RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Florida | 0041228 | I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB | $1,107,184,042.00 | $4,544,217,940.00 |
Florida | 0105152 | I-10 (SR 8) / SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVEMENTS;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $109,672,447.00 | $156,923,492.00 |
Florida | 0755096 | I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE;INTERCHANGE IMPROVEMENT;PRELIMINARY ENGINEER; DESIGN/BUILD | $55,589,401.00 | $66,043,305.00 |
Florida | 0757443 | I-75 AT SR 64; INTERCHANGE IMPROVEMENT;CONSTRUCTION | $44,493,401.00 | $51,100,239.00 |
Florida | 0951671 | SR-9/I-95 FR S. OF SR-842/BROWARD BLVD TO N. OF SR-870/COMMERCIAL BLVD; ADD SPECIAL USE LANE;CONSTRUCTION;DB | $78,876,448.00 | $203,052,820.00 |
Florida | 0951685 | SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER;DB | $36,347,079.00 | $42,217,872.00 |
Florida | 0951695 | SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $33,829,135.00 | $53,186,820.00 |
Florida | 0953133 | I-95 INT @ ELLIS RD /ST JOHNS HERITAGE PKWY;INTERCHANGE (NEW);CONSTRUCTION | $46,211,315.00 | $52,201,689.00 |
Florida | 0955313 | I-95 (SR 9) AT NORTH I-295 INTERCHANGE ;INTERCHANGE RAMP (NEW);CONSTRUCTION;DB | $93,024,176.00 | $252,789,889.00 |
Florida | 0955314 | I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $4,771,071.00 | $163,525,088.00 |
Florida | 1002062 | SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION | $49,032,850.00 | $120,846,136.00 |
Florida | 1171052 | SR 77 FROM NORTH OF CR 279 TO N SUNNY HILLS ENTRANCE;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $59,345,513.00 | $89,128,840.00 |
Florida | 1316003 | GATEWAY EXPRESSWAY FM SR690 @ US19 & SR686 EXT @ CR611 TO W OF I-275;NEW ROAD CONSTRUCTION;PRELIMINARY ENGINEER;DB | $257,777,455.00 | $2,618,718,150.00 |
Florida | 1852019 | US 19 (SR 55) FROM W JUMP COURT TO W FORT ISLAND TRAIL;ADD LANES & RECONSTRUCT;CONSTRUCTION | $25,074,565.00 | $143,450,455.00 |
Florida | 2757410 | I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB | $139,499,915.00 | $242,203,681.00 |
Florida | 2955310 | I-295 (SR 9A) FROM BUCKMAN BRIDGE TO I-95 AUX-LANES;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB-E2S01 | $91,742,836.00 | $96,786,035.00 |
Florida | 2955314 | I-295 (SR 9A) FROM SR202 JTB BLVD TO SR 9B (MANAGED LANES);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $152,858,812.00 | $228,001,808.00 |
Florida | 3115028 | SR201 FROM S OF BALDWIN TO N OF BALDWIN (BYPASS);NEW ROAD CONSTRUCTION;CONSTRUCTION | $69,656,933.00 | $77,051,058.00 |
Florida | 3141036 | SR429/46(WEKIVA PKW) FROM W OF OLD MCDONALD RD TO E OF WEKIVA RIVER RD;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $30,502,118.00 | $292,692,595.00 |
Florida | 3141042 | SR429/46(WEKIVA PKWY)FROM E OF WEKIVA RIVER RD TO ORANGE BOULEVARD;NEW ROAD CONSTRUCTION;CONSTRUCTION | $58,150,187.00 | $246,074,007.00 |
Florida | 3951501 | SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE;BRIDGE-REPLACE AND ADD LANES;CONSTRUCTION;DB | $181,403,482.00 | $783,809,776.00 |
Florida | 4002027 | SR20 FROM SW 56TH AVENUE TO CR315 IN INTERLACHEN;ADD LANES & RECONSTRUCT; UTILITY WORK IN PREP FOR CONSTRUCTION. | $30,602,940.00 | $36,384,171.00 |
