RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Vermont | Bennington | >= 5,000 AND < 50,000 | State | BRIDGE REPLACEMENT - SPECIAL | Preliminary Engineering | $51,786.44 |
$64,733.05 |
|
Vermont | Bennington | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $920,000.00 |
$1,150,000.00 |
|
Vermont | Bennington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $500,000.00 |
$19,957,295.00 |
|
Vermont | Bennington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,900,695.00 |
||
Vermont | Bennington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $280,000.00 |
$350,000.00 |
|
Vermont | Bennington | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $33,797.06 |
$42,246.32 |
|
Vermont | Bennington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,828,213.56 |
$2,285,266.95 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | CONSOLIDATED PRIMARY | Preliminary Engineering | $377,076.18 |
$404,731.15 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | CONSOLIDATED PRIMARY | Right of Way | $30,390.82 |
$31,990.34 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | Local | CONSOLIDATED PRIMARY | Right of Way | $53,824.16 |
$56,657.01 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS - CHARGED TO LIM | Preliminary Engineering | $213,413.90 |
$224,646.21 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $412,379.85 |
$434,084.05 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | Right of Way | $25,324.80 |
$26,657.68 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Preliminary Engineering | $592,000.35 |
$623,158.65 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $19,470,278.20 |
$21,627,833.33 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,062,455.54 |
$4,313,507.79 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $742,369.18 |
$781,441.18 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,045,000.00 |
$1,100,000.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $477,109.18 |
$790,362.40 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $923,750.00 |
$972,368.42 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $5,199.99 |
||
Vermont | Washington | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $100,000.00 |
$600,000.00 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $3,856,000.00 |
$4,820,000.00 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $120,000.00 |
$150,000.00 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,048,000.00 |
$1,310,000.00 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $41,582.64 |
$51,978.30 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $768,995.10 |
$961,243.87 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $24,000.00 |
$30,000.00 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $712,858.00 |
$928,578.55 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,183,009.53 |
$17,172,367.98 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,841,176.21 |
$5,970,863.61 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $261,781.74 |
$322,868.45 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $212,762.58 |
$425,525.16 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $11,504.92 |
$23,009.84 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $493,777.01 |
$608,999.77 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $4,054.00 |
$5,000.00 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $26,700.50 |
$32,931.05 |
|
Vermont | Rutland | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Right of Way | $400,237.22 |
$500,296.53 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $480,000.00 |
$600,000.01 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | N/A | HIGHWAY BRIDGE PROGRAM (PLUS) | Preliminary Engineering | $15,671.69 |
$19,589.61 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $19,800,000.00 |
$24,193,992.27 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $46,915,119.49 |
$55,194,258.22 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,846,833.61 |
$5,702,157.19 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,134,037.33 |
$6,417,546.66 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $21,250.00 |
$25,000.00 |
|
Vermont | Grand Isle | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | $4,194,403.47 |
$4,934,592.32 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Preliminary Engineering | $837,369.08 |
$963,044.20 |
|
Vermont | Caledonia | >= 5,000 AND < 50,000 | N/A | INTERSTATE - 56 | Preliminary Engineering | $227,679.98 |
$243,556.00 |
|
Vermont | Caledonia | >= 5,000 AND < 50,000 | N/A | INTERSTATE - 56 | Right of Way | $21,139.93 |
$22,320.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Right of Way | $440,415.90 |
$465,013.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | $302,009.16 |
$317,904.16 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,747,562.10 |
$8,156,363.51 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,500,087.42 |
$1,579,246.39 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $765,530.90 |
$805,822.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,007,000.00 |
$1,060,000.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,110,000.00 |
||
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,445.98 |
$4,679.98 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $8,020,850.03 |
$8,443,000.03 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,330,000.00 |
$1,400,000.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $15,000.50 |
$15,789.50 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $642,991.94 |
$676,833.94 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,762,857.95 |
$1,855,639.95 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Research | $38,000.00 |
$40,000.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $475,000.00 |
$500,000.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $45,600.00 |
$48,000.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $184,299.98 |
$193,999.97 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $24,397,556.94 |
$27,108,396.60 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $3,556,166.06 |
$3,951,295.62 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $175,885.22 |
$195,428.02 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $44,114.78 |
$49,016.43 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $12,136,210.79 |
$14,279,205.45 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,899,515.66 |
$2,110,572.94 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $9,617.67 |
