RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Texas | 0095022-02 | Tarrant | >= 200,000 | Local | CONGESTION AIR QUALITY | Transit | $21,301,440.00 | $26,626,800.00 |
Texas | 0108184 | Orange | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,596,270.95 | $41,805,542.72 |
Texas | 0108184 | Orange | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,017,361.98 | $1,130,402.20 |
Texas | 0108184 | Orange | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,665,297.18 | $1,850,330.20 |
Texas | 0108184 | Orange | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,801,030.26 | $10,733,339.81 |
Texas | 0303125 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $34,084,564.63 | $42,605,705.79 |
Texas | 0303125 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,644,657.32 | $10,805,821.65 |
Texas | 0303125 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $12,604,239.45 | $15,133,493.75 |
Texas | 0354235 | Bell | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $39,396,099.60 | $43,773,444.00 |
Texas | 0354235 | Falls | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $24,433,277.40 | $27,148,086.00 |
Texas | 0354235 | McLennan | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $27,981,052.03 | $31,090,058.00 |
Texas | 0354235 | Falls | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge New Construction | $4,848,975.00 | $5,387,750.00 |
Texas | 0354235 | Falls | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | $460,880.73 | $512,089.70 |
Texas | 0354235 | McLennan | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | $2,297,981.70 | $2,553,313.00 |
Texas | 0354235 | Bell | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | $4,147,926.57 | $4,608,807.30 |
Texas | 0354235 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $124,192.41 | $137,991.57 |
Texas | 0354235 | Falls | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $21,275.62 | $26,594.53 |
Texas | 0354235 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $207,237.93 | |
Texas | 0354235 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $201,142.70 | |
Texas | 0354235 | Falls | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $201,142.70 | |
Texas | 0354235 | Falls | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $455,104.80 | $568,881.00 |
Texas | 0354235 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | $1,161,477.60 | $1,451,847.00 |
Texas | 0354235 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | $724,884.00 | $906,105.00 |
Texas | 0354235 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,339,413.40 | $1,674,266.76 |
Texas | 0354235 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,300,018.90 | $1,625,023.62 |
Texas | 0354235 | Falls | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $12,761,516.84 | $15,951,896.92 |
Texas | 0355152 | Tarrant | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | $1,101,319.52 | $1,376,649.40 |
Texas | 0355152 | Tarrant | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | $4,075.91 | $5,094.89 |
Texas | 0355152 | Tarrant | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $65,000,000.00 | $108,333,333.33 |
Texas | 0355152 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,022,914.16 | $47,803,237.95 |
Texas | 0355152 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,984,524.20 | $3,316,138.00 |
Texas | 0355152 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,289,986.64 | $10,322,207.38 |
Texas | 0355152 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $4,842,681.27 | $6,053,351.59 |
Texas | 0355152 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $33,895,833.99 | $42,369,792.49 |
Texas | 0355152 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $59,051,687.92 | $73,814,609.90 |
Texas | 0355152 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,120,000.00 | $1,400,000.00 |
Texas | 0356438 | Frio | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $7,560,000.00 | $9,450,000.00 |
Texas | 0356438 | Denton | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $103,678,123.96 | $129,906,072.90 |
Texas | 0356438 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $8,041,876.04 | $10,058,756.24 |
Texas | 0356438 | Denton | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | 4R - Added Capacity | $981,821.09 | $981,821.09 |
Texas | 0356438 | Dallas | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | 4R - Added Capacity | $2,106.91 | $2,106.91 |
Texas | 0356438 | Dallas | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,526,949.00 | $1,908,686.00 |
Texas | 0356438 | Denton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $4,081,311.00 | $5,101,639.00 |
Texas | 0356438 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,189,964.06 | $60,237,455.32 |
Texas | 0356438 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $46,324,910.38 | $57,906,137.73 |
Texas | 0356438 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $442,905.89 | $553,632.37 |
Texas | 0356438 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,696,781.40 | $2,120,976.74 |
Texas | 0356438 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,851,554.32 | $7,314,442.91 |
Texas | 0356438 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $283,323.59 | $354,154.48 |
Texas | 0356438 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,641,727.89 | $2,052,159.86 |
Texas | 0356438 | Denton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $518,482,709.53 | |
Texas | 0356438 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $14,566,366.94 | $23,538,246.30 |
Texas | 0356438 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,231,650.88 | $1,562,015.29 |
Texas | 0356438 | Denton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,718,479.35 | $5,984,112.07 |
Texas | 0356438 | Denton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $17,060,119.19 | $25,451,399.71 |
Texas | 0356438 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $5,365,384.01 | $6,789,952.14 |
Texas | 0356438 | Denton | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Preliminary Engineering | $6,000,000.00 | $6,000,000.00 |
Texas | 0356438 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,452,884.00 | $5,566,105.00 |
Texas | 0356438 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,473,038.31 | $26,842,140.97 |
Texas | 0356438 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,752,000.00 | $10,940,000.00 |
Texas | 0356438 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $54,899,672.84 | $68,705,094.68 |
Texas | 0356438 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,533,250.48 | $9,416,563.08 |
Texas | 0356438 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,963,449.71 | $6,204,312.16 |
Texas | 0356438 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $7,859,999.61 | $9,824,999.51 |
Texas | 0356438 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $32,361,051.19 | $36,636,051.19 |
Texas | 0451346 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $8,240,000.00 | $10,300,000.00 |
Texas | 0451346 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Special Bridge | $134,667.20 | $168,334.00 |
Texas | 0451346 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,431,663.13 | $4,429,632.24 |
Texas | 0451346 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,670,670.86 | $7,098,294.83 |
Texas | 0451346 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,159,482.16 | $1,449,352.70 |
Texas | 0451346 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,007,885.80 | $5,027,048.49 |
Texas | 1102054 | Bell | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $2,162,115.00 | $2,162,115.00 |
Texas | 1102054 | Bell | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $851,524.04 | $1,426,783.75 |
Texas | 1102054 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,443,687.22 | $5,554,609.03 |
Texas | 1102054 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $66,699.63 | $83,374.54 |
Texas | 1102054 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $328,925.81 | $15,174,980.79 |
Texas | 1102054 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $1,254,509.89 | |
Texas | 1102054 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $2,348,426.00 | |
Texas | 1102319 | Montgomery | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,371,835.69 | $1,714,794.62 |
Texas | 1102319 | Montgomery | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $108,382.70 | $29,563,458.38 |
Texas | 1102493 | Howard | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,303,395.10 | $7,879,243.13 |
Texas | 1102493 | Howard | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $54,434,036.30 | $68,059,746.12 |
Texas | 1102493 | Howard | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,225,000.00 | $2,781,250.00 |
Texas | 1102493 | Glasscock | < 5,000 | Other | SURFACE TRANSPORTATION PROJECT | Preliminary Engineering | $400,125.00 | $400,125.00 |
Texas | 1402016 | Harris | >= 200,000 | Other | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $10,976,520.00 | $22,135,217.79 |
Texas | 1402016 | Harris | >= 200,000 | Other | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $3,067,062.68 | |
Texas | 1402016 | Harris | >= 200,000 | Other | HIGH PRIORITY PROJECT SEC 1702 | Other | $160,000.00 | $200,000.00 |
Texas | 1402016 | Harris | >= 200,000 | Other | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $80,000.00 | $100,000.00 |
Texas | 1402016 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,494,977.00 | $5,618,721.25 |
Texas | 1402081 | Fort Bend | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $15,200,000.00 | $39,240,000.00 |
Texas | 1402081 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $194,975.92 | |
Texas | 1402081 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $45,266,254.42 | $56,628,787.95 |
Texas | 1402081 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,567,228.78 | $23,209,035.98 |
Texas | 1402081 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $527,551.20 | $659,439.00 |
Texas | 1402081 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $36,601,559.51 | $45,751,949.39 |
Texas | 1402081 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $12,831,407.60 | $16,039,259.51 |
Texas | 1402081 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,359,032.88 | $1,698,791.10 |
Texas | 1502464 | Hidalgo | >= 200,000 | State | COORD BORDER INFRA PROGRAM | Bridge New Construction | $23,059,694.35 | |
Texas | 1502464 | Hidalgo | >= 200,000 | State | COORD BORDER INFRA PROGRAM | Construction Engineering | $2,280,721.38 | |
Texas | 1502464 | Hidalgo | >= 200,000 | State | COORD BORDER INFRA PROGRAM | New Construction Roadway | $18,612,000.00 | $30,459,584.27 |
Texas | 1502464 | Hidalgo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,199,200.00 | $10,462,748.76 |
Texas | 1502464 | Hidalgo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $800.00 | $776,787.43 |
Texas | 1502521 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $800.00 | $87,439.83 |
Texas | 1502521 | Travis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,947,095.24 | $16,261,025.06 |
Texas | 1502521 | Travis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $507,755.48 | $634,694.35 |
Texas | 1502521 | Travis | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $11,703,165.81 | $53,152,193.26 |
Texas | 1502521 | Travis | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,619,279.11 | $2,024,098.89 |
Texas | 1502521 | Travis | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $171,835.42 | $214,794.27 |
Texas | 1502521 | Travis | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $4,335,988.25 | $5,419,985.42 |
Texas | 1502521 | Travis | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $46,342.61 | $57,928.26 |
Texas | 1502531 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $84,805,805.44 | $111,852,816.80 |
Texas | 1502531 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $61,437.60 | $76,797.00 |
Texas | 1502531 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $12,706,088.45 | $16,025,570.56 |
Texas | 1502531 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,490,697.43 | $14,363,371.79 |
Texas | 1502531 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $5,346,805.60 | $6,683,507.00 |
Texas | 1502531 | Ellis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $341,154.40 | $426,443.00 |
Texas | 1502613 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,419,040.89 | $25,377,413.27 |
Texas | 1502613 | Hays | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $249,380.71 | $311,725.89 |
Texas | 1602247 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $64,332,535.49 | $71,480,594.99 |
Texas | 1602247 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,165,773.16 | $10,184,192.40 |
Texas | 1602259 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $42,259,734.06 | $52,824,667.57 |
Texas | 1602259 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,356,672.43 | $2,945,840.54 |
Texas | 1602427 | Dallas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $239,652.03 | |
Texas | 1602427 | Dallas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,615,812.45 | |
Texas | 1602427 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,265,950.28 | $13,172,682.40 |
Texas | 1602427 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $800.00 | $52,922,069.84 |
Texas | 1602427 | Dallas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $406,288.90 | $507,861.12 |
Texas | 1602427 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $406,288.90 | $507,861.13 |
Texas | 1602427 | Dallas | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | New Construction Roadway | $185,089.00 | $185,089.00 |
Texas | 1602671 | Harris | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,802,655.00 | $97,253,318.00 |
Texas | 1602671 | Harris | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $3,000,000.00 | |
Texas | 1702007 | Waller | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $92,812,358.96 | $116,168,896.68 |
Texas | 1702007 | Waller | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $19,885,947.79 | $24,857,434.74 |
Texas | 1702007 | Waller | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $39,347,887.70 | $49,184,859.62 |
Texas | 1702007 | Waller | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $242,073.87 | |
Texas | 1702007 | Waller | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,302,112.58 | $1,627,640.72 |
Texas | 1702355 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge New Construction | $2,343,556.90 | $2,929,446.13 |
Texas | 1702355 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $13,017,245.19 | $29,771,556.48 |
Texas | 1702355 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,948,975.66 | $11,186,219.58 |
Texas | 1702355 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $18,889.54 | $23,611.93 |
Texas | 1702355 | Dallas | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge New Construction | $81,259.00 | $101,574.00 |
Texas | 1702355 | Dallas | >= 200,000 | State | REPURPOSED SPECIAL | Bridge New Construction | $719,921.00 | $899,901.00 |
Texas | 1702473 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,725,757.40 | $27,097,196.75 |
Texas | 1702473 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,458,558.62 | $4,323,198.28 |
Texas | 1702490 | San Patricio | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,518,425.66 | $25,974,032.08 |
Texas | 1702490 | San Patricio | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,467,813.97 | $3,084,767.45 |
Texas | 1702506 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $64,447,112.28 | $80,558,890.35 |
Texas | 1702506 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $10,286,068.86 | $12,857,586.08 |
Texas | 1702506 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,920,287.08 | $17,400,358.84 |
Texas | 1702506 | Jefferson | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $5,962,172.00 | $7,452,715.00 |
Texas | 1702559 | Harris | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $2,701,893.00 | $3,377,366.25 |
Texas | 1702559 | Harris | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | $4,726,640.73 | $7,558,981.62 |
Texas | 1702559 | Harris | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $10,900,838.43 | $14,452,074.13 |
Texas | 1702626 | Harris | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $6,004,229.34 | $23,047,365.94 |
Texas | 1702626 | Harris | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $3,477,868.72 | $3,864,298.57 |
Texas | 1702631 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $28,860,000.00 | $36,075,000.00 |
Texas | 1702631 | Harris | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $18,172,126.81 | $20,208,448.81 |
Texas | 1702631 | Harris | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $6,813,430.16 | $7,570,477.96 |
Texas | 1702631 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $7,120,000.00 | $8,900,000.00 |
Texas | 1702633 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $38,980,000.00 | $46,222,222.22 |
Texas | 1702633 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $57,568.50 | $63,965.00 |
Texas | 1702633 | Harris | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $52,489,020.72 | $58,321,134.13 |
Texas | 1702633 | Harris | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $10,657,599.84 | $11,841,777.60 |
Texas | 1702650 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $61,783,413.58 | $77,588,237.32 |
Texas | 1702650 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $34,554,105.45 | $38,393,450.50 |
Texas | 1702650 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $421,792.65 | $468,658.50 |
Texas | 1702650 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,921,097.77 | $4,356,775.30 |
Texas | 1702650 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $16,019,161.45 | $17,799,068.28 |
Texas | 1702730 | Denton | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $28,658,195.94 | |
Texas | 1702730 | Denton | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $2,724,755.09 | $4,425,239.76 |
Texas | 1702730 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,726,000.00 | $4,657,500.00 |
Texas | 1702818 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,600,000.00 | $24,096,574.51 |
Texas | 1702818 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,382,897.11 | |
Texas | 1702818 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,196,640.00 | $1,495,800.00 |
Texas | 1702839 | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,500,000.00 | |
Texas | 1702839 | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $134,584,279.02 | $276,441,459.02 |
Texas | 1702839 | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,000,000.00 | $10,000,000.00 |
Texas | 1702839 | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,000,000.00 | $5,000,000.00 |
Texas | 1702842 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $11,854,690.80 | $14,818,363.50 |
Texas | 1702842 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $31,593,309.20 | $39,491,636.50 |
Texas | 1702842 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $197,478,807.54 | $439,932,199.16 |
Texas | 1702842 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,500,000.00 | |
Texas | 1702842 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $18,593,865.79 | $56,320,275.00 |
Texas | 1702842 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,052,420.67 | $1,315,525.84 |
Texas | 1702842 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,694,690.80 | $14,618,363.50 |
Texas | 1702842 | Dallas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,987,805.00 | $12,987,805.00 |
Texas | 1702842 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $400,000.00 | $500,000.00 |
Texas | 1702842 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $31,593,309.20 | $39,491,636.50 |
