| Ohio | E036466 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,916,663.65 | $56,100,052.60 |
| Ohio | E036466 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,080,617.12 | $2,600,771.40 |
| Ohio | E036466 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $981,921.63 | $1,227,402.04 |
| Ohio | E036466 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,846,281.19 | $7,716,946.61 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Research | $9,355.20 | $11,694.00 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $6,601.72 | $8,252.15 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $22,291.10 | $27,863.87 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $142,468.50 | $178,085.63 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $140,631.40 | $175,789.25 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $189,396.17 | $232,241.40 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | $138,567.71 | $138,567.71 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,194,818.23 | $3,214,473.97 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $1,361,776.20 | $1,513,084.67 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $10,952,772.88 | $12,245,771.96 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $9,563,728.82 | $10,626,365.36 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,724,569.43 | $10,805,077.14 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,074,364.99 | $23,415,961.10 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $11,104,317.44 | $12,338,130.50 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $619,953.70 | $688,837.44 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,701,514.39 | $5,223,904.89 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,544,722.97 | $7,271,914.41 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,616,454.72 | $2,907,171.91 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,176,851.55 | $12,847,212.09 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $270,761.95 | $338,452.43 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $137,637.03 | $172,046.29 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Construction Engineering | $4,495.05 | $5,618.82 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Debt Service | $34,658.35 | $43,322.94 |
| Ohio | E036702 | Allen | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Landscaping and Other Scenic Beautification | $460,924.08 | $576,155.11 |
| Ohio | E040035 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $22,183,009.74 | $37,169,658.80 |
| Ohio | E040035 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $64,602.65 | $80,753.31 |
| Ohio | E040035 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $11,619,650.00 | |
| Ohio | E040035 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,601,405.32 | $3,254,412.93 |
| Ohio | E040035 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $11,954,560.77 | $12,934,636.66 |
| Ohio | E040035 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $2,281,720.00 | |
| Ohio | E040035 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,313,951.74 | $1,642,439.69 |
| Ohio | E040035 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,650,356.00 | $2,062,945.00 |
| Ohio | E040090 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $39,267,540.95 | $144,457,019.33 |
| Ohio | E040090 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $16,656,183.48 | $28,906,870.53 |
| Ohio | E040090 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,921,922.86 | $12,135,469.85 |
| Ohio | E040090 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $931,160.58 | $8,099,560.28 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $46,603.14 | $58,253.93 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $5,056,913.86 | $6,328,872.60 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $504,743.00 | $630,928.75 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $335,787.63 | $373,097.37 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $6,181,932.31 | $6,868,813.68 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | $185,445.00 | $2,453,951.00 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,134,024.10 | $3,594,656.39 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $538,188.80 | $672,736.00 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $231,393.60 | $289,242.00 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $798,342.24 | $997,927.84 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,947,864.16 | $6,343,054.77 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $12,696,555.84 | $20,068,994.80 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,240,203.59 | $1,550,254.49 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $174,591.76 | $218,239.70 |
| Ohio | E040187 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $105,135.32 | $131,419.16 |
| Ohio | E040459 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $697,943.80 | $44,864,610.00 |
| Ohio | E040459 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,695,000.00 | |
| Ohio | E040459 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $479,854.28 | $3,068,665.48 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,600,000.00 | $4,000,000.00 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $397,787.71 | $18,682,714.38 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,034,964.14 | $50,940,938.68 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $808,025.89 | $1,457,710.14 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $433,065.65 | $8,184,716.50 |
| Ohio | E040555 | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $91,107.30 | $113,884.13 |
| Ohio | E040555 | Mahoning | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,892.70 | $136,115.87 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,532,239.15 | $24,094,388.80 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $505,344.40 | $584,586.79 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,222,295.03 | $1,968,640.00 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,668,918.03 | $1,880,683.49 |
| Ohio | E040555 | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $31,902.47 | $35,447.19 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $850,000.00 | $944,444.44 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - Added Capacity | $23,750,000.00 | $40,833,333.33 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $42,403,332.69 | $77,938,130.66 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $14,661,821.90 | $16,290,913.22 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,135,340.76 | $15,590,527.01 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $16,504,896.20 | $18,338,773.56 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,287,000.00 | $5,874,444.44 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $40,064,771.09 | $50,080,963.86 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | NATIONAL HWY FREIGHT PGM | Bridge Replacement - Added Capacity | $34,543,180.73 | $38,381,311.92 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,915,952.40 | $48,994,130.00 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $19,335,178.46 | $78,502,243.08 |
| Ohio | E040634 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,353,461.54 | $1,691,826.93 |
| Ohio | E040822 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,802,449.57 | $30,054,824.97 |
| Ohio | E040822 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,516,143.09 | $13,906,825.65 |
| Ohio | E040822 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,506,578.21 | $1,883,222.77 |
| Ohio | E040822 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,558,635.25 | $3,954,039.16 |
| Ohio | E040822 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,672,452.72 | $3,198,475.00 |
| Ohio | E040822 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $11,577.60 | $14,472.00 |
| Ohio | E040822 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $684,000.00 | $855,000.00 |
| Ohio | E040822 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,880,000.00 | $3,600,000.00 |
| Ohio | E040822 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $8,131,362.66 | $9,276,362.66 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $678,405.00 | $753,783.33 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $99,999.68 | $124,999.60 |
| Ohio | E040889 | Hamilton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $129,917.91 | $162,397.39 |
| Ohio | E040889 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $303,575.28 | $379,469.10 |
| Ohio | E040889 | Hamilton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $18,730.73 | $24,016.38 |
| Ohio | E040889 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $43,767.56 | $56,118.41 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,792,005.92 | $10,120,586.79 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,019,413.26 | $50,835,153.22 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,500,000.00 | $1,875,000.00 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,345,306.05 | $24,442,578.40 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Planning | $400,000.00 | $500,000.00 |
| Ohio | E040889 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $710,514.11 | $986,825.15 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,473,006.67 | $1,689,174.24 |
| Ohio | E041146 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,659,479.96 | $1,659,479.96 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $333,035.33 | $416,294.16 |
| Ohio | E041146 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,045,329.71 | $3,806,662.14 |
| Ohio | E041146 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,389,200.00 | $20,677,164.00 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $6,281,535.87 | $7,851,919.84 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $5,617,635.51 | $5,617,635.51 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $35,109,569.55 | $36,248,795.01 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,209,486.40 | $2,761,857.99 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $3,291,245.68 | $3,291,245.68 |
| Ohio | E041146 | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,463,489.48 | $2,463,489.48 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $560,000.00 | $560,000.00 |
| Ohio | E041146 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $2,676,432.39 | $2,676,432.39 |
| Ohio | E050670 | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $27,490,872.80 | $103,347,744.00 |
| Ohio | E050670 | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,924,360.80 | $6,430,750.76 |
| Ohio | E050670 | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,600,000.00 | $10,000,000.00 |
