Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $341,727.00 |
$359,713.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $384,507.00 |
$4,619,860.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $5,908,050.00 |
$6,219,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $299,250.00 |
$315,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $32,690,260.00 |
$34,410,800.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,676,704.00 |
$10,392,717.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,155,843.60 |
$20,335,553.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $10,798,538.00 |
$14,208,299.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,612,850.00 |
$4,641,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,706,050.00 |
$7,059,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,828.00 |
$8,240.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,363,567.00 |
$1,435,334.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $157,938.00 |
$166,250.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $3,167,062.00 |
$3,333,749.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $6,790,453.00 |
$7,147,846.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,780,404.00 |
$2,996,741.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $6,086,732.00 |
$7,206,995.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $3,821,448.00 |
$4,092,888.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $5,835,701.00 |
$7,174,351.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $645,000.00 |
||
Nevada | Clark | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $38,005.00 |
$40,006.00 |
|
Nevada | Clark | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $3,762,421.00 |
$3,960,443.00 |
|
Nevada | Clark | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $2,811,452.77 |
||
Nevada | Clark | >= 200,000 | Local | TRANSPORTATION IMP PROJ | Construction Engineering | $104,494.31 |
$109,994.00 |
|
Nevada | Clark | >= 200,000 | Local | TRANSPORTATION IMP PROJ | New Construction Roadway | $14,286,078.36 |
$44,865,439.23 |
|
Nevada | Clark | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $104,215.00 |
$109,700.00 |
|
Nevada | Clark | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $7,323,685.00 |
$7,709,142.00 |
|
Nevada | Clark | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Other | $7,134,500.00 |
$7,510,000.00 |
|
Nevada | Clark | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,096,016.00 |
||
Nevada | Clark | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,850,917.00 |
$28,899,953.00 |
|
Nevada | Clark | >= 200,000 | N/A | CONGESTION RELIEF PROJECTS | Preliminary Engineering | $2,090,925.00 |
$2,613,656.00 |
|
Nevada | Clark | >= 200,000 | N/A | INTERSTATE MAINT DISC | Construction Engineering | $885,719.00 |
$932,764.00 |
|
Nevada | Clark | >= 200,000 | N/A | INTERSTATE MAINT DISC | New Construction Roadway | $461,385.00 |
$512,650.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $654,909.00 |
$689,378.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $23,144,968.71 |
$59,597,618.57 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $12,000,000.00 |
$12,631,579.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,406,375.00 |
$1,480,395.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $19,930,844.96 |
$20,979,836.80 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $15,232,954.00 |
$16,034,689.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $6,682,538.00 |
$7,034,250.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,425,000.00 |
$1,500,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $1,520.00 |
$1,600.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $5,067,273.00 |
$5,333,971.00 |
|
Nevada | Clark | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Preliminary Engineering | $1,702,400.00 |
$2,128,000.00 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $1,823,817.60 |
$1,919,808.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $182.40 |
$192.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $76,000.00 |
$80,000.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,847,775.92 |
$9,314,815.70 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,078,464.66 |
$21,124,855.30 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,389,587.03 |
$1,462,722.72 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $138.97 |
$146.28 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,979,861.00 |
$6,294,591.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,710,002.81 |
$4,957,897.90 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,237,336.19 |
$7,618,249.10 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $223.98 |
$235.98 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $224.02 |
$236.02 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $1,065,247.61 |
$1,331,559.01 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $2,415,848.39 |
$3,019,810.99 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge New Construction | $167,277.27 |
$209,096.09 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Bridge New Construction | $16.73 |
$20.91 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $753,740.00 |
$942,174.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Other | $566,788.11 |
$708,485.89 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Other | $871,027.89 |
$1,088,784.11 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Training | $27.00 |
$34.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Training | $27.00 |
$34.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,167,443.00 |
$3,710,642.60 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,415,318.40 |
||
Nevada | Churchill | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $553,556.64 |
$582,691.72 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $55.36 |
$58.28 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,377,152.00 |
$2,502,264.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,876,280.35 |
$1,975,032.52 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,883,069.65 |
$3,034,810.48 |
|
Nevada | Churchill | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $88.99 |
