| Connecticut | 0003112 | Capitol | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $4,000,000.00 | $105,470,680.00 |
| Connecticut | 0006113 | Hartford | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $5,911,547.00 | $7,389,433.75 |
| Connecticut | 0006113 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $14,196,892.69 | $19,681,555.72 |
| Connecticut | 0006113 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $473,270.83 | $591,588.55 |
| Connecticut | 0008134 | New Haven | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $5,361,449.60 | $6,701,812.00 |
| Connecticut | 0008134 | Fairfield | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $5,361,449.60 | $6,701,812.00 |
| Connecticut | 0008134 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $64,510,580.80 | $80,638,225.98 |
| Connecticut | 0008134 | Fairfield | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $64,510,580.80 | $80,638,226.04 |
| Connecticut | 0008134 | Fairfield | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,500,000.00 | $1,875,000.00 |
| Connecticut | 0008134 | New Haven | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,500,000.00 | $1,875,000.00 |
| Connecticut | 0008141 | Naugatuck Valley | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $101,286,823.20 | $134,339,762.03 |
| Connecticut | 000T285 | Middlesex | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $54,902,076.80 | $73,670,220.01 |
| Connecticut | 000T323 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $28,749,204.80 | $35,936,506.00 |
| Connecticut | 000T328 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $23,564,119.20 | $29,455,149.00 |
| Connecticut | 000T347 | Statewide | N/A | State | REDISTRIBUTION OF CERTAIN AUTH | Safety | $7,856,187.98 | $7,856,187.98 |
| Connecticut | 000T347 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $24,143,812.02 | $24,143,812.02 |
| Connecticut | 000T391 | South Central Connecticut | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $43,464,198.50 | $139,178,527.50 |
| Connecticut | 000T391 | Lower Connecticut River Valley | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $43,464,198.50 | $139,178,527.50 |
| Connecticut | 000T391 | Lower Connecticut River Valley | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $686,517.40 | $858,146.75 |
| Connecticut | 000T391 | South Central Connecticut | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $686,517.40 | $858,146.75 |
| Connecticut | 000T391 | Lower Connecticut River Valley | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,002,692.60 | $3,753,365.75 |
| Connecticut | 000T391 | South Central Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,002,692.60 | $3,753,365.75 |
| Connecticut | 000T392 | South Central Connecticut | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $38,071,603.00 | $47,589,503.75 |
| Connecticut | 000T392 | South Central Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $71,179,480.29 | $156,906,185.02 |
| Connecticut | 000T392 | South Central Connecticut | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $35,875,113.00 | $44,843,891.25 |
| Connecticut | 000T486 | Statewide | N/A | State | EMERGENCY RELIEF | Other | $3,000,000.00 | $3,000,000.00 |
| Connecticut | 000T486 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $34,530,081.35 | $37,529,290.01 |
| Connecticut | 000T612 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $1,000,000.00 | $26,419,200.00 |
| Connecticut | 000T613 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $1,000,000.00 | $26,447,000.00 |
| Connecticut | 0015105 | Western Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $33,493,164.00 | $42,166,455.02 |
| Connecticut | 0015105 | Western Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $22,000,000.00 | $27,500,000.00 |
| Connecticut | 0015105 | Greater Bridgeport | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,000,000.00 | $6,250,000.00 |
| Connecticut | 0015134 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $62,536,664.21 | $78,175,513.01 |
| Connecticut | 0015134 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,000,000.00 | $6,250,000.01 |
| Connecticut | 0015145 | Western Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $40,723,474.40 | $51,158,111.01 |
| Connecticut | 0032203 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $68,814,621.60 | $86,018,277.00 |
| Connecticut | 0032215 | Southeastern Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $37,685,812.94 | $51,477,256.18 |
| Connecticut | 0032215 | Southeastern Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,311,981.46 | $4,139,976.83 |
| Connecticut | 0034122 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $11,476,455.59 | $14,345,569.49 |
| Connecticut | 0034122 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,696,839.61 | $18,371,050.51 |
