RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way $2,712,183.91 $3,390,229.89
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way $2,727,816.09 $3,409,770.11
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Utilities $100,688.51 $125,860.64
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Utilities $100,111.49 $125,139.36
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $79,866.34 $99,832.85
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $221,760.92 $277,201.15
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,175,521.62 $1,469,401.53
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,659,917.38 $2,074,896.47
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $7,836,808.82 $9,796,010.52
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $11,066,114.18 $13,832,642.48
Tennessee 0001150 Cannon >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $649,275.86 $811,594.83
Tennessee 0001150 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $442,724.14 $553,405.17
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $1,342,397.60 $1,677,997.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Rail/Hwy Crossing $320,000.00 $400,000.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way $1,344,680.00 $1,680,850.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities $512,922.40 $641,153.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State REDISTRIBUTION OF TIFIA FUNDS 4R - Added Capacity $21,881,660.00 $27,352,075.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $37,786,788.00 $47,233,485.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $6,860,364.00 $8,575,455.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $686,000.00 $857,500.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $541,000.00 $676,250.00
Tennessee 0001202 Benton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $7,298,501.21 $11,845,237.11
Tennessee 0001424 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $51,822,166.00
Tennessee 0001424 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,068,684.00 $6,940,579.00
Tennessee 0001424 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,973,894.40 $17,583,645.00
Tennessee 0004008 Shelby >= 200,000 State DONOR STATE BONUS 4R - Added Capacity $1,405,809.22 $1,757,262.00
Tennessee 0004008 Shelby >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $30,000,000.00 $30,000,000.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,748,800.00 $6,994,092.90
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $6,288,356.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $9,680,000.00 $12,629,118.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $835,878.40 $11,917,303.00
Tennessee 0004008 Shelby >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $3,270,000.00 $6,540,000.00
Tennessee 0004008 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $8,594,190.78 $10,742,739.00
Tennessee 0004008 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,120,000.00 $1,400,000.00
Tennessee 0004008 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,600,000.00 $2,000,000.00
Tennessee 0004011 Shelby >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Right of Way $21,196,998.00 $21,196,998.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $76,131,598.00 $122,792,900.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $9,289,078.70 $14,982,385.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $5,332,907.00 $20,511,181.00
Tennessee 0004011 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $12,574,600.77 $28,691,040.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $22,133,027.00 $27,666,284.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,137,486.00 $2,671,858.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $100,000.00 $125,000.00
Tennessee 0006083 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,515,243.00 $10,005,296.00
Tennessee 0006083 Williamson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,636,000.00 $2,045,000.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering $198,949.26 $248,686.57
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $17,465,486.00 $21,831,857.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,213,118.00 $2,766,397.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $563,000.00 $703,750.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,499,600.00 $1,924,437.50
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,181,837.00 $1,520,046.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity $538,347.00 $672,934.00
Tennessee 0009066 Anderson >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity $3,822,487.00 $4,778,109.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $33,401,253.00 $41,751,566.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,392,093.00 $5,490,117.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $19,112,000.00 $23,890,000.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV   $87,500.00
Tennessee 0011081 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $14,807,810.00 $30,245,826.00
Tennessee 0014046 Shelby >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $160,000.00 $200,000.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $52,656,880.00 $65,821,100.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $4,515,280.00 $5,644,100.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $3,188,480.00 $3,985,600.00
Tennessee 0014046 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $15,915,325.60 $19,894,157.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $124,800.00 $156,000.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $800,000.00 $1,000,000.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $80,000.00 $100,000.00
Tennessee 0014046 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $20,000.00 $25,000.00
Tennessee 0014070 Shelby >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $487,491.16 $609,363.96
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $68.84 $86.04
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $143.40 $179.26
Tennessee 0014070 Shelby >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $1,015,606.60 $1,269,508.24
Tennessee 0014070 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $35,868,255.53 $44,835,319.41
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $5,064.47 $6,330.59
Tennessee 0014070 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,780,770.17 $4,725,962.71
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $533.83 $667.29
Tennessee 0014070 Tipton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $61.61 $77.01
Tennessee 0014070 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $436,314.39 $545,392.99
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,600,349.21 $2,000,436.51
