| RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|
| Ohio | E036466 | FRA IR 270 9.15 | $17,825,483.59 | $67,645,172.65 |
| Ohio | E036702 | IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. | $86,193,633.58 | $105,005,995.04 |
| Ohio | E040035 | SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. | $39,767,886.22 | $71,046,216.39 |
| Ohio | E040090 | CUY IR 090 06.83 Major Rehab | $67,776,807.87 | $193,598,919.99 |
| Ohio | E040187 | US-33 in the vicinity of Carroll in Fairfield County. New interchange. | $34,177,724.35 | $50,580,442.48 |
| Ohio | E040459 | CUY IR 077 11.11 Replace | $1,177,798.08 | $50,628,275.48 |
| Ohio | E040555 | MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes | $14,434,542.47 | $112,079,825.97 |
| Ohio | E040634 | FRA IR 70 13.54 (FOURTH PROJECT), South Trench - I-70/71 Overlap including western downtown connections | $221,804,935.77 | $393,461,042.45 |
| Ohio | E040822 | IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. | $55,763,199.10 | $66,743,222.21 |
| Ohio | E040889 | Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements | $20,041,635.50 | $90,260,927.77 |
| Ohio | E041146 | HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, | $81,109,446.55 | $89,720,150.40 |
| Ohio | E050670 | JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg | $31,735,233.60 | $138,678,494.76 |
| Ohio | E060290 | LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports | $33,946,909.11 | $44,391,744.97 |
| Ohio | E060482 | LAW SR 7 2.17 Phase 2A | $20,673,322.68 | $153,938,463.34 |
| Ohio | E070090 | FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. | $45,574,946.87 | $91,878,319.25 |
| Ohio | E070348 | HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. | $50,987,823.39 | $69,145,558.42 |
| Ohio | E070405 | HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system | $99,617,144.17 | $132,465,663.41 |
| Ohio | E070586 | CUY IR 090 16.28 CCG3A | $836,328.13 | $309,394,770.00 |
| Ohio | E080951 | FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes | $17,746,715.78 | $58,336,718.85 |
| Ohio | E081090 | FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures | $35,803,565.29 | $51,079,821.91 |
| Ohio | E090644 | CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge | $37,000,484.04 | $51,149,971.14 |
| Ohio | E100378 | LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St | $17,635,240.61 | $49,839,120.01 |
| Ohio | E100634 | FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps | $28,827,686.63 | $95,168,606.59 |
| Ohio | E100878 | Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. | $54,240,153.79 | $71,332,313.20 |
| Ohio | E100995 | HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work | $25,994,281.28 | $36,405,794.03 |
| Ohio | E110266 | R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville | $33,510,932.28 | $56,354,178.34 |
| Ohio | E110820 | HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT | $89,003,221.94 | $153,993,459.76 |