| Connecticut | 0044160 | Northwest Hills | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,885,200.00 | $27,356,500.00 |
| Connecticut | 0044160 | Northwest Hills | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,890,800.00 | $23,156,439.00 |
| Connecticut | 0066121 | Lower Connecticut River Valley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $31,116,099.60 | $56,104,781.00 |
| Connecticut | 0066121 | Lower Connecticut River Valley | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Bridge Rehabilitation - No Added Capacity | $229,810.00 | $229,810.00 |
| Connecticut | 0072016 | Capitol | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $29,233,520.80 | $39,936,401.00 |
| Connecticut | 0072016 | Capitol | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $6,000,000.00 | $7,500,000.00 |
| Connecticut | 0082141 | Lower Connecticut River Valley | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $36,150,108.00 | $45,187,635.00 |
| Connecticut | 0082141 | Lower Connecticut River Valley | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $27,666,242.40 | $34,597,803.01 |
| Connecticut | 0130008 | Greater Bridgeport | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $4,242,560.18 | $5,303,200.23 |
| Connecticut | 0130008 | Greater Bridgeport | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $21,776,640.62 | $31,669,593.28 |
| Connecticut | 0130008 | Greater Bridgeport | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $9,409,990.00 | $11,762,487.50 |
| Connecticut | 0842306 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $959,067.84 | $1,065,630.95 |
| Connecticut | 0842306 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $664,827.36 | $738,698.00 |
| Connecticut | 0842306 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $4,132,493.04 | $4,591,661.00 |
| Connecticut | 0842306 | New Haven | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $680,284.49 | $755,871.66 |
| Connecticut | 0842306 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $46,849,699.05 | $52,055,222.16 |
| Connecticut | 0842306 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $107,111.02 | $119,012.25 |
| Connecticut | 0842307 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $1,305,474.12 | $1,450,526.82 |
| Connecticut | 0842307 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $264,715.13 | $294,127.93 |
| Connecticut | 0842307 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $137,288.64 | $152,542.95 |
| Connecticut | 0842307 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $57,049,927.83 | $63,388,809.65 |
| Connecticut | 0842307 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $216,281.38 | $240,312.65 |
| Connecticut | 0842310 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $911,520.00 | $1,012,800.00 |
| Connecticut | 0842310 | Fairfield | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $7,600,417.43 | $8,444,908.28 |
| Connecticut | 0842310 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $25,998,743.15 | $28,887,492.39 |
| Connecticut | 0842310 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $120,863.74 | $134,293.05 |
| Connecticut | 0842310 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,017,277.28 | $3,352,530.32 |
| Connecticut | 0842327 | Naugatuck Valley | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,000,000.00 | $25,108,260.00 |
| Connecticut | 0842328 | Naugatuck Valley | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $38,438,225.10 | $46,176,840.01 |
| Connecticut | 0843248 | Capitol | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $10,000,000.00 | $32,286,880.01 |
| Connecticut | 0912136 | Hartford | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $5,305,427.00 | $5,894,918.90 |
| Connecticut | 0912136 | Hartford | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $1,915,852.28 | $2,128,724.76 |
| Connecticut | 0912136 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $30,042,315.72 | $33,380,351.50 |
| Connecticut | 0912136 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $3,925,240.90 | $4,361,378.80 |
| Connecticut | 0912136 | Hartford | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $735,000.00 | $735,000.00 |
| Connecticut | 0912136 | Hartford | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $18,137,492.80 | $20,152,769.79 |
| Connecticut | 0913182 | Capitol | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $2,827,934.50 | $3,142,149.46 |
| Connecticut | 0913182 | Capitol | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $172,657.42 | $191,841.58 |
| Connecticut | 0913182 | Capitol | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $24,602,784.44 | $27,336,427.18 |
| Connecticut | 0913182 | Capitol | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $175,506.09 | $195,006.77 |
