RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Connecticut | 0008130 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $28,521,949.60 | $35,652,437.00 |
Connecticut | 0008134 | New Haven | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $5,361,449.60 | $6,701,812.00 |
Connecticut | 0008134 | Fairfield | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $5,361,449.60 | $6,701,812.00 |
Connecticut | 0008134 | Fairfield | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $64,510,580.80 | $80,638,226.04 |
Connecticut | 0008134 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $64,510,580.80 | $80,638,225.98 |
Connecticut | 0008134 | Fairfield | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,500,000.00 | $1,875,000.00 |
Connecticut | 0008134 | New Haven | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,500,000.00 | $1,875,000.00 |
Connecticut | 0008141 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $86,821,739.20 | $134,339,762.03 |
Connecticut | 000T285 | Middlesex | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $54,902,076.80 | $73,670,220.01 |
Connecticut | 000T323 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $28,749,204.80 | $35,936,506.00 |
Connecticut | 000T328 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $23,564,119.20 | $29,455,149.00 |
Connecticut | 000T347 | Statewide | N/A | State | REDISTRIBUTION OF CERTAIN AUTH | Safety | $7,856,187.98 | $17,856,187.98 |
Connecticut | 000T347 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $12,143,812.02 | $12,143,812.02 |
Connecticut | 000T392 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $71,179,480.29 | $227,139,633.77 |
Connecticut | 000T392 | New Haven | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $17,759,957.00 | $22,199,946.25 |
Connecticut | 0015105 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $30,845,107.20 | $38,856,384.02 |
Connecticut | 0015105 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,000,000.00 | $6,250,000.00 |
Connecticut | 0015105 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $22,000,000.00 | $27,500,000.00 |
Connecticut | 0015134 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $62,536,664.21 | $78,175,513.01 |
Connecticut | 0015134 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,000,000.00 | $6,250,000.01 |
Connecticut | 0015145 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $41,150,830.40 | $51,692,306.01 |
Connecticut | 0032203 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $68,814,621.60 | $86,018,277.00 |
Connecticut | 0032215 | New London | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,688,018.54 | $61,870,723.18 |
Connecticut | 0032215 | New London | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,311,981.46 | $4,139,976.83 |
Connecticut | 0034122 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $11,476,455.59 | $14,345,569.49 |
Connecticut | 0034122 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,696,839.61 | $18,371,050.51 |
Connecticut | 0044139 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,979,009.60 | $16,659,003.00 |
Connecticut | 0044139 | Hartford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $13,345,984.80 | $16,682,482.25 |
Connecticut | 0044160 | Litchfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $14,886,000.00 | $18,607,500.00 |
Connecticut | 0044160 | Litchfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,200,000.00 | $31,905,439.00 |
Connecticut | 0066121 | Middlesex | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $31,116,099.60 | $57,278,621.00 |
Connecticut | 0066121 | Middlesex | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Bridge Rehabilitation - No Added Capacity | $229,810.00 | $229,810.00 |
Connecticut | 0072016 | Hartford | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $13,000,000.00 | $43,131,250.00 |
Connecticut | 0082141 | Middlesex | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $36,150,108.00 | $45,187,635.00 |
Connecticut | 0082141 | Middlesex | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $26,580,250.40 | $39,015,813.01 |
Connecticut | 0130008 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $12,969,024.00 | $32,422,560.00 |
Connecticut | 0842306 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $959,067.84 | $1,065,630.95 |
Connecticut | 0842306 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $664,827.36 | $738,698.00 |
Connecticut | 0842306 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $4,132,493.04 | $4,591,661.00 |
Connecticut | 0842306 | New Haven | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $680,284.49 | $755,871.66 |
Connecticut | 0842306 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $46,849,699.05 | $52,055,222.16 |
Connecticut | 0842306 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $107,111.02 | $119,012.25 |
Connecticut | 0842307 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $1,305,474.12 | $1,450,526.82 |
Connecticut | 0842307 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $264,715.13 | $294,127.93 |
Connecticut | 0842307 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $137,288.64 | $152,542.95 |
Connecticut | 0842307 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $57,049,927.83 | $63,388,809.65 |
Connecticut | 0842307 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $216,281.38 | $240,312.65 |
