U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Tennessee

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way $2,727,816.09 $3,409,770.11
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way $2,712,183.91 $3,390,229.89
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Utilities $100,111.49 $125,139.36
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Utilities $100,688.51 $125,860.64
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $221,760.92 $277,201.15
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $79,866.34 $99,832.85
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,175,521.62 $1,469,401.53
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,659,917.38 $2,074,896.47
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $11,066,114.18 $13,832,642.48
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $7,836,808.82 $9,796,010.52
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $649,275.86 $811,594.83
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $442,724.14 $553,405.17
Tennessee 0004008 Shelby >= 200,000 State DONOR STATE BONUS 4R - Added Capacity $1,405,809.22 $1,757,262.00
Tennessee 0004008 Shelby >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $30,000,000.00 $30,000,000.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $160,000.00 $5,808,092.90
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,288,356.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $21,680,000.00 $27,100,000.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $8,155,452.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $3,270,000.00 $6,540,000.00
Tennessee 0004008 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $8,594,190.78 $10,742,739.00
Tennessee 0004008 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,720,000.00 $3,400,000.00
Tennessee 0004011 Shelby >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Right of Way $21,196,998.00 $21,196,998.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $76,131,598.00 $122,792,900.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $9,289,078.70 $14,982,385.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $5,332,907.00 $20,511,181.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $14,388,075.97 $28,691,040.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $22,133,027.00 $27,666,284.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,137,486.00 $2,671,858.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $100,000.00 $125,000.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,515,243.00 $10,005,296.00
Tennessee 0006083 Williamson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,636,000.00 $2,045,000.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering $198,949.26 $248,686.57
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $17,465,486.00 $21,831,857.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,213,118.00 $2,766,397.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $563,000.00 $703,750.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,499,600.00 $1,874,500.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,181,837.00 $1,520,046.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity $538,347.00 $672,934.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity $3,822,487.00 $4,778,109.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $33,401,253.00 $41,751,566.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,392,093.00 $5,490,117.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $19,112,000.00 $23,890,000.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $10,446,629.00 $18,559,603.00
Tennessee 0014046 Shelby >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $160,000.00 $200,000.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $52,656,880.00 $65,821,100.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $4,515,280.00 $5,644,100.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $3,188,480.00 $3,985,600.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $15,915,325.60 $19,894,157.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $124,800.00 $156,000.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $800,000.00 $1,000,000.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $80,000.00 $100,000.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $20,000.00 $25,000.00
Tennessee 0014063 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $31,200,245.00 $39,000,306.00
Tennessee 0014063 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,068,025.00 $3,835,031.00
Tennessee 0014070 Shelby >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $487,491.16 $609,363.96
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $68.84 $86.04
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $143.40 $179.26
Tennessee 0014070 Shelby >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $1,015,606.60 $1,269,508.24
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $5,064.47 $6,330.59
Tennessee 0014070 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $35,868,255.53 $44,835,319.41
Tennessee 0014070 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,780,770.17 $4,725,962.71
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $533.83 $667.29
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $61.61 $77.01
Tennessee 0014070 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $436,314.39 $545,392.99
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,600,349.21 $2,000,436.51
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,046,211.05 $1,307,763.81
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $12,000.00 $15,000.00
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $26,694,500.56 $33,368,125.70
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $1,723,381.67 $2,154,227.09
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Landscaping and Other Scenic Beautification $7,553.21
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way $7,505,886.30 $9,399,997.87
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities $489,702.53 $1,424,203.44
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Right of Way $697,820.42 $872,275.53