| Ohio | E050670 | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $720,000.00 | $18,900,000.00 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $795,989.25 | $1,011,910.17 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $399,471.14 | $499,996.91 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,788,507.63 | $2,235,634.54 |
| Ohio | E060290 | Lucas | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,585,829.78 | $1,982,287.22 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $3,528.99 | $4,411.24 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Bridge Rehabilitation - No Added Capacity | $862,490.76 | $1,078,113.45 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Debt Service | $495,497.93 | $619,372.41 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $965,365.67 | $1,206,707.09 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $386,130.72 | $482,663.40 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $20,642,962.86 | $25,803,703.59 |
| Ohio | E060290 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $644,453.45 | $805,566.80 |
| Ohio | E060290 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $907,324.16 | $3,074,682.17 |
| Ohio | E060290 | Lucas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $4,414,226.87 | $5,517,783.60 |
| Ohio | E060290 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $55,129.90 | $68,912.38 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Right of Way | $1,229,910.00 | $1,229,910.00 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $144,212.00 | $180,265.00 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Right of Way | $203,974.80 | $254,968.50 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,355,902.15 | $11,694,877.69 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | SURFACE TRANS PRIORITIES S129 | Right of Way | $735,000.00 | $735,000.00 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $40,505,094.37 | |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,200,932.01 | $9,001,165.02 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $88,082,943.11 | |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $698,538.72 | $873,173.40 |
| Ohio | E060482 | Lawrence | >= 50,000 AND < 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Right of Way | $1,104,853.00 | $1,381,066.25 |
| Ohio | E070090 | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $707,167.70 | $785,741.89 |
| Ohio | E070090 | Franklin | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,402,787.77 | |
| Ohio | E070090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,496,945.61 | $15,621,182.00 |
| Ohio | E070090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $9,367,764.32 | $11,709,705.40 |
| Ohio | E070090 | Franklin | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $7,629,864.18 | $9,537,330.22 |
| Ohio | E070090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,585,891.46 | $28,384,953.89 |
| Ohio | E070090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $9,528,065.69 | $12,370,960.51 |
| Ohio | E070090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,200,000.00 | $1,500,000.00 |
| Ohio | E070090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $465,078.37 | $581,347.96 |
| Ohio | E070090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $132,043.94 | $156,652.61 |
| Ohio | E070090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $33,470.08 | $41,837.60 |
| Ohio | E070090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,428,655.52 | $1,785,819.40 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $1,578,861.14 | $1,973,576.42 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $145,757.89 | $182,197.37 |
| Ohio | E070348 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,148,586.48 | $16,435,733.10 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,280,171.39 | $22,855,562.15 |
| Ohio | E070348 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,234,246.91 | $4,042,808.64 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,372,476.06 | $5,465,791.18 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $7,370,377.86 | $14,567,717.42 |
| Ohio | E070348 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $149,125.58 | $186,406.98 |
| Ohio | E070348 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $271,432.73 | $339,290.92 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,632,025.08 | $2,090,521.41 |
| Ohio | E070348 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $59,356.90 | $74,196.12 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $735,211.85 | $919,014.81 |
| Ohio | E070348 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $10,193.52 | $12,741.90 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $7,436,700.00 | $8,263,000.00 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,007,074.52 | $1,258,843.15 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,318,138.21 | $10,128,978.36 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,732,936.74 | $4,777,534.43 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,055,500.10 | $2,817,911.57 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,339,971.20 | $2,924,964.00 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $13,395,000.00 | $14,883,333.33 |
| Ohio | E070405 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,548,282.40 | $3,185,353.00 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $53,458,934.52 | $69,024,508.95 |
| Ohio | E070405 | Hamilton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $10,324,606.48 | $15,201,236.62 |
| Ohio | E070586 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $55,524,376.00 | |
| Ohio | E070586 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $63,173,900.95 | |
| Ohio | E070586 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $71,705,723.05 | |
| Ohio | E070586 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,240,770.00 | |
| Ohio | E070586 | Cuyahoga | >= 200,000 | N/A | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $836,328.13 | $98,750,000.00 |
| Ohio | E080951 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $47,603.53 | $62,074.74 |
| Ohio | E080951 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,200,515.09 | $2,233,076.33 |
| Ohio | E080951 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $2,749,389.43 | $3,054,877.14 |
| Ohio | E080951 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $9,648,376.17 | $13,529,394.13 |
| Ohio | E080951 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $360,000.00 | $33,629,648.03 |
| Ohio | E080951 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $386,226.93 | $1,991,097.50 |
| Ohio | E080951 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,354,604.63 | $3,836,550.98 |
| Ohio | E081090 | Franklin | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $339,744.16 | $377,493.51 |
| Ohio | E081090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,182,513.70 | |
| Ohio | E081090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $22,884,940.32 | $27,328,656.56 |
| Ohio | E081090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $299,656.83 | $995,579.85 |
| Ohio | E081090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,726,138.19 | $3,407,672.74 |
| Ohio | E081090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $866,559.15 | $998,771.67 |
| Ohio | E081090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $233,512.64 | $266,402.94 |
| Ohio | E081090 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,199,237.10 | $6,888,041.22 |
| Ohio | E081090 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,216,696.90 | $3,581,540.25 |
| Ohio | E081090 | Franklin | >= 200,000 | N/A | TECHNOLOGY DEPLOYMENT GRANTS T | Other | $37,080.00 | $53,149.47 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $133,634.21 | $148,482.46 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,870,099.26 | $2,086,397.06 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,423,694.69 | $21,267,028.36 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,841,200.51 | $12,301,500.64 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $722,505.85 | $1,658,458.51 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,167,517.49 | $4,975,375.53 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,221,960.28 | $2,860,618.76 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $311,863.81 | $389,829.76 |
| Ohio | E090644 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,308,007.94 | $5,462,280.06 |
| Ohio | E100378 | Lucas | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Restoration & Rehabilitation | $1,807,078.00 | $3,077,780.01 |
| Ohio | E100378 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,549,336.00 | $11,942,989.84 |
| Ohio | E100378 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,378,162.61 | $10,301,186.35 |
| Ohio | E100378 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $2,400,000.00 | $5,254,102.92 |
| Ohio | E100378 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $468,000.00 | $585,000.00 |
| Ohio | E100378 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $330,800.00 | $413,500.00 |
| Ohio | E100378 | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $251,200.00 | $314,000.00 |
| Ohio | E100378 | Lucas | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $450,664.00 | $563,330.00 |
| Ohio | E100378 | Wood | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,000,000.00 | $17,387,230.89 |
| Ohio | E100634 | Franklin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $589,324.17 | $736,655.21 |
| Ohio | E100634 | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,045,333.48 | $5,682,919.41 |
| Ohio | E100634 | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $604,666.52 | $706,573.91 |
| Ohio | E100634 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,335,344.73 | $39,028,336.84 |
| Ohio | E100634 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,901,256.91 | $2,112,507.68 |
| Ohio | E100634 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $50,000.00 | $62,500.00 |
| Ohio | E100634 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,706,010.36 | $2,132,512.96 |
| Ohio | E100634 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $20,595,750.46 | $44,706,600.58 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $53,541.12 | |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $2,081.67 | |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $1,494,000.00 | $1,660,000.00 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | $1,524,318.30 | $1,693,687.00 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $31,532,304.84 | $46,030,262.07 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,091,667.28 | $2,324,074.76 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,309,283.37 | $8,121,425.96 |