Texas | 1802175 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,000,000.00 | $21,935,020.41 |
Texas | 1802175 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,013,773.17 | |
Texas | 1802175 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $60,000,000.00 | $61,500,000.00 |
Texas | 1802325 | Upton | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $557,589.91 | $5,954,661.09 |
Texas | 1802325 | Pecos | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,538,900.04 | $37,792,919.28 |
Texas | 1802325 | Crane | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $409,422.19 | $4,372,335.88 |
Texas | 1802325 | Crockett | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $98,055.33 | $1,047,160.72 |
Texas | 1802325 | Crockett | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,100.51 | $43,790.55 |
Texas | 1802325 | Pecos | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $391,932.02 | $4,185,553.42 |
Texas | 1802390 | Comal | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $95,883.86 | $384,046.25 |
Texas | 1802390 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $41,726,914.02 | $167,129,945.53 |
Texas | 1802390 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,258,225.62 | $33,058,923.75 |
Texas | 1802390 | Comal | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,976.50 | $75,965.78 |
Texas | 1802404 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,630,769.14 | $37,038,461.42 |
Texas | 1802404 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,753,079.98 | $3,441,349.98 |
Texas | 1802412 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,677,616.72 | $32,097,020.90 |
Texas | 1802412 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,873,592.83 | $2,341,991.04 |
Texas | 1802412 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $313,915.60 | $392,394.50 |
Texas | 1802413 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $102,838,368.49 | $128,547,960.61 |
Texas | 1802413 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,336,778.31 | $11,670,972.89 |
Texas | 1802439 | La Salle | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $33,053,120.08 | $37,643,854.16 |
Texas | 1802439 | La Salle | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,946,879.92 | $3,356,170.83 |
Texas | 1802497 | Austin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $103,259,110.35 | $292,873,696.83 |
Texas | 1802497 | Austin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $21,740,889.65 | $80,997,127.78 |
Texas | 1802546 | Hood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,937,180.39 | |
Texas | 1802546 | Hood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $2,868,539.46 | $10,462,388.47 |
Texas | 1802546 | Hood | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $37,810,000.00 | $47,262,500.00 |
Texas | 1802552 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,432,012.75 | $1,790,015.94 |
Texas | 1802552 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $42,487,396.00 | $53,109,245.00 |
Texas | 1802552 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,884,184.88 | $2,355,231.09 |
Texas | 1802558 | San Patricio | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,541,330.85 | $1,926,663.56 |
Texas | 1802558 | San Patricio | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $23,534,462.63 | $29,418,078.29 |
Texas | 1902002 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,007,411.95 | $74,487,613.22 |
Texas | 1902002 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,026,681.43 | $12,406,448.56 |
Texas | 1902002 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $965,906.62 | $11,750,000.00 |
Texas | 1902056 | Hidalgo | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $13,381,321.22 | $16,726,651.52 |
Texas | 1902056 | Hidalgo | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | New Construction Roadway | $76,430,627.93 | $95,737,129.58 |
Texas | 1902056 | Hidalgo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,406,014.41 | $1,757,518.01 |
Texas | 1902056 | Hidalgo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $800.00 | $294,933.34 |
Texas | 1902057 | Comal | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $62,264,504.41 | $69,259,654.93 |
Texas | 1902057 | Comal | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,053,747.50 | $6,726,386.11 |
Texas | 1902063 | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $139,721.82 | $174,715.02 |
Texas | 1902063 | Guadalupe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $19,954,455.73 | $24,952,030.56 |
Texas | 1902063 | Guadalupe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,678,963.46 | $2,098,704.33 |
Texas | 1902063 | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,756.16 | $14,695.20 |
Texas | 1902081 | Nacogdoches | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $22,555,674.19 | $28,195,592.74 |
Texas | 1902081 | Nacogdoches | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $930,869.94 | $8,146,095.39 |
Texas | 1902081 | Nacogdoches | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $36,954,255.86 | $56,286,643.61 |
Texas | 1902105 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $118,118,310.57 | $148,345,231.62 |
Texas | 1902105 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $14,059,773.66 | $17,574,717.07 |
Texas | 1902105 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,635,319.96 | $13,294,149.95 |
Texas | 1902107 | Refugio | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,497,333.47 | $4,973,416.48 |
Texas | 1902107 | Goliad | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $15,854,191.95 | $21,968,350.40 |
Texas | 1902107 | Refugio | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $39,590.97 | $42,729.82 |
Texas | 1902107 | Goliad | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,608,883.61 | $1,736,439.36 |
Texas | 1902182 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,174,791.10 | $2,718,488.88 |
Texas | 1902182 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $23,357,043.57 | $29,266,986.96 |
Texas | 1902182 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $8,939.20 | $11,174.00 |
Texas | 1902201 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $160,047,323.57 | $202,394,982.82 |
Texas | 1902201 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $66,085,189.12 | $82,606,486.40 |
Texas | 1902201 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $19,951,872.72 | $24,939,840.90 |
Texas | 1902201 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $25,069,816.36 | $31,337,270.45 |
Texas | 1902201 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $344,468.80 | $430,586.00 |
Texas | 1902215 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $126,345.37 | $1,814,666.03 |
Texas | 1902215 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $3,082,255.76 | |
Texas | 1902215 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | New Construction Roadway | $64,000,000.00 | $80,000,000.00 |
Texas | 1902222 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,202,249.52 | $24,332,390.67 |
Texas | 1902222 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,483,832.02 | $1,775,211.26 |
Texas | 1902268 | Grayson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $887,944.27 | $1,109,930.34 |
Texas | 1902268 | Grayson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $112,055.73 | $140,069.66 |
Texas | 1902268 | Grayson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,836,160.96 | $30,545,201.20 |
Texas | 1902268 | Grayson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,441,161.61 | $3,602,313.34 |
Texas | 1902268 | Grayson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $105,000.00 | |
Texas | 1902299 | Jim Wells | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,024,763.60 | $10,030,954.50 |
Texas | 1902299 | Jim Wells | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,176,421.29 | $7,720,526.61 |
Texas | 1902299 | Jim Wells | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $52,546,264.38 | $65,682,830.48 |
Texas | 1902314 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $66,863,824.66 | $83,754,839.91 |
Texas | 1902314 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $8,940,934.76 | $11,176,168.45 |
Texas | 1902314 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $753,575.05 | $941,968.81 |
Texas | 1902314 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,934,097.76 | $4,917,622.20 |
Texas | 1902343 | Galveston | >= 200,000 | State | FERRY BOATS & TERMINAL | Other | $21,874,049.60 | $27,342,562.00 |
Texas | 1902389 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $20,000,000.00 | $25,000,000.00 |
Texas | 1902389 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $505,129.00 | $631,411.25 |
Texas | 1902389 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $6,647,130.45 | $8,308,913.06 |
Texas | 1902389 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $209,676,386.50 | $409,580,492.10 |
Texas | 1902389 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $666,970,187.71 | $797,050,878.60 |
Texas | 1902389 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,307,960.14 | $10,191,398.52 |
Texas | 1902389 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $74,116,619.38 | $220,034,830.42 |
Texas | 1902389 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $65,549,616.59 | $201,949,913.04 |
Texas | 1902389 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $2,608,898.95 | $3,261,123.69 |
Texas | 1902389 | Dallas | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $125,816.23 | $157,270.29 |
Texas | 1902389 | Dallas | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $45,575.22 | $56,969.03 |
Texas | 1902389 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $35,200,000.00 | $44,000,000.00 |
Texas | 1902417 | Hidalgo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $126,876,234.24 | $268,241,240.59 |
Texas | 1902417 | Hidalgo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,713,540.50 | $12,031,056.22 |
Texas | 1902417 | Hidalgo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,523,632.84 | $18,700,482.98 |
Texas | 1902417 | Hidalgo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $332,857.18 | $1,078,384.21 |
Texas | 1996001 | Statewide | N/A | N/A | ST INFR BANK PILOT - ADV CAP | Other | $102,804,452.00 | |
Texas | 1996001 | Statewide | N/A | N/A | ST INFRA BANK PILOT-SUB TO LIM | Other | $71,726,747.00 | $89,658,434.00 |
Texas | 2000401 | Nolan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,322,240.55 | $4,152,800.69 |
Texas | 2000401 | Nolan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $42,190,634.04 | $52,738,292.55 |
Texas | 2002040 | Dallas | >= 200,000 | State | BRIDGE REPLAC & REHAB - DISC | Preliminary Engineering | $1,738,625.00 | $2,173,280.00 |
Texas | 2002040 | Dallas | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | Right of Way | $7,871,426.00 | $7,871,426.00 |
Texas | 2002040 | Dallas | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $20,029,501.00 | $25,036,875.00 |
Texas | 2002040 | Dallas | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | $1,000,000.00 | $1,111,111.11 |
Texas | 2002040 | Dallas | >= 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $5,395,000.00 | $5,994,442.78 |
Texas | 2002040 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $200,000.00 | $250,000.00 |
Texas | 2002632 | Hidalgo | >= 200,000 | Other | BORDER CROSSINGS PROG. CN,NM | Construction Engineering | $3,020,194.00 | $3,020,194.00 |
Texas | 2002632 | Hidalgo | >= 200,000 | Other | BORDER CROSSINGS PROG. CN,NM | Other | $12,208,539.08 | $12,208,539.08 |
Texas | 2002632 | Hidalgo | >= 200,000 | Other | BORDER CROSSINGS PROG. CN,NM | Preliminary Engineering | $298,733.00 | $298,733.00 |
Texas | 2002632 | Hidalgo | >= 200,000 | Other | MISC HWY & HWY SAFTY PROG | Other | $5,121,236.12 | $5,121,236.12 |
Texas | 2002632 | Hidalgo | >= 200,000 | Other | NAT COR PL DV/COOR BDR INF-TEA | Other | $11,683,700.00 | $14,604,625.00 |
Texas | 2002632 | Hidalgo | >= 200,000 | Other | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | $358,643.36 | $448,304.20 |
Texas | 2002632 | Hidalgo | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $455,411.20 | $569,264.00 |
Texas | 2005862 | Wichita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $17,615,525.00 | |
Texas | 2005862 | Wichita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,027,983.00 | |
Texas | 2005862 | Wichita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,496,201.00 | |
Texas | 2005994 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $50,000,000.00 | $62,500,000.01 |
Texas | 2005994 | Dallas | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | 4R - Added Capacity | $1,475,892.00 | $1,475,892.00 |
Texas | 2005994 | Dallas | >= 200,000 | State | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | $2,094,750.00 | $2,618,437.50 |
Texas | 2005994 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,404,165.01 | $5,505,206.26 |
Texas | 2005994 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $54,149,173.87 | $565,437,250.32 |
Texas | 2005994 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $82,769,667.35 | $103,462,046.18 |
Texas | 2005994 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,495,830.00 | $3,119,788.00 |
Texas | 2005994 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $58,807,540.60 | $73,509,425.75 |
Texas | 2005994 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $89,963,285.12 | $112,454,106.40 |
Texas | 2007405 | Montgomery | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $1,057,573.22 | $1,321,966.52 |
Texas | 2007405 | Montgomery | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $942,426.78 | $1,178,033.48 |
Texas | 2007405 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,258,992.00 | $27,623,862.46 |
Texas | 2007405 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $12,775,523.63 | $15,969,407.54 |
Texas | 2007512 | Harris | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $39,573,017.00 | |
Texas | 2007512 | Harris | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $235,187.00 | |
Texas | 2007512 | Harris | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $351,264.69 | $444,638.85 |
Texas | 2007688 | Montgomery | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $512,981.70 | $11,442,156.08 |
Texas | 2007688 | Montgomery | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge New Construction | $135,461.10 | $169,326.37 |
Texas | 2007688 | Montgomery | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $151,557.20 | $189,446.50 |
Texas | 2007688 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,759,256.84 | $2,199,071.05 |
Texas | 2007688 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,144,894.27 | $17,742,957.84 |
Texas | 2007688 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $851,378.51 | $1,064,223.14 |
Texas | 2007688 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $952,543.16 | $1,190,678.95 |
Texas | 2007717 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $23,735,630.68 | $32,879,901.39 |
Texas | 2007717 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,290,840.45 | $3,268,469.65 |
Texas | 2007869 | El Paso | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $11,538,881.00 | $14,423,601.00 |
Texas | 2007869 | El Paso | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,280,000.00 | $1,600,000.00 |
Texas | 2007869 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $74,000,000.00 | $92,500,000.00 |
Texas | 2007869 | El Paso | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $15,000,000.00 | $18,750,000.00 |
Texas | 2007869 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $21,901,119.00 | $37,376,399.00 |
Texas | 2007869 | El Paso | >= 200,000 | Other | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $11,542,253.70 | $14,427,817.12 |
Texas | 2007869 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $29,853,212.78 | $37,316,515.98 |
Texas | 2007869 | El Paso | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $79,518,953.07 | $142,955,666.90 |
Texas | 2007886 | Dallas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $172,800.00 | $2,063,453.76 |
Texas | 2007886 | Dallas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $9,522,309.60 | $11,902,887.00 |
Texas | 2007886 | Dallas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $3,744,090.40 | $22,309,648.02 |
Texas | 2007886 | Dallas | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,369,388.00 | $1,711,735.50 |
Texas | 2007913 | Hays | >= 200,000 | Other | EQUITY BONUS EXEMPT LIM | Construction Engineering | $974,690.75 | $1,218,363.44 |
Texas | 2007913 | Hays | >= 200,000 | Other | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $4,115,840.97 | $5,144,801.21 |
Texas | 2007913 | Hays | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $7,664,751.00 | $9,580,938.75 |
Texas | 2007913 | Hays | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,350,000.00 | $2,937,500.00 |
Texas | 2007913 | Hays | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,157,387.26 | $1,446,734.08 |
Texas | 2007913 | Hays | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,826,141.86 | $2,520,312.54 |
Texas | 2007913 | Hays | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,342,612.74 | $6,678,265.92 |
Texas | 2007913 | Hays | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,983,807.52 | $12,205,626.64 |
Texas | 2008345 | Tarrant | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Restoration & Rehabilitation | $5,129,440.00 | $6,411,800.00 |
Texas | 2008345 | Tarrant | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $4,667,165.40 | |
Texas | 2008345 | Tarrant | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,280,000.00 | $1,600,000.00 |
Texas | 2008345 | Tarrant | >= 200,000 | State | HIGHWAY PRIORITY PROJECTS | Bridge New Construction | $1,980,000.00 | $1,980,000.00 |
Texas | 2008345 | Tarrant | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - Restoration & Rehabilitation | $1,715,000.00 | $1,715,000.00 |
Texas | 2008345 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $22,858,936.80 | $28,573,671.00 |
Texas | 2008345 | Tarrant | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | 4R - Restoration & Rehabilitation | $136,911.00 | $136,911.00 |
Texas | 2008345 | Tarrant | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | Bridge New Construction | $3,882,662.00 | $3,882,662.00 |
Texas | 2008654 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,986,763.38 | $13,658,795.01 |
Texas | 2008654 | Williamson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,144,477.01 | $5,180,596.26 |
Texas | 2008654 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $811,835.21 | $866,160.52 |
Texas | 2008654 | Williamson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $95,625.85 | $119,532.31 |
Texas | 2008654 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $2,571,714.14 | $7,208,434.49 |
Texas | 2008654 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $255,510.26 | $1,602,922.69 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $11,881,239.93 | $14,851,549.92 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | Other | EQUITY BONUS SP LIMITATION | Bridge New Construction | $1,287,962.10 | $1,609,952.63 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | Other | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $273,767.59 | $342,209.49 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | Other | EQUITY BONUS SP LIMITATION | Construction Engineering | $1,945,169.72 | $2,431,462.15 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,994,531.83 | $12,912,643.89 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $250,865.66 | $751,496.63 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $339,484.54 | |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $69,515.71 | $302,314.51 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $493,922.07 | $2,079,548.80 |
