RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Missouri | 0212085 | MO 21 S, ST. LOUIS, Pavement resurfacing, upgrade guardrail, signal and pedestrian facilities to comply with the ADA Transition Plan from Rte. 30 (Gra | $22,552,612.03 | $27,438,294.31 |
Missouri | 0351291 | CLAY CO, CST 19TH ST, NEW INTERCHANGE SOUTH OF RT 92 AT 19TH ST IN KEARNEY | $9,927,800.59 | $25,519,387.64 |
Missouri | 0352118 | IS 35 S, CLINTON, Pavement rehabilitation north and southbound lanes from north of Shoal Creek to north of Rte. 116 near Lathrop | $38,288,878.96 | $42,842,146.45 |
Missouri | 0441106 | WEBSTER CO, IS 44, DB BRIDGE IMPROVE TO BRIDGES IN JASPER, LAWRENCE, GREENE, & WEBSTER COUNTIES & POTENTIAL IMPROVE IN DALLAS COUNTY. | $40,913,700.00 | $43,174,000.00 |
Missouri | 0442332 | PHELPS CO, IS 44, PAVEMENT REBUILD ON THE EB LANES FROM E OF RT 63 TO WEST OF RT 68. | $30,837,986.44 | $34,128,793.72 |
Missouri | 0442344 | IS 44, GREENE CO, ADD LANES AND REPLACE BRIDGES FROM RT 13 (KANSAS EXPRESSWAY) TO RT H (GLENSTONE AVE) IN SPRINGFIELD | $18,972,504.62 | $51,080,581.32 |
Missouri | 0471072 | TIGER PROJECT-ROUTE 47, FRANKLIN COUNTY; PROJECT TO REPLACE BRIDGE OVER THE MISSOURI RIVER FROM RTE. 94 TO 5TH STREET IN WASHINGTON, 3.502 MILES | $59,074,351.40 | $73,842,939.25 |
Missouri | 0512043 | DB, PERRY CO, MO 51, BRIDGE REPLACEMENT OVER THE MISSISSIPPI RIVER "CHESTER BRIDGE" AND HORSE ISLAND CHUTE, NEW TWO-LANE ROADWAY ON MISSOURI APPROACH | $135,491,466.78 | $162,719,000.00 |
Missouri | 0553097 | IS 55, ST LOUIS CITY CO, BRIDGE REHAB FROM VIRGINIA AVE TO BROADWAY STREET | $24,898,822.45 | $26,244,915.94 |
Missouri | 0553099 | IS 55, ST LOUIS CO, PAVEMENT REHABILITATION FROM LINDBERGH BLVD TO I-44 | $30,085,660.30 | $32,949,303.87 |
Missouri | 0553101 | IS 55 N, ST LOUIS CO, BRIDGE REHABILITATION FROM N OF LINDBERGH BLVD TO LOUGHBOROUGH AVE AND REMOVE PED BRIDGE AT DAYCARE OVERPASS | $43,249,735.30 | $45,568,105.24 |
Missouri | 0553103 | DB, IS 55 S, JEFFERSON, Improve capacity, pavement, bridges, safety and operations from Rte M to 1 mile south of Rte 67; safety and operations on Rte | $233,358,950.00 | $245,641,000.00 |
Missouri | 0602117 | US 60 E, WEBSTER, Railroad crossing improvements from 0.2 mile west of Rte. Z in Fordland to Rte. O in Diggins and add interchange at Rte. A. | $2,426,234.99 | $32,998,220.64 |
Missouri | 0641061 | IS 64 ST LOUIS CITY CO; MODIFY INTERCHANGE CONFIGURATION BETWEEN 18TH ST AND GARRISON AVE | $20,156,307.02 | $33,327,887.12 |
Missouri | 0701216 | DB, JACKSON CO, IS 70, BRIDGE REPLACEMENT, REMOVAL AND REBUILD PAVEMENT FROM PASEO TO I-435 | $5,176,300.26 | $265,670,493.58 |
Missouri | 0701223 | IS 70 E, JACKSON, Engineering for safety and capacity improvements from Blue Springs to Wentzville. | $36,500,000.00 | |
Missouri | 0703275 | INFRA DB, IS 70, COOPER CO; BRIDGE REPLACEMENT OVER THE MISSOURI RIVER NEAR ROCHEPORT | $95,754,861.46 | $241,992,015.14 |
Missouri | 0703310 | Design Build, I-70 E, BOONE, Safety and capacity improvements from Columbia to Kingdom City. | $8,300,000.00 | $410,565,000.00 |
Missouri | 1001070 | MO 100, ST LOUIS CO; UPGRADE PED FACILITY TO COMPLY WITH ADA PLAN & PVMT RESURFACING FROM RT 61 TO BID BEND BLVD, BRIDGE REPLACEMENT OVER BLACK CREEK, | $25,165,574.97 | $31,178,003.87 |
