| RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|
| Tennessee | 0001150 | SR-1, Near SR-281 in Cannon County to Centertown in Warren County - Construction New | $28,772,789.26 | $35,965,985.00 |
| Tennessee | 0001202 | SR-1, Camden By-Pass to Tennessee River - Reconstruction | $78,574,313.21 | $100,940,002.11 |
| Tennessee | 0001424 | SR-1, Summer Avenue, From Near White Station Road to 0.1 Mile North of Sycamore View Road (IA) - Widen | $10,042,578.40 | $76,346,390.00 |
| Tennessee | 0004008 | SR-4 (US-78), From the Mississippi State Line to South of Shelby Drive - Widen from 4-Lane to 6-Lane | $58,254,678.40 | $90,268,870.90 |
| Tennessee | 0004011 | SR-4(Lamar Avenue), From South of Shelby Drive to Near Raines/Perkins Road Interchange (IA) - Widen from 4-lanes to 6-lanes divided | $124,525,182.47 | $208,174,504.00 |
| Tennessee | 0006083 | SR-6, From South of SR-441(Moores Lane) to SR-253 (Concord Road) in Brentwood - Reconstruction and Widen | $32,521,756.00 | $42,513,438.00 |
| Tennessee | 0009066 | SR-9 (US-25W) - Bridge over Clinch River in Clinton LM 10.71 - Bridge Replacement | $27,482,824.26 | $34,446,217.07 |
| Tennessee | 0011081 | SR-11, North of Mill Creek to Near SR-254(Old Hickory Boulevard) - Reconstruct and Widen | $71,713,156.00 | $101,465,009.00 |
| Tennessee | 0014046 | SR-14, Bridges over CNIC Railroad and Nonconnah Creek, LM 7.13 - Bridge Replacement | $77,460,765.60 | $96,825,957.00 |
| Tennessee | 0014070 | SR-14 (Austin Peay Highway), From East of Kerrville-Rosemark Road to Tipton County Line (IA) - Reconstruction | $41,594,310.00 | $51,992,887.50 |
| Tennessee | 0015106 | SR-15, From Mill Springs Branch to the Waynesboro Bypass - Widen | $40,304,031.32 | $51,217,307.63 |
| Tennessee | 0015108 | SR-15, From Firetower Road to west of Bigbee Branch - Widen | $53,266,552.42 | $66,626,819.53 |
| Tennessee | 0026076 | SR-26 (Nashville Hwy), From near SR-53 to near SR-96 - Reconstruction | $27,145,732.00 | $33,962,637.00 |
| Tennessee | 0028031 | SR-28(US 127), North of I-40 to Near Potato Farm Road | $37,152,208.88 | $86,960,881.60 |
| Tennessee | 0028038 | SR-28, From near North Lowe Road to near Little Road, north of SR-62 | $8,598,658.11 | $99,683,454.64 |
| Tennessee | 0033055 | SR-33, Knox County Line to South of SR-144 Left - Reconstruction | $47,220,675.79 | $71,297,645.01 |
| Tennessee | 0034086 | SR-34, From SR-32 in Morristown to near East Morris Boulevard - Widen | $64,819,663.10 | $89,655,865.00 |
| Tennessee | 0035038 | SR-35(Newport Bypass), From SR-9 to Saint Tide Hollow Road - Construction - New | $64,103,459.00 | $80,251,910.00 |
| Tennessee | 0035075 | SR-35(Newport Highway), From near Sims Road in Sevier County to near SR-92 in Jefferson County (IA) | $57,083,854.00 | $71,390,880.00 |
| Tennessee | 0054026 | SR-54, Near Rison Street to Near Smith Road - Construction - Widen from 2-Lane to 5-Lane | $38,192,612.00 | $47,952,176.00 |
| Tennessee | 0055006 | First Avenue to SR-16 (US-41A, N Jackson Street), in Tullahoma - Widen | $27,592,589.31 | $34,756,586.89 |
| Tennessee | 0056029 | SR-56, South of SR-288 Near Magness Road to East Bryant Street in Smithville - Widen 5 Lanes | $34,983,177.05 | $43,753,975.00 |
| Tennessee | 0056039 | SR-56, South of Warren/Dekalb County Line to Near Magness Road - Reconstruction | $24,161,812.48 | $30,545,621.60 |
