$1,700,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $442,650.00 |
$500,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $442,650.00 |
$500,000.00 |
|
California | Riverside | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,439,839.50 |
$2,942,542.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,976,000.00 |
$24,328,831.50 |
|
California | Riverside | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,439,839.50 |
$1,799,799.37 |
|
California | Riverside | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $3,860,983.74 |
$7,080,476.33 |
|
California | Riverside | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $44,639,016.26 |
$82,340,811.20 |
|
California | Riverside | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Right of Way | $1,500,000.00 |
$6,570,000.00 |
|
California | Riverside | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Bridge Rehabilitation - Added Capacity | $9,999,452.00 |
$26,437,922.00 |
|
California | Sacramento | >= 200,000 | N/A | CONGESTION AIR QUALITY | Preliminary Engineering | $2,253,476.00 |
$2,545,438.00 |
|
California | Sacramento | >= 200,000 | N/A | CONGESTION AIR QUALITY | Right of Way | $1,746,524.00 |
$1,972,805.00 |
|
California | Sacramento | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,419,889.00 |
$23,295,476.00 |
|
California | Sacramento | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,132,266.00 |
$3,538,085.00 |
|
California | Sacramento | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | 4R - No Added Capacity | $1,512,000.00 |
$4,938,439.00 |
|
California | Santa Barbara | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,294,309.00 |
$1,462,000.00 |
|
California | Santa Barbara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $12,553,549.00 |
$41,430,920.00 |
|
California | Santa Barbara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,394,839.00 |
$6,214,638.00 |
|
California | Santa Barbara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,090,688.00 |
$1,232,000.00 |
|
California | Santa Barbara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,029,884.00 |
$6,640,000.00 |
|
California | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $43,601,009.23 |
$44,055,659.23 |
|
California | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $6,191,095.00 |
$6,259,293.00 |
|
California | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Training | $21,000.00 |
$21,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,837,471.41 |
$4,837,471.41 |
|
California | Alameda | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $8,142,081.37 |
$38,155,450.70 |
|
California | San Joaquin | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $1,467,524.02 |
$6,877,116.30 |
|
California | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $6,874,515.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $34,455,400.00 |
$38,034,900.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,944,700.00 |
$5,400,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,600.00 |
$11,600.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,720,000.00 |
$2,150,000.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $464,328.57 |
$524,487.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $386,294.06 |
$482,867.57 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,212,299.00 |
$1,369,366.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $34,342,326.00 |
$38,791,738.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,664,944.00 |
$6,398,898.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,053,507.00 |
$1,190,001.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $913,705.94 |
$1,142,132.43 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $670,626.43 |
$788,517.00 |
|
California | Tehama | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,236,800.00 |
$1,546,000.00 |
|
California | Butte | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $2,832,960.00 |
$3,200,000.00 |
|
California | Butte | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $354,120.00 |
$400,000.00 |
|
California | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,322,390.00 |
$20,696,250.00 |
|
California | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,390,310.00 |
$2,700,000.00 |
|
California | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $132,795.00 |
$150,000.00 |
|
California | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $44,265.00 |
$50,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 15% OFF SYST | Preliminary Engineering | $2,000,000.00 |
$2,000,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $34,000,000.00 |
$67,525,876.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $6,000,000.00 |
$9,204,012.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $14,344,000.00 |
$14,344,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,956,000.00 |
$1,956,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $6,400,000.00 |
$6,400,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $664,000.00 |
$664,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $150,000.00 |
$150,000.00 |
|
California | San Joaquin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,928,106.00 |
$2,410,132.00 |
|
California | San Joaquin | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $132,960.00 |
$166,200.00 |
|
California | San Joaquin | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $905,174.00 |
$1,131,468.00 |
|
California | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $16,740,846.00 |
$18,909,800.00 |
|
California | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,944,258.00 |
$3,325,718.00 |
|
California | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $8,608,440.00 |
$21,038,599.00 |
|
California | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,173,878.00 |
$2,868,900.00 |
|
California | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,334,068.00 |
$1,976,396.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $23,896,087.00 |
$26,992,078.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,584,413.00 |
$4,048,812.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,269,913.00 |
$4,823,125.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $309,855.00 |
$350,000.00 |
|
California | San Francisco | >= 200,000 | N/A | REPURPOSED SPECIAL | 4R - No Added Capacity | $70,626.52 |
$88,284.00 |
|
California | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,366,000.00 |
$46,938,063.00 |
|
California | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,000,000.00 |
$13,502,468.00 |
|
California | Stanislaus | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $1,027,216.69 |
$1,160,303.00 |
|
California | Stanislaus | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,265,271.09 |
$1,429,200.91 |
|
California | Stanislaus | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Construction Engineering | $5,040.57 |
$5,694.00 |
|
California | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,865,956.00 |
$21,310,240.00 |
|
California | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,240,873.74 |
$3,660,763.00 |
|
California | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $553,313.00 |
$625,000.00 |
|
California | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $442,650.00 |
$504,243.00 |
|
California | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $167,143.91 |
$188,799.18 |
|
California | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $132,795.00 |
$150,000.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $2,731,706.00 |
$3,085,627.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Right of Way | $394,401.00 |
$445,500.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $14,022,877.00 |
$15,839,689.37 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,912,523.00 |
$2,160,310.63 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $22,282,597.63 |
||
California | San Benito | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,957,389.37 |
||
California | San Benito | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $246,133.00 |
$278,023.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $152,714.00 |
$172,500.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $796,111.00 |
$899,256.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $106,236.00 |
$120,000.00 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Rail/Hwy Crossing | $3,000,000.00 |
$5,897,594.34 |
|
California | Riverside | >= 200,000 | N/A | REPURPOSED SPECIAL | Rail/Hwy Crossing | $3,239,641.00 |
$6,368,695.66 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,000,000.00 |
$7,713,854.99 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $14,226,995.00 |
$27,968,345.97 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $13,005.00 |
$25,567.04 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $12,298,685.00 |
$19,884,558.00 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,917,258.00 |
$3,340,179.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $28,644,321.00 |
$32,355,495.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,107,571.00 |
$6,898,872.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,743,470.00 |
$5,358,035.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,357,520.00 |
$1,533,401.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $458,585.00 |
$518,000.00 |
|
California | Marin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $3,941,091.12 |
$6,057,293.96 |
|
California | Marin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $38,963,134.00 |
$58,747,833.00 |
|
California | Marin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $5,656,330.00 |
$10,162,981.00 |
|
California | Santa Clara | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $619,868.00 |
$2,425,000.00 |
|
California | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $31,737,502.88 |
$49,486,866.88 |
|
California | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,518,961.00 |
$20,306,789.00 |
|
California | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $34,939,290.00 |
$49,824,678.18 |
|
California | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,673,823.00 |
$7,081,425.98 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $181,572,148.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $19,500,000.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $25,600.00 |
||
California | San Bernardino | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $359,960.00 |
$359,960.00 |
|
California | San Bernardino | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $1,637,883.64 |
$21,354,992.00 |
|
California | San Bernardino | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $719,921.00 |
$10,266,921.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,310,040.00 |
$8,021,540.00 |
|
California | San Bernardino | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $59,961,284.05 |
$76,083,344.57 |
|
California | Los Angeles | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $19,961,451.95 |
$25,328,577.43 |
|
California | Los Angeles | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $8,507,825.34 |
$15,007,395.53 |
|
California | San Bernardino | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $25,554,174.66 |
$45,076,277.47 |
|
California | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,148,056.63 |
$6,532,237.13 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $54,303,438.00 |
$68,904,249.00 |
|
California | Los Angeles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,713,999.37 |
$2,174,849.87 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,223,914.00 |
$10,223,914.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $25,768,952.00 |
$29,143,625.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $23,096,826.00 |
$25,430,038.00 |
|
California | Riverside | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Right of Way | $585,905.00 |
$585,905.00 |
|
California | Riverside | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,932,262.78 |
$2,415,329.78 |
|
California | Riverside | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $3,000,000.00 |
$3,750,000.00 |
|
California | Riverside | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $3,410,787.63 |
$3,419,603.63 |
|
California | Riverside | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $58,428.49 |
$125,061.00 |
|
California | Riverside | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $3,196,224.00 |
$3,196,224.34 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | $157,964.68 |
$157,964.68 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | Right of Way | $832,035.32 |
$890,161.25 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,214,212.65 |
$134,730,964.64 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $100,000.00 |
$18,951,956.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,661,000.00 |
$3,006,000.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,214,000.00 |
$2,500,800.00 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Preliminary Engineering | $1,000,000.00 |
