RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Colorado | 0131057 | Garfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,737,757.00 | $2,965,871.00 |
Colorado | 0131057 | Garfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $590,995.00 | $33,777,045.00 |
Colorado | 021A008 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $5,875,798.00 | $50,455,000.00 |
Colorado | 021A008 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,187,368.02 | |
Colorado | 021A008 | El Paso | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,093,219.98 | |
Colorado | 021A008 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,133,440.00 | |
Colorado | 021A008 | El Paso | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,066,560.00 | |
Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Resurfacing | $2,545,000.00 | $2,545,000.00 |
Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,916,749.95 | $7,916,700.71 |
Colorado | 0251357 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,981,796.55 | $17,682,330.29 |
Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $5,000.00 | $5,001.00 |
Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $30,570.75 | $32,876.27 |
Colorado | 0251357 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $68,281.25 | $73,430.73 |
Colorado | 0252457 | Denver | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $3,575,986.25 | |
Colorado | 0252457 | Denver | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Bridge Replacement - Added Capacity | $500,000.00 | $500,000.00 |
Colorado | 0252457 | Denver | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $22,240,000.00 | $26,924,802.75 |
Colorado | 0252457 | Denver | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,760,000.00 | $2,200,000.00 |
Colorado | 0252457 | Denver | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $11,303.00 | $27,745.00 |
Colorado | 0252475 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $0.88 | $63,712,004.03 |
Colorado | 0252475 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $0.12 | $9,244,561.97 |
Colorado | 0252476 | Douglas | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $42,840,491.66 | $82,385,560.89 |
Colorado | 0252476 | El Paso | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $22,159,508.34 | $42,614,439.11 |
Colorado | 0252476 | El Paso | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $3,579,612.88 | $8,453,798.56 |
Colorado | 0252476 | Douglas | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $6,920,387.12 | $16,343,543.44 |
Colorado | 0252477 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,916,651.00 | $152,957,475.00 |
Colorado | 0252477 | Douglas | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $650,000.00 | $33,045,249.00 |
Colorado | 0252484 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $1,462,109.00 | $36,406,387.00 |
Colorado | 0252484 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $28,336,368.00 | |
Colorado | 0252504 | Douglas | >= 200,000 | State | WILDLIFE CROSSING PRGM IIJA | Safety | $22,000,000.00 | $30,750,000.00 |
Colorado | 0252518 | Douglas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $74,696,583.00 | |
Colorado | 0253255 | Larimer | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | 4R - Added Capacity | $150,000.00 | $187,500.00 |
Colorado | 0253255 | Larimer | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $5,425,988.00 | $339,938,612.44 |
Colorado | 0253255 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $137,465,948.45 | $171,832,435.56 |
Colorado | 0253255 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,567,601.00 | $5,843,207.00 |
Colorado | 0253255 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $21,970,000.00 | $49,472,775.00 |
Colorado | 0253300 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.18 | $6,646,958.44 |
Colorado | 0253300 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.82 | $29,545,584.56 |
Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $34,590,505.43 | |
Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $333,742.00 | $34,973,972.40 |
Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,440,279.57 | |
Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,719,678.00 | $11,000,000.00 |
Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $9,319,153.60 | |
Colorado | 0702383 | Summit | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $928,000.00 | $1,017,432.30 |
Colorado | 0702383 | Summit | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $8,742,568.00 | $26,455,910.58 |
Colorado | 0702383 | Summit | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | New Construction Roadway | $3,500,000.00 | $3,837,298.54 |
Colorado | 0702413 | Eagle | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $15,556,813.99 | $26,178,463.27 |
Colorado | 0702413 | Summit | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $2,078,407.01 | $3,497,470.73 |
Colorado | 0702413 | Summit | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | $27,224.61 | $45,374.35 |
Colorado | 0702413 | Eagle | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | $203,775.39 | $339,625.65 |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $125,000.00 | |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $18,694,246.22 | $20,771,384.70 |
Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $4,855,357.78 | $5,394,841.97 |
Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $2,343,703.09 | $2,604,114.54 |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $9,023,796.91 | $10,026,441.02 |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $3,880,180.28 | $3,880,181.07 |
Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $1,007,778.72 | $1,007,778.93 |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $17,998,776.81 | $29,997,961.34 |
Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $4,674,727.19 | $7,791,211.99 |
Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $802,460.25 | |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,089,656.84 | |
Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $1,323,620.42 | $4,164,128.07 |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $5,096,243.58 | $16,032,852.52 |
Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $2,803,990.50 | $9,374,375.42 |
Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $10,796,009.50 | $36,093,505.34 |
Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $23,103,837.00 | $89,304,966.22 |
Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $359,415.00 | $1,057,102.94 |
Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,829,625.00 | $6,142,459.05 |
Colorado | 0703496 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,545,288.51 | $7,931,809.03 |
Colorado | 0703496 | Denver | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,827,640.49 | $19,646,889.97 |
Colorado | 0703505 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $20,449,444.00 | $26,505,539.00 |
Colorado | 0703505 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $171,931.00 | $187,997.00 |
Colorado | 0703514 | Jefferson | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $825,457.46 | $15,025,734.13 |
Colorado | 0703514 | Clear Creek | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $3,537,613.54 | $64,394,887.87 |
Colorado | 0703515 | Clear Creek | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,707,000.00 | $2,967,876.33 |
Colorado | 0703515 | Clear Creek | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $19,155,345.00 | $117,509,249.67 |
Colorado | 0704241 | Denver | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $35,796,730.51 | $660,809,533.65 |
Colorado | 0704241 | Adams | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $14,203,269.49 | $262,193,103.93 |
Colorado | 0704251 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $16,322,451.70 | $60,066,622.24 |
Colorado | 0704251 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $8,677,548.30 | $31,933,377.76 |
Colorado | 0704251 | Adams | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.65 | |
Colorado | 0704251 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.35 | |
Colorado | 0704251 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $0.35 | |
Colorado | 0704251 | Adams | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $0.65 | |
Colorado | 0705089 | Kit Carson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $25,886,872.00 | $50,609,259.00 |
Colorado | 0705089 | Kit Carson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $281,976.00 | $290,813.00 |
Colorado | 070A039 | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $695,000.00 | $10,102,489.36 |
Colorado | 070A039 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $35,273,158.64 | |
Colorado | 070A039 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $50,000.00 | $50,000.00 |
Colorado | 0762060 | Logan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $592,645.00 | $26,812,645.00 |
Colorado | 0762060 | Logan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $630,158.00 | $642,024.00 |
Colorado | 0852106 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,471,896.00 | $19,895,997.10 |
Colorado | 0852106 | Douglas | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $6,100,000.00 | $8,455,913.90 |
Colorado | 0852118 | Arapahoe | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $757,123.37 | $946,404.22 |
Colorado | 0852118 | Douglas | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $2,828,876.63 | $3,536,095.78 |
Colorado | 0852118 | Douglas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $394,433.44 | $394,433.44 |
Colorado | 0852118 | Arapahoe | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $105,566.56 | $105,566.56 |
Colorado | 0852118 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,882,664.69 | |
Colorado | 0852118 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $44,397,773.81 | |
Colorado | 0852118 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,687,000.00 | $28,358,750.00 |
Colorado | 0852118 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,366,600.63 | |
Colorado | 0852118 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $633,399.37 | |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,683,836.00 | $5,107,592.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $21,229,869.00 | $21,229,869.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $1,963,334.00 | $1,963,334.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Rail/Hwy Crossing | $667,134.00 | $667,134.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Right of Way | $255,762.00 | $264,909.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $16,770.00 | $232,980.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $90,499.00 | $90,499.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $295,948.00 | $496,835.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $11,506,015.00 | $12,236,718.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Right of Way | $349,578.00 | $349,578.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Utilities | $2,228,935.00 | $2,228,935.00 |
Colorado | 1151038 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $1,749,980.00 | $9,672,480.00 |
Colorado | 1151038 | El Paso | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $5,685,362.00 | $28,426,810.00 |
Colorado | 1151038 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,196,513.00 | $15,982,565.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,759,824.00 | $2,199,780.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $3,520,176.00 | $4,400,220.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $3,360,000.00 | $3,360,000.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $1,333,200.00 | $1,666,500.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $2,666,800.00 | $3,333,500.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,342,790.00 | $25,588,487.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $1,142,145.00 | $1,427,681.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,560,000.00 | $5,700,000.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $8,515,065.00 | $15,000,000.00 |
Colorado | 1602165 | Archuleta | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $29,530,100.28 | |
Colorado | 1602165 | Archuleta | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $543,543.91 | |
Colorado | 1602165 | Archuleta | >= 5,000 AND < 50,000 | State | TRANSPORTATION ALTERNATIVES | Other | $278,140.31 | |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $334,017.91 | $417,522.39 |