$10,686.30 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $3,686,038.80 |
$4,095,598.67 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $34,318.30 |
$38,131.44 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $320,000.00 |
$355,555.55 |
|
Vermont | Windsor | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $6,100,000.00 |
$21,392,283.00 |
|
Vermont | Windsor | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $400,000.00 |
$3,056,041.00 |
|
Vermont | Windsor | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $49,571.69 |
$61,964.61 |
|
Vermont | Windsor | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,120,000.00 |
$1,700,000.00 |
|
Vermont | Windsor | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $48,000.00 |
$60,000.00 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $442,383.60 |
$545,613.72 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $12,511,846.80 |
$26,153,951.00 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,098,153.20 |
$1,354,407.00 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $303,640.59 |
$374,495.05 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | TRANSPORTATION ALTERNATIVES | Preliminary Engineering | $112,430.00 |
$138,665.52 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,512,227.00 |
$25,575,524.28 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,679,069.87 |
$1,950,592.32 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $538,506.81 |
$664,167.25 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $77,472.00 |
$90,000.00 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,380.80 |
$26,000.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Bridge New Construction | $1,002,182.83 |
$1,054,929.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Bridge Rehabilitation (Obsolete) | $255,683.19 |
$269,140.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Construction Engineering | $832,560.98 |
$878,594.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Landscaping and Other Scenic Beautification | $431,400.70 |
$454,106.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | New Construction Roadway | $7,168,901.22 |
$7,573,883.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Other | $662,499.64 |
$697,368.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Preliminary Engineering | $1,883,540.38 |
$1,982,674.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Right of Way | $330,600.00 |
$348,000.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE - 56 | Special Bridge | $762,381.65 |
$802,507.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,520,000.00 |
$1,600,000.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,915,000.00 |
$24,236,315.79 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,671,405.43 |
$8,075,163.66 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,043,029.04 |
$1,097,925.31 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $7,841,529.87 |
$8,254,241.97 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $157,862.84 |
$166,171.42 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,735,340.50 |
$1,826,674.21 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $358,300.40 |
$377,158.32 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | Right of Way | $249,936.29 |
$263,090.83 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM NON ATTRIBUTABLE | Construction Engineering | $1,203,378.26 |
$1,266,713.96 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM NON ATTRIBUTABLE | New Construction Roadway | $2,470.00 |
$2,600.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM NON ATTRIBUTABLE | Other | $675,082.11 |
$710,612.75 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | Local | URBAN SYSTEM NON ATTRIBUTABLE | Preliminary Engineering | $20,778.90 |
$21,872.53 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM NON ATTRIBUTABLE | Preliminary Engineering | $2,214,241.94 |
$2,726,938.24 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM NON ATTRIBUTABLE | Rail/Hwy Crossing | $22,986.71 |
$24,197.00 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM NON ATTRIBUTABLE | Right of Way | $5,983,989.39 |
$6,600,039.29 |
|
Vermont | Chittenden | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM NON ATTRIBUTABLE | Utilities | $1,743,554.53 |
$3,019,731.00 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,700,000.00 |
$16,120,258.73 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,104,000.00 |
$1,380,000.00 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $296,000.00 |
$370,000.00 |
|
Vermont | Windham | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $7,080,000.00 |
$8,850,000.00 |
|
Vermont | Caledonia | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $160,958.06 |
$198,517.59 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $1,247,248.94 |
$1,538,294.20 |
|
Vermont | Caledonia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $725,543.31 |
$2,972,700.70 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,622,167.19 |
$23,035,179.51 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $948,770.25 |
$1,170,165.58 |
|
Vermont | Caledonia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $122,439.25 |
$151,010.42 |
|
Vermont | Caledonia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $73,170.00 |
$97,559.99 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $601,830.00 |
$802,440.01 |
|
Vermont | Caledonia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $9,267.44 |
$11,430.00 |
|
Vermont | Washington | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $71,812.56 |
$88,570.00 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,396,094.00 |
$5,172,729.65 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $435,091.22 |
$483,434.69 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | $48,230,531.25 |
$50,768,980.26 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,376,308.39 |
$5,076,721.32 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,488,000.00 |
$4,360,000.00 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,400,000.00 |
$4,000,000.00 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $14,117,251.44 |
$21,505,460.02 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Training | $29,472.04 |
$31,023.20 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $143,121.35 |
||
Vermont | Addison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $405,061.00 |
$426,380.00 |
|
Vermont | Addison | >= 5,000 AND < 50,000 | N/A | TRANSPORTATION IMP PROJ | Preliminary Engineering | $960,000.00 |
$1,200,000.00 |