RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | New Construction Roadway | $1,241,000.79 | $1,378,886.28 |
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Construction Engineering | $3,200,000.00 | $4,000,000.00 |
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $15,544,015.30 | $19,430,017.87 |
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $0.03 | $0.04 |
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $635,429.56 | $794,286.94 |
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | SEC 115 UNOBL BAL TRANSF | New Construction Roadway | $48,457.46 | $48,457.46 |
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | Construction Engineering | $125,506.34 | $125,506.34 |
Louisiana | 0021023 | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | New Construction Roadway | $836,708.91 | $836,708.91 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $2,262,787.80 | $2,828,484.75 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $111,579.26 | $139,474.07 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $2,851,600.00 | $3,952,573.65 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,203,245.00 | $2,754,056.25 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $381,000,000.00 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $67,000,000.00 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $648,584,084.74 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $121,000,000.00 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $410,600,000.00 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $69,100,000.00 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,000,000.00 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $198,600,000.00 | |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $2,129,789.04 | $2,366,432.27 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $150,000,000.00 | $235,500,000.00 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $27,844.80 | $34,806.00 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $930,340.22 | $1,162,925.27 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $27,844.80 | $34,806.01 |
Louisiana | 0101212 | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $22,759,109.78 | $36,235,493.85 |
Louisiana | 0905504 | Caddo | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | $31,546,064.46 | $31,549,064.46 |
Louisiana | 0905504 | Caddo | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Construction Engineering | $1,007,963.56 | $1,007,963.56 |
Louisiana | 0905504 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $271,680.00 | $339,600.00 |
Louisiana | 0905504 | Caddo | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | $802,545.83 | $1,003,182.29 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $24,664.65 | $1,555,830.81 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Bridge Replacement - No Added Capacity | $288,079.80 | $360,099.75 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | N/A | DONOR STATE BONUS | Environmental Only | $605,915.70 | $757,394.62 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $232,007.48 | $290,009.35 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Environmental Only | $153,953.03 | $192,441.29 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $206,006.97 | $257,508.71 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $45,000,000.00 | $56,250,000.00 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $28,313,847.53 | $93,073,848.80 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,119,592.89 | $36,857,324.31 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,400,125.00 | $3,264,125.00 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $48,596.00 | $60,745.00 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,405,514.07 | $3,006,892.59 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,932,240.00 | $8,665,300.00 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $652,807.10 | $816,008.87 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $4,132,720.83 | $11,132,720.83 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $867,279.17 | $867,279.17 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $362,191.37 | $452,739.21 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,330,429.91 | $6,514,819.86 |
Louisiana | 3806500 | Plaquemines | >= 5,000 AND < 50,000 | State | TRAN COMM SYS PRES PILOT-TEA21 | Environmental Only | $471,609.00 | $589,511.25 |
Louisiana | 4507502 | St. Charles | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $40,617,369.04 | $50,771,711.30 |
Louisiana | 4507502 | St. Charles | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $5,403,424.64 | $6,754,280.80 |
Louisiana | 4507502 | St. Charles | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $125,795.21 | $157,244.01 |
Louisiana | 4507502 | St. Charles | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $3,729,054.13 | $4,661,317.66 |
Louisiana | 4507502 | St. Charles | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $897,497.38 | $1,121,871.74 |
Louisiana | H000343 | East Baton Rouge | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Preservation | $28,339,253.20 | $43,814,521.27 |
Louisiana | H000343 | West Baton Rouge | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Preservation | $47,277,504.13 | $73,094,417.71 |
Louisiana | H000382 | Winn | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $11,816.13 | $14,770.16 |
Louisiana | H000382 | Natchitoches | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $184,838.11 | $231,047.64 |
Louisiana | H000382 | Natchitoches | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Utilities | $5,235.38 | $6,544.22 |
Louisiana | H000382 | Winn | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Utilities | $4,255.26 | $5,319.08 |
Louisiana | H000382 | Natchitoches | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $3,100,152.37 | $17,094,660.10 |
Louisiana | H000382 | Winn | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,868,730.37 | $10,304,432.36 |
Louisiana | H000382 | Winn | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $22,739.94 | $28,424.93 |
Louisiana | H000382 | Natchitoches | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $43,942.92 | $54,928.64 |
Louisiana | H000382 | Natchitoches | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $53,324.74 | $66,655.93 |
Louisiana | H000382 | Natchitoches | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $151,767.26 | $189,709.08 |
Louisiana | H000382 | Winn | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $87,386.74 | $109,233.42 |
Louisiana | H000382 | Winn | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $227,557.98 | $284,447.47 |
Louisiana | H000382 | Natchitoches | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $204,187.76 | $255,234.71 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $46,644.17 | $58,305.22 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $111,047.59 | $138,809.49 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $256,164.23 | $320,205.29 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $196,919.17 | $246,148.96 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $262,491.70 | $328,114.63 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $14,331,859.71 | $17,914,824.64 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $285,308.04 | $356,635.05 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $967,452.48 | $1,209,315.60 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $48,556.76 | $60,695.95 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $1,056,378.00 | $1,320,472.50 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | $8,601,873.15 | $10,752,341.44 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $176,310.11 | $220,387.65 |