Texas | 2008830 | Parker | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $68,452.15 | |
Texas | 2009235 | Galveston | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,667,105.16 | $20,833,881.45 |
Texas | 2009235 | Galveston | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,375,091.14 | $6,032,450.55 |
Texas | 2009513 | Tarrant | >= 200,000 | State | ARRA AMERICAN RECOV & REINV AC | 4R - Added Capacity | $260,816,297.00 | $260,816,297.00 |
Texas | 2009513 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,289,492.06 | $30,580,855.90 |
Texas | 2009513 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $318,844,068.84 | $400,996,980.10 |
Texas | 2009513 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,200,000.00 | $4,000,000.00 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | HIGH PRIORITY PROJECT SEC 1702 | Other | $3,204,720.00 | $4,005,900.00 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | MINIMUM ALLOCATION-EXEMPT 90% | Other | $0.03 | $0.04 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | $100,563.78 | $125,704.72 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | MINIMUM GUARANTEE - TEA-21 | Other | $869,314.22 | $1,086,642.77 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $38,600,999.68 | $48,251,249.51 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Other | $333,682,741.71 | $417,103,427.14 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,971,987.67 | $2,464,984.58 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | REDISTRIBUTION OF CERTAIN AUTH | Other | $17,046,663.50 | $21,308,329.38 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $21,863,186.87 | $27,328,983.59 |
Texas | 2009753 | Tarrant | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Other | $174,199,076.84 | $217,748,846.05 |
Texas | 2009919 | Tarrant | >= 200,000 | State | EQUITY BONUS - CHARGED TO LIM | 4R - Added Capacity | $91,673,876.77 | $114,592,345.96 |
Texas | 2009919 | Tarrant | >= 200,000 | State | EQUITY BONUS - CHARGED TO LIM | Construction Engineering | $11,035,486.80 | $13,794,358.50 |
Texas | 2009919 | Tarrant | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,602,360.00 | $2,002,950.00 |
Texas | 2009919 | Tarrant | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | $2,121,589.00 | $2,357,320.56 |
Texas | 2009919 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $892,556.18 | $1,115,695.22 |
Texas | 2009919 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $107,443.82 | $134,304.78 |
Texas | 2009919 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,891,312.08 | $17,364,140.10 |
Texas | 2009919 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $263,671,612.26 | $329,589,515.32 |
Texas | 2009919 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $36,109,379.36 | $45,136,724.20 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $1,922,061.00 | $2,402,576.25 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,812,182.48 | $4,444,147.44 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,932,864.91 | $6,005,272.74 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $21,352,375.49 | $25,672,483.44 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $1,906,846.04 | $11,100,680.66 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $960,970.11 | $1,780,119.54 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,549,648.80 | $1,937,061.00 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $6,053,755.78 | $20,659,781.88 |
Texas | 2011591 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $11,080,015.49 | $13,850,019.36 |
Texas | 2011998 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $23,357,572.00 | $29,381,623.00 |
Texas | 2011998 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,308,201.00 | $48,287,341.00 |
Texas | 2011998 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $37,569,866.00 | |
Texas | 2011998 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $424,472.00 | |
Texas | 2011998 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $32,155,797.00 | |
Texas | 2011998 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $23,217,305.00 | |
Texas | 2012125 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,784,256.30 | $10,085,013.63 |
Texas | 2012125 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,861,871.20 | $18,577,339.00 |
Texas | 2012125 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,138,128.80 | $3,184,329.00 |
Texas | 2012125 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,681,166.00 | |
Texas | 2012221 | Cameron | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,027,792.33 | $14,759,438.00 |
Texas | 2012221 | Cameron | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,882,342.00 | |
Texas | 2012221 | Cameron | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,272,207.67 | $16,853,986.00 |
Texas | 2012232 | Travis | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | $983,928.00 | $983,928.00 |
Texas | 2012232 | Travis | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,403,540.00 | $3,004,425.00 |
Texas | 2012232 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,036,812.91 | $79,464,148.74 |
Texas | 2012232 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,103,500.23 | $28,875,241.54 |
Texas | 2012232 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,970,000.00 | $2,462,500.00 |
Texas | 2012232 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,655,072.77 | $18,893,630.26 |
Texas | 2012232 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,624,000.00 | $3,280,000.00 |
Texas | 2012232 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $7,692,000.00 | $9,615,000.00 |
Texas | 2012594 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $70,439,967.14 | $97,826,928.18 |
Texas | 2012594 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,560,032.86 | $14,662,475.67 |
Texas | 2012594 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,805,000.00 | $2,256,250.00 |
Texas | 2012594 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,300,000.00 | $5,375,000.00 |
Texas | 2012691 | Bell | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | $21,472,132.45 | $26,840,166.00 |
Texas | 2012691 | Bell | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $74,168,610.45 | $83,051,910.17 |
Texas | 2012691 | Bell | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $5,069,908.80 | $5,900,767.00 |
Texas | 2012691 | Bell | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $22,721,967.00 | $25,246,630.00 |
Texas | 2012691 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $36,507,513.31 | $40,563,907.00 |
Texas | 2012691 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,141,337.92 | $1,426,672.40 |
Texas | 2012691 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $40,550,807.06 | $52,688,508.83 |
Texas | 2012691 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $17,583,153.60 | $21,978,941.60 |
Texas | 2012691 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | $12,189,706.00 | $15,237,132.60 |
Texas | 2012691 | Bell | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $2,344,868.00 | $2,931,085.00 |
Texas | 2012805 | Dallas | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $3,488,000.00 | $4,360,000.00 |
Texas | 2012805 | Dallas | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Rail/Hwy Crossing | $918,490.00 | $1,148,112.50 |
Texas | 2012805 | Dallas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,923,299.76 | $18,968,687.49 |
Texas | 2012805 | Dallas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $167,125.00 | |
Texas | 2012805 | Dallas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $2,046,700.24 | $2,558,375.30 |
Texas | 2013136 | Harris | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $1,578,835.00 | |
Texas | 2013136 | Harris | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $7,338,252.80 | $9,172,816.00 |
Texas | 2013136 | Harris | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $503,311.20 | $629,139.00 |
Texas | 2013136 | Harris | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $4,211,176.00 | $5,263,970.00 |
Texas | 2013136 | Harris | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $15,079,353.21 | $17,701,898.20 |
Texas | 2013136 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $41,197,319.20 | $51,496,649.00 |
Texas | 2013136 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $30,802,680.80 | $38,503,351.00 |
Texas | 2013163 | Harris | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Other | $180,000.00 | $225,000.00 |
Texas | 2013163 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $65,897,897.94 | $82,640,085.00 |
Texas | 2013163 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,048,943.57 | $1,311,179.46 |
Texas | 2013163 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $6,154,620.80 | $7,693,276.00 |
Texas | 2013163 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $11,903,645.60 | $14,879,557.00 |
Texas | 2013218 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,704,886.29 | $2,131,107.86 |
Texas | 2013218 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,164,823.23 | $1,456,029.04 |
Texas | 2013218 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $5,130,290.48 | $6,650,363.10 |
Texas | 2013218 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,137,000.00 | $159,060,786.00 |
Texas | 2013218 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,100,000.00 | $2,625,000.00 |
Texas | 2013221 | Polk | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,762,082.62 | $19,256,528.43 |
Texas | 2013221 | Polk | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $237,917.38 | $80,026,249.64 |
Texas | 2013221 | Polk | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $813,685.77 | $1,892,013.41 |
Texas | 2013226 | Orange | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $7,387,316.19 | $9,234,145.07 |
Texas | 2013226 | Orange | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,552,467.52 | $8,190,584.40 |
Texas | 2013226 | Orange | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,006,241.67 | $2,507,802.09 |
Texas | 2013226 | Orange | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $49,097.79 | $61,372.24 |
Texas | 2013226 | Orange | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $8,583,000.00 | $10,728,750.00 |
Texas | 2013292 | Dallas | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,602,360.00 | $2,002,950.00 |
Texas | 2013292 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $52,582,072.43 | $61,861,261.68 |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,000.00 | |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $180,957,847.14 | $308,645,198.95 |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $24,281,544.88 | $42,651,543.18 |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $83,120,814.50 | $104,385,271.54 |
Texas | 2013292 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,197,496.07 | $1,388,595.55 |
Texas | 2013292 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,438,228.20 | $14,402,475.82 |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,601,947.05 | $25,918,069.60 |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $213,138,274.68 | $245,789,296.51 |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $181,177.20 | $181,177.20 |
Texas | 2013292 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $850,000.00 | $850,000.00 |
Texas | 2013292 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $850,000.00 | $850,000.00 |
Texas | 2013292 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $420,000.00 | $525,000.00 |
Texas | 2013400 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,227,987.01 | $24,758,361.80 |
Texas | 2013400 | Bowie | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $22,007.40 | $73,015.00 |
Texas | 2013400 | Bowie | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $742,262.06 | $2,462,637.60 |
Texas | 2013420 | Hidalgo | >= 200,000 | Other | BORDER STATE INFRASTRUCTURE | New Construction Roadway | $4,462,757.00 | $4,462,757.00 |
Texas | 2013420 | Hidalgo | >= 200,000 | Other | COORD BORDER INFRA PROGRAM | New Construction Roadway | $22,537,243.00 | $22,537,243.00 |
Texas | 2013420 | Hidalgo | >= 200,000 | Other | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | $491,964.00 | $491,964.00 |
Texas | 2013420 | Hidalgo | >= 200,000 | Other | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $801,180.00 | $1,001,475.00 |
Texas | 2013420 | Hidalgo | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $4,963,737.00 | $4,963,737.00 |
Texas | 2013420 | Hidalgo | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $101,557,577.00 | |
Texas | 2013420 | Hidalgo | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $500,000.00 | $20,421,109.00 |
Texas | 2013567 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,989,608.73 | $44,996,333.15 |
Texas | 2013567 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $15,046,705.17 | $15,496,705.17 |
Texas | 2013567 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,600,000.00 | $2,000,000.00 |
Texas | 2013567 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $8,485,146.32 | $8,485,146.32 |
Texas | 2013567 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $190,704.60 | $190,704.60 |
Texas | 2013567 | Harris | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $404,024.22 | |
Texas | 2013596 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $23,053,083.82 | $46,012,151.04 |
Texas | 2013596 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $946,916.18 | $1,494,774.76 |
Texas | 2013596 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $46,844.68 | $58,555.86 |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $19,596,905.00 | |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $56,581,299.10 | |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $15,925,949.84 | $15,925,949.84 |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge New Construction | $23,075,392.24 | $26,367,282.08 |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $3,588,088.40 | $4,485,110.50 |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - No Added Capacity | $9,529,259.34 | $9,529,259.34 |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $6,357,791.89 | $24,577,820.77 |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $22,366,355.67 | $27,957,944.72 |
Texas | 2013740 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Special Bridge | $28,475.20 | $35,594.00 |
Texas | 2013740 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,981,487.46 | $3,981,487.46 |
Texas | 2013740 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,451,958.23 | $2,451,958.23 |
Texas | 2013740 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,382,314.83 | $2,382,314.83 |
Texas | 2013740 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,589,447.97 | $1,589,447.97 |
Texas | 2013874 | Brazoria | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Special Bridge | $14,400,000.00 | $18,000,000.00 |
Texas | 2013874 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $9,543,386.05 | $11,934,402.07 |
Texas | 2013874 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,784,590.22 | $3,480,737.82 |
Texas | 2013875 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,199,488.42 | $3,999,360.52 |
Texas | 2013875 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $13,823,241.54 | $17,279,051.94 |
Texas | 2013875 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,040,000.00 | $1,300,000.00 |
Texas | 2013875 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $11,364,986.40 | $14,206,233.00 |
Texas | 2013983 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,585,452.11 | $76,593,119.95 |
Texas | 2013983 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $8,460,039.00 | $8,460,039.00 |
Texas | 2013983 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,316,582.87 | $13,316,582.87 |
Texas | 2013991 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $73,903,421.09 | |
Texas | 2013991 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Rehabilitation - Added Capacity | $2,264,000.00 | $66,468,565.20 |
Texas | 2013991 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $357,555.29 | |
Texas | 2013991 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $566,000.00 | $13,800,869.54 |
Texas | 2013991 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $27,231,572.71 | |
Texas | 2013996 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,604,481.53 | $8,255,601.91 |
Texas | 2013996 | Bexar | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $924,185.78 | $29,245,398.09 |
Texas | 2014211 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $91,694,207.47 | $113,972,932.44 |
Texas | 2014211 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,912,583.61 | $4,890,729.51 |
Texas | 2014211 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $10,985,052.17 | $13,731,615.21 |
Texas | 2014211 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,490,542.33 | $17,504,753.33 |
Texas | 2014211 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $1,050,269.60 | $1,312,837.00 |
Texas | 2014211 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,800,000.00 | $16,000,000.00 |
Texas | 2014326 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $240,000.00 | $300,000.00 |
Texas | 2014326 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $23,726,629.04 | $29,659,286.30 |
Texas | 2014444 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $28,631,206.13 | $35,789,007.66 |
Texas | 2014444 | Jasper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,992,138.94 | $2,490,173.67 |
Texas | 2014444 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,997,806.48 | $3,747,258.10 |
Texas | 2014444 | Jasper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $208,585.24 | $260,731.55 |
Texas | 2014669 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $3,200,000.00 | $22,843,634.63 |
Texas | 2014669 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,334,289.87 | |
Texas | 2014669 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $868,947.68 | |
Texas | 2014669 | Tarrant | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Bridge New Construction | $3,000,000.00 | $3,750,000.00 |
Texas | 2015062 | Rockwall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $68,527.78 | |
Texas | 2015062 | Rockwall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,709,036.80 | $20,792,000.00 |
Texas | 2015062 | Rockwall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,868,353.90 | |
Texas | 2015062 | Rockwall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,856,429.89 | |
Texas | 2016108 | Travis | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $40,595,343.70 | $45,117,937.44 |
Texas | 2016108 | Travis | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $4,516,294.59 | $5,018,105.10 |
Texas | 2016183 | Tarrant | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $121,363,249.99 | |
Texas | 2016183 | Tarrant | >= 200,000 | Other | CONGESTION AIR QUALITY | Bridge New Construction | $2,171,071.74 | $84,845,589.68 |
Texas | 2016183 | Tarrant | >= 200,000 | Other | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $1,597,290.56 | $1,996,613.20 |
Texas | 2016183 | Tarrant | >= 200,000 | Other | CONGESTION AIR QUALITY | Construction Engineering | $16,231,637.70 | $20,289,547.13 |
Texas | 2016183 | Tarrant | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $25,210,994.87 | $34,801,605.31 |
Texas | 2016183 | Tarrant | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,460,954.92 | $5,576,193.65 |
Texas | 2017887 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $800.00 | $54,390,333.16 |
