RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - No Added Capacity | $1,206,792.67 | $2,273,508.64 |
Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | Bridge Rehabilitation - No Added Capacity | $50,833.80 | |
Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $104,524.03 | |
Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | Utilities | $3,633.54 | |
Missouri | 0212085 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $448,255.00 | |
Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,151,819.23 | $14,296,257.92 |
Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $892,662.95 | $1,050,191.70 |
Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,835,486.05 | $2,159,395.35 |
Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,960,597.94 | $2,535,181.17 |
Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,441,446.70 | $4,441,446.70 |
Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $63,806.49 | $75,066.46 |
Missouri | 0351291 | Clay | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $154,450.00 | $154,450.00 |
Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,831,714.87 | $13,385,092.60 |
Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,057,874.68 | $2,930,584.88 |
Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $667,062.10 | $1,847,933.54 |
Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $592,946.17 | $1,902,908.12 |
Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $420,596.29 | $1,349,795.22 |
Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,415,761.19 | $1,415,761.19 |
Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $787,395.29 | $2,532,862.09 |
Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $335,017.15 | |
Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $33,640,804.71 | $37,378,671.90 |
Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,423,448.35 | $3,803,831.50 |
Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $900,000.00 | $1,000,000.00 |
Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $324,625.90 | $324,625.90 |
Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,808,200.00 | $2,956,000.00 |
Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $26,677,900.00 | $28,082,000.00 |
Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,616,400.00 | $5,912,000.00 |
Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,062,575.00 | $1,118,500.00 |
Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $589,981.69 | $621,033.36 |
Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $94,816.18 | $99,806.51 |
Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $377,777.13 | $397,660.13 |
Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $99,636.23 | $109,639.81 |
Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $620,225.95 | $682,494.62 |
Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $494,794.86 | $544,470.73 |
Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $908,870.00 | $994,300.00 |
Missouri | 0441106 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $237,272.96 | $261,094.84 |
Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $45,125.00 | $47,500.00 |
Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,043.29 | $16,887.67 |
Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $25,055.10 | $26,373.79 |
Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,026.61 | $4,238.54 |
Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $263,796.00 | $277,680.00 |
Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $42,360.50 | $44,590.00 |
Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $210,444.00 | $221,520.00 |
Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $617,500.00 | $650,000.00 |
Missouri | 0441106 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $100,899.50 | $106,210.00 |
Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $26,555,187.52 | $29,505,763.91 |
Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,765,383.63 | $3,072,648.48 |
Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $296,694.36 | $329,660.40 |
Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,220,720.93 | $1,220,720.93 |
Missouri | 0442344 | Greene | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $50,587.70 | $394,348.80 |
Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $10,230,090.31 | $32,853,502.75 |
Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $6,969,344.98 | |
Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,631,445.68 | $4,034,939.64 |
Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,921,263.37 | $3,245,848.19 |
Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $908,701.25 | |
Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,348,604.85 | $1,685,755.08 |
Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $254,332.02 | $317,915.02 |
Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $186,622.53 | $233,277.91 |
Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $47,552.16 | $59,440.20 |
Missouri | 0442344 | Greene | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Restoration & Rehabilitation | $237,690.36 | $297,112.95 |
Missouri | 0442344 | Greene | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Construction Engineering | $64,315.64 | $80,394.55 |
Missouri | 0471072 | Franklin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $81,823.33 | $102,279.16 |
Missouri | 0471072 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $45,372,570.88 | $56,715,713.60 |
Missouri | 0471072 | Franklin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $108,242.50 | $135,303.12 |
Missouri | 0471072 | Franklin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,022.00 | $2,527.50 |
Missouri | 0471072 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,919.34 | $3,649.18 |
Missouri | 0471072 | Warren | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - No Added Capacity | $10,000,000.00 | $12,500,000.00 |
Missouri | 0471072 | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,142,010.53 | $1,427,513.17 |
Missouri | 0471072 | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,648,857.89 | $2,061,072.36 |
Missouri | 0471072 | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $349,811.23 | $437,264.04 |
Missouri | 0471072 | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $242,281.70 | $302,852.12 |
Missouri | 0471072 | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $50,663.31 | $63,329.14 |
