U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Ohio

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Ohio E036466 FRA IR 270 9.15 $17,825,483.59 $67,645,172.65
Ohio E036702 IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. $86,193,633.58 $105,005,995.04
Ohio E040035 SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. $39,767,886.22 $71,046,216.39
Ohio E040090 CUY IR 090 06.83 Major Rehab $67,776,807.87 $193,598,919.99
Ohio E040187 US-33 in the vicinity of Carroll in Fairfield County. New interchange. $34,177,724.35 $50,580,442.48
Ohio E040459 CUY IR 077 11.11 Replace $1,177,798.08 $50,628,275.48
Ohio E040555 MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes $14,434,542.47 $112,079,825.97
Ohio E040634 FRA IR 70 13.54 (FOURTH PROJECT), South Trench - I-70/71 Overlap including western downtown connections $221,804,935.77 $393,461,042.45
Ohio E040822 IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. $55,763,199.10 $66,743,222.21
Ohio E040889 Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements $20,041,635.50 $90,260,927.77
Ohio E041146 HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, $81,109,446.55 $89,720,150.40
Ohio E050670 JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg $31,735,233.60 $138,678,494.76
Ohio E060290 LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports $33,946,909.11 $44,391,744.97
Ohio E060482 LAW SR 7 2.17 Phase 2A $20,673,322.68 $153,938,463.34
Ohio E070090 FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. $45,574,946.87 $91,878,319.25
Ohio E070348 HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. $50,987,823.39 $69,145,558.42
Ohio E070405 HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system $99,617,144.17 $132,465,663.41
Ohio E070586 CUY IR 090 16.28 CCG3A $836,328.13 $309,394,770.00
Ohio E080951 FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes $17,746,715.78 $58,336,718.85
Ohio E081090 FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures $35,803,565.29 $51,079,821.91
Ohio E090644 CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge $37,000,484.04 $51,149,971.14
Ohio E100378 LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St $17,635,240.61 $49,839,120.01
Ohio E100634 FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps $28,827,686.63 $95,168,606.59
Ohio E100878 Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. $54,240,153.79 $71,332,313.20
Ohio E100995 HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work $25,994,281.28 $36,405,794.03
Ohio E110266 R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville $33,510,932.28 $56,354,178.34
Ohio E110820 HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT $89,003,221.94 $153,993,459.76
Ohio E111416 CUY IR 480 18.42 L&R Deck $136,733,544.24 $245,636,580.53
Ohio E120394 MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. $31,213,306.61 $39,880,324.99
Ohio E120441 MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. $19,848,002.03 $33,698,366.91
Ohio E120585 LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges $8,385,393.76 $175,135,392.35
Ohio E120602 LUC IR 75 2.75 Pav Reconst, Bridge repl $13,097,367.12 $30,869,534.20
Ohio E120958 WOO/LUC IR75 30.70/0.00 Major $22,055,075.24 $192,177,916.24
Ohio E130382 RIC US 0030 09.13 $61,349,800.83 $75,772,001.02
Ohio E130407 SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures $55,418,490.41 $103,392,972.57
Ohio E130869 STA IR 0077 08.40/VAR $23,694,366.75 $65,533,753.02
Ohio E130952 HAM IR 275 39.81 $11,179,838.93 $37,588,845.87
Ohio E131180 FRA-70-22.61 (FEF 1A), Interchange, Reconstruction $21,824,687.99 $90,596,514.44
Ohio E131486 FRA-270-51.50/FRA-23-4.19 Pt 1&2 $8,248,130.70 $34,347,534.00
Ohio E131510 WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange $15,040,293.94 $26,841,600.68
Ohio E140008 PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements $5,894,956.00 $35,573,730.00