$93.99 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $89.01 |
$94.01 |
|
Nevada | Clark | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Restoration & Rehabilitation | $9,161,451.68 |
$13,173,911.00 |
|
Nevada | Clark | >= 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $1,926,089.00 |
||
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $45,200,000.00 |
||
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,800,000.00 |
||
Nevada | Clark | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Restoration & Rehabilitation | $4,520,000.00 |
$4,757,895.00 |
|
Nevada | Clark | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $480,000.00 |
$505,263.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $247,694,701.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $25,735,398.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $728,722.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $97,304,771.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,333,250.00 |
||
Nevada | Clark | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $6,588,634.00 |
$6,935,404.00 |
|
Nevada | Clark | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | $494,950.00 |
$521,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $13,998,104.00 |
$14,734,846.00 |
|
Nevada | Clark | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $741,000.00 |
$780,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $7,536,573.00 |
$184,977,202.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,057,853.00 |
$3,218,793.00 |
|
Nevada | Clark | >= 200,000 | N/A | PUBLIC LANDS - BEGINNING FY 83 | 4R - Added Capacity | $7,000,000.00 |
$7,000,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,498,367.00 |
$12,103,544.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $780,000.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $164,000.00 |
||
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $503,500.00 |
$530,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | 4R - Added Capacity | $22,157,583.00 |
$23,323,772.00 |
|
Nevada | Clark | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Construction Engineering | $4,404,463.00 |
$4,636,277.00 |
|
Nevada | Clark | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $7,088,821.00 |
$7,461,916.00 |
|
Nevada | Clark | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | $1,158,278.00 |
$1,219,240.00 |
|
Nevada | Clark | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $206,275.00 |
$217,131.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $381,432.00 |
$401,507.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY PROJECTS,DEMOS S378 | 4R - Added Capacity | $129,935.93 |
$129,935.93 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY PROJECTS,DEMOS S378 | Construction Engineering | $9,096.00 |
$9,096.00 |
|
Nevada | Clark | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | $908,571.00 |
$956,389.00 |
|
Nevada | Clark | >= 200,000 | State | INTERSTATE MAINT DISC | Bridge New Construction | $3,379,938.00 |
$3,557,830.00 |
|
Nevada | Clark | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | $322,791.00 |
$339,780.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $14,960,319.00 |
$15,747,708.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $24,001.00 |
$25,264.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,027,795.00 |
$1,111,689.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $425,695.00 |
||
Nevada | Clark | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Construction Engineering | $42,571.02 |
$42,571.02 |
|
Nevada | Clark | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Landscaping and Other Scenic Beautification | $106,536.00 |
$106,536.00 |
|
Nevada | Clark | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Preliminary Engineering | $200,000.00 |
$200,000.00 |
|
Nevada | Clark | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Training | $5,933.00 |
$5,933.00 |
|
Nevada | Clark | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Utilities | $518,111.00 |
$518,111.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,919,775.34 |
$5,178,711.34 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $53,417.00 |
$192,174.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $2,603,358.00 |
$2,740,377.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $695,639.00 |
$745,846.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $1,297,937.00 |
$1,366,249.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,585,774.79 |
$3,774,500.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $9,679,542.90 |
$10,188,992.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,926,707.00 |
$5,186,007.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $476,901.00 |
$502,001.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $693,406.00 |
$729,901.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | $806,154.00 |
$4,081,214.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $379,475.00 |
$5,763,562.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Landscaping and Other Scenic Beautification | $2,248,578.00 |
||
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $2,609,120.00 |
$29,139,001.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Other | $28,375.00 |
||
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $3,895,557.00 |
$4,100,587.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $321,494.00 |
$7,220,637.00 |
|
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Training | $1,648.00 |
||
Nevada | Clark | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $200,000.00 |
||
Nevada | Clark | >= 200,000 | State | INTERSTATE MAINT DISC | Right of Way | $3,374,270.00 |
$3,551,863.00 |
|
Nevada | Clark | >= 200,000 | N/A | PUBLIC LANDS - BEGINNING FY 83 | Right of Way | $1,187,500.00 |
$1,187,500.00 |
|
Nevada | Clark | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | Construction Engineering | $18,962.00 |
$323,516.00 |
|
Nevada | Clark | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | New Construction Roadway | $163,209.45 |
$2,196,698.31 |
|
Nevada | Clark | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $240,588.00 |
$5,182,221.00 |
|