Colorado | 4701124 | Douglas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $4,409,220.02 | $5,511,525.02 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,556,762.07 | $1,945,952.59 |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $534,848.73 | $668,560.91 |
Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,060,297.14 | $8,825,371.43 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,492,777.13 | $3,115,971.41 |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $289,481.44 | $15,138,225.30 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,349,190.34 | $70,554,943.01 |
Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,821,314.22 | $199,832,891.94 |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,735.23 | $41,411.86 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $31,390.99 | $193,008.84 |
Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $88,908.78 | $546,659.30 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $274,000.00 | $342,500.00 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $60,973.00 | $76,216.25 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,184,783.00 | $3,184,783.00 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $10,644,616.00 | $13,305,770.01 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Maintenance Relocation | $12,312,886.50 | $20,521,477.50 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $4,851,290.00 | $6,064,112.50 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,039,027.00 | $59,635,801.24 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $249,000.00 | $311,250.00 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $738,198.00 | $1,194,575.00 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $9,855,384.00 | $12,319,230.00 |
Colorado | 5502097 | Montrose | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $9,307,848.15 | $9,307,848.15 |
Colorado | 5502097 | Ouray | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $262,851.85 | $262,851.85 |
Colorado | 5502097 | Ouray | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $12,163.27 | $13,437.61 |
Colorado | 5502097 | Montrose | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $430,713.73 | $475,839.39 |
Colorado | 5502097 | Montrose | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $3,174,410.26 | $14,941,514.49 |
Colorado | 5502097 | Ouray | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $89,644.74 | $421,945.51 |
Colorado | C100038 | Denver | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - No Added Capacity | $14,045,882.00 | $22,807,740.66 |
Colorado | C100038 | Denver | >= 200,000 | Local | CONGESTION AIR QUALITY | Preliminary Engineering | $1,704,454.00 | $2,130,567.00 |
Colorado | C100038 | Denver | >= 200,000 | Local | CONGESTION AIR QUALITY | Right of Way | $1,040,000.00 | $1,300,000.00 |
Colorado | C100038 | Denver | >= 200,000 | Local | HIGH RISK RURAL ROAD | Safety | $702,760.00 | $780,844.44 |
Colorado | C100038 | Denver | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $584,154.00 | $649,060.00 |
Colorado | GBLD001 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $164,965.15 | $164,965.16 |
Colorado | GBLD001 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $531,866.57 | $531,866.61 |
Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $102,605.95 | $102,605.95 |
Colorado | GBLD001 | Denver | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $575,331.71 | $575,331.76 |
Colorado | GBLD001 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,790,530.42 | $1,790,530.59 |
Colorado | GBLD001 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,480,681.54 | $1,480,681.65 |
Colorado | GBLD001 | Douglas | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,208,689.44 | $1,208,689.55 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,137,499.79 | $1,137,499.92 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,492,295.12 | $1,492,295.25 |
Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,812,043.48 | $1,812,043.64 |
Colorado | GBLD001 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,103,227.83 | $1,103,227.92 |
Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,367,053.50 | $1,367,367.12 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $858,159.87 | $858,356.75 |
Colorado | GBLD001 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,350,823.51 | $1,351,133.39 |
Colorado | GBLD001 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,117,065.32 | $1,117,321.58 |
Colorado | GBLD001 | Douglas | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $911,867.29 | $912,076.49 |
Colorado | GBLD001 | Denver | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $434,045.45 | $434,145.03 |
Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $77,408.65 | $77,426.40 |
Colorado | GBLD001 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $124,454.07 | $124,482.62 |
Colorado | GBLD001 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $401,254.20 | $401,346.26 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,125,826.90 | $1,126,085.18 |
Colorado | GBLD001 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $832,304.24 | $832,495.18 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.22 | $1,769,630.92 |
Colorado | GBLD001 | Logan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.25 | $1,411,467.48 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.78 | $6,357,299.08 |
Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.77 | $3,849,256.27 |
Colorado | GBLD001 | Washington | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.18 | $984,434.85 |
Colorado | GBLD001 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.80 | $3,267,772.40 |
Colorado | GBLD001 | Washington | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.18 | $91,819.10 |
Colorado | GBLD001 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.80 | $6,027.80 |
Colorado | GBLD001 | Logan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.25 | $131,648.80 |
Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.77 | $285,709.30 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $7,583.92 | $28,448.90 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,111.08 | $7,919.10 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Other | $309.49 | $34,817.21 |