Texas | 2017887 | Dallas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $80.00 | $100.00 |
Texas | 2017887 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $720.00 | $5,708,214.05 |
Texas | 2017887 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,521,803.33 | $5,672,592.95 |
Texas | 2017887 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $36,532.27 | $36,532.27 |
Texas | 2017887 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $462,658.90 | $462,658.90 |
Texas | 2017906 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,021,943.97 | $44,185,921.98 |
Texas | 2017906 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,931,081.05 | $45,225,007.18 |
Texas | 2017906 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $213,852.56 | $267,315.70 |
Texas | 2017906 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,515,150.54 | $3,143,938.19 |
Texas | 2017906 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,095.64 | $1,369.55 |
Texas | 2017906 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $41,067.04 | $51,333.80 |
Texas | 2017906 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $123,200.00 | $154,000.00 |
Texas | 2017906 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $398,332.90 | $498,916.13 |
Texas | 2017906 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,013,491.53 | $1,266,864.41 |
Texas | 2018201 | Nueces | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,537,358.50 | $13,575,113.84 |
Texas | 2018201 | Nueces | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $34,462,641.50 | $85,346,094.94 |
Texas | 2018321 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $80,977,035.70 | $101,241,294.64 |
Texas | 2018321 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $45,013,796.10 | $56,267,245.12 |
Texas | 2018321 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,920,992.41 | $13,651,240.51 |
Texas | 2018416 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $544,167.71 | $753,919.52 |
Texas | 2018416 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,381,700.00 | $27,999,625.00 |
Texas | 2018416 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,378,106.01 | $1,722,632.51 |
Texas | 2018416 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,110,714.04 | $3,888,392.55 |
Texas | 2018416 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $140,000.00 | $175,000.00 |
Texas | 2018434 | Grayson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $585,904.06 | $1,274,029.12 |
Texas | 2018434 | Grayson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $4,076,003.50 | $33,224,813.60 |
Texas | 2018434 | Grayson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $338,092.44 | $735,170.90 |
Texas | 2018627 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $15,388,000.00 | |
Texas | 2018627 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $16,000,000.00 | $24,000,000.00 |
Texas | 2018811 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $48,313,007.12 | $60,391,258.90 |
Texas | 2018811 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,664,750.69 | $5,830,938.36 |
Texas | 2018852 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $28,341,531.68 | $97,106,153.32 |
Texas | 2018852 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,994,086.54 | $125,362,219.21 |
Texas | 2018852 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,475,913.42 | $13,600,414.48 |
Texas | 2018852 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,493,480.22 | $10,419,410.62 |
Texas | 2018852 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $328,700.97 | $528,437.41 |
Texas | 2018852 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $494,287.17 | $794,642.73 |
Texas | 2018852 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,429,414.42 | |
Texas | 2018858 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $18,808,866.94 | $23,582,872.43 |
Texas | 2018858 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,360,080.46 | $2,950,100.57 |
Texas | 2018882 | Reeves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $31,309,293.97 | $39,136,617.47 |
Texas | 2018882 | Reeves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,757,232.98 | $3,446,541.22 |
Texas | 2018907 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,619,808.44 | $18,466,453.82 |
Texas | 2018907 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,425,891.75 | $2,695,435.28 |
Texas | 2018907 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $4,569,733.80 | $5,077,482.00 |
Texas | 2018963 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $188,039,502.89 | $235,561,294.26 |
Texas | 2018963 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,456,916.66 | $14,321,145.83 |
Texas | 2018963 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $1,004,970.00 | $1,256,212.50 |
Texas | 2019047 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $54,355,447.56 | $67,973,247.32 |
Texas | 2019047 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,918,575.18 | $4,898,218.98 |
Texas | 2019048 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $8,228,265.55 | $63,287,566.85 |
Texas | 2019048 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $771,734.45 | $1,848,111.28 |
Texas | 2019063 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $22,821,319.85 | $159,278,699.45 |
Texas | 2019063 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,178,680.15 | $13,075,738.60 |
Texas | 2019106 | Bastrop | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,815,233.02 | $32,947,057.44 |
Texas | 2019106 | Bastrop | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,789,220.78 | $3,385,897.95 |
Texas | 2019166 | El Paso | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | Construction Engineering | $8,000,000.00 | $10,000,000.00 |
Texas | 2019166 | El Paso | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Restoration & Rehabilitation | $3,724,699.00 | $4,655,873.75 |
Texas | 2019166 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $67,521,112.58 | $84,485,306.13 |
Texas | 2019166 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,620,000.00 | $3,275,000.00 |
Texas | 2019166 | El Paso | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | $800.00 | $1,000.00 |
Texas | 2019166 | El Paso | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $3,226,589.81 | $4,033,237.26 |
Texas | 2019166 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $6,581,201.50 | $8,226,501.87 |
Texas | 2019166 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $618,798.50 | $773,498.13 |
Texas | 2019168 | El Paso | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $10,000,000.00 | $10,000,000.00 |
Texas | 2019168 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $77,499,294.21 | $96,274,117.77 |
Texas | 2019168 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,863,696.61 | $9,829,620.76 |
Texas | 2019312 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $173,251,685.76 | $346,252,517.99 |
Texas | 2019312 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,558,314.24 | $27,722,646.71 |
Texas | 2019312 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $225,000.00 | $250,000.00 |
Texas | 2019409 | Hartley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $17,232,384.51 | $35,715,099.81 |
Texas | 2019409 | Dallam | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $65,482.44 | $135,716.08 |
Texas | 2019409 | Dallam | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,304.50 | $15,854.62 |
Texas | 2019409 | Hartley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,690,828.55 | $2,371,397.15 |
Texas | 2019411 | Randall | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,354,107.46 | $5,442,634.32 |
Texas | 2019411 | Potter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $794,078.76 | $992,598.45 |
Texas | 2019411 | Randall | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $35,955,655.63 | $44,944,569.55 |
Texas | 2019437 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,456,474.77 | $2,113,383.49 |
Texas | 2019437 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $15,543,525.23 | $36,223,869.12 |
Texas | 2019599 | Bell | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $662,894.61 | $828,618.26 |
Texas | 2019599 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,712,104.29 | $60,775,165.23 |
Texas | 2019599 | Milam | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,237,017.24 | $15,242,052.36 |
Texas | 2019599 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,876,751.04 | $9,530,914.30 |
Texas | 2019611 | Parmer | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,926,858.91 | $26,546,592.78 |
Texas | 2019611 | Parmer | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,696,830.74 | $2,121,038.43 |
Texas | 2019613 | Bastrop | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $14,688,428.64 | $41,130,099.39 |
Texas | 2019613 | Bastrop | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,311,571.36 | $3,647,299.54 |
Texas | 2019626 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,616,206.16 | $44,015,745.26 |
Texas | 2019626 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $383,793.84 | $4,669,302.53 |
Texas | 2019651 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,785,251.70 | $25,981,564.61 |
Texas | 2019651 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,577,696.34 | $3,222,120.43 |
Texas | 2019651 | Bell | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,932,072.82 | $2,415,091.03 |
Texas | 2019689 | Bowie | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $7,380,226.68 | $9,225,283.35 |
Texas | 2019689 | Bowie | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $619,773.32 | $774,716.65 |
Texas | 2019689 | Bowie | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $17,739,616.58 | $26,745,973.77 |
Texas | 2019689 | Bowie | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $464,829.99 | $2,246,061.23 |
Texas | 2019797 | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,821,688.24 | $3,527,110.30 |
Texas | 2019797 | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,178,311.76 | $1,472,889.70 |
Texas | 2019797 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,634,938.64 | $27,861,827.62 |
Texas | 2019797 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $27,945,200.80 | $34,931,501.00 |
Texas | 2019797 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,050,738.11 | $6,313,422.64 |
Texas | 2019818 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,569,400.91 | $23,211,751.14 |
Texas | 2019818 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,572,044.40 | $1,965,055.50 |
Texas | 2019834 | Hill | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,600,943.70 | $13,251,179.63 |
Texas | 2019834 | Hill | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $82,994,619.87 | $106,140,909.64 |
Texas | 2019834 | Hill | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $8,205,380.13 | $9,310,616.43 |
Texas | 2019859 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $36,573,268.51 | |
Texas | 2019859 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $547,010.57 | |
Texas | 2019859 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $2,151,964.14 | $2,689,955.18 |
Texas | 2019952 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,484,013.83 | $4,388,491.47 |
Texas | 2019952 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $26,240,000.00 | $32,800,000.00 |
Texas | 2019952 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,482,338.79 | $4,352,923.49 |
Texas | 2019988 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $14,904,633.07 | $35,738,430.34 |
Texas | 2019988 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,722,399.61 | $3,402,999.51 |
Texas | 2019990 | Culberson | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,056,438.78 | $3,370,414.53 |
Texas | 2019990 | Culberson | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $31,195,820.99 | $35,444,910.19 |
Texas | 2019996 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $22,993,827.06 | $28,790,453.83 |
Texas | 2019996 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,834,614.12 | $2,293,267.65 |
Texas | 2020008 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,581,056.48 | $141,655,631.33 |
Texas | 2020008 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,005,090.47 | $11,530,277.87 |
Texas | 2020008 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,399,451.92 | $15,610,754.84 |
Texas | 2020008 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $14,401.13 | $351,290.00 |
Texas | 2020056 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,881,525.90 | $12,601,907.37 |
Texas | 2020056 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $312,071.84 | $390,089.80 |
Texas | 2020056 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $30,640,000.00 | $38,300,000.00 |
Texas | 2020057 | Brazoria | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $165,015.75 | $9,511,973.42 |
Texas | 2020057 | Brazoria | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,634,984.25 | $4,192,923.18 |
Texas | 2020057 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $62,040,000.00 | $77,550,000.00 |
Texas | 2020115 | Austin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,931,727.93 | $154,202,576.20 |
Texas | 2020115 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $42,261.14 | $546,172.05 |
Texas | 2020115 | Austin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $400,466.30 | $500,582.88 |
Texas | 2020115 | Austin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $7,406,989.86 | $9,258,737.32 |
Texas | 2020115 | Austin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $217,783.40 | $272,229.25 |
Texas | 2020115 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $771.37 | $964.21 |
Texas | 2020122 | Lubbock | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,121,926.97 | $59,034,902.61 |
Texas | 2020122 | Lubbock | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,959,386.94 | |
Texas | 2020122 | Lubbock | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,070,830.04 | $1,339,537.55 |
Texas | 2020185 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,346,925.68 | $2,933,657.10 |
Texas | 2020185 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $553,874.32 | $692,342.90 |
Texas | 2020185 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,310,558.74 | $2,888,198.43 |
Texas | 2020185 | Williamson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $10,160,129.96 | $12,700,162.44 |
Texas | 2020185 | Williamson | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $21,236,834.78 | $26,608,532.30 |
Texas | 2020185 | Williamson | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $2,069,835.11 | $2,587,293.89 |
Texas | 2020185 | Williamson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $11,240,000.00 | $14,050,000.00 |
Texas | 2020303 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $10,838,375.42 | $13,547,969.27 |
Texas | 2020303 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $33,214,590.04 | $41,518,237.55 |
Texas | 2020303 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,479,877.29 | $3,099,846.61 |
Texas | 2020314 | Cameron | >= 200,000 | Local | COORD BORDER INFRA PROGRAM | 4R - Added Capacity | $4,241,600.00 | $6,636,868.00 |
Texas | 2020314 | Cameron | >= 200,000 | Local | COORD BORDER INFRA PROGRAM | Construction Engineering | $198,000.00 | |
Texas | 2020314 | Cameron | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,024,384.48 | $19,468,480.60 |
Texas | 2020432 | El Paso | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $2,329,920.40 | |
Texas | 2020432 | El Paso | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $1,424,000.00 | $2,891,204.03 |
Texas | 2020432 | El Paso | >= 200,000 | State | COORD BORDER INFRA PROGRAM | New Construction Roadway | $10,400,000.00 | $12,998,000.00 |
Texas | 2020432 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $64,800.00 | $81,000.00 |
Texas | 2020432 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $6,576,000.00 | $8,220,000.00 |
Texas | 2020451 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $17,486,501.16 | $21,858,126.43 |
Texas | 2020451 | Titus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,548,340.06 | $3,185,425.08 |
Texas | 2020455 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $71,336,154.69 | $90,555,721.20 |
Texas | 2020455 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $5,609,899.46 | $7,012,374.32 |
Texas | 2020489 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $54,445,377.16 | $68,065,716.81 |
Texas | 2020489 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,747,900.22 | $15,934,875.27 |
Texas | 2020489 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,687.25 | |
Texas | 2020489 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $28,804,096.00 | $36,005,120.00 |
Texas | 2020493 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $75,423,146.74 | $94,278,933.43 |
Texas | 2020493 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,002,200.06 | $1,252,750.07 |
Texas | 2020493 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $138,162.41 | $172,703.01 |
Texas | 2020493 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,397,768.39 | $12,997,210.49 |
Texas | 2020496 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $27,308,266.50 | $165,899,087.90 |
Texas | 2020496 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,691,728.50 | $16,352,382.56 |
Texas | 2020496 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,025,628.18 | $2,420,815.90 |
Texas | 2020549 | Potter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,335,097.80 | $4,168,872.25 |
Texas | 2020549 | Potter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,080,501.18 | $2,600,626.48 |
Texas | 2020549 | Potter | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $19,320,000.00 | $24,187,158.58 |
Texas | 2020649 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $20,901,831.42 | $26,491,399.27 |
Texas | 2020649 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,699,351.61 | $2,124,189.51 |
Texas | 2020751 | Reeves | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $25,726,478.61 | $64,887,808.76 |
Texas | 2020751 | Culberson | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $747,072.82 | $800,435.16 |
Texas | 2020751 | Reeves | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $526,448.57 | $564,052.04 |
Texas | 2020863 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $25,433,892.51 | $34,054,412.97 |
Texas | 2020863 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $5,240,946.51 | $6,289,135.81 |
Texas | 2020871 | Kleberg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $38,162,281.77 | $47,736,663.14 |
Texas | 2020871 | Kleberg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,964,437.62 | $9,955,547.02 |
Texas | 2020871 | Kleberg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $897,439.23 | $1,121,799.04 |
Texas | 2020871 | Kleberg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,656,900.54 | $4,571,125.68 |
Texas | 2020879 | Brazos | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $32,952,302.29 | $41,832,666.87 |
Texas | 2020879 | Brazos | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,067,103.54 | $6,333,879.42 |
Texas | 2020944 | Runnels | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $20,059,296.88 | $25,130,697.10 |
Texas | 2020944 | Runnels | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,936,175.47 | $2,420,219.34 |
Texas | 2020944 | Runnels | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,452.40 | $1,815.50 |
Texas | 2020950 | Glasscock | < 5,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $10,389,446.00 | $10,389,446.00 |
Texas | 2020950 | Glasscock | < 5,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $8,610,655.87 | $8,610,655.87 |