| Tennessee | 0060013 | SR-60, From 4-Lane North of I-75 (Westlake Drive) to SR-306 - Reconstruction and Widening | $51,475,067.38 | $82,141,600.00 |
| Tennessee | 0062034 | SR-62 (Western Avenue), From Texas Avenue to Major Avenue in Knoxville - Reconstruction - Widen 2 Lane to 5 Lane | $47,344,223.27 | $61,265,808.96 |
| Tennessee | 0063006 | SR-63, From Campbell County Line to Hall Lane - Widen | $30,753,246.00 | $31,367,955.00 |
| Tennessee | 0063055 | SR-63(General Carl W. Stiner Highway), From Near Frontier Road/Woodson Lane to Near Claiborne County Line - Widen from 2-Lane to 5-Lane | $25,430,272.00 | $25,854,928.00 |
| Tennessee | 0066044 | SR-66REL, North of I-81 at SR-341 in Jefferson County to SR-160 in Morristown - Construction - New | $59,003,602.84 | $73,953,275.17 |
| Tennessee | 0069097 | I-69PROP - From West of SR-21 to SR-3(US-51) Near Mayberry Road (IA) - Construction - New 4-Lane Divided Limited Access Interstate Highway | $62,327,712.00 | $77,909,640.00 |
| Tennessee | 0076065 | SR-76, From West of Cades-Atwood Road to East of SR-77 - Reconstruction | $30,816,347.00 | $38,520,433.75 |
| Tennessee | 0076067 | SR-76, From near SR-77 to near Cutlip Lane - Reconstruction - Widen 2-Lane to 4-Lane | $38,937,404.00 | $48,904,540.00 |
| Tennessee | 0081029 | SR-81, Bridge over Nolichucky River, LM 4.54 (Hurricane Helene) - Bridge Replacement | $30,249,600.00 | $31,510,000.00 |
| Tennessee | 0099039 | SR-99(New Salem Highway), From West of Veterans Parkway(SW Loop) to Cason Lane in Murfreesboro -Widen | $46,292,414.00 | $64,367,578.00 |
| Tennessee | 0099048 | SR-99 (New Salem Highway), From Cason Lane to I-24 in Murfreesboro - Widen | $25,003,241.00 | $32,344,770.00 |
| Tennessee | 0101016 | SR-101, From Firetower Road to East of Lakeview Drive - Reconstruction - Widen from Two Lanes to Multi-Lane Facility | $34,396,083.00 | $43,387,182.00 |
| Tennessee | 0107031 | SR-107, Bridge over Nolichucky River, LM 12.65 (Hurricane Helene) - Bridge Replacement | $32,553,600.00 | $33,910,000.00 |
| Tennessee | 0108106 | SR-108, near LM 2.8 (Slide Repair)-Mitigation - Slide | $30,315,936.00 | $37,894,921.00 |
| Tennessee | 0109031 | SR-109, From North of SR-24(US-70) to South of Dry Fork Creek - Reconstruction | $30,815,434.00 | $38,794,690.00 |
| Tennessee | 0109041 | SR-109 PROP (Portland Bypass), From SR-52, west of Portland, to existing SR-109, north of Portland (IA) - New Construction | $90,516,398.00 | $127,885,993.00 |
| Tennessee | 0112006 | SR-112, From SR-12 (Ashland City Highway) to SR-155 (Briley Parkway) - Reconstruction, Widen, Curb and Gutter, Sidewalk, Signalization | $40,015,220.26 | $54,074,471.50 |
| Tennessee | 0115027 | SR-115, South of Topside Road to North of Maloney Road - Widen | $68,161,981.00 | $85,295,033.00 |
| Tennessee | 0115029 | SR-115, From Woodson Drive to near Cherokee Trail - Widen from 4-Lane to 6-Lane | $147,930,568.04 | $190,507,328.74 |
| Tennessee | 0115054 | SR-115, From North of Maloney Road to Woodson Drive - Widen from 4 to 6 Lanes | $74,345,900.00 | $97,316,818.00 |
| Tennessee | 0115057 | SR-115 - (Relocated Alcoa Highway), From SR-35 (Hall Road), South of Airport Road to Proposed Interchange at Tyson Boulevard - Widen | $44,157,589.00 | $55,719,477.00 |
| Tennessee | 0115065 | SR-115(Relocated Alcoa Highway), from Proposed Interchange at Tyson Blvd to Existing SR-115 at South Singleton Station Road - Stage 1 | $45,959,000.00 | $180,552,450.19 |