Missouri | 0471072 | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $73,148.69 | $91,435.86 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge Replacement - Added Capacity | $12,406,572.19 | $15,508,215.24 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $209,785.17 | $262,231.46 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Other | $128,466.12 | $160,582.65 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $247,468.56 | $494,937.12 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Right of Way | $1,284.66 | $1,605.83 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Utilities | $6,423.30 | $8,029.13 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $116,663,167.04 | $137,250,784.76 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,936,953.26 | $2,278,768.54 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,138,504.75 | $1,339,417.35 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,642,031.44 | $5,284,062.88 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,385.05 | $13,394.17 |
Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $99,425.24 | $116,970.87 |
Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,948,628.05 | $8,366,976.90 |
Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $13,154,541.58 | $13,846,885.85 |
Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,161,558.73 | $2,275,324.98 |
Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,222.29 | $8,024.77 |
Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $539,387.00 | $539,387.00 |
Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $1,087,484.80 | $1,208,316.44 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
Missouri | 0553099 | St. Louis | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Safety | $1,459,198.03 | $2,253,694.50 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,302,457.20 | $24,528,902.32 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $37,725.48 | $39,711.03 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $58,216.83 | $61,280.87 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,645,750.00 | $2,785,000.00 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,060,373.48 | $2,289,303.87 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $22,500.00 | $25,000.00 |
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Safety | $499,439.28 | $966,411.28 |
Missouri | 0553101 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $381,442.00 | $381,442.00 |
Missouri | 0553101 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,978,117.65 | $14,713,808.04 |
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $23,763,617.66 | $25,014,334.35 |
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | ||
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,822,481.22 | $4,023,664.44 |
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,177,016.77 | $1,307,796.41 |
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $127,060.00 | $127,060.00 |
Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $199,677,650.00 | $210,187,000.00 |
Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,039,100.00 | $14,778,000.00 |
Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,121,833.00 | $3,286,140.00 |
Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $13,167.00 | $13,860.00 |
Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $15,552,450.00 | $16,371,000.00 |
Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $954,750.00 | $1,005,000.00 |
Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,563,277.04 | |
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,130,065.00 | |
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,006,389.41 | |
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $10,000.00 | |
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $844,044.75 | |
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | 4R - No Added Capacity | $1,162.28 | |
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Construction Engineering | $1,747,465.50 | |
Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $2,426,234.99 | $2,695,816.66 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $52,405.74 | $52,405.74 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $8,384.35 | $8,384.35 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Safety | $119,906.91 | $119,906.91 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,046,641.96 | $3,837,779.02 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $327,440.13 | $614,002.30 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,682,817.29 | $8,781,026.83 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,272,842.01 | $2,386,781.11 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,272,842.00 | $2,386,781.07 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,545,684.02 | $4,773,562.22 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $375,366.12 | $703,871.14 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $60,054.44 | $112,611.63 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $858,856.11 | $1,610,491.73 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,799.76 | $5,250.00 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,799.77 | $5,250.00 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $5,599.52 | $10,500.00 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $614,153.32 | $682,392.58 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $98,264.54 | $109,182.82 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,405,352.22 | $1,561,502.47 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $844,484.64 | $1,135,060.00 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $135,117.54 | $181,609.60 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,932,413.82 | $2,597,330.40 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $379,669.47 | $379,669.47 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $60,742.91 | $60,742.91 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Safety | $868,702.37 | $868,702.37 |
Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,741.52 | $85,772.62 |
Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,741.50 | $85,772.59 |
Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $91,483.04 | $171,545.24 |
Missouri | 0701216 | Jackson | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Bridge Replacement - No Added Capacity | $640,000.00 | |
Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $231,920,000.00 | |
Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,960,000.00 | |
Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,100,000.00 | |
Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,176,300.26 | $12,162,493.58 |
Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,888,000.00 | |
Missouri | 0701223 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,258,137.19 | |
Missouri | 0701223 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,751,642.99 | |
Missouri | 0701223 | Lafayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,676,438.05 | |
Missouri | 0701223 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,244,392.03 | |
Missouri | 0701223 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,382,407.85 | |
Missouri | 0701223 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $865,366.37 | |
