RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Florida | 0041228 | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $12,426,107.83 | $12,426,107.83 |
Florida | 0041228 | Seminole | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $4,147,526.17 | $4,147,526.17 |
Florida | 0041228 | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $57,730,872.58 | $57,730,872.58 |
Florida | 0041228 | Seminole | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $19,269,131.42 | $19,269,131.42 |
Florida | 0041228 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $702,920,500.77 | $3,079,352,746.55 |
Florida | 0041228 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $234,617,405.23 | $1,027,811,467.45 |
Florida | 0041228 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $45,704,129.68 | |
Florida | 0041228 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $136,930,888.32 | |
Florida | 0041228 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $50,208,656.52 | $50,208,656.52 |
Florida | 0041228 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $16,758,402.48 | $16,758,402.48 |
Florida | 0041228 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $112,413.84 | $112,413.84 |
Florida | 0041228 | Orange | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $336,795.16 | $336,795.16 |
Florida | 0041228 | Orange | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,035,204.23 | $3,035,204.23 |
Florida | 0041228 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,013,075.77 | $1,013,075.77 |
Florida | 0041228 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $123,075.43 | $123,075.43 |
Florida | 0041228 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $368,737.57 | $368,737.57 |
Florida | 0041228 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $23,270,438.56 | |
Florida | 0041228 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $7,767,094.44 | |
Florida | 0041228 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,030,056.87 | $14,477,166.94 |
Florida | 0041228 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,086,080.13 | $43,374,009.06 |
Florida | 0105152 | Duval | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $659,485.00 | $659,485.00 |
Florida | 0105152 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $81,838,058.00 | $82,607,475.00 |
Florida | 0105152 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,247,025.00 | $12,171,295.00 |
Florida | 0105152 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $2,901,170.00 | $9,047,918.00 |
Florida | 0105152 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $32,754.00 | $32,754.00 |
Florida | 0105152 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,022,171.00 | $4,076,353.00 |
Florida | 0105152 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,695,285.00 | $8,789,502.00 |
Florida | 0105152 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $62,499.00 | $62,499.00 |
Florida | 0105152 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $38,279,628.00 | |
Florida | 0105152 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $80,000.00 | $1,055,725.00 |
Florida | 0105152 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $134,000.00 | $140,858.00 |
Florida | 0755096 | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,119,439.00 | $50,025,212.00 |
Florida | 0755096 | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,841,599.00 | $7,076,892.00 |
Florida | 0755096 | Lee | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $155,000.00 | $155,000.00 |
Florida | 0755096 | Lee | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,256,063.00 | $5,384,424.00 |
Florida | 0755096 | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $176,667.00 | |
Florida | 0755096 | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,786,285.00 | |
Florida | 0755096 | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $60,800.00 | $282,325.00 |
Florida | 0755096 | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $156,500.00 | $156,500.00 |
Florida | 0757443 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $349,579.00 | $349,579.00 |
Florida | 0757443 | Manatee | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $36,934,207.00 | $41,053,385.00 |
Florida | 0757443 | Manatee | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Administration | $2,487,660.00 | |
Florida | 0757443 | Manatee | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $3,390,506.00 | $3,390,506.00 |
Florida | 0757443 | Manatee | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $2,220,000.00 | $2,220,000.00 |
Florida | 0757443 | Manatee | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $1,599,109.00 | $1,599,109.00 |
Florida | 0951671 | Broward | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,909,687.00 | $1,909,687.00 |
Florida | 0951671 | Broward | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $929,652.00 | $929,652.00 |
Florida | 0951671 | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $32,632.00 | $32,632.00 |
Florida | 0951671 | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,185,787.00 | $1,185,787.00 |
Florida | 0951671 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $50,861,642.00 | $50,861,642.00 |
Florida | 0951671 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,969,067.00 | $23,001,363.00 |
Florida | 0951671 | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,094,318.00 | $104,251,724.00 |
Florida | 0951671 | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $18,882,890.00 | |
Florida | 0951671 | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $893,663.00 | $1,997,443.00 |
Florida | 0951685 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,916,330.98 | $14,047,522.75 |
Florida | 0951685 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $18,309,751.02 | $21,584,382.25 |
Florida | 0951685 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,202,476.07 | $1,385,785.94 |
Florida | 0951685 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,847,634.93 | $2,129,295.06 |
Florida | 0951685 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $107,249.16 | $107,249.16 |
Florida | 0951685 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $164,790.84 | $164,790.84 |
Florida | 0951685 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,066,487.83 | $1,066,487.83 |
Florida | 0951685 | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,638,686.17 | $1,638,686.17 |
Florida | 0951685 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $36,929.29 | $36,929.29 |
Florida | 0951685 | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $56,742.71 | $56,742.71 |
Florida | 0951695 | Palm Beach | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $112,908.00 | $112,908.00 |
Florida | 0951695 | Palm Beach | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $188,164.00 | $188,164.00 |
Florida | 0951695 | Palm Beach | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $8,466,751.00 | $8,474,749.00 |
Florida | 0951695 | Palm Beach | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Administration | $17,785,358.00 | |
Florida | 0951695 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,251,400.00 | $25,656,057.00 |
Florida | 0951695 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $809,912.00 | $831,566.00 |
Florida | 0951695 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $138,018.00 | |
Florida | 0953133 | Brevard | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $1,187,077.00 | $1,187,077.00 |
Florida | 0953133 | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $40,884,957.00 | $40,884,957.00 |
Florida | 0953133 | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,590,555.00 | |
Florida | 0953133 | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,929,783.00 | $1,957,283.00 |
Florida | 0953133 | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $488,035.00 | $497,341.00 |
Florida | 0953133 | Brevard | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - Added Capacity | $1,086,818.00 | $1,086,818.00 |
Florida | 0953133 | Brevard | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | 4R - Added Capacity | $634,645.00 | $3,377,228.00 |
Florida | 0953133 | Brevard | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | Administration | $1,620,430.00 | |
Florida | 0955313 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $78,145,239.00 | $235,175,562.00 |
Florida | 0955313 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,186,748.00 | $14,079,797.00 |
Florida | 0955313 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $320,000.00 | $320,000.00 |
Florida | 0955313 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,872,308.00 | $2,572,547.00 |
Florida | 0955313 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $29,763.00 | $171,865.00 |
Florida | 0955313 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $470,118.00 | $470,118.00 |
Florida | 0955314 | Duval | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $0.93 | $0.93 |
Florida | 0955314 | Duval | >= 200,000 | Other | INTERSTATE MAINTENANCE | 4R - Added Capacity | $0.07 | $0.07 |
Florida | 0955314 | Duval | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $45,738.29 | $45,738.29 |
Florida | 0955314 | Duval | >= 200,000 | Other | INTERSTATE MAINTENANCE | Construction Engineering | $3,711.71 | $3,711.71 |
Florida | 0955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,709,295.23 | $142,498,352.38 |
Florida | 0955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $301,013.77 | $11,563,913.62 |
Florida | 0955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $8,048,883.38 | |
Florida | 0955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $653,176.62 | |
Florida | 0955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $441,047.50 | $441,047.50 |
Florida | 0955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $35,791.50 | $35,791.50 |
Florida | 0955314 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $216,872.56 | $216,872.56 |
Florida | 0955314 | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $17,599.44 | $17,599.44 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $5.00 | $5.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $65,548.00 | $65,548.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $9,973,365.00 | |
Florida | 1002062 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $34,824,419.00 | $93,003,752.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,985,160.00 | $10,922,922.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $837,495.00 | $1,168,551.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $12,583.00 | $12,583.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,012,405.00 | $1,012,405.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,968,532.00 | $2,732,486.00 |
Florida | 1002062 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,326,703.00 | $1,954,519.00 |
Florida | 1171052 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $48,951,049.00 | $68,176,153.00 |
Florida | 1171052 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $6,659,375.00 | |
Florida | 1171052 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,850,951.00 | $9,909,525.00 |
Florida | 1171052 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,543,513.00 | $4,383,787.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $1,913,647.00 | $1,913,647.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | New Construction Roadway | $22,908.00 | $22,908.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $313,414,870.00 | |
Florida | 1316003 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,487,318.00 | $144,997,996.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $185,536,700.00 | $1,886,841,034.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $674,119.00 | $65,236,655.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $852,318.00 | $142,937,423.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $5,846.00 | $5,846.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $127,441.00 | $127,441.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | New Construction Roadway | $789,243.00 | $789,243.00 |
Florida | 1316003 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $62,367,915.00 | $62,431,087.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $735,345.00 | $735,345.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $173,061.00 | $173,061.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,290,110.00 | $116,891,166.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,506,183.00 | |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,676,693.00 | $7,749,798.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,091,365.00 | |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $892,736.00 | $892,736.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $669,324.00 | $2,773,505.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $145,000.00 | $145,000.00 |
Florida | 1852019 | Citrus | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $492,296.00 | $492,296.00 |
Florida | 2757410 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,893,658.00 | $60,121,593.00 |
Florida | 2757410 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $33,852,817.00 | |
