U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Connecticut

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Connecticut 0003112 Glastonbury; Rehabilitation of Putnam Bridge No. 00417 carrying Route 3 over the Connecticut River. $4,000,000.00 $105,470,680.00
Connecticut 0006113 BRISTOL; PROVIDE A SECOND EASTBOUND THROUGH LANE FROM CAROL DRIVE TO PEGGY LANE, A ONE MILE SEGMENT OF THE ROUTE 6 CORRIDOR. (CN) $20,581,710.52 $27,662,578.02
Connecticut 0008134 WATERBURY; REHABILITATION OF BRIDGES (NO ADDED CAPACITY) IN THE ROUTE 8/I-84 INTERCHANGE AREA (CN). $142,744,060.80 $178,430,076.02
Connecticut 0008141 D-B RBC PROJECT - RESURFACING, BRIDGE REHABILITATION, & SAFETY IMPROVEMENTS ON APPROX. 6.43 MILES OF MAINLINE (CN). $101,286,823.20 $134,339,762.03
Connecticut 000T285 Middletown; Reconfiguration of Route 17 On-Ramp onto Route 9 North. $54,902,076.80 $73,670,220.01
Connecticut 000T323 Bridge Painting/Metalizing along the I-395 Corridor in District 2. $28,749,204.80 $35,936,506.00
Connecticut 000T328 DISTRICT 1; Address Steel Beam end deterioration on various Bridges using Ultra High Performance Concrete (UHPC). $23,564,119.20 $29,455,149.00
Connecticut 000T347 Statewide; Job Order Contracting (JOC) Program through 12/31/2027 for installation of pavement markings $32,000,000.00 $32,000,000.00
Connecticut 000T391 Meriden/Middletown; Improve I-91 SB/I-691 EB/15 SB. $94,306,817.00 $287,580,080.00
Connecticut 000T392 Meriden; I-91/I-691/Route 15 Interchange - Improvements to I-91 Northbound, I-691 Westbound, and Route 15 Northbound. $145,126,196.29 $249,339,580.02
Connecticut 000T486 Statewide - Emergency Declaration (ED) for Rain Event August 18-19, 2024, $37,530,081.35 $40,529,290.01
Connecticut 000T612 District 1; Address Steel Beam End Deterioration on various Non-Interstate Bridges. $1,000,000.00 $26,419,200.00
Connecticut 000T613 District 1; Address Steel Beam End Deterioration on various Interstate Bridges carrying I-84 and I-91. $1,000,000.00 $26,447,000.00
Connecticut 0015105 NEW CANAAN/NORWALK - MERRITT PARKWAY (RTE 15) IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS (CN). $60,493,164.00 $75,916,455.02
Connecticut 0015134 WESTPORT - SAFETY IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS ON THE MERRITT PKWY (CT15) IN THE TOWNS OF WESTPORT & FAIRFIELD (CN). $67,536,664.21 $84,425,513.02
Connecticut 0015145 NORWALK - MERRITT PARKWAY (ROUTE 15) RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS (CN) $40,723,474.40 $51,158,111.01
Connecticut 0032203 EAST HARTFORD - RESURFACING, BRIDGE & SAFETY IMPROVEMENTS ON RTE 2 FROM THE CHARTER OAK BRIDGE AREA (CN) $68,814,621.60 $86,018,277.00
Connecticut 0032215 Colchester - RBC Project to address approx. 4.5 miles of Route 2 $40,997,794.40 $55,617,233.01