Connecticut | 0842310 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $911,520.00 | $1,012,800.00 |
Connecticut | 0842310 | Fairfield | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $7,600,417.43 | $8,444,908.28 |
Connecticut | 0842310 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $25,998,743.15 | $28,887,492.39 |
Connecticut | 0842310 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $120,863.74 | $134,293.05 |
Connecticut | 0842310 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,017,277.28 | $3,352,530.32 |
Connecticut | 0842328 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,926,046.00 | $45,562,503.01 |
Connecticut | 0843236 | Hartford | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $866,745.63 | $963,051.00 |
Connecticut | 0843236 | Hartford | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM (PLUS) | Bridge Rehabilitation - No Added Capacity | $89,002.93 | $98,892.15 |
Connecticut | 0843236 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $53,523,939.47 | $59,471,045.00 |
Connecticut | 0843236 | Hartford | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Rehabilitation - No Added Capacity | $456,150.98 | $570,188.73 |
Connecticut | 0843236 | Hartford | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Rehabilitation - No Added Capacity | $647,200.64 | $809,000.82 |
Connecticut | 0843236 | Fairfield | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Rehabilitation - No Added Capacity | $39,192.61 | $48,990.76 |
Connecticut | 0912136 | Hartford | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $5,305,427.00 | $5,894,918.90 |
Connecticut | 0912136 | Hartford | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $1,915,852.28 | $2,128,724.76 |
Connecticut | 0912136 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $30,042,315.72 | $33,380,351.50 |
Connecticut | 0912136 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $3,925,240.90 | $4,361,378.80 |
Connecticut | 0912136 | Hartford | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $735,000.00 | $735,000.00 |
Connecticut | 0912136 | Hartford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $18,137,492.80 | $20,152,769.79 |
Connecticut | 0913182 | Hartford | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $2,827,934.50 | $3,142,149.46 |
Connecticut | 0913182 | Hartford | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $171,059.71 | $190,066.35 |
Connecticut | 0913182 | Hartford | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $20,000,000.00 | $22,222,222.23 |
Connecticut | 0913182 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $6,701,583.75 | $7,446,204.19 |
Connecticut | 0913182 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $41,346.74 | $45,940.83 |
Connecticut | 0913183 | Hartford | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $373,964.91 | $415,516.57 |
Connecticut | 0913183 | Hartford | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $37,248,630.94 | $86,400,548.07 |
Connecticut | 0913183 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $253,709.44 | $281,899.38 |
Connecticut | 0913186 | Hartford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,500,000.00 | $49,024,580.01 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $246,103,765.86 | $282,877,893.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $58,793,422.02 | $67,578,646.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $2,175,000.00 | $2,500,000.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Replacement - No Added Capacity | $837,045.78 | $962,123.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $3,776,030.29 | $4,365,266.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | Bridge Replacement - No Added Capacity | $1,967,856.00 | $1,967,856.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | $10,438,840.80 | $13,048,553.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM | Bridge Replacement - No Added Capacity | $501,665.42 | $576,627.00 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $51,378,724.49 | $59,056,006.09 |
Connecticut | 0951181 | New Haven | >= 200,000 | State | TRANSPORTATION IMP PROJ | Bridge Replacement - No Added Capacity | $45,306,948.18 | $52,076,953.00 |
Connecticut | 0951191 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $29,507,824.15 | $32,786,472.24 |
Connecticut | 0951191 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $6,794.95 | $7,549.95 |
Connecticut | 0951191 | Fairfield | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Safety | $54,115,711.00 | $104,168,320.81 |
Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $3,631,684.08 | $4,539,606.00 |
Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Safety and Education for Peds/Bicyclists | $21,672.80 | $27,091.00 |
Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Utilities | $3,899,612.00 | $4,874,515.00 |
Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $8,417,983.12 | $10,522,481.00 |
Connecticut | 0951204 | New Haven | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $2,917,609.60 | $3,693,742.00 |
Connecticut | 0951204 | New Haven | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | $6,994,271.20 | $8,742,839.00 |
Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $85,681,945.48 | $98,539,836.00 |
Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $16,967,366.40 | $19,502,720.00 |
Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $106,453.20 | $122,360.00 |
Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $232,741.53 | $267,520.00 |
Connecticut | 0951222 | New Haven | >= 200,000 | N/A | INTERSTATE MAINT DISC | Bridge Replacement - No Added Capacity | $1,076,625.00 | $1,237,500.00 |
Connecticut | 0951222 | New Haven | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Bridge Replacement - No Added Capacity | $31,706,114.00 | $36,443,810.00 |
Connecticut | 0951243 | New Haven | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $85,688,461.08 | $98,551,023.00 |
Connecticut | 0951243 | New Haven | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $12,984,486.39 | $14,924,697.00 |
Connecticut | 0951243 | New Haven | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | $262,793.07 | $302,061.00 |
Connecticut | 0951372 | Fairfield | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $732,308.14 | $813,675.71 |
Connecticut | 0951372 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $36,993,342.86 | $41,678,780.30 |
Connecticut | 0951377 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $11,888,025.00 | $13,208,916.67 |
Connecticut | 0951377 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,024,612.40 | $7,805,124.90 |
Connecticut | 0951377 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $16,732,640.20 | $18,591,822.45 |
Connecticut | 0951378 | Fairfield | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $465,271.30 | $516,968.12 |
Connecticut | 0951378 | Fairfield | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $100,669.46 | $111,854.96 |
Connecticut | 0951378 | Fairfield | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $5,673.72 | $6,304.14 |
Connecticut | 0951378 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $23,483,068.02 | $26,092,297.81 |
Connecticut | 0951384 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $86,071,138.97 | $105,303,398.88 |
Connecticut | 0951384 | New Haven | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $5,988,392.02 | $7,485,490.03 |
Connecticut | 0951384 | New Haven | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $10,000,000.00 | $11,111,111.12 |
Connecticut | 0951385 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $46,459,011.70 | $57,477,300.11 |
Connecticut | 0951385 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $15,200,000.00 | $16,888,888.91 |
Connecticut | 0951386 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $37,761,471.52 | $46,247,165.61 |
Connecticut | 0951386 | Fairfield | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $17,411,723.00 | $19,346,358.89 |
Connecticut | 0951386 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $9,155,668.98 | $10,172,965.54 |
Connecticut | 0953073 | New London | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $69,743,408.00 | |
Connecticut | 0953078 | New London | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | $466,059.67 | $582,574.59 |
Connecticut | 0953078 | New London | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $1,600.00 | $2,000.00 |
Connecticut | 0953078 | New London | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - No Added Capacity | $1,288,256.13 | $1,610,320.17 |
Connecticut | 0953078 | New London | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $129,526,892.06 | $206,230,154.26 |
Connecticut | 0953078 | New London | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,165,000.00 | $1,456,250.01 |
Connecticut | 0954110 | New London | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,655,859.90 | $31,088,208.90 |
Connecticut | 0954110 | New London | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $19,000,000.00 | $21,111,111.12 |
Connecticut | 0954118 | New London | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $41,311,332.00 | $46,766,106.00 |
Connecticut | 1063143 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,000,000.00 | $231,503,537.00 |
Connecticut | 1092122 | New Haven | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $26,922,110.32 | $33,652,640.90 |
Connecticut | 1092144 | New Haven | >= 200,000 | Local | REPURPOSED SPECIAL | Bridge Rehabilitation - No Added Capacity | $3,616,605.11 | $4,520,756.39 |
Connecticut | 1092144 | New Haven | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,300,000.00 | $23,408,443.61 |
Connecticut | 1096111 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $46,517,436.00 | $51,686,040.33 |
Connecticut | 1096111 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $14,438,749.50 | $16,043,055.01 |
Connecticut | H100002 | New Haven | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $2,199,978.38 | $2,749,973.00 |
Connecticut | H100002 | New Haven | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $1,097,483.00 | $8,755,039.34 |
Connecticut | H100002 | New Haven | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $5,000,000.00 | $6,250,000.00 |
Connecticut | H100002 | New Haven | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,574,578.95 | $15,718,223.70 |
Connecticut | H121002 | Fairfield | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $3,969,710.77 | $4,962,139.23 |
Connecticut | H121002 | Fairfield | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - No Added Capacity | $245,000.00 | $64,740,204.53 |