| Tennessee | 0126025 | SR-126, From Near East Center Street in Kingsport to Near Briarwood Road (IA) (TMA) - Widen | $24,097,200.00 | $99,216,066.71 |
| Tennessee | 0128029 | SR-128, Bridge Over Pickwick Dam - Bridge Rehabilitation | $26,805,760.00 | $33,507,200.00 |
| Tennessee | 0136008 | SR-136, SR-111 to I-40 - Widen | $48,052,510.27 | $63,660,523.00 |
| Tennessee | 0141016 | SR-141(Hartsville Pike), North of Lovers Lane To SR-26(US-70) - New Construction / Widen | $36,428,347.35 | $48,165,401.00 |
| Tennessee | 0149012 | SR-149, From River Road to SR-13; SR-13, SR-149 to Zinc Plant Road - Widen to 5 Lanes | $60,023,696.13 | $86,210,912.55 |
| Tennessee | 0243090 | I-24, Interchanges at SR-2(Broad Street) and SR-58(Market Street) in Chattanooga - Interchange Modification | $36,840,728.00 | $41,759,295.00 |
| Tennessee | 0243097 | I-24, Bridges over Germantown Road, LM 12.08 and Belvoir Avenue, 12.59 in East Ridge - Bridge Replacement | $36,112,144.89 | $40,124,608.44 |
| Tennessee | 0249079 | I-24, Interchange modification at Hickory Hollow Parkway - Modify Interchange | $31,626,364.02 | $37,740,840.90 |
| Tennessee | 0266013 | SR-266 (Jefferson Pike), From SR-102 to East of I-840 - Widen | $30,678,704.00 | $74,112,669.00 |
| Tennessee | 0269020 | I-269PROP(Paul Barret Parkway), From North of SR-57 in Fayette County to South of Raleigh-Lagrange Road - Stage Construction - New | $35,261,150.07 | $43,959,254.59 |
| Tennessee | 0317017 | SR-317, SR-321(Ooltewah-Ringgold Road) to near Layton Lane - Reconstruction and Widen from 2 Lanes to 5 Lanes | $107,523,113.00 | $136,428,487.00 |
| Tennessee | 0397010 | SR-397 (Mack Hatcher Parkway West) - From S of SR-96 W of Franklin to E of SR-106 N of Franklin - Construction - New | $47,122,479.56 | $62,689,745.00 |
| Tennessee | 0401358 | I-40, From West of SR-20 (US-412, Hollywood Drive) to West of SR-186 (US-45 ByPass) (IA) - Widen | $33,775,792.00 | $42,219,740.00 |
| Tennessee | 0403183 | I-40, Bridges over Squeeze Bottom Lane, LM 6.02 and Buffalo River, LM 6.26 - Bridge Replacement | $41,748,974.00 | $86,112,534.00 |
| Tennessee | 0405146 | I-40, Donelson Pike Interchange (includes Donelson Pike relocation from taxiway bridges over Donelson Pike to I-40) -Modify Interchange | $112,015,586.68 | $147,020,697.00 |
| Tennessee | 0405161 | I-40, Truck Parking and Bridges Replacement over the Caney Fork River - Bridge Replacement | $61,625,000.00 | $77,450,001.00 |
| Tennessee | 0406173 | I-40, Westbound near MM 342 to near MM 344 - Slope Stabilization and Resurfacing | $38,102,563.14 | $42,332,137.72 |
| Tennessee | 0408192 | I-40, From near MM 440 to North Carolina State Line (Hurricane Helene) | $49,750,202.00 | $50,766,666.67 |
| Tennessee | 0408193 | I-40, From near MM 448 to near MM 451 (Hurricane Helene) - Reconstruction | $48,313,451.00 | $50,766,666.67 |
| Tennessee | 0408194 | I-40, Near MMs 450.7, 451.0 and 451.6 (Hurricane Helene) - Slide Mitigation | $29,318,090.00 | $29,318,090.00 |
| Tennessee | 0459010 | SR-459(Lexington Bypass), From SR-20(US-412) West of Lexington to Near SR-22 South of Lexington - New - Super 2-lane bypass on new alignment | $35,214,845.19 | $44,018,557.00 |
