RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Louisiana | 0021023 | I-49, I-49 NORTH (LA 2 TO MIRA-MYRTIS ROAD) | $21,631,118.39 | $26,613,863.84 |
Louisiana | 0101212 | CALCASIEU RIVER BRIDGE | $183,304,140.70 | $2,181,893,136.86 |
Louisiana | 0905504 | I-49 NORTH; (Mira-Myrtis Road - LA 168) | $33,628,253.85 | $33,899,810.31 |
Louisiana | 3806500 | REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE | $109,547,580.50 | $224,964,599.42 |
Louisiana | 4507502 | I-310 MISSISSIPPI RIVER BRIDGE (LULING) | $50,773,140.40 | $63,466,425.51 |
Louisiana | H000343 | US 190; BEG LOG MILE 0.000 END LOG MILE 1.110; MISSISSIPPI RIVER BRIDGE CLEAN, PAINT & REPAIR PHASE 1 | $75,616,757.33 | $116,908,938.98 |
Louisiana | H000382 | US 71; BAYOU BRIDGE (REPLACEMENT) | $5,965,934.96 | $28,645,407.74 |
Louisiana | H000428 | ROUTE LA 12 | $26,417,904.31 | $33,022,380.42 |
Louisiana | H000665 | MISSOURRI PACIFIC RAILROAD OVERPASS NEAR BONITA, END. BEG LOG MI 9.061,END LOG MI 9.35 | $4,780,104.28 | $38,876,255.81 |
Louisiana | H001120 | OUACHITA RIVER BRIDGE (HARRISONBURG) | $35,584,174.67 | $44,480,218.35 |
Louisiana | H001234 | LA 1: PORT ALLEN CANAL BR REPL (PH1)(HBI) | $97,111,734.85 | $117,267,163.97 |
Louisiana | H001263 | LA 1 AT JCT LA 107 & JCT 1189; BEG. LOG. MILE 7.290 END LOG MILE 10.480 | $23,057,271.25 | $28,821,589.24 |
Louisiana | H001344 | US 190: LA 437 - US 190 BUS (PH 1) | $29,277,359.89 | $43,031,967.45 |
Louisiana | H001498 | LA 24 DISTRICT 02 TERREBONNE PARISH BEG. LOG MILE 1.000 END LOG MILE 1.403 BRIDGE REPLACEMENT | $32,897,151.78 | $41,121,433.68 |
Louisiana | H001779 | JIMMIE DAVIS BRIDGE (LA 511); REPLACE EXISTING TRUSS WITH NEW BRIDGE AND APPROACHES | $1,018,229.17 | $411,030,481.50 |
Louisiana | H002365 | LA 63 BRIDGES NEAR BLUFF CREEK | $21,629,472.67 | $27,036,840.85 |
Louisiana | H002370 | LA 42: US 61 - LA 44; | $30,270,977.92 | $59,800,282.37 |
Louisiana | H002375 | AMITE R.BR. NEAR FRENCH SETTLEMENT; BEG: 700' BEFORE BRIDGE BEGIN; END: 700' AFTER BRIDGE END | $21,329,727.21 | $26,662,159.11 |
Louisiana | H002424 | LA 70: SUNSHINE BRIDGE - LA 22 | $35,808,486.88 | $65,655,137.04 |
Louisiana | H002622 | ROUTE LA 616; ARKANSAS ROAD: (CALDWELL ROAD - LA 143) | $66,902,936.33 | $83,708,710.42 |
Louisiana | H002868 | I-49 S:AMB CAFFERY/US90 INTERCHANGE | $21,971,599.81 | $204,780,085.08 |
Louisiana | H002980 | I-10 OVERPASS OVER US 165 | $18,934,456.53 | $98,846,317.82 |
Louisiana | H003003 | I-10: E. JCT I-49 TO LA 328; BEG: E. JCT I-49; END: LA 328 | $148,722,227.82 | $186,715,041.00 |
Louisiana | H003014 | I-10: LA 347 TO ATCHAFALAYA FLDWY BR | $69,589,657.87 | $88,354,253.69 |
Louisiana | H003047 | PECUE LANE/I-10 INTERCHANGE | $50,089,114.00 | $94,432,400.95 |