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,278,211.05 $2,847,763.81
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $12,000.00 $15,000.00
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $26,694,500.56 $33,368,125.70
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $1,723,381.67 $2,154,227.09
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Landscaping and Other Scenic Beautification   $7,553.21
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way $7,505,886.30 $9,399,997.87
Tennessee 0015106 Wayne >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities $489,702.53 $1,424,203.44
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Right of Way $697,820.42 $872,275.53
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $43,921,004.00 $54,901,255.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,539,632.00 $4,424,539.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $183,200.00 $229,000.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $463,216.00 $622,650.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way $3,022,400.00 $3,778,000.00
Tennessee 0015108 Hardin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities $1,439,280.00 $1,799,100.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $21,278,151.00 $26,597,690.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,470,010.00 $3,087,513.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities $3,300,071.00 $4,155,558.00
Tennessee 0026076 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $97,500.00 $121,876.00
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $1,347,758.88 $1,684,698.60
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $19,305,730.00 $49,092,656.50
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $5,665,794.00
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $280,000.00 $350,000.00
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $11,044,000.00 $13,844,587.50
Tennessee 0028031 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,174,720.00 $16,323,145.00
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $27,614.84 $34,518.55
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $658,877.27 $823,596.59
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $827,150.00 $1,033,937.50
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $55,800.00 $69,750.00
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $627,304.81 $784,131.01
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,977,911.19 $2,472,388.99
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   $21,134,673.82
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   $55,836,819.18
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $2,499,671.27
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $5,585,341.73
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,610,267.38 $2,012,834.22
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,389,732.62 $2,987,165.78
Tennessee 0028038 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $212,906.95 $282,726.75
Tennessee 0028038 Fentress >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $211,093.05 $4,125,899.25
Tennessee 0033055 Union >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $1,140,154.00 $1,425,193.00
Tennessee 0033055 Union >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $783,551.66 $979,439.58
Tennessee 0033055 Union >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $3,213,455.30 $4,016,819.13
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $19,351,954.09 $36,248,081.30
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $4,022,448.00 $5,028,060.00
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,799,046.00 $5,998,807.00
Tennessee 0033055 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $13,910,066.74 $17,601,245.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $35,488,800.00 $44,361,000.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,672,800.00 $5,841,000.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $18,321,600.00 $23,960,460.00
Tennessee 0034086 Hamblen >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,336,463.10 $15,493,405.00
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,274,551.18 $6,593,188.97
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $26,956.82 $33,696.03
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $50,202,496.47 $62,753,120.59
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $256,571.53 $320,714.41
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $4,554,722.03 $5,693,402.54
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $23,277.97 $29,097.46
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $238,779.66 $298,474.58
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $1,220.34 $1,525.42
Tennessee 0035038 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $17,923.12 $23,027.22
Tennessee 0035038 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $3,506,959.88 $4,505,662.78
Tennessee 0035075 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $26,284,946.56 $32,856,183.20
Tennessee 0035075 Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $23,292,897.44 $29,116,121.80
Tennessee 0035075 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,678,867.76 $3,348,584.70
Tennessee 0035075 Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,513,196.24 $3,141,495.30
Tennessee 0035075 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $490,855.42 $629,658.85
Tennessee 0035075 Sevier >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,823,090.58 $2,298,836.15
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,994,674.00 $2,493,343.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $19,222,043.00 $24,027,553.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $738,000.00 $922,500.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,435,569.00 $5,755,872.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway $5,200,000.00 $6,500,000.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,240,000.00 $1,550,000.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way $4,662,400.00 $5,828,000.00
Tennessee 0054026 Henry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities $699,926.00 $874,908.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State EQUITY BONUS - CHARGED TO LIM Preliminary Engineering $332,000.00 $415,000.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $16,781,065.00 $20,976,333.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,072,286.00 $2,590,359.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $470,710.31 $588,387.89
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $899,166.00 $1,123,958.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,793,362.00 $8,757,549.00