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $43,811,404.00 $54,764,255.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,539,632.00 $4,424,539.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $160,000.00 $200,000.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $463,216.00 $622,650.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way $3,022,400.00 $3,778,000.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities $1,439,280.00 $1,799,100.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $21,278,151.00 $26,597,690.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,470,010.00 $3,087,513.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities $3,300,071.00 $4,155,558.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $97,500.00 $121,876.00
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $1,347,758.88 $1,684,698.60
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $19,305,730.00 $49,092,656.50
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,665,794.00
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $280,000.00 $350,000.00
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $11,044,000.00 $13,844,587.50
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,174,720.00 $16,323,145.00
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $27,614.84 $34,518.55
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $658,877.27 $823,596.59
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $827,150.00 $1,033,937.50
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $55,800.00 $69,750.00
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,977,911.19 $2,472,388.99
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $627,304.81 $784,131.01
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $55,836,819.18
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $21,134,673.82
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,499,671.27
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $5,585,341.73
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,610,267.38 $2,012,834.22
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,389,732.62 $2,987,165.78
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $211,093.05 $4,125,899.25
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $212,906.95 $282,726.75
Tennessee 0033055 Union >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $1,140,154.00 $1,425,193.00
Tennessee 0033055 Union >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $783,551.66 $979,439.58
Tennessee 0033055 Union >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $3,213,455.30 $4,016,819.13
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $19,351,954.09 $36,248,081.30
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $4,022,448.00 $5,028,060.00
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,799,046.00 $5,998,807.00
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $13,910,066.74 $17,601,245.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $35,488,800.00 $44,361,000.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,672,800.00 $5,841,000.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $18,321,600.00 $23,960,460.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,336,463.10 $15,493,405.00
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $26,956.82 $33,696.03
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,274,551.18 $6,593,188.97
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $50,202,496.47 $62,753,120.59
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $256,571.53 $320,714.41
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $23,277.97 $29,097.46
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $4,554,722.03 $5,693,402.54
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $238,779.66 $298,474.58
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $1,220.34 $1,525.42
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $17,923.12 $23,027.22
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $3,506,959.88 $4,505,662.78
Tennessee 0035064 Jefferson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering $3,258,671.00 $3,258,671.00
Tennessee 0035064 Jefferson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP New  Construction Roadway $31,900,046.00 $31,900,046.00
Tennessee 0035064 Jefferson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities $686,225.00 $717,016.00
Tennessee 0035075 Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $23,292,897.44 $29,116,121.80
Tennessee 0035075 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $26,284,946.56 $32,856,183.20
Tennessee 0035075 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,678,867.76 $3,348,584.70
Tennessee 0035075 Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,513,196.24 $3,141,495.30
Tennessee 0035075 Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,823,090.58 $2,298,836.15
Tennessee 0035075 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $490,855.42 $629,658.85
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $29,537,877.00 $29,537,877.00
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering $3,715,496.00 $3,715,496.00
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Utilities $7,552,906.00 $7,617,086.00
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $184,000.00 $230,000.00
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,742,000.00 $4,677,500.00
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $700,000.00 $875,000.00
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering $980,215.67 $1,225,270.00
Tennessee 0050027 Marshall >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $385,600.00 $482,000.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,994,674.00 $2,493,343.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $18,542,043.00 $23,177,553.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $738,000.00 $922,500.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,435,569.00 $5,755,872.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM New  Construction Roadway $5,200,000.00 $6,500,000.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,240,000.00 $1,550,000.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way $4,662,400.00 $5,828,000.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities $699,926.00 $874,908.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State EQUITY BONUS - CHARGED TO LIM Preliminary Engineering $332,000.00 $415,000.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $16,781,065.00 $20,976,333.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,072,286.00 $2,590,359.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $470,710.31 $588,387.89
