RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Texas | 0095022-02 | VARIOUS LOCATIONS IN TARRANT COUNTY, CONGESTION MITIGATION & AIR QUALITY | $21,301,440.00 | $26,626,800.00 |
Texas | 0108184 | IH 10 FROM W OF ADAMS BAYOU, EAST TO W OF SABINE RIVER BRIDGE RECONSTRUCT MAIN LANES OF EXISTING 4 LANE FREEWAY | $15,079,960.37 | $55,519,614.93 |
Texas | 0303125 | CONSTRUCT ONE-WAY FRONTAGE ROADS, ENTRANCE AND EXIT RAMPS AND REPLACE BRIDGE AT FM 989 ON IH 30. | $55,333,461.40 | $68,545,021.19 |
Texas | 0354235 | IH 35 FROM FALLS COUNTY LINE TO WOODLAWN RD RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE CONGESTION AND ENHANCE SAFETY | $121,454,076.60 | $138,025,677.73 |
Texas | 0355152 | IH 35W FROM IH 820 TO IH 30. RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES | $220,313,023.61 | $294,794,414.93 |
Texas | 0356438 | IH 35E FROM SANDY LAKE RD/WHITLOCK LN TO LOOP 288. RECONST 6 LN TO 8 MAINLANES, 4 CONCURRENT MANAGED/HOV AND FR | $397,540,702.04 | $1,049,891,743.18 |
Texas | 0451346 | IH 45 FROM AT IH 610 S TO CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB | $22,644,369.15 | $28,472,662.26 |
Texas | 1102054 | US 190 FR. 0.20 MI E OF FM 3470 TO 0.30 MI W OF FM 2410 FR. 3470 TO ROY REYNOLDS . CONSTRUCT OVERPASS AND WIDEN FR 2 TO 4 LNS W/CO | $7,852,951.70 | $28,004,799.00 |
Texas | 1102319 | SH 242 FROM AT IH 45 TO . CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH 242 TO SB IH 45 & NB IH 45 TO WB SH 242 ( | $1,480,218.39 | $31,278,253.00 |
Texas | 1102493 | FROM IH 20 TO FM 700. CONSTRUCT NEW RELIEF ROUTE | $63,362,556.40 | $79,120,364.25 |
Texas | 1402016 | RECONSTRUCT CLINTON DRIVE | $15,711,497.00 | $31,121,001.72 |
Texas | 1402081 | IH 69 FR W OF FM 762 TO 0.31 MI W OF FM 2759. WIDEN TO 8 ML, FRTG RDS, ITS, TMS, CONST 2-WAY HOV LNS & INT IMPRVS AT FM 762. | $130,353,034.39 | $183,422,238.85 |
Texas | 1502464 | US 83 FROM 0.28 MI WEST OF SHOWERS RD TO 0.85 MI E OF FM 886(EL FARO RD). CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY | $21,812,000.00 | $67,039,536.19 |
Texas | 1502521 | IH35 FR N. STASSNEY LN TO S. WILLIAM CANNON DR ADD SHLDERS, AUX LNS, RAMP IMPRVMTS, PAV REHAB, BIKE & PED IMPRVM, FRT RD INTSE IMP | $31,332,261.92 | $77,852,159.34 |
Texas | 1502531 | ON IH 35E FR US 77 S OF WAXAHACHIE TO US 77 N OF WAXAHACHIE. RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES | $114,751,988.92 | $149,428,506.15 |
Texas | 1502613 | FM 1626 LANE RECONSTRUCTION | $6,668,421.60 | $25,689,139.16 |
Texas | 1602247 | IH 410 AT US 90. RECONSTRUCT INTERCHANGE AND OPERATIONAL IMPROVEMENTS | $73,498,308.65 | $81,664,787.39 |
Texas | 1602259 | SH 358 FROM NILE STREET TO AYERS STREET. RAMP REVERSAL PHASE II-A, SOUTH SIDE ONLY. | $44,616,406.49 | $55,770,508.11 |
Texas | 1602427 | CONSTRUCT 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND SIDEWALKS ON IH 20 | $11,264,417.08 | $69,151,027.97 |
Texas | 1602671 | SH 288 AT BW 8 INTERCHANGE. CONSTRUCT 8 DIRECT CONNECTORS | $1,802,655.00 | $100,253,318.00 |
Texas | 1702007 | IH 10 ADDITIONAL LANE CONSTRUCTION | $153,348,307.03 | $192,080,905.63 |
Texas | 1702355 | CONSTRUCT 4 LANE BRIDGE AND RAMP MODIFICATIONS ON SH 114 | $25,129,847.29 | $44,912,309.12 |
Texas | 1702473 | SL 335- CONSTRUCT FRONTAGE ROADS. | $19,184,316.02 | $31,420,395.03 |
Texas | 1702490 | CONSTRUCT AUXILIARY LANES AND RAMP REVERSAL ON US 181 | $11,986,239.63 | $29,058,799.53 |
Texas | 1702506 | IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES | $94,615,640.22 | $118,269,550.27 |
Texas | 1702559 | CONSTRUCT 4-LANE DIVIDED URBAN STREET FACILITY ON NEW LOCATION ON AIRPORT BOULEVARD | $18,329,372.16 | $25,388,422.00 |
Texas | 1702626 | RECONSTRUCTION OF DIRECT CONNECTOR ON IH 69 | $9,482,098.06 | $26,911,664.51 |
Texas | 1702631 | CONSTRUCT DIRECT CONNECTOR AND HOV ACCESS TO UPTOWN TRANSIT CENTER ON IH 610 | $60,965,556.97 | $72,753,926.77 |
Texas | 1702633 | IH 610 RECONSTRUCTION | $102,184,189.06 | $116,449,098.95 |
Texas | 1702650 | IH 35 OPERATIONAL IMPROVEMENTS | $116,699,570.90 | $138,606,189.90 |
Texas | 1702730 | FM 2181. WIDEN ROADWAY | $6,450,755.09 | $37,740,935.70 |
Texas | 1702818 | RECONSTRUCT ROADWAY AT BUFFALO SPEEDWAY | $9,796,640.00 | $27,975,271.62 |
Texas | 1702839 | CONSTRUCT 4 LANE TOLLWAY IN SECTIONS ON SH 249 | $146,584,279.02 | $301,941,459.02 |
Texas | 1702842 | CONVERT REVERSIBLE HOV TO REVERSIBLE EXPRESS LANES, RECONSTRUCT AND WIDEN MAINLANES AND FRONTAGE ROADS ON IH35 E AND US 67 | $317,248,899.00 | $624,975,805.00 |
Texas | 1802175 | IH 610 - RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS AT CAMBRIDGE STREET/ALMEDA ROAD/UNION PACIFIC RAILROAD | $69,000,000.00 | $84,448,793.58 |
Texas | 1802325 | ROADWAY WIDEN TO A MODIFIED SUPER 2 ON US 67. | $5,000,000.00 | $53,396,420.94 |
Texas | 1802390 | EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 | $50,100,000.00 | $200,648,881.31 |