Tennessee 0055006 Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $244,000.00 $305,000.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS - CHARGED TO LIM 4R - Added Capacity $122,560.00 $153,200.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS - CHARGED TO LIM Right of Way $415,200.00 $519,000.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Right of Way $3,200,000.00 $4,000,000.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $412,894.00 $516,118.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,097,104.00 $2,621,380.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $1,055,000.00 $1,318,750.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Right of Way $865,000.00 $1,081,250.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Utilities $160,000.00 $200,000.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $4,599,198.74 $5,748,999.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $20,270,814.90 $25,338,520.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,450,405.41 $1,813,008.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $335,000.00 $418,750.00
Tennessee 0056029 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $25,000.00
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS - CHARGED TO LIM 4R - No Added Capacity $150,096.36 $187,620.45
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS - CHARGED TO LIM 4R - No Added Capacity $22,403.64 $28,004.55
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $121,281.71 $151,602.14
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $18,102.72 $22,628.40
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity $2,074,928.60 $2,593,660.75
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity $309,707.45 $387,134.31
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $348,049.52 $435,061.90
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $51,950.48 $64,938.10
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way $1,138,818.04 $1,423,522.55
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way $169,981.96 $212,477.45
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities $27,843.96 $34,804.95
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities $4,156.04 $5,195.05
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $1,428,521.73 $1,785,652.16
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $9,570,582.27 $11,963,227.84
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $181,599.77 $226,999.68
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $1,216,653.23 $1,520,816.32
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities $2,374,337.29 $3,266,684.07
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities $354,397.71 $487,590.93
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $140,058.49 $175,073.11
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $938,341.51 $1,172,926.89
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $415,603.81 $519,504.76
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,784,396.19 $3,480,495.24
Tennessee 0056039 DeKalb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $278,439.62 $348,049.52
Tennessee 0056039 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $41,560.38 $51,950.48
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $33,275,067.38 $44,483,551.00
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $5,399,237.00
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $16,436,600.00 $20,545,750.00
Tennessee 0060013 Bradley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,763,400.00 $11,713,062.00
Tennessee 0062034 Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $4,112,114.00 $5,140,143.00
Tennessee 0062034 Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Safety $120,000.00 $150,000.00
Tennessee 0062034 Knox >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $1,617,237.00 $2,021,546.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $30,103,080.00 $37,628,850.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,076,000.00 $3,845,000.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,181,861.81 $1,477,327.26
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,606,437.69 $9,093,576.00
Tennessee 0062034 Knox >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $1,527,492.77 $1,909,366.70
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $23,288,882.00 $23,288,882.00
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $2,579,541.00 $2,579,541.00
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering $2,394,400.00 $2,993,000.00
Tennessee 0063006 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $2,490,423.00 $2,506,532.00
Tennessee 0063055 Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $20,408,097.46 $20,408,097.46
Tennessee 0063055 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $121,081.54 $121,081.54
Tennessee 0063055 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $13,862.99 $13,862.99
Tennessee 0063055 Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $2,336,585.01 $2,336,585.01
Tennessee 0063055 Campbell >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $2,535,601.24 $2,957,752.61
Tennessee 0063055 Claiborne >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $15,043.76 $17,548.39
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Construction Engineering $1,218,087.02 $1,522,608.78
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION New Construction Roadway $8,945,925.55 $11,182,406.94
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way $1,368,096.01 $1,710,120.33
Tennessee 0066044 Hamblen >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way $1,913,860.95 $2,392,396.48
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Utilities $1,944,032.73 $2,511,686.42
Tennessee 0066044 Hamblen >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Utilities $1,398,101.79 $1,747,627.24
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $6,561.89 $8,202.37
Tennessee 0066044 Hamblen >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $1,433,277.11 $1,791,596.38
Tennessee 0066044 Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,947,337.49 $3,684,171.86
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $13,493.62 $16,867.03
Tennessee 0066044 Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $32,652,203.72 $40,821,775.80
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $3,863,550.32 $4,829,467.75
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,423.48 $4,279.35
Tennessee 0066044 Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $290,683.95 $363,354.93
Tennessee 0066044 Hamblen >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,000,387.19 $1,360,484.87