| Ohio | E100878 | Lorain | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,796,176.57 | $3,106,862.85 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $231,650.22 | $257,389.13 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,721,587.13 | $1,928,359.67 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,835,071.51 | $4,261,190.56 |
| Ohio | E100878 | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,704,094.57 | $1,893,438.41 |
| Ohio | E100995 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,947,834.85 | $18,830,927.61 |
| Ohio | E100995 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,388,119.20 | $6,191,026.61 |
| Ohio | E100995 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $826,574.01 | $4,828,996.00 |
| Ohio | E100995 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $26,044.48 | $28,938.31 |
| Ohio | E100995 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,750,391.24 | $5,278,272.88 |
| Ohio | E100995 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,055,317.50 | $1,247,632.62 |
| Ohio | E110266 | Lorain | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $500,000.00 | $582,265.92 |
| Ohio | E110266 | Lorain | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $15,000.00 | $17,464.08 |
| Ohio | E110266 | Lorain | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $3,000,000.00 | $17,433,333.33 |
| Ohio | E110266 | Lorain | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $2,000,000.00 | $2,322,222.22 |
| Ohio | E110266 | Lorain | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $149,998.00 | $592,664.45 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,547,827.08 | $1,934,783.85 |
| Ohio | E110266 | Lorain | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $175,000.00 | $218,750.00 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $15,831,933.60 | $19,789,917.00 |
| Ohio | E110266 | Lorain | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $981,600.00 | $1,227,000.00 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,957,673.99 | $3,735,022.48 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,039,500.46 | $1,299,375.58 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $423,449.93 | $629,312.41 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $408,057.88 | $610,072.35 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $148,776.65 | $194,970.81 |
| Ohio | E110266 | Lorain | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,598,000.00 | $1,997,500.00 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $130,557.09 | $263,196.36 |
| Ohio | E110266 | Lorain | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $100,000.00 | $125,000.00 |
| Ohio | E110266 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,503,557.60 | $3,381,327.50 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,604,631.35 | $45,429,828.11 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,935.82 | $38,669.78 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $330,626.58 | $413,283.22 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $30,163,067.38 | |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,823,664.22 | |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,798,152.54 | $9,747,690.67 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $729,651.69 | $912,064.62 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $10,333,888.56 | $12,917,360.70 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $421,415.26 | $502,965.84 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,418,186.98 | $7,768,336.59 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $23,023,693.16 | $30,386,478.63 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,748,000.00 | $2,185,000.00 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $280,400.00 | $350,500.00 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,164,040.00 | $2,705,050.00 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,719,600.00 | $4,649,500.00 |
| Ohio | E110820 | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,400,000.00 | $3,000,000.00 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $10,858,736.66 | $12,065,262.96 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,000,000.00 | $5,000,000.00 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,279,304.35 | $3,643,671.50 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Rehabilitation - No Added Capacity | $34,000,000.00 | $48,181,313.68 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | N/A | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | $49,188,779.69 | $133,644,315.95 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | N/A | NATIONAL HWY FREIGHT PGM | Debt Service | $9,006,005.15 | $13,767,884.90 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Debt Service | $21,709,168.78 | $24,121,298.64 |
| Ohio | E111416 | Cuyahoga | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $4,691,549.61 | $5,212,832.90 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,171,337.40 | $1,401,486.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $297,440.10 | $330,489.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $16,464.41 | $16,464.41 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Construction Engineering | $4,815.42 | $4,815.42 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | $835,920.90 | $1,002,126.73 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $17,946.00 | $19,940.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $730,101.60 | $811,224.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $132,768.17 | $132,768.17 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,287,266.95 | $9,109,083.70 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,310,267.90 | $1,637,834.87 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,000,000.00 | $5,000,000.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $498,239.10 | $670,669.60 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,708,073.33 | $2,135,091.66 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $201,740.69 | $298,179.43 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,787,318.84 | $3,484,148.55 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $568,000.00 | $710,000.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,610,000.00 | $2,012,500.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,280,900.00 | $5,351,125.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $719,026.64 | $1,957,779.50 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $386,543.20 | $483,179.00 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $25,186.53 | $31,483.16 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,207,909.81 | $1,509,887.26 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $984,923.91 | $1,231,154.89 |
| Ohio | E120394 | Medina | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $431,115.71 | $538,894.64 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,079,169.43 | $17,550,213.41 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $670,692.20 | $838,365.24 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $40,000.00 | $50,000.00 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,077,103.92 | $2,596,379.90 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,105,286.95 | $1,568,721.44 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $769,727.71 | $962,159.64 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $272,263.20 | $340,329.00 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,676,435.42 | $8,345,544.28 |
| Ohio | E120441 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,157,323.20 | $1,446,654.00 |
| Ohio | E120585 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,534,844.37 | $3,835,545.79 |
| Ohio | E120585 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $804,794.51 | $1,005,993.14 |
| Ohio | E120585 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,701,754.88 | $169,863,853.42 |
| Ohio | E120585 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $344,000.00 | $430,000.00 |
| Ohio | E120602 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,221,615.51 | $27,561,238.67 |
| Ohio | E120602 | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $264,138.19 | $393,243.94 |
| Ohio | E120602 | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $83,771.20 | $93,079.11 |
| Ohio | E120602 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,527,842.22 | $2,821,972.48 |
| Ohio | E120958 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $311,815.32 | $19,869,245.51 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $616,613.83 | $39,291,371.81 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,573,867.19 | |
| Ohio | E120958 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,240,192.17 | $1,240,192.17 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $103,833,003.40 | |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $413,397.40 | $413,397.40 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,019,060.79 | $11,142,449.99 |
| Ohio | E120958 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,335,979.77 | $1,489,548.74 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,026,214.98 | $1,400,263.58 |
| Ohio | E120958 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $522,520.98 | $712,976.45 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,999,853.80 | $2,499,817.25 |
| Ohio | E120958 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,009,108.96 | $1,261,386.20 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,356,307.55 | $2,945,384.44 |
| Ohio | E120958 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,188,972.45 | $1,486,215.56 |
| Ohio | E120958 | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $9,994.24 | $12,492.80 |
| Ohio | E120958 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $5,043.00 | $6,303.75 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $6,589,800.00 | $7,322,000.00 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $287,585.74 | $359,482.18 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $770,381.41 | $962,976.76 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $15,322,274.01 | $19,152,842.51 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,346,909.45 | $5,433,636.81 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,343,880.80 | $6,679,851.00 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $301,316.00 | $376,645.00 |
| Ohio | E130382 | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $28,387,653.42 | $35,484,566.76 |
| Ohio | E130407 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,424,151.21 | $16,529,543.73 |
| Ohio | E130407 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,245,934.52 | $4,057,418.15 |
| Ohio | E130407 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,654,149.18 | $42,346,704.40 |
| Ohio | E130407 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,541,249.49 | $6,326,282.20 |
| Ohio | E130407 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,252,266.43 | $2,815,333.04 |