Florida | 2757410 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,695,677.00 | $127,053,075.00 |
Florida | 2757410 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $17,265,616.00 | |
Florida | 2757410 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $3,910,580.00 | $3,910,580.00 |
Florida | 2955310 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $80,381,817.00 | $85,413,906.00 |
Florida | 2955310 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $11,110.00 | |
Florida | 2955310 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,994,895.00 | $9,994,895.00 |
Florida | 2955310 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $212,238.00 | $212,238.00 |
Florida | 2955310 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $878,279.00 | $878,279.00 |
Florida | 2955310 | Duval | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $229,845.00 | $229,845.00 |
Florida | 2955310 | Duval | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $45,762.00 | $45,762.00 |
Florida | 2955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $33,927,206.36 | |
Florida | 2955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,778,906.64 | |
Florida | 2955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $15,509,470.10 | |
Florida | 2955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,727,487.90 | |
Florida | 2955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $132,866,392.95 | $134,201,061.17 |
Florida | 2955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,351,553.05 | $14,500,211.83 |
Florida | 2955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $90,750.03 | $90,750.03 |
Florida | 2955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $10,107.97 | $10,107.97 |
Florida | 2955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $224,945.00 | $224,945.00 |
Florida | 2955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $25,055.00 | $25,055.00 |
Florida | 2955314 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,000.00 | $2,420,494.11 |
Florida | 2955314 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $268,598.89 | |
Florida | 2955314 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $732,161.80 | $15,161,488.28 |
Florida | 2955314 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,552,017.00 | $3,552,017.00 |
Florida | 2955314 | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $81,550.20 | $1,688,728.72 |
Florida | 2955314 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $149,894.13 | $149,894.13 |
Florida | 2955314 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $745,309.00 | $745,309.00 |
Florida | 2955314 | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $20,075.87 | $20,075.87 |
Florida | 3115028 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,313,194.00 | $6,313,194.00 |
Florida | 3115028 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $53,850,533.00 | $53,850,533.00 |
Florida | 3115028 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,257,329.00 | $1,257,329.00 |
Florida | 3115028 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $3,693,796.00 | |
Florida | 3115028 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $15,507.00 | $15,507.00 |
Florida | 3115028 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,220,370.00 | $11,920,699.00 |
Florida | 3141036 | Lake | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $688,769.00 | $688,769.00 |
Florida | 3141036 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $15,842,495.00 | |
Florida | 3141036 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,426,723.00 | $1,426,723.00 |
Florida | 3141036 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $1,295,185.00 | $1,295,185.00 |
Florida | 3141036 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,137,199.00 | $265,485,181.00 |
Florida | 3141036 | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $980,749.00 | $980,749.00 |
Florida | 3141036 | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $6,973,493.00 | $6,973,493.00 |
Florida | 3141042 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,344,678.00 | $204,386,422.00 |
Florida | 3141042 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $8,793,025.00 | |
Florida | 3141042 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,805,509.00 | $32,894,560.00 |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $756,442.90 | $1,260,220.21 |
Florida | 3951501 | Miami-Dade | >= 200,000 | Other | CONGESTION AIR QUALITY | Construction Engineering | $284,414.10 | $473,828.79 |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,418,800.00 | $3,418,800.00 |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $154,588,055.00 | $702,367,525.00 |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,468,671.17 | $39,184,325.53 |
Florida | 3951501 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,808,137.83 | $14,732,874.47 |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,329,726.52 | $1,329,726.52 |
Florida | 3951501 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $499,962.48 | $499,962.48 |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,053,787.51 | |
Florida | 3951501 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $396,212.49 | |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $941,690.72 | |
Florida | 3951501 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $354,065.28 | |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $150,494.00 | |
Florida | 3951501 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,249,272.00 | $17,646,263.00 |
Florida | 4002027 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $22,766,475.00 | $27,079,992.00 |
Florida | 4002027 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,410,309.00 | |
Florida | 4002027 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,836,465.00 | $7,870,593.00 |
Florida | 4002027 | Putnam | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $23,277.00 | |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,964,317.00 | $1,964,317.00 |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Rail/Hwy Crossing | $30,000.00 | $30,000.00 |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $206,788.00 | $206,788.00 |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,933,139.00 | $15,997,459.00 |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,015,064.00 | |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $910,599.00 | $910,599.00 |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,427,736.00 | $4,427,736.00 |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $28,600.00 | $28,600.00 |
Florida | 4047203 | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,087,931.00 | |
Florida | 4221091 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $22,403,492.00 | |
Florida | 4221091 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $25,948,763.00 | $484,996,291.00 |
Florida | 4222081 | Walton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $45,485,694.67 | $45,915,776.21 |
Florida | 4222081 | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $604,154.33 | $609,866.79 |
Florida | 4222081 | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $23,387.82 | |
Florida | 4222081 | Walton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,760,827.18 | |
Florida | 4222081 | Walton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,937,194.53 | $5,937,194.53 |
Florida | 4222081 | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $78,859.47 | $78,859.47 |
Florida | 4881064 | Nassau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $105,072.00 | $14,193,758.00 |
Florida | 4881064 | Nassau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,634,542.00 | |
Florida | 4881064 | Nassau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $54,008,144.00 | $56,764,124.00 |
Florida | 4881064 | Nassau | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,689,829.00 | $4,689,829.00 |
Florida | 4881064 | Nassau | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $183,690.00 | $183,690.00 |
Florida | 5951553 | Broward | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $385,825.00 | $385,825.00 |
Florida | 5951553 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $664,468,266.00 | $2,419,827,587.00 |
Florida | 5951553 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $158,334,383.00 | |
Florida | 5951553 | Broward | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $172,796.00 | $172,796.00 |
Florida | 5951553 | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $682,026.00 | $682,026.00 |
Florida | 5951553 | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,456.00 | $2,456.00 |
Florida | 5951556 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $80,952,434.00 | |
Florida | 5951557 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $124,950,849.00 | |
Florida | 5951560 | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Operations | $14,391,079.00 | $14,391,079.00 |
Florida | 5951560 | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $145,999,203.00 | $145,999,203.00 |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $112,977,159.54 | $180,093,164.84 |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,301,635.46 | $2,074,894.16 |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,115,094.84 | |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $58,932.16 | |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,522,470.28 | $24,772,847.42 |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $17,540.72 | $285,413.58 |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $357,975.69 | |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $4,124.31 | |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,161,249.76 | |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $24,900.24 | |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $100,040,522.47 | $100,147,292.35 |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,152,589.53 | $1,153,819.65 |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,886.10 | $37,815.33 |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $113.90 | $435.67 |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,526,834.03 | $1,526,834.03 |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,590.97 | $17,590.97 |
Florida | 6268021 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,317,643.14 | $1,317,643.14 |
Florida | 6268021 | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $15,180.86 | $15,180.86 |
Florida | 7079006 | St. Lucie | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $168,833.29 | $168,833.29 |
Florida | 7079006 | St. Lucie | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $480,097.00 | $480,097.00 |
Florida | 7079006 | St. Lucie | >= 200,000 | Other | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $14,521.71 | $14,521.71 |
Florida | 7079006 | St. Lucie | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $13,602.98 | $13,602.98 |
Florida | 7079006 | St. Lucie | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,170.02 | $1,170.02 |
Florida | 7079006 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,791,584.00 | $23,163,396.00 |
Florida | 7079006 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,759,317.63 | $5,759,317.63 |
Florida | 7079006 | St. Lucie | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $495,371.37 | $495,371.37 |
Florida | 7079006 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,280,275.00 | |
Florida | 7079006 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $57,502.00 | $5,409,396.00 |
Florida | 7079006 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $717,716.00 | |
Florida | 7079006 | St. Lucie | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $72,115.22 | $72,115.22 |
Florida | 7079006 | St. Lucie | >= 200,000 | Other | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $6,202.78 | $6,202.78 |
Florida | 7810035 | Pasco | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $3,038,355.00 | $3,038,355.00 |
Florida | 7810035 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,368,230.00 | $1,560,122.00 |
Florida | 7810035 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $28,551,476.00 | $33,042,674.00 |
Florida | 7810035 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $3,171,115.00 | |
Florida | 7810035 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,094,028.00 | $6,156,060.00 |
Florida | 7810035 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $7,644,752.00 | |
Florida | 8886496 | Volusia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,269,527.00 | |
Florida | 8886496 | Volusia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $32,152,105.00 | $32,152,105.00 |
Florida | 8886496 | Volusia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,713,215.00 | $1,713,215.00 |
Florida | 8886496 | Volusia | >= 200,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $113,787.00 | $113,787.00 |
Florida | 8886496 | Volusia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $5,397,332.00 | $5,840,966.00 |