Nevada | Clark | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Traffic Management/Engineering - HOV | $4,571,167.00 |
$41,188,082.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,103,711.62 |
$16,820,506.51 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $33,303.29 |
$35,056.09 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $49,229,656.01 |
$374,085,505.20 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $299,729.54 |
$315,504.78 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $302,957.00 |
$318,900.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,164,133.50 |
$6,660,143.40 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $10,000,000.00 |
$10,526,316.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $2,726,597.00 |
$2,870,100.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $38,025,594.91 |
$209,219,489.02 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $37,722,579.00 |
$39,707,978.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,255,527.00 |
$14,483,938.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,170,000.00 |
$5,442,105.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $107,840.00 |
$447,545.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,670,000.00 |
$18,600,000.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,330,000.00 |
$2,452,632.00 |
|
Nevada | Clark | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $44,250,000.00 |
$44,250,000.00 |
|
Nevada | Clark | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $5,750,000.00 |
$5,750,000.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,311,500.00 |
$131,891,860.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,072,208.00 |
$14,179,166.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $10,620,000.00 |
||
Nevada | Clark | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $6,066,899.00 |
$6,386,210.00 |
|
Nevada | Clark | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $967,418.00 |
$1,018,334.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $27,622,043.00 |
$139,160,430.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,777,958.00 |
$10,152,500.00 |
|
Nevada | Clark | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $61,679.00 |
$64,925.00 |
|
Nevada | Clark | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Other | $584,937.00 |
$615,723.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $18,900,689.00 |
$18,900,689.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $852,690.00 |
$852,690.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,344,773.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $5,295,566.00 |
$5,574,280.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,918,346.00 |
$3,096,943.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,134,450.00 |
$1,194,158.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,300,331.00 |
$2,421,401.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,110,265.00 |
$1,168,699.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $22,910.00 |
$24,116.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $915,490.00 |
$963,674.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $3,217,108.00 |
$3,386,429.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,068,700.00 |
$2,222,457.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $3,800.00 |
$4,000.00 |
|
Nevada | Clark | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $84,728.00 |
$89,187.00 |
|
Nevada | Clark | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Other | $802,997.00 |
$845,260.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $17,061,399.35 |
$17,061,399.35 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Maintenance Resurfacing | $21,126.00 |
$21,126.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Rehabilitation - No Added Capacity | $371,720.00 |
$371,720.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $3,857,235.00 |
$3,857,235.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Landscaping and Other Scenic Beautification | $421,777.00 |
$421,777.00 |
|
Nevada | Clark | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $6,166,206.00 |
$6,166,206.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,213,246.65 |
$13,456,215.65 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $166,302.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $297,801.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,112.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $79,277.00 |
$103,013.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $36,709.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $22,199.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $324,538.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $3,800.00 |
$4,000.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,559,341.00 |
$21,641,412.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $191,295.00 |
$201,363.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $474,423.00 |
$499,393.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,852,425.00 |
$10,370,974.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $6,644,114.00 |
$6,993,804.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $15,436,998.00 |
$16,249,472.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,348.00 |
$2,472.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $17,613.00 |
$18,540.00 |
|
Nevada | Clark | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Rehabilitation - Added Capacity | $370,020.00 |
$462,525.00 |
|
Nevada | Clark | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $616,937.00 |
$771,172.00 |
|
Nevada | Clark | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Other | $1,922,855.00 |
$2,403,569.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $19,192,375.00 |
$21,858,573.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $25,000.00 |
$372,416.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,551,898.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $12,397,603.00 |
$13,050,108.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,575,748.00 |
$2,711,314.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,696,925.00 |
$1,786,237.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,817,022.00 |
