| New York | 0016273 | NY 112 RECONS BETWEEN I-495(LIE) AND GRANNY ROAD | $32,490,601.00 | $39,208,126.00 |
| New York | 0054093 | NY347 Reconst Hallock Rd to CR97 | $33,048,000.00 | $52,545,259.10 |
| New York | 0054183 | SMITHTOWN:RECONSTRUCTION OF ROUTE 347 FROM TERRY ROAD TO GIBBS POND ROAD. | $30,497,801.00 | $37,508,188.00 |
| New York | 0054203 | SMITHTOWN:RECONSTRUCT ROUTE 347 FROM ROUTE 111 TO MOUNT PLEASANT ROAD. | $18,837,225.00 | $32,046,532.00 |
| New York | 0054233 | RECONSTRUCT NY 347 FROM GIBBS POND ROAD TO HALLOCK ROAD | $64,925,220.00 | $79,952,033.00 |
| New York | 0229483 | I495/CROOKED HILL RD INTRCHNG CONST | $31,756,097.00 | $39,146,122.00 |
| New York | 0229563 | I495 PAVEMENT REHAB NASS LINE TO EXIT 55 | $24,642,324.00 | $39,585,726.00 |
| New York | 0534803 | SSP Pavement Resurfacing Exit 20 to Exit 32 | $22,255,154.00 | $27,818,946.13 |
| New York | 0759783 | CR46 Bridge Rehab Over Narrows Channel | $39,617,000.00 | $126,273,046.24 |
| New York | 0760653 | NASSAU COUNTY BRIDGE REHAB | $8,794,384.00 | $31,062,000.00 |
| New York | 0760783 | HOSP RD/NY27 BRID WIDEN & INTERSECT IMPROV - CONST | $24,166,674.00 | $31,514,280.00 |
| New York | 0761353 | WALT WHITMAN RD OVER I495 BRIDGE WIDENING | $24,251,856.70 | $30,314,821.70 |
| New York | 0809253 | HEMPSTEAD:REPAIRS ON TWO DRAW BRIDGES, MEADOWBROOK STATE PARKWAY OVER SLOOP CHANNEL AND LOOP PARKWAY OVER LONG CREEK. | $20,473,758.00 | $27,605,074.00 |
| New York | 1306813 | RT. 7 OVER THE HUDSON RIVER, BRIDGE REPAIR | $25,732,635.00 | $32,315,797.00 |
| New York | 1525383 | I890 FROM THRUWAY EXIT26 TO I890 EXIT3 PAVEMENT REHAB | $18,081,766.00 | $25,487,115.00 |
| New York | 1721903 | I-87: EXIT 4, AIRPORT CONNECTOR, PART2 | $34,440,343.00 | $38,317,048.00 |
| New York | 1810993 | DURABLE PAVEMENT MARKINGS AND INTERSTATE CRACK SEALING SFY 25-26 | $13,184,738.00 | $25,238,860.00 |
| New York | 1SRP013 | AMTRAK RAIL/ LIVINGSTON AVE BRIDGE REPLACEMENT | $90,000,000.00 | $690,042,700.00 |
| New York | 3057673 | MbC Rt 13/34/96, Rt 79, Rt 89 and Safety Improvements | $5,192,430.18 | $30,422,477.60 |
| New York | 3314343 | RT 34 OVER ERIE BARGE CANAL BRIDGE REPLACEMENT, TOWN OF CATO, CAYUGA COUNTY | $21,377,113.00 | $26,721,392.00 |
| New York | 3501903 | I-81 VIADUCT - I-481 CONVERSION TO I-81 NORTH OF KIRKVILLE RD | $191,975,715.00 | $296,386,503.00 |
| New York | 3501913 | I-81 VIADUCT - I-481 CONVERSION TO I-81 SOUTH OF KIRKVILLE RD | $303,615,000.00 | $384,516,116.00 |
| New York | 3501923 | I-81 VIADUCT - BL 81 NORTHERN SECTION PHASE 1 | $134,855,941.01 | $230,272,230.11 |
| New York | 3501933 | I-81 VIADUCT - I-690 OVER CROUSE AND LODI | $288,481,530.55 | $344,742,118.35 |
| New York | 3501943 | I-81 VIADUCT - BL 81 SOUTHERN SECTION PHASE 1 | $203,016,766.32 | $285,787,016.32 |
| New York | 3506413 | SYRACUSE:INTERSTATE 690 OVER TEALL AVENUE AND BEECH STREET-BRIDGE REPLACEMENT PROJECT. | $61,559,777.03 | $68,399,753.03 |