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $899,166.00 $1,123,958.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,793,362.00 $8,757,549.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $244,000.00 $305,000.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way $3,200,000.00 $4,000,000.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $412,894.00 $516,118.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,097,104.00 $2,621,380.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $1,055,000.00 $1,318,750.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Right of Way $865,000.00 $1,081,250.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Utilities $160,000.00 $200,000.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $4,599,198.74 $5,748,999.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $20,270,814.90 $25,338,520.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,450,405.41 $1,813,008.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $335,000.00 $418,750.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $25,000.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $105,792.00 $132,240.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $15,808.00 $19,760.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity $83,200.00 $104,000.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity $556,800.00 $696,000.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $348,000.00 $435,000.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $52,000.00 $65,000.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way $209,144.00 $261,430.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way $1,399,656.00 $1,749,570.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities $1,245,840.00 $1,557,300.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities $186,160.00 $232,700.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $9,569,220.48 $11,961,525.60
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $1,429,883.52 $1,787,354.40
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $181,772.89 $227,216.08
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $1,216,480.11 $1,520,599.92
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities $2,373,999.45 $3,266,219.25
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities $354,735.55 $488,055.75
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $938,208.00 $1,172,760.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $140,192.00 $175,240.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $416,000.00 $520,000.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,784,000.00 $3,480,000.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $278,400.00 $348,000.00
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $41,600.00 $52,000.00
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $33,275,067.38 $44,483,551.00
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,399,237.00
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $12,436,600.00 $15,545,750.00
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,763,400.00 $11,713,062.00
Tennessee 0062034 Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $4,112,114.00 $5,140,143.00
Tennessee 0062034 Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Safety $120,000.00 $150,000.00
Tennessee 0062034 Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $1,617,237.00 $2,021,546.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $30,103,080.00 $37,628,850.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,076,000.00 $3,845,000.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,181,861.81 $1,477,327.26
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,606,437.69 $9,093,576.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $1,527,492.77 $1,909,366.70
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $23,288,882.00 $23,288,882.00
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $2,579,541.00 $2,579,541.00
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering $2,394,400.00 $2,993,000.00
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $2,490,423.00 $2,506,532.00
Tennessee 0063055 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $121,081.54 $121,081.54
Tennessee 0063055 Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $20,408,097.46 $20,408,097.46
Tennessee 0063055 Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $2,336,585.01 $2,336,585.01
Tennessee 0063055 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $13,862.99 $13,862.99
Tennessee 0063055 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $15,043.76 $17,548.39
Tennessee 0063055 Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $2,535,601.24 $2,957,752.61
Tennessee 0065010 Robertson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $888,259.65 $1,110,324.56
Tennessee 0065010 Robertson >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $3,232,567.00 $4,040,709.00
Tennessee 0065010 Robertson >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $2,263,759.00 $2,829,698.00
Tennessee 0065010 Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $18,071,682.00 $22,589,602.00
Tennessee 0065010 Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $344,000.00 $430,000.00
Tennessee 0065010 Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,159,920.00 $3,949,900.00
Tennessee 0065010 Robertson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $4,779,648.00 $5,991,491.00
Tennessee 0069097 Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,666,156.00 $7,082,695.00
Tennessee 0069097 Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $56,152,852.00 $70,191,065.00
Tennessee 0069097 Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $508,704.00 $635,880.00
Tennessee 0073050 Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $890,000.00 $1,112,500.00
Tennessee 0073050 Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $55,887,609.00 $69,859,511.00
Tennessee 0073050 Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $4,805,283.00 $6,006,604.00
Tennessee 0073050 Loudon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Utilities $323,842.00 $1,475,225.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $21,799,080.00 $27,248,850.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,378,760.00 $2,973,450.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $240,000.00 $300,000.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,934,800.00 $3,668,500.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,561,720.00 $3,202,150.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $851,200.00 $1,064,000.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $50,787.00 $63,483.75