Louisiana | H000428 | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $76,899.20 | $96,124.00 |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $230,639.48 | $288,299.35 |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | HIGHWAY BRIDGE PROGRAM | Preliminary Engineering | $4,766.24 | $5,957.80 |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $799,817.25 | $999,771.56 |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $25,726,482.40 | |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $307,369.03 | |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,280,679.10 | $1,600,848.87 |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $230,744.56 | $288,430.70 |
Louisiana | H000665 | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,233,457.65 | $9,659,096.10 |
Louisiana | H001120 | Catahoula | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Environmental Only | $60,252.78 | $75,315.97 |
Louisiana | H001120 | Catahoula | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $686,564.71 | $858,205.89 |
Louisiana | H001120 | Catahoula | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $159,866.58 | $199,833.23 |
Louisiana | H001120 | Catahoula | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $34,677,490.60 | $43,346,863.26 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,189,801.32 | $1,487,251.64 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $16,501.46 | $20,626.83 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $15,950,764.48 | $15,950,764.48 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $66,343,727.63 | $82,929,659.54 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,012,712.82 | $11,265,891.04 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $24,747.28 | $30,934.10 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,266,602.74 | $4,083,253.41 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $539,253.87 | $539,253.87 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $691,813.49 | $864,766.86 |
Louisiana | H001234 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $75,809.76 | $94,762.20 |
Louisiana | H001263 | Avoyelles | >= 5,000 AND < 50,000 | N/A | EXTENSION OF ALLOC PROGRAMS | Utilities | $1,693,560.54 | $2,116,950.68 |
Louisiana | H001263 | Avoyelles | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Utilities | $986,617.65 | $1,233,272.07 |
Louisiana | H001263 | Avoyelles | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,331,153.95 | $10,413,942.59 |
Louisiana | H001263 | Avoyelles | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,924,941.63 | $12,406,177.04 |
Louisiana | H001263 | Avoyelles | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $46,135.63 | $57,669.54 |
Louisiana | H001263 | Avoyelles | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $253,966.55 | $317,458.19 |
Louisiana | H001263 | Avoyelles | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,820,895.30 | $2,276,119.13 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $12,427,633.73 | $15,534,542.16 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $5,000,000.00 | $12,685,267.58 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,172,366.27 | $1,465,457.83 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,519,063.12 | $5,648,828.90 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $287,381.99 | $359,227.49 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $83,414.56 | $104,268.20 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,869,794.30 | $2,337,242.89 |
Louisiana | H001344 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,917,705.92 | $4,897,132.40 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Environmental Only | $11,243.83 | $14,054.79 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $8,435.96 | $10,544.95 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $91,762.19 | $114,702.74 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $45,280.00 | $56,600.00 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Environmental Only | $15,792.02 | $19,740.03 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $55,208.92 | $69,011.16 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $26,938,701.21 | $33,673,376.51 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,003,871.93 | $5,004,839.91 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $770,505.34 | $963,125.62 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $799,482.66 | $999,353.32 |
Louisiana | H001498 | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $156,867.72 | $196,084.65 |
Louisiana | H001779 | Caddo | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Environmental Only | $476.61 | $595.76 |
Louisiana | H001779 | Bossier | >= 50,000 AND < 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Environmental Only | $3,989.29 | $4,986.62 |
Louisiana | H001779 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,918,880.68 | |
Louisiana | H001779 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,870,486.32 | |
Louisiana | H001779 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,154,246.88 | |
Louisiana | H001779 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $37,565,753.12 | |
Louisiana | H001779 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $16,940,826.78 | |
Louisiana | H001779 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $201,758,118.81 | |
Louisiana | H001779 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $27,644,777.92 | |
Louisiana | H001779 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $77,659,431.28 | |
Louisiana | H001779 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $25,912.11 | $272,876.47 |
Louisiana | H001779 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $987,851.16 | $1,835,115.96 |
Louisiana | H001779 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $2,731,390.43 | |
Louisiana | H001779 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $7,672,994.47 | |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $17,662,380.71 | $22,077,975.89 |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $27,743.26 | $34,679.07 |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $56,176.95 | $70,221.20 |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,729,059.92 | $3,411,324.90 |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $26,498.40 | $33,123.00 |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $667,554.77 | $834,443.47 |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $258,642.40 | $323,303.00 |
Louisiana | H002365 | East Feliciana | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $201,416.26 | $251,770.32 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $6,491,668.16 | $8,114,585.20 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $2,900,500.00 | $25,383,941.26 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $5,263,710.05 | $6,476,765.54 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | N/A | SURFACE TRANS PRIORITIES S129 | Right of Way | $245,000.00 | $245,000.00 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,980,531.57 | $6,225,664.45 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $322.51 | $403.14 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $3,956,750.00 | $4,165,000.00 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,800,000.00 | $6,000,000.00 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $172,965.00 | $1,633,582.47 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $1,363,303.05 | $1,435,055.84 |
