U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Tennessee

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Tennessee 0001150 SR-1, Near SR-281 in Cannon County to Centertown in Warren County - Construction New $28,772,789.26 $35,965,985.00
Tennessee 0004008 SR-4 (US-78), From the Mississippi State Line to South of Shelby Drive - Widen from 4-Lane to 6-Lane $67,830,000.00 $99,791,901.90
Tennessee 0004011 SR-4(Lamar Avenue), From South of Shelby Drive to Near Raines/Perkins Road Interchange (IA) - Widen from 4-lanes to 6-lanes divided $126,338,657.67 $208,174,504.00
Tennessee 0006083 SR-6, From South of SR-441(Moores Lane) to SR-253 (Concord Road) in Brentwood - Reconstruction and Widen $32,521,756.00 $42,513,438.00
Tennessee 0009066 SR-9 (US-25W) - Bridge over Clinch River in Clinton LM 10.71 - Bridge Replacement $27,482,824.26 $34,396,279.57
Tennessee 0011081 SR-11, North of Mill Creek to Near SR-254(Old Hickory Boulevard) - Reconstruct and Widen $67,351,975.00 $89,691,286.00
Tennessee 0014046 SR-14, Bridges over CNIC Railroad and Nonconnah Creek, LM 7.13 - Bridge Replacement $77,460,765.60 $96,825,957.00
Tennessee 0014063 SR-14(Austin Peay Highway), From SR-385 to East of Kerrville-Rosemark Road (IA) - Reconstruction - Widen from 2-lane to 4-lane divided typical section $34,268,270.00 $42,835,337.00
Tennessee 0014070 SR-14 (Austin Peay Highway), From East of Kerrville-Rosemark Road to Tipton County Line (IA) - Reconstruction $41,594,310.00 $51,992,887.50
Tennessee 0015106 SR-15, From Mill Springs Branch to the Waynesboro Bypass - Widen $39,072,031.32 $49,677,307.63
Tennessee 0015108 SR-15, From Firetower Road to west of Bigbee Branch - Widen $53,133,752.42 $66,460,819.53
Tennessee 0026076 SR-26 (Nashville Hwy), From near SR-53 to near SR-96 - Reconstruction $27,145,732.00 $33,962,637.00
Tennessee 0028031 SR-28(US 127), North of I-40 to Near Potato Farm Road $37,152,208.88 $86,960,881.60
Tennessee 0028038 SR-28, From near North Lowe Road to near Little Road, north of SR-62 $8,598,658.11 $99,683,454.64
Tennessee 0033055 SR-33, Knox County Line to South of SR-144 Left - Reconstruction $47,220,675.79 $71,297,645.01
Tennessee 0034086 SR-34, From SR-32 in Morristown to near East Morris Boulevard - Widen $64,819,663.10 $89,655,865.00
Tennessee 0035038 SR-35(Newport Bypass), From SR-9 to Saint Tide Hollow Road - Construction - New $64,103,459.00 $80,251,910.00
Tennessee 0035064 SR-35 - Intersection of SR-92 / Dickey Road to Grapevine Hollow Road - Construction - New - Construct 5th Lane on 4-Lane Divided Road $35,844,942.00 $35,875,733.00
Tennessee 0035075 SR-35(Newport Highway), From near Sims Road in Sevier County to near SR-92 in Jefferson County (IA) $57,083,854.00 $71,390,880.00
Tennessee 0050027 SR-50, SR-106(US-431, Franklin Pike) to SR-11(US-31A, Verona Avenue) in Lewisburg - Reconstruction $46,798,094.67 $48,360,229.00
Tennessee 0054026 SR-54, Near Rison Street to Near Smith Road - Construction - Widen from 2-Lane to 5-Lane $37,512,612.00 $47,102,176.00
Tennessee 0055006 First Avenue to SR-16 (US-41A, N Jackson Street), in Tullahoma - Widen $27,592,589.31 $34,756,586.89
Tennessee 0056029 SR-56, South of SR-288 Near Magness Road to East Bryant Street in Smithville - Widen 5 Lanes $34,445,417.05 $43,081,775.00
Tennessee 0056039 SR-56, South of Warren/Dekalb County Line to Near Magness Road - Reconstruction $23,926,892.00 $30,251,971.00
Tennessee 0060013 SR-60, From 4-Lane North of I-75 (Westlake Drive) to SR-306 - Reconstruction and Widening $47,475,067.38 $77,141,600.00
Tennessee 0062034 SR-62 (Western Avenue), From Texas Avenue to Major Avenue in Knoxville - Reconstruction - Widen 2 Lane to 5 Lane $47,344,223.27 $61,265,808.96
Tennessee 0063006 SR-63, From Campbell County Line to Hall Lane - Widen $30,753,246.00 $31,367,955.00