Louisiana | H003184 | I-10: TEXAS STATE LINE-E. OF COONE GULLY | $158,327,984.42 | $175,093,624.31 |
Louisiana | H003370 | I-220/1-20 INTERCHANGE IMP & BAFB ACCESS | $54,615,407.94 | $122,391,189.98 |
Louisiana | H003425 | I-12: LA 63 - TANGIPAHOA PARISH LINE | $25,043,519.20 | $28,748,965.99 |
Louisiana | H003495 | I-49 NORTH ( I-220 TO MARTIN LUTHER KING DRIVE) BEG. LOG MILE 0.000 END LOG MILE 1.024 | $21,210,200.00 | $62,623,421.89 |
Louisiana | H004100 | I-10; LA 415 TO ESSEN ON I-10 AND I-12 | $170,379,473.43 | $375,984,483.19 |
Louisiana | H004113 | LA 3241: LA 435 TO LA 40/LA 41(BUSH) | $17,251,187.69 | $76,184,276.21 |
Louisiana | H004435 | LA 3241: LA 36 TO LA 435 | $18,994,625.31 | $94,357,386.64 |
Louisiana | H005967 | Nelson Road, Extension of Nelson Road to Contraband Bayou, New Bridge over bayou for access to Port of Lake Charles | $82,872,440.19 | $146,599,214.47 |
Louisiana | H006196 | WISNER BLVD BRIDGE REPLACEMENT; BEG: EXIST. STRUCTURE: 24'W X 1423'L | $20,116,947.67 | $25,202,578.20 |
Louisiana | H007289 | KANSAS LANE EXTENSION; INTERSECTION OF US 80 AND EXISTING KANSAS LANE TO INTERSECTION OF US 165 AND FORSYTHE AVE. EXT. | $21,144,685.32 | $31,125,842.62 |
Louisiana | H008145 | LA 1: LEEVILLE TO GOLDEN MEADOW (PHASE 2) | $167,203,564.14 | $507,461,198.13 |
Louisiana | H008226 | CHENIERE SPILLWAY & BRIDGE REPLACEMENT; ROUTE: LA 3033; TYPE: REPLACEMENT OF A CONCRETE DECK GIRDER BRIDGE. | $20,205,982.68 | $25,257,478.34 |
Louisiana | H009250 | I-10; HIGHLAND ROAD TO LA 73; WIDEN I-10 FROM 4 TO 6 LANES TOWARDS THE MEDIAN SIDE | $85,204,847.29 | $98,140,121.15 |
Louisiana | H009461 | I-10 ATCHAFALAYA FLDWY CLEAN & PAINT; | $23,994,928.93 | $26,590,222.37 |
Louisiana | H009479 | ROUTE LA 1; STRUCTURAL REPAIRS CLEANING AND PAINTING OF VERTICAL LIFT BRIDGE | $28,405,885.41 | $35,507,356.78 |
Louisiana | H009498 | LA 121: CALCASIEU RIVER BRIDGE | $17,551,398.58 | $35,191,173.77 |
Louisiana | H009620 | I-10:WEST OF LA 108 TO 1-210 INTERCHANG | $48,619,057.51 | $58,606,429.81 |
Louisiana | H010018 | I-10: NO EAST DRAIN CANAL BRIDGE REPLACE | $28,912,673.03 | $36,140,841.29 |
Louisiana | H010037 | NEW FERRY BOAT / CAMERON FERRY CROSSING | $54,590,000.00 | |
Louisiana | H010353 | US 167: ACCESS MANAGEMENT (LFT TURN LNS) | $20,420,952.95 | $25,086,974.19 |
Louisiana | H010601 | I-10: LA 328 to LA 347 | $96,053,949.97 | $115,455,732.66 |
Louisiana | H010652 | LA 73: US 61 (AIRLINE) - ESSEN LANE | $20,640,588.79 | $25,800,735.99 |
Louisiana | H010673 | US90Z : HARVEY CANAL TUNNEL REHABILITATION | $42,168,111.44 | $72,512,835.09 |
Louisiana | H010916 | PRIEN LAKE MAIN SPAN RE-DECKING (DDIR LA2020-01 I-210: C.S. 450-30: LM 1.02 - 4.00) | $48,526,147.42 | $53,931,489.33 |