Florida | 8886496 | Volusia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,819,974.00 | $5,148,043.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $2,020,976.00 | $2,020,976.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $162,520.00 | $162,520.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $839,333.00 | $839,333.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $8,000.00 | $8,000.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,010,267.00 | $1,010,267.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,432,080.00 | |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $336,167.00 | $336,167.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,466,764.00 | $5,305,369.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $23,777,903.00 | $23,777,903.00 |
Florida | 8886777 | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $703,765.00 | $703,765.00 |
Florida | D117027 | Charlotte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $27,924,703.00 | $29,867,254.00 |
Florida | D117027 | Charlotte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,210,494.00 | |
Florida | D117027 | Charlotte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,049,758.00 | $2,083,085.00 |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,114,312.00 | $3,549,312.00 |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $460,505.00 | |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,022,103.00 | $9,046,711.00 |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $49,891.00 | $49,891.00 |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,791,691.00 | $1,828,386.00 |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $776,178.00 | $776,178.00 |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $76,433,469.00 | $77,365,629.00 |
Florida | D117115 | Manatee | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Administration | $26,883,744.00 | |
Florida | D118021 | Sarasota | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,931,117.00 | $1,931,117.00 |
Florida | D118021 | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,730,071.00 | $12,489,212.00 |
Florida | D118021 | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $345,000.00 | $345,000.00 |
Florida | D118021 | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,557,364.00 | |
Florida | D118021 | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $489,862.00 | $3,755,963.00 |
Florida | D118021 | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $6,629,557.00 | |
Florida | D118039 | Lee | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Maintenance Resurfacing | $1,799,322.00 | $1,808,207.00 |
Florida | D118039 | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,511,773.00 | $12,907,140.00 |
Florida | D118039 | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,493,184.00 | |
Florida | D118039 | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $131,597.00 | $393,073.00 |
Florida | D118039 | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $501,372.00 | $8,818,334.00 |
Florida | D118043 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $59,728,437.23 | $59,975,990.11 |
Florida | D118043 | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,532,494.77 | $8,567,858.89 |
Florida | D118043 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $7,564,106.04 | |
Florida | D118043 | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,080,568.96 | |
Florida | D118043 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,147,705.66 | $6,519,677.67 |
Florida | D118043 | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $878,229.34 | $931,367.33 |
Florida | D118043 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $6,140,207.76 | $6,140,207.76 |
Florida | D118043 | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $877,158.24 | $877,158.24 |
Florida | D118043 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $23,667.05 | $23,667.05 |
Florida | D118043 | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,380.95 | $3,380.95 |
Florida | D118043 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $617,386.40 | $617,386.40 |
Florida | D118043 | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $88,196.60 | $88,196.60 |
Florida | D118043 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $26,250.05 | $30,625.06 |
Florida | D118043 | Polk | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,749.95 | $4,374.94 |
Florida | D118127 | Manatee | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $318,455.00 | $318,455.00 |
Florida | D118127 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $137,847,687.00 | $137,978,714.00 |
Florida | D118127 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,795,886.00 | $13,625,048.00 |
Florida | D118127 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,058,555.00 | $1,058,555.00 |
Florida | D118127 | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $327,256.00 | $10,626,084.00 |
Florida | D118127 | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $6,971,384.00 | |
Florida | D118127 | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $20,591.00 | |
Florida | D118127 | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,285,591.00 | |
Florida | D119037 | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,848,187.00 | $4,848,187.00 |
Florida | D119037 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,191,923.00 | $47,568,678.00 |
Florida | D119037 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,399,626.00 | |
Florida | D119037 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,010.00 | $4,010.00 |
Florida | D119037 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $475,729.00 | |
Florida | D119037 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $786,739.00 | $786,739.00 |
Florida | D119037 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,298,447.00 | $2,298,447.00 |
Florida | D119075 | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $310,712.00 | $310,712.00 |
Florida | D119075 | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $5,816,508.00 | $5,816,508.00 |
Florida | D119075 | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $781,266.00 | $959,572.00 |
Florida | D119075 | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,874,121.00 | $2,874,121.00 |
Florida | D119075 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,671,661.00 | $2,671,661.00 |
Florida | D119075 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $31,188,670.00 | $33,304,629.00 |
Florida | D119075 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,021,618.00 | |
Florida | D119075 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $151,521.00 | $201,286.00 |
Florida | D119075 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $170,618.00 | $170,618.00 |
Florida | D119075 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,953,870.00 | |
Florida | D120030 | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $50,080,705.00 | $54,505,847.00 |
Florida | D120030 | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,970,971.00 | |
Florida | D120030 | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,768,655.00 | $6,752,273.00 |
Florida | D120030 | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $35,000.00 | |
Florida | D120030 | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,108,389.00 | |
Florida | D120030 | Sarasota | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $1,927,115.00 | $1,927,115.00 |
Florida | D120030 | Sarasota | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $24,267.00 | $24,267.00 |
Florida | D120030 | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $75,376.00 | |
Florida | D120059 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $20,018.00 | |
Florida | D120059 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $12,826,044.00 | $30,602,755.00 |
Florida | D120059 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,275,102.00 | $8,015,079.00 |
Florida | D120059 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $63,996.00 | |
Florida | D120059 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $211,839.00 | |
Florida | D121032 | DeSoto | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $373,842.00 | $424,128.00 |
Florida | D121032 | DeSoto | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,122,738.00 | $13,221,634.00 |
Florida | D121032 | DeSoto | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - No Added Capacity | $8,668,848.00 | $8,693,848.00 |
Florida | D121032 | DeSoto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,494,759.00 | $8,986,356.00 |
Florida | D121032 | DeSoto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $44,800.00 | $44,800.00 |
Florida | D121032 | DeSoto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,209,386.00 | $4,209,386.00 |
Florida | D122022 | Lee | >= 200,000 | Local | CONGESTION AIR QUALITY | Administration | $1,130,804.00 | $1,130,804.00 |
Florida | D122022 | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $15,000,000.00 | |
Florida | D122022 | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $32,014,196.00 | |
Florida | D122022 | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,000.00 | $5,000.00 |
Florida | D122025 | Manatee | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $1,563,063.00 | $1,563,063.00 |
Florida | D122025 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $13,279,355.00 | $13,279,355.00 |
Florida | D122025 | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $4,881,782.00 | $10,220,678.00 |
Florida | D122025 | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $475,575.00 | $1,711,200.00 |
Florida | D122060 | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $23,002,926.26 | |
Florida | D122060 | Collier | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $2,484.74 | |
Florida | D122060 | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,767,694.06 | |
Florida | D122060 | Collier | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $190.94 | |
Florida | D122060 | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,186,124.84 | |
Florida | D122060 | Collier | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $344.16 | |
Florida | D122068 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,838,848.00 | $36,398,517.00 |
Florida | D122068 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,907,226.00 | |
Florida | D122068 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,933,411.00 | |
Florida | D122068 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $589,293.00 | $589,293.00 |
Florida | D122068 | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $612,500.00 | |
Florida | D123035 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $6,109,530.00 | |
Florida | D123035 | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,675,982.00 | |
Florida | D123035 | Polk | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Maintenance Resurfacing | $3,223,487.00 | $3,248,487.00 |
Florida | D123035 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,962,917.00 | $7,130,454.00 |
Florida | D123035 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $5,898,879.00 | $5,898,879.00 |
Florida | D123035 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $409,250.00 | |
Florida | D123035 | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $205,600.00 | $3,725,830.00 |
Florida | D123035 | Polk | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Maintenance Resurfacing | $904,173.00 | $919,173.00 |
Florida | D123041 | Highlands | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $200,368.00 | $200,368.00 |
Florida | D123041 | Highlands | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,034,335.00 | |
Florida | D123041 | Highlands | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $4,173,306.00 | $6,652,024.00 |
Florida | D123041 | Highlands | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $810,167.00 | |
Florida | D123041 | Highlands | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $313,397.00 | $2,012,965.00 |
Florida | D124033 | Collier | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $6,659,628.00 | $6,659,628.00 |
Florida | D124033 | Collier | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Administration | $1,690,096.00 | |
Florida | D124033 | Collier | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $4,114,682.00 | |
Florida | D124033 | Collier | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $60,000.00 | $37,493,794.00 |
Florida | D124033 | Collier | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,841,574.00 | $1,841,574.00 |
Florida | D124033 | Collier | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $735,192.00 | |
Florida | D124033 | Collier | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $900,101.00 | $900,101.00 |
Florida | D124056 | Polk | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $4,000,000.00 | $107,139,760.00 |
Florida | D217011 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $53,376,779.00 | |
Florida | D217011 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,029,214.00 | $7,029,214.00 |
Florida | D217011 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $96,287,186.00 | $99,656,803.00 |
Florida | D217011 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $758,255,395.00 | |
Florida | D217011 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $690,839.00 | $690,839.00 |
Florida | D217069 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,505,189.00 | |