$1,912,655.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $73,416.00 |
$83,580.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $5,572,948.00 |
$5,866,261.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $547,347.00 |
$576,155.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $25,808,711.00 |
$27,187,064.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $467,576.00 |
$492,184.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,627,933.00 |
$2,776,245.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,040.00 |
$3,200.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $7,999,432.00 |
$8,420,455.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $799,943.00 |
$842,045.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,609,300.00 |
$52,119,899.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $9,238,314.17 |
$9,922,733.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $669,678.00 |
$6,468,312.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $7,473,290.00 |
$7,866,621.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $5,154,984.00 |
$5,426,299.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $760.00 |
$800.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $240,592.00 |
$274,055.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Rehabilitation - No Added Capacity | $17,254,759.00 |
$17,254,759.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $1,138,580.65 |
$1,138,580.65 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $4,378,273.00 |
$4,378,273.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $695,977.67 |
$732,608.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $13,223,562.00 |
$13,919,538.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,148,141.00 |
$43,709,482.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $241,912.00 |
$799,238.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,463,857.00 |
$10,257,532.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,301,773.00 |
$7,787,799.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $1,081,365.00 |
$8,588,935.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $12,596,879.00 |
$27,413,418.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $171.00 |
$577.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,178.00 |
$17,304.00 |
|
Nevada | Washoe | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $63,158.00 |
$78,947.00 |
|
Nevada | Washoe | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Other | $1,200,000.00 |
$1,500,000.00 |
|
Nevada | Washoe | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $5,038,517.00 |
$5,303,702.00 |
|
Nevada | Washoe | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $265,185.00 |
$279,142.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,096,529.00 |
||
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,066,084.00 |
$1,122,194.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,500,000.00 |
$1,578,947.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,442,213.00 |
$6,781,277.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $11,194,126.00 |
$11,834,694.00 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,175,151.00 |
$8,650,863.00 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,425,000.00 |
$1,500,000.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,204,249.00 |
$2,320,262.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Maintenance Resurfacing | $4,172,353.00 |
$5,215,443.00 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Maintenance Resurfacing | $326,751.00 |
$408,438.00 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $659,161.00 |
$693,853.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $843,302.00 |
$887,687.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $144,058.00 |
$151,640.00 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $871,985.00 |
$917,879.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,296,391.00 |
$8,114,363.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $149,494.00 |
$1,836,720.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Landscaping and Other Scenic Beautification | $19,000.00 |
$1,129,039.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $76,000.00 |
$9,661,688.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $1,425,000.00 |
$1,500,000.00 |
|
Nevada | Washoe | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $111,961.00 |
||
Nevada | Washoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $9,310,203.00 |
$11,637,754.00 |
|
Nevada | Washoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,598,967.00 |
$3,248,709.00 |
|
Nevada | Washoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Landscaping and Other Scenic Beautification | $1,893,118.00 |
$2,366,398.00 |
|
Nevada | Washoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $9,197,712.00 |
$11,497,140.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,009,902.00 |
$10,536,739.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,335,343.00 |
$1,405,625.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $661,284.00 |
$696,088.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $5,027,586.00 |
$5,292,195.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $39,724,189.70 |
$41,814,937.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,934,041.00 |
$5,193,727.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,010,492.00 |
$7,415,202.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $959,810.00 |
$1,010,327.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $2,380,645.00 |
$2,505,942.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,914.00 |
$4,120.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $254,729.00 |
||
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $2,462,296.76 |
$2,591,890.00 |
|
Nevada | Lyon | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $120,251.00 |
$126,581.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,651,054.00 |
$9,106,373.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $463,387.00 |
$487,776.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,794,201.00 |
$4,018,896.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $1,830,593.00 |
$1,926,940.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $11,527,454.00 |