Connecticut 0034122 NEWTOWN - MAJOR INTERSECTION IMPROVEMENTS, CT 34 at I-84 (CN). $26,173,295.20 $32,716,620.00
Connecticut 0044160 Norfolk - Replace 3 Retaining Walls adjacent to Rte. 44 (CN). $31,776,000.00 $50,512,939.00
Connecticut 0066121 MIDDLETOWN, REHABILITATION OF BRIDGE #00524 (ARRIGONI) WHICH CARRIES ROUTE 66 OVER THE CONNECTICUT RIVER (CN). $31,345,909.60 $56,334,591.00
Connecticut 0072016 Rehabilitate four Bridges carrying Route 72 in New Britain and Plainville. $35,233,520.80 $47,436,401.00
Connecticut 0082141 EAST HADDAM - REHABILITATION OF BRIDGE #01138, ROUTE 82 OVER CONNECTICUT RIVER (CN) $63,816,350.40 $79,785,438.01
Connecticut 0130008 Bridgeport; Rehabilitation of Bridge # 02475, Route 130 over Pequonnock River. $35,429,190.80 $48,735,281.01
Connecticut 0842306 WATERBURY; REHABILITATION OF BR. 03191B CARRYING I-84 WB OVER RTE. 8 AND THE NAUGATUCK RIVER. (CN) $53,393,482.80 $59,326,096.02
Connecticut 0842307 WATERBURY; REHABILITATION OF BR. 03191A CARRYING I-84 EB OVER I-84 WB, RTE. 8, AND THE NAUGATUCK RIVER. (CN) $58,973,687.10 $65,526,320.00
Connecticut 0842310 NEWTOWN; RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS ON I-84. $37,648,821.60 $41,832,024.04
Connecticut 0842327 Waterbury - Remove I-84 Exit 21 EB Off-Ramp, extend Auxiliary Lane on I-84 to Exit 22 EB Off-Ramp (CN). $8,000,000.00 $25,108,260.00
Connecticut 0842328 Pavement Rehabilitation of approximately 7.7 miles of I-84 in Southbury and Middlebury. $38,438,225.10 $46,176,840.01
Connecticut 0843248 Hartford; Rehabilitation of Aetna Viaduct Bridge Nos. 03160A and 03160B carrying I-84 Eastbound and Westbound (CN). $10,000,000.00 $32,286,880.01
Connecticut 0912136 WETHERSFIELD/HARTFORD; I-91 IMPROVEMENTS AND UPGRADES. $60,061,328.70 $66,653,143.75
Connecticut 0913182 Windsor Locks; Rehabilitation of Bridge #00454, I-91 over CT River, Amtrak and Rte. 159 (Dexter Coffin Bridge). $38,619,853.20 $42,910,948.63
Connecticut 0913183 Hartford - Rehab of Bridge No. 01469B (Dutch Point Viaduct) carrying Interstate-91 SB over the CT Southern Railroad, SR 598 WB and TR 803. $73,943,807.40 $87,097,964.05
Connecticut 0913186 Pavement Resurfacing on I-91 NB from approx. MP 50.93 to 58.17 and I-91 SB from approx. MP 50.90 to 58.17 in East Windsor/Enfield. $32,038,812.90 $37,132,426.02
Connecticut 0951181 NEW HAVEN; I-95/Q BR.RPL(NO ADDED CAPACITY) & DEMOLITION (CONTRACT B) FR. VIC EAST ST TO VIC. WOODWARD AVE, E. SHORE (CN). $421,279,298.84 $485,009,923.09
Connecticut 0951191 NORWALK/WESTPORT; I-95 RECONSTRUCT THE MEDIAN AND INSTALL 45" CONCRETE BARRIER CURB IN NORWALK & WESTPORT $89,078,350.95 $138,144,115.00
Connecticut 0951204 NEW HAVEN; ADVANCE SOIL PRELOAD CONTRACT FOR S. P. #92-531 - I-91/I-95/CT RTE. 34 INTERCHANGE (CONTRACT E1)(CN) $25,882,832.80 $32,400,274.00