| Connecticut | 0913182 | Capitol | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $10,799,624.01 | $11,999,582.81 |
| Connecticut | 0913182 | Capitol | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $41,346.74 | $45,940.83 |
| Connecticut | 0913183 | Capitol | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $725,407.72 | $806,008.59 |
| Connecticut | 0913183 | Capitol | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $20,451.89 | $22,724.33 |
| Connecticut | 0913183 | Capitol | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $67,652,235.66 | $80,107,328.76 |
| Connecticut | 0913183 | Capitol | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,545,712.13 | $6,161,902.37 |
| Connecticut | 0913186 | Capitol | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $25,538,812.90 | $28,376,458.79 |
| Connecticut | 0913186 | Capitol | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,500,000.00 | $8,755,967.23 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $246,103,765.86 | $282,877,893.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $58,793,422.02 | $67,578,646.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $2,175,000.00 | $2,500,000.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Replacement - No Added Capacity | $837,045.78 | $962,123.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $3,776,030.29 | $4,365,266.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | Bridge Replacement - No Added Capacity | $1,967,856.00 | $1,967,856.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | $10,438,840.80 | $13,048,553.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM | Bridge Replacement - No Added Capacity | $501,665.42 | $576,627.00 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $51,378,724.49 | $59,056,006.09 |
| Connecticut | 0951181 | New Haven | >= 200,000 | State | TRANSPORTATION IMP PROJ | Bridge Replacement - No Added Capacity | $45,306,948.18 | $52,076,953.00 |
| Connecticut | 0951191 | Western Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $34,955,845.00 | $38,839,828.74 |
| Connecticut | 0951191 | Western Connecticut | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $6,794.95 | $7,549.95 |
| Connecticut | 0951191 | Western Connecticut | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Safety | $54,115,711.00 | $99,296,736.31 |
| Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $3,631,684.08 | $4,539,606.00 |
| Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Safety and Education for Peds/Bicyclists | $21,672.80 | $27,091.00 |
| Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Utilities | $3,899,612.00 | $4,874,515.00 |
| Connecticut | 0951204 | New Haven | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $8,417,983.12 | $10,522,481.00 |
| Connecticut | 0951204 | New Haven | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $2,917,609.60 | $3,693,742.00 |
| Connecticut | 0951204 | New Haven | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | $6,994,271.20 | $8,742,839.00 |
| Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $85,681,945.48 | $98,539,836.00 |
| Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $16,967,366.40 | $19,502,720.00 |
| Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $106,453.20 | $122,360.00 |
| Connecticut | 0951222 | New Haven | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $232,741.53 | $267,520.00 |
| Connecticut | 0951222 | New Haven | >= 200,000 | N/A | INTERSTATE MAINT DISC | Bridge Replacement - No Added Capacity | $1,076,625.00 | $1,237,500.00 |
| Connecticut | 0951222 | New Haven | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Bridge Replacement - No Added Capacity | $31,706,114.00 | $36,443,810.00 |
| Connecticut | 0951243 | New Haven | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $85,688,461.08 | $98,551,023.00 |
| Connecticut | 0951243 | New Haven | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $12,984,486.39 | $14,924,697.00 |
| Connecticut | 0951243 | New Haven | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | $262,793.07 | $302,061.00 |
| Connecticut | 0951372 | Fairfield | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $732,308.14 | $813,675.71 |
| Connecticut | 0951372 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $36,993,342.86 | $41,678,780.30 |
| Connecticut | 0951377 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $11,888,025.00 | $13,208,916.67 |
| Connecticut | 0951377 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,024,612.40 | $7,805,124.90 |
| Connecticut | 0951377 | Fairfield | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $16,732,640.20 | $18,591,822.45 |
| Connecticut | 0951378 | Western Connecticut | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $465,271.30 | $516,968.12 |
