U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Texas

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Texas 0095022-02 VARIOUS LOCATIONS IN TARRANT COUNTY, CONGESTION MITIGATION & AIR QUALITY $21,301,440.00 $26,626,800.00
Texas 0108184 IH 10 FROM  W OF ADAMS BAYOU, EAST TO  W OF SABINE RIVER BRIDGE RECONSTRUCT MAIN LANES OF EXISTING 4 LANE FREEWAY $15,079,960.37 $55,519,614.93
Texas 0303125 CONSTRUCT ONE-WAY FRONTAGE ROADS, ENTRANCE AND EXIT RAMPS AND REPLACE BRIDGE AT FM 989 ON IH 30. $55,333,461.40 $68,545,021.19
Texas 0354235 IH 35 FROM  FALLS COUNTY LINE TO  WOODLAWN RD RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE CONGESTION AND ENHANCE SAFETY $121,454,076.60 $138,025,677.73
Texas 0355152 IH 35W FROM IH 820 TO IH 30. RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES $220,313,023.61 $294,794,414.93
Texas 0356438 IH 35E FROM SANDY LAKE RD/WHITLOCK LN TO LOOP 288. RECONST 6 LN TO 8 MAINLANES, 4 CONCURRENT MANAGED/HOV AND FR $397,540,702.04 $1,049,891,743.18
Texas 0451346 IH 45 FROM AT IH 610 S TO CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB $22,644,369.15 $28,472,662.26
Texas 1102054 US 190 FR. 0.20 MI E OF FM 3470 TO 0.30 MI W OF FM 2410 FR. 3470 TO ROY REYNOLDS . CONSTRUCT OVERPASS AND WIDEN FR 2 TO 4 LNS W/CO $7,852,951.70 $28,004,799.00
Texas 1102319 SH 242 FROM  AT IH 45 TO  . CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH 242 TO SB IH 45 & NB IH 45 TO WB SH 242 ( $1,480,218.39 $31,278,253.00
Texas 1102493 FROM IH 20 TO FM 700. CONSTRUCT NEW RELIEF ROUTE $63,362,556.40 $79,120,364.25
Texas 1402016 RECONSTRUCT CLINTON DRIVE $15,711,497.00 $31,121,001.72
Texas 1402081 IH 69 FR W OF FM 762 TO 0.31 MI W OF FM 2759. WIDEN TO 8 ML, FRTG RDS, ITS, TMS, CONST 2-WAY HOV LNS & INT IMPRVS AT FM 762. $130,353,034.39 $183,422,238.85
Texas 1502464 US 83 FROM 0.28 MI WEST OF SHOWERS RD TO 0.85 MI E OF FM 886(EL FARO RD). CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY $21,812,000.00 $67,039,536.19
Texas 1502521 IH35 FR N. STASSNEY LN TO S. WILLIAM CANNON DR ADD SHLDERS, AUX LNS, RAMP IMPRVMTS, PAV REHAB, BIKE & PED IMPRVM, FRT RD INTSE IMP $31,332,261.92 $77,852,159.34
Texas 1502531 ON IH 35E FR US 77 S OF WAXAHACHIE TO US 77 N OF WAXAHACHIE. RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES $114,751,988.92 $149,428,506.15
Texas 1502613 FM 1626 LANE RECONSTRUCTION $6,668,421.60 $25,689,139.16
Texas 1602247 IH 410 AT US 90. RECONSTRUCT INTERCHANGE AND OPERATIONAL IMPROVEMENTS $73,498,308.65 $81,664,787.39
Texas 1602259 SH 358 FROM NILE STREET TO AYERS STREET.  RAMP REVERSAL PHASE II-A, SOUTH SIDE ONLY. $44,616,406.49 $55,770,508.11
Texas 1602427 CONSTRUCT 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND SIDEWALKS ON IH 20 $11,264,417.08 $69,151,027.97
Texas 1602671 SH 288 AT BW 8 INTERCHANGE.  CONSTRUCT 8 DIRECT CONNECTORS $1,802,655.00 $100,253,318.00
Texas 1702007 IH 10 ADDITIONAL LANE CONSTRUCTION $153,348,307.03 $192,080,905.63
Texas 1702355 CONSTRUCT 4 LANE BRIDGE AND RAMP MODIFICATIONS ON SH 114 $25,129,847.29 $44,912,309.12
Texas 1702473 SL 335- CONSTRUCT FRONTAGE ROADS. $19,184,316.02 $31,420,395.03
Texas 1702490 CONSTRUCT AUXILIARY LANES AND RAMP REVERSAL ON US 181 $11,986,239.63 $29,058,799.53
Texas 1702506 IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES $94,615,640.22 $118,269,550.27
Texas 1702559 CONSTRUCT 4-LANE DIVIDED URBAN STREET FACILITY ON NEW LOCATION ON AIRPORT BOULEVARD $18,329,372.16 $25,388,422.00
Texas 1702626 RECONSTRUCTION OF DIRECT CONNECTOR ON IH 69 $9,482,098.06 $26,911,664.51
Texas 1702631 CONSTRUCT DIRECT CONNECTOR AND HOV ACCESS TO UPTOWN TRANSIT CENTER ON IH 610 $60,965,556.97 $72,753,926.77
Texas 1702633 IH 610 RECONSTRUCTION $102,184,189.06 $116,449,098.95
Texas 1702650 IH 35 OPERATIONAL IMPROVEMENTS $116,699,570.90 $138,606,189.90
Texas 1702730 FM 2181. WIDEN ROADWAY $6,450,755.09 $37,740,935.70
Texas 1702818 RECONSTRUCT ROADWAY AT BUFFALO SPEEDWAY $9,796,640.00 $27,975,271.62
Texas 1702839 CONSTRUCT 4 LANE TOLLWAY IN SECTIONS ON SH 249 $146,584,279.02 $301,941,459.02
Texas 1702842 CONVERT REVERSIBLE HOV TO REVERSIBLE EXPRESS LANES, RECONSTRUCT AND WIDEN MAINLANES AND FRONTAGE ROADS ON IH35 E AND US 67 $317,248,899.00 $624,975,805.00
Texas 1802175 IH 610 - RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS AT CAMBRIDGE STREET/ALMEDA ROAD/UNION PACIFIC RAILROAD $69,000,000.00 $84,448,793.58
Texas 1802325 ROADWAY WIDEN TO A MODIFIED SUPER 2 ON US 67. $5,000,000.00 $53,396,420.94