Tennessee 0066044 Jefferson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $4,580.02 $6,228.64
Tennessee 0069097 Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,666,156.00 $7,082,695.00
Tennessee 0069097 Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $56,152,852.00 $70,191,065.00
Tennessee 0069097 Obion >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $508,704.00 $635,880.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $21,799,080.00 $27,248,850.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,378,760.00 $2,973,450.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $240,000.00 $300,000.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,934,800.00 $3,668,500.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,561,720.00 $3,202,150.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $851,200.00 $1,064,000.00
Tennessee 0076065 Carroll >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $50,787.00 $63,483.75
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $27,414,960.00 $34,268,700.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,022,880.00 $3,778,600.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,020,800.00 $1,276,000.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,248,800.00 $4,061,000.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $3,165,964.00 $4,190,240.00
Tennessee 0076067 Carroll >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,064,000.00 $1,330,000.00
Tennessee 0081029 Washington >= 50,000 AND < 200,000 State EMERGENCY RELIEF Bridge Replacement - No Added Capacity $25,236,800.00 $26,280,000.00
Tennessee 0081029 Washington >= 50,000 AND < 200,000 State EMERGENCY RELIEF Construction Engineering $2,803,200.00 $2,920,000.00
Tennessee 0081029 Washington >= 50,000 AND < 200,000 State EMERGENCY RELIEF Preliminary Engineering $2,073,600.00 $2,160,000.00
Tennessee 0081029 Washington >= 50,000 AND < 200,000 State EMERGENCY RELIEF Right of Way $40,000.00 $50,000.00
Tennessee 0081029 Washington >= 50,000 AND < 200,000 State EMERGENCY RELIEF Safety $96,000.00 $100,000.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $29,654,343.00 $37,067,929.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,555,378.00 $4,444,224.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,428,200.00 $1,785,250.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $4,136,352.00 $5,170,440.00
Tennessee 0099039 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $7,518,141.00 $15,899,735.00
Tennessee 0099048 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $18,810,224.00 $23,512,780.00
Tennessee 0099048 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,294,166.00 $2,867,707.00
Tennessee 0099048 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,898,851.00 $5,964,283.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $15,485,832.00 $19,357,290.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,880,159.00 $2,350,199.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $11,618,000.00 $14,522,500.00
Tennessee 0101016 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $5,412,092.00 $7,157,193.00
Tennessee 0107031 Greene >= 50,000 AND < 200,000 State EMERGENCY RELIEF Bridge Replacement - No Added Capacity $27,042,688.00 $28,161,133.00
Tennessee 0107031 Greene >= 50,000 AND < 200,000 State EMERGENCY RELIEF Construction Engineering $3,003,856.00 $3,129,017.00
Tennessee 0107031 Greene >= 50,000 AND < 200,000 State EMERGENCY RELIEF Preliminary Engineering $2,371,056.00 $2,469,850.00
Tennessee 0107031 Greene >= 50,000 AND < 200,000 State EMERGENCY RELIEF Right of Way $40,000.00 $50,000.00
Tennessee 0107031 Greene >= 50,000 AND < 200,000 State EMERGENCY RELIEF Safety $96,000.00 $100,000.00
Tennessee 0108106 Marion >= 5,000 AND < 50,000 State PROTECT PROGRAM APPORTIONED Construction Engineering $2,755,994.00 $3,444,993.00
Tennessee 0108106 Marion >= 5,000 AND < 50,000 State PROTECT PROGRAM APPORTIONED Resilience Improvement - Highway Project $27,559,942.00 $34,449,928.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $14,274,724.00 $17,843,405.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,596,931.00 $1,996,164.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $212,000.00 $265,000.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $6,445,200.00 $8,318,889.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $7,626,579.00 $9,546,232.00
Tennessee 0109031 Wilson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $660,000.00 $825,000.00
Tennessee 0109041 Sumner >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $8,347,056.00 $10,433,820.00
Tennessee 0109041 Sumner >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $75,991,972.00 $94,989,966.00
Tennessee 0109041 Sumner >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $9,464,489.00
Tennessee 0109041 Sumner >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $6,177,370.00 $12,997,718.00
Tennessee 0112006 Davidson >= 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $312,000.00 $390,000.00
Tennessee 0112006 Davidson >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $492,000.00 $615,000.00
Tennessee 0112006 Davidson >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $793,311.26 $991,640.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $21,608,132.00 $27,010,165.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,619,711.00 $3,274,640.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $992,400.00 $1,240,500.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $7,008,000.00 $8,760,000.00
Tennessee 0112006 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $6,189,666.00 $11,792,526.50
Tennessee 0115027 Knox >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $400,000.00 $500,000.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $52,264,492.00 $65,330,616.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,159,021.00 $6,448,777.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,410,000.00 $3,012,500.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $432,000.00 $540,000.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,828,800.00 $2,286,000.00
Tennessee 0115027 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,667,668.00 $7,177,140.00
Tennessee 0115029 Knox >= 200,000 State EXTENSION OF ALLOC PROGRAMS Preliminary Engineering $323,500.00 $404,375.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $96,545,405.74 $120,681,757.19
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $14,906,132.00 $18,632,665.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,304,000.00 $4,130,000.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $10,240,000.00 $12,800,000.00
Tennessee 0115029 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $17,197,680.30 $27,091,218.55