Florida | 4047203 | CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $23,501,179.00 | $29,668,494.00 |
Florida | 4221091 | SR 30 (US 98) PENSACOLA BAY BRIDGE NO. 480035;BRIDGE REPLACEMENT;CONSTRUCTION;DB | $25,948,763.00 | $507,399,783.00 |
Florida | 4222081 | SR 30 (US 98) FROM EMERALD BAY DRIVE TO TANG-O-MAR DRIVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $52,105,903.00 | $54,325,912.00 |
Florida | 4881064 | SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $58,986,735.00 | $81,465,943.00 |
Florida | 5951553 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $665,711,369.00 | $2,579,405,073.00 |
Florida | 5951556 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $80,952,434.00 | |
Florida | 5951557 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $124,950,849.00 | |
Florida | 5951560 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB - AVAILABILITY PAYMENTS & OPERATIONS UNDER CRRSSA | $160,390,282.00 | $160,390,282.00 |
Florida | 6268021 | SR 826 FROM FLAGLER ST TO NW 154 ST. & I-75 FROM SR 826 TO NW 170 ST.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $219,899,167.00 | $319,165,209.00 |
Florida | 7079006 | SR-713/KINGS HWY FR 800' S OF SR-70 TO N OF PICOS ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $11,860,318.00 | $38,582,015.00 |
Florida | 7810035 | SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $35,052,089.00 | $54,613,078.00 |
Florida | 8886496 | CR 4050 ORANGE AVE BR#794003 VETERANS MEMORIAL BRIDGE;BRIDGE REPLACEMENT;CONSTRUCTION;LAP | $44,196,413.00 | $50,237,643.00 |
Florida | 8886777 | W. MIDWAY RD/CR-712 FROM S. 25TH STREET/SR-615 TO SR-5/US-1;ADD LANES & RECONSTRUCT;CONSTRUCTION | $31,325,695.00 | $39,596,380.00 |
Florida | D117027 | I-75 FROM S OF N JONES LOOP TO N OF US 17 ;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,974,461.00 | $36,160,833.00 |
Florida | D117115 | I-75 AT SR 70 INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $90,187,644.00 | $119,960,356.00 |
Florida | D118021 | US 41 - VENICE BYPASS FROM CENTER RD TO GULF COAST BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $14,496,050.00 | $26,708,213.00 |
Florida | D118039 | US 41 (SR 45) FROM WINKLER AVENUE TO SR 82 ;RESURFACING;CONSTRUCTION | $6,944,064.00 | $31,419,938.00 |
Florida | D118043 | I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB | $83,066,864.00 | $92,424,566.00 |
Florida | D118127 | I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $152,347,839.00 | $174,884,422.00 |
Florida | D119037 | US 27 AT SR 60;INTERCHANGE - ADD LANES;CONSTRUCTION | $51,129,306.00 | $58,381,416.00 |
Florida | D119075 | SR 542 FROM BUCKEYE LOOP ROAD TO US 27;ADD LANES & RECONSTRUCT;CONSTRUCTION | $43,965,077.00 | $53,284,595.00 |
Florida | D120030 | I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $57,800,742.00 | $67,399,238.00 |
Florida | D120059 | I-4 (SR 400) AT CSX RAILROAD;BRIDGE REPLACEMENT;CONSTRUCTION | $16,101,146.00 | $38,913,687.00 |
Florida | D121032 | SR 70 FROM PEACE RIVER TO SE BAKER STREET;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION | $15,914,373.00 | $35,580,152.00 |
Florida | D122022 | BIG CARLOS BRIDGE REPLACEMENT ;BRIDGE REPLACEMENT;ADMINISTRATION;LAP | $1,135,804.00 | $48,150,000.00 |