Texas 1802390 EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 $50,100,000.00 $200,648,881.31
Texas 1802404 CONSTRUCT MAIN LANES, OVERPASSES, FRONTAGE ROADS AND STRUCTURES ON US 77 $32,383,849.12 $40,479,811.40
Texas 1802412 US 69 - WIDEN FREEWAY FROM 4 TO 6 LANES $27,865,125.15 $34,831,406.44
Texas 1802413 IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES $112,175,146.80 $140,218,933.50
Texas 1802439 WIDEN ROAD - ADD LANES ON SH 97 $36,000,000.00 $41,000,024.99
Texas 1802497 WIDEN TO SIX MAIN LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING; INTELLIGENT TRANSPORTATION SYSTEM ON IH 10 $125,000,000.00 $373,870,824.61
Texas 1802546 CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION ON US 377 $40,678,539.46 $62,662,068.86
Texas 1802552 WIDEN 2 TO 4 LANE DIVIDED ON FM 156. $45,803,593.63 $57,254,492.03
Texas 1802558 CONSTRUCT GRADE SEPARATION ON US 181 $25,075,793.48 $31,344,741.85
Texas 1902002 WIDEN ROAD - ADD LANES ON SH 36 $7,000,000.00 $98,644,061.78
Texas 1902056 FM 2221. CONSTRUCT CONTROLLED ACCESS FACILITY. $91,218,763.56 $114,516,232.45
Texas 1902057 CONSTRUCT RAMPS ON IH 35. $68,318,251.91 $75,986,041.04
Texas 1902063 REHABILITATION OF EXISTING ROAD ON SH 123. $21,784,897.17 $27,240,145.11
Texas 1902081 CONSTRUCT 4 LANE DIRECT CONNECTION (FUTURE I-69) ON US 59. $60,440,799.99 $92,628,331.74
Texas 1902105 IH 45 WIDEN ROAD ADD LANES $142,813,404.19 $179,214,098.64
Texas 1902107 REHABILITATION OF EXISTING ROAD ON US 183 $22,000,000.00 $28,720,936.06
Texas 1902182 FM 2100 WIDEN TO 4 LANE DIVIDED $25,540,773.87 $31,996,649.84
Texas 1902201 INTERCHANGE IMPROVEMENT ON SL 12 AND SS 482. $271,498,670.57 $341,709,166.57
Texas 1902215 WIDEN ROAD AND ADD LANES ON IH 410 $64,126,345.37 $84,896,921.79
Texas 1902222 CONSTRUCT 1 AUXILIARY LANE IN EACH DIRECTION ON IH 20. $21,686,081.54 $26,107,601.93
Texas 1902268 WIDEN FROM 2 LANE TO 4 LANE WITH A CONTINUOUS LEFT TURN LANE; REPLACE BRIDGE AT SAND CREEK $26,277,322.57 $35,502,514.54
Texas 1902299 CONSTRUCT NEW ROADWAY LANES ON US 281 $66,747,449.27 $83,434,311.59
Texas 1902314 WIDEN FREEWAY - ADD LANES ON IH 10. $80,492,432.23 $100,790,599.37
Texas 1902343 SH 87 - FERRY OPERATION PROJECTS $21,874,049.60 $27,342,562.00
Texas 1902389 WIDEN FREEWAY ON IH 635. $1,084,753,320.17 $1,720,223,200.00
Texas 1902417 CONSTRUCT INTERCHANGE ON IH 2 AND IH 69C. $139,446,264.76 $300,051,164.00
Texas 1996001 STATEWIDE, STATE INFRASTRUCTURE BANK -ADV CAP $71,726,747.00 $192,462,886.00
Texas 2000401 CONSTRUCT REST AREA ON IH 20 $45,512,874.59 $56,891,093.24
Texas 2002040 IH 30 FROM EAST OF SYLVAN AVE TO IH 35E. WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV. $36,234,552.00 $42,437,134.89
Texas 2002632 US CUSTOMS PORT OF ENTRY EXIT TO US 281. CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF) $33,146,456.76 $36,270,895.40
Texas 2005862 US 82 FROM US 82 AT US 281 TO .. CONSTRUCT DIRECT CONNECT INTERCHANGE $31,139,709.00
Texas 2005994 IH 635 FROM WEBB CHAPEL TO WEST OF US 75 (MERIT DR). IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV/MANAGED LANES $346,160,303.95 $930,082,152.42
Texas 2007405 FM 1314 FROM 1.0 MI S OF SH 242 TO 2.6 MILE NW OF LOOP 494 WIDEN TO 4 LANE DIVIDED RURAL ROAD AND LENGTHEN OR REPLACE $33,034,515.63 $46,093,270.00
Texas 2007512 WIDEN ROAD - ADD LANES ON GREENS ROAD $351,264.69 $40,252,842.85
Texas 2007688 FM 1484 FROM FM 3083 TO FM 2432. WIDEN TO 4 LANE DIVIDED $18,508,072.78 $33,997,859.93
Texas 2007717 FM 1488 FROM EAST OF FM 149 AT MOSTYN TO FM 2978. WIDEN 2 LANES TO 4-LANE DIVIDED (PTF) $26,026,471.13 $36,148,371.04
Texas 2007869 SS 601 FROM US 54 (PATRIOT FREEWAY) TO LOOP 375 (PURPLE HEART FREEWAY). CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES $244,634,419.55 $359,350,000.00
Texas 2007886 EXTEND CONFLANS RD FROM W OF SH 161 TO VALLEY VIEW LANE IN CITY OF IRVING. NEW LOCATION CITY STREET - 4 LANE DIVIDED $14,808,588.00 $37,987,724.28
Texas 2007913 FM 3407 FROM  RM 12 TO RM 2439 CONSTRUCT 4-LN DIVIDED ROADWAY $32,415,232.10 $41,732,542.58
Texas 2008345 ON SH 199 AT BYPASS CHANNEL IN FTW TO NEAR CBD & TRINITY RIVER. CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL. $36,982,949.80 $48,967,209.40
Texas 2008654 US 79 FROM 79-B E OF TAYLOR TO E OF FM 1063. UPGRADE TO 4-LN DIVIDED RDWY $19,865,925.85 $28,636,441.28
Texas 2008830 IH 20 FROM SH 171; IN WEATHERFORD TO FM 2552; ON EAST AND WEST BOUND FRONTAGE ROADS. RECONSTRUCT AND EXTEND FRONTAGE ROAD. $19,196,974.61 $35,689,114.71