Tennessee 0115029 Knox >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Utilities $609,451.00 $761,814.00
Tennessee 0115029 Knox >= 200,000 State REPURPOSED SPECIAL Right of Way $3,300,000.00 $4,125,000.00
Tennessee 0115029 Knox >= 200,000 State REPURPOSED SPECIAL Utilities $979,399.00 $1,224,249.00
Tennessee 0115029 Knox >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $525,000.00 $656,250.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $67,120,000.00 $83,900,000.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,675,535.00 $7,094,419.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,025,365.00 $5,666,149.00
Tennessee 0115054 Knox >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $525,000.00 $656,250.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $28,835,756.00 $36,044,695.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,143,736.00 $3,929,670.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $7,163,200.00 $8,960,100.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,626,056.00 $2,548,960.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $365,669.00 $457,087.00
Tennessee 0115057 Blount >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $3,023,172.00 $3,778,965.00
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $16,414,000.00
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway   $88,520,250.00
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $18,169,450.19
Tennessee 0115065 Blount >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $45,959,000.00 $57,448,750.00
Tennessee 0126025 Sullivan >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $13,992,116.00 $66,317,895.00
Tennessee 0126025 Sullivan >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $7,215,720.00 $9,019,650.00
Tennessee 0126025 Sullivan >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,889,364.00 $23,878,521.71
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $23,747,040.00 $29,683,800.00
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,374,720.00 $2,968,400.00
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $524,000.00 $655,000.00
Tennessee 0128029 Hardin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $160,000.00 $200,000.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $21,436,413.27 $26,795,518.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $3,168,212.00 $3,960,266.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Right of Way $8,146,390.00 $10,182,988.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Utilities $7,369,806.00 $12,807,139.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,242,000.00 $2,802,500.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $624,409.00 $780,512.00
Tennessee 0136008 Putnam >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $5,065,280.00 $6,331,600.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $21,140,828.00 $26,426,036.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $467,580.35 $584,475.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $2,011,783.00 $2,514,729.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,541,740.00 $3,177,175.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $304,000.00 $380,000.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,071,320.00 $3,061,150.00
Tennessee 0141016 Wilson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $7,891,096.00 $12,021,836.00
Tennessee 0149012 Montgomery >= 200,000 State EQUITY BONUS SP LIMITATION Utilities $3,073,392.00 $3,841,740.00
Tennessee 0149012 Montgomery >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $2,296,000.00 $2,870,000.00
Tennessee 0149012 Montgomery >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $151,728.00 $189,660.00
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $11,249,303.55 $11,249,303.55
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Construction Engineering $6,517,142.00 $6,517,142.00
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities $3,805,336.00 $4,078,374.00
Tennessee 0149012 Montgomery >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $5,652,409.00 $7,065,512.00
Tennessee 0149012 Montgomery >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $8,389,541.00 $10,486,927.00
Tennessee 0149012 Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $18,888,844.58 $39,855,253.00
Tennessee 0149012 Montgomery >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $57,001.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,718,303.00 $1,909,226.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $21,721,758.00 $24,135,287.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,879,531.00 $3,199,479.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,150,000.00 $3,500,000.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $315,000.00 $350,000.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,434,523.00 $2,705,026.00
Tennessee 0243090 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,621,613.00 $5,960,277.00
Tennessee 0243097 Hamilton >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $287,489.64 $319,433.44
Tennessee 0243097 Hamilton >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering $95,681.25 $106,313.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $29,625,431.00 $32,917,146.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,962,543.00 $3,291,716.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,061,000.00 $2,290,000.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $180,000.00 $200,000.00
Tennessee 0243097 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $900,000.00 $1,000,000.00
Tennessee 0249079 Davidson >= 200,000 State DONOR STATE BONUS 4R - No Added Capacity $646,878.02 $718,753.36
Tennessee 0249079 Davidson >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $2,972,855.00 $3,303,172.22
Tennessee 0249079 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $20,525,135.00 $25,406,142.32
Tennessee 0249079 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,604,865.00 $2,894,294.00
Tennessee 0249079 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $4,876,631.00 $5,418,479.00
Tennessee 0266013 Rutherford >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $3,100,000.00 $3,875,000.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $15,375,880.00 $34,658,485.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $5,921,754.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,456,000.00 $3,070,000.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,270,000.00 $2,837,500.00
Tennessee 0266013 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $7,476,824.00 $23,749,930.00
Tennessee 0269020 Shelby >= 200,000 State GRANTS SUP PLAN SECTION 117 New Construction Roadway $491,964.00 $491,964.00