Texas | 1802404 | CONSTRUCT MAIN LANES, OVERPASSES, FRONTAGE ROADS AND STRUCTURES ON US 77 | $32,383,849.12 | $40,479,811.40 |
Texas | 1802412 | US 69 - WIDEN FREEWAY FROM 4 TO 6 LANES | $27,865,125.15 | $34,831,406.44 |
Texas | 1802413 | IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES | $112,175,146.80 | $140,218,933.50 |
Texas | 1802439 | WIDEN ROAD - ADD LANES ON SH 97 | $36,000,000.00 | $41,000,024.99 |
Texas | 1802497 | WIDEN TO SIX MAIN LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING; INTELLIGENT TRANSPORTATION SYSTEM ON IH 10 | $125,000,000.00 | $373,870,824.61 |
Texas | 1802546 | CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION ON US 377 | $40,678,539.46 | $62,662,068.86 |
Texas | 1802552 | WIDEN 2 TO 4 LANE DIVIDED ON FM 156. | $45,803,593.63 | $57,254,492.03 |
Texas | 1802558 | CONSTRUCT GRADE SEPARATION ON US 181 | $25,075,793.48 | $31,344,741.85 |
Texas | 1902002 | WIDEN ROAD - ADD LANES ON SH 36 | $7,000,000.00 | $98,644,061.78 |
Texas | 1902056 | FM 2221. CONSTRUCT CONTROLLED ACCESS FACILITY. | $91,218,763.56 | $114,516,232.45 |
Texas | 1902057 | CONSTRUCT RAMPS ON IH 35. | $68,318,251.91 | $75,986,041.04 |
Texas | 1902063 | REHABILITATION OF EXISTING ROAD ON SH 123. | $21,784,897.17 | $27,240,145.11 |
Texas | 1902081 | CONSTRUCT 4 LANE DIRECT CONNECTION (FUTURE I-69) ON US 59. | $60,440,799.99 | $92,628,331.74 |
Texas | 1902105 | IH 45 WIDEN ROAD ADD LANES | $142,813,404.19 | $179,214,098.64 |
Texas | 1902107 | REHABILITATION OF EXISTING ROAD ON US 183 | $22,000,000.00 | $28,720,936.06 |
Texas | 1902182 | FM 2100 WIDEN TO 4 LANE DIVIDED | $25,540,773.87 | $31,996,649.84 |
Texas | 1902201 | INTERCHANGE IMPROVEMENT ON SL 12 AND SS 482. | $271,498,670.57 | $341,709,166.57 |
Texas | 1902215 | WIDEN ROAD AND ADD LANES ON IH 410 | $64,126,345.37 | $84,896,921.79 |
Texas | 1902222 | CONSTRUCT 1 AUXILIARY LANE IN EACH DIRECTION ON IH 20. | $21,686,081.54 | $26,107,601.93 |
Texas | 1902268 | WIDEN FROM 2 LANE TO 4 LANE WITH A CONTINUOUS LEFT TURN LANE; REPLACE BRIDGE AT SAND CREEK | $26,277,322.57 | $35,502,514.54 |
Texas | 1902299 | CONSTRUCT NEW ROADWAY LANES ON US 281 | $66,747,449.27 | $83,434,311.59 |
Texas | 1902314 | WIDEN FREEWAY - ADD LANES ON IH 10. | $80,492,432.23 | $100,790,599.37 |
Texas | 1902343 | SH 87 - FERRY OPERATION PROJECTS | $21,874,049.60 | $27,342,562.00 |
Texas | 1902389 | WIDEN FREEWAY ON IH 635. | $1,084,753,320.17 | $1,720,223,200.00 |
Texas | 1902417 | CONSTRUCT INTERCHANGE ON IH 2 AND IH 69C. | $139,446,264.76 | $300,051,164.00 |
Texas | 1996001 | STATEWIDE, STATE INFRASTRUCTURE BANK -ADV CAP | $71,726,747.00 | $192,462,886.00 |
Texas | 2000401 | CONSTRUCT REST AREA ON IH 20 | $45,512,874.59 | $56,891,093.24 |
Texas | 2002040 | IH 30 FROM EAST OF SYLVAN AVE TO IH 35E. WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV. | $36,234,552.00 | $42,437,134.89 |
Texas | 2002632 | US CUSTOMS PORT OF ENTRY EXIT TO US 281. CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF) | $33,146,456.76 | $36,270,895.40 |
Texas | 2005862 | US 82 FROM US 82 AT US 281 TO .. CONSTRUCT DIRECT CONNECT INTERCHANGE | $31,139,709.00 | |
Texas | 2005994 | IH 635 FROM WEBB CHAPEL TO WEST OF US 75 (MERIT DR). IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV/MANAGED LANES | $346,160,303.95 | $930,082,152.42 |
Texas | 2007405 | FM 1314 FROM 1.0 MI S OF SH 242 TO 2.6 MILE NW OF LOOP 494 WIDEN TO 4 LANE DIVIDED RURAL ROAD AND LENGTHEN OR REPLACE | $33,034,515.63 | $46,093,270.00 |
Texas | 2007512 | WIDEN ROAD - ADD LANES ON GREENS ROAD | $351,264.69 | $40,252,842.85 |
Texas | 2007688 | FM 1484 FROM FM 3083 TO FM 2432. WIDEN TO 4 LANE DIVIDED | $18,508,072.78 | $33,997,859.93 |
Texas | 2007717 | FM 1488 FROM EAST OF FM 149 AT MOSTYN TO FM 2978. WIDEN 2 LANES TO 4-LANE DIVIDED (PTF) | $26,026,471.13 | $36,148,371.04 |
Texas | 2007869 | SS 601 FROM US 54 (PATRIOT FREEWAY) TO LOOP 375 (PURPLE HEART FREEWAY). CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES | $244,634,419.55 | $359,350,000.00 |
Texas | 2007886 | EXTEND CONFLANS RD FROM W OF SH 161 TO VALLEY VIEW LANE IN CITY OF IRVING. NEW LOCATION CITY STREET - 4 LANE DIVIDED | $14,808,588.00 | $37,987,724.28 |
Texas | 2007913 | FM 3407 FROM RM 12 TO RM 2439 CONSTRUCT 4-LN DIVIDED ROADWAY | $32,415,232.10 | $41,732,542.58 |
Texas | 2008345 | ON SH 199 AT BYPASS CHANNEL IN FTW TO NEAR CBD & TRINITY RIVER. CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL. | $36,982,949.80 | $48,967,209.40 |
Texas | 2008654 | US 79 FROM 79-B E OF TAYLOR TO E OF FM 1063. UPGRADE TO 4-LN DIVIDED RDWY | $19,865,925.85 | $28,636,441.28 |
Texas | 2008830 | IH 20 FROM SH 171; IN WEATHERFORD TO FM 2552; ON EAST AND WEST BOUND FRONTAGE ROADS. RECONSTRUCT AND EXTEND FRONTAGE ROAD. | $19,196,974.61 | $35,689,114.71 |
Texas | 2009235 | FM 646 FROM FM 517 TO FM 1764. WIDEN FROM 2 LANES TO 4-LANE DIVIDED (PTF) | $18,042,196.30 | $26,866,332.00 |
