RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Connecticut | 0008130 | SHELTON/DERBY; REHABILITATION OF BRIDGE #00571A, (COMMODORE HULL) ROUTE 8 OVER THE HOUSATONIC RIVER, ROUTE 110 & LOCAL ROADS. (CN) | $28,521,949.60 | $35,652,437.00 |
Connecticut | 0008134 | WATERBURY; REHABILITATION OF BRIDGES (NO ADDED CAPACITY) IN THE ROUTE 8/I-84 INTERCHANGE AREA (CN). | $142,744,060.80 | $178,430,076.02 |
Connecticut | 0008141 | D-B RBC PROJECT - RESURFACING, BRIDGE REHABILITATION, & SAFETY IMPROVEMENTS ON APPROX. 6.43 MILES OF MAINLINE (CN). | $86,821,739.20 | $134,339,762.03 |
Connecticut | 000T285 | Middletown; Reconfiguration of Route 17 On-Ramp onto Route 9 North. | $54,902,076.80 | $73,670,220.01 |
Connecticut | 000T323 | Bridge Painting/Metalizing along the I-395 Corridor in District 2. | $28,749,204.80 | $35,936,506.00 |
Connecticut | 000T328 | DISTRICT 1; Address Steel Beam end deterioration on various Bridges using Ultra High Performance Concrete (UHPC). | $23,564,119.20 | $29,455,149.00 |
Connecticut | 000T347 | Statewide; Job Order Contracting (JOC) Program through 12/31/2025 for installation of pavement markings | $20,000,000.00 | $30,000,000.00 |
Connecticut | 000T392 | Meriden; I-91/I-691/Route 15 Interchange - Improvements to I-91 Northbound, I-691 Westbound, and Route 15 Northbound. | $88,939,437.29 | $249,339,580.02 |
Connecticut | 0015105 | NEW CANAAN/NORWALK - MERRITT PARKWAY (RTE 15) IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS (CN). | $57,845,107.20 | $72,606,384.02 |
Connecticut | 0015134 | WESTPORT - SAFETY IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS ON THE MERRITT PKWY (CT15) IN THE TOWNS OF WESTPORT & FAIRFIELD (CN). | $67,536,664.21 | $84,425,513.02 |
Connecticut | 0015145 | NORWALK - MERRITT PARKWAY (ROUTE 15) RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS (CN) | $41,150,830.40 | $51,692,306.01 |
Connecticut | 0032203 | EAST HARTFORD - RESURFACING, BRIDGE & SAFETY IMPROVEMENTS ON RTE 2 FROM THE CHARTER OAK BRIDGE AREA (CN) | $68,814,621.60 | $86,018,277.00 |
Connecticut | 0032215 | Colchester - RBC Project to address approx. 4.5 miles of Route 2 to Rehabilitate Pavement & Upgrade 4.5 miles of Route 2 | $10,000,000.00 | $66,010,700.01 |
Connecticut | 0034122 | NEWTOWN - MAJOR INTERSECTION IMPROVEMENTS, CT 34 at I-84 (CN). | $26,173,295.20 | $32,716,620.00 |
Connecticut | 0044139 | HARTFORD - SAFETY IMPROVEMENTS, HOMESTEAD AVE TO GARDEN STREET, RT44 (CN). | $25,324,994.40 | $33,341,485.25 |
Connecticut | 0044160 | Norfolk - Replace 3 Retaining Walls adjacent to Rte. 44 (CN). | $18,086,000.00 | $50,512,939.00 |
Connecticut | 0066121 | MIDDLETOWN, REHABILITATION OF BRIDGE #00524 (ARRIGONI) WHICH CARRIES ROUTE 66 OVER THE CONNECTICUT RIVER (CN). | $31,345,909.60 | $57,508,431.00 |
Connecticut | 0072016 | Rehabilitate four Bridges carrying Route 72 in New Britain and Plainville. | $13,000,000.00 | $43,131,250.00 |
Connecticut | 0082141 | EAST HADDAM - REHABILITATION OF BRIDGE #01138, ROUTE 82 OVER CONNECTICUT RIVER (CN) | $62,730,358.40 | $84,203,448.01 |
Connecticut | 0130008 | Bridgeport; Rehabilitation of Bridge # 02475, Route 130 over Pequonnock River. | $12,969,024.00 | $32,422,560.00 |
Connecticut | 0842306 | WATERBURY; REHABILITATION OF BR. 03191B CARRYING I-84 WB OVER RTE. 8 AND THE NAUGATUCK RIVER. (CN) | $53,393,482.80 | $59,326,096.02 |
Connecticut | 0842307 | WATERBURY; REHABILITATION OF BR. 03191A CARRYING I-84 EB OVER I-84 WB, RTE. 8, AND THE NAUGATUCK RIVER. (CN) | $58,973,687.10 | $65,526,320.00 |
Connecticut | 0842310 | NEWTOWN; RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS ON I-84. | $37,648,821.60 | $41,832,024.04 |
Connecticut | 0842328 | Pavement Rehabilitation of approximately 7.7 miles of I-84 in Southbury and Middlebury. | $26,926,046.00 | $45,562,503.01 |
Connecticut | 0843236 | HARTFORD; REHABILITATION OF BR #03160A-D, BR #03301, AND BR #03303 (I - 84 HARTFORD VIADUCT). (CN) | $55,622,232.26 | $61,961,168.46 |