| Ohio | E111416 | CUY IR 480 18.42 L&R Deck | $136,733,544.24 | $245,636,580.53 |
| Ohio | E120394 | MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. | $31,213,306.61 | $39,880,324.99 |
| Ohio | E120441 | MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. | $19,848,002.03 | $33,698,366.91 |
| Ohio | E120585 | LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges | $8,385,393.76 | $175,135,392.35 |
| Ohio | E120602 | LUC IR 75 2.75 Pav Reconst, Bridge repl | $13,097,367.12 | $30,869,534.20 |
| Ohio | E120958 | WOO/LUC IR75 30.70/0.00 Major | $22,055,075.24 | $192,177,916.24 |
| Ohio | E130382 | RIC US 0030 09.13 | $61,349,800.83 | $75,772,001.02 |
| Ohio | E130407 | SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures | $55,418,490.41 | $103,392,972.57 |
| Ohio | E130869 | STA IR 0077 08.40/VAR | $23,694,366.75 | $65,533,753.02 |
| Ohio | E130952 | HAM IR 275 39.81 | $11,179,838.93 | $37,588,845.87 |
| Ohio | E131180 | FRA-70-22.61 (FEF 1A), Interchange, Reconstruction | $21,824,687.99 | $90,596,514.44 |
| Ohio | E131486 | FRA-270-51.50/FRA-23-4.19 Pt 1&2 | $8,248,130.70 | $34,347,534.00 |
| Ohio | E131510 | WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange | $15,040,293.94 | $26,841,600.68 |
| Ohio | E140008 | PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements | $5,894,956.00 | $35,573,730.00 |
| Ohio | E140310 | STW - Ohio Bridge Partnership Program Debt Service Authorization | $90,791,149.79 | $94,042,475.85 |
| Ohio | E140985 | HAM IR 71 8.42 | $24,129,069.40 | $38,756,099.32 |
| Ohio | E150345 | SUM IR 0076 05.62 | $18,126,455.46 | $36,591,434.84 |
| Ohio | E150403 | LUC IR 475 1.85 @20A Interchnge, Build a new interchange | $15,040,920.00 | $117,964,212.48 |
| Ohio | E150816 | SUM SR 0008 01.75. Replacement / re-alignment of High Level Bridge between Glenwood and Perkins. | $118,594,392.00 | $182,120,670.00 |
| Ohio | E160211 | CUY Rockside Road Bridges | $25,156,130.17 | |
| Ohio | E170058 | MUS SR 60 00.00 | $21,999,385.54 | $27,451,731.91 |
| Ohio | E170580 | WAY SR 0021 00.00 | $26,945,806.41 | $33,152,725.00 |
| Ohio | E170713 | HAM IR 75 3.84 | $56,816,661.34 | $98,578,438.41 |
| Ohio | E170982 | FRA-71-9.62/9.71 Part 1 & 2 | $66,253,008.05 | $126,453,704.17 |
| Ohio | E171059 | FRA IR 670 3.920 | $45,326,715.69 | $69,321,863.84 |
| Ohio | E171372 | FRA-70-22.85 (FEF-1B&C) | $84,646,739.00 | $105,377,679.99 |
| Ohio | E171457 | SUM IR 77/277/US 224 Interchange | $9,278,333.24 | $60,176,026.67 |
| Ohio | E180007 | DEL US 36/SR 37 11.03/11.25 | $34,795,561.74 | $43,153,952.26 |
| Ohio | E180034 | HAM WHV New Viaduct Construction | $154,452,860.97 | $777,618,514.69 |
| Ohio | E180134 | FRA IR 70 14.54 (Proj 2E) | $48,967,629.58 | $88,336,800.69 |
| Ohio | E180372 | MOT IR 75 7.15 | $49,898,997.00 | $55,443,330.00 |
| Ohio | E180373 | GRE US 35 5.63 | $36,389,089.50 | $45,424,398.88 |
| Ohio | E180428 | SUM IR 0076/0077 8.42/09.74 | $74,435,026.29 | $196,868,416.90 |
| Ohio | E180439 | CLE 32-3.50 | $26,265,068.50 | $65,450,510.00 |