Louisiana | H002370 | Ascension | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | Construction Engineering | $96,227.58 | $120,284.47 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $9,537.82 | $11,922.28 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $21,772.10 | $27,215.13 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $39,768.48 | $49,710.61 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $802,875.12 | $1,003,593.90 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $44,908.09 | $56,135.11 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $37,705.56 | $47,131.96 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Preliminary Engineering | $362,318.67 | $452,898.34 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $18,611,171.30 | $23,263,964.13 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $84,611.47 | $105,764.34 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $617,619.20 | $772,024.00 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $463,738.45 | $579,673.12 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $191,987.20 | $239,984.00 |
Louisiana | H002375 | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,713.75 | $52,142.19 |
Louisiana | H002424 | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $22,442,764.48 | $37,347,833.65 |
Louisiana | H002424 | St. James | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $13,328,297.79 | $22,180,112.87 |
Louisiana | H002424 | Ascension | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $23,480.20 | $29,350.25 |
Louisiana | H002424 | St. James | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $13,944.41 | $17,430.51 |
Louisiana | H002424 | St. James | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $69,698.21 | |
Louisiana | H002424 | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $108,239.52 | |
Louisiana | H002424 | St. James | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,902,472.03 | |
Louisiana | H002622 | Ouachita | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | Utilities | $6,477,628.64 | $8,097,035.80 |
Louisiana | H002622 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $34,071,037.90 | $42,668,837.38 |
Louisiana | H002622 | Ouachita | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $57,075.17 | $71,343.96 |
Louisiana | H002622 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $400.00 | $500.00 |
Louisiana | H002622 | Ouachita | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $23,040,000.00 | $28,800,000.00 |
Louisiana | H002622 | Ouachita | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,649,896.80 | $3,312,371.00 |
Louisiana | H002622 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $606,897.82 | $758,622.28 |
Louisiana | H002868 | Lafayette | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $539,625.50 | |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $37,137,552.49 | |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,069,592.20 | |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $62,574,564.29 | |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,007,230.02 | |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $42,277,132.38 | |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,767,047.00 | |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $21,542,796.63 | $50,871,337.22 |
Louisiana | H002868 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $428,803.18 | $536,003.98 |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $415,186.13 | $518,982.66 |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $16,504,255.98 | $20,630,319.98 |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $75,178,247.16 | |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $645,177.09 | $806,471.36 |
Louisiana | H002980 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $67,560.52 | $84,450.65 |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,102,100.07 | $1,377,625.08 |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $133,086.95 | $166,358.69 |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $22,640.00 | $28,300.00 |
Louisiana | H002980 | Jefferson Davis | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $44,449.79 | $55,562.24 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $4,375.25 | $4,861.40 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $12,715.55 | $14,128.38 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $44,772.64 | $1,221,869.07 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | $768,934.00 | $961,167.50 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $8,759.10 | $9,732.35 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $25,456.20 | $28,284.65 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $82,573.80 | $91,748.65 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $239,980.12 | $266,644.60 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $29,090,000.00 | $36,362,500.00 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $20,910,000.00 | $26,137,500.00 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,085,074.19 | $21,361,342.74 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,699,712.47 | $7,124,640.59 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $15,934,791.91 | $19,918,489.91 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $115,800.90 | $144,751.10 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,959,184.02 | $4,948,980.01 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,540,670.65 | $1,712,855.99 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $535,313.45 | $595,499.63 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,758,195.83 | $2,197,744.79 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $13,396.29 | $16,647.81 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $402,400.75 | $503,000.94 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $222,639.25 | $278,299.06 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $2,650,164.11 | $3,312,705.14 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,911,838.04 | $6,139,797.56 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Traffic Management/Engineering - HOV | $318,618.10 | $398,272.63 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $20,073,770.00 | $25,072,212.50 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Rehabilitation - Added Capacity | $20,846,142.00 | $26,057,677.50 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $938,552.00 | $1,173,190.00 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $333,166.00 | $416,457.50 |
Louisiana | H003003 | St. Martin | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $178,253.20 | $222,816.50 |
Louisiana | H003003 | Lafayette | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $16,978.00 | $21,222.50 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,900,308.80 | $2,375,386.00 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $4,313,837.20 | $5,392,296.49 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $1,256,755.84 | $1,396,395.38 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $10,000,000.00 | $12,500,000.00 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,016,338.38 | $31,045,960.61 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $15,278,657.95 | $19,731,241.28 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,099,497.41 | $5,129,371.77 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,824,414.88 | $7,280,518.60 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $939,855.53 | $1,053,093.72 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $757,380.29 | $946,725.36 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $869,504.23 | $1,086,880.28 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $190,815.72 | $238,519.66 |