| New York | 4104903 | RT 104 FROM RIDGEWAY AVE TO CULVER RD | $15,770,009.00 | $30,733,169.00 |
| New York | 4390303 | I390/490 NORTHBOUND RAMPS REALIGNMENT | $53,970,592.00 | $61,664,924.00 |
| New York | 4390933 | I-390 from Rt 20A (Exit 8 - Geneseo) To Exit 10 (Avon | $9,021,006.00 | $29,288,812.00 |
| New York | 4490163 | 449016 - I-490 over the Erie Canal and over Kreag Rd (BINS 4443429 and 1048989) | $33,088,342.00 | $64,652,903.00 |
| New York | 4490503 | I-490 from Rt 204 (Exit 6 - Airport) to Howard Rd | $24,049,365.00 | $26,736,517.00 |
| New York | 4590043 | I-590 OVER RT 31 BRIDGE REPLACEMENT AND I-590 over ALLEN'S CREEK RD BRIDGE DECK REPLACEMENT | $24,708,690.00 | $56,341,311.00 |
| New York | 494X053 | RT 19 AND RT 98 OVER ERIE CANAL LIFT BRIDGE REHAB | $8,236,607.00 | $29,557,974.00 |
| New York | 5006923 | I-86/CHAUTAUQUA LAKE; BRIDGE REHAB | $99,343,822.07 | $113,091,527.07 |
| New York | 5111773 | Bridge Replacement & Widening US Route 20 over Cazenovia Creek, Towns of Elma & West Seneca, Erie County | $27,946,536.00 | $52,300,047.00 |
| New York | 5512573 | Best Street Bridge Replacement over Kensington Expressway & New Substation, City of Buffalo, Erie County | $37,668,337.13 | $79,324,359.02 |
| New York | 5761603 | Transforming Main Street: Building Equity and Assuring Mobility through Sustainability (Main Street BEAMS) | $25,385,693.00 | $65,100,001.00 |
| New York | 5763933 | CARS ON MAIN ST BUFFALO; EXCHANGE TO MOHAWK | $30,912,000.00 | $51,520,002.00 |
| New York | 6096323 | SR 36 HORNELL GATEWAY CONNECTION PROJECT (PHASE I) | $10,190,082.00 | $47,044,177.00 |
| New York | 7036043 | RT 410 / BLACK RIVER, TOWN OF DENMARK, LEWIS CO. | $30,210,700.00 | |
| New York | 7111213 | BRIDGE REPLACEMENT, NY Route 12E over Chaumont River | $27,763,102.00 | $28,123,102.00 |
| New York | 8002243 | ROUTES 94 & 17A PAVING IMPROVEMENTS: WARWICK AND GOSHEN | $13,434,362.00 | $36,009,884.00 |
| New York | 8006843 | ROUTE 17 @ ROUTE 32 (EXIT 131) INTERCHANGE RECONSTRUCTION TOWNS OF MONROE AND WOODBURY ORANGE COUNTY. NY DEMO #583 | $113,157,814.00 | $142,642,639.00 |
| New York | 8018463 | 801846 - ROUTE 28 / ESOPUS CREEK-BRIDGE REPLACEMENT - BIN 1091290, CIN C870151 | $20,006,887.76 | $25,008,610.76 |
| New York | 8062093 | DEERPARK:INTERSTATE 84 OVER THE DELAWARE RIVER BETWEEN NEW YORK AND PENNSYLVANIA AND COUNTY ROUTE 16 FOR BRIDGE REHABILITATION. | $29,792,397.00 | $47,729,866.00 |
| New York | 8065103 | ROUTE 17 AT EXIT 122 STAGE II; ORANGE COUNTY | $63,600,800.00 | $79,501,003.00 |
| New York | 8101463 | WESTCHESTER COUNTY BRIDGES: HRP, SMRP, ROUTE 1 | $94,852,000.00 | $121,852,241.00 |
| New York | 8127263 | TACONIC STATE PARKWAY @ PUDDING STREET INTERCHANGE, NEW GRADE SEPARATED INTERCHANGE, TOWN OF PUTNAM VALLEY PUTNAM COUNTY | $25,271,363.00 | $32,453,463.00 |
| New York | 8239453 | ROUTE 9W: SEVEN BRIDGE REPLACEMENTS AND REHABILITATIONS IN THE TOWNS OF HIGHLANDS, CORNWALL, AND NEW WINDSOR, ORANGE COUNTY | $23,580,000.00 | $29,475,000.00 |