Texas 2009235 FM 646 FROM FM 517 TO FM 1764. WIDEN FROM 2 LANES TO 4-LANE DIVIDED (PTF) $18,042,196.30 $26,866,332.00
Texas 2009513 ENGINEERING, ROW, & CONSTRUCTION OF DFW CONNECTOR ON SH 114 AND SH 121. RECONSTRUCT FREEWAY, FRONTAGE ROADS AND RAMPS $607,149,857.90 $696,394,133.00
Texas 2009753 ENGINEERING, ROW AND CST OF DFW CONNECTOR ON SH 121 AND SH 114. RECONST FRWY 4 TO 6 W/AUX LNS,FR RDS & RAMPS & ADD COLLECTOR $591,539,254.30 $739,424,067.78
Texas 2009919 IH 820 FROM IH 35W TO SH 121/SH 183. RECONSTRUCT 4 TO 10 W/ HOV/MANAGED LANE, INTERCHANGE AND CONNECTORS $421,105,616.27 $526,087,354.64
Texas 2011591 US 271 FROM 0.3 MI. NORTH OF US 67 TO .7MI SOUTH OF FM 3417. CONSTRUCT FIRST PHASE OF ULTIMATE 4-LANE DIVIDED FREEWAY $53,570,720.10 $87,852,142.31
Texas 2011998 IH 610 FROM TC JESTER TO N OF IH 10 ON IH 610 AND TO 34TH ST ON US 290. RECONSTR US290/IH610 IC, CONSTR INTERCHANGE W/ DC'S W/ TWO $36,665,773.00 $171,036,404.00
Texas 2012125 LP 363 FROM IH 35 NORTH OF TEMPLE TO SH 53. CONSTRUCT NORTHBOUND FRONTAGE ROAD TO PROVIDE INTERIM 4-LANE $24,784,256.30 $35,527,847.63
Texas 2012221 SH 550 @ US 77/83 TO 0.53 MI E OF OLD ALICE RD. CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES $2,300,000.00 $34,495,766.00
Texas 2012232 US 290 FROM WEST OF RM 1826 TO SL 1; RECONSTRUCT 4-LANE TO 6-LANE CONTROLLED ACCESS HIGHWAY AND FRONTAGE ROADS $21,468,853.91 $146,578,873.54
Texas 2012594 US 59 - WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS $84,105,000.00 $120,120,653.85
Texas 2012691 IH 35 FROM S LP 363 IN TEMPLE TO NUGENT AVE. RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES. $233,750,004.59 $275,865,720.60
Texas 2012805 RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE ON MEDICAL DISTRICT DRIVE. $19,376,490.00 $27,202,300.29
Texas 2013136 ON IH 610 FROM W OF W 34TH ST ON US 290 TO N AND S OF US 290 ON IH 610.RECONSTRUCT US 290/IH 610 INCLUDING IH10 TO US 290 OUTBOUND $99,132,093.21 $124,346,658.20
Texas 2013163 IH 45 FROM 0.9884 MILES SOUTH OF FM 2351 TO SOUTH OF MEDICAL CENTER DRIVE. WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3-LANE FR $85,185,107.91 $106,749,097.46
Texas 2013218 CONSTRUCT FOUR LANE FREEWAY AT DIBOLL (FUTURE I-69) $14,237,000.00 $171,923,286.00
Texas 2013221 HIGHWAY IMPROVEMENT ON US 59. $2,813,685.77 $101,174,791.48
Texas 2013226 IH 10 AT SH 87 AND TEXAS AND NEW ORLEANS RAILROAD. REPLACE BRIDGE AND APPROACHES $24,578,123.17 $30,722,653.80
Texas 2013292 SH183 FROM FM157 TO I35E; LP12 FROM SH183 TO I35E; AND SH114 FROM SH97 TO SH183. RECONSTRUCT & ADD MANAGED LANES $576,221,762.15 $809,451,840.03
Texas 2013400 US 82 FROM FM 1840 TO SH 98. RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES $9,992,256.47 $27,294,014.40
Texas 2013420 ON SH 365 FROM FM 396 TO US 281. CONSTRUCT 4-LANE CONTROLLED ACCESS TOLLED FACILITY $33,756,881.00 $155,435,862.00
Texas 2013567 CONSTRUCT 6-LANE DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY WITH AUTO PUMP STATION AND RAILROAD LINE WITH UNDERPASSES ON HEMPSTEAD ROAD $42,312,164.82 $71,572,913.46
Texas 2013596 REHABILITATION OF EXISTING ROADWAY AND INTERCHANGE IMPROVEMENTS ON US 175 AND SH 310. $24,046,844.68 $47,565,481.66
Texas 2013740 US 290 - RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES AND TWO 2-LANE FRONTAGE ROADS $91,276,521.07 $195,462,373.84
Texas 2013874 REPLACE BRIDGE AND APPROACHES ON FM 1495. $26,727,976.27 $33,415,139.89
Texas 2013875 CONSTRUCT NEW ROAD ON LP 375. $29,427,716.36 $36,784,645.46
Texas 2013983 US 290 FROM E OF MUESCHKE RD TO E OF TELGE RD. RECON AN WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MAIN LANES, AUX LANES AND 2-LN FR $37,362,073.98 $98,369,741.82
Texas 2013991 IH 610 FROM W OF 34TH ST ON US 209 TO IH 610. RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS AND 3-LANE REVERSIBLE $2,830,000.00 $181,761,983.83
Texas 2013996 FM 1957 FROM SH 211 TO LOOP 1604. EXPAND FROM 2 LANES TO 4 LANE DIVIDED. $7,528,667.31 $37,501,000.00
Texas 2014211 ON US 59 FROM SP 10 TO W OF FM 762. WIDEN TO 6-LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM W/ GRADE SEPARATION $135,932,655.18 $167,412,867.49
Texas 2014326 CONSTRUCT NEW ROAD ON MCHARD ROAD. $23,966,629.04 $29,959,286.30
Texas 2014444 WIDEN ROAD, ADD LANES, AND SHOULDERS ON US 69 $33,829,736.79 $42,287,170.98
Texas 2014669 AT WHITE SETTLEMENT RD IN FTW. CONST 4 LN BRIDGE AT NEW LOC OF PROPOSED BYPASS CHANNEL FOR TRINITY RIVER NEAR CBD OF FTW $6,200,000.00 $33,796,872.18