$12,384,162.00 |
|
Nevada | Pershing | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $8,787,157.00 |
$9,249,639.00 |
|
Nevada | Pershing | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,624,079.00 |
$1,709,557.00 |
|
Nevada | Pershing | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $12,804,708.00 |
$13,478,640.00 |
|
Nevada | Pershing | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,119,727.00 |
$1,178,660.00 |
|
Nevada | Pershing | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,887,907.00 |
$1,987,271.00 |
|
Nevada | Pershing | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $701,653.00 |
$738,582.00 |
|
Nevada | Eureka | < 5,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $2,203,317.77 |
$2,319,281.00 |
|
Nevada | Eureka | < 5,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $77,549.00 |
$81,631.00 |
|
Nevada | Eureka | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,036.30 |
$49,511.89 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,751,640.70 |
$17,633,306.11 |
|
Nevada | Eureka | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,981,549.23 |
$2,085,842.00 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $536,517.00 |
$564,755.00 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,891,610.75 |
$3,043,800.42 |
|
Nevada | Eureka | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $763,518.25 |
$803,703.58 |
|
Nevada | Eureka | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $180,557.69 |
$190,061.09 |
|
Nevada | Lander | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,356,082.31 |
$1,427,455.91 |
|
Nevada | Eureka | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $575,264.00 |
$605,541.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge New Construction | $142,500.00 |
$150,000.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $5,079,039.00 |
$5,346,357.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $688,446.00 |
$724,680.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $4,347,967.00 |
||
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $589,352.00 |
||
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $9,171,930.00 |
$9,654,663.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,545,367.00 |
$2,679,334.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $28,021,727.00 |
$29,496,555.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,052,043.00 |
$2,160,046.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $654,201.00 |
$688,633.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,712,233.00 |
$2,854,982.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $1,483,172.00 |
$1,853,965.00 |
|
Nevada | Humboldt | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $201,038.00 |
$251,298.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $12,676,302.00 |
$13,343,476.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Preventive Maintenance | $195,853.00 |
$206,161.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | $60,241.00 |
$881,239.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $2,183,813.00 |
$2,298,750.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $2,572,778.00 |
$2,708,187.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | New Construction Roadway | $1,591,227.00 |
||
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Other | $5,679,008.00 |
$6,298,687.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | $950,000.00 |
$1,000,000.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Right of Way | $14,250.00 |
$15,000.00 |
|
Nevada | Eureka | < 5,000 | State | FAST ACT NATIONAL FREIGHT | Training | $336.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | $168,409.00 |
$177,273.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $16,841.00 |
$17,727.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $22,125,814.00 |
$23,290,331.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $2,098,332.00 |
$2,208,770.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,491,384.00 |
$2,622,509.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $304.00 |
$320.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $689,377.00 |
$725,660.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | FAST ACT NATIONAL FREIGHT | Construction Engineering | $130,179.00 |
$137,031.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | FAST ACT NATIONAL FREIGHT | New Construction Roadway | $7,066,018.00 |
$7,437,914.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $21,140,314.00 |
$22,282,962.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $406,819.00 |
$428,231.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,894,908.00 |
$3,050,272.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $792.00 |
$834.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $641,250.00 |
$675,000.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $38,000.00 |
$40,000.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,425.00 |
$1,500.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,750.00 |
$5,000.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $548.00 |
$577.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | $2,803,165.88 |
$2,950,700.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Bridge Rehabilitation - No Added Capacity | $1,650,776.00 |
$1,737,659.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $518,390.00 |
$545,673.00 |
|
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,552,512.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,719,677.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,645,434.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,478,317.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $10,043.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $15,789.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $300,000.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $7,020,964.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $948,341.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,505,880.00 |
||
Nevada | Elko | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $432,216.00 |
||
Nevada | Clark | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | New Construction Roadway | $269,471.67 |