Texas | 2009513 | ENGINEERING, ROW, & CONSTRUCTION OF DFW CONNECTOR ON SH 114 AND SH 121. RECONSTRUCT FREEWAY, FRONTAGE ROADS AND RAMPS | $607,149,857.90 | $696,394,133.00 |
Texas | 2009753 | ENGINEERING, ROW AND CST OF DFW CONNECTOR ON SH 121 AND SH 114. RECONST FRWY 4 TO 6 W/AUX LNS,FR RDS & RAMPS & ADD COLLECTOR | $591,539,254.30 | $739,424,067.78 |
Texas | 2009919 | IH 820 FROM IH 35W TO SH 121/SH 183. RECONSTRUCT 4 TO 10 W/ HOV/MANAGED LANE, INTERCHANGE AND CONNECTORS | $421,105,616.27 | $526,087,354.64 |
Texas | 2011591 | US 271 FROM 0.3 MI. NORTH OF US 67 TO .7MI SOUTH OF FM 3417. CONSTRUCT FIRST PHASE OF ULTIMATE 4-LANE DIVIDED FREEWAY | $53,570,720.10 | $87,852,142.31 |
Texas | 2011998 | IH 610 FROM TC JESTER TO N OF IH 10 ON IH 610 AND TO 34TH ST ON US 290. RECONSTR US290/IH610 IC, CONSTR INTERCHANGE W/ DC'S W/ TWO | $36,665,773.00 | $171,036,404.00 |
Texas | 2012125 | LP 363 FROM IH 35 NORTH OF TEMPLE TO SH 53. CONSTRUCT NORTHBOUND FRONTAGE ROAD TO PROVIDE INTERIM 4-LANE | $24,784,256.30 | $35,527,847.63 |
Texas | 2012221 | SH 550 @ US 77/83 TO 0.53 MI E OF OLD ALICE RD. CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES | $2,300,000.00 | $34,495,766.00 |
Texas | 2012232 | US 290 FROM WEST OF RM 1826 TO SL 1; RECONSTRUCT 4-LANE TO 6-LANE CONTROLLED ACCESS HIGHWAY AND FRONTAGE ROADS | $21,468,853.91 | $146,578,873.54 |
Texas | 2012594 | US 59 - WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS | $84,105,000.00 | $120,120,653.85 |
Texas | 2012691 | IH 35 FROM S LP 363 IN TEMPLE TO NUGENT AVE. RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES. | $233,750,004.59 | $275,865,720.60 |
Texas | 2012805 | RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE ON MEDICAL DISTRICT DRIVE. | $19,376,490.00 | $27,202,300.29 |
Texas | 2013136 | ON IH 610 FROM W OF W 34TH ST ON US 290 TO N AND S OF US 290 ON IH 610.RECONSTRUCT US 290/IH 610 INCLUDING IH10 TO US 290 OUTBOUND | $99,132,093.21 | $124,346,658.20 |
Texas | 2013163 | IH 45 FROM 0.9884 MILES SOUTH OF FM 2351 TO SOUTH OF MEDICAL CENTER DRIVE. WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3-LANE FR | $85,185,107.91 | $106,749,097.46 |
Texas | 2013218 | CONSTRUCT FOUR LANE FREEWAY AT DIBOLL (FUTURE I-69) | $14,237,000.00 | $171,923,286.00 |
Texas | 2013221 | HIGHWAY IMPROVEMENT ON US 59. | $2,813,685.77 | $101,174,791.48 |
Texas | 2013226 | IH 10 AT SH 87 AND TEXAS AND NEW ORLEANS RAILROAD. REPLACE BRIDGE AND APPROACHES | $24,578,123.17 | $30,722,653.80 |
Texas | 2013292 | SH183 FROM FM157 TO I35E; LP12 FROM SH183 TO I35E; AND SH114 FROM SH97 TO SH183. RECONSTRUCT & ADD MANAGED LANES | $576,221,762.15 | $809,451,840.03 |
Texas | 2013400 | US 82 FROM FM 1840 TO SH 98. RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES | $9,992,256.47 | $27,294,014.40 |
Texas | 2013420 | ON SH 365 FROM FM 396 TO US 281. CONSTRUCT 4-LANE CONTROLLED ACCESS TOLLED FACILITY | $33,756,881.00 | $155,435,862.00 |
Texas | 2013567 | CONSTRUCT 6-LANE DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY WITH AUTO PUMP STATION AND RAILROAD LINE WITH UNDERPASSES ON HEMPSTEAD ROAD | $42,312,164.82 | $71,572,913.46 |
Texas | 2013596 | REHABILITATION OF EXISTING ROADWAY AND INTERCHANGE IMPROVEMENTS ON US 175 AND SH 310. | $24,046,844.68 | $47,565,481.66 |
Texas | 2013740 | US 290 - RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES AND TWO 2-LANE FRONTAGE ROADS | $91,276,521.07 | $195,462,373.84 |
Texas | 2013874 | REPLACE BRIDGE AND APPROACHES ON FM 1495. | $26,727,976.27 | $33,415,139.89 |
Texas | 2013875 | CONSTRUCT NEW ROAD ON LP 375. | $29,427,716.36 | $36,784,645.46 |
Texas | 2013983 | US 290 FROM E OF MUESCHKE RD TO E OF TELGE RD. RECON AN WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MAIN LANES, AUX LANES AND 2-LN FR | $37,362,073.98 | $98,369,741.82 |
Texas | 2013991 | IH 610 FROM W OF 34TH ST ON US 209 TO IH 610. RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS AND 3-LANE REVERSIBLE | $2,830,000.00 | $181,761,983.83 |
Texas | 2013996 | FM 1957 FROM SH 211 TO LOOP 1604. EXPAND FROM 2 LANES TO 4 LANE DIVIDED. | $7,528,667.31 | $37,501,000.00 |
Texas | 2014211 | ON US 59 FROM SP 10 TO W OF FM 762. WIDEN TO 6-LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM W/ GRADE SEPARATION | $135,932,655.18 | $167,412,867.49 |
Texas | 2014326 | CONSTRUCT NEW ROAD ON MCHARD ROAD. | $23,966,629.04 | $29,959,286.30 |
Texas | 2014444 | WIDEN ROAD, ADD LANES, AND SHOULDERS ON US 69 | $33,829,736.79 | $42,287,170.98 |
Texas | 2014669 | AT WHITE SETTLEMENT RD IN FTW. CONST 4 LN BRIDGE AT NEW LOC OF PROPOSED BYPASS CHANNEL FOR TRINITY RIVER NEAR CBD OF FTW | $6,200,000.00 | $33,796,872.18 |
Texas | 2015062 | ON IH 30 AT FM 3549. RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS AND RAMPS CONSTRUCTION. | $16,709,036.80 | $26,585,311.57 |
Texas | 2016108 | ADD SHOULDERS, AUXILLARY LNS, RAMP IMPROVEMENTS, PAVEMENT REHAB, BIKE AND PED IMPROVEMENTS & FRONTAGE ROAD INTERSECTION IMPROVEMENTS ON IH 35 | $45,111,638.29 | $50,136,042.54 |