Tennessee 0063055 SR-63(General Carl W. Stiner Highway), From Near Frontier Road/Woodson Lane to Near Claiborne County Line - Widen from 2-Lane to 5-Lane $25,430,272.00 $25,854,928.00
Tennessee 0065010 SR-65 - From Old Hwy 431 to Walling Road - Reconstruction $32,739,835.65 $40,941,724.56
Tennessee 0069097 I-69PROP - From West of SR-21 to SR-3(US-51) Near Mayberry Road (IA) - Construction - New 4-Lane Divided Limited Access Interstate Highway $62,327,712.00 $77,909,640.00
Tennessee 0073050 SR-73, From SR-2 (US-11) to East of Little Tennessee River (Ft Loudoun/Tellico Canal) - Reconstruction $61,906,734.00 $78,453,840.00
Tennessee 0076065 SR-76, From West of Cades-Atwood Road to East of SR-77 - Reconstruction $30,816,347.00 $38,520,433.75
Tennessee 0076067 SR-76, From near SR-77 to near Cutlip Lane - Reconstruction - Widen 2-Lane to 4-Lane $38,937,404.00 $48,904,540.00
Tennessee 0099039 SR-99(New Salem Highway), From West of Veterans Parkway(SW Loop) to Cason Lane in Murfreesboro -Widen $53,968,136.00 $79,791,441.00
Tennessee 0099048 SR-99 (New Salem Highway), From Cason Lane to I-24 in Murfreesboro - Widen $25,003,241.00 $32,344,770.00
Tennessee 0101016 SR-101, From Firetower Road to East of Lakeview Drive - Reconstruction - Widen from Two Lanes to Multi-Lane Facility $34,396,083.00 $43,387,182.00
Tennessee 0109031 SR-109, From North of SR-24(US-70) to South of Dry Fork Creek - Reconstruction $30,815,434.00 $38,794,690.00
Tennessee 0109032 SR-109, From South of Dry Fork Creek to South of Cumberland River - Reconstruction $39,853,985.00 $50,974,068.50
Tennessee 0112006 SR-112, From SR-12 (Ashland City Highway) to SR-155 (Briley Parkway) -Reconstruction, Widen, Curb and Gutter, Sidewalk, Signalization $39,064,420.26 $51,005,040.00
Tennessee 0115027 SR-115, South of Topside Road to North of Maloney Road - Widen $63,031,188.00 $78,877,045.00
Tennessee 0115029 SR-115, From Woodson Drive to near Cherokee Trail - Widen from 4-Lane to 6-Lane $137,210,568.04 $171,730,567.31
Tennessee 0115054 SR-115, From North of Maloney Road to Woodson Drive - Widen from 4 to 6 Lanes $74,345,900.00 $97,316,818.00
Tennessee 0115057 SR-115 - (Relocated Alcoa Highway), From SR-35 (Hall Road), South of Airport Road to Proposed Interchange at Tyson Boulevard - Widen $57,078,945.00 $71,853,312.00
Tennessee 0115065 SR-115(Relocated Alcoa Highway), from Proposed Interchange at Tyson Blvd to Existing SR-115 at South Singleton Station Road - Stage 1 $45,959,000.00 $180,552,450.19
Tennessee 0128029 SR-128, Bridge Over Pickwick Dam - Bridge Rehabilitation $26,805,760.00 $33,507,200.00
Tennessee 0136008 SR-136, SR-111 to I-40 - Widen $48,052,510.27 $63,660,523.00
Tennessee 0141016 SR-141(Hartsville Pike), North of Lovers Lane To SR-26(US-70) - New Construction / Widen $31,788,347.35 $42,365,401.00
Tennessee 0149012 SR-149, From River Road to SR-13; SR-13, SR-149 to Zinc Plant Road - Widen to 5 Lanes $60,023,696.13 $86,210,912.55
Tennessee 0243090 I-24, Interchanges at SR-2(Broad Street) and SR-58(Market Street) in Chattanooga - Interchange Modification $36,840,728.00 $41,759,295.00
Tennessee 0243097 I-24, Bridges over Germantown Road, LM 12.08 and Belvoir Avenue, 12.59 in East Ridge - Bridge Replacement $36,112,144.89 $40,124,608.44
Tennessee 0249079 I-24, Interchange modification at Hickory Hollow Parkway - Modify Interchange $31,626,364.02 $37,740,840.90
Tennessee 0266013 SR-266 (Jefferson Pike), From SR-102 to East of I-840 - Widen $30,678,704.00 $74,112,669.00
Tennessee 0269020 I-269PROP(Paul Barret Parkway), From North of SR-57 in Fayette County to South of Raleigh-Lagrange Road - Stage Construction - New $35,261,150.07 $43,959,254.59
Tennessee 0317017 SR-317, SR-321(Ooltewah-Ringgold Road) to near Layton Lane - Reconstruction and Widen from 2 Lanes to 5 Lanes $95,323,113.00 $121,178,487.00