| Tennessee | 0460010 | SR-460PROP (Somerville Beltway), From Near SR-15 (US-64) West of Somerville to Near SR-76 South of Somerville - Stage Construction - New | $26,872,624.00 | $33,590,780.00 |
| Tennessee | 0462005 | Northwest Connector Route, SR-1 (U.S. 70) to SR-298 (Genesis Road) - Construction - New | $17,785,434.00 | $26,271,002.00 |
| Tennessee | 0551119 | I-55 at Crump Boulevard in Memphis - Modify Interchange | $110,556,666.19 | $122,852,691.00 |
| Tennessee | 0551135 | I-55 exit Ramp to SB SR-14, Bridge over SR-14, LM 7.46; and SR-14, Bridge over I-55, LM 7.44 | $48,811,808.40 | $61,014,760.50 |
| Tennessee | 0652096 | I-65, Interchange at SR-99 (US-412) in Columbia - Modify Interchange | $33,870,115.49 | $42,216,763.54 |
| Tennessee | 0652113 | I-65, Interchange at Buckner Road in Spring Hill (Design Build) - New Interchange | $34,328,097.00 | $62,005,000.00 |
| Tennessee | 0653103 | I-65, Weigh Station near the Kentucky State Line - Weigh Station or Rest Area Improvements | $31,623,969.00 | $35,179,528.00 |
| Tennessee | 0653128 | I-65, From near SR-25 (Main Street) to near SR-109 - Section 4 - Widen | $163,598,789.00 | $204,679,612.00 |
| Tennessee | 0653129 | I-65, From Near Rivergate Parkway to Near SR-41 (US-31W) Section 1 - Widen | $3,984,000.00 | $143,568,019.00 |
| Tennessee | 0751131 | I-75, Interchange at I-24 - Modify Interchange | $136,876,258.00 | $152,084,732.00 |
| Tennessee | 0751144 | I-75, Interchange Modifications at Hamilton Place Mall - Modify Interchange | $73,520,595.00 | $85,854,428.00 |
| Tennessee | 0751155 | I-75, Interchange at I-24, Phase 2 (IA) - Modify Interchange | $160,625,352.64 | $178,472,614.04 |
| Tennessee | 0753154 | I-75, Truck Climbing Lane, MP 135.5 to MP 140.1 - Widen, Striping, Pavement Marking, Guardrail | $15,235,323.02 | $35,545,136.69 |
| Tennessee | 0753192 | I-75, Interchange at SR-131 (Exit 112, Emory Road) (IA) - Reconstruction | $46,484,516.00 | $52,121,685.00 |
| Tennessee | 0983028 | SMART Corridor (Phase I), I-24, From I-440 (Exit 53) to SR-10 (Exit 81 / US-231); and SR-1 from I-24 to SR-10 and various connector routes - ITS | $20,205,829.00 | $25,257,286.00 |
| Tennessee | 0983030 | I-24 SMART Corridor (Phase II), From I-440 (Exit 53) to SR-10 (Exit 81 / US-231) in Murfreesboro and SR-1 from I-24 to SR-10 in Murfreesboro - ITS | $47,833,870.52 | $59,792,338.16 |
| Tennessee | 8300070 | Albert Gallatin Ave/Hatten Track Rd Ext, From SR-109 to SR-174 - New Construction | $28,435,790.00 | $37,352,392.00 |
| Tennessee | 9202134 | Walnut Street Pedestrian Bridge-Bridge Rehabilitation | $33,153,529.00 | $41,441,914.00 |
| Tennessee | 9305031 | McEwen Drive, From East of Cool Springs Boulevard/Oxford Glen Drive to SR-252 (Wilson Pike)-Widen | $30,239,999.00 | $60,579,752.00 |
| Tennessee | 9307012 | Walton Ferry Road/Old Shackle Island Road, From Nokes Drive to Volunteer Drive in Hendersonville (Section 2) - Widen | $20,565,105.78 | $31,466,506.73 |
| Tennessee | 9409107 | Canada Road, From I-40 to SR-1(US-70) in Lakeland - Realign and Widen | $34,438,695.00 | $43,048,369.25 |
| Tennessee | 9900159 | I-40, From the Shelby/Fayette County Line to near I-840 in Dickson County - Intelligent Transportation System | $31,031,200.00 | $38,789,000.00 |
| Tennessee | NBIS047 | Various On-System and Off-System Bridges Statewide - FY 2025 - 2026 (Inspection & Evaluation) - Bridge Repair | $26,240,000.00 | $32,800,000.00 |