Texas 2015062 ON IH 30 AT FM 3549. RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS AND RAMPS CONSTRUCTION. $16,709,036.80 $26,585,311.57
Texas 2016108 ADD SHOULDERS, AUXILLARY LNS, RAMP IMPROVEMENTS, PAVEMENT REHAB, BIKE AND PED IMPROVEMENTS & FRONTAGE ROAD INTERSECTION IMPROVEMENTS ON IH 35 $45,111,638.29 $50,136,042.54
Texas 2016183 ON IH30 FR 1.0 MI W OF SH360 TO GREAT SOUTHWEST PKWY; AT SIX FLAGS DR. CONST DIR CONN INTCHG AT SH360 & TMS & RECONSTR BRIDGE. $49,671,949.79 $268,872,798.96
Texas 2017887 WIDEN FREEWAY FROM FOUR TO SIX LANES ON US 67 $3,022,594.50 $66,270,431.33
Texas 2017906 WIDEN ROADWAY INCLUDING FRONTAGE ROADS, STRIPING AND SIGNING ON IH 45 $63,259,215.23 $94,794,666.94
Texas 2018201 CONSTRUCT RELIEF ROUTE AROUND DRISCOLL ON US 77. $40,000,000.00 $98,921,208.78
Texas 2018321 IH 820 AND SH 121. RECONSTRUCTION AND WIDENING. $136,911,824.21 $171,159,780.27
Texas 2018416 FM 762 AND FM 2759 - WIDEN TO 4 LANES DIVIDED $27,554,687.76 $34,539,569.58
Texas 2018434 US 377 AT LAKE TEXOMA. BRIDGE REPLACEMENT. $5,000,000.00 $35,234,013.62
Texas 2018627 CITY STREET FROM MARSALIS AVENUE TO EWING AVENUE.  CONSTRUCT LOCAL ENHANCEMENTS. $16,000,000.00 $39,388,000.00
Texas 2018811 WIDEN FROM 2 LANES TO 4 LANE ON US 69 $52,977,757.81 $66,222,197.26
Texas 2018852 WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES ON SH 146 $81,128,000.00 $253,240,692.19
Texas 2018858 SH 242 AT FM 1314. CONSTRUCT GRADE SEPARATION. $21,168,947.40 $26,532,973.00
Texas 2018882 ROADWAY WIDENING TO A MODIFIED SUPER 2 ON US 285 $34,066,526.95 $42,583,158.69
Texas 2018907 RECONSTRUCT INTERSECTION ON IH 35. $23,615,433.99 $26,239,371.10
Texas 2018963 RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS ON IH 45 $200,501,389.55 $251,138,652.59
Texas 2019047 REHABILITATE EXISTING ROADWAY ON US 83. $58,274,022.74 $72,871,466.30
Texas 2019048 REHABILITATION OF EXISTING HIGHWAY ON US 83. $9,000,000.00 $65,135,678.13
Texas 2019063 BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONS AT INTERSECTIONS ON US 62. $25,000,000.00 $172,354,438.05
Texas 2019106 RECONSTRUCT EXISTING 4-LANE UNDIVIDED ROADWAY TO A 4-LANE DIVIDED ROADWAY ON US 290. $31,604,453.80 $36,332,955.39
Texas 2019166 US 54 FROM LOOP 375, INTERCHANGE IMPROVEMENTS. $92,293,201.39 $115,450,417.14
Texas 2019168 WIDEDN FROM 4 TO 6 LANES ON SL 375. $95,362,990.82 $116,103,738.53
Texas 2019312 RECONSTRUCTION ON 1H 35 TO INCLUDE WIDENING FROM 6 TO 8 LANES. $185,035,000.00 $374,225,164.70
Texas 2019409 US 54, CONVERT TO SUPER 2 HIGHWAY $19,000,000.00 $38,238,067.66
Texas 2019411 CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY ON SL 335. $41,103,841.85 $51,379,802.32
Texas 2019437 CONSTRUCT FRONTAGE ROADS ON US 59. $17,000,000.00 $38,337,252.61
Texas 2019599 WIDEN NON-FREEWAY FROM 2 LANE TO 4 LANE ON US 190 $36,488,767.18 $86,376,750.15
Texas 2019611 US 60 TO WEST OF BOVINA. REHAB OF EXISTING ROADWAY. $16,623,689.65 $28,667,631.21
Texas 2019613 CONSTRUCT TWO NEW COLORADO RIVER 2-LANE FRONTAGE ROAD BRIDGES ON SH 21. $16,000,000.00 $44,777,398.93
Texas 2019626 FM 2100 - WIDEN TO 4-LANE DIVIDED $4,000,000.00 $48,685,047.79
Texas 2019651 WIDEN ROAD AND ADD LANES ON US 190. $25,295,020.86 $31,618,776.07
Texas 2019689 REPLACE BRIDGES AND APPROACHES ON SH 8. $26,204,446.57 $38,992,035.00
Texas 2019797 SH 242 - WIDEN FROM 2 TO 4 LANES $49,630,877.55 $74,106,751.26
Texas 2019818 WIDEN FREEWAY FROM 4 TO 6 LANES ON US 69. $20,141,445.31 $25,176,806.64
Texas 2019834 WIDEN FREEWAY ON IH 35E $101,800,943.70 $128,702,705.70
Texas 2019859 INTERCHANGE IMPROVEMENT ON IH 45. $2,151,964.14 $39,810,234.26
Texas 2019952 SH 242 - WIDEN FROM 2 TO 4 LANES $33,206,352.62 $41,541,414.96
Texas 2019988 FM 3005 - INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL IMPROVEMENTS, APPROX 12 INCH OVERLY AND STRIPING. $17,627,032.68 $39,141,429.85
Texas 2019990 CONSTRUCT NEW SAFETY REST AREA ON IH 10 $34,252,259.77 $38,815,324.72
Texas 2019996 CONSTRUCT BRIDGE AT RM 620. $24,828,441.18 $31,083,721.48
Texas 2020008 US 75 AT US 82 SOUTH OF CENTER STREET WIDEN ROAD. $14,000,000.00 $169,147,954.04
Texas 2020056 WIDEN ROAD - ADD LANES ON SH 36 $33,833,597.74 $51,291,997.17
Texas 2020057 WIDEN ROAD - ADD LANES ON SH 36 $64,840,000.00 $91,254,896.60
Texas 2020115 WIDEN ROAD AND ADD LANES ON IH 10 $20,000,000.00 $164,781,261.91
Texas 2020122 WIDEN ROAD ADD LANES AND SHOULDERS ON CR 8082. $17,192,757.01 $64,333,827.10
Texas 2020185 RECONSTRUCT INTERCHANGE AND CONSTRUCT FRONTAGE ROAD ON IH 35. $49,918,158.59 $62,460,187.06