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $27,414,960.00 $34,268,700.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,022,880.00 $3,778,600.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,020,800.00 $1,276,000.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,248,800.00 $4,061,000.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $3,165,964.00 $4,190,240.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,064,000.00 $1,330,000.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $35,678,747.00 $44,598,434.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $5,297,145.00 $6,621,432.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,428,200.00 $1,785,250.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $4,136,352.00 $5,170,440.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $7,427,692.00 $21,615,885.00
Tennessee 0099048 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $18,810,224.00 $23,512,780.00
Tennessee 0099048 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,294,166.00 $2,867,707.00
Tennessee 0099048 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,898,851.00 $5,964,283.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $15,485,832.00 $19,357,290.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,880,159.00 $2,350,199.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $11,618,000.00 $14,522,500.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $5,412,092.00 $7,157,193.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $14,274,724.00 $17,843,405.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,596,931.00 $1,996,164.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $212,000.00 $265,000.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $6,445,200.00 $8,318,889.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $7,626,579.00 $9,546,232.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $660,000.00 $825,000.00
Tennessee 0109032 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $20,952,500.00 $26,190,626.00
Tennessee 0109032 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,477,039.00 $3,096,299.00
Tennessee 0109032 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $400,000.00 $500,000.00
Tennessee 0109032 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $8,817,600.00 $11,090,787.50
Tennessee 0109032 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,346,846.00 $9,021,356.00
Tennessee 0109032 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $860,000.00 $1,075,000.00
Tennessee 0112006 Davidson >= 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $312,000.00 $390,000.00
Tennessee 0112006 Davidson >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $492,000.00 $615,000.00
Tennessee 0112006 Davidson >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $793,311.26 $991,640.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $18,394,936.00 $22,993,671.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,619,711.00 $3,274,640.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $904,800.00 $1,131,000.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $6,751,200.00 $8,439,000.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $8,796,462.00 $13,170,089.00
Tennessee 0115027 Knox >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $400,000.00 $500,000.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $47,944,492.00 $59,930,616.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,159,021.00 $6,448,777.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,610,000.00 $2,012,500.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $432,000.00 $540,000.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,828,800.00 $2,286,000.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,656,875.00 $7,159,152.00
Tennessee 0115029 Knox >= 200,000 State EXTENSION OF ALLOC PROGRAMS Preliminary Engineering $323,500.00 $404,375.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $86,468,145.04 $108,085,181.31
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $14,906,132.00 $18,632,665.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,304,000.00 $4,130,000.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $10,240,000.00 $12,800,000.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $16,554,941.00 $20,911,033.00
Tennessee 0115029 Knox >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Utilities $609,451.00 $761,814.00
Tennessee 0115029 Knox >= 200,000 State REPURPOSED SPECIAL Right of Way $3,300,000.00 $4,125,000.00
Tennessee 0115029 Knox >= 200,000 State REPURPOSED SPECIAL Utilities $979,399.00 $1,224,249.00
Tennessee 0115029 Knox >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $525,000.00 $656,250.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $67,120,000.00 $83,900,000.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,675,535.00 $7,094,419.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,025,365.00 $5,666,149.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $525,000.00 $656,250.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $26,433,656.00 $33,042,070.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,143,736.00 $3,929,670.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $9,563,200.00 $11,954,000.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $14,549,512.00 $18,691,520.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $365,669.00 $457,087.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $3,023,172.00 $3,778,965.00
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $16,414,000.00
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $88,520,250.00
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $18,169,450.19
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $45,959,000.00 $57,448,750.00
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $23,747,040.00 $29,683,800.00
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,374,720.00 $2,968,400.00
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $524,000.00 $655,000.00