| New York | 8392093 | US ROUTE 6, ANNSVILLE CIRCLE-CAMP SMITH: FLOOD MITIGATION; TOWN OF CORTLAND, WESTCHESTER COUNTY | $14,471,788.00 | $28,372,000.00 |
| New York | 8729723 | I-287 BRIDGE DECK REPLACEMENTS OVER MIDLAND AVE AND METRO-NORTH RAILROAD, CITY OF RYE, WESTCHESTER CO. | $29,773,363.00 | $33,081,516.00 |
| New York | 8755234 | RAMAPO & CLARKSTOWN:NEW HEMPSTEAD ROAD/COUNTY ROUTE 80 FROM THE PALISADES INTERSTATE PARKWAY TO ROUTE 304 FOR RECONSTRUCTION. | $21,286,280.00 | $32,187,034.00 |
| New York | 8756209 | FAIR STREET: RT 52 - JOHN SIMPSON ROAD, TOWN OF CARMEL, PUTNAM COUNTY | $22,345,823.00 | $27,932,279.00 |
| New York | 8808623 | WURTS STREET / DOCK STREET & RONDOUT CREEK | $70,337,401.00 | $70,337,401.00 |
| New York | 8813273 | BRIDGE REHABILITATION: SIX BRIDGES IN WESTCHESTER COUNTY. | $22,446,847.00 | $28,090,237.00 |
| New York | 8813553 | ROUTE 9W WALL REPAIR, TOWN OF HIGHLANDS, ORANGE COUNTY | $14,240,693.00 | $29,202,442.00 |
| New York | 8813683 | BRIDGE REHABILITATION/REPLACE: WESTCHESTER COUNTY | $43,958,583.00 | $55,504,079.00 |
| New York | 8814073 | I-684 PMI PAVING: HUTCHINSON RIVER PARKWAY TO ROUTE 172 OVERPASS, TOWN OF BEDFORD, WESTCHESTER COUNTY | $25,559,362.01 | $28,399,487.01 |
| New York | 8814893 | INTERSTATE 287 PAVING: WESTCHESTER AVENUE TO ROUTE 1, WESTCHESTER COUNTY | $7,510,500.00 | $32,377,766.00 |
| New York | 8815293 | RUSTIC RAIL REPLACEMENTS: WESTCHESTER COUNTY | $24,898,540.00 | $31,123,178.00 |
| New York | 8815563 | PMI PAVING: SBP & TSP CONCRETE REPAIRS; WESTCHESTER CTY | $39,123,550.00 | |
| New York | 8LHT113 | Lower Hudson Transit Link (8823.50 & 8823.51) | $70,987,368.00 | $119,616,998.00 |
| New York | 8TZ1003 | ROCKLAND AND WESTCHESTER COUNTIES:TAPPEN ZEE BRIDGE OVER THE HUDSON RIVER FOR BRIDGE REPLACEMENT (DESIGN/BUILD CONTRACT). | $3,216,685,500.00 | |
| New York | 9013393 | RT 17 INTERCHANGE 105 RECONSTRUCTION AND RT 42 IMPROVEMENTS | $30,863,046.23 | $35,684,915.23 |
| New York | 9038263 | RTE.434 GREENWAY: PENNSYLVANIA AVENUE TO MURRAY HILL ROAD | $23,007,630.00 | $28,759,540.00 |
| New York | 9067823 | RT 17 APALACHIN TO BROOME COUNTY LINE, CRACK & SEAT, TIOGA COUNTY | $36,259,362.00 | $51,975,058.00 |
| New York | 9358223 | I-88 PAVEMENT & BRIDGE PROJECT, OTSEGO AND SCHOHARIE COUNTIES | $47,126,011.00 | $52,362,236.00 |
| New York | 9358433 | I-88 EXIT 17 TO 18, CRACK & SEAT | $31,827,708.00 | $37,014,123.82 |
| New York | 9500804 | BINGHAMTON:INTERSTATE 81/ROUTE 17 INTERCHANGE RECONSTRUCTION (PROSPECT MOUNTAIN PHASE 2) RECONST INTERCHANGE 4, INCL NEW BRIDGES, | $23,444,954.00 | $167,243,863.00 |
| New York | 9501243 | 950124 - I81, EXIT 7 TO CORTLAND COUNTY LINE, MILLING AND RESURFACING | $23,293,423.00 | $25,881,585.00 |
| New York | X021523 | NEW YORK CITY (BROOKLYN):REPLACEMENT OF THE BELT PARKWAY BRIDGE OVER MILL BASIN IN BROOKLYN, NY TO BRING TO A STATE OF GOOD REPAIR | $164,239,866.33 | $283,299,833.33 |