Florida | D217069 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,485,912.00 | $2,550,912.00 |
Florida | D217069 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $22,559,900.00 | $34,327,600.00 |
Florida | D217069 | Clay | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $79,488.00 | $145,000.00 |
Florida | D217080 | Putnam | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,244,527.00 | $1,244,527.00 |
Florida | D217080 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,144,935.00 | $42,200,449.00 |
Florida | D217080 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,579,323.00 | |
Florida | D217080 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,791,243.00 | $4,791,243.00 |
Florida | D217103 | Duval | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Administration | $1,498,614.00 | |
Florida | D217103 | Duval | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $692,735.00 | $692,735.00 |
Florida | D217103 | Duval | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $6,437,287.00 | $16,475,897.00 |
Florida | D217103 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,069,250.00 | $9,735,806.00 |
Florida | D217103 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $45,135.00 | $45,135.00 |
Florida | D217128 | Duval | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $837.00 | $837.00 |
Florida | D217128 | Duval | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $50,993.00 | $50,993.00 |
Florida | D217128 | Duval | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,161.00 | $1,161.00 |
Florida | D217128 | Duval | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,494,346.00 | $1,494,346.00 |
Florida | D217128 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $143,558,523.00 | $211,671,925.00 |
Florida | D217128 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $24,498,265.00 | |
Florida | D217128 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,625,264.00 | $19,069,994.00 |
Florida | D217128 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $673,373.00 | $1,667,960.00 |
Florida | D217128 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,708,132.00 | $6,271,505.00 |
Florida | D217128 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $249,939.00 | $255,546.00 |
Florida | D217128 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $11,101,205.00 | $11,229,040.00 |
Florida | D218017 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $13,363,285.00 | |
Florida | D218017 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,863,363.00 | $3,863,363.00 |
Florida | D218017 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $108,783,753.00 | $263,673,111.00 |
Florida | D218017 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $72,576.00 | $72,576.00 |
Florida | D218017 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $362,734.00 | $382,697.00 |
Florida | D218017 | Clay | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $74,306.00 | |
Florida | D218123 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $21,276,476.00 | |
Florida | D218123 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,068,645.00 | $14,674,870.00 |
Florida | D218123 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $235,000,000.00 | $636,159,329.00 |
Florida | D218123 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,676,834.00 | $1,676,834.00 |
Florida | D218123 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,021,340.00 | |
Florida | D218124 | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $12,006,336.00 | |
Florida | D218124 | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $32,593,365.00 | |
Florida | D218124 | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $333,272,043.00 | |
Florida | D218124 | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $150,000.00 | |
Florida | D219120 | Duval | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $3,144,864.44 | $12,635,403.17 |
Florida | D219120 | Duval | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $9,317,635.56 | $37,436,297.83 |
Florida | D219120 | Duval | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Administration | $233,793.70 | |
Florida | D219120 | Duval | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Administration | $692,686.30 | |
Florida | D219120 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $43,928.43 | $46,451.89 |
Florida | D219120 | Duval | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $130,151.57 | $137,628.11 |
Florida | D219130 | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,601,946.00 | $22,887,943.00 |
Florida | D219130 | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,246,980.00 | |
Florida | D219130 | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,352,270.00 | $3,543,264.00 |
Florida | D220122 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $54,367,234.00 | $171,209,294.00 |
Florida | D220122 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $16,880,636.00 | |
Florida | D220122 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $366,324.00 | $101,065,545.00 |
Florida | D220122 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $535,550.00 | $535,550.00 |
Florida | D220122 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $123,560.49 | $4,380,845.82 |
Florida | D220122 | Duval | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,025.51 | $153,502.18 |
Florida | D221010 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $26,370,921.00 | $27,689,641.00 |
Florida | D221010 | Duval | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $461,859.00 | $461,859.00 |
Florida | D221010 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,319,416.00 | $9,073,957.00 |
Florida | D221010 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,694,649.00 | |
Florida | D221010 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $131,050.00 | $568,793.00 |
Florida | D221018 | Duval | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $6,556,233.17 | $7,385,181.22 |
Florida | D221018 | Duval | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $8,140,322.70 | $9,169,557.67 |
Florida | D221018 | Clay | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $3,712,390.12 | $4,181,772.27 |
Florida | D221018 | Clay | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $1,461,450.01 | $1,646,230.84 |
Florida | D221018 | Clay | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Administration | $173,323.36 | |
Florida | D221018 | Clay | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | Administration | $68,231.88 | |
Florida | D221018 | Duval | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Administration | $306,096.08 | |
Florida | D221018 | Duval | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | Administration | $380,053.68 | |
Florida | D221018 | Duval | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $944,793.44 | $944,793.44 |
Florida | D221018 | Duval | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,173,070.39 | $1,173,070.39 |
Florida | D221018 | Clay | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $534,978.26 | $534,978.26 |
Florida | D221018 | Clay | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | Construction Engineering | $210,603.91 | $210,603.91 |
Florida | D221018 | Duval | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $560,686.00 | $560,686.00 |
Florida | D221018 | Duval | >= 200,000 | Other | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $696,156.56 | $696,156.56 |
Florida | D221018 | Clay | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $317,481.91 | $317,481.91 |
Florida | D221018 | Clay | >= 200,000 | Other | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $124,982.53 | $124,982.53 |
Florida | D221018 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,847.74 | |
Florida | D221018 | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,435.18 | |
Florida | D221018 | Clay | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,407.36 | |
Florida | D221018 | Clay | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,309.72 | |
Florida | D221062 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,660,028.00 | $11,034,122.00 |
Florida | D221062 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $11,734,589.00 | |
Florida | D221062 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,319,448.00 | |
Florida | D221062 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,446,161.00 | $7,779,376.00 |
Florida | D222030 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $57,437.57 | |
Florida | D222030 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $44,189.43 | |
Florida | D222030 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Freight | $15,607,680.84 | |
Florida | D222030 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Freight | $12,007,735.16 | |
Florida | D222030 | Duval | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Administration | $1,691,107.31 | |
Florida | D222030 | Duval | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | Administration | $1,301,049.69 | |
Florida | D222030 | Duval | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $3,773,556.01 | $3,773,556.01 |
Florida | D222030 | Duval | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | Construction Engineering | $2,903,176.99 | $2,903,176.99 |
Florida | D222030 | Duval | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Freight | $26,205,966.73 | $30,419,759.53 |
Florida | D222030 | Duval | >= 200,000 | Other | NATIONAL HWY FREIGHT PGM | Freight | $20,161,503.27 | $23,403,375.47 |
Florida | D222030 | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $377,796.30 | |
Florida | D222030 | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $290,656.70 | |
Florida | D222084 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $22,377,733.00 | $27,942,233.00 |
Florida | D222084 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $968,757.00 | |
Florida | D222084 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $69,972.00 | $1,532,874.00 |
Florida | D223050 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $15,935,233.44 | |
Florida | D223050 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,440,179.56 | |
Florida | D223050 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $930,873.18 | |
Florida | D223050 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $609,873.82 | |
Florida | D223050 | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,589,700.05 | |
Florida | D223050 | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,041,512.95 | |
Florida | D317016 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,178,318.00 | $27,291,857.00 |
Florida | D317016 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $11,962,105.00 | |
Florida | D317016 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,913,368.00 | $3,941,224.00 |
Florida | D317016 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $150,087.00 | $150,087.00 |
Florida | D317016 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $797,954.00 | $838,959.00 |
Florida | D317035 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $58,054,974.00 | $66,037,056.00 |
Florida | D317035 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $23,828,626.00 | |
Florida | D317035 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,367,213.00 | $7,686,815.00 |
Florida | D318058 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,074,426.78 | $22,507,123.30 |
Florida | D318058 | Escambia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,046,093.22 | $6,041,086.70 |
Florida | D318058 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $885,693.10 | |
Florida | D318058 | Escambia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $237,726.90 | |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,884,305.04 | $39,354,708.52 |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,834,974.96 | $8,709,551.48 |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,056,776.79 | |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $455,183.21 | |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,168,810.72 | $4,732,994.00 |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $922,595.28 | $1,047,454.00 |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $204,698.40 | |
Florida | D319003 | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,301.60 | |
Florida | D319075 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,869,259.24 | $39,144,183.88 |
Florida | D319075 | Washington | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $477,669.76 | $722,788.12 |
Florida | D319075 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $9,282,329.97 | |
Florida | D319075 | Washington | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $171,396.03 | |
Florida | D319075 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,907,102.30 | $5,385,997.87 |
Florida | D319075 | Washington | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $72,143.70 | $99,451.13 |
Florida | D319079 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $67,375,956.00 | $71,679,381.00 |
Florida | D319079 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,674,254.00 | |
Florida | D319079 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,579,990.00 | $8,296,641.00 |