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $160,000.00 $200,000.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $21,436,413.27 $26,795,518.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $3,168,212.00 $3,960,266.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Right of Way $8,146,390.00 $10,182,988.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Utilities $7,369,806.00 $12,807,139.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,242,000.00 $2,802,500.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $624,409.00 $780,512.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $5,065,280.00 $6,331,600.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $16,500,828.00 $20,626,036.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $467,580.35 $584,475.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $2,011,783.00 $2,514,729.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,541,740.00 $3,177,175.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $304,000.00 $380,000.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,071,320.00 $3,061,150.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $7,891,096.00 $12,021,836.00
Tennessee 0149012 Montgomery >= 200,000 State EQUITY BONUS SP LIMITATION Utilities $3,073,392.00 $3,841,740.00
Tennessee 0149012 Montgomery >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $2,296,000.00 $2,870,000.00
Tennessee 0149012 Montgomery >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $151,728.00 $189,660.00
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $11,249,303.55 $11,249,303.55
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering $6,517,142.00 $6,517,142.00
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities $3,805,336.00 $4,078,374.00
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $5,652,409.00 $7,065,512.00
Tennessee 0149012 Montgomery >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $8,389,541.00 $10,486,927.00
Tennessee 0149012 Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $18,888,844.58 $39,855,253.00
Tennessee 0149012 Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $57,001.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,718,303.00 $1,909,226.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $21,721,758.00 $24,135,287.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,879,531.00 $3,199,479.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,150,000.00 $3,500,000.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $315,000.00 $350,000.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,434,523.00 $2,705,026.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,621,613.00 $5,960,277.00
Tennessee 0243097 Hamilton >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $287,489.64 $319,433.44
Tennessee 0243097 Hamilton >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering $95,681.25 $106,313.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $29,625,431.00 $32,917,146.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,962,543.00 $3,291,716.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,061,000.00 $2,290,000.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $180,000.00 $200,000.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $900,000.00 $1,000,000.00
Tennessee 0249079 Davidson >= 200,000 State DONOR STATE BONUS 4R - No Added Capacity $646,878.02 $718,753.36
Tennessee 0249079 Davidson >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $2,972,855.00 $3,303,172.22
Tennessee 0249079 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $20,525,135.00 $25,406,142.32
Tennessee 0249079 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,604,865.00 $2,894,294.00
Tennessee 0249079 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $4,876,631.00 $5,418,479.00
Tennessee 0266013 Rutherford >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $3,100,000.00 $3,875,000.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $15,375,880.00 $34,658,485.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $5,921,754.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,456,000.00 $3,070,000.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,270,000.00 $2,837,500.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $7,476,824.00 $23,749,930.00
Tennessee 0269020 Shelby >= 200,000 State GRANTS SUP PLAN SECTION 117 New  Construction Roadway $491,964.00 $491,964.00
Tennessee 0269020 Shelby >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New  Construction Roadway $1,836,590.00 $2,295,738.00
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 New  Construction Roadway $431,158.00 $538,948.00
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $800,000.00 $1,000,000.00
Tennessee 0269020 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $1,916,400.00 $2,395,500.00
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $828,738.00 $1,035,922.00
Tennessee 0269020 Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $3,402,641.00 $4,253,302.00
Tennessee 0269020 Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM New  Construction Roadway $20,028,742.07 $25,041,734.59
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM New  Construction Roadway $5,524,917.00 $6,906,146.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $65,506,772.00 $81,883,465.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $7,448,076.00 $9,310,095.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $5,884,800.00 $7,356,000.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $16,483,465.00 $22,628,927.00
Tennessee 0397010 Williamson >= 200,000 State EQUITY BONUS EXEMPT LIM Right of Way $105,702.64 $132,129.00
Tennessee 0397010 Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS New  Construction Roadway $320,000.00 $400,000.00
Tennessee 0397010 Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS Right of Way $6,838,686.00 $8,548,357.00
Tennessee 0397010 Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS Utilities $402,400.00 $503,000.00
Tennessee 0397010 Williamson >= 200,000 State GRANTS SUP PLAN SECTION 117 Right of Way $983,928.00 $983,928.00
Tennessee 0397010 Williamson >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $2,051,772.00 $2,564,715.00
Tennessee 0397010 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,609,808.00 $4,512,261.00
Tennessee 0397010 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $31,599,158.00 $40,748,948.00
Tennessee 0397010 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,156,490.00 $5,432,129.00
Tennessee 0397010 Williamson >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM New  Construction Roadway $650,080.00 $812,600.00
Tennessee 0397010 Williamson >= 200,000 State REPURPOSED SPECIAL New  Construction Roadway $103,140.92 $128,926.00