| Ohio | E130407 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,395,739.44 | $8,944,545.43 |
| Ohio | E130407 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $14,412,880.72 | $18,831,250.97 |
| Ohio | E130407 | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $60,000.00 | $187,884.34 |
| Ohio | E130407 | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,128,473.75 | $2,660,592.19 |
| Ohio | E130407 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $303,645.67 | $693,418.12 |
| Ohio | E130869 | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $7,912,937.39 | $11,183,378.99 |
| Ohio | E130869 | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,884,683.42 | $2,108,201.98 |
| Ohio | E130869 | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $10,343,708.80 | $12,502,777.37 |
| Ohio | E130869 | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,553,037.14 | $39,739,394.68 |
| Ohio | E130952 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,817,017.06 | $8,817,030.43 |
| Ohio | E130952 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,997,887.92 | $23,638,617.53 |
| Ohio | E130952 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,360,576.75 | $3,564,589.18 |
| Ohio | E130952 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,004,357.20 | $1,568,608.73 |
| Ohio | E131180 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,119,426.35 | $47,687,522.31 |
| Ohio | E131180 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,645,471.14 | $28,408,461.23 |
| Ohio | E131180 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $75,479.55 | $588,197.77 |
| Ohio | E131180 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,294,310.95 | $5,367,888.69 |
| Ohio | E131180 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,210,000.00 | $5,788,888.88 |
| Ohio | E131180 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,480,000.00 | $2,755,555.56 |
| Ohio | E131486 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $3,845,697.74 | $4,531,791.99 |
| Ohio | E131486 | Pickaway | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $301,948.66 | $355,818.01 |
| Ohio | E131486 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $344,129.14 | $430,161.43 |
| Ohio | E131486 | Franklin | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,800,000.00 | $4,407,396.90 |
| Ohio | E131486 | Franklin | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $277,661.79 | $308,513.10 |
| Ohio | E131486 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,988.92 | $122,862.67 |
| Ohio | E131486 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,654,704.45 | $24,190,989.90 |
| Ohio | E131510 | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,680,075.27 | $8,602,607.91 |
| Ohio | E131510 | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,030,976.74 | $7,797,028.09 |
| Ohio | E131510 | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $593,022.80 | $3,418,010.83 |
| Ohio | E131510 | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $784,191.64 | $897,110.78 |
| Ohio | E131510 | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,578,572.16 | $2,865,080.18 |
| Ohio | E131510 | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,408,479.14 | $1,775,275.07 |
| Ohio | E131510 | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $410,421.43 | $513,026.78 |
| Ohio | E131510 | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $479,556.94 | $839,536.36 |
| Ohio | E131510 | Warren | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $74,997.82 | $133,924.68 |
| Ohio | E140008 | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,894,956.00 | $2,368,695.00 |
| Ohio | E140008 | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $884,133.65 | $2,808,132.06 |
| Ohio | E140008 | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,338,290.98 | $26,585,430.58 |
| Ohio | E140008 | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $777,575.37 | $3,811,472.36 |
| Ohio | E140310 | Statewide | N/A | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $6,442,739.88 | $6,442,739.88 |
| Ohio | E140310 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $66,384,635.91 | $67,777,712.66 |
| Ohio | E140310 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $15,396,587.21 | $17,254,836.52 |
| Ohio | E140310 | Statewide | N/A | Local | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,567,186.79 | $2,567,186.79 |
| Ohio | E140985 | Hamilton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $6,610,195.80 | $7,344,662.00 |
| Ohio | E140985 | Hamilton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $6,139.04 | $6,821.16 |
| Ohio | E140985 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,000,000.00 | $1,000,000.00 |
| Ohio | E140985 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,905,118.73 | $18,204,816.05 |
| Ohio | E140985 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,675,459.42 | $4,524,849.03 |
| Ohio | E140985 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,303,669.36 | $5,709,171.63 |
| Ohio | E140985 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $279,317.45 | $279,317.45 |
| Ohio | E140985 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $389,169.60 | $486,462.00 |
| Ohio | E140985 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $960,000.00 | $1,200,000.00 |
| Ohio | E150345 | Summit | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,170,055.72 | $2,170,055.72 |
| Ohio | E150345 | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $188,578.53 | $335,720.04 |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $965,078.37 | $1,718,096.72 |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,538,529.51 | |
| Ohio | E150345 | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,668,917.61 | |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $422,178.26 | $422,178.26 |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,349,361.23 | $2,526,904.62 |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $171,113.84 | $2,222,571.49 |
| Ohio | E150345 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,667,991.85 | $4,313,634.33 |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,419,918.94 | $1,637,678.76 |
| Ohio | E150345 | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $145,042.27 | $168,412.98 |
| Ohio | E150345 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,307,508.06 | $3,725,733.63 |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $523,808.24 | $523,808.24 |
| Ohio | E150345 | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $102,353.33 | $102,353.33 |
| Ohio | E150345 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,122,817.17 | $2,669,160.45 |
| Ohio | E150345 | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $707,605.72 | $889,720.14 |
| Ohio | E150345 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $567,206.36 | $567,206.36 |
| Ohio | E150345 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $342,368.81 | $1,095,421.91 |
| Ohio | E150345 | Summit | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $35,688.62 | $114,187.08 |
| Ohio | E150345 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $612,938.86 | $766,173.57 |
| Ohio | E150345 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $24,123.54 | $30,154.42 |
| Ohio | E150345 | Summit | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $35,366.56 | $45,508.75 |
| Ohio | E150345 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $245,351.18 | $339,306.92 |
| Ohio | E150403 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,183,102.29 | $75,198,067.86 |
| Ohio | E150403 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $292,817.71 | $366,022.14 |
| Ohio | E150403 | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $220,000.00 | $275,000.00 |
| Ohio | E150403 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,285,000.00 | $3,902,750.00 |
| Ohio | E150403 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,060,000.00 | $5,075,000.00 |
| Ohio | E150403 | Lucas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,000,000.00 | $33,147,372.48 |
| Ohio | E150816 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,326,892.18 | $21,690,295.23 |
| Ohio | E150816 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $78,222,370.61 | $130,277,963.26 |
| Ohio | E150816 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,727,365.20 | $10,964,549.50 |
| Ohio | E150816 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $3,127,428.01 | $4,699,942.01 |
| Ohio | E150816 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,100,000.00 | $1,375,000.00 |
| Ohio | E150816 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,225,000.00 | $10,281,250.00 |
| Ohio | E150816 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,080,000.00 | $1,850,000.00 |
| Ohio | E150816 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $733,957.30 | $917,446.62 |
| Ohio | E150816 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $51,378.70 | $64,223.38 |
| Ohio | E160211 | Cuyahoga | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $22,779,709.09 | |
| Ohio | E160211 | Cuyahoga | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,376,421.08 | |
| Ohio | E170058 | Morgan | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Maintenance Resurfacing | $169.73 | $188.59 |
| Ohio | E170058 | Muskingum | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Maintenance Resurfacing | $341,830.27 | $379,811.41 |
| Ohio | E170058 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $8,360.00 | $10,450.00 |
| Ohio | E170058 | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $18,863,890.55 | $23,579,863.19 |
| Ohio | E170058 | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $778,748.13 | $973,435.16 |
| Ohio | E170058 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $369.85 | $462.31 |
| Ohio | E170058 | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $182,947.22 | $228,684.02 |
| Ohio | E170058 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $773.57 | $966.96 |
| Ohio | E170058 | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,712,818.09 | $2,141,022.61 |
| Ohio | E170058 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $52.54 | $65.67 |
| Ohio | E170058 | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $109,425.59 | $136,781.99 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $206,905.98 | $258,632.47 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $53,025.87 | $66,282.34 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $37,371.62 | $46,714.52 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $886,585.32 | $985,094.80 |
| Ohio | E170580 | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,544.58 | $1,716.20 |