$283,654.23 |
|
Nevada | Clark | >= 200,000 | Local | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | $1,639,091.21 |
$1,725,359.17 |
|
Nevada | Clark | >= 200,000 | N/A | SEC 115 UNOBL BAL TRANSF | Preliminary Engineering | $5,950,000.00 |
$5,950,000.00 |
|
Nevada | Clark | >= 200,000 | N/A | SEC 115 UNOBL BAL TRANSF | Right of Way | $50,000.00 |
$50,000.00 |
|
Nevada | Clark | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $13,753,832.57 |
$35,897,258.81 |
|
Nevada | Clark | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $231,361,914.07 |
$249,038,855.94 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $100,000.00 |
$605,263.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $963,631.00 |
$1,014,349.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $14,500,000.00 |
||
Nevada | Clark | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $159,915.86 |
$168,332.49 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,457,123.00 |
$2,586,445.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,533,173.14 |
$10,652,851.51 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $2,403,582.00 |
$2,530,086.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $63,687,306.00 |
$90,999,182.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,643,404.00 |
$2,782,531.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,394.00 |
$9,888.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $787,655.00 |
$829,111.00 |
|
Nevada | Clark | >= 200,000 | State | PUBLIC LANDS - BEGINNING FY 83 | Construction Engineering | $100,000.00 |
$100,000.00 |
|
Nevada | Clark | >= 200,000 | State | PUBLIC LANDS - BEGINNING FY 83 | New Construction Roadway | $1,900,000.00 |
$1,900,000.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,890,765.00 |
$17,779,752.65 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $8,929,388.00 |
$9,399,356.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,072,303.00 |
$2,181,372.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $65,282.71 |
$68,718.64 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $760.00 |
$800.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $108,699.00 |
$114,420.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $648,869.28 |
||
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $862,340.53 |
$907,726.88 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,112,103.00 |
$5,381,161.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $201,494.00 |
$212,099.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $10,068,739.17 |
$10,877,672.55 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $250,000.00 |
$263,158.00 |
|
Nevada | Clark | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $126,370.26 |
$133,021.33 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,597,879.15 |
$19,576,715.37 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,506,139.00 |
$6,848,567.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $25,414,556.78 |
$26,942,164.78 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $3,706,476.00 |
$3,901,554.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $1,961,340.00 |
$2,064,568.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,745,757.00 |
$4,995,534.00 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $798.00 |
$840.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,338,921.47 |
$2,462,022.23 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $223,372.00 |
$235,128.00 |
|
Nevada | Clark | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,322,001.00 |
$1,391,580.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $71,513,448.25 |
$75,316,682.37 |
|
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,392,923.73 |
$18,308,341.40 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,000.00 |
||
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $929,950.00 |
$978,894.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $175,852.42 |
||
Nevada | Clark | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $5,699,389.60 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,275,871.75 |
$5,553,549.21 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $4,049,995.00 |
$4,263,153.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $450,000.00 |
$473,684.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,581,163.00 |
$21,280,855.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,546,737.00 |
$8,830,438.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $5,885,758.00 |
$6,195,534.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,507,785.00 |
$23,951,442.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $3,545,159.00 |
$3,731,746.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,040.00 |
$3,200.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,908,073.00 |
$8,324,287.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $878,750.00 |
$925,000.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $6,172,934.00 |
$32,454,383.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,339,114.00 |
$8,566,077.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $297,713.00 |
$313,382.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $2,251,757.00 |
$27,020,863.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,324,966.00 |
$3,499,964.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,480.00 |
$5,768.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,907,108.00 |
||
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,500,000.00 |
$4,736,842.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $500,000.00 |
$526,316.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge New Construction | $3,398,423.00 |
$3,577,287.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $1,185,600.00 |
$1,342,737.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $2,194,634.00 |
$2,310,141.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $1,855,653.00 |
$2,356,337.00 |
|
Nevada | Clark | >= 200,000 | State | CONGESTION AIR QUALITY | Utilities | $1,996,981.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $32,394,895.00 |
$41,782,719.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,439,427.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,633,967.00 |