Tennessee 0401348 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $56,644,708.65 $70,805,885.81
Tennessee 0401348 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,816,612.00 $6,020,765.00
Tennessee 0401348 Madison >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $1,700,000.00 $2,125,000.00
Tennessee 0401358 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $30,705,264.00 $38,381,580.00
Tennessee 0401358 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,070,528.00 $3,838,160.00
Tennessee 0402337 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $73,388,800.00 $91,736,000.00
Tennessee 0402337 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $7,039,250.00 $8,799,062.50
Tennessee 0402337 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,118,400.00 $2,648,000.00
Tennessee 0402337 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $279,200.00 $349,000.00
Tennessee 0402337 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $20,000.00 $25,000.00
Tennessee 0402337 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $800.00 $1,000.00
Tennessee 0402337 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,048,000.00 $1,310,000.00
Tennessee 0403183 Humphreys >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $34,703,403.00 $78,284,121.00
Tennessee 0403183 Humphreys >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $7,045,571.00 $7,828,413.00
Tennessee 0405142 Wilson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $600,000.00 $750,000.00
Tennessee 0405142 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $29,526,408.00 $36,908,009.00
Tennessee 0405142 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,069,801.00 $3,837,252.00
Tennessee 0405142 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $949,600.00 $1,187,000.00
Tennessee 0405142 Wilson >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $104,826.00 $131,033.00
Tennessee 0405142 Wilson >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $17,181.31 $21,477.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $61,057,410.00 $79,649,099.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,493,854.00 $8,117,318.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,000,000.00 $5,000,000.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,019,604.00 $2,524,505.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,958,683.00 $2,580,319.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF 4R - No Added Capacity $32,116,631.14 $35,685,145.72
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Construction Engineering $3,654,000.00 $4,060,000.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Preliminary Engineering $1,902,332.00 $2,111,992.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Safety $96,600.00 $105,000.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance  Resurfacing $333,000.00 $370,000.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $4,907,894.28
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM New  Construction Roadway $237,313.19 $296,642.00
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,895,896.00 $3,619,870.00
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $29,653,508.00 $37,066,885.00
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,428,128.00 $3,035,160.00
Tennessee 0460010 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,377,512.00 $2,971,890.00
Tennessee 0460010 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $21,922,504.00 $27,403,130.00
Tennessee 0460010 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,852,608.00 $2,315,760.00
Tennessee 0551119 Shelby >= 200,000 State INTERSTATE 4R Preliminary Engineering $66,681.75 $74,091.00
Tennessee 0551119 Shelby >= 200,000 State INTERSTATE MAINT DISC Preliminary Engineering $940,419.00 $1,044,910.00
Tennessee 0551119 Shelby >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $3,141,394.63 $3,490,440.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $87,217,470.00 $96,908,300.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $8,870,238.00 $9,855,820.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,625,000.00 $2,916,667.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,386,632.00 $2,651,813.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,449,068.00 $2,733,137.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $386,013.81 $428,903.00
Tennessee 0551135 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $3,724,034.40 $4,655,043.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $21,583,552.00 $26,979,440.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,845,520.00 $3,556,900.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,188,880.00 $2,736,100.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $339,648.00 $424,560.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $318,400.00 $398,000.00
Tennessee 0551135 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $17,811,774.00 $22,264,717.50
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $1,802,005.02 $1,802,005.02
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $4,197,308.00 $4,197,308.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Added Capacity $1,222,037.67 $1,357,819.63
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $921,076.43 $1,023,419.22
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,336,500.00 $12,761,741.53
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,793,143.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $526,140.00 $584,600.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,367,787.00 $1,519,763.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $412,653.00 $1,150,624.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $8,464,889.27 $9,405,432.52
Tennessee 0652113 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $7,136,081.00 $8,920,101.00