$1,000,000.00 |
|
California | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $55,000,000.00 |
$168,643,465.41 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $56,743,389.35 |
$208,396,772.59 |
|
California | Riverside | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,611,954.00 |
$12,093,380.00 |
|
California | Riverside | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $442,650.00 |
$18,012,000.00 |
|
California | Riverside | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | $44,958,350.00 |
$108,633,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $37,973,881.00 |
$42,893,800.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $54,626,119.00 |
$61,703,512.00 |
|
California | Los Angeles | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $35,000,000.00 |
$518,596,550.00 |
|
California | Los Angeles | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $12,000,000.00 |
$15,000,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,514,517.93 |
$1,514,517.93 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $47,134,482.07 |
$47,134,482.07 |
|
California | Los Angeles | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $27,000,000.00 |
$338,900,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,000,000.00 |
$3,800,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $14,172,712.00 |
$20,707,745.76 |
|
California | San Bernardino | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $1,803,508.00 |
$2,634,629.24 |
|
California | San Diego | >= 200,000 | N/A | CARBON REDUCTION PROGRAM | New Construction Roadway | $3,543,000.00 |
$4,002,033.00 |
|
California | San Diego | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $9,200,000.00 |
$9,200,000.00 |
|
California | San Diego | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $3,000,000.00 |
$3,694,413.00 |
|
California | San Diego | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $2,650,000.00 |
$2,650,000.00 |
|
California | San Diego | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | New Construction Roadway | $4,944,000.00 |
$6,968,295.00 |
|
California | San Diego | >= 200,000 | N/A | CONGESTION AIR QUALITY | Other | $27,753,200.00 |
$27,753,200.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,000.00 |
$1,900,000,000.00 |
|
California | Orange | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $3,355,000.00 |
$41,385,000.00 |
|
California | Orange | >= 200,000 | N/A | CONGESTION AIR QUALITY | Right of Way | $8,599,474.00 |
$8,599,474.00 |
|
California | Orange | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $32,742,994.00 |
$32,742,994.00 |
|
California | Orange | >= 200,000 | N/A | REPURPOSED EARMARKS EXEMPT | Construction Engineering | $475,000.00 |
$475,000.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $18,100,000.00 |
$22,200,000.00 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $10,991,813.33 |
$10,991,813.33 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $57,911,524.67 |
$77,007,063.67 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,444,992.32 |
$1,444,992.32 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $27,388,076.68 |
$36,623,380.68 |
|
California | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $18,655,000.00 |
$33,009,000.00 |
|
California | Riverside | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $52,194,265.00 |
$79,970,006.00 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $4,262,603.00 |
$6,734,603.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $839,440.00 |
$30,298,000.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $5,448,000.00 |
$32,041,000.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $104,000.00 |
$2,264,000.00 |
|
California | Kern | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,218,000.00 |
$1,218,000.00 |
|
California | Kern | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $3,230,000.00 |
$3,230,000.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $810,000.00 |
$810,000.00 |
|
California | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,500,000.00 |
$9,323,532.00 |
|
California | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $800,000.00 |
$5,700,000.00 |
|
California | Kern | >= 200,000 | State | NAT'L COOR INF IM PROGRAM | 4R - Added Capacity | $4,530,000.00 |
$28,157,068.00 |
|
California | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,250,000.00 |
$35,964,100.00 |
|
California | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $88,000.00 |
$88,000.00 |
|
California | Sacramento | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,500,000.00 |
$1,500,000.00 |
|
California | Sacramento | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,641,900.00 |
$28,238,902.12 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $194,274.00 |
$194,274.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $755,726.00 |
$755,726.00 |
|
California | Sacramento | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $50,000.00 |
$58,762.00 |
|
California | Sacramento | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $646,000.00 |
$31,307,729.19 |
|
California | Placer | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $1,357,588.00 |
$2,989,772.00 |
|
California | Placer | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $275,000.00 |
$5,345,000.00 |
|
California | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,000,000.00 |
$29,143,228.00 |
|
California | San Mateo | >= 200,000 | State | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $3,559,977.49 |
$50,043,250.63 |
|
California | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $999,962.00 |
$52,215,503.00 |
|
California | Sonoma | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $107,760.76 |
$46,766,897.00 |
|
California | Sonoma | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | $20,084.49 |
$8,719,103.00 |
|
California | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $34,000,000.00 |
$34,000,000.00 |
|
California | Sonoma | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $691,382.11 |
$864,227.64 |
|
California | Marin | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $108,617.89 |
$135,772.36 |
|
California | Marin | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $1,221,951.22 |
$1,527,439.02 |
|
California | Sonoma | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $7,778,048.78 |
$9,722,560.98 |
|
California | Sonoma | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $5,185,365.85 |
$5,185,365.85 |
|
California | Marin | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $814,634.15 |
$814,634.15 |
|
California | Sonoma | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,400,000.00 |
$20,118,000.00 |
|
California | Solano | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $63,464,510.00 |
$178,700,000.00 |
|
California | Marin | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | $61,708,245.00 |
$84,664,065.46 |
|
California | Marin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $5,464,085.00 |
$7,438,858.54 |
|
California | Sonoma | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $602,206.00 |
$819,849.12 |
|
California | San Francisco | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $2,878,677.00 |
$3,919,058.92 |
|
California | Contra Costa | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $1,745,875.00 |
$2,376,851.23 |
|
California | Santa Clara | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $3,252,009.00 |
$4,427,316.73 |
|
California | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $12,561,207.71 |
$23,298,888.79 |
|
California | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,576,474.94 |
$1,970,593.67 |
|
California | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,132,000.00 |
$61,561,000.00 |
|
California | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $745,410.47 |
$933,534.42 |
|
California | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $600,000.00 |
$750,000.00 |
|
California | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,098,688.99 |
$127,191,000.00 |
|
California | Santa Cruz | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,640,000.00 |
$28,110,000.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $404,017.00 |
$58,711,000.00 |
|
California | Santa Barbara | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $2,045,498.00 |
$46,232,000.00 |
|
California | Santa Barbara | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $366,000.00 |
$9,520,000.00 |
|
California | Santa Barbara | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $7,000,000.00 |
$7,907,000.00 |
|
California | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $3,100,000.00 |
$76,671,000.00 |
|
California | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $874,234.29 |
$14,583,688.29 |
|
California | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $3,013,669.85 |
$8,000,000.00 |
|
California | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $3,895,000.00 |
$76,671,000.00 |
|
California | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $292,856.30 |
$6,105,071.00 |
|
California | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $335,478.78 |
$8,607,810.20 |
|
California | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,298,890.69 |
$8,000,000.00 |
|
California | San Luis Obispo | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $4,659,000.00 |
$27,490,000.00 |
|
California | San Luis Obispo | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,600,000.00 |
$5,560,000.00 |
|
California | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $3,050,000.00 |
$5,180,000.00 |
|
California | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $6,092,000.00 |
$8,742,000.00 |
|
California | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $2,300,000.00 |
$3,000,000.00 |
|
California | Fresno | >= 200,000 | N/A | REPURPOSED EARMARKS EXEMPT | New Construction Roadway | $1,061,148.70 |
$29,402,328.00 |
|
California | Fresno | >= 200,000 | N/A | REPURPOSED SPECIAL | Construction Engineering | $775,170.00 |
$1,198,170.00 |
|
California | Fresno | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | $830,000.00 |
$22,997,672.00 |
|
California | San Luis Obispo | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $2,962,400.00 |
$7,803,000.00 |
|
California | San Luis Obispo | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $10,055,000.00 |
$29,114,567.37 |
|
California | San Luis Obispo | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $17,500,000.00 |
$21,212,000.00 |
|
California | Kern | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $16,000,000.00 |
$57,398,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Bridge New Construction | $40,000,000.00 |
$111,810,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Right of Way | $44,370,000.00 |
$50,118,604.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $14,157,001.00 |
$17,696,251.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $4,499,156.20 |
$23,921,834.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $111,563,423.52 |
$140,094,110.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $6,807,200.00 |
$7,689,145.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $61,345,800.00 |
$100,381,800.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,553,000.00 |
$5,143,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $34,770,000.00 |
$39,990,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $93,634,889.00 |
$147,564,889.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,480,000.00 |
$12,480,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,750,000.00 |
$4,750,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,100,000.00 |
$4,100,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,800,000.00 |
$3,800,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $15,975,000.00 |
$25,768,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $33,000,000.00 |
$50,935,053.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $47,139,000.00 |
$48,010,947.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $6,086,000.00 |
$32,500,000.00 |
|
California | Los Angeles | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $517,910.00 |
$2,489,410.00 |
|
California | Los Angeles | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $7,647,110.00 |
$12,022,110.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $148,634,000.00 |
$190,384,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $12,356,000.00 |
$49,515,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $19,188,000.00 |
$277,778,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | 4R - Added Capacity | $87,235,000.00 |
$165,364,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $12,844,000.00 |
$34,534,000.00 |
|
California | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $30,101,635.23 |
$129,924,035.23 |
|
California | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $9,556,499.77 |
$30,727,999.77 |
|
California | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $18,138,815.00 |
$20,489,534.00 |