Missouri | 0701223 | Saline | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,935,018.32 | |
Missouri | 0701223 | Montgomery | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,711,008.70 | |
Missouri | 0701223 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $575,588.50 | |
Missouri | 0701223 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $788,631.00 | |
Missouri | 0701223 | Montgomery | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,344,304.13 | |
Missouri | 0701223 | Saline | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,651,226.40 | |
Missouri | 0701223 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,185,664.32 | |
Missouri | 0701223 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,894,078.22 | |
Missouri | 0701223 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,075,108.55 | |
Missouri | 0701223 | Lafayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,667,067.73 | |
Missouri | 0701223 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,399,978.41 | |
Missouri | 0701223 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,093,941.24 | |
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $77,233,770.07 | $161,250,000.00 |
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | ||
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $504,459.58 | $1,436,950.55 |
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $661,770.35 | $1,885,049.45 |
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | ||
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | $4,500,000.00 | |
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $43,387,153.68 | |
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,000,000.00 | |
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,000,000.00 | |
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,178,000.00 | |
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | $17,354,861.46 | $17,354,861.46 |
Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | ||
Missouri | 0703310 | Boone | >= 50,000 AND < 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Safety | $3,283,447.02 | $4,104,308.79 |
Missouri | 0703310 | Callaway | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Safety | $5,016,552.98 | $6,270,691.21 |
Missouri | 0703310 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $156,705,476.69 | |
Missouri | 0703310 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $239,419,523.31 | |
Missouri | 0703310 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,456,902.14 | |
Missouri | 0703310 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,608,097.86 | |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,441,543.90 | $1,801,929.87 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $8,557,672.81 | $10,697,091.01 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $147,779.62 | $184,724.53 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $713,368.33 | $891,710.41 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,161,696.06 | $1,452,120.08 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $27,901.75 | $34,877.19 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,613,008.01 | $4,516,260.01 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,043,836.62 | $2,554,795.77 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $815,960.23 | $815,960.23 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $163,807.64 | $204,759.55 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,058,730.27 | $6,323,412.84 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $74,763.58 | $93,454.47 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $360,902.07 | $451,127.59 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $587,716.74 | $734,645.93 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $14,115.85 | $17,644.81 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $299,899.13 | $299,899.13 |
Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $82,872.36 | $103,590.45 |
Missouri | 1691117 | Jackson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $5,082,112.00 | $7,353,129.23 |
Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,340,237.22 | $26,188,384.52 |
Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $72,123,762.78 | $104,218,399.99 |
Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,958,058.20 | |
Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,041,941.80 | |
Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $985,756.90 | $2,166,810.90 |
Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,651,043.10 | $3,629,189.10 |
Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,482,274.94 | $5,602,843.68 |
Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,541,725.06 | $14,427,156.32 |
Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,152,443.84 | $1,440,554.80 |
Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $447,556.16 | $559,445.20 |
Missouri | 1691117 | Jackson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | $9,346,147.75 | $13,522,612.70 |
Missouri | 1691117 | Clay | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | $15,653,852.25 | $22,649,008.65 |
Missouri | 1691117 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $34,917,888.00 | $50,521,464.91 |
Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,805,487.50 | $4,005,776.32 |
Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $18,710,965.15 | $19,695,752.79 |
Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,636,693.28 | $4,880,729.77 |
Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $544,569.85 | $605,077.61 |
Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $48,896.98 | $51,470.50 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $196,829,612.49 | $216,650,948.84 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,339,475.83 | $10,279,988.44 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $641,780.95 | $675,558.90 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,525,569.05 | $14,237,441.10 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,423,140.05 | $7,012,491.16 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $304,702.48 | $332,658.87 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $131,166.15 | $138,165.00 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,764,333.85 | $2,911,835.00 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $923,044.17 | $971,625.44 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $43,797.95 | $46,103.11 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $426,107.23 | $448,533.92 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $8,970,646.77 | $9,442,786.08 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Traffic Management/Engineering - HOV | $35,247.80 | $75,782.17 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Traffic Management/Engineering - HOV | $742,849.38 | $1,597,113.40 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $13,881,978.58 | $14,612,609.03 |
Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $659,396.32 | $694,101.39 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $352,818.00 | $352,818.00 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,523,032.32 | $30,024,244.55 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $73,743.77 | $77,625.02 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,219,001.21 | $3,388,422.32 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,367,493.61 | $3,544,730.11 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,906.04 | $2,006.36 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,946.55 | $2,049.00 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,643,377.42 | $1,907,564.58 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $505,800.00 | $562,000.00 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,600,135.80 | $1,600,135.80 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $20,589.24 | $21,672.88 |
Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | ||
Missouri | 2705360 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $337,075.00 | $337,075.00 |
Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,409,594.63 | $26,263,820.10 |
Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,195,411.98 | $4,637,511.10 |
Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $4,734,997.61 | $5,782,920.50 |
Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,222,291.57 | $4,551,846.81 |
Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $66,801.92 | $94,815.71 |
Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,114,753.84 | $1,478,673.30 |
Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $155,050.00 | |
Missouri | 2705372 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $122,224,663.43 | |
Missouri | 2705372 | St. Louis | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | $60,997,802.91 | $67,775,336.57 |
Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,176,999.74 | $14,432,245.00 |
Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,077,187.04 | $6,930,158.96 |
Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $10,756.16 | $69,200.50 |
Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $218,429.63 | $1,405,282.47 |
Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $491,627.43 | $3,162,919.84 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $70,897.59 | |
Missouri | 3661005 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $25,302.41 | |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,338,152.22 | $5,103,708.49 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,155,541.53 | $14,300,637.10 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,207,588.20 | $1,420,692.00 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,520,942.75 | $1,789,344.42 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $542,804.38 | $638,593.38 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $785,226.50 | $981,533.12 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,200,211.74 | $2,750,264.68 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,787,916.29 | |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $638,083.71 | |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $871,316.22 | $883,254.18 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $2,441,435.92 | $2,474,886.22 |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,535.17 | |
Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $16,250.88 | |
Missouri | 5617602 | St. Louis | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Restoration & Rehabilitation | $7,576,000.00 | $13,160,576.12 |
Missouri | 5617602 | St. Louis | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $7,950,000.00 | $11,682,969.77 |
Missouri | 5617602 | St. Louis | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $7,125,000.00 | $10,470,586.11 |
Missouri | 5901816 | Greene | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $19,763,822.00 | $29,725,000.00 |
Missouri | 5901816 | Greene | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,197,000.00 | $1,800,000.00 |
Missouri | 5909802 | Greene | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,439,840.00 | $1,799,800.00 |
Missouri | 5909802 | Greene | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $684,648.73 | $855,810.91 |
Missouri | 5909802 | Greene | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Utilities | $1,348,655.97 | $1,685,819.95 |
Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $15,574,006.74 | $19,467,508.43 |
Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,819,712.57 | $6,024,640.70 |
Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $137,888.00 | $172,360.00 |
Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $780,041.30 | $975,051.63 |
Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,148,271.20 | $6,435,339.00 |
Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $264,687.53 | $330,859.40 |
Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $350,283.56 | $437,854.44 |
Missouri | P231001 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $28,414,810.83 | $28,414,810.83 |
Missouri | P231001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $45,117,477.28 | $56,396,846.59 |
Missouri | P231001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $402,236.42 | $502,795.52 |
Missouri | P231001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $6,814,772.63 | $8,518,465.79 |
Missouri | P241001 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $37,176,740.50 | $37,176,740.50 |
Missouri | P241001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $40,540,364.90 | $50,675,456.12 |
Missouri | P241001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $495,500.57 | $619,375.71 |
Missouri | P241001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $6,563,392.59 | $8,204,240.73 |
Missouri | S102026 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,131,380.32 | $1,414,225.40 |
Missouri | S102026 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $684,209.00 | $855,261.25 |
Missouri | S102026 | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $718,322.74 | $897,903.42 |
Missouri | S102026 | Schuyler | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,736,484.32 | $3,420,605.41 |
Missouri | S102026 | Scotland | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,642,031.27 | $2,052,539.09 |
Missouri | S102026 | Shelby | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $855,129.37 | $1,068,911.71 |
Missouri | S102026 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,402,531.74 | $1,753,164.67 |
Missouri | S102026 | Macon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $718,322.74 | $897,903.42 |
Missouri | S102026 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,505,048.80 | $1,881,311.00 |