Connecticut 0951222 NEW HAVEN; I-95 - NB APPROACH AND RIVER PIERS FOR NEW PEARL HARBOR MEMORIAL BR., CONTRACT B1 (CN) $135,771,245.61 $156,113,746.00
Connecticut 0951243 NEW HAVEN; BREAKOUT OF PROJ 92-531. RECONST OF I-95 / I-91 / ROUTE 34 INTERCHANGE ASSOC WITH Q BR. REPL. CONTRACT E-2 (CN) $98,935,740.54 $113,777,781.00
Connecticut 0951372 NORWALK; REHAB OF BRIDGE #00059 (YANKEE DOODLE BRIDGE), I-95 OVER NORWALK RIVER AND HENDRICKS RD. (CN) $37,725,651.00 $42,492,456.01
Connecticut 0951377 STRATFORD; PROVIDE A FULL INTERCHANGE ON I-95 AT INTERCHANGE 33 BY CONSTRUCTING A NEW SB OFF-RAMP AND A NEW NB ON-RAMP. $35,645,277.60 $39,605,864.02
Connecticut 0951378 STAMFORD; REHABILITATION OF BRIDGE NO. 00032 CARRYING I-95 AND I-95 RAMPS OVER MNRR AND LOCAL ROADS. (CN) $24,054,682.50 $26,727,425.03
Connecticut 0951384 West Haven; Replace Bridge Nos. 161 & 162 carrying I-95 over SR 745 & Metro North RR, respectively. $109,079,958.49 $131,700,475.03
Connecticut 0951385 Stamford - This Design-Build project involves construction of an Auxiliary Lane on I-95 SB from Exit 7 to Exit 6 (CN). $68,274,011.70 $78,860,014.02
Connecticut 0951386 I-95 Pavement Preservation from NY State Line to Exit 6 in Stamford (CN). $73,480,929.30 $85,935,452.04
Connecticut 0953072 New London/Groton; Gold Star Memorial Bridge Northbound Structure Rehabilitation and Construction of Multi-Use Path on Southbound Structure (PE) (CN). $283,434,907.77 $918,357,172.01
Connecticut 0953073 NEW LONDON/GROTON; PHASE 1A OF REHAB FOR BR #03819 NB (GOLD STAR MEMORIAL BRIDGE) CARRYING I-95 OVER THAMES RIVER & LOCAL ROADS. $22,158,689.00 $91,902,097.01
Connecticut 0953078 East Lyme - Improvement of I-95 Interchange 74 at Rte 161 & Replacement of Bridge #00250 $159,896,696.80 $209,863,511.03
Connecticut 0954110 Groton, Stonington, and North Stonington; Safety Improvements and Pavement Rehabilitation on I-95 Southbound. $43,655,859.90 $49,566,444.02
Connecticut 0954118 Safety Improvements and Pavement Rehabilitation on I-95 NB in Groton, Stonington & North Stonington $45,837,419.40 $51,795,092.00
Connecticut 1042133 East Hartford; Replace Cameras and Communications Equipment in the Hartford area with Modern Equipment $22,444,379.10 $26,802,899.01
Connecticut 1063143 HARTFORD; INTERCHANGE 29 @ I-91N & RTE 15N IMPROVEMENTS $5,000,000.00 $231,503,537.00
Connecticut 1092144 NEW HAVEN; MAJOR REHABILITATION OF BRIDGE #03810 OVER QUINNIPIAC RIVER. $4,916,605.11 $27,929,200.00
Connecticut 1096111 NEWTOWN; REHABILITATION OF BRIDGES 01218 & 04180, I-84 EB & WB O/ HOUSATONIC RIVER. SUPERSTRUCTURE REPLACEMENTS. $60,956,185.50 $67,729,095.34
Connecticut H100002 DERBY; RECONSTRUCTION OF APPROXIMATELY 2,400 FEET OF ROUTE 34. $24,218,069.02 $37,744,802.04
Connecticut H121002 STAMFORD; REPLACEMENT OF DEFICIENT MNRR BRIDGE #08012R OVER ATLANTIC ST (CN). $4,214,710.77 $69,702,343.76