| Ohio | E180746 | MUS IR 70 10.66 | $41,660,499.47 | $104,963,980.71 |
| Ohio | E180796 | FRA IR 71 0.00 | $46,161,522.68 | $52,834,214.94 |
| Ohio | E190121 | FRA IR 71 17.46 (Proj 3B) | $35,533,902.62 | $43,802,190.00 |
| Ohio | E190122 | FRA-70/71-12.68/15.16 (Proj 4R) | $135,094,882.30 | $309,478,698.01 |
| Ohio | E190125 | DEL-71-8.91 (Ph A) | $27,347,416.00 | $34,507,543.55 |
| Ohio | E190184 | MOT IR 75 14.74 | $7,114,602.92 | $57,479,131.03 |
| Ohio | E190250 | CUY SR 014 06.93 Replace | $3,443,648.50 | $57,319,597.72 |
| Ohio | E190304 | TRU SR 46/82 DDI | $19,430,131.90 | $26,108,881.00 |
| Ohio | E190328 | WAY SR 0083 10.81 | $26,683,223.10 | $33,564,881.61 |
| Ohio | E190498 | MAH Youngstown Smart 2 Network | $22,544,845.82 | $27,191,852.01 |
| Ohio | E190542 | MAD/PIC-71-7.30/0.00 | $55,458,167.40 | $139,130,607.36 |
| Ohio | E190934 | LAK US 020 24.99 Major Rehab | $21,224,288.00 | $26,530,360.00 |
| Ohio | E191306 | FRA SR 16 8.24 | $13,441,875.00 | $25,968,661.74 |
| Ohio | E191584 | LAK US 020 19.59 Major Rehab | $48,457,688.00 | $60,572,109.99 |
| Ohio | E200136 | SUM IR 0077 28.75 | $55,032,316.24 | $63,939,826.99 |
| Ohio | E200137 | SUM IR 0077 24.12 | $51,848,940.00 | $59,960,585.00 |
| Ohio | E200155 | LOR IR 0090 10.76 | $102,785,577.26 | $123,691,154.03 |
| Ohio | E200167 | CUY Pleasant Valley Road Bridges | $13,951,120.00 | $29,715,823.54 |
| Ohio | E200211 | FRA-71/270-28.27/25.99A | $38,244,538.71 | $42,493,931.91 |
| Ohio | E200428 | CLE 32-2.33 | $26,865,531.50 | $34,775,239.99 |
| Ohio | E200605 | UNI US 33 24.870 | $24,764,000.00 | $42,755,700.01 |
| Ohio | E200816 | FRA IR 270 43.180 | $37,675,412.61 | $41,861,569.58 |
| Ohio | E200947 | ROS-159-0.41 Bridge St Safety | $18,741,409.97 | $29,215,840.54 |
| Ohio | E201074 | JEF SR 7 14.440 | $19,421,013.53 | $25,966,970.12 |
| Ohio | E210099 | CUY IR 490 00.00 Major Rehab | $45,762,676.74 | $50,847,454.60 |
| Ohio | E210244 | LUC US 23 11.75 Inter-Chng | $27,954,111.40 | $36,724,276.03 |
| Ohio | E210348 | LUC Toledo Build Grant - GCR | $23,668,160.00 | $57,062,892.00 |
| Ohio | E220031 | FAI US 33 03.18 | $55,099,604.80 | $68,874,506.00 |
| Ohio | E220056 | CUY IR 077 00.42 Interchange | $22,478,101.39 | $33,846,769.99 |
| Ohio | E220165 | Brent Spence Bridge Corridor | $786,434,950.08 | $1,016,974,682.26 |
| Ohio | E220273 | WAR SR 63 0.83 | $15,031,560.51 | $25,673,035.58 |
| Ohio | E230501 | ATH/MEG US 33 18.70/0.00 | $6,640,910.65 | $69,635,805.51 |
| Ohio | E230503 | MEG US 33 19.11 | $5,738,328.96 | $72,623,323.49 |
| Ohio | E230571 | FRA IR 70 0.00 | $57,801,771.90 | $64,224,191.00 |
| Ohio | E230890 | PAU/DEF US 24 12.30/0.00 | $27,972,904.00 | $34,966,130.00 |
| Ohio | E240415 | HAM IR 75 8.91 | $8,793,243.83 | $100,179,174.25 |
| Ohio | E240618 | BEL IR 70 9.35 | $10,034,059.15 | $29,105,600.00 |
| Ohio | E240912 | ATH/MEG-33-23.23/0.00 | $6,502,370.82 | $124,241,840.00 |
| Ohio | E241004 | MEG US 33 13.98 | $1,744,387.50 | $33,330,200.00 |