|
California | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | $12,658,000.00 |
$20,583,651.00 |
|
California | San Bernardino | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Traffic Management/Engineering - HOV | $4,975,000.00 |
$19,756,232.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $29,307,000.00 |
$47,657,217.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $59,323,000.00 |
$239,662,136.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $26,551,000.00 |
||
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $6,020,355.96 |
$6,215,355.96 |
|
California | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $3,283,000.00 |
$17,431,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Preliminary Engineering | $10,315,304.28 |
$10,315,304.28 |
|
California | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | $28,482,971.10 |
$149,854,971.10 |
|
California | San Bernardino | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,256,987.00 |
$2,256,987.00 |
|
California | San Bernardino | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $557,000.00 |
$657,000.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY PRIORITY PROJECTS | Preliminary Engineering | $1,980,000.00 |
$1,980,000.00 |
|
California | San Bernardino | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $1,710,000.00 |
$1,710,000.00 |
|
California | San Bernardino | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Preliminary Engineering | $500,646.00 |
$650,646.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,265,240.00 |
$50,967,799.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,366,759.83 |
$6,366,759.83 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $909,454.00 |
$909,454.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $210,000.00 |
$210,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,637,000.00 |
$74,690,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,300,000.00 |
||
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $23,000,000.00 |
$73,367,539.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $300,000.00 |
$25,830,038.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $69,401,792.00 |
$100,146,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $13,598,208.00 |
$17,300,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,750,801.30 |
$4,236,757.37 |
|
California | San Diego | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,599,999.50 |
$8,329,032.61 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $42,748,778.60 |
$50,923,386.39 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,581,060.00 |
$11,673,296.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,778,000.00 |
$2,778,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $13,511,000.00 |
$14,301,210.06 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $12,611,000.00 |
$12,611,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,852,000.00 |
$1,852,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $550,000.00 |
$550,000.00 |
|
California | Imperial | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $240,239.74 |
$27,533,239.74 |
|
California | Imperial | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Other | $100,000.00 |
$100,000.00 |
|
California | Imperial | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $2,059,760.00 |
$3,709,760.00 |
|
California | San Diego | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $9,423,107.00 |
$9,423,107.00 |
|
California | San Diego | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $103,425,021.00 |
$103,425,021.00 |
|
California | San Diego | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $25,593,241.00 |
$25,593,241.00 |
|
California | Orange | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $60,626.00 |
$60,626.00 |
|
California | San Diego | >= 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $1,090,677.00 |
$1,090,677.00 |
|
California | San Diego | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | $2,915,223.00 |
$2,915,223.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,730,000.00 |
$27,730,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $34,502,699.00 |
$75,884,699.00 |
|
California | San Diego | >= 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | Other | $135,151.89 |
$135,151.89 |
|
California | San Diego | >= 200,000 | N/A | REPURPOSED SPECIAL | Other | $944,733.91 |
$944,733.91 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,520,000.00 |
$7,000,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $5,480,000.00 |
$30,775,055.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,350,000.00 |
$2,500,000.00 |
|
California | San Diego | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $3,459,832.00 |
$6,992,162.00 |
|
California | San Diego | >= 200,000 | N/A | CONGESTION AIR QUALITY | Other | $33,824,168.00 |
$51,483,222.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,222,173.00 |
||
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,683,313.00 |
$21,724,511.00 |
|
California | Orange | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | $1,130,000.00 |
$6,976,172.00 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $774,600.00 |
$4,282,303.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $25,126,600.00 |
$132,696,162.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $8,353,200.00 |
$61,927,879.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $745,600.00 |
$50,307,000.00 |
|
California | Orange | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $6,433,000.00 |
$56,111,000.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $10,872,515.00 |
$24,719,149.00 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,542,485.00 |
$6,979,851.00 |
|
California | Orange | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $5,554,363.00 |
$24,674,580.00 |
|
California | Orange | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,367,000.00 |
$4,691,394.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,342,637.00 |
$99,254,420.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,522,000.00 |
$19,872,606.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,144,000.00 |
$10,587,000.00 |
|
California | Orange | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,728,000.00 |
$11,643,192.49 |
|
California | Orange | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,000,000.00 |
$4,017,444.29 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $23,036,000.00 |
$98,318,395.22 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,732,000.00 |
$15,583,968.00 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,106,467.00 |
$7,367,720.00 |
|
California | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,312,533.00 |
$12,886,280.00 |
|
California | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $1,074,868.00 |
$1,214,128.00 |
|
California | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $6,197,100.00 |
$7,000,000.00 |
|
California | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $885,300.00 |
$1,000,000.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $53,797,092.00 |
$60,787,758.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,736,445.00 |
$15,516,147.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $56,396.00 |
$63,703.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $58,781,699.00 |
||
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $16,311,519.00 |
||
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,088,597.00 |
$8,007,000.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $338,185.00 |
$382,000.00 |
|
California | San Francisco | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $18,000,000.00 |
$36,571,300.00 |
|
California | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $4,235,770.00 |
||
California | San Francisco | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $18,816,572.00 |
$29,502,262.00 |
|
California | San Francisco | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,934,288.00 |
$7,478,465.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,139,558.00 |
$6,935,003.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,629,730.00 |
$5,980,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $2,559,999.98 |
$4,032,999.98 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $12,438,565.00 |
$15,548,206.00 |
|
California | Los Angeles | >= 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Right of Way | $2,397,435.00 |
$2,996,794.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,113,511.97 |
$3,516,899.97 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $18,001,799.00 |
$22,283,111.00 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,558,390.00 |
$1,751,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Preliminary Engineering | $11,909,661.45 |
$33,387,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Right of Way | $3,557,000.00 |
||
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Bridge New Construction | $287,750,000.00 |
||
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Construction Engineering | $48,850,000.00 |
||
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Right of Way | $494,915.00 |
$26,053,000.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $3,335,401.00 |
$4,169,251.00 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $845,649.45 |
$4,661,112.19 |
|
California | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Bridge New Construction | $1,094,681.00 |
$1,368,351.25 |
|
California | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Bridge New Construction | $2,814,794.85 |
$8,981,558.45 |
|
California | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Preliminary Engineering | $3,648,599.00 |
$4,560,749.00 |
|
California | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Right of Way | $400,848.00 |
$2,209,423.18 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $57,450.00 |
$71,812.50 |
|
California | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Right of Way | $1,348,770.00 |
$1,348,770.00 |
|
California | Los Angeles | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Rail/Hwy Crossing | $3,882,543.91 |
$37,931,729.00 |
|
California | Los Angeles | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | $2,309,071.00 |
$12,727,305.63 |
|
California | San Francisco | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $250,000.00 |
$250,000.00 |
|
California | San Francisco | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Facilities for Pedestrians and Bicycles | $7,793,000.00 |
$11,124,924.00 |
|
California | San Francisco | >= 200,000 | N/A | REPURPOSED EARMARKS EXEMPT | Facilities for Pedestrians and Bicycles | $475,000.00 |
$593,750.00 |
|
California | San Francisco | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $6,521,000.00 |
$23,683,330.00 |
|
California | Alameda | >= 200,000 | N/A | REPURPOSED SPECIAL | Other | $21,364.11 |
$26,705.14 |
|
California | Alameda | >= 200,000 | N/A | SURFACE TRANS RESEARCH-TEA21 | Construction Engineering | $2,696.48 |
$4,717,499.88 |
|
California | Alameda | >= 200,000 | N/A | SURFACE TRANS RESEARCH-TEA21 | Other | $9,717,303.52 |
$23,818,644.09 |
|
California | San Bernardino | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Right of Way | $287.42 |
$324.66 |
|
California | San Bernardino | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $22,371,930.77 |
$28,561,127.00 |
|
California | San Bernardino | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,123,463.23 |
$1,269,020.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $37,961,925.00 |
$92,491,084.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,000,000.00 |
$9,161,989.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $12,190,715.00 |
$25,518,112.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $54,115,959.99 |
$68,281,125.22 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $22,132.00 |
$3,910,786.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,457.59 |
$5,035.12 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,084,120.00 |
$2,091,120.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,923,783.00 |
$3,076,783.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $18,425,237.00 |
$29,133,172.00 |
|
California | San Bernardino | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $5,900,000.00 |
$6,664,408.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $34,535,349.00 |
||
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,548,559.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $28,596,100.00 |
$120,664,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,200,000.00 |
$24,514,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,906,800.00 |
$8,072,400.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,508,400.00 |
$14,844,500.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,000,000.00 |
$5,000,000.00 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,210,480.71 |
$75,727,980.71 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $19,200.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $66,377,100.00 |