Missouri | 1691117 | BUILD, JACKSON CO, US 169 N, DESIGN BUILD, BRIDGE REPLACEMENT OF BUCK O'NEIL BRIDGE OVER MO RIVER & BRIDGE/RD IMPROVEMENTS RICHARDS RD TO 12 ST IN KC | $175,724,800.00 | $259,279,000.00 |
Missouri | 2553052 | IS 255, ST LOUIS CO; BRIDGE REHABILITATION AT THE MISSISSIPPI RIVER (JEFFERSON BARRACKS BR) | $27,746,612.76 | $29,238,806.99 |
Missouri | 2705352 | DESIGN-BUILD, IS 270, ST LOUIS CO, PAVE & BRIDGE IMPROVE ON THE I-270 NORTH CORRIDOR ON DISCONNECTED SECTIONS IN NORTH CO. | $255,642,849.05 | $280,127,741.85 |
Missouri | 2705359 | IS 270, ST LOUIS CO, MODIFY INTERCHANGE CONFIGURATION AT RIVERVIEW BLVD IN ST LOUIS CITY | $39,309,843.96 | $41,483,268.62 |
Missouri | 2705360 | IS 270, ST LOUIS CO; BRIDGE REPLACEMENT OVER CONWAY ROAD AND BRIDGE REHABILITIATION AND PAVEMENT REPAIR OVER I-64 RAMP AND RTE. AB (LADUE ROAD). | $30,080,926.55 | $43,301,712.52 |
Missouri | 2705372 | IS 270, ST LOUIS CITY; PAYMENT TO IDOT FOR BRIDGE REPLACEMENT OF CHAIN OF ROCKS BRIDGE OVER MISSISSIPPI RIVER | $60,997,802.91 | $190,000,000.00 |
Missouri | 3301527 | Colbern Rd, Jackson County, Payment to Lee's Summit to add lanes and modify intersections from Douglas Road to Rte. 350. | $3,975,000.00 | $25,999,806.77 |
Missouri | 3661005 | MO 366 E, ST. LOUIS, Pavement resurfacing and upgrade pedestrian facilities to comply with the ADA Transition Plan from 0.3 mile west of Geyer Rd. to | $26,063,219.46 | $32,926,899.64 |
Missouri | 5617602 | BUILD PROJECT, ST LOUIS CITY, SIGNAL IMPROVEMENTS ON JEFFERSON AVE FROM MARKET ST TO NATURAL BRIDGE AVE AND PEDESTRIAN/BICYCLE IMPROVEMENTS ON 20TH ST | $22,651,000.00 | $35,314,132.00 |
Missouri | 5901816 | DB, BUILD GRANT, GREENE CO, CITY OF SPRINGFIELD, RECONSTRUCT MULTI-USE PATH ALONG GRANT AVE. PARKWAY FROM DOWNTOWN TO SUNSHINE ST. | $20,960,822.00 | $31,525,000.00 |
Missouri | 5909802 | GREENE CO; PUBLIC IMPROVEMENTS FOR THE EXTENSION OF KANSAS EXPRESSWAY FROM REPUBLIC RD TO THE FUTURE EAST/WEST ARTERIAL. | $30,548,035.60 | $38,185,044.46 |
Missouri | P231001 | 2023 PREVENTATIVE MAINTENANCE PLAN | $80,749,297.16 | $93,832,918.73 |
Missouri | P241001 | 2024 PREVENTATIVE MAINTENANCE PLAN | $84,775,998.56 | $96,675,813.06 |
Missouri | S102026 | CHBP, VARIOUS, VARIOUS, BRIDGE REPLACEMENTS AT VARIOUS LOCATIONS IN THE NORTHEAST AND NORTHWEST DISTRICT | $20,794,000.00 | $25,992,500.00 |
Missouri | S102057 | Various; Various; Bridge replacements on various routes in Carroll, Chariton, Grundy, Linn, Livingston, Mercer, Putnam and Sullivan Counties. | $12,082,864.69 | $29,827,000.00 |
Missouri | S502015 | DB OR 70,ST CHARLES;CORRIDOR IMPROVEMENTS FROM CAVE SPRINGS BLVD TO FAIRGROUNDS RD;BRIDGE REHAB OVER I-70 @ZUBEHL & CAVE SPRINGS & MODIFY INTERCHANGE | $51,319,098.86 | $62,693,809.15 |
Missouri | S502067 | DB, VARIOUS, VARIOUS, SAFETY IMPROVEMENTS ON VARIOUS LOCATIONS IN THE ST LOUIS DISTRICT | $40,310,907.29 | $51,769,000.00 |
Missouri | S602025 | MO 86, TANEY CO, BRIDGE REPLACEMENT OVER TABLE ROCK LAKE | $65,490,925.61 | $77,283,463.41 |
Missouri | S703077 | DESIGN-BUILD,BOLLINGER CO, MO 51, BRIDGE REPLACEMENT OVER DRAINAGE DITCH #65 & CASTOR RIVER OVERFLOW AND BRIDGE IMPRVMTS OVER VARIOUS DRAINAGE DITCHES | $21,694,550.00 | $25,523,000.00 |