Texas | 2016183 | ON IH30 FR 1.0 MI W OF SH360 TO GREAT SOUTHWEST PKWY; AT SIX FLAGS DR. CONST DIR CONN INTCHG AT SH360 & TMS & RECONSTR BRIDGE. | $49,671,949.79 | $268,872,798.96 |
Texas | 2017887 | WIDEN FREEWAY FROM FOUR TO SIX LANES ON US 67 | $3,022,594.50 | $66,270,431.33 |
Texas | 2017906 | WIDEN ROADWAY INCLUDING FRONTAGE ROADS, STRIPING AND SIGNING ON IH 45 | $63,259,215.23 | $94,794,666.94 |
Texas | 2018201 | CONSTRUCT RELIEF ROUTE AROUND DRISCOLL ON US 77. | $40,000,000.00 | $98,921,208.78 |
Texas | 2018321 | IH 820 AND SH 121. RECONSTRUCTION AND WIDENING. | $136,911,824.21 | $171,159,780.27 |
Texas | 2018416 | FM 762 AND FM 2759 - WIDEN TO 4 LANES DIVIDED | $27,554,687.76 | $34,539,569.58 |
Texas | 2018434 | US 377 AT LAKE TEXOMA. BRIDGE REPLACEMENT. | $5,000,000.00 | $35,234,013.62 |
Texas | 2018627 | CITY STREET FROM MARSALIS AVENUE TO EWING AVENUE. CONSTRUCT LOCAL ENHANCEMENTS. | $16,000,000.00 | $39,388,000.00 |
Texas | 2018811 | WIDEN FROM 2 LANES TO 4 LANE ON US 69 | $52,977,757.81 | $66,222,197.26 |
Texas | 2018852 | WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES ON SH 146 | $81,128,000.00 | $253,240,692.19 |
Texas | 2018858 | SH 242 AT FM 1314. CONSTRUCT GRADE SEPARATION. | $21,168,947.40 | $26,532,973.00 |
Texas | 2018882 | ROADWAY WIDENING TO A MODIFIED SUPER 2 ON US 285 | $34,066,526.95 | $42,583,158.69 |
Texas | 2018907 | RECONSTRUCT INTERSECTION ON IH 35. | $23,615,433.99 | $26,239,371.10 |
Texas | 2018963 | RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS ON IH 45 | $200,501,389.55 | $251,138,652.59 |
Texas | 2019047 | REHABILITATE EXISTING ROADWAY ON US 83. | $58,274,022.74 | $72,871,466.30 |
Texas | 2019048 | REHABILITATION OF EXISTING HIGHWAY ON US 83. | $9,000,000.00 | $65,135,678.13 |
Texas | 2019063 | BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONS AT INTERSECTIONS ON US 62. | $25,000,000.00 | $172,354,438.05 |
Texas | 2019106 | RECONSTRUCT EXISTING 4-LANE UNDIVIDED ROADWAY TO A 4-LANE DIVIDED ROADWAY ON US 290. | $31,604,453.80 | $36,332,955.39 |
Texas | 2019166 | US 54 FROM LOOP 375, INTERCHANGE IMPROVEMENTS. | $92,293,201.39 | $115,450,417.14 |
Texas | 2019168 | WIDEDN FROM 4 TO 6 LANES ON SL 375. | $95,362,990.82 | $116,103,738.53 |
Texas | 2019312 | RECONSTRUCTION ON 1H 35 TO INCLUDE WIDENING FROM 6 TO 8 LANES. | $185,035,000.00 | $374,225,164.70 |
Texas | 2019409 | US 54, CONVERT TO SUPER 2 HIGHWAY | $19,000,000.00 | $38,238,067.66 |
Texas | 2019411 | CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY ON SL 335. | $41,103,841.85 | $51,379,802.32 |
Texas | 2019437 | CONSTRUCT FRONTAGE ROADS ON US 59. | $17,000,000.00 | $38,337,252.61 |
Texas | 2019599 | WIDEN NON-FREEWAY FROM 2 LANE TO 4 LANE ON US 190 | $36,488,767.18 | $86,376,750.15 |
Texas | 2019611 | US 60 TO WEST OF BOVINA. REHAB OF EXISTING ROADWAY. | $16,623,689.65 | $28,667,631.21 |
Texas | 2019613 | CONSTRUCT TWO NEW COLORADO RIVER 2-LANE FRONTAGE ROAD BRIDGES ON SH 21. | $16,000,000.00 | $44,777,398.93 |
Texas | 2019626 | FM 2100 - WIDEN TO 4-LANE DIVIDED | $4,000,000.00 | $48,685,047.79 |
Texas | 2019651 | WIDEN ROAD AND ADD LANES ON US 190. | $25,295,020.86 | $31,618,776.07 |
Texas | 2019689 | REPLACE BRIDGES AND APPROACHES ON SH 8. | $26,204,446.57 | $38,992,035.00 |
Texas | 2019797 | SH 242 - WIDEN FROM 2 TO 4 LANES | $49,630,877.55 | $74,106,751.26 |
Texas | 2019818 | WIDEN FREEWAY FROM 4 TO 6 LANES ON US 69. | $20,141,445.31 | $25,176,806.64 |
Texas | 2019834 | WIDEN FREEWAY ON IH 35E | $101,800,943.70 | $128,702,705.70 |
Texas | 2019859 | INTERCHANGE IMPROVEMENT ON IH 45. | $2,151,964.14 | $39,810,234.26 |
Texas | 2019952 | SH 242 - WIDEN FROM 2 TO 4 LANES | $33,206,352.62 | $41,541,414.96 |
Texas | 2019988 | FM 3005 - INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL IMPROVEMENTS, APPROX 12 INCH OVERLY AND STRIPING. | $17,627,032.68 | $39,141,429.85 |
Texas | 2019990 | CONSTRUCT NEW SAFETY REST AREA ON IH 10 | $34,252,259.77 | $38,815,324.72 |
Texas | 2019996 | CONSTRUCT BRIDGE AT RM 620. | $24,828,441.18 | $31,083,721.48 |
Texas | 2020008 | US 75 AT US 82 SOUTH OF CENTER STREET WIDEN ROAD. | $14,000,000.00 | $169,147,954.04 |
Texas | 2020056 | WIDEN ROAD - ADD LANES ON SH 36 | $33,833,597.74 | $51,291,997.17 |
Texas | 2020057 | WIDEN ROAD - ADD LANES ON SH 36 | $64,840,000.00 | $91,254,896.60 |
Texas | 2020115 | WIDEN ROAD AND ADD LANES ON IH 10 | $20,000,000.00 | $164,781,261.91 |
Texas | 2020122 | WIDEN ROAD ADD LANES AND SHOULDERS ON CR 8082. | $17,192,757.01 | $64,333,827.10 |
Texas | 2020185 | RECONSTRUCT INTERCHANGE AND CONSTRUCT FRONTAGE ROAD ON IH 35. | $49,918,158.59 | $62,460,187.06 |
Texas | 2020303 | WIDEN ROAD - ADD LANES ON FM 2218 | $46,532,842.75 | $58,166,053.43 |
Texas | 2020314 | OSTOS ROAD WIDEN ROAD, ADD LANES, AND SHOULDERS. | $19,265,984.48 | $26,303,348.60 |
Texas | 2020432 | CONSTRUCT NEW ROAD ON PELLICANO DRIVE AT JOE BATTLE BOULEVARD TO DARRINGTON AT BERRYVILLE STREET. | $18,464,800.00 | $26,520,124.43 |