$72,721,600.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,607,500.00 |
$9,400,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,600.00 |
$8,400.00 |
|
California | Alameda | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $4,633,810.24 |
$4,633,810.24 |
|
California | Contra Costa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $1,158,189.76 |
$1,158,189.76 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,066,366.66 |
$42,600,727.07 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $56,278,233.34 |
$170,441,572.93 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,582,789.40 |
$16,183,134.22 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,145,210.60 |
$4,044,865.78 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,899.66 |
$3,839.31 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,600.34 |
$15,360.69 |
|
California | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $32,960,000.00 |
$37,230,318.00 |
|
California | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $15,000,000.00 |
$16,943,410.00 |
|
California | Los Angeles | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - Added Capacity | $43,000,000.00 |
$48,571,106.00 |
|
California | Los Angeles | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | $220,000,000.00 |
$632,646,925.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $16,945,500.00 |
$19,140,969.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $66,397,500.00 |
$82,000,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $90,544,500.00 |
$91,077,100.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $21,300,000.00 |
$21,300,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,023,000.00 |
$1,023,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $34,300.00 |
$34,300.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $20,172,000.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,023,000.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $14,100.00 |
||
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,537,100.00 |
||
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $3,016,700.00 |
||
California | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,800,000.00 |
||
California | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $26,877,505.00 |
||
California | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - Added Capacity | $19,113,075.00 |
||
California | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $6,570,080.00 |
||
California | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $10,287,000.00 |
||
California | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $8,613,000.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $950,000.00 |
$950,000.00 |
|
California | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $61,332,927.00 |
$62,128,557.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $16,200,000.00 |
$16,238,235.00 |
|
California | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $14,960.00 |
$14,960.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $54,728,300.00 |
$57,056,400.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,200,000.00 |
$7,600,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,000.00 |
$7,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $85,091,500.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,470,000.00 |
||
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,000.00 |
||
California | Placer | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,959,788.00 |
$2,213,700.00 |
|
California | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $21,528,035.00 |
$25,889,267.00 |
|
California | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,630,119.00 |
$5,230,001.00 |
|
California | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,589,107.00 |
$1,794,993.00 |
|
California | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $249,655.00 |
$282,000.00 |
|
California | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $88,530.00 |
$100,000.00 |
|
California | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $17,706.00 |
$20,000.00 |
|
California | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $177,060.00 |
$200,000.00 |
|
California | Placer | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Preliminary Engineering | $991,307.00 |
$991,307.00 |
|
California | Merced | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $19,770,600.00 |
$22,706,400.00 |
|
California | Merced | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $7,082,400.00 |
$8,000,000.00 |
|
California | Merced | >= 200,000 | State | EMERGENCY RELIEF | Training | $9,300.00 |
$10,600.00 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,922,780.00 |
$3,108,700.00 |
|
California | Riverside | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Other | $8,077,220.00 |
$13,773,624.00 |
|
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $9,803,676.00 |
||
California | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,166,826.00 |
$1,548,409.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $9,913,977.00 |
$14,377,939.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $1,487,095.00 |
$2,156,690.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Training | $12,040.00 |
$13,600.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $3,092,058.00 |
$33,392,667.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,434,379.00 |
$5,008,900.00 |
|
California | San Luis Obispo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $22,838,100.00 |
$23,022,900.00 |
|
California | San Luis Obispo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,878,000.00 |
$7,878,000.00 |
|
California | San Luis Obispo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $7,600.00 |
$7,600.00 |
|
California | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $21,699,400.00 |
$24,974,000.00 |
|
California | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,969,200.00 |
$3,354,000.00 |
|
California | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,677,700.00 |
$31,316,500.00 |
|
California | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,872,000.00 |
||
California | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,700.00 |
$7,600.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $40,533,700.00 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,700,000.00 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $14,400.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $17,927,004.23 |
||
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $345,595.77 |
||
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $220,306.28 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $11,427,893.72 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,720,443.66 |
||
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $129,556.34 |
||
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $317.75 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $16,482.25 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $42,431,894.60 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $698,905.40 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $119,928.19 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,281,071.81 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,115.74 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $84.26 |
||
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,373,458.86 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $398,541.14 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $47,516.22 |
||
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,667,483.78 |
||
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $15,719.98 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $280.02 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $60,232,629.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,154,000.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $21,600.00 |
||
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $26,714,100.00 |
||
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,150,000.00 |
||
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,900.00 |
||
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $41,026,500.00 |
$46,837,600.00 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,365,600.00 |
$8,320,000.00 |
|
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,900.00 |
$13,500.00 |
|
California | San Joaquin | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $1,619,237.00 |
$1,829,026.32 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $25,833,273.68 |
||
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,311,000.00 |
||
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $16,800.00 |
||
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $51,824,900.00 |
||
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,287,000.00 |
||
California | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,100.00 |
||
California | San Diego | >= 200,000 | N/A | COORD BORDER INFRA PROGRAM | New Construction Roadway | $58,212.97 |
$58,212.97 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,150,000.00 |
$4,150,000.00 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $31,486,087.03 |
$31,486,087.03 |
|
California | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $11,800.00 |
$11,800.00 |
|
California | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,113,904.21 |
$31,615,661.87 |
|
California | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,266,900.66 |
$3,690,162.28 |
|
California | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $1,876.00 |
$7,560.00 |
|
California | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,100,044.06 |
$7,913,478.06 |
|
California | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,636,572.58 |
$34,487,211.33 |
|
California | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $159,121.52 |
$3,213,369.72 |
|
California | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $273,744.53 |
$8,205,125.28 |
|
California | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $2,546.00 |
$15,523.00 |
|
California | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $485.00 |
$2,957.00 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $20,915,200.00 |
$23,855,000.00 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,965,700.00 |
$3,350,000.00 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,900.00 |
$13,500.00 |
|
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $40,396,600.00 |
$46,174,900.00 |
|
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,205,100.00 |
$4,750,000.00 |
|
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $14,800.00 |
$16,800.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $152,801,900.00 |
$172,960,300.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $16,466,500.00 |
$18,600,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $32,500.00 |
$36,800.00 |
|
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $46,386,800.00 |
$52,828,000.00 |
|
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,223,200.00 |
$5,900,000.00 |
|
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,800.00 |
$5,500.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $18,764,200.00 |
$21,350,900.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,682,200.00 |
$1,900,200.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,647,000.00 |
$2,990,000.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,500.00 |
$5,100.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $6,300,000.00 |
$7,000,000.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $33,582,600.00 |
$37,834,900.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $18,100.00 |
$20,200.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,871,170.00 |
$8,891,000.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,092,300.00 |
$6,900,000.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $29,257,600.00 |
$33,595,700.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,800.00 |
$13,400.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $4,868,738.00 |
$5,409,683.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $30,650,932.50 |
$34,262,725.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $15,100.00 |
$16,800.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,974,700.00 |
$4,541,300.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $944,453.00 |
$1,066,917.00 |
|
California | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,700.00 |
$4,200.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $25,604,100.00 |
$29,415,000.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,669,800.00 |
$7,534,000.00 |
|
California | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $76,596,400.00 |
||
California | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $14,721,000.00 |
||
California | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $25,200.00 |
||
California | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,991,807.00 |
$5,638,549.00 |
|
California | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $31,552,443.00 |
$35,640,397.00 |
|
California | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,732,866.00 |
$5,346,059.00 |
|
California | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $7,790.00 |
$9,300.00 |
|
California | Lake | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $7,226,100.00 |
$8,029,000.00 |
|
California | Lake | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $32,606,800.00 |
$36,551,100.00 |
|
California | Lake | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $11,400.00 |
$12,700.00 |
|
California | Lake | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $18,837,100.00 |
$21,429,400.00 |
|
California | Lake | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,991,000.00 |
$2,249,000.00 |
|
California | Lake | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $6,600.00 |
$7,500.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $660,000.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $2,801,200.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $34,453,000.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,730,000.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,900.00 |
||
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $81,692,595.02 |
$92,644,256.44 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $9,694,600.00 |
$10,950,700.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,933,900.00 |
$11,221,000.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $29,700.00 |
$33,600.00 |
|
California | San Luis Obispo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,229,604.98 |
$20,591,443.56 |
|
California | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $198,081,915.27 |
$198,081,915.27 |
|
California | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $33,515,357.00 |
$33,515,357.00 |
|
California | Los Angeles | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $9,185,186.73 |
$9,185,186.73 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,179,264.00 |
$21,179,264.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,000,000.00 |
$5,000,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $35,726,551.36 |
$35,726,551.36 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $56,176,030.00 |
$56,286,030.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $9,758,091.64 |
$9,774,591.64 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Rail/Hwy Crossing | $26,400.00 |
$26,400.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Training | $10,560.00 |
$10,560.00 |
|
California | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $74,326,666.00 |
||
California | Placer | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $3,942.28 |
$4,453.04 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,546,562.01 |
$33,947,047.85 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,364,439.00 |
$4,930,000.00 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,100.00 |
$12,600.00 |
|
California | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,500,000.00 |
||
California | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $29,364,800.00 |
||
California | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $11,800.00 |
||
California | El Dorado | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $5,220,000.00 |
$7,300,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $19,498,900.00 |
$25,715,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $11,600.00 |
$16,200.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,190,800.00 |
$2,505,500.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $424,900.00 |
$480,000.00 |
|
California | El Dorado | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $1,900.00 |
$2,200.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $50,000,000.00 |
$396,892,300.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,496,300.00 |
$36,800,000.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $793,200.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $60,700.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $46,634,400.00 |
$52,915,300.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,639,700.00 |
$7,500,000.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,400.00 |
$11,800.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $147,835,800.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $19,650,000.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $44,600.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,583,100.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,800,000.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,900.00 |
||
California | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $35,634,363.00 |
$43,549,439.00 |
|
California | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | $5,221,774.00 |
$7,592,651.00 |
|
California | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $14,164,800.00 |
$16,000,000.00 |
|
California | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $18,859.00 |
$21,303.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,439,349.00 |
$7,273,635.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $673,541.00 |
$760,805.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,362.00 |
$3,798.00 |
|
California | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $110,148.78 |
$124,419.72 |
|
California | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $59,665,717.22 |
$67,396,043.81 |
|
California | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $20,058.96 |
$22,658.17 |
|
California | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $37.04 |
$41.83 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,808.36 |
$5,110.23 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,062,929.64 |
$2,768,126.62 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,487,692.59 |
$12,976,044.95 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $21,207.41 |
$23,955.05 |
|
California | Los Angeles | >= 200,000 | N/A | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $97,969,500.00 |
$278,367,300.00 |
|
California | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,000,000.00 |
$30,000,000.00 |
|
California | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $30,500.00 |
$34,500.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $124,506,420.00 |
$125,020,920.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,980,000.00 |
$13,980,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $810,000.00 |
$810,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $16,800.00 |
$16,800.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $35,504,200.00 |
$35,731,200.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,875,100.00 |
$3,875,100.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $21,800.00 |
$21,800.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $19,764,115.00 |
$19,764,115.00 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $97,897,600.00 |
$97,897,600.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,646,085.00 |
$5,646,085.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,000,000.00 |
$20,000,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $48,662,262.24 |
$49,261,662.24 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $2,595,000.00 |
$2,595,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,200.00 |
$22,200.00 |
|
California | San Bernardino | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $13,188,337.76 |
$13,188,337.76 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,461,300.00 |
$24,967,400.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,055,000.00 |
$4,055,000.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $21,284,200.00 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,742,000.00 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $15,100.00 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,522,700.00 |
$65,119,500.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $13,450,000.00 |
$15,192,600.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,503,300.00 |
$17,512,000.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,400.00 |
$52,500.00 |
|
California | Riverside | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $21,635,000.00 |
$24,038,900.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $103,983,654.93 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $46,733,345.07 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,552,184.58 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,888,815.42 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $444,742.93 |
$510,947.40 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,543,957.07 |
$25,899,852.60 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,803,417.50 |
$2,037,141.19 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $36,082.50 |
$40,758.81 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $105,928.96 |
$119,653.84 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,294,371.04 |
$5,980,346.16 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $15,195.96 |
$17,254.77 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $304.04 |
$345.23 |
|
California | Riverside | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Maintenance Resurfacing | $985,956.16 |
$985,956.16 |
|
California | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Maintenance Resurfacing | $16,014,043.84 |
$16,014,043.84 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,903,808.38 |
$10,443,228.99 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $548,191.62 |
$642,971.01 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $239,163.97 |
$270,151.99 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,884,536.03 |
$4,387,848.01 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,072.41 |
$2,355.01 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $127.59 |
$144.99 |
|
California | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $3,100,000.00 |
$3,100,000.00 |
|
California | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Rail/Hwy Crossing | $98,800.00 |
$176,400.00 |
|
California | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $17,676,800.00 |
$17,876,200.00 |
|
California | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $15,000.00 |
$15,000.00 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,583,100.00 |
$19,405,300.00 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,000,000.00 |
$2,600,000.00 |
|
California | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,900.00 |
$7,700.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $39,320,500.00 |
$45,014,700.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,134,700.00 |
$5,800,000.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $27,500.00 |
$31,100.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,416,480.00 |
$1,600,000.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $84,884.21 |
$94,315.79 |
|
California | Butte | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,795,115.79 |
$3,105,684.21 |
|
California | Butte | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $24,771,713.68 |
$27,702,703.15 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $752,286.32 |
$841,296.85 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $306.53 |
$341.90 |
|
California | Butte | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $10,093.47 |
$11,258.10 |
|
California | Butte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $12,400,026.52 |
$14,125,622.30 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $376,573.48 |
$428,977.70 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $57,402.94 |
$64,842.10 |
|
California | Butte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,890,197.06 |
$2,135,157.90 |
|
California | Butte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,599.58 |
$7,570.10 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $200.42 |
$229.90 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $8,127,000.00 |
$9,030,000.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $42,235,900.00 |
$47,362,500.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $6,100.00 |
$6,800.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,692,300.00 |
$13,336,800.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,832,900.00 |
$3,200,000.00 |
|
California | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,800.00 |
$2,100.00 |
|
California | Plumas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $92,685,500.00 |
||
California | Plumas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,130,000.00 |
||
California | Plumas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $10,500.00 |
||
California | Plumas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $17,700.00 |
||
California | Plumas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $92,700.00 |
||
California | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $3,960,000.00 |
$4,400,000.00 |
|
California | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $19,192,500.00 |
$21,659,000.00 |
|
California | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $6,000.00 |
$6,700.00 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $4,227,120.00 |
$4,696,800.00 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $21,595,400.00 |
$24,332,400.00 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $1,500.00 |
$1,700.00 |
|
California | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $6,070,140.45 |
$6,744,600.50 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $55,259.55 |
$61,399.50 |
|
California | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $19,457,171.59 |
$22,122,705.88 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $177,128.41 |
$201,394.12 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $56.83 |
$63.15 |
|
California | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $6,243.17 |
$6,936.85 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $34,873,100.00 |
$39,875,300.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,249,400.00 |
$4,800,000.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,700.00 |
$8,800.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $27,016,404.30 |
$30,842,321.67 |
|
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,995.70 |
$2,278.33 |
|
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $292.82 |
$330.77 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,964,007.18 |
$4,477,669.23 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,699.50 |
$7,699.43 |
|
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $0.50 |
$0.57 |
|
California | Solano | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,829,720.00 |
$9,046,220.00 |
|
California | Alameda | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $31,318,880.00 |
$36,184,880.00 |
|
California | Alameda | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,040,000.00 |
$6,404,000.00 |
|
California | Solano | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,510,000.00 |
$1,601,000.00 |
|
California | Solano | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $2,080.00 |
$2,560.00 |
|
California | Alameda | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $8,320.00 |
$10,240.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,650,800.00 |
$21,606,800.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,160,900.00 |
$4,700,000.00 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,200.00 |
$15,000.00 |
|
California | Alameda | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Safety | $676,060.57 |
$751,178.50 |
|
California | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $4,882,500.00 |
$5,425,000.00 |
|
California | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Rail/Hwy Crossing | $74,200.00 |
$82,500.00 |
|
California | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $18,391,589.43 |
$20,748,621.50 |
|
California | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $7,100.00 |
$7,900.00 |
|
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $21,597,400.00 |
||
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,712,000.00 |
||
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,600.00 |
||
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $49,861,400.00 |
$56,796,100.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,826,100.00 |
$6,581,000.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,700.00 |
$4,200.00 |
|
California | Riverside | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $100,000.00 |
$100,000.00 |
|
California | Riverside | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $9,969,000.00 |
$9,969,000.00 |
|
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $129,288,818.00 |
||
California | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,970,000.00 |
||
California | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $47,298,500.00 |
$72,252,100.00 |
|
California | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,000,000.00 |
$14,843,000.00 |
|
California | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $33,500.00 |
$37,900.00 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $8,421,400.00 |
$17,219,400.00 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,530,600.00 |
$7,061,300.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,028,500.00 |
$4,057,000.00 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $500.00 |
$1,100.00 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,600.00 |
$9,200.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $51,638,100.00 |
$58,408,400.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,639,700.00 |
$7,500,000.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $15,400.00 |
$17,500.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,147,000.00 |
$8,442,700.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $49,342,900.00 |
$56,179,000.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,353,500.00 |
$6,700,000.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $16,300.00 |
$20,100.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $31,781,900.00 |
$36,142,700.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,682,768.00 |
$4,160,000.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,900.00 |
$10,100.00 |
|
California | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $22,146,722.95 |
$25,440,002.51 |
|
California | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $21,677.05 |
$24,900.49 |
|
California | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | $2,063.23 |
$2,330.61 |
|
California | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | $2,107,936.77 |
$2,381,105.39 |
|
California | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Rail/Hwy Crossing | $215,489.08 |
$243,561.60 |
|
California | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Rail/Hwy Crossing | $210.92 |
$238.40 |
|
California | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $10.27 |
$11.67 |
|
California | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $10,489.73 |
$11,918.33 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $840,976.86 |
$6,649,988.04 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $823.14 |
$6,508.96 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $78.03 |
$618.34 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $79,721.97 |
$631,745.66 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,278,065.16 |
$6,958,297.59 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,648.79 |
$6,202.41 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $7.92 |
$63.27 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $8,092.08 |
$64,636.73 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $299.71 |
$3,166.90 |
|
California | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $0.29 |
$3.10 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $30,978,300.00 |
$35,405,000.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,426,500.00 |
$5,000,000.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,300.00 |
$15,100.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,268,200.00 |
$60,985,200.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $27,900.00 |
$1,330,600.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $100,000.00 |
$10,000,000.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $500.00 |
$24,400.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $706,320.00 |
$784,800.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,505,900.00 |
$4,154,400.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $10,700.00 |
$11,900.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,386,000.00 |
$27,697,200.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,585,699.36 |
$1,895,200.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $18,600.00 |
$35,600.00 |
|
California | Sutter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,286,641.37 |
$2,582,900.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $49,118,800.00 |
$56,117,700.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,046,200.00 |
$5,700,000.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,800.00 |
$13,400.00 |
|
California | Merced | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Restoration & Rehabilitation | $2,243,381.00 |
$2,534,035.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $46,679,919.00 |
$52,979,965.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,207,100.00 |
$10,400,000.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,300.00 |
$15,100.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $67,650,500.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,500,000.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,400.00 |
||
California | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $39,344,000.00 |
$44,958,500.00 |
|
California | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,203,800.00 |
$10,396,400.00 |
|
California | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,623,600.00 |
$12,000,000.00 |
|
California | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $18,600.00 |
$21,100.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $60,948,400.00 |
$69,551,900.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $800,600.00 |
$904,400.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,738,300.00 |
$11,000,000.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,500.00 |
$25,500.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $45,185,500.00 |
$51,362,200.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,134,700.00 |
$5,800,000.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,600.00 |
$10,900.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $7,933,700.00 |
$9,477,700.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $13,098,100.00 |
$14,795,100.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,400,300.00 |
$6,100,000.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $66,300.00 |
$74,900.00 |
|
California | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,900.00 |
$13,500.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,905,200.00 |
$27,834,000.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,554,800.00 |
$1,756,300.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,983,800.00 |
$4,500,000.00 |
|
California | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,400.00 |
$11,800.00 |
|
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $23,082,200.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,000,000.00 |
||
California | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,500.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $34,888,197.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,900,000.00 |
||
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,800.00 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,964,400.00 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,408,000.00 |
||
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $12,600.00 |
||
California | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Maintenance Resurfacing | $17,000,000.00 |
$17,000,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,852,100.00 |
$24,999,200.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,077,100.00 |
$5,735,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $12,400.00 |
$14,100.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $52,433,368.00 |
$52,958,368.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,054,000.00 |
$7,054,000.00 |
|
California | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,646,000.00 |
$3,646,000.00 |
|
California | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $20,160.00 |
$20,160.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $7,936,755.86 |
$7,936,755.86 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $14,362,765.50 |
$24,737,003.15 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $14,300.00 |
$14,300.00 |
|
California | Mariposa | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $676.56 |
$764.22 |
|
California | Mariposa | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $24,513,700.00 |
$28,047,100.00 |
|
California | Mariposa | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,463,023.44 |
$2,782,235.78 |
|
California | San Benito | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $60,882,000.00 |
$86,507,500.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,847,300.00 |
$3,216,200.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,738,300.00 |
$11,000,000.00 |
|
California | San Benito | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,900.00 |
$13,500.00 |
|
California | Glenn | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $77,293,263.80 |
$88,786,400.00 |
|
California | Glenn | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,853,000.00 |
$10,000,000.00 |
|
California | Glenn | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $28,000.00 |
$31,700.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,728,300.00 |
$126,327,994.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $27,986,500.00 |
$33,621,680.62 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $49,800.00 |