Florida | D122025 | SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION | $20,199,775.00 | $26,774,296.00 |
Florida | D122060 | I-75 (SR 93) FROM BONITA BEACH RD TO ALICO RD;RESURFACING;CONSTRUCTION | $27,959,765.00 | |
Florida | D122068 | SR 70 FROM LORRAINE ROAD TO BOURNSIDE BLVD ;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $15,428,141.00 | $48,440,947.00 |
Florida | D123035 | SR 33 (LAKELAND HILLS BLVD) FROM PARKVIEW PLACE TO GRANADA ST;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION | $13,195,056.00 | $32,117,585.00 |
Florida | D123041 | SR 25 (US 27) FROM SHORELINE DR TO DAVIS & GAINES RD;RESURFACING;CONSTRUCTION | $4,687,071.00 | $25,709,859.00 |
Florida | D124033 | SR 82 FROM HENDRY COUNTY LINE TO GATOR SLOUGH LANE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $9,461,303.00 | $53,435,067.00 |
Florida | D124056 | I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION;INTERCHANGE - ADD LANES;CONSTRUCTION | $4,000,000.00 | $107,139,760.00 |
Florida | D217011 | FCX SOUTH OF US17 TO NORTH OF SR16; NEW ROAD CONSTRUCTION;CONSTRUCTION | $104,007,239.00 | $919,009,030.00 |
Florida | D217069 | SR200(US301) FROM: BRADFORD C/L TO: NORTH OF CR218;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION; CONCRETE PROJECT WITH STATE MATERIALS | $25,125,300.00 | $38,528,701.00 |
Florida | D217080 | SR15(US17) FROM: W. OF DUNNS CREEK TO: HORSE LANDING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $42,180,705.00 | $52,815,542.00 |
Florida | D217103 | I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION | $16,244,407.00 | $28,448,187.00 |
Florida | D217128 | I-10 FROM I-295 TO I-95;ADD MANAGED LANES;PRELIMINARY ENGINEER;DB | $174,463,773.00 | $276,211,572.00 |
Florida | D218017 | SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD);NEW ROAD CONSTRUCTION;CONSTRUCTION | $113,082,426.00 | $281,429,338.00 |
Florida | D218123 | SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $243,745,479.00 | $682,808,849.00 |
Florida | D218124 | SR23 FROM I-95 TO WEST OF CR16A ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $378,021,744.00 | |
Florida | D219120 | URBAN CORE RIVERFRONT REVITALIZATION & COMPLETE STREETS;MISCELLANEOUS CONSTRUCTION;PRELIMINARY ENGINEER;LAP | $12,636,580.00 | $51,182,261.00 |
Florida | D219130 | I-95(SR9) FROM SR207 TO INTL GOLF PARKWAY;RESURFACING;CONSTRUCTION | $18,954,216.00 | $27,678,187.00 |
Florida | D220122 | I-95(SR9) FROM SOUTH OF SR126(EMERSON ST) TO ATLANTIC BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $55,399,694.00 | $294,225,373.00 |
Florida | D221010 | SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE;RESURFACING;CONSTRUCTION | $28,283,246.00 | $39,488,899.00 |
Florida | D221018 | I-295(SR9A) @ US17 TO SOUTH OF WELLS ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION | $24,433,149.00 | $27,918,200.00 |
Florida | D221062 | SR115 FROM SOUTHSIDE BLVD TO MATHEWS BRIDGE;RESURFACING;CONSTRUCTION | $15,106,189.00 | $31,867,535.00 |
Florida | D222030 | I-95(SR9) @ SR115(US1)/ML KING/20TH STREET ;INTERCHANGE - ADD LANES;CONSTRUCTION | $53,044,203.00 | $91,877,521.00 |
Florida | D222084 | I-295(SR9A) FROM MORSE AVE TO US90 ;RESURFACING;CONSTRUCTION | $22,447,705.00 | $30,443,864.00 |
Florida | D223050 | I-10(SR8) FROM CHAFFEE ROAD TO I-295(SR9A) ;RESURFACING;CONSTRUCTION | $30,547,373.00 | |