| Connecticut | 0951378 | Western Connecticut | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $100,669.46 | $111,854.96 |
| Connecticut | 0951378 | Western Connecticut | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $5,673.72 | $6,304.14 |
| Connecticut | 0951378 | Western Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $23,483,068.02 | $26,092,297.81 |
| Connecticut | 0951384 | South Central Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $93,091,566.47 | $113,103,873.88 |
| Connecticut | 0951384 | New Haven | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $5,988,392.02 | $7,485,490.03 |
| Connecticut | 0951384 | South Central Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $10,000,000.00 | $11,111,111.12 |
| Connecticut | 0951385 | Western Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $47,874,011.70 | $56,193,347.33 |
| Connecticut | 0951385 | Western Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $20,400,000.00 | $22,666,666.69 |
| Connecticut | 0951386 | Western Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $46,913,537.32 | $56,416,127.61 |
| Connecticut | 0951386 | Western Connecticut | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $17,411,723.00 | $19,346,358.89 |
| Connecticut | 0951386 | Western Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $9,155,668.98 | $10,172,965.54 |
| Connecticut | 0953072 | Southeastern Connecticut | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Rehabilitation - No Added Capacity | $147,350,000.00 | $767,151,718.93 |
| Connecticut | 0953072 | Southeastern Connecticut | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $10,800,000.00 | $12,000,000.00 |
| Connecticut | 0953072 | Southeastern Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $125,284,907.77 | $139,205,453.08 |
| Connecticut | 0953073 | Southeastern Connecticut | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $19,942,820.10 | $22,158,689.00 |
| Connecticut | 0953073 | Southeastern Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,215,868.90 | $69,743,408.01 |
| Connecticut | 0953078 | Southeastern Connecticut | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | $466,059.67 | $582,574.59 |
| Connecticut | 0953078 | Southeastern Connecticut | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $1,600.00 | $2,000.00 |
| Connecticut | 0953078 | Southeastern Connecticut | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - No Added Capacity | $1,288,256.13 | $1,610,320.17 |
| Connecticut | 0953078 | Southeastern Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $154,775,781.00 | $203,462,366.26 |
| Connecticut | 0953078 | Southeastern Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,365,000.00 | $4,206,250.01 |
| Connecticut | 0954110 | Southeastern Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,655,859.90 | $28,455,332.90 |
| Connecticut | 0954110 | Southeastern Connecticut | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $19,000,000.00 | $21,111,111.12 |
| Connecticut | 0954118 | Southeastern Connecticut | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $45,837,419.40 | $51,795,092.00 |
| Connecticut | 1042133 | Capitol | >= 200,000 | State | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | $22,444,379.10 | $26,802,899.01 |
| Connecticut | 1063143 | Hartford | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,000,000.00 | $231,503,537.00 |
| Connecticut | 1092144 | South Central Connecticut | >= 200,000 | Local | REPURPOSED SPECIAL | Bridge Rehabilitation - No Added Capacity | $3,616,605.11 | $4,520,756.39 |
| Connecticut | 1092144 | South Central Connecticut | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,300,000.00 | $23,408,443.61 |
| Connecticut | 1096111 | Fairfield | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $46,517,436.00 | $51,686,040.33 |
| Connecticut | 1096111 | Fairfield | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $14,438,749.50 | $16,043,055.01 |
| Connecticut | H100002 | Naugatuck Valley | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $2,199,978.38 | $2,749,973.00 |
| Connecticut | H100002 | Naugatuck Valley | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $1,097,483.00 | $8,844,069.48 |
| Connecticut | H100002 | Naugatuck Valley | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $5,000,000.00 | $6,250,000.00 |
| Connecticut | H100002 | Naugatuck Valley | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $15,920,607.64 | $19,900,759.56 |
| Connecticut | H121002 | Western Connecticut | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $3,969,710.77 | $4,962,139.23 |
| Connecticut | H121002 | Western Connecticut | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - No Added Capacity | $245,000.00 | $64,740,204.53 |