$14,789,431.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $1,064,288.00 |
$1,120,303.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $1,900,000.00 |
$6,303,220.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $8,444,075.00 |
$36,281,819.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $19,500,415.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $12,360.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $70,398.00 |
$94,118.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,271,784.00 |
$3,443,983.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $950,000.00 |
$1,000,000.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $22,270,391.00 |
$23,442,517.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Maintenance Resurfacing | $1,206,868.42 |
$1,270,388.23 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $78,016.00 |
$82,122.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,539,882.00 |
$1,620,928.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | $20.00 |
$20.68 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $14,840,575.38 |
$15,621,658.29 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,279,519.66 |
$3,452,125.91 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Maintenance Resurfacing | $3,606,674.00 |
$3,796,498.95 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Training | $399.00 |
$420.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $237,474.20 |
$249,972.85 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $39,059.34 |
$41,115.09 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HIGH RISK RURAL ROAD | Construction Engineering | $44,633.00 |
$46,982.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HIGH RISK RURAL ROAD | Safety | $1,862,816.18 |
$1,960,859.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Restoration & Rehabilitation | $14,548,834.00 |
||
Nevada | Nye | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $963,654.00 |
$3,603,134.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $14,018,969.00 |
$16,560,953.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $330.00 |
||
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,626,641.00 |
$31,781,675.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,690,009.00 |
$3,736,294.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $2,097,379.00 |
$2,207,767.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,697.00 |
$4,944.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,904,129.00 |
$8,320,136.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $874,291.00 |
$920,306.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $18,998,444.00 |
$19,998,362.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $872,676.00 |
$1,976,049.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $61,104.00 |
$307,800.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,330,202.00 |
$2,925,337.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,462.00 |
$4,697.00 |
|
Nevada | Nye | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $235.00 |
$247.00 |
|
Nevada | Clark | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - No Added Capacity | $46,729.00 |
$46,729.00 |
|
Nevada | Clark | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | Construction Engineering | $3,271.00 |
$3,271.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Utilities | $750,258.47 |
$789,745.90 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,233,287.85 |
$2,350,829.85 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,158,125.60 |
$7,534,869.37 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $13,588,250.00 |
$26,081,852.57 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $20,407,948.09 |
$21,482,050.46 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $852,726.00 |
$897,607.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $4,531,930.38 |
$4,828,407.38 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $32,802.00 |
$34,528.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $15,335,192.08 |
$16,857,477.94 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $486,070.00 |
$511,653.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $12,906,147.00 |
$13,585,418.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $1,900.00 |
$2,000.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $629,241.53 |
$662,359.53 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $125,000.00 |
$131,579.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,144,691.00 |
$7,520,728.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Bridge New Construction | $1,700,741.00 |
$1,790,254.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $1,764,742.00 |
$1,857,622.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | New Construction Roadway | $14,181,927.00 |
$14,928,345.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $80,000.00 |
$84,210.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $639,921.00 |
$673,601.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | $828,458.00 |
$872,062.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | $7,471,681.34 |
$7,907,177.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,166,702.00 |
$4,386,002.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $3,863,521.94 |
$4,066,865.24 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,950,857.00 |
$2,059,534.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $9,925,093.45 |
$10,447,467.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | PUBLIC LANDS - BEGINNING FY 83 | Construction Engineering | $898,775.00 |
$898,775.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,305,875.00 |
$4,532,500.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,332,400.14 |
$1,402,526.57 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $74,618.00 |
||
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $1,545,070.00 |
$1,626,389.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $80,079.00 |
$685,189.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $7,600.00 |
$8,000.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $15,265.00 |
$16,068.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $81,259.00 |