Florida | D317016 | SR 30 (US 98) ELEVATED ROADWAY E TO W OF TYNDALL AFB ENTRANCE;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $26,039,727.00 | $44,184,232.00 |
Florida | D317035 | SR 388 WEST BAY PARKWAY FROM SR 79 TO E OF NWF BEACHES INTL AIRPORT;ADD LANES & RECONSTRUCT;CONSTRUCTION | $65,422,187.00 | $97,552,497.00 |
Florida | D318058 | SR 30 (US 98) GREGORY ST & BAYFRONT PKWY @ 17TH AVE INTERCHANGE;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION;DB | $19,120,520.00 | $29,671,630.00 |
Florida | D319003 | SR 390 ST ANDREWS FROM SR 368 23RD ST TO E OF CR 2312 BALDWIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $42,810,686.00 | $56,606,668.00 |
Florida | D319075 | SR 77 FROM BAY COUNTY LINE TO NORTH OF CR 279;ADD LANES & RECONSTRUCT;CONSTRUCTION | $30,326,175.00 | $54,806,147.00 |
Florida | D319079 | SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | $74,959,706.00 | $90,540,089.00 |
Florida | D319080 | SR 369 (US 319) FROM EAST IVAN ROAD TO NORTH OF SR 267;ADD LANES & RECONSTRUCT;CONSTRUCTION | $25,853,276.00 | $32,906,259.00 |
Florida | D320013 | SR 8 (I-10) INTERCHANGE WEST OF CRESTVIEW;INTERCHANGE (NEW);CONSTRUCTION SUPPORT;DB | $9,671,265.00 | $96,849,557.00 |
Florida | D320016 | SR 263 CAPITAL CIRCLE FROM CR 2203 SPRINGHILL RD TO SR 371 ORANGE AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $30,569,186.00 | $80,840,772.00 |
Florida | D320021 | SR 10 (US 90) OVER SIMPSON RIVER BRIDGE NO. 580056 & 580108;BRIDGE REPLACEMENT;CONSTRUCTION | $8,888,658.00 | $29,581,127.00 |
Florida | D320028 | SR 30A (US 98) PCB PARKWAY FROM WALTON COUNTY LINE TO HEATHER DRIVE;RESURFACING;CONSTRUCTION | $6,048,263.00 | $26,632,341.00 |
Florida | D322007 | SR 77 FROM NORTH OF ROGERS ROAD TO SOUTH OF CANE MILL ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $13,084,233.00 | $64,461,882.00 |
Florida | D322015 | SR 8 (I-10) @ SR 95 (US 29) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $278,335,231.00 | |
Florida | D322082 | SR 30A (US 98) PC BEACH PKWY FROM MANDY LANE TO EAST OF NAUTILUS ST;ADD LANES & RECONSTRUCT;CONSTRUCTION | $56,315,782.00 | |
Florida | D322083 | SR 30A (US98) PC BCH PKWY FROM E OF NAUTILUS ST TO E OF R JACKSON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $69,240,240.00 | |
Florida | D323043 | SR 30 (US 98B) GARDEN ST FROM N STREET TO SR 8A (I-110) RAMP;RESURFACING;CONSTRUCTION | $4,225,779.00 | $25,046,861.00 |
Florida | D323054 | SR 30 (US 98) OVER ST ANDREWS BAY ICWW BRIDGE NO. 460019;BRIDGE REPLACEMENT;CONSTRUCTION;DB | $49,476,698.00 | $387,845,857.00 |
Florida | D323055 | SR 8 (I-10) OVER SR 10 (US 90A) NINE MILE RD BR NO. 480061 & 480066;BRIDGE REPLACEMENT;CONSTRUCTION | $55,257,490.00 | $63,810,495.00 |
Florida | D324065 | SR 79 FROM SOUTH OF MILLERS FERRY RD TO MALLORY RD;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION | $27,835,338.00 | |
Florida | D417080 | SR-80 FROM W OF LION COUNTRY SAFARI RD TO FOREST HILL/CRESTWOOD BLVD.;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $33,595,658.00 | $47,199,656.00 |
Florida | D418011 | SR-9/I-95 @ SR-808/GLADES ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $27,803,763.00 | $29,877,946.00 |