| New York | X021733 | DB REHAB OF BELT PKWY BRIDGES OVER NOSTRAND AVE, BEDFORD AVE, OCEAN AVE & SHEEPSHEAD BAY RD KINGS CO. | $73,800,000.00 | $317,080,211.00 |
| New York | X051593 | Rehab of 7 Grand Central Parkway Bridges, Queens County - Design Build | $135,309,459.00 | $169,206,448.00 |
| New York | X051603 | KGI INFRASTRUCTURE & OPERATIONAL IMPROVEMENT IN QUEENS CO. | $5,178,232.00 | $366,398,371.00 |
| New York | X110263 | REPLACEMENT OF BRONX RIVER PARKWAY BRIDGES OVER MNRR, BRONX CO. (BINS 1075049 & 1075059) | $63,903,765.00 | $80,111,908.75 |
| New York | X110283 | Replacement of Bronx River Parkway Bridge over Amtrak/CSX Railroad, Bronx County | $133,968,734.00 | $167,497,655.00 |
| New York | X110293 | Bronx River Parkway: REPLACEMENT OF 2 BRIDGES OVER E TREMONT AVE AND MTA YARD, BRONX COUNTY | $238,597,263.00 | $567,109,082.00 |
| New York | X228693 | MOBILITY IMPROVEMENT ON LIE EB B/T CLEARVIEW EXPWY & SPRINGFIELD BLVD, REPLACEMENT OF OCEANIA ST BRIDGE OVER LIE IN QUEENS COUNTY, NYC (BIN: 1055300) | $76,622,376.00 | $94,817,268.00 |
| New York | X720313 | REPLACEMENT OF EAST 138TH STREET BRIDGE OVER MAJOR DEEGAN EXPRESSWAY | $43,626,771.00 | $59,696,801.00 |
| New York | X720393 | Rehab of Major Deegan Expy Between W.161st St & Highbridge Interchange (BINS 1067451, 1066840) & Depot Pl Bridge Rehab over MDE (BIN 1067452) in Bronx | $115,424,833.00 | $131,918,688.84 |
| New York | X720453 | REHABILITATION WEST TREMONT BRIDGE OVER MDE & MNR | $73,125,000.00 | $85,816,532.00 |
| New York | X726993 | NEW YORK CITY:REHAB 3 BRIDGES ALONG THE CROSS BRONX EXPRESSWAY HIGH-BRIDGE INTERCHANGE. | $45,350,696.00 | $84,509,371.00 |
| New York | X727113 | Cross Bronx Expressway Active Traffic Management, Bronx Co. | $26,672,000.00 | $29,840,000.00 |
| New York | X727163 | REPLACEMENT OF RAMP OCH, SHERIDAN BLVD. NORTH TO CBE WEST | $41,912,087.61 | $52,390,110.61 |
| New York | X729773 | NEW YORK CITY:KOSCIUSZKO BRIDGE REPLACEMENT - Phase II. | $351,382,006.00 | $357,780,360.00 |
| New York | X731273 | BRUCKNER EXPWY-HUTCHINSON PKWY MOBILITY IMPROVEMENT PROJECT, BRONX CO., NYC | $29,829,449.00 | $43,024,886.00 |
| New York | X731453 | REHABILITATION OF BRUCKNER BLVD VIADUCT (278I). BRONX, NYC | $32,673,426.00 | $209,001,783.00 |
| New York | X731493 | ARTHUR SHERIDAN ENHANCEMENT (I-895) | $41,216,825.67 | $51,521,033.67 |
| New York | X731513 | BRIDGE REHABILITATION OF BRUCKNER EXPRESSWAY (I-278) OVER ROSEDALE AVENUE, BRONX COUNTY | $46,396,800.00 | $52,422,428.00 |
| New York | X731523 | BV BQE (I-278) VIADUCT OVER LAUREL HILL BLVD BETWEEN 47TH & 58TH ST REHAB, QUEENS, NYC | $108,907,200.00 | $200,234,000.00 |
| New York | X731613 | GOWANUS EXPRESSWAY STEEL REPAIRS & RAMP D DECK REPLACEMENT, KINGS COUNTY | $28,725,858.00 | $32,498,687.00 |
| New York | X731633 | HUNTS POINT TRUCK ACCESS IMPROVEMENT PROJECT PHASE 1, BRONX CO. NYC | $333,300,901.57 | $572,997,981.63 |