Texas | 2020451 | BRIDGE REPLACEMENT ON US 271 | $20,034,841.22 | $25,043,551.51 |
Texas | 2020455 | WIDEN ROAD ADD LANES AND SHOULDERS TO IH 30. | $76,946,054.15 | $97,568,095.52 |
Texas | 2020489 | WIDEN FREEWAY ON SH 199. | $95,997,373.38 | $120,008,399.33 |
Texas | 2020493 | WIDEN FREEWAY ON SH 170. | $86,961,277.60 | $108,701,597.00 |
Texas | 2020496 | CONVERT NON-FREEWAY ON US 59. | $31,025,623.18 | $184,672,286.36 |
Texas | 2020549 | HIGHWAY IMPROVEMENT ON IH 40. | $24,735,598.98 | $30,956,657.31 |
Texas | 2020649 | CONSTRUCT NEW INTERCHANGE AT NORTH SL 338 AT US 385 | $22,601,183.03 | $28,615,588.78 |
Texas | 2020751 | REHABILITATION OF EXISTING ROAD ON FM 2119 | $27,000,000.00 | $66,252,295.96 |
Texas | 2020863 | CONSTRUCT BRIDGE ON IH 20 | $30,674,839.02 | $40,343,548.78 |
Texas | 2020871 | CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 | $50,681,059.16 | $63,385,134.88 |
Texas | 2020879 | WIDEN NON-FREEWAY FACILITY ON FM 2818 | $38,019,405.83 | $48,166,546.29 |
Texas | 2020944 | ADD PASSING LANES ON US 83. | $21,996,924.75 | $27,552,731.94 |
Texas | 2020950 | SURFACING AND ROADWAY RESTORATION ON SH 137 | $47,303,780.32 | $57,214,901.80 |
Texas | 2020966 | WIDEN ROAD - ADD LANES ON IH 10. | $46,028,828.08 | $57,536,035.10 |
Texas | 2021088 | INFRASTRUCTURE IMPROVEMENTS ON JOHN HAYES(DARRINGTON/BERRYVILLE) | $16,583,040.80 | $25,769,177.34 |
Texas | 2021093 | WIDEN ROAD - ADD LANES ON SL 121 | $26,337,010.89 | $33,070,636.82 |
Texas | 2021189 | REHABILITATION OF EXISTING ROAD ON FM 2004 | $21,477,838.44 | $31,453,621.29 |
Texas | 2021213 | BRIDGE REPLACEMENT ON SH 198. | $12,000,000.00 | $33,166,851.37 |
Texas | 2021310 | WIDEN ROAD - ADD LANES ON SH 72. | $8,000,000.00 | $50,911,818.47 |
Texas | 2021327 | WIDEN ROAD AND ADD LANES ON IH 35. | $110,331,664.18 | $235,087,606.29 |
Texas | 2021404 | CONSTRUCT DIRECT CONNECTORS ON IH 410 | $84,762,682.49 | $105,987,638.80 |
Texas | 2021440 | US 59. HIGHWAY IMPROVEMENT. | $57,844,043.02 | $72,330,053.77 |
Texas | 2021488 | WIDEN ROAD-ADD LANES ON SL 1604 | $5,000,000.00 | $163,323,331.38 |
Texas | 2021492 | WIDEN ROAD - ADD LANES ON FM 1463 | $7,000,000.00 | $60,122,177.87 |
Texas | 2021518 | HIGHWAY IMPROVEMENT ON IH 27. | $22,188,679.24 | $28,052,631.54 |
Texas | 2021525 | HAZARD ELIMINATION AND SAFETY ON US 90. | $20,170,805.16 | $36,174,073.89 |
Texas | 2021536 | CONSTRUCT NEW ROADWAY LANES AND INSTALL ILLUMINATION ON US 380. | $122,194,673.77 | $153,203,526.72 |
Texas | 2021543 | CONSTRUCT AND WIDEN ROAD ON FM 60. | $8,000,000.00 | $39,536,156.51 |
Texas | 2021547 | RECONSTRUCT AND WIDEN ROADWAYS ON SH 242 | $19,897,876.80 | $35,019,355.32 |
Texas | 2021576 | CONVERT NON-FREEWAY ON FM 1585 | $7,856,000.00 | $170,958,500.84 |
Texas | 2021615 | HIGHWAY IMPROVEMENT ON SL 1604 AT FM 2696 | $12,618,163.65 | $40,359,224.86 |
Texas | 2021616 | WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. | $72,299,838.00 | $226,609,058.80 |
Texas | 2021643 | INTERSECTION IMPROVEMENTS ON FM 1960. | $24,390,665.22 | $31,599,080.97 |
Texas | 2021704 | WIDEN ROAD AND ADD LANES ON US 82 | $43,727,125.65 | $54,658,907.06 |
Texas | 2021728 | WIDEN ROAD - ADD LANES ON SH 36. | $54,784,000.00 | $109,072,964.81 |
Texas | 2021745 | CONSTRUCT NEW ROAD AT KENNY FORT BOULEVARD. | $5,431,696.00 | $28,369,555.49 |
Texas | 2021787 | CONSTRUCT NEW ROAD ON JUPITER DRIVE | $13,238,558.40 | $33,932,592.00 |
Texas | 2021840 | RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES ON FM 2100. | $35,214,056.19 | $61,888,437.27 |
Texas | 2021858 | CONSTRUCT FRONTAGE ROADS ON SL 9 AND BI 45J | $21,069,697.99 | $30,125,121.77 |
Texas | 2021859 | CONSTRUCT FRONTAGE ROADS ON SL 9. | $40,738,586.18 | $50,948,232.73 |
Texas | 2021864 | WIDEN ROAD - ADD SHOULDERS ON US 287 | $29,081,956.02 | $36,459,683.01 |
Texas | 2021943 | CONSTRUCT RAMPS ON SH 6. | $48,337,354.80 | $60,671,693.50 |
Texas | 2022009 | WIDEN ROAD-ADD LANES ON IH 45. | $97,658,604.46 | $225,626,238.93 |
Texas | 2022013 | HIGHWAY IMPROVEMENT ON US 69. | $58,983,111.83 | $78,831,618.79 |
Texas | 2022027 | CONSTRUCT NEW ROADWAY LANES AND RECONSTRUCT EXISTING ROADWAY ON IH 35E | $623,356,560.75 | $668,302,241.00 |
Texas | 2022053 | WIDEN FREEWAY ON IH 10 | $166,260,971.09 | $237,039,820.10 |
Texas | 2022076 | EXPAND FROM 8 LANES TO 14 LANES ON IH 35. EXPRESSWAY-ADD 6 NEW EXPRESS LANES | $65,570,351.00 | $1,783,218,521.00 |
Texas | 2022153 | CONSTRUCT FRONTAGE RAODS ALONG IH 20. | $15,000,000.00 | $91,848,786.31 |
Texas | 2022160 | CONSTRUCT BRIDGE ON SL 360 | $43,713,793.38 | $68,642,241.73 |
Texas | 2022185 | WIDEN ROAD AND ADD LANES ON US 83. | $22,784,686.94 | $28,590,109.25 |
Texas | 2022340 | WIDEN ROAD - ADD LANES ON IH 35 | $230,962,376.23 | $578,235,425.65 |
Texas | 2022356 | INTERCHANGE IMPROVEMENT ON IH 20 | $60,596,223.58 | $78,885,163.03 |
Texas | 2022386 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE- SS 366. | $50,837,003.05 | |