Florida | D319079 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $3,760.00 | $3,760.00 |
Florida | D319079 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,886,053.00 | |
Florida | D319080 | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $899,376.00 | |
Florida | D319080 | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,567,320.00 | $25,306,950.00 |
Florida | D319080 | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,356,961.00 | |
Florida | D319080 | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,285,956.00 | $4,429,843.00 |
Florida | D319080 | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $913,129.00 | |
Florida | D320013 | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,707,265.00 | $8,499,630.00 |
Florida | D320013 | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $84,500,880.00 | |
Florida | D320013 | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,964,000.00 | $3,849,047.00 |
Florida | D320016 | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,628,554.00 | $70,490,685.00 |
Florida | D320016 | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,583,145.00 | |
Florida | D320016 | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,762,632.00 | $6,588,942.00 |
Florida | D320016 | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $178,000.00 | $178,000.00 |
Florida | D320021 | Santa Rosa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $8,450,501.00 | $8,450,501.00 |
Florida | D320021 | Santa Rosa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $436,157.00 | $436,157.00 |
Florida | D320021 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,389,070.00 | |
Florida | D320021 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $13,529,054.00 | |
Florida | D320021 | Santa Rosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,000.00 | $5,776,345.00 |
Florida | D320028 | Bay | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $4,077,674.00 | $22,485,815.00 |
Florida | D320028 | Bay | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,008,727.00 | |
Florida | D320028 | Bay | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,970,589.00 | $3,137,799.00 |
Florida | D322007 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,754,535.00 | $53,928,895.00 |
Florida | D322007 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,017,355.00 | |
Florida | D322007 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $980,746.00 | $6,021,879.00 |
Florida | D322007 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,348,952.00 | $2,493,753.00 |
Florida | D322015 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $16,176,563.00 | |
Florida | D322015 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,834,276.00 | |
Florida | D322015 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $174,060.00 | |
Florida | D322015 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $234,596,962.00 | |
Florida | D322015 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,553,370.00 | |
Florida | D322082 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $49,956,408.00 | |
Florida | D322082 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,544,752.00 | |
Florida | D322082 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,814,622.00 | |
Florida | D322083 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $60,868,106.00 | |
Florida | D322083 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,446,672.00 | |
Florida | D322083 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,925,462.00 | |
Florida | D323043 | Escambia | >= 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $1,125,779.00 | $1,137,569.00 |
Florida | D323043 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $12,466,788.02 | |
Florida | D323043 | Escambia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,135,965.98 | |
Florida | D323043 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,408,114.49 | |
Florida | D323043 | Escambia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $128,306.51 | |
Florida | D323043 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,252,403.06 | |
Florida | D323043 | Escambia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $296,356.94 | |
Florida | D323043 | Escambia | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Maintenance Resurfacing | $2,841,119.00 | $2,841,119.00 |
Florida | D323043 | Escambia | >= 200,000 | Other | PROTECT PROGRAM APPORTIONED | 4R - Maintenance Resurfacing | $258,881.00 | $258,881.00 |
Florida | D323043 | Escambia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,919,520.50 | |
Florida | D323043 | Escambia | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $174,905.50 | |
Florida | D323043 | Escambia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $24,682.00 | |
Florida | D323043 | Escambia | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $2,249.00 | |
Florida | D323054 | Bay | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Administration | $12,204,292.00 | |
Florida | D323054 | Bay | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $38,439,583.00 | $263,977,470.00 |
Florida | D323054 | Bay | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $9,866,115.00 | $9,866,115.00 |
Florida | D323054 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $85,514,940.00 | |
Florida | D323054 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,000.00 | $12,933,040.00 |
Florida | D323054 | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,180,000.00 | |
Florida | D323054 | Bay | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,170,000.00 | $1,170,000.00 |
Florida | D323055 | Escambia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Administration | $2,302,223.00 | |
Florida | D323055 | Escambia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $55,134,599.00 | $55,134,599.00 |
Florida | D323055 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $70,842.00 | $5,698,610.00 |
Florida | D323055 | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $52,049.00 | $675,063.00 |
Florida | D324065 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,162,885.00 | |
Florida | D324065 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $894,417.00 | |
Florida | D324065 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,778,036.00 | |
Florida | D417080 | Palm Beach | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $443,249.00 | $443,249.00 |
Florida | D417080 | Palm Beach | >= 200,000 | N/A | MIN ALLOC 90%-SUB TO LIM-STEA | 4R - Added Capacity | $1.00 | $1.00 |
Florida | D417080 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,577,608.00 | $10,093,528.00 |
Florida | D417080 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $54,744.00 | $54,744.00 |
Florida | D417080 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,698,070.00 | $22,768,162.00 |
Florida | D417080 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $5,009,687.00 | |
Florida | D417080 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $218,689.00 | $263,244.00 |
Florida | D417080 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,603,297.00 | $7,927,373.00 |
Florida | D417080 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $639,668.00 | |
Florida | D418011 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,107,911.00 | $25,160,622.00 |
Florida | D418011 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,342,748.00 | |
Florida | D418011 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,367,645.00 | $2,516,048.00 |
Florida | D418011 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $152,978.00 | $683,299.00 |
Florida | D418011 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $175,229.00 | $175,229.00 |
Florida | D419098 | Broward | >= 200,000 | State | HSIP LIMITING FLEXIBLE | New Construction Roadway | $49,389.33 | $49,389.33 |
Florida | D419098 | Broward | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | New Construction Roadway | $25,792.43 | $25,792.43 |
Florida | D419098 | Broward | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | New Construction Roadway | $67,294.24 | $67,294.24 |
Florida | D419098 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $448,817.15 | |
Florida | D419098 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $234,384.42 | |
Florida | D419098 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $611,525.43 | |
Florida | D419098 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,207,613.63 | $1,214,058.62 |
Florida | D419098 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $630,648.40 | $634,014.10 |
Florida | D419098 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,645,405.97 | $1,654,187.28 |
Florida | D419098 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $8,283,530.13 | $8,283,530.13 |
Florida | D419098 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $4,325,883.28 | $4,325,883.28 |
Florida | D419098 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $11,286,533.59 | $11,286,533.59 |
Florida | D419098 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $343,826.24 | $590,139.87 |
Florida | D419098 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $179,555.32 | $308,186.90 |
Florida | D419098 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $468,472.44 | $804,081.23 |
Florida | D420011 | Broward | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - No Added Capacity | $558,969.00 | $10,913,472.00 |
Florida | D420011 | Broward | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $217,625.00 | $217,625.00 |
Florida | D420011 | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,362,522.00 | $2,362,522.00 |
Florida | D420011 | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $14,747,547.00 | $17,996,640.00 |
Florida | D420011 | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,182,488.00 | |
Florida | D420011 | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $152,043.00 | $152,043.00 |
Florida | D420011 | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $495,070.00 | $3,050,017.00 |
Florida | D420011 | Broward | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | 4R - No Added Capacity | $722,666.00 | $722,666.00 |
Florida | D420011 | Broward | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | 4R - No Added Capacity | $1,869,911.00 | $1,869,911.00 |
Florida | D420092 | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,656,615.00 | $8,472,892.00 |
Florida | D420092 | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,812,721.00 | $3,135,666.00 |
Florida | D420092 | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $4,761,349.00 | $4,983,783.00 |
Florida | D420092 | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $206,018.00 | |
Florida | D420092 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $6,783,356.00 | |
Florida | D420092 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $110,996,854.00 | |
Florida | D420092 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $130,499.00 | $312,728.00 |
Florida | D420092 | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $847,830.00 | $847,830.00 |
Florida | D421056 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $6,104,004.00 | |
Florida | D421056 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $64,756.00 | $64,756.00 |
Florida | D421056 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,012,192.00 | $13,217,161.00 |
Florida | D421056 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,014,243.00 | $14,912,200.00 |
Florida | D421056 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $3,807,311.00 | $3,807,311.00 |
Florida | D421056 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $26,000.00 | $269,641.00 |
Florida | D421077 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,754,146.00 | $44,482,023.00 |
Florida | D421077 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $26,166,316.00 | |
Florida | D421077 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $47,688.00 | $14,687,078.00 |
Florida | D421077 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $80,000.00 | |
Florida | D421077 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $3,155,000.00 | |
Florida | D421077 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $12,455,269.00 | |
Florida | D421077 | Palm Beach | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $7,468,985.00 | $104,955,369.00 |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Maintenance Resurfacing | $19.98 | $37.43 |
Florida | D421085 | Palm Beach | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Maintenance Resurfacing | $84,328.02 | $157,967.57 |
Florida | D421085 | Palm Beach | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,029,923.09 | |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $480.91 | |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $184.21 | |
Florida | D421085 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $777,526.79 | |
Florida | D421085 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $272,404.46 | $18,892,019.23 |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $64.54 | $4,475.77 |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $963.16 | |