| Ohio | E170580 | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,133.97 | $1,259.97 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $650,903.89 | $723,226.54 |
| Ohio | E170580 | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,747.30 | $4,163.66 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $2,268,722.53 | $2,520,802.82 |
| Ohio | E170580 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $35,983.68 | $44,979.59 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,413,860.91 | $26,767,326.14 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $799,189.26 | $998,986.58 |
| Ohio | E170580 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,392.32 | $1,740.40 |
| Ohio | E170580 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $584,421.03 | $730,526.28 |
| Ohio | E170580 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,018.15 | $1,272.69 |
| Ohio | E170713 | Hamilton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $6,750,000.00 | $7,500,000.00 |
| Ohio | E170713 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,271,671.92 | $21,673,212.53 |
| Ohio | E170713 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,343,467.09 | $3,758,643.45 |
| Ohio | E170713 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,947,492.81 | $14,505,546.56 |
| Ohio | E170713 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $197,619.72 | $219,577.47 |
| Ohio | E170713 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $73,478.41 | $81,642.68 |
| Ohio | E170713 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,090,375.00 | $35,230,440.67 |
| Ohio | E170713 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,451,070.73 | $6,709,686.70 |
| Ohio | E170713 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $679,750.67 | $849,688.34 |
| Ohio | E170713 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,011,734.99 | $8,050,000.01 |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,109,920.15 | $7,947,419.69 |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $36,198,883.88 | $52,854,959.69 |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,490,480.00 | |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,960,070.00 | |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $12,155,620.00 | |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,972,830.00 | |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $15,731,030.00 | |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,610,349.63 | $2,012,937.04 |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $18,797,566.39 | $25,183,722.50 |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $411,760.00 | |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $3,536,288.00 | $4,567,775.25 |
| Ohio | E170982 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $165,100.00 | |
| Ohio | E171059 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $135,000.00 | $150,000.00 |
| Ohio | E171059 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $4,500,000.00 | $5,000,000.00 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,055,801.71 | $5,789,648.71 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,000,000.00 | $2,228,240.45 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,535,024.90 | $2,535,024.90 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,943,374.12 | $3,260,782.54 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,342,416.59 | $7,258,392.60 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $10,218,503.50 | $10,760,165.85 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,484,084.00 | $7,484,084.00 |
| Ohio | E171059 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,199,263.95 | $5,249,079.94 |
| Ohio | E171059 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,913,246.92 | $19,606,444.85 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $14.18 | $17.73 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,721,412.51 | $27,151,765.64 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,510,410.26 | $9,456,011.40 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,236,226.23 | $3,962,542.96 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,950,000.00 | $7,437,499.99 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,479,000.00 | $1,848,750.00 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $25,238,071.96 | $33,047,589.94 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $931,100.26 | $1,163,875.32 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $5,744,031.20 | $7,180,039.00 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $790,942.29 | $900,444.24 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $9,136,900.37 | $10,905,326.39 |
| Ohio | E171372 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,908,629.74 | $2,323,817.38 |
| Ohio | E171457 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,038,333.24 | $53,209,360.00 |
| Ohio | E171457 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,240,000.00 | $6,966,666.67 |
| Ohio | E180007 | Delaware | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,201,843.00 | $3,677,032.78 |
| Ohio | E180007 | Delaware | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $2,000,000.00 | $2,500,000.00 |
| Ohio | E180007 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $333,988.61 | $417,485.76 |
| Ohio | E180007 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,323,726.76 | $4,154,658.45 |
| Ohio | E180007 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,318,027.70 | $6,647,534.62 |
| Ohio | E180007 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,379.39 | $29,224.24 |
| Ohio | E180007 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,200,000.00 | $1,950,000.00 |
| Ohio | E180007 | Delaware | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $65,482.87 | $81,853.59 |
| Ohio | E180007 | Delaware | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $318,245.54 | $397,806.93 |
| Ohio | E180007 | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,256,206.80 | $6,105,029.56 |
| Ohio | E180007 | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $11,274,032.77 | $14,092,540.96 |
| Ohio | E180007 | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,713,911.97 | $2,142,389.96 |
| Ohio | E180007 | Delaware | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,581.13 | $5,726.41 |
| Ohio | E180007 | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $762,135.20 | $952,669.00 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $583,174,801.45 | |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $5,765,920.00 | |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $1,000,000.00 | $1,250,000.00 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | Bridge New Construction | $101,975,954.00 | $127,469,942.50 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | Preliminary Engineering | $24,000,000.00 | $30,000,000.00 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | Right of Way | $1,140,000.00 | $1,425,000.00 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,563,012.51 | $5,703,765.64 |
| Ohio | E180034 | Hamilton | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $372,840.00 | $372,840.00 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $734,639.01 | $793,225.26 |
| Ohio | E180034 | Hamilton | >= 200,000 | Local | REPURPOSED EARMARKS EXEMPT | Preliminary Engineering | $646,116.00 | $646,116.00 |
| Ohio | E180034 | Hamilton | >= 200,000 | Local | REPURPOSED SPECIAL | Preliminary Engineering | $1,084,816.10 | $1,084,816.10 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $8,748,676.35 | $9,209,133.00 |
| Ohio | E180034 | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $10,186,807.00 | $10,722,954.74 |
| Ohio | E180134 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $9,000,000.00 | $10,000,000.00 |
| Ohio | E180134 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $270,000.00 | $300,000.00 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,635.01 | $54,543.76 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $800.00 | $17,986,615.40 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $170,374.47 | $189,304.97 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,888,787.93 | $8,247,081.49 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,215,073.69 | $22,358,039.74 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,880,408.54 | $3,600,510.68 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $46,380.20 | $57,975.25 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $843,261.49 | $843,461.49 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,889,640.66 | $3,905,832.78 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $64,441.43 | $71,601.60 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $27,427.03 | $30,474.48 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,140,136.48 | $3,651,348.64 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,150,758.84 | $8,150,758.84 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,736,534.18 | $4,037,198.23 |
| Ohio | E180134 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $460,182.19 | $460,282.19 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $64,299.04 | $71,443.38 |
| Ohio | E180134 | Franklin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $237,732.00 | $2,194,176.30 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,702.40 | $123,245.44 |
| Ohio | E180134 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $832,054.00 | $2,002,906.03 |
| Ohio | E180372 | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $382,500.00 | $425,000.00 |
| Ohio | E180372 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,761,878.80 | $1,957,643.11 |
| Ohio | E180372 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $40,531,536.54 | $45,035,040.60 |
| Ohio | E180372 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $1,908,781.81 | $2,120,868.68 |
| Ohio | E180372 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,239,397.00 | $3,599,330.00 |
| Ohio | E180372 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $2,074,902.85 | $2,305,447.61 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,478,774.06 | $25,598,467.58 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,947,791.40 | $6,184,739.25 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,261,642.23 | $1,577,052.79 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,221,902.91 | $6,527,378.64 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $183,773.19 | $229,716.49 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $450,495.22 | $563,119.02 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,796,076.99 | $2,245,096.23 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,248,633.50 | $1,498,828.88 |
| Ohio | E180373 | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $800,000.00 | $1,000,000.00 |
| Ohio | E180428 | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $4,500,000.00 | $5,000,000.00 |