Texas | 2020950 | Reagan | < 5,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $5,999,898.13 | $5,999,898.13 |
Texas | 2020950 | Glasscock | < 5,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $4,383,682.68 | $5,479,603.35 |
Texas | 2020950 | Reagan | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $5,571,857.57 | $7,040,513.40 |
Texas | 2020950 | Glasscock | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $12,348,240.07 | $19,694,785.05 |
Texas | 2020966 | Orange | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,097,491.46 | $53,871,864.33 |
Texas | 2020966 | Orange | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,931,336.62 | $3,664,170.77 |
Texas | 2021088 | El Paso | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $3,183,081.00 | $3,183,081.00 |
Texas | 2021088 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $11,892,988.80 | $20,702,382.54 |
Texas | 2021088 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,506,971.00 | $1,883,713.80 |
Texas | 2021093 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $18,679,346.67 | $23,498,556.55 |
Texas | 2021093 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $2,636,568.64 | $3,295,710.80 |
Texas | 2021093 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $576,617.56 | $720,771.95 |
Texas | 2021093 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,444,478.02 | $5,555,597.52 |
Texas | 2021189 | Brazoria | >= 200,000 | State | FEDERAL LAND ACCESS PROGRAM | 4R - Restoration & Rehabilitation | $2,999,107.01 | $8,330,852.80 |
Texas | 2021189 | Galveston | >= 200,000 | State | FEDERAL LAND ACCESS PROGRAM | 4R - Restoration & Rehabilitation | $892.99 | $2,480.53 |
Texas | 2021189 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $15,997,354.64 | $20,019,676.32 |
Texas | 2021189 | Galveston | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,800.64 | $6,007.69 |
Texas | 2021189 | Galveston | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $742.70 | $928.38 |
Texas | 2021189 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,474,940.46 | $3,093,675.57 |
Texas | 2021213 | Henderson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $12,000,000.00 | $33,166,851.37 |
Texas | 2021310 | DeWitt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,945,156.48 | $50,562,795.57 |
Texas | 2021310 | Karnes | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $54,843.52 | $349,022.90 |
Texas | 2021327 | Cooke | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $3,635.02 | $4,543.78 |
Texas | 2021327 | Cooke | >= 5,000 AND < 50,000 | State | EXTENSION OF ALLOC PROGRAMS | 4R - Added Capacity | $260,204.87 | $325,256.09 |
Texas | 2021327 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $108,663,720.79 | $186,832,812.17 |
Texas | 2021327 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,009,768.84 | $47,432,075.92 |
Texas | 2021327 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $344,115.41 | $430,144.27 |
Texas | 2021327 | Cooke | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $50,219.25 | $62,774.06 |
Texas | 2021404 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $76,150,523.44 | $95,222,439.99 |
Texas | 2021404 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $8,612,159.05 | $10,765,198.81 |
Texas | 2021440 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $48,239,435.40 | $60,324,294.25 |
Texas | 2021440 | Angelina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,604,607.62 | $12,005,759.52 |
Texas | 2021488 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,000,000.00 | $163,323,331.38 |
Texas | 2021492 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $7,000,000.00 | $49,528,120.42 |
Texas | 2021492 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,594,057.45 | |
Texas | 2021518 | Potter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $792,611.58 | $1,025,054.16 |
Texas | 2021518 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $18,685,298.00 | $23,537,419.20 |
Texas | 2021518 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,625,256.68 | $3,395,143.76 |
Texas | 2021518 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $85,512.98 | $95,014.42 |
Texas | 2021525 | Liberty | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $214,138.66 | $14,000,000.00 |
Texas | 2021525 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,789,100.70 | $1,987,889.67 |
Texas | 2021525 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $18,167,565.80 | $20,186,184.22 |
Texas | 2021536 | Denton | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $44,960,000.00 | $56,200,000.00 |
Texas | 2021536 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $49,893,938.40 | $62,664,461.00 |
Texas | 2021536 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,019,305.26 | $7,524,131.58 |
Texas | 2021536 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $14,900,663.80 | $18,625,829.75 |
Texas | 2021536 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,420,766.31 | $8,189,104.39 |
Texas | 2021543 | Burleson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,000,000.00 | $39,536,156.51 |
Texas | 2021547 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $19,897,876.80 | $35,019,355.32 |
Texas | 2021576 | Lubbock | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,856,000.00 | $131,350,806.40 |
Texas | 2021576 | Lubbock | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $11,097,595.10 | |
Texas | 2021576 | Lubbock | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $28,510,099.34 | |
Texas | 2021615 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $10,239,948.62 | $24,443,404.76 |
Texas | 2021615 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge New Construction | $255,610.25 | $1,710,630.32 |
Texas | 2021615 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Rehabilitation - No Added Capacity | $481,253.68 | $3,220,712.53 |
Texas | 2021615 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | $616,107.53 | $4,123,200.15 |
Texas | 2021615 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $4,070,330.32 | |
Texas | 2021615 | Bexar | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,025,243.57 | $2,790,946.78 |
Texas | 2021616 | Bexar | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,488,838.00 | $4,361,047.50 |
Texas | 2021616 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,695,771.67 | $161,925,663.44 |
Texas | 2021616 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $23,287,340.66 | $29,109,175.83 |
Texas | 2021616 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $7,578,861.96 | $9,473,577.45 |
Texas | 2021616 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,482,315.93 | $8,607,812.24 |
Texas | 2021616 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,966,709.78 | $7,131,782.34 |
Texas | 2021616 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,800,000.00 | $6,000,000.00 |
Texas | 2021643 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $21,682,888.72 | $28,214,360.34 |
Texas | 2021643 | Harris | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $2,707,776.50 | $3,384,720.63 |
Texas | 2021704 | Montague | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $31,720,972.15 | $39,651,215.19 |
Texas | 2021704 | Montague | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,006,153.50 | $15,007,691.87 |
Texas | 2021728 | Brazoria | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,000,000.00 | $20,146,808.81 |
Texas | 2021728 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $52,784,000.00 | $84,673,040.13 |
Texas | 2021728 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $4,253,115.87 | |
Texas | 2021745 | Williamson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $97,000.00 | |
Texas | 2021745 | Williamson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,431,696.00 | $28,272,555.49 |
Texas | 2021787 | Bell | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $5,000,000.00 | $5,000,000.00 |
Texas | 2021787 | Bell | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,238,558.40 | $18,634,394.00 |
Texas | 2021787 | Bell | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,298,198.00 | |
Texas | 2021840 | Harris | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $654,056.19 | $817,570.24 |
Texas | 2021840 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $34,560,000.00 | $61,057,904.03 |
Texas | 2021840 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $12,963.00 | |
Texas | 2021858 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $345,600.00 | $432,000.00 |
Texas | 2021858 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $17,190,713.33 | $25,276,390.94 |
Texas | 2021858 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $3,500,000.00 | $4,375,000.00 |
Texas | 2021858 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $33,384.66 | $41,730.83 |
Texas | 2021859 | Dallas | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $326,400.00 | $408,000.00 |
Texas | 2021859 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $34,607,136.09 | $43,283,920.12 |
Texas | 2021859 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,805,050.09 | $7,256,312.61 |
Texas | 2021864 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,629,344.90 | $2,143,919.12 |
Texas | 2021864 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,222,154.20 | $2,777,692.75 |
Texas | 2021864 | Johnson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $800.00 | $1,000.00 |
Texas | 2021864 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,000,000.00 | $11,250,000.00 |
Texas | 2021864 | Johnson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $10,471,698.86 | $13,089,623.57 |
Texas | 2021864 | Johnson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $2,124,308.00 | $2,655,385.00 |
Texas | 2021864 | Johnson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $673,273.60 | $841,592.00 |
Texas | 2021864 | Johnson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,960,376.46 | $3,700,470.57 |
Texas | 2021943 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $30,419,924.39 | $38,274,905.49 |
Texas | 2021943 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,080,114.40 | $5,100,143.00 |
Texas | 2021943 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,185,804.40 | $7,732,255.50 |
Texas | 2021943 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,172,268.42 | $2,715,335.52 |
Texas | 2021943 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,479,243.19 | $6,849,053.99 |
Texas | 2022009 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $650,911.64 | $1,530,645.91 |
Texas | 2022009 | Walker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $82,919,170.14 | $172,694,784.76 |
Texas | 2022009 | Walker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,916,143.39 | $50,771,896.68 |
Texas | 2022009 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $172,379.29 | $628,911.58 |
Texas | 2022013 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $16,000,000.00 | $20,000,000.00 |
Texas | 2022013 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $18,545,754.78 | $28,284,922.48 |
Texas | 2022013 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $16,925,191.68 | $21,156,489.60 |
Texas | 2022013 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,512,165.37 | $9,390,206.71 |
Texas | 2022027 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $318,024,191.75 | $318,024,191.75 |
Texas | 2022027 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $1,880,898.00 | $21,880,898.00 |
Texas | 2022027 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $7,100,000.00 | $7,100,000.00 |
Texas | 2022027 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Preliminary Engineering | $151,568,750.00 | $151,568,750.00 |
Texas | 2022027 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $45,000,000.00 | $45,000,000.00 |
Texas | 2022027 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $53,702,053.00 | $67,127,566.25 |
Texas | 2022027 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $46,080,668.00 | $57,600,835.00 |
Texas | 2022053 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $76,460,716.62 | $125,532,145.78 |
Texas | 2022053 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,860,916.48 | $5,091,193.14 |
Texas | 2022053 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $827,651.88 | $919,613.20 |
Texas | 2022053 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $24,732,274.72 | $30,915,343.40 |
Texas | 2022053 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $35,109,004.06 | $42,998,458.52 |
Texas | 2022053 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $35,590.39 | $39,544.88 |
Texas | 2022053 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $25,234,816.94 | $31,543,521.18 |
Texas | 2022076 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $65,570,351.00 | $1,771,690,289.95 |
Texas | 2022076 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $11,528,231.05 | |
Texas | 2022153 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,000,000.00 | $91,848,786.31 |
Texas | 2022160 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $34,820,353.30 | $57,525,441.63 |
Texas | 2022160 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,893,440.08 | $11,116,800.10 |
Texas | 2022185 | Starr | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,020,588.92 | $21,384,986.72 |
Texas | 2022185 | Starr | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $688,075.20 | $860,094.00 |
Texas | 2022185 | Starr | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,908,044.78 | $6,135,055.98 |
Texas | 2022185 | Starr | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $167,978.04 | $209,972.55 |
Texas | 2022340 | Travis | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $7,145,608.00 | $8,932,010.00 |
Texas | 2022340 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $249,092,760.33 | |
Texas | 2022340 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $33,302,356.42 | |
Texas | 2022340 | Travis | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $116,628,157.80 | $152,922,535.86 |
Texas | 2022340 | Travis | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $25,832,159.51 | $32,290,199.39 |
Texas | 2022340 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,000,000.00 | $2,500,000.00 |
Texas | 2022340 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $79,356,450.92 | $99,195,563.65 |
Texas | 2022356 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,707,164.19 | $42,897,319.26 |
Texas | 2022356 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,889,059.39 | $10,987,843.77 |
Texas | 2022356 | Midland | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $25,000,000.00 | $25,000,000.00 |
Texas | 2022386 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,214,533.92 | |
Texas | 2022386 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $45,622,469.13 | |
Texas | 2022402 | Bexar | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $6,000,000.00 | $6,000,000.00 |
Texas | 2022402 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $184,759,300.18 | $233,728,266.16 |
Texas | 2022402 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $95,540,222.28 | $119,425,277.85 |
Texas | 2022402 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $142,942.00 | $178,677.50 |
Texas | 2022402 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $28,800,059.36 | $36,000,074.20 |
Texas | 2022402 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $26,984,211.86 | $33,730,264.83 |
Texas | 2022402 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $29,452,730.70 | $36,815,913.38 |
Texas | 2022402 | Bexar | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $79,518.68 | $99,398.35 |
Texas | 2022437 | Travis | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $13,535,359.00 | $16,919,198.75 |
Texas | 2022437 | Travis | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $2,231,557.62 | $2,789,447.02 |
Texas | 2022437 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $50,086,079.64 | $420,150,619.88 |
Texas | 2022437 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,088,908.60 | $14,317,400.70 |
Texas | 2022437 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,244,500.59 | $29,511,581.06 |
Texas | 2022437 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,387,581.26 | $57,689,652.90 |
Texas | 2022437 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $50,222,528.36 | $66,162,000.20 |
Texas | 2022446 | Houston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $21,758,968.72 | $27,198,710.90 |
Texas | 2022446 | Houston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,294,392.22 | $4,117,990.28 |
Texas | 2022446 | Houston | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $54,085.93 | |
Texas | 2022480 | Hill | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $19,427,454.18 | $24,284,317.73 |
Texas | 2022480 | Hill | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,035,301.25 | $2,544,126.56 |
Texas | 2022496 | Loving | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $27,124,121.82 | $34,020,152.28 |
Texas | 2022496 | Loving | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,664,848.54 | $7,081,060.68 |
Texas | 2022509 | Taylor | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,134,305.29 | $3,917,881.61 |
Texas | 2022509 | Brazoria | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,402,915.87 | $11,753,644.84 |
Texas | 2022509 | Taylor | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $827,935.82 | $5,132,768.45 |
Texas | 2022509 | Brazoria | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $5,085,891.45 | $31,529,863.28 |
Texas | 2022509 | Brazoria | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,215,250.82 | $10,174,682.73 |
Texas | 2022510 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,000,000.00 | |
Texas | 2022510 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $45,014,868.02 | $56,268,585.04 |
Texas | 2022510 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $14,570,659.98 | $21,369,930.10 |
Texas | 2022510 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,535,903.48 | |
Texas | 2022512 | Brazoria | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,932,659.26 | $26,165,824.08 |
Texas | 2022512 | Brazoria | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,294,685.12 | $6,618,356.40 |
Texas | 2022512 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,120,000.00 | $26,400,000.01 |
Texas | 2022572 | Hidalgo | >= 200,000 | Local | BORDER STATE INFRASTRUCTURE | Other | $3,200,000.00 | $6,100,000.00 |
Texas | 2022572 | Hidalgo | >= 200,000 | Local | COORD BORDER INFRA PROGRAM | Construction Engineering | $326,218.11 | |
Texas | 2022572 | Hidalgo | >= 200,000 | Local | COORD BORDER INFRA PROGRAM | Other | $14,073,367.00 | $22,777,583.30 |
Texas | 2022572 | Hidalgo | >= 200,000 | Local | HIGHWAY INFRA PRGM -ALLOC | Other | $25,000,000.00 | $50,000,000.00 |
Texas | 2022572 | Hidalgo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $406,633.00 | $508,291.26 |
Texas | 2022575 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $42,020,703.86 | $52,572,860.17 |
Texas | 2022575 | Brazoria | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,384,713.88 | $5,480,892.35 |
Texas | 2022576 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $878,356.00 | $1,867,945.00 |
Texas | 2022576 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $70,806,607.12 | $88,574,195.92 |
Texas | 2022576 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,666,017.33 | $9,634,191.00 |
Texas | 2022582 | Andrews | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $7,712,108.00 | $8,569,008.90 |
Texas | 2022582 | Andrews | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,774,228.67 | $1,971,365.19 |