Florida | D421085 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $4,065,440.84 | |
Florida | D421085 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $89,103.89 | $171,377.40 |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $21.11 | $40.60 |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $5.30 | |
Florida | D421085 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $22,371.70 | |
Florida | D421085 | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $496,730.32 | $496,730.32 |
Florida | D421085 | Hendry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $117.68 | $117.68 |
Florida | D422005 | Broward | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $160,031.00 | $160,031.00 |
Florida | D422005 | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $2,460,270.00 | $2,460,270.00 |
Florida | D422005 | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $166,598.00 | $166,598.00 |
Florida | D422005 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,088,563.00 | |
Florida | D422005 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $28,130,253.00 | |
Florida | D422005 | Broward | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $164,865.00 | $164,865.00 |
Florida | D422005 | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,000.00 | $5,000.00 |
Florida | D422059 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,089,790.94 | $7,426,775.71 |
Florida | D422059 | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,193,382.19 | $4,241,085.44 |
Florida | D422059 | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,798,508.87 | $6,391,606.85 |
Florida | D422059 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,735,246.95 | |
Florida | D422059 | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $990,918.64 | |
Florida | D422059 | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,493,382.41 | |
Florida | D422059 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $133,738.98 | $964,655.60 |
Florida | D422059 | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $76,372.07 | $550,869.80 |
Florida | D422059 | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $115,097.95 | $830,198.60 |
Florida | D422059 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $24,674.40 | |
Florida | D422059 | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | $14,090.40 | |
Florida | D422059 | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $21,235.20 | |
Florida | D422059 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $178,858.18 | $426,738.46 |
Florida | D422059 | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $102,137.54 | $243,690.39 |
Florida | D422059 | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $153,928.28 | $367,258.15 |
Florida | D422059 | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $963,155.78 | |
Florida | D422059 | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $550,013.35 | |
Florida | D422059 | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $828,907.87 | |
Florida | D422068 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $150,093.00 | $64,540,744.00 |
Florida | D422068 | Broward | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Utilities | $15,618.00 | $15,618.00 |
Florida | D422068 | Broward | >= 200,000 | State | REPURPOSED SPECIAL | Utilities | $172,580.00 | $172,580.00 |
Florida | D422077 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $520,229,233.52 | |
Florida | D422077 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,198,080.76 | |
Florida | D422077 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $187,746,738.72 | |
Florida | D422077 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $119,622,517.43 | |
Florida | D422077 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $275,489.02 | |
Florida | D422077 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $43,170,848.55 | |
Florida | D422077 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $733,570.61 | |
Florida | D422077 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,689.40 | |
Florida | D422077 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $264,739.99 | |
Florida | D422077 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $23,207,640.71 | |
Florida | D422077 | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $53,446.88 | |
Florida | D422077 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,375,459.41 | |
Florida | D422093 | Indian River | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,470,967.00 | |
Florida | D422093 | Indian River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,881,759.00 | |
Florida | D422093 | Indian River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,000.00 | $6,269,141.00 |
Florida | D422093 | Indian River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,595,314.00 | $24,017,270.00 |
Florida | D423002 | Indian River | >= 50,000 AND < 200,000 | Local | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $2,297,071.00 | $36,142,190.00 |
Florida | D423002 | Indian River | >= 50,000 AND < 200,000 | Local | PROTECT PROGRAM APPORTIONED | Utilities | $5,527,234.00 | |
Florida | D423002 | Indian River | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,483,660.00 | |
Florida | D423002 | Indian River | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $828,672.00 | $5,672,693.00 |
Florida | D423057 | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,108,447.00 | $33,257,543.00 |
Florida | D424062 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $27,307,631.53 | |
Florida | D424062 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,147,349.47 | |
Florida | D424062 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,115,051.23 | |
Florida | D424062 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $781,842.77 | |
Florida | D424062 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,879,435.89 | |
Florida | D424062 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,018,980.11 | |
Florida | D424062 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $235,132.00 | |
Florida | D424062 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $164,868.00 | |
Florida | D424062 | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,252.10 | |
Florida | D424062 | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $877.90 | |
Florida | D517015 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $48,868,436.00 | |
Florida | D517015 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,388,231.00 | $163,211,357.00 |
Florida | D517015 | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $120,055,112.00 | $120,055,112.00 |
Florida | D517015 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $20,000.00 | $20,000.00 |
Florida | D517015 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $3,853,827.00 | $10,889,656.00 |
Florida | D519013 | Lake | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $5,716,514.00 | $5,716,514.00 |
Florida | D519013 | Lake | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $15,821,159.00 | $15,821,159.00 |
Florida | D519013 | Lake | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1.00 | $1.00 |
Florida | D519013 | Lake | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $6,009,171.00 | $6,009,171.00 |
Florida | D519013 | Lake | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | $121,891.00 | $121,891.00 |
Florida | D519013 | Lake | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $839,043.00 | $839,043.00 |
Florida | D519013 | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,583,984.00 | $15,621,942.00 |
Florida | D519013 | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,177,062.00 | |
Florida | D519013 | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,543,914.00 | $5,548,378.00 |
Florida | D519013 | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,501,046.00 | |
Florida | D520035 | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Administration | $3,861,622.00 | |
Florida | D520035 | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $6,622,000.00 | $9,963,748.00 |
Florida | D520035 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,455,645.00 | $5,856,699.00 |
Florida | D520035 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $47,774,476.00 | $55,949,327.00 |
Florida | D520035 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,050,000.00 | |
Florida | D520035 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,607,570.00 | $8,607,570.00 |
Florida | D520075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $5,394.48 | |
Florida | D520075 | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $5.52 | |
Florida | D520075 | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $28,603.88 | $29,343.70 |
Florida | D520075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $27,961,192.12 | $28,684,395.30 |
Florida | D520075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,920,293.57 | |
Florida | D520075 | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,964.43 | |
Florida | D520075 | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $768.89 | $2,251.69 |
Florida | D520075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $751,614.11 | $2,201,101.31 |
Florida | D520104 | Seminole | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $904,098.30 | $904,098.30 |
Florida | D520104 | Seminole | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $747,705.70 | $747,705.70 |
Florida | D520104 | Seminole | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $88,953.69 | $88,953.69 |
Florida | D520104 | Seminole | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $73,566.31 | $73,566.31 |
Florida | D520104 | Seminole | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,960,707.96 | $1,960,707.96 |
Florida | D520104 | Seminole | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,621,541.04 | $1,621,541.04 |
Florida | D520104 | Seminole | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $44,476.30 | $44,476.30 |
Florida | D520104 | Seminole | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $36,782.70 | $36,782.70 |
Florida | D520104 | Seminole | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $377,897.19 | $377,897.19 |
Florida | D520104 | Seminole | >= 200,000 | Local | REPURPOSED SPECIAL | 4R - Added Capacity | $312,527.81 | $312,527.81 |
Florida | D520104 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $549,063.54 | $7,325,436.33 |
Florida | D520104 | Seminole | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $454,085.46 | $6,058,268.67 |
Florida | D520104 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $743,011.78 | |
Florida | D520104 | Seminole | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $614,484.22 | |
Florida | D520104 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,101,006.60 | $1,592,771.29 |
Florida | D520104 | Seminole | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $910,552.40 | $1,317,250.71 |
Florida | D520104 | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,228,721.79 | |
Florida | D520104 | Seminole | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,016,175.21 | |
Florida | D521023 | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $14,760,028.00 | $14,760,028.00 |
Florida | D521023 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $179,428,097.00 | $180,673,408.00 |
Florida | D521023 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $12,908,905.00 | |
Florida | D521023 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,037,322.00 | $15,292,173.00 |
Florida | D521023 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $18,841.00 | $87,287.00 |
Florida | D521023 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,197,050.00 | $15,336,589.00 |
Florida | D521049 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,059,111.00 | $11,945,668.00 |
Florida | D521049 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,500,405.00 | |
Florida | D521049 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $14,279,737.00 | $14,279,737.00 |
Florida | D521049 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $152,080.00 | $1,755,399.00 |
Florida | D521049 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $34,500.00 | $34,500.00 |
Florida | D521092 | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $11,515,699.00 | $23,347,569.00 |
Florida | D521092 | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Administration | $1,061,134.00 | |
Florida | D521092 | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $1,714,687.00 | $2,552,778.00 |
Florida | D522091 | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $2,088,570.00 | $48,838,290.00 |
Florida | D522091 | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | Administration | $162,951.00 | |
Florida | D522091 | Osceola | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,270,144.00 | $2,278,262.00 |
Florida | D522091 | Osceola | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $35,000.00 | $35,000.00 |
Florida | D523009 | Marion | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - No Added Capacity | $629,725.00 | $629,725.00 |
Florida | D523009 | Marion | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - No Added Capacity | $5,850,000.00 | $8,217,638.00 |