$85,536.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,172,086.00 |
$10,713,169.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $2,426,230.00 |
$2,553,926.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $32,697,445.00 |
$34,450,863.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,814,344.00 |
$7,172,994.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $783.00 |
$824.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,936.00 |
$84,270.00 |
|
Nevada | Carson City | >= 50,000 AND < 200,000 | State | SURFACE TRANSPORTATION PROJECT | New Construction Roadway | $779,067.00 |
$820,071.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,440,827.00 |
$10,990,344.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $15,577,639.00 |
$16,397,515.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,719,576.00 |
$2,862,712.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,174,503.00 |
$1,236,319.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,615,000.00 |
$1,700,000.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,026,000.00 |
$1,080,000.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,793.00 |
$2,940.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,952,827.00 |
$28,371,396.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,170,835.00 |
$5,442,984.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,406,658.00 |
$1,480,693.00 |
|
Nevada | Clark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $12,415,886.00 |
$13,069,354.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $714,275.00 |
$751,869.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,124,082.00 |
$1,183,244.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,435,767.00 |
$6,774,492.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $225.00 |
$234.00 |
|
Nevada | Clark | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $626.00 |
$659.00 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Bridge New Construction | $5,105,650.00 |
$5,374,368.00 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | $2,088,810.00 |
$2,198,747.00 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Landscaping and Other Scenic Beautification | $86,060.00 |
$90,589.00 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | $17,657,580.00 |
$18,586,926.00 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Training | $1,520.00 |
$1,600.00 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $22,112,098.96 |
$23,275,893.64 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,397,166.74 |
$4,625,896.11 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $7,143,093.88 |
$15,716,837.67 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $767,203.47 |
||
Nevada | Washoe | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $3,795,121.85 |
$3,994,865.11 |
|
Nevada | Washoe | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,186,223.20 |
$1,248,656.00 |
|
Nevada | Washoe | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | $700,000.00 |
$736,842.00 |
|
Nevada | Washoe | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $18,234,203.00 |
$19,193,898.00 |
|
Nevada | Washoe | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $700,000.00 |
$736,842.00 |
|
Nevada | Washoe | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | New Construction Roadway | $38,035,349.00 |
$40,037,210.00 |
|
Nevada | Washoe | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,750,000.00 |
$1,842,105.00 |
|
Nevada | Washoe | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $23,286,877.00 |
$24,512,503.00 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Bridge New Construction | $6,017,540.00 |
$6,334,253.00 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | $946,713.35 |
$996,540.35 |
|
Nevada | Washoe | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | $8,370,000.00 |
$8,810,526.00 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $55,143,417.44 |
$58,045,702.57 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,961,836.48 |
$12,591,406.93 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $36,000.00 |
||
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $58,090,981.92 |
$61,148,402.34 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $18,269,723.89 |
$33,944,731.59 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $430,517.52 |
$15,542,371.33 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Landscaping and Other Scenic Beautification | $8,179,910.00 |
||
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $50,311,445.77 |
$55,966,001.26 |
|
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $8,000.00 |
||
Nevada | Washoe | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $2,060.00 |
||
Nevada | Washoe | >= 200,000 | N/A | PUBLIC LANDS - BEGINNING FY 83 | Construction Engineering | $58,874.00 |
$58,874.00 |
|
Nevada | Washoe | >= 200,000 | N/A | PUBLIC LANDS - BEGINNING FY 83 | New Construction Roadway | $782,181.00 |
$782,181.00 |
|
Nevada | Washoe | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $29,029,535.58 |
$30,557,405.88 |
|
Nevada | Washoe | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,819,223.70 |
$10,336,024.63 |
|
Nevada | Washoe | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $42,008,124.05 |
$44,219,076.39 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,676,000.00 |
$8,657,062.74 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $9,312,834.79 |
$13,147,239.00 |
|
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,108,186.00 |
||
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,138,279.00 |
||
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $370,045.00 |
||
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,369,018.00 |
||
Nevada | Washoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $252.00 |
||
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $783,037.05 |
$4,134,962.00 |
|
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $575,456.00 |
||
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $621,404.00 |
||
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $118,898.00 |
||
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,173,217.00 |
||
Nevada | Washoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $84.00 |