Texas 2020303 WIDEN ROAD - ADD LANES ON FM 2218 $46,532,842.75 $58,166,053.43
Texas 2020314 OSTOS ROAD WIDEN ROAD, ADD LANES, AND SHOULDERS. $19,265,984.48 $26,303,348.60
Texas 2020432 CONSTRUCT NEW ROAD ON PELLICANO DRIVE AT JOE BATTLE BOULEVARD TO DARRINGTON AT BERRYVILLE STREET. $18,464,800.00 $26,520,124.43
Texas 2020451 BRIDGE REPLACEMENT ON US 271 $20,034,841.22 $25,043,551.51
Texas 2020455 WIDEN ROAD ADD LANES AND SHOULDERS TO IH 30. $76,946,054.15 $97,568,095.52
Texas 2020489 WIDEN FREEWAY ON SH 199. $95,997,373.38 $120,008,399.33
Texas 2020493 WIDEN FREEWAY ON SH 170. $86,961,277.60 $108,701,597.00
Texas 2020496 CONVERT NON-FREEWAY ON US 59. $31,025,623.18 $184,672,286.36
Texas 2020549 HIGHWAY IMPROVEMENT ON IH 40. $24,735,598.98 $30,956,657.31
Texas 2020649 CONSTRUCT NEW INTERCHANGE AT NORTH SL 338 AT US 385 $22,601,183.03 $28,615,588.78
Texas 2020751 REHABILITATION OF EXISTING ROAD ON FM 2119 $27,000,000.00 $66,252,295.96
Texas 2020863 CONSTRUCT BRIDGE ON IH 20 $30,674,839.02 $40,343,548.78
Texas 2020871 CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 $50,681,059.16 $63,385,134.88
Texas 2020879 WIDEN NON-FREEWAY FACILITY ON FM 2818 $38,019,405.83 $48,166,546.29
Texas 2020944 ADD PASSING LANES ON US 83. $21,996,924.75 $27,552,731.94
Texas 2020950 SURFACING AND ROADWAY RESTORATION ON SH 137 $47,303,780.32 $57,214,901.80
Texas 2020966 WIDEN ROAD - ADD LANES ON IH 10. $46,028,828.08 $57,536,035.10
Texas 2021088 INFRASTRUCTURE IMPROVEMENTS ON JOHN HAYES(DARRINGTON/BERRYVILLE) $16,583,040.80 $25,769,177.34
Texas 2021093 WIDEN ROAD - ADD LANES ON SL 121 $26,337,010.89 $33,070,636.82
Texas 2021189 REHABILITATION OF EXISTING ROAD ON FM 2004 $21,477,838.44 $31,453,621.29
Texas 2021213 BRIDGE REPLACEMENT ON SH 198. $12,000,000.00 $33,166,851.37
Texas 2021310 WIDEN ROAD - ADD LANES ON SH 72. $8,000,000.00 $50,911,818.47
Texas 2021327 WIDEN ROAD AND ADD LANES ON IH 35. $110,331,664.18 $235,087,606.29
Texas 2021404 CONSTRUCT DIRECT CONNECTORS ON IH 410 $84,762,682.49 $105,987,638.80
Texas 2021440 US 59. HIGHWAY IMPROVEMENT. $57,844,043.02 $72,330,053.77
Texas 2021488 WIDEN ROAD-ADD LANES ON SL 1604 $5,000,000.00 $163,323,331.38
Texas 2021492 WIDEN ROAD - ADD LANES ON FM 1463 $7,000,000.00 $60,122,177.87
Texas 2021518 HIGHWAY IMPROVEMENT ON IH 27. $22,188,679.24 $28,052,631.54
Texas 2021525 HAZARD ELIMINATION AND SAFETY ON US 90. $20,170,805.16 $36,174,073.89
Texas 2021536 CONSTRUCT NEW ROADWAY LANES AND INSTALL ILLUMINATION ON US 380. $122,194,673.77 $153,203,526.72
Texas 2021543 CONSTRUCT AND WIDEN ROAD ON FM 60. $8,000,000.00 $39,536,156.51
Texas 2021547 RECONSTRUCT AND WIDEN ROADWAYS ON SH 242 $19,897,876.80 $35,019,355.32
Texas 2021576 CONVERT NON-FREEWAY ON FM 1585 $7,856,000.00 $170,958,500.84
Texas 2021615 HIGHWAY IMPROVEMENT ON SL 1604 AT FM 2696 $12,618,163.65 $40,359,224.86
Texas 2021616 WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. $72,299,838.00 $226,609,058.80
Texas 2021643 INTERSECTION IMPROVEMENTS ON FM 1960. $24,390,665.22 $31,599,080.97
Texas 2021704 WIDEN ROAD AND ADD LANES ON US 82 $43,727,125.65 $54,658,907.06
Texas 2021728 WIDEN ROAD - ADD LANES ON SH 36. $54,784,000.00 $109,072,964.81
Texas 2021745 CONSTRUCT NEW ROAD AT KENNY FORT BOULEVARD. $5,431,696.00 $28,369,555.49
Texas 2021787 CONSTRUCT NEW ROAD ON JUPITER DRIVE $13,238,558.40 $33,932,592.00
Texas 2021840 RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES ON FM 2100. $35,214,056.19 $61,888,437.27
Texas 2021858 CONSTRUCT FRONTAGE ROADS ON SL 9 AND BI 45J $21,069,697.99 $30,125,121.77
Texas 2021859 CONSTRUCT FRONTAGE ROADS  ON SL 9. $40,738,586.18 $50,948,232.73
Texas 2021864 WIDEN ROAD - ADD SHOULDERS ON US 287 $29,081,956.02 $36,459,683.01
Texas 2021943 CONSTRUCT RAMPS ON SH 6. $48,337,354.80 $60,671,693.50
Texas 2022009 WIDEN ROAD-ADD LANES ON IH 45. $97,658,604.46 $225,626,238.93
Texas 2022013 HIGHWAY IMPROVEMENT ON US 69. $58,983,111.83 $78,831,618.79
Texas 2022027 CONSTRUCT NEW ROADWAY LANES AND RECONSTRUCT EXISTING ROADWAY ON IH 35E $623,356,560.75 $668,302,241.00
Texas 2022053 WIDEN FREEWAY ON IH 10 $166,260,971.09 $237,039,820.10
Texas 2022076 EXPAND FROM 8 LANES TO 14 LANES ON IH 35. EXPRESSWAY-ADD 6 NEW EXPRESS LANES $65,570,351.00 $1,783,218,521.00
Texas 2022153 CONSTRUCT FRONTAGE RAODS ALONG IH 20. $15,000,000.00 $91,848,786.31
Texas 2022160 CONSTRUCT BRIDGE ON SL 360 $43,713,793.38 $68,642,241.73
Texas 2022185 WIDEN ROAD AND ADD LANES ON US 83. $22,784,686.94 $28,590,109.25