Florida | D523009 | Marion | >= 200,000 | State | CARBON REDUCTION PROGRAM | Administration | $1,204,594.00 | |
Florida | D523009 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,054,383.00 | |
Florida | D523021 | Volusia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,869,543.00 | |
Florida | D523021 | Volusia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,406,894.00 | |
Florida | D523021 | Volusia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $95,698,443.00 | |
Florida | D523021 | Volusia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $16,834,696.00 | |
Florida | D523040 | Marion | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $4,872.00 | $4,872.00 |
Florida | D523040 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $55,697,198.00 | |
Florida | D523040 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,180,416.00 | |
Florida | D523040 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,904,094.00 | $40,064,919.00 |
Florida | D523040 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $3,627,170.00 | |
Florida | D523040 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $102,902.00 | $4,046,091.00 |
Florida | D523042 | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $365,615.00 | $365,615.00 |
Florida | D523042 | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $802,538.00 | $802,538.00 |
Florida | D523042 | Osceola | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $152,432.00 | $24,675,766.00 |
Florida | D523042 | Osceola | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Administration | $62,748.00 | |
Florida | D524037 | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $98,672,598.00 | |
Florida | D524037 | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,045,679.00 | |
Florida | D524037 | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,556,067.00 | |
Florida | D619048 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $14,440,966.00 | $14,440,966.00 |
Florida | D619048 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $2,096,000.00 | $7,384,075.00 |
Florida | D619048 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,057,807.00 | |
Florida | D619048 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,678,882.00 | |
Florida | D620056 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $52,680,546.00 | |
Florida | D620056 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,659,216.00 | |
Florida | D620056 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $60,878,771.00 | $64,885,086.00 |
Florida | D620056 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $48,519.00 | $48,519.00 |
Florida | D620056 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,451,368.00 | $2,859,110.00 |
Florida | D621008 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $45,635,044.00 | $45,635,044.00 |
Florida | D621008 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,976,356.00 | |
Florida | D621008 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,242,657.00 | $6,267,394.00 |
Florida | D621008 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $598,265.00 | $598,265.00 |
Florida | D622032 | Miami-Dade | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $32,029.00 | $32,029.00 |
Florida | D622032 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $128,126,743.00 | |
Florida | D622032 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,342,569.00 | |
Florida | D622032 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $17,698,424.00 | |
Florida | D622032 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,030,420.00 | |
Florida | D622074 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $34,429,464.00 | $34,429,464.00 |
Florida | D622074 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $12,094,467.00 | $12,094,467.00 |
Florida | D622074 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Rail/Hwy Crossing | $500,000.00 | $500,000.00 |
Florida | D622074 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $373,135.00 | |
Florida | D622075 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $71,694,063.00 | $71,694,063.00 |
Florida | D622075 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $13,017,517.00 | $13,017,517.00 |
Florida | D622075 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Rail/Hwy Crossing | $500,000.00 | $500,000.00 |
Florida | D624006 | Miami-Dade | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $10,890.00 | $10,890.00 |
Florida | D624006 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,540,873.00 | |
Florida | D624006 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,555,731.00 | |
Florida | D624006 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $964,501.00 | $39,941,744.00 |
Florida | D624006 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $22,314.00 | $22,314.00 |
Florida | D717065 | Pasco | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $79,971.25 | $79,971.25 |
Florida | D717065 | Pasco | >= 200,000 | Other | CONGESTION AIR QUALITY | 4R - No Added Capacity | $82,110.75 | $82,110.75 |
Florida | D717065 | Pasco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,979,589.82 | $17,439,447.51 |
Florida | D717065 | Pasco | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,433,847.18 | $17,906,007.49 |
Florida | D717065 | Pasco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,486,955.07 | |
Florida | D717065 | Pasco | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,553,488.93 | |
Florida | D717065 | Pasco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,767,471.64 | $4,365,215.37 |
Florida | D717065 | Pasco | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,868,263.36 | $4,481,998.63 |
Florida | D718036 | Pasco | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $1,922,510.00 | $1,922,510.00 |
Florida | D718036 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,035,509.00 | $9,035,509.00 |
Florida | D718036 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,666,803.00 | $41,553,492.00 |
Florida | D718036 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,948,379.00 | |
Florida | D718036 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,885,826.00 | $8,045,522.00 |
Florida | D718036 | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,970,335.00 | |
Florida | D718036 | Pasco | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $1,063,384.00 | $1,063,384.00 |
Florida | D718055 | Pinellas | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $3,143,906.00 | $3,143,906.00 |
Florida | D718055 | Pinellas | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Replacement - Added Capacity | $71,784.00 | $71,784.00 |
Florida | D718055 | Pinellas | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $6,558,502.00 | $6,558,502.00 |
Florida | D718055 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,034,082.28 | |
Florida | D718055 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,513,744.72 | |
Florida | D718055 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $188,545,371.00 | $848,539,528.00 |
Florida | D718055 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,958,338.66 | $5,578,650.41 |
Florida | D718055 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,760,514.34 | $13,561,109.59 |
Florida | D718055 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $3,015.25 | $3,015.25 |
Florida | D718055 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $7,329.75 | $7,329.75 |
Florida | D718055 | Pinellas | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - Added Capacity | $26,297,958.00 | $26,297,958.00 |
Florida | D718056 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,745,300.00 | |
Florida | D718056 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,511,503.00 | $2,511,503.00 |
Florida | D718056 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $30,866,218.00 | $31,780,512.00 |
Florida | D718056 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $13,791,406.00 | |
Florida | D718067 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $32,691,878.00 | $32,944,598.00 |
Florida | D718067 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,931,959.00 | |
Florida | D718067 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,925,458.00 | $5,158,619.00 |
Florida | D718067 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,726,608.00 | |
Florida | D719008 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,732,755.00 | $19,559,924.00 |
Florida | D719008 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,002,453.00 | |
Florida | D719008 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,948,147.00 | $2,612,447.00 |
Florida | D719008 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,968,947.00 | |
Florida | D719008 | Hernando | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $352,272.00 | $352,272.00 |
Florida | D720024 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,771,032.00 | $21,062,595.00 |
Florida | D720024 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,417,314.00 | |
Florida | D720024 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,079,978.00 | |
Florida | D720024 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,513,944.00 | |
Florida | D720024 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,500.00 | |
Florida | D720029 | Hillsborough | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $378,026.00 | $378,026.00 |
Florida | D720029 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $20,523,933.00 | $23,167,880.00 |
Florida | D720029 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,242,243.00 | |
Florida | D720029 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,889,766.00 | |
Florida | D720029 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $119,592.00 | |
Florida | D720029 | Hillsborough | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Maintenance Resurfacing | $2,722,459.00 | $2,735,508.00 |
Florida | D720029 | Hillsborough | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $280,964.00 | |
Florida | D720029 | Hillsborough | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $200.00 | $82,511.00 |
Florida | D720031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $86,889,931.00 | $91,087,330.00 |
Florida | D720031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,279,710.00 | |
Florida | D720031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,364,037.00 | $9,753,594.00 |
Florida | D720031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $967,748.00 | $967,748.00 |
Florida | D720031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $406,257.00 | |
Florida | D721012 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,693,072.00 | $41,637,157.00 |
Florida | D721012 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,962,596.00 | |
Florida | D721012 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,747,366.00 | $6,889,396.00 |
Florida | D721012 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $146,683.00 | |
Florida | D721013 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,039,176.00 | $54,360,317.00 |
Florida | D721013 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,196,138.00 | |
Florida | D721013 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,881,037.00 | $6,768,406.00 |
Florida | D721013 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $51,427.00 | |
Florida | D721013 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $621,922.00 | $621,922.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $2,989,151.00 | $2,989,151.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $73,974,259.00 | $73,974,259.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,742,770.00 | $3,723,840.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $812,600.00 | $812,600.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $68,002.00 | $68,002.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $20,675,105.00 | $21,052,474.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $4,224,254.00 | |
Florida | D721023 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,681,761.00 | $5,501,801.00 |
Florida | D721023 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $9,936,620.00 | |
Florida | D721023 | Pinellas | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $298,916.00 | $298,916.00 |
Florida | D721027 | Hillsborough | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,095,260.00 | $1,670,591.00 |
Florida | D721027 | Hillsborough | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $510,640.00 | $510,640.00 |
Florida | D721027 | Hillsborough | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Administration | $1,202,898.00 | |
Florida | D721027 | Hillsborough | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Construction Engineering | $289,500.00 | $289,500.00 |
Florida | D721027 | Hillsborough | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Other | $9,782,100.00 | $23,351,364.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $2,197,136.00 | $2,197,136.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $2,683,028.00 | $2,683,028.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $107,203,174.00 | $107,843,355.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,887,738.00 | $9,136,933.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $740,000.00 | $1,142,667.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,622,027.00 | $5,622,027.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $8,430,647.00 | |