Texas | 2022402 | CONSTRUCT DIRECT CONECTORS ON IH 10 | $371,758,985.06 | $465,977,872.27 |
Texas | 2022437 | WIDEN FREEWAY ON IH 35 | $123,796,515.07 | $607,539,900.51 |
Texas | 2022446 | BRIDGE REPLACEMENT ON SH 21 | $25,053,360.94 | $31,370,787.11 |
Texas | 2022480 | BRIDGE REPLACEMENT ON SH 174 | $21,462,755.43 | $26,828,444.29 |
Texas | 2022496 | ROADWAY WIDENING TO A SUPER 2 HIGHWAY ON SH 302 | $32,788,970.36 | $41,101,212.96 |
Texas | 2022509 | WIDEN ROAD ADD LANES ON SH 36. | $19,666,299.25 | $62,508,840.91 |
Texas | 2022510 | WIDEN ROAD - ADD LANES ON FM 723. | $59,585,528.00 | $89,174,418.62 |
Texas | 2022512 | WIDEN ROAD - ADD LANES ON SH 36 | $47,347,344.38 | $59,184,180.49 |
Texas | 2022572 | CONSTRUCT INSPECTION STATION AT ANZALDUAS INTERNATIONAL BRIDGE PORT OF ENTRY. | $42,680,000.00 | $79,712,092.67 |
Texas | 2022575 | CONSTRUCT BRIDGE ON SH 288. | $46,405,417.74 | $58,053,752.52 |
Texas | 2022576 | WIDEN BRIDGE ON SH 146 | $79,350,980.45 | $100,076,331.92 |
Texas | 2022582 | SAFTETY IMPROVEMENT ON SH 115 AT FM 181. | $24,877,979.85 | $39,516,973.36 |
Texas | 2022583 | ROADWAY REHABILITATION ON SH 18. | $11,191,711.67 | $40,565,620.66 |
Texas | 2022584 | PREVENTIVE MAINTENANCE - BI 20-E | $20,787,686.83 | $26,149,033.06 |
Texas | 2022590 | WIDEN ROAD - ADD LANES AND SHOULDERS ON SH 302. | $27,961,047.38 | $35,061,309.22 |
Texas | 2022591 | ROADWAY REHABILITATION ON SH 18. | $28,651,646.01 | $35,814,557.51 |
Texas | 2022599 | ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY ON US 67. | $23,400,589.18 | $29,250,736.48 |
Texas | 2022615 | INTERCHANGE IMPROVEMENT ON US 75. | $40,557,316.64 | $50,710,215.40 |
Texas | 2022632 | BRIDGE REPLACEMENT ON SH 7 | $22,917,104.57 | $28,647,410.21 |
Texas | 2022634 | WIDEN ROAD - ADD LANES ON IH 20 | $6,670,634.10 | $96,409,242.48 |
Texas | 2022675 | WIDEN FREEWAY IN VARIOUS LOCATIONS IN THE FORT WORTH DISTRICT TO INCLUDE IH 820, IH 20, US 287 | $388,751,290.65 | $1,631,948,203.63 |
Texas | 2022726 | WIDEN ROAD AND ADD LANES ON FM 646 | $81,812,848.21 | |
Texas | 2022745 | INTERCHANGE IMPROVEMENT ON US 59. | $53,707,623.07 | $93,422,800.16 |
Texas | 2022793 | RECONSTRUCT EXISTING ROADWAY AND BRIDGE REPLACEMENT ON US 80. | $33,574,120.00 | $138,124,160.45 |
Texas | 2022811 | WIDEN ROAD - ADD LANES ON FM 16 | $16,788,271.47 | $49,908,063.76 |
Texas | 2022901 | WIDEN ROADS AND ADD LANES TO SH 46. | $31,467,502.00 | $64,037,567.08 |
Texas | 2022915 | CONSTRUCT NEW ROAD ON PANTHER CREEK PARKWAY. | $30,000,000.00 | $59,104,193.55 |
Texas | 2022926 | WIDEN ROAD - ADD LANES ON SH 105. | $74,143,317.18 | $95,118,054.42 |
Texas | 2022929 | CONSTRUCT BRIDGE ON SH 288. | $24,984,371.85 | $31,230,464.81 |
Texas | 2022936 | WIDEN ROAD - ADD LANES ON SH 99 | $70,083,917.31 | $87,604,896.65 |
Texas | 2022950 | HIGHWAY IMPROVEMENT ON SL 378 | $32,252,864.29 | $40,316,080.37 |
Texas | 2022999 | BRIDGE REPLACEMENT ON US 175. | $23,553,211.23 | $33,158,144.21 |
Texas | 2023047 | SURFACING AND ROADWAY RESTORATION ON IH 35 AND IH 10 | $24,460,605.31 | $27,335,849.36 |
Texas | 2023058 | WIDEN ROAD - ADD LANES ON FM 2642 | $22,619,255.70 | $28,290,034.63 |
Texas | 2023121 | RESURFACE ROADWAY ON US 90 | $24,326,575.20 | $30,814,434.99 |
Texas | 2023140 | CONSTRUCT BRIDGE ON SEAN HAGGERTY DRIVE | $20,340,665.15 | $28,363,855.29 |
Texas | 2023154 | REPLACE BRIDGE AND APPROACHES ON SH 155. | $33,679,487.92 | $50,299,359.90 |
Texas | 2023166 | WIDEN FREEWAY ON IH 30 | $64,471,349.01 | $386,910,587.24 |
Texas | 2023167 | CONSTRUCT NEW ROADWAY LANES ON SH 5. | $35,402,104.26 | $44,674,434.76 |
Texas | 2023253 | CONSTRUCTION OF EAST-WEST CONNECTOR AT SH 360, 20TH AVENUE AND RENTAL CAR DRIVE. | $28,810,026.00 | $44,682,411.57 |
Texas | 2023274 | HIGHWAY IMPROVEMENT ON CR 861. | $25,511,817.69 | |
Texas | 2023277 | FREEWAY OPERATIONAL IMPROVEMENTS- IH 45 | $20,277,013.98 | $25,390,767.48 |
Texas | 2023340 | INTERCHANGE IMPROVEMENT ON IH 35 EAST. | $81,808,137.42 | $122,383,413.50 |
Texas | 2023491 | DRAINAGE IMPROVEMENTS ON IH 45 | $5,989,157.91 | $30,012,812.53 |
Texas | 2023494 | WIDEN ROAD AND ADD LANES ON FM 521 | $61,205,326.40 | $77,018,958.44 |
Texas | 2023497 | WIDEN ROAD - ADD LANES ON SH 6 | $23,075,560.68 | $28,967,288.84 |
Texas | 2023505 | RAILROAD CROSSING IMPROVEMENTS ON SH 183 | $27,113,208.01 | $34,285,760.02 |
Texas | 2023524 | ROADWAY REHABILITATION AND RECONSTRUCTION WITH NO ADDED CAPACITY ON FM 1450. | $70,888,304.86 | $88,610,381.07 |
Texas | 2023557 | CONSTRUCT BRIDGE ON UA 90 | $37,632,095.20 | $53,506,311.85 |
Texas | 2023629 | WIDEN ROAD ON US 83. | $29,829,993.07 | $37,307,686.44 |
Texas | 2023675 | WIDEN ROAD AND ADD LANES ON FM 2252 | $35,067,079.31 | $55,521,412.57 |
Texas | 2023679 | INTERCHANGE IMPROVEMENT ON IH 30 | $145,812,969.65 | $218,377,307.05 |
Texas | 2023693 | INTERCHANGE IMPROVEMENT AND CONSTRUCT RAMPS ON IH 20. | $45,944,416.61 | $57,430,520.75 |