Louisiana | H003014 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Traffic Management/Engineering - HOV | $142,291.64 | $177,864.54 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $5,785,118.00 | $5,785,118.00 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $5,276,796.00 | $6,595,995.00 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,901,760.00 | $2,377,200.00 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,930,865.10 | $41,345,090.05 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,398,989.90 | $4,248,737.38 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,830,145.00 | $22,873,460.52 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,343,040.00 | $6,678,800.00 |
Louisiana | H003047 | East Baton Rouge | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,622,400.00 | $4,528,000.00 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $9,827,388.44 | $9,827,388.44 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Maintenance Resurfacing | $39,171,640.60 | $39,171,640.60 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - Added Capacity | $17,356,248.67 | $17,356,248.67 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $22,088,087.43 | $22,088,087.43 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $85,032.53 | $85,032.53 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,509,805.21 | $1,509,805.21 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,400,000.00 | $13,000,000.00 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,357,620.48 | $4,197,025.60 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,352,595.82 | $2,635,959.17 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $51,927,522.00 | $64,909,402.50 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $237,500.00 | $296,875.00 |
Louisiana | H003184 | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $14,543.24 | $16,159.16 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Debt Service | $1,635,835.00 | $1,635,835.00 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Debt Service | $1,500,000.00 | $1,500,000.00 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $28,253,898.59 | |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,375.00 | $1,375.00 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,519,871.20 | $13,516,055.99 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $369,949.34 | |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $16,132,871.53 | |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $30,340,969.54 | $46,851,445.29 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,802.66 | $9,753.32 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $745,389.54 | $2,255,840.92 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $7,094,165.00 | $7,094,165.00 |
Louisiana | H003370 | Bossier | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,770,000.00 | $4,770,000.00 |
Louisiana | H003425 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,476,888.30 | $1,689,698.92 |
Louisiana | H003425 | Livingston | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $22,650,751.05 | $25,914,417.25 |
Louisiana | H003425 | Livingston | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $42,796.02 | $53,495.03 |
Louisiana | H003425 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,791.05 | $3,488.81 |
Louisiana | H003425 | East Baton Rouge | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $53,283.23 | $66,604.04 |
Louisiana | H003425 | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $817,009.55 | $1,021,261.94 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | Right of Way | $35.22 | $44.03 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | Utilities | $164,098.54 | $205,123.18 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,681.19 | $2,101.49 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $33,138.69 | $41,423.37 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Utilities | $250,324.70 | $312,905.88 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $113,533.06 | $141,916.33 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Right of Way | $4,666,644.50 | $8,595,287.91 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Utilities | $1,386,770.32 | $1,733,462.91 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $294,422.69 | $368,028.36 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $7,119,291.46 | $42,182,803.88 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $118,357.49 | $212,946.86 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,982,045.62 | $3,727,557.02 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $733,972.35 | $917,465.45 |
Louisiana | H003495 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $359,692.49 | $449,615.61 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $2,834,872.22 | $3,543,590.28 |
Louisiana | H003495 | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | New Construction Roadway | $151,319.46 | $189,149.33 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $100,766.86 | $152,250.92 |
Louisiana | H004100 | West Baton Rouge | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $52,535.38 | $79,376.88 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | HIGH PRIORITY CORRIDOR ON NHS | Preliminary Engineering | $86,191.52 | $107,739.40 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $25,554.05 | $28,393.39 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $33,756,868.69 | $137,734,536.22 |
Louisiana | H004100 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $17,599,334.85 | $71,807,654.47 |
Louisiana | H004100 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,461,380.37 | $8,930,081.89 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,639,191.95 | $17,128,579.24 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $147,028.01 | $183,785.01 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $70,028,886.87 | $87,844,820.47 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,977,401.72 | $18,258,294.61 |
Louisiana | H004100 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,244,486.28 | $9,519,065.39 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,025,338.40 | $8,265,104.01 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,198,814.79 | $1,498,518.48 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Preliminary Engineering | $9,650.29 | $12,062.86 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $563,524.12 | $704,405.15 |
Louisiana | H004100 | West Baton Rouge | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $55,617.62 | $65,432.50 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $106,678.84 | $125,504.51 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | SECTION 149(B) | Preliminary Engineering | $0.35 | $0.35 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | SECTION 149(D) | Preliminary Engineering | $4,403.16 | $7,338.60 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $8,000,000.00 | $9,411,764.71 |
Louisiana | H004100 | East Baton Rouge | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,295,819.31 | $4,119,774.13 |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $2,764,714.59 | $3,455,893.24 |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,763,285.41 | $2,204,106.76 |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,655,928.10 | $8,416,810.13 |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,169,921.60 | $5,212,402.00 |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $701,220.00 | $876,525.00 |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $115,118.06 | $143,897.58 |