Tennessee 0397010 SR-397 (Mack Hatcher Parkway West) - From S of SR-96 W of Franklin to E of SR-106 N of Franklin - Construction - New $48,821,165.56 $64,766,993.00
Tennessee 0401348 I-40, From West of SR-186 (US-45 ByPass) to East of SR-5 (North Highland Avenue) - Widen $63,161,320.65 $78,951,650.81
Tennessee 0401358 I-40, From West of SR-20 (US-412, Hollywood Drive) to West of SR-186 (US-45 ByPass) (IA) - Widen $33,775,792.00 $42,219,740.00
Tennessee 0402337 I-40, From East of SR-5(US-45) to East of SR-1(US-70) in Jackson - Widen from 4-Lane to 6-Lane on existing alignment $83,894,450.00 $104,868,062.50
Tennessee 0403183 I-40, Bridges over Squeeze Bottom Lane, LM 6.02 and Buffalo River, LM 6.26 - Bridge Replacement $41,748,974.00 $86,112,534.00
Tennessee 0405142 I-40, From East of SR-109 to East of I-840 - Widen, HOV Lanes, Shoulders, Bridge Widening $34,267,816.31 $42,834,771.00
Tennessee 0405146 I-40, Donelson Pike Interchange (includes Donelson Pike relocation from taxiway bridges over Donelson Pike to I-40) -Modify Interchange $75,529,551.00 $97,871,241.00
Tennessee 0406173 I-40, Westbound near MM 342 to near MM 344 - Slope Stabilization and Resurfacing $38,102,563.14 $47,240,032.00
Tennessee 0459010 SR-459(Lexington Bypass), From SR-20(US-412) West of Lexington to Near SR-22 South of Lexington - New - Super 2-lane bypass on new alignment $35,214,845.19 $44,018,557.00
Tennessee 0460010 SR-460PROP (Somerville Beltway), From Near SR-15 (US-64) West of Somerville to Near SR-76 South of Somerville - Stage Construction - New $26,152,624.00 $32,690,780.00
Tennessee 0551119 I-55 at Crump Boulevard in Memphis - Modify Interchange $108,082,917.19 $120,104,081.00
Tennessee 0551135 I-55 exit Ramp to SB SR-14, Bridge over SR-14, LM 7.46; and SR-14, Bridge over I-55, LM 7.44 $48,811,808.40 $61,014,760.50
Tennessee 0652096 I-65, Interchange at SR-99 (US-412) in Columbia - Modify Interchange $20,250,396.39 $36,595,855.92
Tennessee 0652113 I-65, Interchange at Buckner Road in Spring Hill (Design Build) - New Interchange $34,328,097.00 $60,800,000.00
Tennessee 0653103 I-65, Weigh Station near the Kentucky State Line - Weigh Station or Rest Area Improvements $31,623,969.00 $35,179,528.00
Tennessee 0653128 I-65, From near SR-25 (Main Street) to near SR-109 - Section 4 - Widen $156,918,789.00 $196,329,612.00
Tennessee 0751131 I-75, Interchange at I-24 - Modify Interchange $136,876,258.00 $152,084,732.00
Tennessee 0751144 I-75, Interchange Modifications at Hamilton Place Mall - Modify Interchange $73,520,595.00 $85,854,428.00
Tennessee 0751155 I-75, Interchange at I-24, Phase 2 (IA) - Modify Interchange $122,951,869.64 $138,110,967.99
Tennessee 0983028 SMART Corridor (Phase I), I-24, From I-440 (Exit 53) to SR-10 (Exit 81 / US-231); and SR-1 from I-24 to SR-10 and various connector routes - ITS $20,445,829.00 $25,557,286.00
Tennessee 0983030 I-24 SMART Corridor (Phase II), From I-440 (Exit 53) to SR-10 (Exit 81 / US-231) in Murfreesboro and SR-1 from I-24 to SR-10 in Murfreesboro - ITS $45,593,867.52 $56,992,341.00
Tennessee 1243081 I-124, From the I-24 Interchange to South of the Tennessee River Bridge - Widen - Add Lanes $132,958,317.00 $167,869,722.00
Tennessee 8300070 Albert Gallatin Ave/Hatten Track Rd Ext, From SR-109 to SR-174 - New Construction $28,435,790.00 $37,352,392.00
Tennessee 9202134 Walnut Street Pedestrian Bridge-Bridge Rehabilitation $18,861,881.00 $28,724,048.00
Tennessee 9305031 McEwen Drive, From East of Cool Springs Boulevard/Oxford Glen Drive to SR-252 (Wilson Pike)-Widen $30,239,999.00 $60,579,752.00
Tennessee 9307012 Walton Ferry Road/Old Shackle Island Road, From Nokes Drive to Volunteer Drive in Hendersonville (Section 2) - Widen $20,355,844.78 $28,522,963.73
Tennessee NBIS045 Various On-System and Off-System Bridges Statewide -  FY 2023 - 2024 (Inspection & Evaluation) $21,125,000.00 $26,406,250.00