| New York | X731653 | HUNTS POINT INTERSTATE ACCESS IMPROVEMENT PROJECT, CONTRACT 3, BRONX COUNTY | $49,200,000.00 | $458,164,897.00 |
| New York | X731683 | REHABILITATION OF THE WOOLLEY AVE AND BRADLEY AVE BRIDGES OVER STATEN ISLAND EXPRESSWAY IN RICHMOND COUNTY, NY | $11,076,646.00 | $32,802,804.00 |
| New York | X731703 | BRIDGE REHAB OF FORT HAMILTON PKWY OVER GOWANUS EXPWY, KINGS, CO. NYC | $34,045,215.00 | $43,681,509.00 |
| New York | X731713 | GOWANUS EXPRESSWAY (I-278) BRIDGE CORRECTIVE REPAIRS AND PREVENTIVE MAINTENANCE | $17,885,493.87 | $68,250,000.00 |
| New York | X731733 | Gowanus Expressway Viaduct Painting and Steel Repairs, Kings County, NYC | $74,936,036.00 | $185,154,493.00 |
| New York | X735563 | NEW YORK CITY (QUEENS):KEW GARDENS INTERCHANGE/VAN WYCK EXPRESSWAY INTERCHANGE INFRASTRUCTURAL & OPERATIONAL IMPROVEMENTS. | $28,014,954.00 | $181,419,419.00 |
| New York | X735803 | VAN WYCK EXPRESSWAY VIADUCT REHABILITATION, QUEENS COUNTY | $135,927,488.99 | $137,814,543.99 |
| New York | X735843 | X73584 - (DB CONTRACT 3) VAN WYCK EXPRESSWAY CAPACITY IMPROVEMENTS | $524,485,431.28 | $815,582,084.00 |
| New York | X757003 | NEW YORK CITY:WILLIS AVENUE OVER THE HARLEM RIVER FOR BRIDGE REPLACEMENT. | $217,541,858.00 | $538,557,994.00 |
| New York | X757533 | BROADWAY BRIDGE REHABILITATION (2240137) | $88,720,000.00 | $110,900,000.00 |
| New York | X758863 | MADISON AVE. BRIDGE REHAB (BIN 2240079) | $21,400,000.00 | $30,353,000.00 |
| New York | X758923 | NEW YORK CITY (QUEENS):ROOSEVELT AVENUE OVER THE VAN WYCK EXPRESSWAY/INTERSTATE 678 FOR BRIDGE REHABILITATION. | $53,333,335.00 | $70,266,669.00 |
| New York | X759193 | NYC, ER EVENT 01-02, SEPTEMBERR 11, 2001, RECONSTRUCTION OF WORTH ST, HUDSON ST. TO EAST BROADWAY | $12,000,000.00 | $95,000,000.00 |
| New York | X759213 | ER EVENT NY2001-02, 9/11, NYC, MANHATTAN RECONSTRUCTION OF WARREN AND JOHN STREETS. | $8,029,696.98 | $27,429,696.98 |
| New York | X759846 | NEW YORK CITY:ROUTE 9A NORTH AND WEST PROMENADE PROJECT EXTRA TASKS FOR CONSTRUCTION INSPECTION AND CONSTRUCTION SUPPORT SERVICES. | $38,781,817.00 | $38,781,817.00 |
| New York | X761243 | IMPLEMENT PHASE FOUR OF GRAND CONCOURSE SAFETY IMPROVEMENTS | $18,456,401.00 | $60,566,864.00 |
| New York | X761263 | REHAB BROOKLYN BRIDGE, MANHATTAN APPROACHES (CONTRACT 7) | $60,799,074.00 | $159,040,843.00 |
| New York | X761264 | REHABILITATE THE MANHATTAN APPROACHES TO THE BROOKLYN BRIDGE IN NY COUNTY | $39,200,000.00 | $41,263,158.00 |
| New York | X762074 | TMC OPERATIONAL SUPPORT FOR FFY 19 | $36,250,000.00 | $62,556,415.00 |
| New York | X764203 | PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES | $16,038,203.30 | $25,444,626.00 |
| New York | X764263 | WILLIAMSBURG BRIDGE REHABILITATION CONTRACT # 9 (BIN2240039), NEW YORK COUNTY | $134,072,000.00 | $196,085,937.19 |
| New York | X764273 | PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES | $22,813,144.00 | $28,516,430.00 |