Colorado | GBLD002 | Weld | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Other | $1,690.51 | $190,182.79 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Preliminary Engineering | $22,901.98 | $5,674,169.28 |
Colorado | GBLD002 | Weld | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Preliminary Engineering | $125,098.02 | $30,994,141.62 |
Colorado | GBLD002 | Weld | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $102,618.77 | $6,584,034.04 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $973,293.23 | $5,535,628.22 |
Colorado | GBLD002 | Weld | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $5,517,092.46 | $5,517,092.46 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $982,907.54 | $982,907.54 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,753,471.86 | $21,435,499.92 |
Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,802,727.14 | $45,696,668.17 |
Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $960,179.53 | $36,271,171.30 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $274,460.47 | $10,367,855.70 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $50,275.88 | $550,831.94 |
Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $282,200.19 | $3,091,837.87 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $5,156,740.59 | $23,439,729.95 |
Colorado | GBLD002 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $14,843,259.41 | $67,469,360.96 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $123,955.82 | $135,901.57 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $727,387.18 | $797,486.22 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,999,996.00 | $9,151,128.21 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1.00 | $2,515,792.00 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1.00 | $1.10 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1.00 | $16,505,000.00 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1.00 | $5,451,308.00 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,609,000.00 | $1,787,777.78 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $41,600,720.00 | $76,897,000.45 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1.00 | $24,527,474.75 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1.00 | $200,536.78 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $257,264.00 | $310,742.85 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $8,074,845.00 | $10,093,556.25 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety | $4,900,857.00 | $6,242,021.78 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Safety | $5,374,298.00 | $6,946,006.76 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1.00 | $3,824,193.00 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,926,961.77 | $64,763,378.94 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $1,084,027.33 | $1,309,369.89 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $5,730,536.67 | $6,659,435.24 |
Colorado | GBLD004 | Mesa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1.00 | $1,500,000.00 |
Colorado | GBLD004 | Garfield | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $6,020,468.00 | $7,525,585.00 |
Colorado | GBLD004 | Mesa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $374.00 | $26,365,368.00 |
Colorado | GBLD004 | Garfield | >= 50,000 AND < 200,000 | Local | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $1,000,000.00 | $6,321,456.00 |
Colorado | GBLD005 | Boulder | >= 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $4,913,496.00 | $17,517,522.65 |
Colorado | GBLD005 | Boulder | >= 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $8,577,243.00 | $10,360,240.37 |
Colorado | GBLD005 | Boulder | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $10,000,000.00 | $59,118,671.44 |
Colorado | GBLD005 | Boulder | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $4,001,391.00 | $4,833,181.54 |
Colorado | GBLD005 | Boulder | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $1,679,217.00 | $2,028,284.82 |
Colorado | M320144 | Denver | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $919,369.00 | $27,802,889.50 |
Colorado | M320144 | Denver | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $23,689,182.50 | |
Colorado | M420001 | Park | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,567,902.00 | $24,226,906.00 |
Colorado | M420001 | Park | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $350,000.00 | $1,969,311.32 |
Colorado | R200266 | Otero | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $7,412,795.60 | $36,919,713.60 |
Colorado | R200266 | Park | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $3,176,912.40 | $15,822,734.40 |
Colorado | R200266 | Park | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $1,098,395.69 | $1,403,933.37 |
Colorado | R200266 | Otero | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $228,746.68 | $292,376.50 |
Colorado | R200266 | Las Animas | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $242,576.32 | $310,053.11 |
Colorado | R200266 | Fremont | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $237,388.52 | $303,422.23 |
Colorado | R200266 | Chaffee | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $5,432.67 | $6,943.86 |
Colorado | R200266 | Teller | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $72,752.12 | $92,989.37 |
Colorado | SW01498 | Boulder | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $2,425,686.65 | $112,152,069.43 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $217,525.35 | $10,057,324.71 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Utilities | $584,200.72 | $750,170.85 |
Colorado | SW01498 | Boulder | >= 200,000 | State | CONGESTION AIR QUALITY | Utilities | $6,514,587.28 | $8,365,367.15 |
Colorado | SW01498 | Boulder | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $42,687.93 | $53,359.91 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $3,828.07 | $4,785.09 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,990.00 | $37,487.50 |
Colorado | SW01498 | Boulder | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $334,427.00 | $418,033.75 |
Colorado | SW01498 | Boulder | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,251,013.00 | $5,313,766.25 |