| Ohio | E180428 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,712,505.27 | $7,219,497.92 |
| Ohio | E180428 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,268,002.02 | $44,677,117.75 |
| Ohio | E180428 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,202,222.60 | $53,002,469.55 |
| Ohio | E180428 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $10,439,002.34 | $30,077,374.61 |
| Ohio | E180428 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,182,086.17 | $2,313,429.08 |
| Ohio | E180428 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,167,054.61 | $15,714,999.61 |
| Ohio | E180428 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,259,325.53 | $10,394,945.10 |
| Ohio | E180428 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $9,811,884.38 | $14,793,223.28 |
| Ohio | E180428 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,124,380.47 | $6,124,380.47 |
| Ohio | E180428 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,768,562.90 | $7,550,979.53 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $500,000.00 | $625,000.00 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Safety | $995,537.71 | $1,244,422.14 |
| Ohio | E180439 | Clermont | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Safety | $4,462.29 | $5,577.86 |
| Ohio | E180439 | Clermont | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $12,235.36 | $72,132.55 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $2,729,709.14 | $16,092,771.15 |
| Ohio | E180439 | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,117.32 | $52,845.91 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,480,274.33 | $11,789,923.06 |
| Ohio | E180439 | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $970.02 | $29,816.58 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $216,409.44 | $6,652,077.39 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,029,458.51 | $2,536,823.16 |
| Ohio | E180439 | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,096.63 | $11,370.78 |
| Ohio | E180439 | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,010,120.00 | $20,012,650.00 |
| Ohio | E180439 | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,653.61 | $2,067.02 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $368,921.93 | $461,152.40 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $555,602.06 | $5,437,504.81 |
| Ohio | E180439 | Clermont | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $339,500.15 | $424,375.19 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $340,574.22 | $340,574.22 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,733,101.86 | $36,603,446.51 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $308,422.16 | $342,691.29 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $12,450,316.64 | $45,538,988.86 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,130,442.50 | $3,478,269.44 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,321,526.14 | $12,579,473.51 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,085,000.00 | $4,538,888.88 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $520,178.00 | $577,975.56 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $73,242.73 | $91,553.41 |
| Ohio | E180746 | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $697,695.22 | $872,119.03 |
| Ohio | E180796 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,780,736.28 | $9,725,920.34 |
| Ohio | E180796 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $131,617.66 | $164,522.08 |
| Ohio | E180796 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $484,673.35 | $541,183.24 |
| Ohio | E180796 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,673,873.46 | $32,019,149.55 |
| Ohio | E180796 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,895,198.32 | $6,550,220.36 |
| Ohio | E180796 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,732,193.11 | $2,165,241.39 |
| Ohio | E180796 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,597.34 | $23,466.84 |
| Ohio | E180796 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,442,633.16 | $1,644,511.14 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $95,695.01 | $119,618.76 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $97,948.01 | $108,831.12 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $83,312.64 | $104,140.80 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $95,547.64 | $106,164.04 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,126,081.70 | $2,455,345.28 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $8,030,000.00 | $10,037,500.00 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $14,415,317.62 | $18,031,280.00 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - Added Capacity | $1,360,000.00 | $1,700,000.00 |
| Ohio | E190121 | Franklin | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | $6,480,000.00 | $7,200,000.00 |
| Ohio | E190121 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,598,855.92 | $3,681,602.29 |
| Ohio | E190121 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $151,144.08 | $257,707.71 |
| Ohio | E190122 | Franklin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Landscaping and Other Scenic Beautification | $2,370,702.16 | $2,963,377.70 |
| Ohio | E190122 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,954,764.35 | $9,943,455.44 |
| Ohio | E190122 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $250,616.00 | $1,806,780.00 |
| Ohio | E190122 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $19,873,226.64 | $22,081,362.93 |
| Ohio | E190122 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,950,832.65 | $113,610,582.42 |
| Ohio | E190122 | Franklin | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $63,218,387.02 | $103,022,983.77 |
| Ohio | E190122 | Franklin | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge New Construction | $30,262,901.84 | $51,057,426.17 |
| Ohio | E190122 | Franklin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $227,432.00 | $554,540.00 |
| Ohio | E190122 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $400,000.00 | $500,000.00 |
| Ohio | E190122 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $586,019.64 | $3,938,189.58 |
| Ohio | E190125 | Delaware | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $4,797,844.94 | $5,997,306.17 |
| Ohio | E190125 | Delaware | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $400,061.46 | $823,350.38 |
| Ohio | E190125 | Delaware | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $2,000,000.00 | $2,500,000.00 |
| Ohio | E190125 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $917,277.60 | $1,146,597.00 |
| Ohio | E190125 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,389,024.50 | $1,736,280.62 |
| Ohio | E190125 | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $17,843,207.50 | $22,304,009.38 |
| Ohio | E190184 | Montgomery | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,110,000.00 | $1,233,333.33 |
| Ohio | E190184 | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $626,101.50 | $778,869.67 |
| Ohio | E190184 | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $50,000.00 | $100,000.00 |
| Ohio | E190184 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $698,369.21 | $1,396,738.42 |
| Ohio | E190184 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,494,196.20 | $3,007,521.99 |
| Ohio | E190184 | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,135,936.01 | $50,962,667.62 |
| Ohio | E190250 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $430,346.45 | $35,995,000.00 |
| Ohio | E190250 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,708,699.25 | $15,255,570.00 |
| Ohio | E190250 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $304,602.80 | $6,069,027.72 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | CARBON REDUCTION PROGRAM | Safety | $1,529,069.00 | $1,911,336.25 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | CONGESTION AIR QUALITY | Safety | $2,500,000.00 | $3,125,000.00 |
| Ohio | E190304 | Trumbull | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $108,447.14 | $120,496.84 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $161,552.86 | $179,503.16 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,809,000.00 | $2,010,000.00 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $300,000.00 | $375,000.00 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $2,973,429.90 | $3,303,811.00 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $33,131.19 | $41,413.98 |
| Ohio | E190304 | Trumbull | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $198,787.22 | $248,484.03 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,441,040.02 | $5,051,300.02 |
| Ohio | E190304 | Trumbull | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,714.42 | $23,392.98 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $285,991.15 | $357,488.99 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,526,200.80 | $1,907,751.00 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $625,590.00 | $695,100.00 |
| Ohio | E190304 | Trumbull | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $63,430.12 | $178,407.48 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $301,293.13 | $847,435.68 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $200,217.38 | $283,225.07 |
| Ohio | E190304 | Trumbull | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,388.32 | $14,922.96 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $1,470,931.00 | $1,838,663.75 |
| Ohio | E190304 | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $2,876,918.25 | $3,596,147.81 |
| Ohio | E190328 | Warren | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $13,016.00 | $32,360.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $16,482.00 | $32,964.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $189,915.00 | $419,795.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $27,892.00 | $34,865.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $988,201.75 | $1,235,252.18 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $62,681.28 | $78,351.60 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,680.00 | $4,600.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $99,040.00 | $123,800.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $63,320.43 | $79,150.54 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $192,058.01 | $240,072.51 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $452,417.80 | $565,522.25 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $17,979,098.83 | $22,473,873.53 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $156,420.00 | $195,525.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $3,817,231.20 | $4,771,539.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,281,184.00 | $1,601,480.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $42,324.00 | $52,905.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $85,185.60 | $106,482.00 |