Texas | 2022582 | Andrews | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $15,391,643.18 | $28,976,599.27 |
Texas | 2022583 | Winkler | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $5,995,251.00 | $7,494,063.75 |
Texas | 2022583 | Winkler | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $5,196,460.67 | $29,347,841.86 |
Texas | 2022583 | Winkler | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,723,715.05 | |
Texas | 2022584 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $9,154,702.33 | $11,638,762.30 |
Texas | 2022584 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $9,528,363.65 | $11,857,278.63 |
Texas | 2022584 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $22,216.07 | |
Texas | 2022584 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,104,620.85 | $2,630,776.06 |
Texas | 2022590 | Loving | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $25,413,823.42 | $31,872,901.27 |
Texas | 2022590 | Loving | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,547,223.96 | $3,188,407.95 |
Texas | 2022591 | Ward | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $26,570,568.18 | $33,213,210.23 |
Texas | 2022591 | Winkler | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $99,453.37 | $124,316.71 |
Texas | 2022591 | Winkler | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,389.54 | $9,236.93 |
Texas | 2022591 | Ward | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,974,234.92 | $2,467,793.64 |
Texas | 2022599 | Coleman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,087,405.48 | $25,109,256.86 |
Texas | 2022599 | Coleman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,313,183.70 | $4,141,479.62 |
Texas | 2022615 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,010,851.08 | $32,527,133.45 |
Texas | 2022615 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,304,833.76 | $9,131,042.20 |
Texas | 2022615 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $85,156.60 | $106,445.75 |
Texas | 2022615 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $7,156,475.20 | $8,945,594.00 |
Texas | 2022632 | Houston | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $20,198,222.18 | $25,248,807.22 |
Texas | 2022632 | Houston | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,718,882.39 | $3,398,602.99 |
Texas | 2022634 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,134,636.44 | $74,216,749.48 |
Texas | 2022634 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $65,121.70 | $939,140.00 |
Texas | 2022634 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $536,331.50 | $7,734,600.80 |
Texas | 2022634 | Ector | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $934,544.46 | $13,518,752.20 |
Texas | 2022675 | Tarrant | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $280,011,716.25 | $280,011,716.25 |
Texas | 2022675 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,178,847.60 | $1,122,060,608.75 |
Texas | 2022675 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,088,333.47 | $83,785,386.96 |
Texas | 2022675 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $653,336.53 | $816,670.67 |
Texas | 2022675 | Tarrant | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $77,819,056.80 | $97,273,821.00 |
Texas | 2022675 | Tarrant | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $48,000,000.00 | |
Texas | 2022726 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $39,552,321.40 | |
Texas | 2022726 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,500,000.00 | |
Texas | 2022726 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $21,563,958.40 | |
Texas | 2022726 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $3,050,571.18 | |
Texas | 2022726 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $384,482.58 | |
Texas | 2022726 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,761,514.65 | |
Texas | 2022745 | Webb | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - No Added Capacity | $5,147,063.19 | $13,603,716.70 |
Texas | 2022745 | Webb | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | Bridge New Construction | $7,382,688.80 | |
Texas | 2022745 | Webb | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | Construction Engineering | $11,562,206.79 | |
Texas | 2022745 | Webb | >= 200,000 | State | COORD BORDER INFRA PROGRAM | 4R - No Added Capacity | $15,347,374.92 | $19,184,218.65 |
Texas | 2022745 | Webb | >= 200,000 | State | COORD BORDER INFRA PROGRAM | Bridge New Construction | $453,184.96 | $566,481.20 |
Texas | 2022745 | Webb | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $32,760,000.00 | $41,101,914.70 |
Texas | 2022745 | Webb | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $21,573.32 | |
Texas | 2022793 | Kaufman | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $28,783,842.00 | $133,333,882.45 |
Texas | 2022793 | Kaufman | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $3,599,197.60 | $3,599,197.60 |
Texas | 2022793 | Kaufman | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - Added Capacity | $1,191,080.40 | $1,191,080.40 |
Texas | 2022811 | Smith | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $16,788,271.47 | $49,908,063.76 |
Texas | 2022901 | Comal | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $11,467,502.00 | $11,467,502.00 |
Texas | 2022901 | Comal | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,006,728.09 | $43,020,631.05 |
Texas | 2022901 | Comal | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,993,271.91 | $9,549,434.03 |
Texas | 2022915 | Collin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $150,000.00 | $3,318,620.55 |
Texas | 2022915 | Collin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $29,850,000.00 | $55,785,573.00 |
Texas | 2022926 | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $41,638,532.85 | $41,638,532.85 |
Texas | 2022926 | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $9,866,262.15 | $9,866,262.15 |
Texas | 2022926 | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $398,498.18 | $498,122.72 |
Texas | 2022926 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,131,699.65 | |
Texas | 2022926 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,183,407.05 | |
Texas | 2022926 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,240,024.00 | $27,800,030.00 |
Texas | 2022929 | Brazoria | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge New Construction | $21,342,803.65 | $26,678,504.56 |
Texas | 2022929 | Brazoria | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $3,641,568.20 | $4,551,960.25 |
Texas | 2022936 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,775,019.00 | $28,468,774.00 |
Texas | 2022936 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $38,235,724.31 | $47,794,654.65 |
Texas | 2022936 | Fort Bend | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,073,174.00 | $11,341,468.00 |
Texas | 2022950 | Tom Green | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $29,811,348.26 | $37,264,185.33 |
Texas | 2022950 | Tom Green | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,441,516.03 | $3,051,895.04 |
Texas | 2022999 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,023,183.66 | |
Texas | 2022999 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,760,672.02 | $8,450,840.02 |
Texas | 2022999 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,067,620.01 | $3,834,525.01 |
Texas | 2022999 | Dallas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,693,446.52 | |
Texas | 2022999 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $124,919.20 | $156,149.00 |
Texas | 2022999 | Dallas | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $12,000,000.00 | $12,000,000.00 |
Texas | 2022999 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,600,000.00 | $2,000,000.00 |
Texas | 2023047 | Bexar | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $4,498,280.98 | $4,998,089.98 |
Texas | 2023047 | Bexar | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Special Bridge | $11,034,670.02 | $12,260,744.47 |
Texas | 2023047 | Bexar | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $280,359.06 | $320,166.96 |
Texas | 2023047 | Bexar | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $4,817,077.54 | $5,501,050.50 |
Texas | 2023047 | Bexar | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $210,662.04 | $234,068.86 |
Texas | 2023047 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,619,555.67 | $4,021,728.59 |
Texas | 2023058 | Hunt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $19,926,948.73 | $24,924,650.92 |
Texas | 2023058 | Hunt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $143,930.00 | $179,912.50 |
Texas | 2023058 | Hunt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $237,480.00 | $296,850.00 |
Texas | 2023058 | Hunt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $46,646.45 | $58,308.06 |
Texas | 2023058 | Hunt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,264,250.52 | $2,830,313.15 |
Texas | 2023121 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,071,365.02 | $26,745,422.26 |
Texas | 2023121 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,255,210.18 | $4,069,012.73 |
Texas | 2023140 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $20,340,665.15 | $25,100,871.93 |
Texas | 2023140 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,262,983.36 | |
Texas | 2023154 | Marion | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $29,987,074.85 | $45,683,843.56 |
Texas | 2023154 | Marion | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,692,413.07 | $4,615,516.34 |
Texas | 2023166 | Rockwall | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $40,000,000.00 | $50,000,000.00 |
Texas | 2023166 | Rockwall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $22,989,754.11 | $316,486,382.62 |
Texas | 2023166 | Rockwall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,481,594.90 | $20,424,204.62 |
Texas | 2023167 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,173,727.74 | $5,220,562.65 |
Texas | 2023167 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $31,228,376.52 | $39,453,872.11 |
Texas | 2023253 | Statewide | N/A | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $27,369,524.00 | $38,487,070.20 |
Texas | 2023253 | Statewide | N/A | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,440,502.00 | $6,195,341.37 |
Texas | 2023274 | Bexar | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,131,245.17 | |
Texas | 2023274 | Bexar | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,380,572.52 | |
Texas | 2023277 | Freestone | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,692,081.96 | $20,909,602.46 |
Texas | 2023277 | Freestone | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,584,932.02 | $4,481,165.02 |
Texas | 2023340 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $63,491,949.59 | $99,339,818.39 |
Texas | 2023340 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,263,968.63 | $4,228,321.11 |
Texas | 2023340 | Denton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,052,219.20 | $18,815,274.00 |
Texas | 2023491 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,414,190.00 | |
Texas | 2023491 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,348.83 | |
Texas | 2023491 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,989,157.91 | $5,989,157.91 |
Texas | 2023491 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,596,115.79 | |
Texas | 2023494 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $40,882,637.06 | $51,588,372.94 |
Texas | 2023494 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,588,144.24 | $9,485,180.30 |
Texas | 2023494 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,004,656.48 | $2,505,820.60 |
Texas | 2023494 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,209,040.73 | $1,511,300.91 |
Texas | 2023494 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,520,847.89 | $11,928,283.69 |
Texas | 2023497 | Bosque | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,975,657.86 | $26,335,757.87 |
Texas | 2023497 | Bosque | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,099,902.82 | $2,631,530.97 |
Texas | 2023505 | Tarrant | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $9,600,000.00 | $12,000,000.00 |
Texas | 2023505 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $14,798,504.30 | $18,878,330.38 |
Texas | 2023505 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $14,050.00 | |
Texas | 2023505 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,714,703.71 | $3,393,379.64 |
Texas | 2023524 | Pecos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $61,081,300.32 | $76,351,625.40 |
Texas | 2023524 | Reeves | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $6,405,098.98 | $8,006,373.72 |
Texas | 2023524 | Reeves | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,401,246.06 | $4,251,557.58 |
Texas | 2023524 | Pecos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $659.50 | $824.37 |
Texas | 2023557 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $14,465,509.60 | $23,139,122.00 |
Texas | 2023557 | Fort Bend | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,408,957.85 | |
Texas | 2023557 | Fort Bend | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge New Construction | $23,166,585.60 | $28,958,232.00 |
Texas | 2023629 | Zapata | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,384,679.90 | $32,997,213.48 |
Texas | 2023629 | Zapata | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,445,313.17 | $4,310,472.96 |
Texas | 2023675 | Comal | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,822,400.00 | $12,278,000.00 |
Texas | 2023675 | Comal | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $20,622,393.00 | $37,465,554.68 |
Texas | 2023675 | Comal | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,622,286.31 | $5,777,857.89 |
Texas | 2023679 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $115,253,760.59 | $180,177,585.68 |
Texas | 2023679 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $6,218,744.00 | $7,773,430.00 |
Texas | 2023679 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $707,976.00 | $884,970.00 |
Texas | 2023679 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,867,920.00 | $3,584,900.00 |
Texas | 2023679 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,764,569.06 | $25,956,421.37 |
Texas | 2023693 | Parker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,677,397.78 | $7,096,747.22 |
Texas | 2023693 | Parker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,278,868.10 | $24,098,585.12 |
Texas | 2023693 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $20,988,150.73 | $26,235,188.41 |
Texas | 2023694 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,709,114.75 | $29,726,794.17 |
Texas | 2023694 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,774,089.30 | $4,196,342.56 |
Texas | 2023704 | Kaufman | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $31,945,948.80 | $39,939,141.17 |
Texas | 2023704 | Kaufman | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,951,185.44 | $3,688,981.80 |
Texas | 2023704 | Kaufman | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,456,536.98 | $5,571,736.30 |
Texas | 2023723 | Cherokee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $27,961,842.01 | |
Texas | 2023723 | Cherokee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,723,483.83 | |
Texas | 2023767 | Coke | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,347,064.75 | $21,738,975.72 |
Texas | 2023767 | Coke | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $238,121.51 | $996,849.35 |
Texas | 2023767 | Coke | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,122,485.32 | |
Texas | 2023767 | Coke | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,181,836.70 | $1,390,231.69 |
Texas | 2023773 | San Jacinto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,905,539.44 | $81,148,875.39 |
Texas | 2023773 | San Jacinto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $2,751,020.26 | $14,105,594.50 |
Texas | 2023773 | San Jacinto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $2,128,862.29 | $10,915,538.60 |
Texas | 2023773 | San Jacinto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,933,398.03 | $15,047,677.48 |
Texas | 2023837 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $327,991,258.40 | $409,989,073.00 |
Texas | 2023837 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,911,728.80 | $13,639,661.00 |
Texas | 2023837 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $22,224,212.80 | $27,780,266.00 |
Texas | 2023874 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,872,992.20 | |
Texas | 2023874 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,587,200.00 | $28,234,000.00 |
Texas | 2023874 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $17,017,782.10 | |
Texas | 2023933 | Ward | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $25,748,575.98 | $28,609,528.83 |
Texas | 2023933 | Ward | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,362,033.24 | $3,735,592.49 |
Texas | 2023947 | Guadalupe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $140,598,845.79 | $190,510,864.07 |
Texas | 2023947 | Guadalupe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $605,057.20 | $756,321.50 |
Texas | 2023947 | Guadalupe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,860,681.21 | $26,356,863.42 |
Texas | 2023947 | Guadalupe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $22,337,523.40 | $27,921,904.25 |
Texas | 2023947 | Guadalupe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $14,804,902.40 | $18,506,128.00 |
Texas | 2023954 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $38,222,847.25 | |
Texas | 2023954 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,128,953.20 | $20,161,191.50 |
Texas | 2023954 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $3,516,494.00 | |
Texas | 2023954 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $443,205.75 | |
Texas | 2023954 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $8,964,639.51 | |
Texas | 2023958 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $43,852,910.94 | $55,397,503.92 |
Texas | 2023958 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,938,852.00 | $2,423,565.00 |
Texas | 2023958 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $242,308.03 | $302,885.04 |
Texas | 2023958 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,147,449.74 | $6,506,526.03 |
Texas | 2023992 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $59,900,948.07 | $74,876,185.10 |
Texas | 2023992 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $689,612.00 | $862,015.00 |
Texas | 2023992 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $814,321.60 | $1,017,902.00 |
Texas | 2023992 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,501,546.88 | $9,376,933.60 |
Texas | 2023992 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,583,124.09 | $13,228,905.11 |
Texas | 2024004 | Kendall | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - Maintenance Resurfacing | $391,779.28 | $435,310.31 |
Texas | 2024004 | Kendall | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Maintenance Resurfacing | $88,735.05 | $98,596.50 |
Texas | 2024004 | Kendall | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $3,666,069.77 | $4,073,410.86 |
Texas | 2024004 | Kendall | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | $323,462.32 | $359,402.58 |
Texas | 2024004 | Kendall | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,990,975.51 | $2,212,195.00 |
Texas | 2024004 | Kendall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,635,115.33 | $18,544,026.61 |
Texas | 2024004 | Kendall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,276,008.18 | $2,529,389.30 |
Texas | 2024033 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $27,439,336.66 | $34,299,170.83 |
