U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Colorado

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Colorado 0131057 SH13 GarCo RioBlanco Hill $2,328,752.00 $36,742,916.00
Colorado 021A008 US 24/SH 21 & AIRPORT RD DDI $5,875,798.00 $62,935,588.00
Colorado 0251357 I25A PUEBLO RESURFACING MP 64-79.6 $18,547,398.50 $28,255,339.00
Colorado 0252457 I-25:ALAMEDA RIVER PH 2.0 $24,511,303.00 $33,228,534.00
Colorado 0252475 I-25 SOUTH GAP PACKAGE 1 $1.00 $72,956,566.00
Colorado 0252476 I-25 SOUTH GAP PACKAGE 2 $75,500,000.00 $149,797,342.00
Colorado 0252477 I-25 SOUTH GAP PACKAGE 3 $6,566,651.00 $186,002,724.00
Colorado 0252484 I-25 Fillmore to Garden of Gods $1,462,109.00 $64,742,755.00
Colorado 0252504 I25 GREENLAND WILDLIFE OVERPASS $22,000,000.00 $30,750,000.00
Colorado 0252518 CRYSTAL VALLEY INTERCHANGE-PACKAGE 2 $74,696,583.00
Colorado 0253255 I-25 North: SH 402 to SH 14 $169,579,537.45 $567,274,530.00
Colorado 0253300 I-25: SH 66 to SH 56, Segment 5 CP1 $1.00 $36,192,543.00
Colorado 025A049 I-25 AT US50B RECONSTRUCTION $4,053,420.00 $106,323,911.00
Colorado 0702383 I-70 EB Aux Frisco to Silverthorne $13,170,568.00 $31,310,641.42
Colorado 0702413 Vail Pass Aux Phase 1 CAP 2 $17,866,221.00 $30,060,934.00
Colorado 0702417 Vail Pass Aux Phase 1 CP 4 $82,498,431.00 $151,155,894.00
Colorado 0703445 I-70 WESTBOUND PEAK PERIOD SHOULDER LANE $28,292,877.00 $96,504,528.21
Colorado 0703496 I-70 NOISE WALL REPLCMNT- I-76 to Pecos $5,372,929.00 $27,578,699.00
Colorado 0703505 I-70 EB RESURFACING MP223 to Georgetown $20,621,375.00 $26,693,536.00
Colorado 0703514 I-70 FLOYD HILL PACKAGE 1 EAST SECTION $4,363,071.00 $79,420,622.00
Colorado 0703515 I-70 FLOYD HILL PACKAGE 2 West SECTION $21,862,345.00 $120,477,126.00
Colorado 0704241 CENTRAL 70 $50,000,000.00 $923,002,637.58
Colorado 0704251 I70 AND PICADILLY INTERCHANGE $25,000,000.00 $92,000,002.00
Colorado 0705089 I-70 Pkg:Bethune E and W & Burlington WB $26,168,848.00 $50,900,072.00
Colorado 070A039 I-70 RESURF & EB I-70 ATM 252 to 262 $745,000.00 $45,425,648.00
Colorado 0762060 I-76 Corridor Improvements $1,222,803.00 $27,454,669.00
Colorado 0852106 US-85 Louviers To MP 191.75 $22,571,896.00 $28,351,911.00
Colorado 0852118 US-85 HIGHLANDS RANCH PKWY TO DAD CLARK $26,773,000.00 $92,621,688.50
Colorado 0853107 Peckham Grade Separated Intersection $40,287,680.00 $44,868,383.00
Colorado 1151038 SH115 PAVEMENT RECONSTRUCTION MP 27 to M $10,631,855.00 $54,081,855.00
Colorado 1211086 WADS BLVD WIDENING:35TH AVE TO 48TH AVE $42,200,000.00 $62,676,168.00
Colorado 1602165 US 160 PAGOSA RECONSTRUCT $30,351,784.50
Colorado 4701124 C-470 TOLLED EXPRESS LANES SEGMENT 1 $21,974,944.00 $306,792,044.00
Colorado 5501029 US 550/160 CONNECTION SOUTH DESIGN-BUILD $43,210,157.50 $116,955,715.50
Colorado 5502097 US 550 Otter Road to R3/R5 Line $13,277,632.00 $25,423,437.00
Colorado C100038 ILIFF AVE OP IMP:PARKER RD-QUEBEC ST- Ar $18,077,250.00 $27,668,212.10
Colorado GBLD001 BUILD Vehicle Tech, Safety & Mobility $20,009,700.00 $38,193,408.00
Colorado GBLD002 BUILD: North Interstate 25 Phase 2 $37,700,570.07 $298,392,546.07
Colorado GBLD003 BUILD MAMS Improvement Project $72,558,512.77 $203,561,494.47
Colorado GBLD004 RAISE GRANT MOVE W3 PARENT $7,020,843.00 $41,712,409.00
Colorado GBLD005 RAISE CO 119 Corridor Improvements $29,171,347.00 $93,857,900.82
Colorado M320144 BROADWAY STATION&I25 SAFETY-CMGC PKG 2 $919,369.00 $51,492,072.00
Colorado M420001 US 285 at Hwy 9C Improvements $12,917,902.00 $26,196,217.32
Colorado R200266 R2B2 (REGION 2 BRIDGE BUNDLE) (GRANT) $12,475,000.00 $55,152,166.44
Colorado SW01498 HPTE US 36 Phase II to Foothills Blvd $14,403,946.00 $137,152,364.64