Tennessee 0652113 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,192,016.00 $2,740,020.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity $16,780,000.00 $33,082,597.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $2,100,000.00 $3,544,763.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Preliminary Engineering $4,120,000.00 $9,212,519.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way $1,000,000.00 $2,000,000.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Utilities $1,000,000.00 $1,300,000.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $246,600.00 $274,000.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,670,598.00 $2,967,332.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $712,350.00 $791,500.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,281,969.00 $1,424,410.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $56,609.00 $104,682.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Vehicle Weight Enforcement Program $4,028,939.00 $4,476,599.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Vehicle Weight Enforcement Program $22,626,904.00 $25,141,005.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $138,548,333.00 $173,185,417.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $12,818,156.00 $16,022,695.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $5,504,000.00 $6,880,000.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $48,300.00 $241,500.00
Tennessee 0751131 Hamilton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $3,000,000.00 $3,333,334.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $45,846,158.00 $50,940,175.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $12,600,000.00 $14,000,000.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $7,200,000.00 $8,000,000.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $18,610.00 $20,678.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,032,648.00 $4,480,720.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $64,178,842.00 $71,309,825.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $38,614,546.00 $44,084,986.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,385,453.00 $7,094,948.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,500,000.00 $5,000,000.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,179,001.00 $1,310,001.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,350,000.00 $1,500,000.00
Tennessee 0751144 Hamilton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $21,491,595.00 $26,864,493.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $55,229,143.00 $61,365,715.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,720,000.00 $7,150,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,144,000.00 $2,680,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $800,000.00 $1,000,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $75,000.00 $100,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,100,000.00 $1,500,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $52,375,726.64 $58,195,252.99
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $5,508,000.00 $6,120,000.00
Tennessee 0983028 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,413,722.00 $1,767,153.00
Tennessee 0983028 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $18,137,218.00 $22,671,523.00
Tennessee 0983028 Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $81,354.00 $101,692.00
Tennessee 0983028 Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Traffic Management/Engineering - HOV $813,535.00 $1,016,918.00
Tennessee 0983030 Davidson >= 200,000 State CONGESTION AIR QUALITY Traffic Management/Engineering - HOV $5,582,191.28 $6,977,740.97
Tennessee 0983030 Rutherford >= 200,000 State CONGESTION AIR QUALITY Traffic Management/Engineering - HOV $9,092,171.16 $11,365,217.03
Tennessee 0983030 Rutherford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,147,364.87 $2,684,206.09
Tennessee 0983030 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,318,387.13 $1,647,983.91
Tennessee 0983030 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $6,639,104.68 $8,298,881.47
Tennessee 0983030 Rutherford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $10,813,652.40 $13,517,066.53
Tennessee 0983030 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,323,807.14 $1,654,758.92
Tennessee 0983030 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,156,192.86 $2,695,241.08
Tennessee 0983030 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $6,520,996.00 $8,151,245.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $108,032,495.00 $136,708,107.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $7,522,220.00 $9,402,775.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $144,000.00 $180,000.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,236,000.00 $1,545,000.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $396,424.00 $499,868.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $2,500,000.00 $3,125,000.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $6,460,538.00 $8,075,672.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $4,760,000.00 $5,950,000.00
Tennessee 1243081 Hamilton >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities $1,906,640.00 $2,383,300.00
Tennessee 8300070 Sumner >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,409,605.00 $4,262,006.00
Tennessee 8300070 Sumner >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $20,735,071.00 $27,726,493.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $755,413.00 $944,267.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $180,000.00 $225,000.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,341,233.00 $2,926,541.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,014,468.00 $1,268,085.00
Tennessee 9202134 Hamilton >= 200,000 Local HWY INFRA PRGM-IIJA DEMO Facilities for Pedestrians and Bicycles $5,000,000.00 $6,250,000.00
Tennessee 9202134 Hamilton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,277,221.00 $2,846,527.00
Tennessee 9202134 Hamilton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $11,584,660.00 $19,627,521.00
Tennessee 9305031 Williamson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $26,326,423.00 $55,687,781.00
Tennessee 9305031 Williamson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,913,576.00 $4,891,971.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $11,967,511.00 $15,476,187.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,445,673.00 $1,807,091.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $880,720.00 $1,100,900.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $200,000.00 $250,000.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $5,613,347.78 $7,016,684.73
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $248,593.00 $2,872,101.00
Tennessee NBIS045 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Inspection and Bridge Related Training $13,475,000.00 $16,843,750.00
Tennessee NBIS045 Statewide N/A Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Inspection and Bridge Related Training $7,650,000.00 $9,562,500.00