| Ohio | E190328 | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,213,075.20 | $1,516,344.00 |
| Ohio | E190498 | Mahoning | >= 200,000 | State | APPALACHIAN DEV HIGHWAY SYSTEM | 4R - No Added Capacity | $581,160.00 | $581,160.00 |
| Ohio | E190498 | Mahoning | >= 200,000 | Local | APPALACHIAN DEV HIGHWAY SYSTEM | 4R - No Added Capacity | $868,840.00 | $868,840.00 |
| Ohio | E190498 | Mahoning | >= 200,000 | Local | CONGESTION AIR QUALITY | Construction Engineering | $250,047.43 | $250,047.43 |
| Ohio | E190498 | Mahoning | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $167,250.27 | $167,250.27 |
| Ohio | E190498 | Mahoning | >= 200,000 | Local | CONGESTION AIR QUALITY | Safety | $1,234,079.05 | $1,234,079.05 |
| Ohio | E190498 | Mahoning | >= 200,000 | State | CONGESTION AIR QUALITY | Safety | $825,444.32 | $825,444.32 |
| Ohio | E190498 | Mahoning | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $363,998.49 | $454,998.11 |
| Ohio | E190498 | Mahoning | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $3,920,608.17 | $4,914,900.21 |
| Ohio | E190498 | Mahoning | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $6,932,583.83 | $8,691,589.79 |
| Ohio | E190498 | Mahoning | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,720,757.22 | $7,150,946.53 |
| Ohio | E190498 | Mahoning | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,680,077.04 | $2,052,596.30 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $6,553.09 | $7,281.21 |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $4,743.54 | $5,270.60 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,672,418.62 | $19,949,708.55 |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,790,020.53 | $8,991,838.46 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,266,091.70 | |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,194,963.79 | |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,625,594.78 | $3,844,934.32 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,122,678.34 | $7,247,759.18 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,499,431.06 | $6,388,121.31 |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,013,832.48 | |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,950,864.00 | |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,682,966.55 | $12,487,493.51 |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,316,516.96 | $2,659,485.30 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,362,851.33 | $5,063,997.40 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,268,465.86 | $8,982,565.92 |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,091,463.27 | $6,504,773.55 |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,098,397.71 | $2,331,553.01 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,898,635.42 | $3,220,706.03 |
| Ohio | E190542 | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $7,319.12 | $8,132.36 |
| Ohio | E190542 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $10,111.22 | $11,234.68 |
| Ohio | E190934 | Lake | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,835,781.91 | $24,794,727.39 |
| Ohio | E190934 | Lake | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,388,506.09 | $1,735,632.61 |
| Ohio | E191306 | Franklin | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $1,466,279.00 | $1,832,848.75 |
| Ohio | E191306 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $10,415,596.00 | $21,535,812.99 |
| Ohio | E191306 | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,560,000.00 | $2,600,000.00 |
| Ohio | E191584 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $36,408,039.38 | $45,510,049.22 |
| Ohio | E191584 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,994,525.36 | $4,993,156.71 |
| Ohio | E191584 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,170,123.26 | $3,962,654.06 |
| Ohio | E191584 | Lake | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $4,885,000.00 | $6,106,250.00 |
| Ohio | E200136 | Summit | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $4,709,506.05 | $5,886,882.56 |
| Ohio | E200136 | Summit | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $48,131.85 | $60,164.81 |
| Ohio | E200136 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,808,309.60 | $6,010,387.00 |
| Ohio | E200136 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $51,200.00 | $64,000.00 |
| Ohio | E200136 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,591,958.21 | $10,739,947.76 |
| Ohio | E200136 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $32,857,368.66 | $36,567,034.04 |
| Ohio | E200136 | Summit | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $32,466.15 | $36,073.50 |
| Ohio | E200136 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $648,717.05 | $810,896.31 |
| Ohio | E200136 | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,281,773.07 | $3,761,234.81 |
| Ohio | E200136 | Summit | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,885.60 | $3,206.20 |
| Ohio | E200137 | Summit | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $964,086.18 | $1,071,206.87 |
| Ohio | E200137 | Summit | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $80,391.27 | $89,323.63 |
| Ohio | E200137 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,931,353.27 | $16,164,191.59 |
| Ohio | E200137 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $31,491,075.97 | $34,990,084.41 |
| Ohio | E200137 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $184,319.55 | $204,799.50 |
| Ohio | E200137 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,109,573.76 | $3,580,804.00 |
| Ohio | E200137 | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,488,140.00 | $1,860,175.00 |
| Ohio | E200137 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,600,000.00 | $2,000,000.00 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $2,872,939.68 | $3,860,484.62 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $233,425.56 | $306,142.31 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $157,716.39 | $206,894.12 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $33,467,647.76 | $41,834,559.70 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $895,683.47 | $995,203.86 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $31,365,725.80 | $34,850,806.45 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $558,870.36 | $620,967.07 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,601,033.98 | $5,437,640.02 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,112,978.35 | $3,679,010.99 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | 4R - No Added Capacity | $10,600,218.98 | $13,250,273.73 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,238,918.87 | $15,298,648.58 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,598,742.15 | $1,998,427.69 |
| Ohio | E200155 | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,081,675.91 | $1,352,094.89 |
| Ohio | E200167 | Cuyahoga | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $11,858,452.00 | $27,099,988.54 |
| Ohio | E200167 | Cuyahoga | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $2,092,668.00 | $2,615,835.00 |
| Ohio | E200211 | Franklin | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $3,039,829.93 | $3,377,588.81 |
| Ohio | E200211 | Franklin | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $2,024,268.21 | $2,249,186.90 |
| Ohio | E200211 | Franklin | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $778,637.56 | $865,152.85 |
| Ohio | E200211 | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,240,000.00 | $3,600,000.00 |
| Ohio | E200211 | Franklin | >= 200,000 | State | INTERSTATE MAINTENANCE | Safety | $880,636.53 | $978,485.03 |
| Ohio | E200211 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,031,071.01 | $1,145,634.46 |
| Ohio | E200211 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,831,565.61 | $2,035,072.90 |
| Ohio | E200211 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,374,000.00 | $3,748,888.89 |
| Ohio | E200211 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $22,044,529.86 | $24,493,922.07 |
| Ohio | E200428 | Clermont | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $3,320,976.61 | $3,689,974.01 |
| Ohio | E200428 | Clermont | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $4,287,078.89 | $4,763,420.99 |
| Ohio | E200428 | Clermont | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $873,000.00 | $1,091,250.00 |
| Ohio | E200428 | Clermont | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $1,127,000.00 | $1,408,750.00 |
| Ohio | E200428 | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,400,000.00 | $3,000,000.00 |
| Ohio | E200428 | Clermont | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $672,651.06 | $840,813.82 |
| Ohio | E200428 | Clermont | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $12,502,198.54 | $17,877,748.17 |
| Ohio | E200428 | Clermont | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,682,626.40 | $2,103,283.00 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $6,526,922.50 | $8,158,653.13 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $2,797,252.50 | $3,496,565.63 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $1,336,760.66 | $1,670,950.83 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,769,835.04 | $4,375,766.85 |
| Ohio | E200605 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,000,081.86 | $4,739,509.26 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,636,793.12 | $12,282,279.86 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $576,652.72 | $720,815.90 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,653,342.08 | $5,024,984.80 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $703,947.90 | $1,333,159.23 |
| Ohio | E200605 | Union | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $762,411.62 | $953,014.52 |
| Ohio | E200816 | Franklin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $20,069,224.47 | $22,299,138.30 |
| Ohio | E200816 | Franklin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $944,619.48 | $1,049,577.20 |
| Ohio | E200816 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,119,291.98 | $11,243,657.76 |
| Ohio | E200816 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $3,684,008.25 | $4,093,342.50 |
| Ohio | E200816 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $404,768.03 | $449,742.26 |