Connecticut | 0912136 | WETHERSFIELD/HARTFORD; I-91 IMPROVEMENTS AND UPGRADES. | $60,061,328.70 | $66,653,143.75 |
Connecticut | 0913182 | Windsor Locks; Rehabilitation of Bridge #00454, I-91 over CT River, Amtrak and Rte. 159 (Dexter Coffin Bridge). | $29,741,924.70 | $33,046,583.06 |
Connecticut | 0913183 | Hartford - Rehab of Bridge No. 01469B (Dutch Point Viaduct) carrying Interstate-91 SB over the CT Southern Railroad, SR 598 WB and TR 803. | $37,876,305.29 | $87,097,964.02 |
Connecticut | 0913186 | Pavement Resurfacing on I-91 NB from approx. MP 50.93 to 58.17 and I-91 SB from approx. MP 50.90 to 58.17 in East Windsor/Enfield. | $6,500,000.00 | $49,024,580.01 |
Connecticut | 0951181 | NEW HAVEN; I-95/Q BR.RPL(NO ADDED CAPACITY) & DEMOLITION (CONTRACT B) FR. VIC EAST ST TO VIC. WOODWARD AVE, E. SHORE (CN). | $421,279,298.84 | $485,009,923.09 |
Connecticut | 0951191 | NORWALK/WESTPORT; I-95 RECONSTRUCT THE MEDIAN AND INSTALL 45" CONCRETE BARRIER CURB IN NORWALK & WESTPORT | $83,630,330.10 | $136,962,343.00 |
Connecticut | 0951204 | NEW HAVEN; ADVANCE SOIL PRELOAD CONTRACT FOR S. P. #92-531 - I-91/I-95/CT RTE. 34 INTERCHANGE (CONTRACT E1)(CN) | $25,882,832.80 | $32,400,274.00 |
Connecticut | 0951222 | NEW HAVEN; I-95 - NB APPROACH AND RIVER PIERS FOR NEW PEARL HARBOR MEMORIAL BR., CONTRACT B1 (CN) | $135,771,245.61 | $156,113,746.00 |
Connecticut | 0951243 | NEW HAVEN; BREAKOUT OF PROJ 92-531. RECONST OF I-95 / I-91 / ROUTE 34 INTERCHANGE ASSOC WITH Q BR. REPL. CONTRACT E-2 (CN) | $98,935,740.54 | $113,777,781.00 |
Connecticut | 0951372 | NORWALK; REHAB OF BRIDGE #00059 (YANKEE DOODLE BRIDGE), I-95 OVER NORWALK RIVER AND HENDRICKS RD. (CN) | $37,725,651.00 | $42,492,456.01 |
Connecticut | 0951377 | STRATFORD; PROVIDE A FULL INTERCHANGE ON I-95 AT INTERCHANGE 33 BY CONSTRUCTING A NEW SB OFF-RAMP AND A NEW NB ON-RAMP. | $35,645,277.60 | $39,605,864.02 |
Connecticut | 0951378 | STAMFORD; REHABILITATION OF BRIDGE NO. 00032 CARRYING I-95 AND I-95 RAMPS OVER MNRR AND LOCAL ROADS. (CN) | $24,054,682.50 | $26,727,425.03 |
Connecticut | 0951384 | West Haven; Replace Bridge Nos. 161 & 162 carrying I-95 over SR 745 & Metro North RR, respectively. | $102,059,530.99 | $123,900,000.03 |
Connecticut | 0951385 | Stamford - This Design-Build project involves construction of an Auxiliary Lane on I-95 SB from Exit 7 to Exit 6 (CN). | $61,659,011.70 | $74,366,189.02 |
Connecticut | 0951386 | I-95 Pavement Preservation from NY State Line to Exit 6 in Stamford (CN). | $64,328,863.50 | $75,766,490.04 |
Connecticut | 0953073 | NEW LONDON/GROTON; PHASE 1A OF REHAB FOR BR #03819 NB (GOLD STAR MEMORIAL BRIDGE) CARRYING I-95 OVER THAMES RIVER & LOCAL ROADS. | $69,743,408.00 | |
Connecticut | 0953078 | East Lyme - Improvement of I-95 Interchange 74 at Rte 161 & Replacement of Bridge #00250 | $132,447,807.86 | $209,881,299.03 |
Connecticut | 0954110 | Groton, Stonington, and North Stonington; Safety Improvements and Pavement Rehabilitation on I-95 Southbound. | $43,655,859.90 | $52,199,320.02 |
Connecticut | 0954118 | Safety Improvements and Pavement Rehabilitation on I-95 NB in Groton, Stonington & North Stonington | $41,311,332.00 | $46,766,106.00 |
Connecticut | 1063143 | HARTFORD; INTERCHANGE 29 @ I-91N & RTE 15N IMPROVEMENTS | $5,000,000.00 | $231,503,537.00 |
Connecticut | 1092122 | NEW HAVEN; REPLACEMENT OF BRIDGE #3748 STATE STREET OVER MILL RIVER (CN). | $26,922,110.32 | $33,652,640.90 |
Connecticut | 1092144 | NEW HAVEN; MAJOR REHABILITATION OF BRIDGE #03810 OVER QUINNIPIAC RIVER. | $4,916,605.11 | $27,929,200.00 |
Connecticut | 1096111 | NEWTOWN; REHABILITATION OF BRIDGES 01218 & 04180, I-84 EB & WB O/ HOUSATONIC RIVER. SUPERSTRUCTURE REPLACEMENTS. | $60,956,185.50 | $67,729,095.34 |
Connecticut | H100002 | DERBY; RECONSTRUCTION OF APPROXIMATELY 2,400 FEET OF ROUTE 34. | $20,872,040.33 | $33,473,236.04 |
Connecticut | H121002 | STAMFORD; REPLACEMENT OF DEFICIENT MNRR BRIDGE #08012R OVER ATLANTIC ST (CN). | $4,214,710.77 | $69,702,343.76 |