$56,316.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $65,794.95 |
$74,319.38 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $17,278,200.00 |
||
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $12,750,400.00 |
||
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,782,000.00 |
||
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,700.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,345,260.00 |
$7,345,260.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,942,322.00 |
$30,876,262.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,700,000.00 |
$5,700,000.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,000,000.00 |
$2,000,000.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,920.00 |
$10,920.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $5,939,100.00 |
$6,599,000.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $19,250,900.00 |
$21,903,700.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $6,100.00 |
$6,800.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $3,780,318.00 |
$3,825,678.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $27,631,640.00 |
$28,203,640.00 |
|
California | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $3,360.00 |
$3,360.00 |
|
California | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,547,000.00 |
$31,613,553.00 |
|
California | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $64,378,000.00 |
$72,844,100.00 |
|
California | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,227,500.00 |
$3,645,800.00 |
|
California | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,720,200.00 |
$9,850,000.00 |
|
California | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $17,800.00 |
$20,200.00 |
|
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $36,098,000.00 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,413,000.00 |
||
California | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,400.00 |
||
California | Santa Clara | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | $795,847.43 |
$795,847.43 |
|
California | San Francisco | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | $90,349,207.78 |
$128,870,178.22 |
|
California | Sonoma | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | $84,147.23 |
$84,147.23 |
|
California | San Francisco | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Construction Engineering | $15,228,790.22 |
$21,105,881.66 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $15,251,053.02 |
$15,251,053.02 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $570,037.92 |
$570,037.92 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $865,283.90 |
$865,283.90 |
|
California | Los Angeles | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $1,895,354.82 |
$1,895,354.82 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,939,565.00 |
$49,173,749.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,995,038.55 |
$8,995,038.55 |
|
California | San Mateo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $21,000.00 |
$21,000.00 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,440,331.02 |
$28,763,830.00 |
|
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,226,350.98 |
$17,419,052.00 |
|
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,402,048.24 |
$4,402,048.24 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,347,951.76 |
$7,347,951.76 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,144.30 |
$7,144.30 |
|
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,255.70 |
$4,255.70 |
|
California | Marin | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $6,662,393.01 |
$6,662,393.01 |
|
California | Sonoma | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $11,184,565.99 |
$11,184,565.99 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $26,387,000.00 |
$48,401,800.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,327,000.00 |
$1,499,000.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $11,958,700.00 |
$13,508,100.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,152,600.00 |
$17,158,600.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $20,800.00 |
$23,500.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,277,219.74 |
$24,573,547.50 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,149,780.26 |
$24,444,552.50 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $5,944,300.00 |
$5,944,300.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,975,700.00 |
$3,975,700.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,388,977.21 |
$5,389,741.47 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,009,622.79 |
$6,010,258.53 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $51,234.47 |
$51,234.47 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $50,965.53 |
$50,965.53 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,283.42 |
$6,283.42 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,316.58 |
$6,316.58 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $54,240,600.00 |
$61,489,100.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $11,961,700.00 |
$24,385,400.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,493,000.00 |
$16,851,000.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $2,966,700.00 |
$2,999,700.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $19,100.00 |
$23,700.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $36,395,000.00 |
$41,241,000.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,469,662.17 |
$7,307,900.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,700.00 |
$7,600.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,989,076.13 |
$26,109,854.65 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,213,098.73 |
$2,499,829.14 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,700.00 |
$4,200.00 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,867,300.00 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $72,381,200.00 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,000,000.00 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $484,000.00 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $17,600.00 |
||
California | Los Angeles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $6,500,000.00 |
$6,500,000.00 |
|
California | Los Angeles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $37,308,000.00 |
$37,616,400.00 |
|
California | Los Angeles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $14,300.00 |
$14,300.00 |
|
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $78,927,100.00 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,968,000.00 |
||
California | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,900.00 |
||
California | San Francisco | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Rehabilitation - No Added Capacity | $21,468,546.00 |
$24,399,852.00 |
|
California | San Francisco | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $10,000.00 |
$11,400.00 |
|
California | San Francisco | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $12,265,254.00 |
$13,854,348.00 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,129,600.00 |
||
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,341,982.50 |
$3,775,000.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $36,397,122.60 |
$83,205,831.10 |
|
California | Santa Barbara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,850,554.69 |
$6,758,345.42 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,888,400.00 |
$18,470,000.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,523.06 |
$25,176.00 |
|
California | San Francisco | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,700,000.00 |
$3,000,000.00 |
|
California | San Francisco | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $19,905,300.00 |
$22,353,500.00 |
|
California | San Francisco | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $7,100.00 |
$7,900.00 |
|
California | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $30,562,700.00 |
$98,496,500.00 |
|
California | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $8,263,819.74 |
||
California | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,971,280.26 |
||
California | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,286,700.00 |
$18,430,000.00 |
|
California | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $8,200.00 |
$29,400.00 |
|
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $32,469,100.00 |
$36,927,900.00 |
|
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,612,800.00 |
$6,340,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $17,000.00 |
$19,300.00 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $27,096,100.00 |
$30,993,100.00 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,639,700.00 |
$7,500,000.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $44,910,600.00 |
$51,382,600.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $8,190,700.00 |
$9,252,000.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $16,700.00 |
$19,000.00 |
|
California | Santa Barbara | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $76,065,500.00 |
$139,481,500.00 |
|
California | Santa Barbara | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $13,186,100.00 |
$27,796,900.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,503,400.00 |
$22,804,400.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,477,400.00 |
$3,518,100.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $19,200.00 |
$31,100.00 |
|
California | Del Norte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $75,963,900.00 |
$86,547,400.00 |
|
California | Del Norte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $11,823,100.00 |
$13,355,000.00 |
|
California | Del Norte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $15,500.00 |
$17,600.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $25,802,200.00 |
$29,379,400.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,982,900.00 |
$4,499,000.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,500.00 |
$1,700.00 |
|
California | Marin | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $1,014,700.00 |
$91,663,300.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $44,818,500.00 |
$51,075,200.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,501,200.00 |
$6,214,000.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,200.00 |
$9,300.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,112,800.00 |
$12,964,200.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,719,900.00 |
$8,720,100.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,899,700.00 |
$4,405,000.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,700.00 |
$7,600.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $31,695,500.00 |
$36,206,300.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,993,800.00 |
$7,900,000.00 |
|
California | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $700.00 |
$900.00 |
|
California | San Mateo | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $15,006,284.40 |
$16,950,600.00 |
|
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $5,580,315.60 |
$6,743,300.00 |
|
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,887,200.00 |
$6,650,000.00 |
|
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,100.00 |
$11,500.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $22,531,500.00 |
$25,733,200.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,060,400.00 |
$3,457,000.00 |
|
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,084,000.00 |
||
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $34,394,000.00 |
||
California | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $19,745,000.00 |
||
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $50,477,114.98 |
||
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $204,285.02 |
||
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,674.38 |
||
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,748,325.62 |
||
California | San Mateo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,593.68 |
||
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6.32 |
||
California | Los Angeles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $46,728,465.00 |
||
California | Los Angeles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,967,000.00 |
||
California | Los Angeles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $4,200.00 |
||
California | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $28,226,641.61 |
$32,093,608.00 |
|
California | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $3,389,400.00 |
$3,864,400.00 |
|
California | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,780,120.99 |
$4,270,000.00 |
|
California | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $14,800.00 |
$16,800.00 |
|
California | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $33,255,400.00 |
||
California | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,297,000.00 |
||
California | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $21,000.00 |
||