Louisiana | H004113 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,050,877.19 | |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $6,030,793.28 | |
Louisiana | H004113 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $80,999.93 | $101,249.91 |
Louisiana | H004113 | St. Tammany | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $47,691,721.12 | |
Louisiana | H004435 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $17,789,955.79 | |
Louisiana | H004435 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $130,687.58 | |
Louisiana | H004435 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $4,528,000.00 | $5,660,000.00 |
Louisiana | H004435 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $53,846,581.63 | |
Louisiana | H004435 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,596,946.43 | $9,593,063.04 |
Louisiana | H004435 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,168,458.88 | $6,460,573.60 |
Louisiana | H004435 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $701,220.00 | $876,525.00 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Environmental Only | $757,088.85 | $946,361.07 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Bridge New Construction | $2,384,861.03 | $2,981,076.29 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Environmental Only | $39,762.98 | $232,713.69 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $2,186,488.99 | $2,790,876.43 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $57,872,789.34 | $72,340,986.68 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,260,366.82 | $2,160,334.53 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $670,561.44 | $838,201.80 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $40,954,223.03 | |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $53,246.38 | $66,557.99 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $11,360,943.87 | $15,429,969.84 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $189,424.63 | $236,780.79 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | Bridge New Construction | $941,262.58 | $1,176,578.22 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | REPURPOSED SPECIAL | Bridge New Construction | $4,922,714.30 | $6,153,392.88 |
Louisiana | H005967 | Calcasieu | >= 200,000 | N/A | SECTION 149(B) | Preliminary Engineering | $232,928.98 | $291,161.23 |
Louisiana | H006196 | Orleans | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $16,906,503.01 | $21,101,951.83 |
Louisiana | H006196 | Orleans | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Bridge Replacement - No Added Capacity | $3,210,444.66 | $4,100,626.37 |
Louisiana | H007289 | Ouachita | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Rail/Hwy Crossing | $100,591.88 | $803,536.85 |
Louisiana | H007289 | Ouachita | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $2,556,188.41 | $3,222,029.29 |
Louisiana | H007289 | Ouachita | >= 50,000 AND < 200,000 | N/A | HIGHWAY PROJECTS,DEMOS S378 | Right of Way | $5,487,900.00 | $5,487,900.00 |
Louisiana | H007289 | Ouachita | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,976,048.51 | $12,550,628.69 |
Louisiana | H007289 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $6,293,998.23 | $8,286,297.79 |
Louisiana | H007289 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $181,966.86 | $227,458.57 |
Louisiana | H007289 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $547,991.43 | $547,991.43 |
Louisiana | H008145 | Lafourche | >= 50,000 AND < 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | 4R - Maintenance Relocation | $994,847.85 | |
Louisiana | H008145 | Lafourche | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge New Construction | $135,000,000.00 | $427,177,966.97 |
Louisiana | H008145 | Lafourche | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $33,704,099.00 | |
Louisiana | H008145 | Lafourche | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $3,804,218.57 | |
Louisiana | H008145 | Lafourche | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $32,203,564.14 | $41,780,065.74 |
Louisiana | H008226 | Ouachita | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $32,336.75 | $40,420.94 |
Louisiana | H008226 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $17,871,263.57 | $22,339,079.45 |
Louisiana | H008226 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,815,978.74 | $2,269,973.43 |
Louisiana | H008226 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $49,039.62 | $61,299.52 |
Louisiana | H008226 | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $437,364.00 | $546,705.00 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $148,445.99 | $185,557.49 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $490,031.40 | $612,539.24 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | N/A | HIGHWAY INFRASTRUCTURE | Preliminary Engineering | $1,736,640.00 | $2,170,800.00 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,135,542.46 | $32,669,428.07 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,776,025.39 | $19,720,031.74 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,478,762.30 | $1,848,452.87 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,848,418.13 | $6,060,522.67 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $70,377.41 | $88,164.58 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $70,600.75 | $88,444.37 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $229,567.72 | $286,959.66 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $755,138.90 | $943,923.62 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $32,745.27 | $32,745.27 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $18,340,988.73 | $18,340,988.73 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $3,893,525.66 | $3,893,525.66 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $6,951.34 | $6,951.34 |
Louisiana | H009250 | East Baton Rouge | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $19,944.52 | $19,944.52 |
Louisiana | H009250 | Ascension | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $11,171,141.32 | $11,171,141.32 |
Louisiana | H009461 | Iberville | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $6,888.21 | $7,653.57 |
Louisiana | H009461 | St. Martin | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $4,880.16 | $5,422.40 |
Louisiana | H009461 | Iberville | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $27,825.96 | $30,917.74 |
Louisiana | H009461 | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $43,913.87 | $48,793.18 |
Louisiana | H009461 | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $16,927,405.04 | $18,755,899.31 |
Louisiana | H009461 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,980,753.73 | $6,626,800.64 |
Louisiana | H009461 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $51,940.54 | $57,711.71 |
Louisiana | H009461 | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $73,489.41 | $81,654.91 |
Louisiana | H009461 | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $502,296.62 | $558,107.35 |
Louisiana | H009461 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $355,018.96 | $394,465.52 |
Louisiana | H009461 | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $12,008.59 | $13,342.88 |