Texas | 2023694 | REHABILITATE EXISTING ROADWAY ON IH 820. | $30,483,204.05 | $33,923,136.73 |
Texas | 2023704 | INTERCHANGE IMPROVEMENT ON US 175. | $39,353,671.22 | $49,199,859.27 |
Texas | 2023723 | WIDEN ROAD AND ADD LANES ON FM 2493. | $31,685,325.84 | |
Texas | 2023767 | HIGHWAY IMPROVEMENT ON US 277 AND SH 70 | $8,767,022.96 | $26,248,542.08 |
Texas | 2023773 | HIGHWAY IMPROVEMENT ON US 59 | $22,718,820.02 | $121,217,685.97 |
Texas | 2023837 | HIGHWAY IMPROVEMENT ON IH 820 | $361,127,200.00 | $451,409,000.00 |
Texas | 2023874 | WIDEN ROAD AND ADD LANES ON FM 1516 | $22,587,200.00 | $61,124,774.30 |
Texas | 2023933 | BRIDGE REPLACEMENT, BRIDGE MAINTENANCE ON IH 20. | $29,110,609.22 | $32,345,121.32 |
Texas | 2023947 | WIDEN ROAD - ADD LANES ON IH 10 | $199,207,010.00 | $264,052,081.24 |
Texas | 2023954 | WIDEN ROAD - ADD LANES ON FM 1518 | $16,128,953.20 | $71,308,378.01 |
Texas | 2023958 | WIDEN ROAD AND ADD LANES ON SL 1604 | $51,181,520.71 | $64,630,479.99 |
Texas | 2023992 | CONVERT NON-FREEWAY ON US 59 | $79,489,552.64 | $99,361,940.81 |
Texas | 2024004 | RESURFACE ROADWAY ON IH 10. | $25,372,145.44 | $28,252,331.16 |
Texas | 2024033 | REHABILITATE EXISTING ROADWAY ON US 60. | $30,421,153.74 | $38,026,442.18 |
Texas | 2024041 | HIGHWAY IMPROVEMENT ON US 75 | $54,896,516.43 | $69,532,251.54 |
Texas | 2024349 | BRIDGE MAINTENANCE ON IH 345 | $4,621,197.84 | $27,661,564.16 |
Texas | 2024365 | SURFACING AND ROADWAY RESTORATION ON RM 652 | $1,677,058.00 | $25,051,787.01 |
Texas | 2024436 | CONVERT NON-FREEWAY ON US 59 | $55,935,154.00 | $401,869,625.24 |
Texas | 2024523 | BRIDGE REPLACEMENT ON IH 35 | $33,269,352.86 | $37,209,207.49 |
Texas | 2024529 | INTERSTATE DESIGNATION ON US 77 | $223,326,108.66 | |
Texas | 2024530 | WIDEN ROAD - ADD LANES ON SL 1604 | $120,573,958.95 | $151,782,404.55 |
Texas | 2024535 | HIGHWAY IMPROVEMENT ON IH 20 | $54,727,927.16 | |
Texas | 2024536 | HIGHWAY IMPROVEMENT ON IH 20. | $55,378,008.73 | |
Texas | 2024562 | WIDEN ROAD - ADD LANES ON IH 20 | $172,434,852.18 | |
Texas | 2024576 | WIDEN ROAD - ADD LANES ON US 77 | $111,893,032.31 | |
Texas | 2024654 | PREVENTIVE MAINTENANCE ON IH 10 | $32,169,722.33 | |
Texas | 2024691 | CONSTRUCT NEW ROADWAY LANES ON US 75. | $90,378,794.13 | |
Texas | 2024696 | SURFACING AND ROADWAY RESTORATION ON SH 123 | $4,653,346.58 | $42,990,133.92 |
Texas | 2024737 | INTERCHANGE IMPROVEMENT ON IH 35 EAST. | $86,013,938.76 | $95,795,606.94 |
Texas | 2024738 | INTERCHANGE IMPROVEMENT ON IH 35 EAST. | $52,141,770.55 | $65,198,166.62 |
Texas | 2024766 | WIDEN ROAD - ADD LANES ON US 82 | $29,345,972.59 | $36,697,102.27 |
Texas | 2024806 | CONSTRUCT NEW ROAD ON IH 27 | $54,095,072.87 | $60,105,636.53 |
Texas | 2024821 | INFRASTRUCTURE IMPROVEMENT ON DURHAM. | $63,460,816.49 | |
Texas | 2024833 | WIDEN ROAD AND ADD LANES ON IH 35. | $90,804,119.14 | $620,788,259.66 |
Texas | 2024845 | WIDEN ROAD - ADD LANES ON IH 35 | $152,823,910.58 | $316,897,343.97 |
Texas | 2024849 | CONSTRUCT NEW ROAD ON SL 363 | $48,282,313.10 | $60,402,552.19 |
Texas | 2024864 | CONSTRUCT NEW ROAD ON IH 27 | $237,063,775.13 | $296,753,374.10 |
Texas | 2024922 | BRIDGE REPLACEMENT ON US 287 | $22,986,609.57 | $28,864,601.97 |
Texas | 2024944 | INTERCHANGE IMPROVEMENT ON IH 35. | $447,068,750.15 | $560,808,176.52 |
Texas | 2024979 | WIDEN ROAD - ADD LANES ON IH 10 | $480,295,259.66 | $618,589,643.14 |
Texas | 2024994 | HIGHWAY IMPROVEMENT, CONSTRUCT RAMPS ON IH 20 AND IH 30 | $99,356,088.43 | $110,978,891.44 |
Texas | 2025009 | WIDEN ROAD - ADD LANES ON IH 69 | $133,731,165.00 | $474,493,113.79 |
Texas | 2025020 | REHABILITATE EXISTING ROADWAY ON SH 43 | $28,805,194.05 | |
Texas | 2025038 | CONSTRUCT BRIDGE ON IH 69 | $69,001,480.53 | |
Texas | 2025041 | WIDEN ROAD - ADD LANES ON SH 105 | $37,767,925.60 | $56,597,611.28 |
Texas | 2025042 | WIDEN ROAD AND ADD LANES ON SL 336 | $25,965,668.38 | $40,807,680.86 |
Texas | 2025050 | WIDEN ROAD - ADD LANES AND SHOULDERS ON US 82 | $103,031,709.53 | |
Texas | 2025066 | WIDEN ROAD - ADD LANES ON US 75 | $112,518,753.37 | |
Texas | 2025079 | CONSTRUCT NEW ROAD ON US 190. | $69,637,374.70 | |
Texas | 2025143 | WIDEN ROAD - ADD LANES ON SH 105 | $26,132,313.09 | |
Texas | 2025144 | CONSTRUCTION NEW ROAD ON IH 35 | $271,825,936.67 | |
Texas | 2025159 | BRIDGE REPLACEMENT ON US 59. | $28,491,656.28 | |
Texas | 2025211 | INTERCHANGE IMPROVEMENT ON SL 20. | $44,610,442.63 | |
Texas | 2025216 | CONSTRUCT BRIDGE ON US 90. | $29,118,192.22 | $36,397,740.29 |
Texas | 2025218 | FERRY OPERATION PROJECTS ON SH87. | $30,650,945.00 | $51,455,133.15 |
Texas | 2025323 | DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS ALONG IH 35 TO COLORADO RIVER. | $307,572,519.06 | |
Texas | 2B20004 | CONSTRUCT SUPER 2, GRADING, BASE, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKING ON US 281. | $21,058,021.44 | $26,322,526.81 |
Texas | 2B20006 | WIDEN ROAD AND INSTALL SIGNS ON SH 114. | $25,977,982.83 | $35,472,478.54 |