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $7,783,560.00 |
$8,648,400.00 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $41,610,600.00 |
$46,864,100.00 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $18,900.00 |
$21,000.00 |
|
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $10,050,000.00 |
||
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $55,441,500.00 |
||
California | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $12,600.00 |
||
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $11,680,166.00 |
||
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | $12,774,925.00 |
||
California | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,493,583.00 |
||
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,888,500.00 |
$47,827,100.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,682,124.87 |
$4,159,200.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $718,000.00 |
$811,100.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,993,800.00 |
$7,900,000.00 |
|
California | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $21,000.00 |
$23,800.00 |
|
California | Fresno | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge New Construction | $3,970,875.13 |
$4,485,400.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $20,590,894.14 |
$23,258,664.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $3,362,493.00 |
$3,798,139.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | $17,732,950.90 |
$20,030,442.96 |
|
California | Humboldt | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $2,748,069.00 |
$3,104,111.00 |
|
California | Humboldt | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Training | $10,411.00 |
$11,760.00 |
|
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $24,444,800.00 |
$24,843,200.00 |
|
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,400,000.00 |
$3,400,000.00 |
|
California | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $8,400.00 |
$8,400.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $14,028,394.00 |
$15,017,000.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $20,213,400.00 |
$21,637,400.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,850,000.00 |
||
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $17,600.00 |
$17,600.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $31,298,409.09 |
$63,531,809.09 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,575,900.00 |
$3,151,900.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,000,000.00 |
$12,000,000.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $137,500.00 |
$275,000.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,700.00 |
$19,400.00 |
|
California | Kern | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $560,383.00 |
$1,120,766.00 |
|
California | Kern | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | $2,322,907.91 |
$4,645,824.91 |
|
California | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | $20,239,200.00 |
$43,118,030.00 |
|
California | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge New Construction | $4,749,800.00 |
$9,995,325.00 |
|
California | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,000.00 |
$5,500,000.00 |
|
California | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $10,000.00 |
$20,000.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $22,680,000.00 |
||
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $163,947,411.00 |
||
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $52,000.00 |
||
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,051,600.00 |
$19,326,100.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,594,000.00 |
$6,594,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,600.00 |
$10,600.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,374,200.00 |
$5,374,200.00 |
|
California | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $23,670,000.00 |
$23,670,000.00 |
|
California | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $32,810,097.00 |
$37,060,993.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $95,104,489.00 |
$107,830,284.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $26,559,000.00 |
$30,000,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $31,163.00 |
$35,200.00 |
|
California | Los Angeles | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - Restoration & Rehabilitation | $100,000.00 |
$125,000.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,426,500.00 |
$5,000,000.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $29,476,300.00 |
$33,598,000.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,200.00 |
$15,000.00 |
|
California | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $370,218.38 |
$410,646.38 |
|
California | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $118,140.62 |
$131,041.62 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $51,504,441.00 |
$56,939,812.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,554,100.00 |
$13,710,000.00 |
|
California | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $23,700.00 |
$26,100.00 |
|
California | Napa | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $739,000.00 |
$739,000.00 |
|
California | Napa | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge New Construction | $829,084.09 |
$1,748,042.29 |
|
California | Napa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $16,358,615.91 |
$35,021,857.71 |
|
California | Napa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $864,000.00 |
$5,000,000.00 |
|
California | Napa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $6,800.00 |
$14,400.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,174,100.00 |
$4,715,000.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $17,654,100.00 |
$20,445,400.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,600.00 |
$10,900.00 |
|
California | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $92,645,800.00 |
$116,489,900.00 |
|
California | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $8,401,000.00 |
$9,490,000.00 |
|
California | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | $15,700.00 |
$19,400.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,178,200.00 |
$14,885,600.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,800,000.00 |
$3,162,800.00 |
|
California | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,200.00 |
$4,800.00 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $72,368,700.00 |
$81,744,900.00 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,004,000.00 |
$29,207,200.00 |
|
California | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $12,200.00 |
$13,800.00 |
|
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $41,814,100.00 |
||
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,500,000.00 |
||
California | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,400.00 |
||
California | San Bernardino | >= 200,000 | N/A | INTERSTATE MAINT DISC | 4R - Added Capacity | $3,341,000.00 |
$3,773,862.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $102,459,000.00 |
$230,189,188.00 |
|
California | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $26,551,000.00 |
$29,990,964.00 |
|
California | San Bernardino | >= 200,000 | N/A | PUBLIC LANDS - BEGINNING FY 83 | 4R - Added Capacity | $2,000,000.00 |
$2,259,122.00 |
|
California | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,682,800.00 |
$4,160,000.00 |
|
California | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $20,365,000.00 |
$23,330,700.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $26,933,600.00 |
$30,786,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,798,300.00 |
$5,420,000.00 |
|
California | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,900.00 |
$10,100.00 |
|
California | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $27,317,594.00 |
$31,406,879.00 |
|
California | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $4,097,637.00 |
$4,711,030.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,359,485.00 |
$1,535,621.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,156,466.00 |
$13,731,464.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,257,264.00 |
$1,420,156.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $24,547,337.00 |
$37,340,605.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $6,690,315.00 |
$7,557,117.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,685,642.00 |
$6,734,655.00 |
|
California | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $12,642.00 |
$14,280.00 |
|
California | San Francisco | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $12,933,231.45 |
$12,933,231.45 |
|
California | Marin | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,233,307.86 |
$3,233,307.86 |
|
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $56,083,877.17 |
$67,107,400.95 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $111,924,810.67 |
$132,963,610.93 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $27,628,941.37 |
$410,737,838.09 |
|
California | Marin | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $6,907,235.35 |
$102,684,459.53 |
|
California | Marin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $282,090.46 |
$333,797.64 |
|
California | San Francisco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,128,361.83 |
$1,335,190.55 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $133,252,688.00 |
$144,933,200.00 |
|
California | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,000,000.00 |
$8,000,000.00 |
|
California | Santa Clara | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,794,780.80 |
$3,100,300.65 |
|
California | Contra Costa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,205,219.20 |
$13,539,469.35 |
|
California | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $63,917,305.00 |
$79,617,179.00 |
|
California | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $8,948,421.00 |
$11,146,400.00 |
|
California | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $13,279.00 |
$15,000.00 |
|
California | San Joaquin | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Rehabilitation - No Added Capacity | $24,000,000.00 |
$25,813,848.41 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $6,800,951.59 |
||
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,499,000.00 |
$5,082,000.00 |
|
California | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $16,000.00 |
||
California | San Luis Obispo | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $16,804,215.00 |
$42,302,750.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $42,235,300.00 |
$47,707,400.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,766,400.00 |
$15,550,000.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $28,101,385.00 |
$65,839,950.00 |
|
California | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $17,500.00 |
$19,800.00 |
|
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $31,230,630.00 |
||
California | Humboldt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,470,070.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,410,000.00 |
||
California | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $13,500.00 |
||
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $38,854,562.61 |
$44,168,393.39 |
|
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,543,100.00 |
$9,650,000.00 |
|
California | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,600.00 |
$13,200.00 |
|
California | Siskiyou | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $24,311,937.39 |
$27,461,806.61 |
|
California | Solano | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $7,868,780.00 |
$15,386,643.00 |
|
California | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,700,364.97 |
$38,069,427.00 |
|
California | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $828.21 |
$8,460,936.00 |
|
California | Solano | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $42,000.00 |
||
California | Stanislaus | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $38,881,400.00 |
$103,288,441.00 |
|
California | Stanislaus | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $41,700.00 |
$47,200.00 |
|
California | Ventura | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $3,810,600.00 |
$4,234,000.00 |
|
California | Ventura | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $18,877,900.00 |
$21,138,000.00 |
|
California | Ventura | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $5,500.00 |
$6,200.00 |
|
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $5,799,300.00 |
$6,631,900.00 |
|
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,514,700.00 |
$1,711,000.00 |
|
California | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,700.00 |
$3,100.00 |
|
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $235,472,700.00 |
||
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,800,000.00 |
||
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $21,200.00 |
||
California | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $26,400.00 |