Florida | D419098 | SR-9/I-95 @COPANS RD FR S OF NB EXIT RAMP TO N OF SB TO WB EXIT RAMP;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION | $28,513,945.00 | $30,537,818.00 |
Florida | D420011 | LOXAHATCHEE RD. FROM ARTHUR MARSHALL LOXAHATCHEE REFUGE TO SR-7/US-441;ROAD RECONSTRUCTION - 2 LANE;CONSTRUCTION | $21,126,353.00 | $39,467,384.00 |
Florida | D420092 | SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 ;BRIDGE REPLACEMENT;CONSTRUCTION | $13,209,014.00 | $135,739,127.00 |
Florida | D421056 | SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD;BRIDGE REPLACEMENT;CONSTRUCTION SUPPORT | $17,924,502.00 | $38,375,073.00 |
Florida | D421077 | SR-710/BEELINE HWY FROM NORTHLAKE BLVD TO SR-708/BLUE HERON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $16,270,819.00 | $205,981,055.00 |
Florida | D421085 | SR-25/US-27 FROM HENDRY/PALM BEACH COUNTYLINE TO SR-80;RESURFACING;CONSTRUCTION | $942,790.00 | $26,619,662.00 |
Florida | D422005 | SR-869/SW 10TH STREET CONNECTOR TSM&O SMART WORK ZONE;ITS COMMUNICATION SYSTEM;CONSTRUCTION;DB | $2,956,764.00 | $35,175,580.00 |
Florida | D422059 | SR-9/I-95 @ 6TH AVENUE SOUTH;INTERCHANGE - ADD LANES;CONSTRUCTION | $5,841,815.00 | $28,064,504.00 |
Florida | D422068 | SR-869/SW 10TH ST FROM FL TURNPIKE/SAWGRASS EXPRESSWAY TO W OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $338,291.00 | $64,728,942.00 |
Florida | D422077 | SR-9/I-95 FROM SOUTH OF SW 10TH STREET TO NORTH OF HILLSBORO BLVD.;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $904,879,455.00 | |
Florida | D422093 | SR-9/I-95 @ OSLO ROAD INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION | $3,596,314.00 | $37,639,137.00 |
Florida | D423002 | OSLO ROAD FROM SW 82ND AVE TO 58TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT | $3,125,743.00 | $49,825,777.00 |
Florida | D423057 | SR-93/I-75/ALLIGATOR ALLEY FR MP 31.261 TO BROWARD/COLLIER COUNTY LINE;RESURFACING;CONSTRUCTION | $5,108,447.00 | $33,257,543.00 |
Florida | D424062 | SR-9/I-95 @ SUNRISE BLVD. INTERCHANGE IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION | $53,652,421.00 | |
Florida | D517015 | SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400);NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $134,317,170.00 | $343,044,561.00 |
Florida | D519013 | SR 500 (US 441) FROM LAKE ELLA RD TO AVENIDA CENTRAL; ADD LANES & RECONSTRUCT; CONSTRUCTION | $46,635,677.00 | $53,356,207.00 |
Florida | D520035 | I-4 (SR 400) AT DARYL CARTER PARKWAY INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION | $66,459,691.00 | $88,288,966.00 |
Florida | D520075 | SR 93 (I-75) FROM SUMTER COUNTY TO SR 200; RESURFACING; CONSTRUCTION | $28,742,179.00 | $32,844,750.00 |
Florida | D520104 | SR 426/CR 419 FROM PINE AVENUE TO AVENUE B; ADD LANES & RECONSTRUCT; CONSTRUCTION | $9,182,965.00 | $26,064,377.00 |
Florida | D521023 | I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $208,441,338.00 | $239,058,390.00 |
Florida | D521049 | SR 464 FROM SR 500 (US 27/301) TO SR 35; RESURFACING; CONSTRUCTION | $19,525,428.00 | $29,515,709.00 |
Florida | D521092 | SPACE COMMERCE WAY;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $13,230,386.00 | $26,961,481.00 |
Florida | D522091 | NEPTUNE ROAD FROM SOUTH OF KINGS CREST RD TO SR 500 / US 192;WIDEN/RESURFACE EXIST LANES;CONSTRUCTION;LAP | $4,393,714.00 | $51,314,503.00 |