| Ohio | E200816 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,453,500.40 | $2,726,111.56 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $660,000.00 | $825,000.00 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $917,721.49 | $1,019,690.54 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $900,000.00 | $1,000,000.00 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,215,488.50 | $9,842,350.03 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Safety | $2,000,000.00 | $2,500,000.00 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $3,423,963.47 | $4,279,954.34 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,068,618.23 | $1,350,066.22 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $1,093,098.28 | $1,570,629.41 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,700,000.00 | $2,125,000.00 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,887,520.00 | $3,609,400.00 |
| Ohio | E200947 | Ross | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $875,000.00 | $1,093,750.00 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $15,213,278.10 | $19,016,597.63 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $845,563.98 | $1,056,954.98 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $297,000.00 | $371,250.00 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $50,000.00 | $62,500.00 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $320,000.00 | $400,000.00 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Right of Way | $24,000.00 | $30,000.00 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Right of Way | $250,000.00 | $312,500.00 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,195,110.26 | $4,193,887.82 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $226,061.19 | $314,442.69 |
| Ohio | E201074 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $208,837.00 | |
| Ohio | E210099 | Cuyahoga | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $7,276,932.44 | $8,085,516.49 |
| Ohio | E210099 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $32,375,579.86 | $35,972,866.51 |
| Ohio | E210099 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $273,492.00 | $303,880.00 |
| Ohio | E210099 | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,387,672.44 | $3,764,080.49 |
| Ohio | E210099 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,449,000.00 | $2,721,111.11 |
| Ohio | E210244 | Lucas | >= 200,000 | Local | CONGESTION AIR QUALITY | Safety | $562,302.13 | $702,877.66 |
| Ohio | E210244 | Lucas | >= 200,000 | State | CONGESTION AIR QUALITY | Safety | $3,372,517.07 | $4,215,646.35 |
| Ohio | E210244 | Lucas | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $3,636,654.63 | $4,545,818.29 |
| Ohio | E210244 | Lucas | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $303,231.37 | $379,039.21 |
| Ohio | E210244 | Lucas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $8,847,520.36 | $9,830,578.18 |
| Ohio | E210244 | Lucas | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $343,459.64 | $381,621.82 |
| Ohio | E210244 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,564,015.36 | $2,077,363.90 |
| Ohio | E210244 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $984,490.00 | $1,958,582.50 |
| Ohio | E210244 | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $71,576.64 | $145,416.10 |
| Ohio | E210244 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,001,762.46 | $2,051,430.01 |
| Ohio | E210244 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $958,655.22 | $1,860,500.01 |
| Ohio | E210244 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,564,732.00 | $2,631,607.00 |
| Ohio | E210244 | Lucas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $934,087.20 | $1,167,609.00 |
| Ohio | E210244 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $458,800.00 | $573,500.00 |
| Ohio | E210244 | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $2,350,307.32 | $4,202,686.00 |
| Ohio | E210348 | Lucas | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $21,516,480.00 | $53,385,792.00 |
| Ohio | E210348 | Lucas | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $2,151,680.00 | $3,677,100.00 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $7,730,484.95 | $9,663,106.19 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $551,136.05 | $688,920.06 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $40,370.76 | $50,463.45 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $566,258.64 | $707,823.30 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $100,954.91 | $126,193.64 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,416,039.49 | $1,770,049.36 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $785,576.44 | $981,970.55 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,357,729.24 | $1,697,161.55 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $92,877.18 | $116,096.48 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $18,610,536.33 | $23,263,170.41 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $1,326,816.81 | $1,658,521.01 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $880,000.00 | $1,100,000.00 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,200,000.00 | $11,500,000.00 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $11,626,935.82 | $14,533,669.78 |
| Ohio | E220031 | Fairfield | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $813,888.18 | $1,017,360.22 |
| Ohio | E220056 | Cuyahoga | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $1,285,250.00 | $2,734,574.46 |
| Ohio | E220056 | Cuyahoga | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $1,214,750.00 | $2,584,574.47 |
| Ohio | E220056 | Summit | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge Rehabilitation - Added Capacity | $2,451,926.39 | $3,064,907.99 |
| Ohio | E220056 | Summit | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $48,073.61 | $60,092.01 |
| Ohio | E220056 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,683,466.27 | $2,104,332.84 |
| Ohio | E220056 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,619,469.66 | $3,631,944.84 |
| Ohio | E220056 | Cuyahoga | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,530,636.67 | $3,432,721.25 |
| Ohio | E220056 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,229,133.33 | $10,254,592.59 |
| Ohio | E220056 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,584,255.15 | $3,370,755.64 |
| Ohio | E220056 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $408,683.28 | $454,092.53 |
| Ohio | E220056 | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $314,229.40 | $681,609.64 |
| Ohio | E220056 | Cuyahoga | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $192,177.51 | $421,209.69 |
| Ohio | E220056 | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $916,050.12 | $1,051,362.04 |
| Ohio | E220165 | Hamilton | >= 200,000 | State | BRIDGE INVESTMENT PROGRAM-IIJA | Preliminary Engineering | $426,020,112.00 | $532,525,140.00 |
| Ohio | E220165 | Hamilton | >= 200,000 | State | BRIDGE INVESTMENT PROGRAM-IIJA | Right of Way | $107,171,888.00 | $133,964,860.00 |
| Ohio | E220165 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,142,950.08 | $37,859,682.26 |
| Ohio | E220165 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $100,000.00 | $125,000.00 |
| Ohio | E220165 | Hamilton | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $250,000,000.00 | $312,500,000.00 |
| Ohio | E220273 | Warren | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $5,000,000.00 | $6,250,000.00 |
| Ohio | E220273 | Warren | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $6,355,353.31 | $13,327,776.58 |
| Ohio | E220273 | Warren | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,676,207.20 | $6,095,259.00 |
| Ohio | E230501 | Athens | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,125,938.77 | $40,620,623.85 |
| Ohio | E230501 | Meigs | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,308,801.87 | $25,007,469.15 |
| Ohio | E230501 | Athens | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,206,170.01 | $4,007,712.51 |
| Ohio | E230503 | Meigs | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,649,776.96 | $69,736,730.00 |
| Ohio | E230503 | Meigs | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,088,552.00 | $2,886,593.49 |
| Ohio | E230571 | Franklin | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $1,951,996.36 | $2,168,884.84 |
| Ohio | E230571 | Franklin | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $153,015.44 | $170,017.16 |
| Ohio | E230571 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $46,772,479.99 | $51,969,422.21 |
| Ohio | E230571 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $233,890.20 | $259,878.00 |
| Ohio | E230571 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,274,072.01 | $3,637,857.79 |
| Ohio | E230571 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $582,150.00 | $646,833.33 |
| Ohio | E230571 | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $196,317.90 | $218,131.00 |
| Ohio | E230571 | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,637,850.00 | $5,153,166.67 |
| Ohio | E230890 | Defiance | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,657,738.09 | $15,822,172.62 |
| Ohio | E230890 | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,657,738.09 | $15,822,172.61 |
| Ohio | E230890 | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $506,309.91 | $632,887.39 |
| Ohio | E230890 | Defiance | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $506,309.91 | $632,887.38 |
| Ohio | E230890 | Paulding | >= 5,000 AND < 50,000 | N/A | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $1,644,808.00 | $2,056,010.00 |
| Ohio | E240415 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,166,914.27 | $1,965,038.64 |
| Ohio | E240415 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,199,963.35 | $82,749,945.41 |
| Ohio | E240415 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $789,613.39 | $2,167,143.94 |
| Ohio | E240415 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,118,543.69 | $6,046,307.81 |
| Ohio | E240415 | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $518,209.13 | $7,250,738.45 |
| Ohio | E240618 | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,720,801.04 | $11,891,553.55 |
| Ohio | E240618 | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $616,985.03 | $773,834.61 |
| Ohio | E240618 | Belmont | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,305,593.38 | $10,529,261.88 |
| Ohio | E240618 | Belmont | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,510,164.19 | $4,810,305.57 |
| Ohio | E240618 | Belmont | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $790,515.51 | $988,144.39 |
| Ohio | E240618 | Belmont | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $90,000.00 | $112,500.00 |
| Ohio | E240912 | Meigs | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,308,030.43 | $82,314,226.81 |
| Ohio | E240912 | Athens | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,194,340.39 | $41,927,613.19 |
| Ohio | E241004 | Meigs | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,744,387.50 | $33,330,200.00 |