Texas | 2B20010 | INFRASTRUCTURE IMPROVEMENTS ON SL 375 | $33,600,250.88 | $42,000,313.61 |
Texas | 2B20015 | CONSTRUCT NEW ROADWAY LANES ON IH 37. | $14,000,000.00 | $69,791,097.00 |
Texas | 2B20048 | WIDEN ROAD AND ADD LANES ON IH 45 | $78,971,131.75 | $98,859,273.45 |
Texas | 2B20200 | NEW LOCATION FREEWAY AND INTERSECTION IMPROVEMENTS ON AVONDALE-HASLET ROAD, HASLET PARKWAY AND FM 156. | $33,556,556.01 | $49,088,603.58 |
Texas | 2B20250 | HIGWAY IMPROVEMENT ON SH 302. | $9,000,000.00 | $47,343,520.93 |
Texas | 2B20255 | WIDEN ROAD (ADD LANES) ON FM 2478. | $23,494,713.75 | $29,368,392.19 |
Texas | 2B20260 | SH 121 - CONSTRUCT NEW ROADWAY LANES. | $68,469,120.00 | $101,958,550.50 |
Texas | 2B20290 | WIDEN ROAD AND ADD LANES ON US 190. | $210,051,052.14 | |
Texas | 2B22010 | HIGHWAY IMPROVEMENT ON SH 128. | $29,560,475.28 | $36,950,594.10 |
Texas | 2B22018 | INTERCHANGE IMPROVEMENT ON IH 30. CONSTRUCT NEW ROAD ON IH30. BRIDGE REPLACEMENT ON IH30 | $24,446,874.57 | $146,504,004.18 |
Texas | 2B23020 | BRIDGE REPLACEMENT ON IH 20. | $21,081,810.38 | $26,405,262.98 |
Texas | 2B23042 | BRIDGE REPLACEMENT ON IH 27 | $21,869,565.96 | $27,549,034.45 |
Texas | 2B23048 | WIDEN ROAD - ADD LANES ON US 75 | $160,231,110.14 | $203,370,315.87 |
Texas | 2B23079 | WIDEN ROAD AND ADD LANES ON US 59 AND US 77. | $48,194,600.59 | $60,462,098.74 |
Texas | 2B23121 | WIDEN ROAD AND ADD LANES ON SH 72. | $12,058,257.42 | $63,299,973.20 |
Texas | 2B23122 | CONSTRUCT TRADE PROCESSING CENTER ON CR 31. | $21,031,325.00 | $36,531,325.00 |
Texas | 2B23149 | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59 | $43,451,479.35 | $54,395,679.43 |
Texas | 2B23150 | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) ON US 59 | $77,384,315.57 | $96,840,785.05 |
Texas | 2B23151 | RECONSTRUCT EXISTING ROADWAY ON US 59 | $99,989,233.38 | $118,868,594.54 |
Texas | 2B23204 | BRIDGE REPLACEMENT ON US 190 | $20,053,454.39 | $25,066,817.99 |
Texas | 2B23273 | WIDEN ROAD - ADD LANES -ON SH 359 | $8,963,056.20 | $53,754,179.56 |
Texas | 2B23276 | BRIDGE REPLACEMENT ON IH 20. | $35,231,147.94 | $44,038,934.92 |
Texas | 2B23294 | SEAL COAT ON US 87,SH 354,BI 40D,US 60,US 385,IH 40,SH 207,SH 70,SH 15,SH 136,FM 119,FM 293,FM 1913,FM 2219, AND RM 2381 | $23,030,416.83 | $28,788,021.02 |
Texas | 2B24013 | PREVENTIVE MAINTENANCE ON US 67 | $59,538,855.38 | |
Texas | 2B24041 | CONSTRUCT NEW ROAD ON SH 84 | $27,099,609.29 | $158,974,336.71 |
Texas | 2B24070 | CONSTRUCT REST AREA ON IH 10 | $31,829,861.40 | $39,804,593.61 |
Texas | 2B24071 | REHABILITATE EXISTING ROADWAY ON SH 4 | $21,902,189.66 | $27,391,472.78 |
Texas | 2B24072 | RECONSTRUCT EXISTING ROADWAY ON SH 285 | $31,143,553.75 | $38,929,442.19 |
Texas | 2B24073 | BRIDGE REPLACEMENT ON SH 35. | $16,189,607.29 | $30,290,611.90 |
Texas | 2B24075 | WIDEN LANES - ADD LANES ON IH 10. | $135,566,274.00 | $171,196,640.26 |
Texas | 2B24092 | HIGHWAY IMPROVEMENT ON SH 71. | $31,219,855.64 | $39,176,130.62 |
Texas | 2B24096 | CONSTRUCT NEW ROAD ON IH 10 | $104,471,200.99 | $130,919,251.53 |
Texas | 2B24119 | CONSTRUCT RAMPS ON SH 358. | $38,713,037.92 | $48,531,221.79 |
Texas | 2B24168 | WIDEN ROAD AND ADD LANES ON SL 1604 | $47,775,633.00 | $181,383,784.89 |
Texas | 2B24195 | WIDEN ROAD - ADD LANES ON US 83 | $34,001,635.42 | $42,547,136.50 |
Texas | 2B24205 | CONSTRUCT TWIN SPAN BRIDGE ON TL 23. | $1,600,000.00 | $65,596,725.19 |
Texas | 2B24247 | WIDEN ROAD -ADD LANES ON IH 10. | $198,744,950.05 | $248,856,821.64 |
Texas | 2B24253 | DRAINAGE IMPROVEMENTS ON IH 35 | $414,321,368.39 | |
Texas | 2B24256 | CONVERT NON-FREEWAY ON SH 286. | $84,890,837.28 | |
Texas | 2B24270 | WIDEN ROAD - ADD LANES ON US 80. | $258,807.20 | $306,534,112.67 |
Texas | 2B24271 | INTERCHANGE IMPROVEMENT ON IH 635. | $189,905,350.69 | |
Texas | 2B24273 | INFRASTRUCTURE IMPROVEMENTS ON SH 178 | $35,270,086.09 | $245,476,488.70 |
Texas | 2B24277 | CONSTRUCT BRIDGE ON US 83 | $23,773,486.75 | $29,716,858.44 |
Texas | 2B24288 | SURFACING AND ROADWAY RESTORATION ON SH 73. | $23,809,051.38 | $29,761,314.23 |
Texas | 2B24314 | INTERSTATE DESIGNATION ON US 77. | $124,758,900.77 | |
Texas | 2B24398 | INTERSTATE DESIGNATION ON US 77. | $47,733,046.68 | |
Texas | 2B24429 | CONSTRUCT BRIDGE ON US 90 | $25,198,115.86 | $31,613,735.72 |
Texas | 2B24547 | INFRASTRUCTURE IMPROVEMENTS ON IH 410 | $120,954,097.39 | |
Texas | NBIS019 | STATEWIDE INVENTORY AND INSPECTION OF ON AND OFF-SYSTEM BRIDGES FOR FISCAL YEARS 2019 AND 2020 | $52,800,000.00 | $66,000,000.00 |
Texas | NBIS023 | FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - OFF SYSTEM | $27,950,000.00 | $34,937,500.00 |
Texas | SB97001 | STATEWIDE, STATE INFRASTRUCTURE BANK-ADV CAP. | $99,562,057.00 | $285,168,019.00 |
Texas | X597001 | US 181; FROM N. OF THE CORPUS CHRISTI SHIP CHANNEL TO S. OF THE CORPUS CHRISTI SHIP CHANNEL. CONST NEW HARBOR BR OVER SHIP CHANNEL | $738,423,258.92 | $870,451,051.54 |