Louisiana | H010960 | LA 30 ROUNDABOUTS @ TANGER MALL & I-10 | $21,436,494.44 | $37,977,561.61 |
Louisiana | H011111 | I-49 NORTH, SEGMENT K - PHASE 2; SCOPE: Construction of new roadway, including bridges for I-49 North, between I-220 and MLK Dr | $62,919,647.40 | $159,845,825.80 |
Louisiana | H011137 | I-12: LA 21 TO US 190; Scope: Roadway widening and overlay includes bridge widening/replacement. | $5,224,453.63 | $68,423,865.04 |
Louisiana | H011152 | I-12: US 190 TO LA 59; ROADWAY WIDENING AND OVERLAY | $61,878,711.03 | $74,922,664.65 |
Louisiana | H011446 | MOUND REST AREA RENOVATIONS | $25,931,928.21 | $28,813,253.56 |
Louisiana | H011487 | LA 182: BERWICK BAY BRIDGE REHAB (HBI) | $35,937,556.76 | $44,921,945.96 |
Louisiana | H011670 | I-10 / LOYOLA INTERCHANGE IMPROVEMENT | $101,146,022.74 | $225,565,400.38 |
Louisiana | H011705 | US 11: LAKE PONTCHARTRAIN BR. REHAB PH 2 | $36,968,953.41 | $46,211,164.77 |
Louisiana | H011915 | AIRPORT CONNECTOR ROAD AND BRIDGE | $17,528,716.80 | $31,069,459.31 |
Louisiana | H011965 | LA 47: IWGO BRIDGE REHABILITATION (HBI) | $57,262,340.39 | $71,577,925.49 |
Louisiana | H012174 | I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR) | $90,110,453.59 | $98,819,925.25 |
Louisiana | H012232 | LA 3064 TO LA 1248 PHASE 2 | $20,291,500.87 | $30,028,943.16 |
Louisiana | H012588 | I-10: ATCH BASIN BR - W BATON ROUGE P/L | $24,448,087.74 | $27,164,541.93 |
Louisiana | H012889 | I-20 REHAB (W OF LA 3 TO AIRLINE DR) | $105,539,992.11 | $160,976,572.91 |
Louisiana | H013116 | LA 20 WIDEN: LA 307 - S. VACHERIE | $23,166,553.96 | $25,575,030.90 |
Louisiana | H013196 | US 190: 0.5 MI W OF LA 978 - LA 976 | $21,156,384.28 | $26,445,480.35 |
Louisiana | H013203 | US 90: LA 318 - LA 83 | $51,045,249.96 | $63,806,562.45 |
Louisiana | H013245 | MOTORIST ASSISTANCE PATROL (MAP) | $28,346,245.86 | $35,432,807.33 |
Louisiana | H013265 | US 90: LA 14 - LA 83 | $31,379,572.97 | $38,619,895.39 |
Louisiana | H013866 | I-12: LA 21 TO US 190 | $58,416,626.79 | $73,033,933.48 |
Louisiana | H013897 | I-10 & I-12 COLLEGE DR FLYOVER RAMP | $35,430,631.37 | $85,749,329.21 |
Louisiana | H014093 | LA 6: US 171 TO NATCHITOCHES P.L. | $21,643,268.47 | $27,154,085.59 |
Louisiana | H014146 | US 190: ROUGON RD - 0.5 MI W OF LA 978 | $20,402,803.92 | $25,690,428.34 |
Louisiana | H014258 | LA 1:PORT ALLEN CANAL BR REPL (PH2)(HBI) | $98,355,798.71 | $122,944,748.40 |
Louisiana | H014354 | N MONROE ST: S SERVICE RD W - W PARK AVE | $17,191,530.00 | $28,314,597.62 |
Louisiana | H015028 | LA 302: BAYOU BARATARIA MB REPL PHASE 1 | $59,840,813.58 | $74,842,392.76 |
Louisiana | H015360 | I-49: NB & SB SLOPE REPAIR | $38,827,073.00 |