Louisiana | H009461 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $8,507.84 | $9,453.16 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $11,287,403.99 | $14,109,254.99 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $420,971.37 | $526,214.21 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $8,388.15 | $10,485.19 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $4,801,493.92 | $6,001,867.40 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $2,765,524.27 | $3,456,905.34 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | HIGHWAY BRIDGE PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,876.47 | $2,345.59 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $141,432.13 | $176,790.16 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $5,507,348.49 | $6,884,185.61 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,477,845.94 | $3,097,307.43 |
Louisiana | H009479 | Lafourche | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $993,600.68 | $1,242,000.86 |
Louisiana | H009498 | Rapides | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $11,343,989.55 | $27,431,912.48 |
Louisiana | H009498 | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $4,887,222.44 | $6,109,028.05 |
Louisiana | H009498 | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $200,896.43 | $251,120.54 |
Louisiana | H009498 | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $226,765.44 | $283,456.80 |
Louisiana | H009498 | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $129,618.03 | $162,022.54 |
Louisiana | H009498 | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $629,290.69 | $786,613.36 |
Louisiana | H009498 | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $133,616.00 | $167,020.00 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $1,344.00 | $1,680.00 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | $23,217.28 | $29,021.60 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,955,954.58 | $16,617,732.87 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,051,373.85 | $11,314,217.59 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,587.06 | $9,483.82 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $22,426,535.70 | $28,033,169.63 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $501,429.98 | $559,473.93 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $164,674.83 | $182,972.03 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $120,639.91 | $150,802.94 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $451,301.07 | $564,126.34 |
Louisiana | H009620 | Calcasieu | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $914,999.25 | $1,143,749.06 |
Louisiana | H010018 | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $28,844,387.52 | $36,055,484.40 |
Louisiana | H010018 | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $68,285.51 | $85,356.89 |
Louisiana | H010037 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Ferry Boats | $54,590,000.00 | |
Louisiana | H010353 | Lafayette | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $17,702,814.12 | $19,669,793.46 |
Louisiana | H010353 | Vermilion | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $1,791,377.10 | $1,990,419.00 |
Louisiana | H010353 | Lafayette | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $845,577.40 | $3,126,577.40 |
Louisiana | H010353 | Vermilion | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $81,184.33 | $300,184.33 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $1,281,094.86 | $1,423,438.74 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $41,816,998.89 | $52,271,248.61 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,377,688.04 | $12,641,875.60 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $11,154,502.29 | $13,943,127.86 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $938,929.95 | $1,173,662.44 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,241,421.69 | $2,836,777.12 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $122,190.30 | $149,163.60 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $497,376.39 | $1,004,832.99 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,109,797.52 | $1,387,246.90 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,938,693.12 | $2,423,366.40 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,089.92 | $56,362.40 |
Louisiana | H010601 | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $23,530,167.00 | $26,144,630.00 |
Louisiana | H010652 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,699,640.29 | $24,624,550.36 |
Louisiana | H010652 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $75,152.03 | $93,940.04 |
Louisiana | H010652 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $810,717.64 | $1,013,397.05 |
Louisiana | H010652 | East Baton Rouge | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $55,078.83 | $68,848.54 |
Louisiana | H010673 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,195,730.45 | $2,744,663.06 |
Louisiana | H010673 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,741,425.76 | $5,869,702.34 |
Louisiana | H010673 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Tunnel Preventive Maintenance | $17,556,004.51 | |
Louisiana | H010673 | Jefferson | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Tunnel Rehabilitation | $16,757,861.04 | $20,947,326.30 |
Louisiana | H010673 | Jefferson | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $11,842,672.48 | $15,857,111.74 |
Louisiana | H010673 | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Tunnel Rehabilitation | $7,630,421.71 | $9,538,027.14 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | EMERGENCY RELIEF | Bridge Rehabilitation - No Added Capacity | $3,375,018.68 | $3,750,020.75 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $1,413,005.12 | $1,570,005.69 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $73,108.30 | $81,742.88 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $10,864.72 | $12,071.91 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $40,817,741.49 | $45,353,223.63 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $999,169.16 | $1,122,133.00 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $990,279.53 | $1,100,310.59 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $827,627.76 | $920,500.15 |
Louisiana | H010916 | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $19,332.66 | $21,480.73 |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Safety | $11,735,923.40 | $11,735,923.40 |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,904,060.06 | |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $193,604.00 | |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,443,525.97 | $1,443,525.97 |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $22,147.02 | $22,147.02 |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,005.05 | $2,005.05 |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $7,718,337.19 | $20,321,527.61 |
Louisiana | H010960 | Ascension | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $514,555.81 | $1,354,768.50 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | EQUITY BONUS - CHARGED TO LIM | New Construction Roadway | $6,141.48 | $7,676.85 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $52,149.49 | $65,186.86 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | Construction Engineering | $71,961.28 | $89,951.60 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | New Construction Roadway | $9,258.03 | $11,572.54 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $74,738.73 | $93,423.41 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $900,032.52 | $1,125,040.65 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | $640,673.20 | $800,841.50 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $24,742.80 | $30,928.50 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | New Construction Roadway | $6,709.92 | $6,709.92 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Construction Engineering | $621,229.48 | $776,536.86 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $7,379,201.94 | $9,224,002.42 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,275,166.75 | $1,593,958.43 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $50,045,065.50 | $142,854,907.75 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,727,556.12 | $2,159,445.15 |