Tennessee 0269020 Shelby >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $1,836,590.00 $2,295,738.00
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $431,158.00 $538,948.00
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $800,000.00 $1,000,000.00
Tennessee 0269020 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $1,916,400.00 $2,395,500.00
Tennessee 0269020 Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $3,402,641.00 $4,253,302.00
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $828,738.00 $1,035,922.00
Tennessee 0269020 Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway $20,028,742.07 $25,041,734.59
Tennessee 0269020 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway $5,524,917.00 $6,906,146.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $76,906,772.00 $96,133,465.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $7,448,076.00 $9,310,095.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $6,684,800.00 $8,356,000.00
Tennessee 0317017 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $16,483,465.00 $22,628,927.00
Tennessee 0397010 Williamson >= 200,000 State EQUITY BONUS EXEMPT LIM Right of Way $105,702.64 $132,129.00
Tennessee 0397010 Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS New Construction Roadway $804,000.00 $1,005,000.00
Tennessee 0397010 Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS Right of Way $5,616,000.00 $7,020,000.00
Tennessee 0397010 Williamson >= 200,000 State EXTENSION OF ALLOC PROGRAMS Utilities $402,400.00 $503,000.00
Tennessee 0397010 Williamson >= 200,000 State GRANTS SUP PLAN SECTION 117 Right of Way $983,928.00 $983,928.00
Tennessee 0397010 Williamson >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $2,051,772.00 $2,564,715.00
Tennessee 0397010 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,609,808.00 $4,512,261.00
Tennessee 0397010 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $30,639,158.00 $39,548,948.00
Tennessee 0397010 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,156,490.00 $5,478,238.00
Tennessee 0397010 Williamson >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway $650,080.00 $812,600.00
Tennessee 0397010 Williamson >= 200,000 State REPURPOSED SPECIAL New Construction Roadway $103,140.92 $128,926.00
Tennessee 0401358 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $30,705,264.00 $38,381,580.00
Tennessee 0401358 Madison >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,070,528.00 $3,838,160.00
Tennessee 0403183 Humphreys >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $34,703,403.00 $78,284,121.00
Tennessee 0403183 Humphreys >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $7,045,571.00 $7,828,413.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $86,642,064.00 $114,873,598.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $10,877,716.00 $13,597,145.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,000,000.00 $5,000,000.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $7,699,604.00 $9,624,505.00
Tennessee 0405146 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,796,202.68 $3,925,449.00
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC 4R - No Added Capacity $19,495,367.41 $24,369,209.72
Tennessee 0405161 Putnam >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -ALLOC 4R - No Added Capacity $2,000,666.59 $2,500,833.28
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity $14,350,000.00 $20,500,000.00
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $1,886,411.43 $2,358,014.29
Tennessee 0405161 Putnam >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $193,588.57 $241,985.71
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State NAT SIG FREIGHT AND HWY PROJ 4R - No Added Capacity $1,001,218.31 $1,251,523.34
Tennessee 0405161 Putnam >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - No Added Capacity $102,747.69 $128,434.66
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $9,917,263.93 $11,019,182.14
Tennessee 0405161 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $1,017,736.07 $1,130,817.86
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $4,081,178.57 $4,534,642.86
Tennessee 0405161 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $418,821.43 $465,357.14
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $6,239,668.57 $7,799,585.71
Tennessee 0405161 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $640,331.43 $800,414.29
Tennessee 0405161 Putnam >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Utilities $26,060.00 $32,575.00
Tennessee 0405161 Smith >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Utilities $253,940.00 $317,425.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF 4R - No Added Capacity $32,116,631.14 $35,685,145.72
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Construction Engineering $3,654,000.00 $4,060,000.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Preliminary Engineering $1,902,332.00 $2,111,992.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State EMERGENCY RELIEF Safety $96,600.00 $105,000.00
Tennessee 0406173 Roane >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $333,000.00 $370,000.00
Tennessee 0408192 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF 4R - No Added Capacity $30,437,296.00 $30,753,962.67
Tennessee 0408192 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Construction Engineering $10,472,844.00 $10,922,844.00
Tennessee 0408192 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Preliminary Engineering $2,369,738.00 $2,416,060.00
Tennessee 0408192 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Right of Way $1,800,000.00 $2,000,000.00
Tennessee 0408192 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Safety $4,670,324.00 $4,673,800.00
Tennessee 0408193 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF 4R - No Added Capacity $33,850,000.00 $34,166,666.67
Tennessee 0408193 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Construction Engineering $4,050,000.00 $4,500,000.00
Tennessee 0408193 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Preliminary Engineering $5,500,000.00 $5,500,000.00
Tennessee 0408193 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Right of Way $3,313,451.00 $3,681,612.22
Tennessee 0408193 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Safety $1,600,000.00 $1,600,000.00
Tennessee 0408193 Cocke >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $1,318,387.78
Tennessee 0408194 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF 4R - No Added Capacity $26,534,620.00 $26,534,620.00
Tennessee 0408194 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Construction Engineering $2,653,470.00 $2,653,470.00
Tennessee 0408194 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Preliminary Engineering $110,000.00 $110,000.00