Ohio E140310 STW - Ohio Bridge Partnership Program Debt Service Authorization $90,791,149.79 $94,042,475.85
Ohio E140985 HAM IR 71 8.42 $24,129,069.40 $38,756,099.32
Ohio E150345 SUM IR 0076 05.62 $18,126,455.46 $36,591,434.84
Ohio E150403 LUC IR 475 1.85 @20A Interchnge, Build a new interchange $15,040,920.00 $117,964,212.48
Ohio E150816 SUM SR 0008 01.75. Replacement / re-alignment of High Level Bridge between Glenwood and Perkins. $118,594,392.00 $182,120,670.00
Ohio E160211 CUY Rockside Road Bridges   $25,156,130.17
Ohio E170058 MUS SR 60 00.00 $21,999,385.54 $27,451,731.91
Ohio E170580 WAY SR 0021 00.00 $26,945,806.41 $33,152,725.00
Ohio E170713 HAM IR 75 3.84 $56,816,661.34 $98,578,438.41
Ohio E170982 FRA-71-9.62/9.71 Part 1 & 2 $66,253,008.05 $126,453,704.17
Ohio E171059 FRA IR 670 3.920 $45,326,715.69 $69,321,863.84
Ohio E171372 FRA-70-22.85 (FEF-1B&C) $84,646,739.00 $105,377,679.99
Ohio E171457 SUM IR 77/277/US 224 Interchange $9,278,333.24 $60,176,026.67
Ohio E180007 DEL US 36/SR 37 11.03/11.25 $34,795,561.74 $43,153,952.26
Ohio E180034 HAM WHV New Viaduct Construction $154,452,860.97 $777,618,514.69
Ohio E180134 FRA IR 70 14.54 (Proj 2E) $48,967,629.58 $88,336,800.69
Ohio E180372 MOT IR 75 7.15 $49,898,997.00 $55,443,330.00
Ohio E180373 GRE US 35 5.63 $36,389,089.50 $45,424,398.88
Ohio E180428 SUM IR 0076/0077 8.42/09.74 $74,435,026.29 $196,868,416.90
Ohio E180439 CLE 32-3.50 $26,265,068.50 $65,450,510.00
Ohio E180746 MUS IR 70 10.66 $41,660,499.47 $104,963,980.71
Ohio E180796 FRA IR 71 0.00 $46,161,522.68 $52,834,214.94
Ohio E190121 FRA IR 71 17.46 (Proj 3B) $35,533,902.62 $43,802,190.00
Ohio E190122 FRA-70/71-12.68/15.16 (Proj 4R) $135,094,882.30 $309,478,698.01
Ohio E190125 DEL-71-8.91 (Ph A) $27,347,416.00 $34,507,543.55
Ohio E190184 MOT IR 75 14.74 $7,114,602.92 $57,479,131.03
Ohio E190250 CUY SR 014 06.93 Replace $3,443,648.50 $57,319,597.72
Ohio E190304 TRU SR 46/82 DDI $19,430,131.90 $26,108,881.00
Ohio E190328 WAY SR 0083 10.81 $26,683,223.10 $33,564,881.61
Ohio E190498 MAH Youngstown Smart 2 Network $22,544,845.82 $27,191,852.01
Ohio E190542 MAD/PIC-71-7.30/0.00 $55,458,167.40 $139,130,607.36
Ohio E190934 LAK US 020 24.99 Major Rehab $21,224,288.00 $26,530,360.00
Ohio E191306 FRA SR 16 8.24 $13,441,875.00 $25,968,661.74
Ohio E191584 LAK US 020 19.59 Major Rehab $48,457,688.00 $60,572,109.99
Ohio E200136 SUM IR 0077 28.75 $55,032,316.24 $63,939,826.99
Ohio E200137 SUM IR 0077 24.12 $51,848,940.00 $59,960,585.00
Ohio E200155 LOR IR 0090 10.76 $102,785,577.26 $123,691,154.03
Ohio E200167 CUY Pleasant Valley Road Bridges $13,951,120.00 $29,715,823.54
Ohio E200211 FRA-71/270-28.27/25.99A $38,244,538.71 $42,493,931.91
Ohio E200428 CLE 32-2.33 $26,865,531.50 $34,775,239.99
Ohio E200605 UNI US 33 24.870 $24,764,000.00 $42,755,700.01
Ohio E200816 FRA IR 270 43.180 $37,675,412.61 $41,861,569.58
Ohio E200947 ROS-159-0.41 Bridge St Safety $18,741,409.97 $29,215,840.54
Ohio E201074 JEF SR 7 14.440 $19,421,013.53 $25,966,970.12
Ohio E210099 CUY IR 490 00.00 Major Rehab $45,762,676.74 $50,847,454.60
Ohio E210244 LUC US 23 11.75 Inter-Chng $27,954,111.40 $36,724,276.03
Ohio E210348 LUC Toledo Build Grant - GCR $23,668,160.00 $57,062,892.00
Ohio E220031 FAI US 33 03.18 $55,099,604.80 $68,874,506.00
Ohio E220056 CUY IR 077 00.42 Interchange $22,478,101.39 $33,846,769.99
Ohio E220165 Brent Spence Bridge Corridor $786,434,950.08 $1,016,974,682.26
Ohio E220273 WAR SR 63 0.83 $15,031,560.51 $25,673,035.58
Ohio E230501 ATH/MEG US 33 18.70/0.00 $6,640,910.65 $69,635,805.51
Ohio E230503 MEG US 33 19.11 $5,738,328.96 $72,623,323.49
Ohio E230571 FRA IR 70 0.00 $57,801,771.90 $64,224,191.00
Ohio E230890 PAU/DEF US 24 12.30/0.00 $27,972,904.00 $34,966,130.00
Ohio E240415 HAM IR 75 8.91 $8,793,243.83 $100,179,174.25
Ohio E240618 BEL IR 70 9.35 $10,034,059.15 $29,105,600.00
Ohio E240912 ATH/MEG-33-23.23/0.00 $6,502,370.82 $124,241,840.00
Ohio E241004 MEG US 33 13.98 $1,744,387.50 $33,330,200.00