Louisiana | H011111 | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | Construction Engineering | $85,020.16 | $1,005,643.36 |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,111,242.57 | $1,234,713.97 |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $42,277,301.96 | |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $56,841.78 | |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Protection | $3,374,324.16 | |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $14,419,568.25 | |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,490,880.40 | |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,091,948.30 | $4,546,609.23 |
Louisiana | H011137 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $21,262.76 | $23,625.29 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,086,886.66 | $1,207,651.84 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,873,781.13 | $9,859,756.81 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,515,348.31 | $31,894,185.39 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $18,298,932.46 | $22,873,665.57 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,409,503.36 | $4,899,448.18 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $444,006.51 | $555,008.13 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,095,042.46 | $3,438,936.06 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $148,422.17 | $185,527.71 |
Louisiana | H011152 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $6,787.97 | $8,484.96 |
Louisiana | H011446 | Madison | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $221,321.14 | $245,912.38 |
Louisiana | H011446 | Madison | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $25,160,581.37 | $27,956,201.52 |
Louisiana | H011446 | Madison | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $550,025.70 | $611,139.66 |
Louisiana | H011487 | St. Mary | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $22,987,923.17 | $28,734,903.96 |
Louisiana | H011487 | St. Mary | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Rehabilitation - No Added Capacity | $2,523,360.30 | $3,154,200.38 |
Louisiana | H011487 | St. Mary | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $2,552,868.98 | $3,191,086.23 |
Louisiana | H011487 | St. Mary | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,533,833.51 | $8,167,291.89 |
Louisiana | H011487 | St. Mary | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,339,570.80 | $1,674,463.50 |
Louisiana | H011670 | Jefferson | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $6,117,882.00 | $6,117,882.00 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,319,460.10 | $20,383,216.13 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $18,433,029.88 | $33,960,779.88 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $33,914,815.47 | $110,925,465.93 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $514,228.00 | $642,785.00 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $29,973,605.76 | $43,662,269.91 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Debt Service | $1,595,656.75 | $1,595,656.75 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $51,817.58 | $51,817.58 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | REPURPOSED SPECIAL | Debt Service | $735,218.25 | $735,218.25 |
Louisiana | H011670 | Jefferson | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $2,490,308.95 | $2,490,308.95 |
Louisiana | H011670 | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $5,000,000.00 | $5,000,000.00 |
Louisiana | H011705 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $16,704,829.02 | $20,881,036.28 |
Louisiana | H011705 | Orleans | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $17,090,608.89 | $21,363,261.11 |
Louisiana | H011705 | Orleans | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,031,436.30 | $1,289,281.73 |
Louisiana | H011705 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,008,190.97 | $1,260,225.36 |
Louisiana | H011705 | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $560,457.89 | $700,572.36 |
Louisiana | H011705 | Orleans | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $573,430.34 | $716,787.93 |
Louisiana | H011915 | Lafourche | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $15,067,684.24 | $18,834,605.30 |
Louisiana | H011915 | Lafourche | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $1,354,315.76 | $1,692,894.70 |
Louisiana | H011915 | Lafourche | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $409,923.49 | |
Louisiana | H011915 | Lafourche | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,084,057.97 | |
Louisiana | H011915 | Lafourche | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,106,716.80 | $7,047,977.85 |
Louisiana | H011965 | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $44,012,608.52 | $55,015,760.65 |
Louisiana | H011965 | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,879,215.64 | $11,099,019.55 |
Louisiana | H011965 | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,370,516.23 | $5,463,145.29 |
Louisiana | H012174 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $22,572,286.44 | $25,080,318.27 |
Louisiana | H012174 | Acadia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $671.88 | $746.53 |
Louisiana | H012174 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $649,093.35 | $721,214.83 |
Louisiana | H012174 | Acadia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $19.32 | $21.47 |
Louisiana | H012174 | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $11,724,859.68 | $11,724,859.68 |
Louisiana | H012174 | Acadia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $349.00 | $349.00 |
Louisiana | H012174 | Lafayette | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $55,161,532.00 | $61,290,591.11 |
Louisiana | H012174 | Acadia | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $1,641.92 | $1,824.36 |
Louisiana | H012232 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,457,439.06 | $2,457,439.06 |
Louisiana | H012232 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $13,634,061.81 | $23,371,504.10 |
Louisiana | H012232 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,200,000.00 | $4,200,000.00 |
Louisiana | H012588 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,159.41 | $19,066.01 |
Louisiana | H012588 | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,050,159.33 | $25,611,288.14 |
Louisiana | H012588 | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $833,867.74 | $926,519.71 |
Louisiana | H012588 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $50.83 | $56.48 |
Louisiana | H012588 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $437.13 | $485.70 |
Louisiana | H012588 | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $546,413.30 | $607,125.89 |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Landscaping and Other Scenic Beautification | $1,125,889.39 | $1,250,988.21 |
Louisiana | H012889 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,263,909.24 | |
Louisiana | H012889 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $71,724,329.54 | $79,693,699.60 |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $48,547.27 | $24,311,624.87 |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,000,000.00 | $13,452,538.36 |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $529,726.63 | |