Texas | 2024033 | Deaf Smith | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,202.93 | $17,753.66 |
Texas | 2024033 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $49,814.40 | $62,268.00 |
Texas | 2024033 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,490.03 | $5,612.54 |
Texas | 2024033 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,911,802.54 | $3,639,753.17 |
Texas | 2024033 | Deaf Smith | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,507.18 | $1,883.98 |
Texas | 2024041 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $34,166,963.94 | $43,420,910.55 |
Texas | 2024041 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,946,542.54 | $16,304,878.18 |
Texas | 2024041 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,783,009.95 | $9,806,462.81 |
Texas | 2024349 | Dallas | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $3,000.00 | $3,750.00 |
Texas | 2024349 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,251,562.36 | $6,266,357.96 |
Texas | 2024349 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,626,929.24 | $17,380,126.28 |
Texas | 2024349 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $321,534.24 | $2,238,614.92 |
Texas | 2024349 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $1,418,172.00 | $1,772,715.00 |
Texas | 2024365 | Culberson | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,542,466.31 | $23,039,980.96 |
Texas | 2024365 | Culberson | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $134,591.69 | $2,011,806.05 |
Texas | 2024436 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,160,959.33 | $259,985,878.48 |
Texas | 2024436 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,217,264.23 | $15,902,155.05 |
Texas | 2024436 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $35,826.97 | $256,950.00 |
Texas | 2024436 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,167,967.07 | $65,752,395.19 |
Texas | 2024436 | Wharton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,353,136.40 | $59,972,246.52 |
Texas | 2024523 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,456,308.68 | $1,618,120.76 |
Texas | 2024523 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,593,044.18 | $2,900,895.06 |
Texas | 2024523 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $223,525.00 | |
Texas | 2024523 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $8,680,474.81 | $9,644,972.01 |
Texas | 2024523 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $20,539,525.19 | $22,821,694.66 |
Texas | 2024529 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $184,837,913.61 | |
Texas | 2024529 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $6,587,080.00 | |
Texas | 2024529 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,156,971.13 | |
Texas | 2024529 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $30,744,143.92 | |
Texas | 2024530 | Bexar | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $1,120,000.00 | $1,400,000.00 |
Texas | 2024530 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $96,393,176.02 | $121,451,443.70 |
Texas | 2024530 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,610,399.48 | $3,262,999.35 |
Texas | 2024530 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $6,626,960.20 | $8,283,700.25 |
Texas | 2024530 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,472,061.20 | $1,840,076.50 |
Texas | 2024530 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,478,381.88 | $1,847,977.35 |
Texas | 2024530 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,872,980.17 | $13,696,207.40 |
Texas | 2024535 | Reeves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $50,212,726.79 | |
Texas | 2024535 | Reeves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,515,200.37 | |
Texas | 2024536 | Reeves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $50,809,057.93 | |
Texas | 2024536 | Reeves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,568,950.80 | |
Texas | 2024562 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $143,683,664.74 | |
Texas | 2024562 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $10,050,690.00 | |
Texas | 2024562 | Midland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,700,497.44 | |
Texas | 2024576 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,846.78 | |
Texas | 2024576 | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $87,784,665.10 | |
Texas | 2024576 | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,029,853.27 | |
Texas | 2024576 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,470.23 | |
Texas | 2024576 | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,862,375.70 | |
Texas | 2024576 | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $360,763.13 | |
Texas | 2024576 | Fayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,817,202.85 | |
Texas | 2024576 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,855.25 | |
Texas | 2024654 | Culberson | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $30,312,916.41 | |
Texas | 2024654 | Culberson | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,856,805.92 | |
Texas | 2024691 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,179,400.00 | |
Texas | 2024691 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $3,706,987.50 | |
Texas | 2024691 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $985,601.28 | |
Texas | 2024691 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,069,510.84 | |
Texas | 2024691 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $70,437,294.51 | |
Texas | 2024696 | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,302,901.77 | $39,760,253.75 |
Texas | 2024696 | Wilson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $350,444.81 | $3,229,880.17 |
Texas | 2024737 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $70,130,284.26 | $78,055,188.15 |
Texas | 2024737 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $6,958,177.83 | $7,780,147.70 |
Texas | 2024737 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,925,476.67 | $9,960,271.09 |
Texas | 2024738 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $32,273,600.73 | $40,333,594.03 |
Texas | 2024738 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $14,561,802.57 | $18,225,639.56 |
Texas | 2024738 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,321.08 | |
Texas | 2024738 | Ellis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,652.88 | |
Texas | 2024738 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,637,449.87 | $3,296,812.34 |
Texas | 2024738 | Dallas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,248,466.34 | $2,810,582.92 |
Texas | 2024738 | Ellis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $420,451.04 | $525,563.81 |
Texas | 2024766 | Montague | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,499,163.19 | $29,386,952.27 |
Texas | 2024766 | Presidio | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,645,282.80 | $2,056,603.50 |
Texas | 2024766 | Presidio | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $923,958.72 | $1,154,948.40 |
Texas | 2024766 | Presidio | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $116,452.30 | $145,565.38 |
Texas | 2024766 | Montague | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $207,365.29 | $259,206.61 |
Texas | 2024766 | Montague | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,953,750.29 | $3,693,826.11 |
Texas | 2024806 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,346,380.03 | $52,607,088.92 |
Texas | 2024806 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,013,565.73 | $3,348,406.37 |
Texas | 2024806 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $344,404.15 | $382,671.28 |
Texas | 2024806 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,390,722.96 | $3,767,469.96 |
Texas | 2024821 | Harris | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $63,149,816.49 | |
Texas | 2024821 | Harris | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $311,000.00 | |
Texas | 2024833 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $245,919,295.26 | |
Texas | 2024833 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $34,772,222.12 | |
Texas | 2024833 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $55,714,822.53 | |
Texas | 2024833 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,962,959.95 | |
Texas | 2024833 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $50,790,535.46 | |
Texas | 2024833 | Travis | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $67,420,612.25 | $188,713,165.00 |
Texas | 2024833 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $23,383,506.89 | $37,915,259.34 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $1,610,371.00 | $1,610,371.00 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $29,224,094.80 | $29,224,094.80 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge New Construction | $18,377,284.20 | $18,377,284.20 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Rehabilitation - Added Capacity | $788,250.00 | $788,250.00 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,570,287.00 | |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $70,792,498.21 | $175,947,270.14 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $24,178,429.22 | $24,178,429.22 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $456,340.50 | $456,340.50 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,896,716.49 | |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,396,642.65 | $42,148,300.62 |
Texas | 2024845 | Cooke | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,700,000.00 | |
Texas | 2024849 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $36,315,015.68 | $45,420,517.02 |
Texas | 2024849 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $5,340,798.88 | $6,675,998.60 |
Texas | 2024849 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $673,134.32 | $841,417.90 |
Texas | 2024849 | Bell | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,953,364.22 | $7,464,618.67 |
Texas | 2024864 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $217,656,297.25 | $272,425,459.58 |
Texas | 2024864 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $468,405.28 | $612,091.40 |
Texas | 2024864 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $53,827.45 | $70,339.34 |
Texas | 2024864 | Randall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,885,245.15 | $23,645,483.78 |
Texas | 2024922 | Hardeman | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $20,400,123.78 | $25,620,154.73 |
Texas | 2024922 | Hardeman | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,586,485.79 | $3,244,447.24 |
Texas | 2024944 | Frio | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $31,265,651.01 | $39,082,063.76 |
Texas | 2024944 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $152,649,943.12 | $192,784,667.75 |
Texas | 2024944 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $24,980,511.10 | $31,225,638.87 |
Texas | 2024944 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $40,445,343.94 | $50,556,679.92 |
Texas | 2024944 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,068,645.93 | $11,335,807.41 |
Texas | 2024944 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $35,738,021.71 | $44,672,527.14 |
Texas | 2024944 | Frio | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,844,931.59 | $9,806,164.48 |
Texas | 2024944 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $797,152.16 | $996,440.20 |
Texas | 2024944 | Denton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $144,278,549.59 | $180,348,186.99 |
Texas | 2024979 | Jefferson | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $1,800,000.00 | |
Texas | 2024979 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $238,385,020.80 | $302,021,575.00 |
Texas | 2024979 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $78,172,975.64 | $97,716,219.55 |
Texas | 2024979 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $118,989,062.26 | $148,736,327.83 |
Texas | 2024979 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,870,658.06 | $18,588,322.58 |
Texas | 2024979 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $29,877,542.90 | $49,727,198.18 |
Texas | 2024994 | Parker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $85,840,873.25 | $95,901,029.92 |
Texas | 2024994 | Parker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $126,369.00 | $140,410.00 |
Texas | 2024994 | Parker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $22,195.77 | $24,661.97 |
Texas | 2024994 | Parker | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,366,650.41 | $14,912,789.55 |
Texas | 2025009 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,645,496.93 | |
Texas | 2025009 | Harris | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $10,976,350.71 | |
Texas | 2025009 | Harris | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $260,957,231.75 | |
Texas | 2025009 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $53,299,030.00 | |
Texas | 2025009 | Harris | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,649,019.00 | $12,061,273.75 |
Texas | 2025009 | Harris | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $124,082,146.00 | $124,553,730.65 |
Texas | 2025020 | Rusk | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $26,423,702.98 | |
Texas | 2025020 | Rusk | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,381,491.07 | |
Texas | 2025038 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,319,417.80 | |
Texas | 2025038 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $47,988,347.00 | |
Texas | 2025038 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,609,381.19 | |
Texas | 2025038 | Harris | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,084,334.54 | |
Texas | 2025041 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,368,835.73 | |
Texas | 2025041 | San Jacinto | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,227.17 | |
Texas | 2025041 | San Jacinto | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $27,016.24 | |
Texas | 2025041 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,976,625.12 | |
Texas | 2025041 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $35,559,553.20 | $44,449,441.52 |
Texas | 2025041 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $2,208,372.40 | $2,760,465.50 |
Texas | 2025042 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,350,528.75 | |
Texas | 2025042 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $66.64 | |
Texas | 2025042 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,314,557.54 | $27,893,196.92 |
Texas | 2025042 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,651,110.84 | $4,563,888.55 |
Texas | 2025050 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $91,039,984.20 | |
Texas | 2025050 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $527,530.00 | |
Texas | 2025050 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $66,487.91 | |
Texas | 2025050 | Bowie | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,397,707.42 | |
Texas | 2025066 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $470,397.82 | |
Texas | 2025066 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $95,833,607.61 | |
Texas | 2025066 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,072,147.90 | |
Texas | 2025066 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $101,214.20 | |
Texas | 2025066 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,551,818.90 | |
Texas | 2025066 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $206,587.81 | |
Texas | 2025066 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,222,982.80 | |
Texas | 2025066 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $59,996.33 | |
Texas | 2025079 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,739,788.60 | |
Texas | 2025079 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,781,969.19 | |
Texas | 2025079 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $53,115,616.91 | |
Texas | 2025143 | Liberty | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,280,790.50 | |
Texas | 2025143 | Liberty | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $926,555.50 | |
Texas | 2025143 | Liberty | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,924,967.09 | |
Texas | 2025144 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $38,665,513.86 | |
Texas | 2025144 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $103,892.09 | |
Texas | 2025144 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $29,917,149.65 | |
Texas | 2025144 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $831,303.00 | |
Texas | 2025144 | McLennan | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $202,308,078.07 | |
Texas | 2025159 | Goliad | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $17,547,358.75 | |
Texas | 2025159 | Goliad | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,738,949.19 | |
Texas | 2025159 | Goliad | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,205,348.34 | |
Texas | 2025211 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $35,952,197.28 | |
Texas | 2025211 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,121,922.85 | |
Texas | 2025211 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,536,322.50 | |
Texas | 2025216 | Liberty | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $14,797,253.39 | $18,496,566.75 |
Texas | 2025216 | Liberty | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Bridge New Construction | $10,702,425.60 | $13,378,032.00 |
Texas | 2025216 | Liberty | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $3,618,513.23 | $4,523,141.54 |
Texas | 2025218 | Galveston | >= 200,000 | State | FERRY BOATS & TERMINAL | Construction Engineering | $8,177,869.40 | |
Texas | 2025218 | Galveston | >= 200,000 | State | FERRY BOATS & TERMINAL | Ferry Boats | $20,968,583.00 | $33,594,901.75 |
Texas | 2025218 | Galveston | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Ferry Boats | $9,682,362.00 | $9,682,362.00 |
Texas | 2025323 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $53,258,300.19 | |
Texas | 2025323 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $211,388,458.06 | |
Texas | 2025323 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $42,925,760.81 | |
Texas | 2B20004 | Palo Pinto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $18,032,451.03 | $22,540,563.79 |
Texas | 2B20004 | Palo Pinto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,025,570.41 | $3,781,963.02 |
Texas | 2B20006 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,782,324.39 | $3,477,905.49 |
Texas | 2B20006 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $19,827,009.13 | $27,783,761.42 |
Texas | 2B20006 | Denton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $55,209.31 | $69,011.63 |
Texas | 2B20006 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $3,313,440.00 | $4,141,800.00 |
Texas | 2B20010 | El Paso | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - No Added Capacity | $21,290,932.60 | $26,613,665.76 |
Texas | 2B20010 | El Paso | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | Construction Engineering | $2,709,318.28 | $3,386,647.85 |
Texas | 2B20010 | El Paso | >= 200,000 | State | COORD BORDER INFRA PROGRAM | 4R - No Added Capacity | $9,600,000.00 | $12,000,000.00 |
Texas | 2B20015 | Nueces | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $14,000,000.00 | $69,791,097.00 |
Texas | 2B20048 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,955,684.08 | $7,589,963.87 |
Texas | 2B20048 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $17,167,951.81 | $21,459,939.76 |
Texas | 2B20048 | Galveston | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,647,495.86 | $5,809,369.82 |
Texas | 2B20048 | Galveston | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $51,200,000.00 | $64,000,000.00 |