Tennessee 0408194 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Right of Way $10,000.00 $10,000.00
Tennessee 0408194 Cocke >= 5,000 AND < 50,000 State EMERGENCY RELIEF Safety $10,000.00 $10,000.00
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway $237,313.19 $296,642.00
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,895,896.00 $3,619,870.00
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $29,653,508.00 $37,066,885.00
Tennessee 0459010 Henderson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,428,128.00 $3,035,160.00
Tennessee 0460010 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,377,512.00 $2,971,890.00
Tennessee 0460010 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $22,642,504.00 $28,303,130.00
Tennessee 0460010 Fayette >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,852,608.00 $2,315,760.00
Tennessee 0462005 Cumberland >= 50,000 AND < 200,000 State REDISTRIBUTION OF TIFIA FUNDS New Construction Roadway $1,040,000.00 $1,300,000.00
Tennessee 0462005 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,562,788.00 $1,953,485.00
Tennessee 0462005 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $11,941,720.00 $14,927,150.00
Tennessee 0462005 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,460,000.00 $1,825,000.00
Tennessee 0462005 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,326,136.00 $1,657,670.00
Tennessee 0462005 Cumberland >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $454,790.00 $4,607,697.00
Tennessee 0551119 Shelby >= 200,000 State INTERSTATE 4R Preliminary Engineering $66,681.75 $74,091.00
Tennessee 0551119 Shelby >= 200,000 State INTERSTATE MAINT DISC Preliminary Engineering $940,419.00 $1,044,910.00
Tennessee 0551119 Shelby >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $3,141,394.63 $3,490,440.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $91,681,704.00 $101,868,560.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $8,870,238.00 $9,855,820.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,725,875.00 $3,028,750.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,195,440.00 $1,328,267.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,548,900.00 $1,732,950.00
Tennessee 0551119 Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $386,013.81 $428,903.00
Tennessee 0551135 Shelby >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $3,724,034.40 $4,655,043.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $21,583,552.00 $26,979,440.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,845,520.00 $3,556,900.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,188,880.00 $2,736,100.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $339,648.00 $424,560.00
Tennessee 0551135 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $318,400.00 $398,000.00
Tennessee 0551135 Shelby >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $17,811,774.00 $22,264,717.50
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $4,197,308.00 $4,197,308.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $7,422,912.65 $7,422,912.65
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Added Capacity $1,222,037.67 $1,357,819.63
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $921,076.43 $1,023,419.22
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,336,500.00 $3,946,782.11
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $2,793,143.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $526,140.00 $584,600.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,367,787.00 $1,519,763.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $478,001.00 $1,150,624.00
Tennessee 0652096 Maury >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $16,398,352.74 $18,220,391.93
Tennessee 0652113 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $7,136,081.00 $9,495,101.00
Tennessee 0652113 Williamson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,192,016.00 $2,740,020.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity $16,780,000.00 $31,058,597.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $2,100,000.00 $3,283,763.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Preliminary Engineering $4,120,000.00 $6,052,519.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way $1,000,000.00 $6,860,000.00
Tennessee 0652113 Williamson >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Utilities $1,000,000.00 $2,515,000.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $246,600.00 $274,000.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,670,598.00 $2,967,332.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $712,350.00 $791,500.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,281,969.00 $1,424,410.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $56,609.00 $104,682.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Vehicle Weight Enforcement Program $4,028,939.00 $4,476,599.00
Tennessee 0653103 Robertson >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Vehicle Weight Enforcement Program $22,626,904.00 $25,141,005.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $145,228,333.00 $181,535,417.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $12,818,156.00 $16,022,695.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $5,504,000.00 $6,880,000.00
Tennessee 0653128 Robertson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $48,300.00 $241,500.00
Tennessee 0653129 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $62,859,220.56
Tennessee 0653129 Sumner >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $63,129,887.44
Tennessee 0653129 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $6,285,922.06
Tennessee 0653129 Sumner >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $6,312,988.94
Tennessee 0653129 Sumner >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,116,320.00 $1,395,400.00
Tennessee 0653129 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,867,680.00 $3,584,600.00
Tennessee 0751131 Hamilton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $3,000,000.00 $3,333,334.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $45,846,158.00 $50,940,175.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $12,600,000.00 $14,000,000.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $7,200,000.00 $8,000,000.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $18,610.00 $20,678.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,032,648.00 $4,480,720.00
Tennessee 0751131 Hamilton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $64,178,842.00 $71,309,825.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $38,614,546.00 $44,084,986.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,385,453.00 $7,094,948.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,500,000.00 $5,000,000.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,179,001.00 $1,310,001.00