Florida | D721035 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $339,348.00 | $485,463.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $9,279,559.00 | |
Florida | D721035 | Pinellas | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $1,255,130.00 | $1,255,130.00 |
Florida | D721035 | Pinellas | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $3,191,531.00 | $3,191,531.00 |
Florida | D722039 | Pinellas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $413,433.00 | $417,788.00 |
Florida | D722039 | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $64,011.00 | $64,011.00 |
Florida | D722039 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $5,483,180.00 | $5,638,347.00 |
Florida | D722039 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $8,310,300.00 | $17,519,332.00 |
Florida | D722039 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,443,022.00 | |
Florida | D722039 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,149,582.00 | |
Florida | D722039 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $74,566.00 | $74,566.00 |
Florida | D722039 | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $264,906.00 | |
Florida | D722064 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $35,118,052.00 | $36,608,594.00 |
Florida | D722064 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,797,591.00 | |
Florida | D722064 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,913.00 | $3,538,545.00 |
Florida | D722064 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $50,000.00 | |
Florida | D723023 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,643,400.00 | |
Florida | D723023 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $859,146.00 | |
Florida | D723023 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,962,709.00 | |
Florida | D723023 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $50,000.00 | |
Florida | D723029 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,830,008.64 | |
Florida | D723029 | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,537,211.36 | |
Florida | D723029 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $971,582.71 | |
Florida | D723029 | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $193,091.29 | |
Florida | D723029 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,195,300.45 | |
Florida | D723029 | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $635,030.55 | |
Florida | D723030 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $51,866,711.00 | |
Florida | D723030 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,787,550.00 | |
Florida | D723030 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,637,737.00 | |
Florida | D723031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $46,309,464.00 | |
Florida | D723031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,508,415.00 | |
Florida | D723031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,943,569.00 | |
Florida | D723031 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $546,657.00 | |
Florida | D723070 | Hillsborough | >= 200,000 | Other | NAT SIG FREIGHT AND HWY PROJ | Administration | $1,061,004.00 | |
Florida | D723070 | Hillsborough | >= 200,000 | Other | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $2,892,785.00 | $3,733,503.00 |
Florida | D723070 | Hillsborough | >= 200,000 | Other | NAT SIG FREIGHT AND HWY PROJ | Freight | $12,107,215.00 | $27,101,769.00 |
Florida | E221002 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Construction Engineering | $4,190,793.00 | $4,190,793.00 |
Florida | E221002 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Other | $134,203,542.00 | $143,032,837.00 |
Florida | E221002 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Preliminary Engineering | $2,417,671.00 | $2,417,671.00 |
Florida | E221003 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Construction Engineering | $2,653,697.00 | $2,653,697.00 |
Florida | E221003 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Other | $70,179,243.00 | $70,179,243.00 |
Florida | E221003 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Preliminary Engineering | $5,035.00 | $5,035.00 |
Florida | E221003 | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $14,239,006.00 | |
Florida | E221003 | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $86,859,089.00 | |
Florida | E221003 | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $14,072,218.00 | |
Florida | E221003 | Lee | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,609,704.00 | |
Florida | E221006 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Construction Engineering | $4,056,745.00 | $4,951,479.00 |
Florida | E221006 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Other | $35,759,950.00 | $43,646,957.00 |
Florida | E221006 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Preliminary Engineering | $5,830,951.00 | $7,116,996.00 |
Florida | E221014 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Construction Engineering | $1,629,366.00 | $1,988,730.00 |
Florida | E221014 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Other | $16,684,489.00 | $20,364,323.00 |
Florida | E221014 | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Preliminary Engineering | $3,030,509.00 | $3,698,902.00 |
Florida | E221014 | Lee | >= 200,000 | Other | EMERGENCY RELIEF | Preliminary Engineering | $255,799.00 | $312,217.00 |
Florida | E231006 | Flagler | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Administration | $7,182.37 | |
Florida | E231006 | Volusia | >= 200,000 | State | EMERGENCY RELIEF | Administration | $2,225,995.63 | |
Florida | E231006 | Flagler | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $8,337.80 | $10,176.74 |
Florida | E231006 | Volusia | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $2,584,093.20 | $3,154,027.26 |
Florida | E231006 | Flagler | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Other | $141,095.92 | $172,215.21 |
Florida | E231006 | Volusia | >= 200,000 | State | EMERGENCY RELIEF | Other | $43,729,133.08 | $53,373,774.79 |
Florida | E231006 | Volusia | >= 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $3,732,288.44 | $4,555,462.39 |
Florida | E231006 | Flagler | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $12,042.56 | $14,698.61 |
Florida | NASA002 | Brevard | >= 200,000 | State | FRA TRANSFER DEVELOPMENT | Bridge Replacement - No Added Capacity | $12,778,000.00 | $12,778,000.00 |
Florida | NASA002 | Brevard | >= 200,000 | State | FRA TRANSFER DEVELOPMENT | Construction Engineering | $710,000.00 | $710,000.00 |
Florida | NASA002 | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Administration | $4,875,554.00 | |
Florida | NASA002 | Brevard | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $70,241,965.00 | $70,241,965.00 |
Florida | NASA002 | Brevard | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $437,051.70 | $593,631.16 |
Florida | NASA002 | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $6,090,597.30 | $8,226,542.84 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,259,859.00 | $1,259,859.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,139,869.00 | $16,081,331.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $194,860,142.00 | $2,342,736,170.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,842,639.00 | $4,653,611.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $171,996.00 | $171,996.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $587,707.00 | $587,707.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $157,567.00 | $157,567.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | SECTION 149(B) | Preliminary Engineering | $103,548.00 | $103,548.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | SECTION 149(D) | Preliminary Engineering | $146,246.00 | $146,246.00 |
Florida | PMT1001 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,000.00 | $1,000.00 |
Florida | SR20001 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $49,379,866.00 | $55,639,371.00 |
Florida | SR20001 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $2,755,499.00 | $2,771,481.00 |
Florida | SR20001 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $6,507,729.00 | |
Florida | SR20001 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,445,180.00 | $6,888,901.00 |
Florida | SR20001 | Putnam | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $951,552.00 | $1,008,794.00 |
Florida | TAMI002 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Administration | $3,608,590.00 | |
Florida | TAMI002 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge New Construction | $53,225,456.00 | $53,225,456.00 |
Florida | TAMI002 | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $6,774,544.00 | $11,341,377.00 |
Florida | TAMI002 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,945,742.00 | $14,327,096.00 |
Florida | TAMI002 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $827,115.00 | $3,172,785.00 |
Florida | TAMI002 | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $120,003.00 | |
Florida | TAMI002 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $51,253.00 | |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Administration | $114,565.56 | |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Administration | $104,317.44 | |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $77,301.38 | $660,126.28 |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $70,386.62 | $601,076.72 |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $346,119.12 | $523,046.09 |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $413,663.82 | $616,856.85 |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,356,576.94 | $1,509,776.56 |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,252,083.06 | $1,435,179.44 |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $734,820.37 | |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $878,219.63 | |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety and Education for Peds/Bicyclists | $3,712,425.12 | $4,578,581.00 |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Safety and Education for Peds/Bicyclists | $4,316,251.88 | $5,351,437.00 |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety and Education for Peds/Bicyclists | $523,410.00 | $523,410.00 |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety and Education for Peds/Bicyclists | $476,590.00 | $476,590.00 |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Construction Engineering | $715,515.09 | $2,069,413.99 |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | Construction Engineering | $651,510.91 | $1,884,301.01 |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Safety and Education for Peds/Bicyclists | $5,671,420.58 | $5,671,420.58 |
Florida | TGER002 | Miami-Dade | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Safety and Education for Peds/Bicyclists | $16,505,826.00 | $18,958,758.00 |
Florida | TGER002 | Miami-Dade | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | Safety and Education for Peds/Bicyclists | $5,164,101.42 | $5,164,101.42 |
Florida | TGER004 | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $6,875,000.00 | $22,727,516.08 |
Florida | TGER004 | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $11,710,000.00 | $38,711,158.29 |
Florida | TGER004 | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $6,415,000.00 | $21,206,838.63 |
Florida | TGER004 | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Administration | $1,070,530.45 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Administration | $1,823,405.32 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Administration | $998,902.23 | |
Florida | TGER004 | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,299,743.05 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $3,917,089.62 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,145,869.33 | |
Florida | TGER004 | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,915,881.27 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $3,263,268.33 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,787,691.40 | |
Florida | TGER004 | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $590,519.33 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $1,005,815.46 | |
Florida | TGER004 | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $551,008.21 | |
Florida | TPEX275 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $433,188,831.00 | $954,592,986.00 |
Florida | TPEX275 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $104,183,559.00 | |
Florida | TPEX275 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $33,118,503.00 | $101,888,238.00 |
Florida | TPEX275 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $2,500,000.00 | |
Florida | TPEX275 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $17,860,547.00 | |
Florida | TPEX275 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $146,592,782.00 | $497,826,598.00 |
Florida | TPEX275 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,092,232.00 |