Texas 2022340 WIDEN ROAD - ADD LANES ON IH 35 $230,962,376.23 $578,235,425.65
Texas 2022356 INTERCHANGE IMPROVEMENT ON IH 20 $60,596,223.58 $78,885,163.03
Texas 2022386 CONSTRUCT PEDESTRIAN INFRASTRUCTURE- SS 366. $50,837,003.05
Texas 2022402 CONSTRUCT DIRECT CONECTORS ON IH 10 $371,758,985.06 $465,977,872.27
Texas 2022437 WIDEN FREEWAY ON IH 35 $123,796,515.07 $607,539,900.51
Texas 2022446 BRIDGE REPLACEMENT ON SH 21 $25,053,360.94 $31,370,787.11
Texas 2022480 BRIDGE REPLACEMENT ON SH 174 $21,462,755.43 $26,828,444.29
Texas 2022496 ROADWAY WIDENING TO A SUPER 2 HIGHWAY ON SH 302 $32,788,970.36 $41,101,212.96
Texas 2022509 WIDEN ROAD ADD LANES ON SH 36. $19,666,299.25 $62,508,840.91
Texas 2022510 WIDEN ROAD - ADD LANES ON FM 723. $59,585,528.00 $89,174,418.62
Texas 2022512 WIDEN ROAD - ADD LANES ON SH 36 $47,347,344.38 $59,184,180.49
Texas 2022572 CONSTRUCT INSPECTION STATION AT ANZALDUAS INTERNATIONAL BRIDGE PORT OF ENTRY. $42,680,000.00 $79,712,092.67
Texas 2022575 CONSTRUCT BRIDGE ON SH 288. $46,405,417.74 $58,053,752.52
Texas 2022576 WIDEN BRIDGE ON SH 146 $79,350,980.45 $100,076,331.92
Texas 2022582 SAFTETY IMPROVEMENT ON SH 115 AT FM 181. $24,877,979.85 $39,516,973.36
Texas 2022583 ROADWAY REHABILITATION ON SH 18. $11,191,711.67 $40,565,620.66
Texas 2022584 PREVENTIVE MAINTENANCE - BI 20-E $20,787,686.83 $26,149,033.06
Texas 2022590 WIDEN ROAD - ADD LANES AND SHOULDERS ON SH 302. $27,961,047.38 $35,061,309.22
Texas 2022591 ROADWAY REHABILITATION ON SH 18. $28,651,646.01 $35,814,557.51
Texas 2022599 ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY ON US 67. $23,400,589.18 $29,250,736.48
Texas 2022615 INTERCHANGE IMPROVEMENT ON US 75. $40,557,316.64 $50,710,215.40
Texas 2022632 BRIDGE REPLACEMENT ON SH 7 $22,917,104.57 $28,647,410.21
Texas 2022634 WIDEN ROAD - ADD LANES ON IH 20 $6,670,634.10 $96,409,242.48
Texas 2022675 WIDEN FREEWAY IN VARIOUS LOCATIONS IN THE FORT WORTH DISTRICT TO INCLUDE IH 820, IH 20, US 287 $388,751,290.65 $1,631,948,203.63
Texas 2022726 WIDEN ROAD AND ADD LANES ON FM 646 $81,812,848.21
Texas 2022745 INTERCHANGE IMPROVEMENT ON US 59. $53,707,623.07 $93,422,800.16
Texas 2022793 RECONSTRUCT EXISTING ROADWAY AND BRIDGE REPLACEMENT ON US 80. $33,574,120.00 $138,124,160.45
Texas 2022811 WIDEN ROAD - ADD LANES ON FM 16 $16,788,271.47 $49,908,063.76
Texas 2022901 WIDEN ROADS AND ADD LANES TO SH 46. $31,467,502.00 $64,037,567.08
Texas 2022915 CONSTRUCT NEW ROAD ON PANTHER CREEK PARKWAY. $30,000,000.00 $59,104,193.55
Texas 2022926 WIDEN ROAD - ADD LANES ON SH 105. $74,143,317.18 $95,118,054.42
Texas 2022929 CONSTRUCT BRIDGE ON SH 288. $24,984,371.85 $31,230,464.81
Texas 2022936 WIDEN ROAD - ADD LANES ON SH 99 $70,083,917.31 $87,604,896.65
Texas 2022950 HIGHWAY IMPROVEMENT ON SL 378 $32,252,864.29 $40,316,080.37
Texas 2022999 BRIDGE REPLACEMENT ON US 175. $23,553,211.23 $33,158,144.21
Texas 2023047 SURFACING AND ROADWAY RESTORATION ON IH 35 AND IH 10 $24,460,605.31 $27,335,849.36
Texas 2023058 WIDEN ROAD - ADD LANES ON FM 2642 $22,619,255.70 $28,290,034.63
Texas 2023121 RESURFACE ROADWAY ON US 90 $24,326,575.20 $30,814,434.99
Texas 2023140 CONSTRUCT BRIDGE ON SEAN HAGGERTY DRIVE $20,340,665.15 $28,363,855.29
Texas 2023154 REPLACE BRIDGE AND APPROACHES ON SH 155. $33,679,487.92 $50,299,359.90
Texas 2023166 WIDEN FREEWAY ON IH 30 $64,471,349.01 $386,910,587.24
Texas 2023167 CONSTRUCT NEW ROADWAY LANES ON SH 5. $35,402,104.26 $44,674,434.76
Texas 2023253 CONSTRUCTION OF EAST-WEST CONNECTOR AT SH 360, 20TH AVENUE AND RENTAL CAR DRIVE. $28,810,026.00 $44,682,411.57
Texas 2023274 HIGHWAY IMPROVEMENT ON CR 861. $25,511,817.69
Texas 2023277 FREEWAY OPERATIONAL IMPROVEMENTS- IH 45 $20,277,013.98 $25,390,767.48
Texas 2023340 INTERCHANGE IMPROVEMENT ON IH 35 EAST. $81,808,137.42 $122,383,413.50
Texas 2023491 DRAINAGE IMPROVEMENTS ON IH 45 $5,989,157.91 $30,012,812.53
Texas 2023494 WIDEN ROAD AND ADD LANES ON FM 521 $61,205,326.40 $77,018,958.44
Texas 2023497 WIDEN ROAD - ADD LANES ON SH 6 $23,075,560.68 $28,967,288.84
Texas 2023505 RAILROAD CROSSING IMPROVEMENTS ON SH 183 $27,113,208.01 $34,285,760.02
Texas 2023524 ROADWAY REHABILITATION AND RECONSTRUCTION WITH NO ADDED CAPACITY ON FM 1450. $70,888,304.86 $88,610,381.07
Texas 2023557 CONSTRUCT BRIDGE ON UA 90 $37,632,095.20 $53,506,311.85
Texas 2023629 WIDEN ROAD ON US 83. $29,829,993.07 $37,307,686.44
Texas 2023675 WIDEN ROAD AND ADD LANES ON FM 2252 $35,067,079.31 $55,521,412.57