Tennessee 0751144 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,350,000.00 $1,500,000.00
Tennessee 0751144 Hamilton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $21,491,595.00 $26,864,493.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $71,543,176.00 $79,492,417.78
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $13,446,450.00 $14,940,500.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,412,000.00 $2,680,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $900,000.00 $1,000,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $90,000.00 $100,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,350,000.00 $1,500,000.00
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $52,375,726.64 $58,195,251.82
Tennessee 0751155 Hamilton >= 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $5,508,000.00 $6,120,000.00
Tennessee 0751155 Hamilton >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $13,000,000.00 $14,444,444.44
Tennessee 0753154 Campbell >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering $291,723.02 $324,136.69
Tennessee 0753154 Campbell >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $13,477,500.00 $32,642,000.00
Tennessee 0753154 Campbell >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,165,500.00 $2,245,000.00
Tennessee 0753154 Campbell >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $300,600.00 $334,000.00
Tennessee 0753192 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $29,441,700.00 $32,713,000.00
Tennessee 0753192 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,303,900.00 $3,671,000.00
Tennessee 0753192 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $57,600.00 $64,000.00
Tennessee 0753192 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $7,639,501.00 $8,488,335.00
Tennessee 0753192 Knox >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,791,815.00 $6,435,350.00
Tennessee 0753192 Knox >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $250,000.00 $750,000.00
Tennessee 0983028 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,413,722.00 $1,767,153.00
Tennessee 0983028 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $17,897,218.00 $22,371,523.00
Tennessee 0983028 Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $81,354.00 $101,692.00
Tennessee 0983028 Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Traffic Management/Engineering - HOV $813,535.00 $1,016,918.00
Tennessee 0983030 Rutherford >= 200,000 State CONGESTION AIR QUALITY Traffic Management/Engineering - HOV $9,092,171.16 $11,365,213.96
Tennessee 0983030 Davidson >= 200,000 State CONGESTION AIR QUALITY Traffic Management/Engineering - HOV $5,582,191.28 $6,977,739.10
Tennessee 0983030 Rutherford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,147,364.87 $2,684,206.09
Tennessee 0983030 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,318,387.13 $1,647,983.91
Tennessee 0983030 Rutherford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $11,458,033.73 $14,322,542.17
Tennessee 0983030 Davidson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $7,034,726.35 $8,793,407.93
Tennessee 0983030 Rutherford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,156,192.86 $2,695,241.08
Tennessee 0983030 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,323,807.14 $1,654,758.92
Tennessee 0983030 Davidson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $7,720,996.00 $9,651,245.00
Tennessee 8300070 Sumner >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,409,605.00 $4,262,006.00
Tennessee 8300070 Sumner >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $20,735,071.00 $27,726,493.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $755,413.00 $944,267.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $180,000.00 $225,000.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,341,233.00 $2,926,541.00
Tennessee 8300070 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,014,468.00 $1,268,085.00
Tennessee 9202134 Hamilton >= 200,000 Local HWY INFRA PRGM-IIJA DEMO Facilities for Pedestrians and Bicycles $5,000,000.00 $6,250,000.00
Tennessee 9202134 Hamilton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $860,759.00 $1,075,949.00
Tennessee 9202134 Hamilton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $13,001,122.00 $16,251,404.00
Tennessee 9202134 Hamilton >= 200,000 Local TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $14,291,648.00 $17,864,561.00
Tennessee 9305031 Williamson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $26,326,423.00 $55,687,781.00
Tennessee 9305031 Williamson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,913,576.00 $4,891,971.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $11,908,669.00 $15,402,635.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,450,487.00 $1,813,109.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $209,261.00 $261,577.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $880,720.00 $1,100,900.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $200,000.00 $250,000.00
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $5,613,347.78 $7,016,684.73
Tennessee 9307012 Sumner >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $302,621.00 $5,621,601.00
Tennessee 9409107 Shelby >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Right of Way $3,145,000.00 $3,931,250.50
Tennessee 9409107 Shelby >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $15,419,515.00 $19,274,393.75
Tennessee 9409107 Shelby >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $2,629,748.00 $3,287,185.00
Tennessee 9409107 Shelby >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,121,924.00 $2,652,405.00
Tennessee 9409107 Shelby >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,021,852.00 $1,277,315.00
Tennessee 9409107 Shelby >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $8,459,720.00 $10,574,650.00
Tennessee 9409107 Shelby >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $400,000.00 $500,000.00
Tennessee 9409107 Shelby >= 200,000 Local TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $1,240,936.00 $1,551,170.00
Tennessee 9900159 Statewide N/A State NAT SIG FREIGHT AND HWY PROJ Preliminary Engineering $1,440,000.00 $1,800,000.00
Tennessee 9900159 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,690,400.00 $3,363,000.00
Tennessee 9900159 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $26,900,800.00 $33,626,000.00
Tennessee NBIS047 Statewide N/A Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Inspection and Bridge Related Training $26,240,000.00 $32,800,000.00