Texas | 2B20200 | Tarrant | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $239,478.64 | $299,348.30 |
Texas | 2B20200 | Tarrant | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $320,000.00 | $400,000.00 |
Texas | 2B20200 | Tarrant | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $2,600,113.36 | $3,250,141.70 |
Texas | 2B20200 | Tarrant | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $143,656.01 | $179,570.01 |
Texas | 2B20200 | Tarrant | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $20,000,000.00 | $20,000,000.00 |
Texas | 2B20200 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,898,765.64 | |
Texas | 2B20200 | Tarrant | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $10,253,308.00 | $15,060,777.93 |
Texas | 2B20250 | Loving | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $36,009.42 | $190,879.55 |
Texas | 2B20250 | Winkler | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $8,874,161.85 | $47,040,355.47 |
Texas | 2B20250 | Winkler | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $89,465.70 | $111,832.12 |
Texas | 2B20250 | Loving | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $363.03 | $453.79 |
Texas | 2B20255 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1.00 | $1.25 |
Texas | 2B20255 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,267,676.00 | $27,834,595.00 |
Texas | 2B20255 | Collin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,227,036.75 | $1,533,795.94 |
Texas | 2B20260 | Fannin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,681,740.61 | $2,056,872.00 |
Texas | 2B20260 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $61,257,655.92 | $86,052,889.63 |
Texas | 2B20260 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,510,563.47 | $13,824,838.87 |
Texas | 2B20260 | Collin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $19,160.00 | $23,950.00 |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $120,480,934.72 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,260,260.00 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,988,145.00 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,374,627.32 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $21,982,503.93 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $45,444,136.27 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,601,987.90 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,043,970.00 | |
Texas | 2B20290 | Madison | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $2,874,487.00 | |
Texas | 2B22010 | Andrews | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $26,306,820.82 | $32,883,526.02 |
Texas | 2B22010 | Andrews | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,253,654.46 | $4,067,068.08 |
Texas | 2B22018 | Hunt | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $9,133,323.45 | $11,416,654.31 |
Texas | 2B22018 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,081,944.64 | $88,873,413.12 |
Texas | 2B22018 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $991,258.86 | $9,522,190.20 |
Texas | 2B22018 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,750,135.97 | $16,458,970.68 |
Texas | 2B22018 | Hunt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $290,211.65 | $13,732,776.04 |
Texas | 2B22018 | Hunt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,200,000.00 | $6,499,999.83 |
Texas | 2B23020 | Eastland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $19,127,792.12 | $23,957,731.66 |
Texas | 2B23020 | Eastland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,954,018.26 | $2,447,531.32 |
Texas | 2B23042 | Lubbock | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Rehabilitation - No Added Capacity | $20,115,196.70 | $25,334,772.53 |
Texas | 2B23042 | Lubbock | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $1,754,369.26 | $2,214,261.92 |
Texas | 2B23048 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $138,359,974.93 | $176,006,568.36 |
Texas | 2B23048 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,446,720.48 | $9,308,400.60 |
Texas | 2B23048 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $7,166,388.72 | $8,957,985.90 |
Texas | 2B23048 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,791,238.86 | $2,239,048.58 |
Texas | 2B23048 | Grayson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,466,787.15 | $6,858,312.43 |
Texas | 2B23079 | Victoria | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $37,780,013.96 | $47,440,703.23 |
Texas | 2B23079 | Victoria | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,536,418.96 | $4,420,523.70 |
Texas | 2B23079 | Victoria | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $3,777,040.00 | $4,721,300.00 |
Texas | 2B23079 | Victoria | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,101,127.67 | $3,879,571.81 |
Texas | 2B23121 | DeWitt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,631,924.45 | $57,162,921.39 |
Texas | 2B23121 | DeWitt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $166,202.60 | $2,386,465.00 |
Texas | 2B23121 | DeWitt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,425,423.85 | |
Texas | 2B23121 | DeWitt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $260,130.37 | $325,162.96 |
Texas | 2B23122 | Presidio | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,803,750.09 | $1,803,750.09 |
Texas | 2B23122 | Presidio | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Rail/Hwy Crossing | $19,227,574.91 | $34,727,574.91 |
Texas | 2B23149 | Webb | >= 200,000 | State | COORD BORDER INFRA PROGRAM | 4R - No Added Capacity | $8,185,812.80 | $10,232,266.00 |
Texas | 2B23149 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,766,243.72 | $17,276,398.76 |
Texas | 2B23149 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,299,422.83 | $5,387,014.67 |
Texas | 2B23149 | Webb | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $17,200,000.00 | $21,500,000.00 |
Texas | 2B23150 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $66,215,057.81 | $82,860,171.05 |
Texas | 2B23150 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,002,602.72 | $3,753,253.40 |
Texas | 2B23150 | Webb | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $19,041.80 | |
Texas | 2B23150 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,166,655.04 | $10,208,318.80 |
Texas | 2B23151 | Webb | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - No Added Capacity | $9,996,224.01 | $12,495,280.01 |
Texas | 2B23151 | Webb | >= 200,000 | State | COORD BORDER INFRA PROGRAM | 4R - No Added Capacity | $25,503,834.42 | $25,503,834.42 |
Texas | 2B23151 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $27,131,838.75 | $34,137,540.54 |
Texas | 2B23151 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,226,393.44 | $5,282,991.80 |
Texas | 2B23151 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $669,213.43 | $836,516.79 |
Texas | 2B23151 | Webb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,301,729.33 | $15,412,430.98 |
Texas | 2B23151 | Webb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $20,160,000.00 | $25,200,000.00 |
Texas | 2B23204 | Jasper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,285,289.31 | $22,856,611.67 |
Texas | 2B23204 | Jasper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,768,165.08 | $2,210,206.32 |
Texas | 2B23273 | Webb | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $8,637,871.20 | $10,797,338.99 |
Texas | 2B23273 | Webb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $325,185.00 | $406,481.25 |
Texas | 2B23273 | Webb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $36,319,303.38 | |
Texas | 2B23273 | Webb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,231,055.94 | |
Texas | 2B23276 | Van Zandt | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | $32,011,796.96 | $40,014,746.20 |
Texas | 2B23276 | Van Zandt | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $3,219,350.98 | $4,024,188.72 |
Texas | 2B23294 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $6,900,374.00 | $8,625,467.50 |
Texas | 2B23294 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $11,869,065.47 | $15,793,132.23 |
Texas | 2B23294 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,260,977.36 | $4,369,421.29 |
Texas | 2B24013 | Reagan | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $11,453.29 | |
Texas | 2B24013 | Irion | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $54,911,542.29 | |
Texas | 2B24013 | Tom Green | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,941.20 | |
Texas | 2B24013 | Tom Green | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $723.80 | |
Texas | 2B24013 | Irion | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,612,194.80 | |
Texas | 2B24041 | Webb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $23,648,667.32 | |
Texas | 2B24041 | Webb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $17,732,310.65 | |
Texas | 2B24041 | Webb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $27,099,609.29 | $117,593,358.74 |
Texas | 2B24070 | Hudspeth | < 5,000 | State | CARBON REDUCTION PROGRAM | Safety | $21,830,954.40 | $27,288,693.00 |
Texas | 2B24070 | Hudspeth | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,335,333.10 | $2,920,433.23 |
Texas | 2B24070 | Hudspeth | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $7,663,573.90 | $9,595,467.38 |
Texas | 2B24071 | Cameron | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $548,153.15 | $697,791.44 |
Texas | 2B24071 | Cameron | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $19,181,098.91 | $23,976,373.64 |
Texas | 2B24071 | Cameron | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,172,937.60 | $2,717,307.70 |
Texas | 2B24072 | Brooks | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,761,598.96 | $2,201,998.70 |
Texas | 2B24072 | Duval | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $73,673.41 | $92,091.76 |
Texas | 2B24072 | Jim Hogg | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $26,010,223.99 | $32,512,779.99 |
Texas | 2B24072 | Jim Hogg | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,298,057.39 | $4,122,571.74 |
Texas | 2B24073 | Matagorda | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $14,368,078.80 | $26,882,455.70 |
Texas | 2B24073 | Matagorda | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,821,528.49 | $3,408,156.20 |
Texas | 2B24075 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,506,710.00 | |
Texas | 2B24075 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,376,948.59 | $9,221,185.74 |
Texas | 2B24075 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,744,612.93 | $16,162,853.92 |
Texas | 2B24075 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $68,461,083.44 | $85,576,354.30 |
Texas | 2B24075 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Bridge New Construction | $4,983,833.92 | $6,229,792.40 |
Texas | 2B24075 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - Added Capacity | $41,999,795.12 | $52,499,743.90 |
Texas | 2B24092 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,715,595.88 | $24,773,199.85 |
Texas | 2B24092 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,717,591.44 | $3,396,989.30 |
Texas | 2B24092 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $4,122,382.00 | $5,152,977.50 |
Texas | 2B24092 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $724,065.44 | $905,081.80 |
Texas | 2B24092 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,940,220.88 | $4,947,882.17 |
Texas | 2B24096 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $58,952,367.04 | $73,988,212.53 |
Texas | 2B24096 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $14,179,162.82 | $17,723,953.52 |
Texas | 2B24096 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,772,040.87 | $2,215,051.09 |
Texas | 2B24096 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,818,277.26 | $12,305,343.14 |
Texas | 2B24096 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $19,749,353.00 | $24,686,691.25 |
Texas | 2B24119 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,681,059.44 | $37,108,824.30 |
Texas | 2B24119 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,650,479.20 | $5,813,099.00 |
Texas | 2B24119 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $118,462.40 | $264,958.00 |
Texas | 2B24119 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,804.84 | $33,113.13 |
Texas | 2B24119 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,248,232.04 | $5,311,227.36 |
Texas | 2B24168 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $81,155,122.03 | |
Texas | 2B24168 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $20,535,421.32 | |
Texas | 2B24168 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,566,414.27 | |
Texas | 2B24168 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $17,407,286.02 | |
Texas | 2B24168 | Bexar | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $47,775,633.00 | $59,719,541.25 |
Texas | 2B24195 | Starr | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,424,940.03 | $31,821,220.14 |
Texas | 2B24195 | Starr | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $882,343.20 | $1,102,929.00 |
Texas | 2B24195 | Starr | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,936,144.16 | $4,920,180.20 |
Texas | 2B24195 | Starr | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $496,096.89 | $620,121.11 |
Texas | 2B24195 | Starr | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,262,111.14 | $4,082,686.05 |
Texas | 2B24205 | Hidalgo | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $20,000,000.00 | |
Texas | 2B24205 | Hidalgo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,600,000.00 | $44,004,605.19 |
Texas | 2B24205 | Hidalgo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,592,120.00 | |
Texas | 2B24247 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $117,076,061.44 | $146,730,291.80 |
Texas | 2B24247 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,903,454.40 | $3,629,318.00 |
Texas | 2B24247 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $233,448.00 | $291,810.00 |
Texas | 2B24247 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $59,064,432.96 | $73,830,541.20 |
Texas | 2B24247 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,439,097.60 | $8,048,872.00 |
Texas | 2B24247 | Colorado | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,028,455.65 | $16,325,988.64 |
Texas | 2B24253 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $349,735,188.20 | |
Texas | 2B24253 | Travis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $58,847,832.19 | |
Texas | 2B24253 | Travis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,738,348.00 | |
Texas | 2B24256 | Nueces | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,032,289.64 | |
Texas | 2B24256 | Nueces | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $43,000,000.00 | |
Texas | 2B24256 | Nueces | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $24,272,281.00 | |
Texas | 2B24256 | Nueces | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $11,586,266.64 | |
Texas | 2B24270 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $234,018,179.47 | |
Texas | 2B24270 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $13,310,181.00 | |
Texas | 2B24270 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,575,800.64 | |
Texas | 2B24270 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $22,289,090.89 | |
Texas | 2B24270 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,107,489.82 | |
Texas | 2B24270 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $30,909,861.85 | |
Texas | 2B24270 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $258,807.20 | $323,509.00 |
Texas | 2B24271 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $166,664,267.29 | |
Texas | 2B24271 | Dallas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,241,083.40 | |
Texas | 2B24273 | El Paso | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - No Added Capacity | $20,000,000.00 | $20,000,000.00 |
Texas | 2B24273 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $109,537,277.20 | |
Texas | 2B24273 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $63,758,560.37 | |
Texas | 2B24273 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,894,506.25 | |
Texas | 2B24273 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,286,144.88 | |
Texas | 2B24273 | El Paso | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge New Construction | $15,270,086.09 | $22,000,000.00 |
Texas | 2B24277 | Jones | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,366,148.68 | $16,707,685.85 |
Texas | 2B24277 | Taylor | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,654,075.12 | $3,317,593.90 |
Texas | 2B24277 | Jones | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,799,953.60 | $5,999,942.00 |
Texas | 2B24277 | Jones | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $681,638.72 | $852,048.40 |
Texas | 2B24277 | Jones | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,895,322.30 | $2,369,152.88 |
Texas | 2B24277 | Taylor | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $376,348.33 | $470,435.41 |
Texas | 2B24288 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,964,336.60 | $27,455,420.75 |
Texas | 2B24288 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,844,714.78 | $2,305,893.48 |
Texas | 2B24314 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $102,800,952.30 | |
Texas | 2B24314 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,324,940.00 | |
Texas | 2B24314 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $994,577.00 | |
Texas | 2B24314 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $174,689.98 | |
Texas | 2B24314 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,463,741.49 | |
Texas | 2B24398 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $40,602,376.21 | |
Texas | 2B24398 | Kenedy | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,130,670.47 | |
Texas | 2B24429 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $22,064,717.66 | $27,690,603.08 |
Texas | 2B24429 | Harris | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,133,398.20 | $3,923,132.64 |
Texas | 2B24547 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,709,507.80 | |
Texas | 2B24547 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $95,570,831.26 | |
Texas | 2B24547 | Bexar | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $17,673,758.33 | |
Texas | NBIS019 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Inspection and Bridge Related Training | $52,800,000.00 | $66,000,000.00 |
Texas | NBIS023 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Inspection and Bridge Related Training | $27,950,000.00 | $34,937,500.00 |
Texas | SB97001 | Statewide | N/A | State | ST INFR BANK PILOT - ADV CAP | Other | $160,715,448.00 | |
Texas | SB97001 | Statewide | N/A | State | ST INFRA BANK PILOT - EXEMPT | Other | $6,948,724.00 | $8,685,905.00 |
Texas | SB97001 | Statewide | N/A | N/A | ST INFRA BANK PILOT-SUB TO LIM | Other | $80,613,333.00 | $100,766,666.00 |
Texas | SB97001 | Statewide | N/A | State | STATE INFRASTRUCTURE BANK - GF | Other | $12,000,000.00 | $15,000,000.00 |
Texas | X597001 | Nueces | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $4,100,398.00 | $5,125,498.00 |
Texas | X597001 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $420,611,107.47 | $494,836,597.02 |
Texas | X597001 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $247,350,000.00 | $291,000,000.00 |
Texas | X597001 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $47,100,000.00 | $55,411,764.70 |
Texas | X597001 | Nueces | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $5,548,154.70 | $6,935,193.38 |
Texas | X597001 | Nueces | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,713,598.75 | $17,141,998.44 |