Texas 2023679 INTERCHANGE IMPROVEMENT ON IH 30 $145,812,969.65 $218,377,307.05
Texas 2023693 INTERCHANGE IMPROVEMENT AND CONSTRUCT RAMPS ON IH 20. $45,944,416.61 $57,430,520.75
Texas 2023694 REHABILITATE EXISTING ROADWAY ON IH 820. $30,483,204.05 $33,923,136.73
Texas 2023704 INTERCHANGE IMPROVEMENT ON US 175. $39,353,671.22 $49,199,859.27
Texas 2023723 WIDEN ROAD AND ADD LANES ON FM 2493. $31,685,325.84
Texas 2023767 HIGHWAY IMPROVEMENT ON US 277 AND SH 70 $8,767,022.96 $26,248,542.08
Texas 2023773 HIGHWAY IMPROVEMENT ON US 59 $22,718,820.02 $121,217,685.97
Texas 2023837 HIGHWAY IMPROVEMENT ON IH 820 $361,127,200.00 $451,409,000.00
Texas 2023874 WIDEN ROAD AND ADD LANES ON FM 1516 $22,587,200.00 $61,124,774.30
Texas 2023933 BRIDGE REPLACEMENT, BRIDGE MAINTENANCE ON IH 20. $29,110,609.22 $32,345,121.32
Texas 2023947 WIDEN ROAD - ADD LANES ON IH 10 $199,207,010.00 $264,052,081.24
Texas 2023954 WIDEN ROAD - ADD LANES ON FM 1518 $16,128,953.20 $71,308,378.01
Texas 2023958 WIDEN ROAD AND ADD LANES ON SL 1604 $51,181,520.71 $64,630,479.99
Texas 2023992 CONVERT NON-FREEWAY ON US 59 $79,489,552.64 $99,361,940.81
Texas 2024004 RESURFACE ROADWAY ON IH 10. $25,372,145.44 $28,252,331.16
Texas 2024033 REHABILITATE EXISTING ROADWAY ON US 60. $30,421,153.74 $38,026,442.18
Texas 2024041 HIGHWAY IMPROVEMENT ON US 75 $54,896,516.43 $69,532,251.54
Texas 2024349 BRIDGE MAINTENANCE ON IH 345 $4,621,197.84 $27,661,564.16
Texas 2024365 SURFACING AND ROADWAY RESTORATION ON RM 652 $1,677,058.00 $25,051,787.01
Texas 2024436 CONVERT NON-FREEWAY ON US 59 $55,935,154.00 $401,869,625.24
Texas 2024523 BRIDGE REPLACEMENT ON IH 35 $33,269,352.86 $37,209,207.49
Texas 2024529 INTERSTATE DESIGNATION ON US 77 $223,326,108.66
Texas 2024530 WIDEN ROAD - ADD LANES ON SL 1604 $120,573,958.95 $151,782,404.55
Texas 2024535 HIGHWAY IMPROVEMENT ON IH 20 $54,727,927.16
Texas 2024536 HIGHWAY IMPROVEMENT ON IH 20. $55,378,008.73
Texas 2024562 WIDEN ROAD - ADD LANES ON IH 20 $172,434,852.18
Texas 2024576 WIDEN ROAD - ADD LANES ON US 77 $111,893,032.31
Texas 2024654 PREVENTIVE MAINTENANCE ON IH 10 $32,169,722.33
Texas 2024691 CONSTRUCT NEW ROADWAY LANES ON US 75. $90,378,794.13
Texas 2024696 SURFACING AND ROADWAY RESTORATION ON SH 123 $4,653,346.58 $42,990,133.92
Texas 2024737 INTERCHANGE IMPROVEMENT ON IH 35 EAST. $86,013,938.76 $95,795,606.94
Texas 2024738 INTERCHANGE IMPROVEMENT ON IH 35 EAST. $52,141,770.55 $65,198,166.62
Texas 2024766 WIDEN ROAD - ADD LANES ON US 82 $29,345,972.59 $36,697,102.27
Texas 2024806 CONSTRUCT NEW ROAD ON IH 27 $54,095,072.87 $60,105,636.53
Texas 2024821 INFRASTRUCTURE IMPROVEMENT ON DURHAM. $63,460,816.49
Texas 2024833 WIDEN ROAD AND ADD LANES ON IH 35. $90,804,119.14 $620,788,259.66
Texas 2024845 WIDEN ROAD - ADD LANES ON IH 35 $152,823,910.58 $316,897,343.97
Texas 2024849 CONSTRUCT NEW ROAD ON SL 363 $48,282,313.10 $60,402,552.19
Texas 2024864 CONSTRUCT NEW ROAD ON IH 27 $237,063,775.13 $296,753,374.10
Texas 2024922 BRIDGE REPLACEMENT ON US 287 $22,986,609.57 $28,864,601.97
Texas 2024944 INTERCHANGE IMPROVEMENT ON IH 35. $447,068,750.15 $560,808,176.52
Texas 2024979 WIDEN ROAD - ADD LANES ON IH 10 $480,295,259.66 $618,589,643.14
Texas 2024994 HIGHWAY IMPROVEMENT, CONSTRUCT RAMPS ON IH 20 AND IH 30 $99,356,088.43 $110,978,891.44
Texas 2025009 WIDEN ROAD - ADD LANES ON IH 69 $133,731,165.00 $474,493,113.79
Texas 2025020 REHABILITATE EXISTING ROADWAY ON SH 43 $28,805,194.05
Texas 2025038 CONSTRUCT BRIDGE ON IH 69 $69,001,480.53
Texas 2025041 WIDEN ROAD - ADD LANES ON SH 105 $37,767,925.60 $56,597,611.28
Texas 2025042 WIDEN ROAD AND ADD LANES ON SL 336 $25,965,668.38 $40,807,680.86
Texas 2025050 WIDEN ROAD - ADD LANES AND SHOULDERS ON US 82 $103,031,709.53
Texas 2025066 WIDEN ROAD - ADD LANES ON US 75 $112,518,753.37
Texas 2025079 CONSTRUCT NEW ROAD ON US 190. $69,637,374.70
Texas 2025143 WIDEN ROAD - ADD LANES ON SH 105 $26,132,313.09
Texas 2025144 CONSTRUCTION NEW ROAD ON IH 35 $271,825,936.67
Texas 2025159 BRIDGE REPLACEMENT ON US 59. $28,491,656.28
Texas 2025211 INTERCHANGE IMPROVEMENT ON SL 20. $44,610,442.63
Texas 2025216 CONSTRUCT BRIDGE ON US 90. $29,118,192.22 $36,397,740.29
Texas 2025218 FERRY OPERATION PROJECTS ON SH87. $30,650,945.00 $51,455,133.15
Texas 2025323 DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS ALONG IH 35 TO COLORADO RIVER. $307,572,519.06
Texas 2B20004 CONSTRUCT SUPER 2, GRADING, BASE, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKING ON US 281. $21,058,021.44 $26,322,526.81