Louisiana | H012889 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $425,727.61 | $473,030.68 |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,539,368.72 | $1,710,409.71 |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,418,472.80 | |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $2,343,137.73 | |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $832,043.10 | $924,492.32 |
Louisiana | H012889 | Caddo | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $72,225.97 | $80,253.30 |
Louisiana | H012889 | Bossier | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $24,771,860.51 | $27,524,289.46 |
Louisiana | H013116 | Lafourche | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $2,942,009.80 | $3,268,899.78 |
Louisiana | H013116 | St. James | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $13,707,779.03 | $15,230,865.59 |
Louisiana | H013116 | St. James | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Bridge Replacement - No Added Capacity | $5,026,503.62 | $5,585,004.02 |
Louisiana | H013116 | St. James | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Environmental Only | $983,719.73 | $983,719.73 |
Louisiana | H013116 | Lafourche | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Environmental Only | $186,817.78 | $186,817.78 |
Louisiana | H013116 | Lafourche | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $281,357.12 | $281,357.12 |
Louisiana | H013116 | St. James | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $38,366.88 | $38,366.88 |
Louisiana | H013196 | Pointe Coupee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,156,384.28 | $26,445,480.35 |
Louisiana | H013203 | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $47,595,888.78 | $59,494,860.97 |
Louisiana | H013203 | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $3,125,125.20 | $3,906,406.50 |
Louisiana | H013203 | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $69,005.94 | $86,257.43 |
Louisiana | H013203 | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $255,230.04 | $319,037.55 |
Louisiana | H013245 | Calcasieu | >= 200,000 | N/A | CARBON REDUCTION PROGRAM | Traffic Management/Engineering - HOV | $327,500.00 | $409,375.00 |
Louisiana | H013245 | Bossier | >= 50,000 AND < 200,000 | N/A | CARBON REDUCTION PROGRAM | Traffic Management/Engineering - HOV | $510,000.00 | $637,500.00 |
Louisiana | H013245 | East Baton Rouge | >= 200,000 | N/A | CARBON REDUCTION PROGRAM | Traffic Management/Engineering - HOV | $2,185,500.00 | $2,731,875.00 |
Louisiana | H013245 | Calcasieu | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $353,005.69 | $441,257.12 |
Louisiana | H013245 | Rapides | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $352,899.82 | $441,124.77 |
Louisiana | H013245 | Tangipahoa | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $6,694.67 | $8,368.34 |
Louisiana | H013245 | St. Tammany | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $352,899.82 | $441,124.77 |
Louisiana | H013245 | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,354,804.46 | $1,693,505.57 |
Louisiana | H013245 | Tangipahoa | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,188,870.15 | $1,486,087.70 |
Louisiana | H013245 | Rapides | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 | $1,488,392.81 |
Louisiana | H013245 | Orleans | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 | $1,488,392.81 |
Louisiana | H013245 | Bossier | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 | $1,488,392.82 |
Louisiana | H013245 | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 | $1,488,392.81 |
Louisiana | H013245 | East Baton Rouge | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 | $1,488,392.81 |
Louisiana | H013245 | Bossier | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $3,108,855.75 | $3,886,069.68 |
Louisiana | H013245 | Calcasieu | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $831,457.39 | $1,039,321.74 |
Louisiana | H013245 | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $4,727,288.50 | $5,909,110.63 |
Louisiana | H013245 | Tangipahoa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $810,824.60 | $1,013,530.75 |
Louisiana | H013245 | St. Tammany | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,344,739.41 | $1,680,924.26 |
Louisiana | H013245 | Orleans | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $4,126,355.75 | $5,157,944.69 |
Louisiana | H013245 | Rapides | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $810,978.60 | $1,013,723.25 |
Louisiana | H013265 | Iberia | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $2,460,025.00 | $2,460,025.00 |
Louisiana | H013265 | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $28,016,347.10 | $35,030,869.30 |
Louisiana | H013265 | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $809,663.17 | $1,012,078.96 |
Louisiana | H013265 | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $93,537.70 | $116,922.13 |
Louisiana | H013866 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $32,528,465.88 | $40,673,732.35 |
Louisiana | H013866 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $670,510.84 | $838,138.54 |
Louisiana | H013866 | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $217,650.07 | $272,062.59 |
Louisiana | H013866 | St. Tammany | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $7,653,581.52 | $9,566,976.90 |
Louisiana | H013866 | St. Tammany | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $17,346,418.48 | $21,683,023.10 |
Louisiana | H013897 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,440,030.16 | $14,402,577.70 |
Louisiana | H013897 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,520,645.00 | $13,129,306.25 |
Louisiana | H013897 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $26,570,096.21 | $55,592,620.26 |
Louisiana | H013897 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $250,000.00 | |
Louisiana | H013897 | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,893,420.00 | $2,366,775.00 |
Louisiana | H013897 | East Baton Rouge | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | Other | $6,440.00 | $8,050.00 |
Louisiana | H014093 | Sabine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $21,643,268.47 | $27,154,085.59 |
Louisiana | H014146 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $6,401,919.04 | $8,073,766.18 |
Louisiana | H014146 | Pointe Coupee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,000,884.88 | $17,616,662.16 |
Louisiana | H014258 | West Baton Rouge | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $88,130,070.18 | $110,162,587.73 |
Louisiana | H014258 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $9,792,230.02 | $12,240,287.53 |
Louisiana | H014258 | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $433,498.51 | $541,873.14 |
Louisiana | H014354 | Lincoln | >= 5,000 AND < 50,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $17,191,530.00 | $28,314,597.62 |
Louisiana | H015028 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Protection | $16,029,956.08 | $20,037,445.10 |
Louisiana | H015028 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $37,528,145.25 | $46,910,181.56 |
Louisiana | H015028 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,826,208.49 | $7,324,136.40 |
Louisiana | H015028 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $332,626.97 | $415,783.71 |
Louisiana | H015028 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $123,876.79 | $154,845.99 |
Louisiana | H015360 | Natchitoches | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $38,827,073.00 |