Florida | D523009 | I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S OF SR 200;REST AREA;CONSTRUCTION | $6,479,725.00 | $38,106,340.00 |
Florida | D523021 | I-95 INTERCHANGE AT PIONEER TRAIL; INTERCHANGE (NEW); CONSTRUCTION | $123,809,576.00 | |
Florida | D523040 | I-75(SR 93) AT NW 49TH ST FROM END OF NW 49TH ST TO END OF NW 35TH ST;INTERCHANGE (NEW);CONSTRUCTION | $6,011,868.00 | $109,620,666.00 |
Florida | D523042 | NEPTUNE RD FROM PARTIN SETTLEMENT RD TO S OF KINGS CREST ROAD;WIDEN/RESURFACE EXIST LANES;CONSTRUCTION;LAP | $1,320,585.00 | $25,906,667.00 |
Florida | D524037 | I-95 NB FROM SR514 (MALABAR RD) TO CONCRETE JOINT N OF SR519 (FISKE);RESURFACING;CONSTRUCTION | $115,274,344.00 | |
Florida | D619048 | SR 826/PALMETTO EXPY - SR 826 EASTBOUND RAMP TO SR 9A/I-95 NORTHBOUND;INTERCHANGE RAMP (NEW);CONSTRUCTION | $16,536,966.00 | $25,561,730.00 |
Florida | D620056 | SR 25/OKEECHOBEE RD FROM E. OF NW 107 AVE TO E. OF NW 116 WAY(CNCRETE);ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $62,378,658.00 | $126,132,477.00 |
Florida | D621008 | SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO WEST OF HEFT;ADD LANES & RECONSTRUCT;CONSTRUCTION | $52,475,966.00 | $54,477,059.00 |
Florida | D622032 | SR 25/OKEECHOBEE RD. & SR 826/PALMETTO EXPRESSWAY INTERCHANGE;INTERCHANGE RAMP (NEW);CONSTRUCTION | $32,029.00 | $157,230,185.00 |
Florida | D622074 | SR 7 AND SR 9/GOLDEN GLADES INTERCHANGE VARIOUS RAMP IMPROVEMENTS;INTERCHANGE RAMP (NEW);CONSTRUCTION | $47,023,931.00 | $47,397,066.00 |
Florida | D622075 | SR 826 CONNECTOR AT GOLDEN GLADES INTERCHG AND VARIOUS RAMPS;ADD LANES & RECONSTRUCT;CONSTRUCTION | $85,211,580.00 | $85,211,580.00 |
Florida | D624006 | SR 25/OKEECHOBEE RD FROM EAST OF NW 87 AVE TO NW 79 AVE (CONCRETE);ADD LANES & RECONSTRUCT;CONSTRUCTION | $997,705.00 | $75,071,552.00 |
Florida | D717065 | I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I);INTERCHANGE - ADD LANES;CONSTRUCTION | $42,211,254.00 | $49,395,195.00 |
Florida | D718036 | SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45);ADD LANES & RECONSTRUCT;CONSTRUCTION | $38,574,032.00 | $66,539,131.00 |
Florida | D718055 | I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $231,346,719.00 | $907,309,610.00 |
Florida | D718056 | I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $33,377,721.00 | $51,828,721.00 |
Florida | D718067 | SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $37,617,336.00 | $43,761,784.00 |
Florida | D719008 | SR 50 FROM US 98/MCKETHAN RD TO US 301;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $21,033,174.00 | $25,496,043.00 |
Florida | D720024 | US 301/SR 43 FROM N OF LAKE ST CHARLES BLVD TO N OF PROGRESS BLVD;RESURFACING;CONSTRUCTION;DB | $16,771,032.00 | $25,090,331.00 |
Florida | D720029 | US 41/SR 45 FROM N OF 15TH AVE TO S OF BULLFROG CREEK;RESURFACING;CONSTRUCTION | $23,624,618.00 | $31,896,490.00 |
Florida | D720031 | I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $97,221,716.00 | $106,494,639.00 |
Florida | D721012 | I-275 (SR 93) FROM N OF MLK TO N OF HILLSBOROUGH AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $40,440,438.00 | $52,635,832.00 |
Florida | D721013 | I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION | $52,542,135.00 | $64,998,210.00 |