Texas 2B20006 WIDEN ROAD AND INSTALL SIGNS ON SH 114. $25,977,982.83 $35,472,478.54
Texas 2B20010 INFRASTRUCTURE IMPROVEMENTS ON SL 375 $33,600,250.88 $42,000,313.61
Texas 2B20015 CONSTRUCT NEW ROADWAY LANES ON IH 37. $14,000,000.00 $69,791,097.00
Texas 2B20048 WIDEN ROAD AND ADD LANES ON IH 45 $78,971,131.75 $98,859,273.45
Texas 2B20200 NEW LOCATION FREEWAY AND INTERSECTION IMPROVEMENTS ON AVONDALE-HASLET ROAD, HASLET PARKWAY AND FM 156. $33,556,556.01 $49,088,603.58
Texas 2B20250 HIGWAY IMPROVEMENT ON SH 302. $9,000,000.00 $47,343,520.93
Texas 2B20255 WIDEN ROAD (ADD LANES) ON FM 2478. $23,494,713.75 $29,368,392.19
Texas 2B20260 SH 121 - CONSTRUCT NEW ROADWAY LANES. $68,469,120.00 $101,958,550.50
Texas 2B20290 WIDEN ROAD AND ADD LANES ON US 190. $210,051,052.14
Texas 2B22010 HIGHWAY IMPROVEMENT ON SH 128. $29,560,475.28 $36,950,594.10
Texas 2B22018 INTERCHANGE IMPROVEMENT ON IH 30. CONSTRUCT NEW ROAD ON IH30. BRIDGE REPLACEMENT ON IH30 $24,446,874.57 $146,504,004.18
Texas 2B23020 BRIDGE REPLACEMENT ON IH 20. $21,081,810.38 $26,405,262.98
Texas 2B23042 BRIDGE REPLACEMENT ON IH 27 $21,869,565.96 $27,549,034.45
Texas 2B23048 WIDEN ROAD - ADD LANES ON US 75 $160,231,110.14 $203,370,315.87
Texas 2B23079 WIDEN ROAD AND ADD LANES ON US 59 AND US 77. $48,194,600.59 $60,462,098.74
Texas 2B23121 WIDEN ROAD AND ADD LANES ON SH 72. $12,058,257.42 $63,299,973.20
Texas 2B23122 CONSTRUCT TRADE PROCESSING CENTER ON CR 31. $21,031,325.00 $36,531,325.00
Texas 2B23149 INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59 $43,451,479.35 $54,395,679.43
Texas 2B23150 INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59 $77,384,315.57 $96,840,785.05
Texas 2B23151 RECONSTRUCT EXISTING ROADWAY ON US 59 $99,989,233.38 $118,868,594.54
Texas 2B23204 BRIDGE REPLACEMENT ON US 190 $20,053,454.39 $25,066,817.99
Texas 2B23273 WIDEN ROAD - ADD LANES -ON SH 359 $8,963,056.20 $53,754,179.56
Texas 2B23276 BRIDGE REPLACEMENT ON IH 20. $35,231,147.94 $44,038,934.92
Texas 2B23294 SEAL COAT ON US 87,SH 354,BI 40D,US 60,US 385,IH 40,SH 207,SH 70,SH 15,SH 136,FM 119,FM 293,FM 1913,FM 2219, AND RM 2381 $23,030,416.83 $28,788,021.02
Texas 2B24013 PREVENTIVE MAINTENANCE ON US 67 $59,538,855.38
Texas 2B24041 CONSTRUCT NEW ROAD ON SH 84 $27,099,609.29 $158,974,336.71
Texas 2B24070 CONSTRUCT REST AREA ON IH 10 $31,829,861.40 $39,804,593.61
Texas 2B24071 REHABILITATE EXISTING ROADWAY ON SH 4 $21,902,189.66 $27,391,472.78
Texas 2B24072 RECONSTRUCT EXISTING ROADWAY ON SH 285 $31,143,553.75 $38,929,442.19
Texas 2B24073 BRIDGE REPLACEMENT ON SH 35. $16,189,607.29 $30,290,611.90
Texas 2B24075 WIDEN LANES - ADD LANES ON IH 10. $135,566,274.00 $171,196,640.26
Texas 2B24092 HIGHWAY IMPROVEMENT ON SH 71. $31,219,855.64 $39,176,130.62
Texas 2B24096 CONSTRUCT NEW ROAD ON IH 10 $104,471,200.99 $130,919,251.53
Texas 2B24119 CONSTRUCT RAMPS ON SH 358. $38,713,037.92 $48,531,221.79
Texas 2B24168 WIDEN ROAD AND ADD LANES ON SL 1604 $47,775,633.00 $181,383,784.89
Texas 2B24195 WIDEN ROAD - ADD LANES ON US 83 $34,001,635.42 $42,547,136.50
Texas 2B24205 CONSTRUCT TWIN SPAN BRIDGE ON TL 23. $1,600,000.00 $65,596,725.19
Texas 2B24247 WIDEN ROAD -ADD LANES ON IH 10. $198,744,950.05 $248,856,821.64
Texas 2B24253 DRAINAGE IMPROVEMENTS ON IH 35 $414,321,368.39
Texas 2B24256 CONVERT NON-FREEWAY ON SH 286. $84,890,837.28
Texas 2B24270 WIDEN ROAD - ADD LANES ON US 80. $258,807.20 $306,534,112.67
Texas 2B24271 INTERCHANGE IMPROVEMENT ON IH 635. $189,905,350.69
Texas 2B24273 INFRASTRUCTURE IMPROVEMENTS ON SH 178 $35,270,086.09 $245,476,488.70
Texas 2B24277 CONSTRUCT BRIDGE ON US 83 $23,773,486.75 $29,716,858.44
Texas 2B24288 SURFACING AND ROADWAY RESTORATION ON SH 73. $23,809,051.38 $29,761,314.23
Texas 2B24314 INTERSTATE DESIGNATION ON US 77. $124,758,900.77
Texas 2B24398 INTERSTATE DESIGNATION ON US 77. $47,733,046.68
Texas 2B24429 CONSTRUCT BRIDGE ON US 90 $25,198,115.86 $31,613,735.72
Texas 2B24547 INFRASTRUCTURE IMPROVEMENTS ON IH 410 $120,954,097.39
Texas NBIS019 STATEWIDE INVENTORY AND INSPECTION OF ON AND OFF-SYSTEM BRIDGES FOR FISCAL YEARS 2019 AND 2020 $52,800,000.00 $66,000,000.00
Texas NBIS023 FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - OFF SYSTEM $27,950,000.00 $34,937,500.00
Texas SB97001 STATEWIDE, STATE INFRASTRUCTURE BANK-ADV CAP. $99,562,057.00 $285,168,019.00
Texas X597001 US 181; FROM N. OF THE CORPUS CHRISTI SHIP CHANNEL TO S. OF THE CORPUS CHRISTI SHIP CHANNEL. CONST NEW HARBOR BR OVER SHIP CHANNEL $738,423,258.92 $870,451,051.54