Missouri | S102026 | Lewis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,778,662.06 | $2,223,327.58 |
Missouri | S102026 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,326,064.43 | $2,907,580.54 |
Missouri | S102026 | Adair | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,231,259.68 | $1,539,074.60 |
Missouri | S102026 | Gentry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $854,953.53 | $1,068,691.91 |
Missouri | S102026 | Gentry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $54,454.40 | $68,068.00 |
Missouri | S102026 | Adair | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $78,422.40 | $98,028.00 |
Missouri | S102026 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $148,153.60 | $185,192.00 |
Missouri | S102026 | Lewis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $113,288.00 | $141,610.00 |
Missouri | S102026 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $95,860.80 | $119,826.00 |
Missouri | S102026 | Macon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $45,752.00 | $57,190.00 |
Missouri | S102026 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $89,331.20 | $111,664.00 |
Missouri | S102026 | Shelby | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $54,465.60 | $68,082.00 |
Missouri | S102026 | Scotland | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $104,585.60 | $130,732.00 |
Missouri | S102026 | Schuyler | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $174,294.40 | $217,868.00 |
Missouri | S102026 | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $45,752.00 | $57,190.00 |
Missouri | S102026 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $43,579.20 | $54,474.00 |
Missouri | S102026 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $72,060.80 | $90,076.00 |
Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Other | $320,000.00 | $400,000.00 |
Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $1,760,000.00 | $2,200,000.00 |
Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Right of Way | $8,000.00 | $10,000.00 |
Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Utilities | $1,600.00 | $2,000.00 |
Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Putnam | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $9,018,864.69 | $11,273,580.86 |
Missouri | S102057 | Mercer | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Mercer | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $7,343.43 | $9,179.28 |
Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $15,473.12 | $19,341.40 |
Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $11,277.76 | $14,097.20 |
Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $15,735.20 | $19,669.00 |
Missouri | S102057 | Putnam | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $13,506.47 | $16,883.08 |
Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $27,539.18 | $34,423.96 |
Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $4,720.55 | $5,900.68 |
Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $8,404.29 | $10,505.40 |
Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $13,076,419.14 | |
Missouri | S102057 | Mercer | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Putnam | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | S102057 | Putnam | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | S102057 | Mercer | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,647,000.00 | |
Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,960,000.00 | $3,700,000.00 |
Missouri | S102057 | Mercer | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | S102057 | Putnam | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
Missouri | S502015 | St. Charles | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - No Added Capacity | $2,034,760.92 | $2,483,413.00 |
Missouri | S502015 | St. Charles | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $53,835.08 | $65,705.38 |
Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $42,148,996.37 | $51,442,587.00 |
Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,115,165.32 | $1,361,052.31 |
Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,376,841.17 | $5,471,051.46 |
Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,589,500.00 | $1,870,000.00 |
Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $581,538.91 | $3,300,000.00 |
Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,600,000.00 | $4,000,000.00 |
Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Right of Way | $98,481.07 | $100,000.00 |
Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $36,030,887.31 | $44,369,000.00 |
Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,024,124.45 | $10,616,617.00 |
Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $47,449,233.80 | $55,822,628.00 |
Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,651,480.00 | $6,648,800.00 |
Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $27.68 | $32.56 |
Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,157,304.68 | $3,946,630.85 |
Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $160,000.00 | $200,000.00 |
Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $48,755.00 | $48,755.00 |
Missouri | S703077 | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
Missouri | S703077 | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,216,766.00 | $2,607,960.00 |
Missouri | S703077 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,389,220.00 | $8,693,200.00 |
Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,955,688.00 | $3,477,280.00 |
Missouri | S703077 | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
Missouri | S703077 | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
Missouri | S703077 | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,851.85 | $128,061.00 |
Missouri | S703077 | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $216,663.30 | $254,898.00 |
Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $541,658.25 | $637,245.00 |
Missouri | S703077 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
Missouri | S703077 | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
Missouri | S703077 | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
Missouri | S703077 | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
Missouri | S703077 | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
Missouri | S703077 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $451,915.59 | $531,665.40 |
Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $965,382.06 | $1,135,743.60 |
Missouri | S703077 | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
Missouri | S703077 | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,746.55 | $32,643.00 |
Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $271,782.14 | $319,743.70 |
Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $93,717.86 | $110,256.30 |