| New York | X772433 | NEW YORK CITY:UNIONPORT BRIDGE REPLACEMENT | $148,897,916.00 | $219,825,398.00 |
| New York | X772483 | NEW YORK CITY:REHABILITATION OF ATLANTIC AVENUE BRIDGE | $31,303,085.00 | $67,491,859.00 |
| New York | X772513 | REHABILITATE RIVERSIDE DRIVE BRIDGE/W 158TH STREET (2246720) | $53,333,600.00 | $82,758,144.00 |
| New York | X772563 | NEW YORK CITY:REHABILITATE THE WESTCHESTER AVENUE BRIDGE OVER THE HUTCHINSON RIVER PARKWAY. | $34,859,000.00 | $45,408,750.00 |
| New York | X772653 | Hunts Point Terminal Produce Market Redevelopment | $134,125,000.00 | $400,000,000.00 |
| New York | X772843 | REHABILITATION MANHATTAN BRIDGE STRUCTURAL COMPONENTS (2240028) | $36,013,789.86 | $71,366,865.86 |
| New York | X773093 | BROOKLYN WATERFRONT GREENWAY GOWANUS CONNECTOR | $608.00 | $30,948,284.00 |
| New York | X773113 | SAFETY IMPROVEMENTS ON 4TH AVENUE IN BROOKLYN (REPURPOSED EARMARK NY650 - PROGRAM CODE RPS9) | $15,774,175.00 | $50,677,414.00 |
| New York | X773363 | RECONSTRUCTION OF TILLARY STREET (PHASE 2) (BROOKLYN), NEW YORK CITY. | $14,667,000.00 | $41,600,000.00 |
| New York | X774073 | RECONSTRUCTION OF 5TH AVENUE BRIDGE OVER LIRR & SEA BEACH (Bridge NY), KINGS COUNTY | $45,284,117.00 | $50,802,516.00 |
| New York | X777013 | EMERGENCY RELIEF NY2013-01, HURRICANE SANDY, NYCDOT (QUEENS COUNTY) PERMANENT FLOOD REPAIRS TO METROPOLITAN AVE BRIDGE BY CONTRACT | $22,600,000.00 | $28,250,000.00 |
| New York | X777044 | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO MOVEABLE BRIDGES BY CONTRACT FORCES. | $41,673,232.00 | $52,091,540.00 |
| New York | X777114 | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO BATTERY PARK AND WEST STREET UNDERPASSES BY CONTRACT FORCES. | $53,418,887.00 | $66,773,609.00 |
| New York | X777503 | Flood Mitigation Improvements for Battery Park and West Street Underpasses in Manhattan- ER Event #NY 1301 | $61,873,548.00 | $107,304,741.00 |
| New York | X806593 | LIE Active Traffic and Demand Management, I-495 between Queens-Midtown Tunnel and Main Street, Queens County | $22,065,600.00 | $27,582,000.00 |
| New York | XM16563 | BRIDGE EXPANSION JOINTS REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN NYC | $21,558,342.75 | $26,947,929.75 |
| New York | XM17033 | FDR Drive Cleaning and Painting - South Street, NY, NY | $4,122,656.00 | $38,123,007.00 |
| New York | XM21603 | RETAINING WALL REHABILITATION & CORRECTIVE MAINTENANCE, ALL COUNTIES, NYC | $19,054,056.88 | $25,557,946.41 |
| New York | XM22043 | BRIDGE PAINTING AT VARIOUS LOCATIONS IN BRONX, KINGS, QUEENS, AND RICHMOND COUNTIES, NYC | $18,764,261.00 | $43,733,225.00 |
| New York | XM24033 | Bridge Painting at Various Federally Aid Eligible Locations in Bronx, Queens, Kings and Richmond Counties | $22,453,084.00 | $29,425,944.00 |
| New York | XM24603 | RETAINING WALLS REHAB & CORRECTIVE MAINTENANCE, KINGS, NEW YORK, RICHMOND, NYC | $32,577,959.00 | $40,722,449.00 |