Florida | D721023 | US 19 (SR 55) FROM N OF SR 580 (MAIN ST) TO NORTHSIDE DR;ADD LANES & RECONSTRUCT;CONSTRUCTION | $105,242,564.00 | $122,581,917.00 |
Florida | D721027 | I-4/SR 400 FROM DOWNTOWN TAMPA TO POLK COUNTY LINE;ITS COMMUNICATION SYSTEM;CONSTRUCTION | $11,677,500.00 | $27,024,993.00 |
Florida | D721035 | US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $131,119,112.00 | $151,267,476.00 |
Florida | D722039 | US 19/SR55/34TH ST FROM SR 682/54TH AVE S TO 22ND AVE N;RESURFACING;CONSTRUCTION | $14,345,490.00 | $28,571,554.00 |
Florida | D722064 | I-4/SR 400 FROM E OF MCINTOSH RD TO E OF COUNTY LINE RD;RESURFACING;CONSTRUCTION SUPPORT | $35,130,965.00 | $41,994,730.00 |
Florida | D723023 | I-75/SR 93A FROM S OF PROGRESS BLVD TO N OF WOODBERRY RD;RIGID PAVEMENT REHABILITATION;CONSTRUCTION | $26,515,255.00 | |
Florida | D723029 | I-75/SR 93A FROM N CSX R/R/BROADWAY AVE TO S OF SR 582/FOWLER AVE;RIGID PAVEMENT REHABILITATION;CONSTRUCTION | $32,362,225.00 | |
Florida | D723030 | I-75/SR 93A NB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $61,291,998.00 | |
Florida | D723031 | I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $57,308,105.00 | |
Florida | D723070 | I-4 TRUCK PARKING FACILITY; PARKING FACILITY; CONSTRUCTION; DB | $15,000,000.00 | $31,896,276.00 |
Florida | E221002 | HURRICANE IAN SANIBEL ISLAND ACCESS - EMERGENCY ROAD REPAIRS; EMERGENCY OPERATIONS; SANIBEL CSWY/SEXTANT - DB - IN12002E | $140,812,006.00 | $149,641,301.00 |
Florida | E221003 | HURRICANE IAN SANIBEL ISLAND ACCESS PERMANENT REPAIRS; EMERGENCY OPERATIONS; DB CONSTRUCTION - IN12004P | $72,837,975.00 | $189,617,992.00 |
Florida | E221006 | HURRICANE IAN PINE ISLAND ROADWAY PERMANENT REPAIRS; EMERGENCY OPERATIONS; PINE ISLAND BRIDGE APPROACH - IN12006P | $45,647,646.00 | $55,715,432.00 |
Florida | E221014 | HURRICANE IAN SANIBEL ISLAND ACCESS - PERMANENT REPAIRS;EMERGENCY OPERATIONS;CONSTRUCTION;CAUSEWAY FROM SEXTANT;DB IN12003P | $21,600,163.00 | $26,364,172.00 |
Florida | E231006 | SR A1A; SR 5 TO FLAGLER ROAD/SLOPE PROTECTION PERMANENT REPAIR PROJECT;VOLUSIA CO - NI79001P | $50,206,991.00 | $63,513,533.00 |
Florida | NASA002 | NASA CAUSEWAY BRIDGE; BRIDGE REPLACEMENT; CONSTRUCTION | $90,257,614.00 | $97,425,693.00 |
Florida | PMT1001 | PORT OF MIAMI TUNNEL FROM PORT OF MIAMI TO SR 836/I-395;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $214,270,573.00 | $2,365,899,035.00 |
Florida | SR20001 | SR20 FROM ALACHUA C/L TO SW 56TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $59,532,097.00 | $72,816,276.00 |
Florida | TAMI002 | SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURE S-333 TO STRUCTURE S-334;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION;DB | $65,772,857.00 | $85,846,560.00 |
Florida | TGER002 | FIU UNIVERSITY CITY PROSPERITY PROJ. ALONG SW 109 AVE & SR 90/SW 8 ST; PEDESTRIAN OVERPASS; DESIGN & CONSTRUCTION MANAGED BY FDOT | $41,253,181.94 | $51,855,997.94 |
Florida | TGER004 | BIG BEND ROAD/CR 672 @ I-75/SR93A FROM W OF COVINGTON TO E OF SIMMONS;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $25,000,000.00 | $104,015,237.00 |
Florida | TPEX275 | I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | $612,900,116.00 | $1,687,944,160.00 |