| RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|---|---|---|---|
| Montana | 0017056 | Blaine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $22,033,280.12 | $25,448,464.00 |
| Montana | 0017056 | Blaine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,864,326.41 | $3,308,300.32 |
| Montana | 0052160 | Lake | >= 5,000 AND < 50,000 | State | FEDERAL LAND ACCESS PROGRAM | Bridge Replacement - Added Capacity | $16,756,229.70 | $16,756,229.70 |
| Montana | 0052160 | Lake | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | 4R - No Added Capacity | $10,104,683.30 | $10,104,683.30 |
| Montana | 0052160 | Lake | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - Added Capacity | $3,706,124.00 | $3,706,124.00 |
| Montana | 0052160 | Lake | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $2,436,719.00 | $2,436,719.00 |
| Montana | 0052160 | Lake | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,590,221.70 | $4,590,221.70 |
| Montana | 0052160 | Lake | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $4,551,200.30 | $4,551,200.30 |
| Montana | 0052160 | Lake | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,910,118.00 | $4,910,118.00 |
| Montana | 0110078 | Roosevelt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,376,155.79 | $15,449,475.39 |
| Montana | 0110078 | Roosevelt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,796,284.78 | $2,074,711.00 |
| Montana | 0110078 | Roosevelt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $134,836.22 | $155,736.00 |
| Montana | 0110078 | Roosevelt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $494,905.77 | |
| Montana | 0110078 | Roosevelt | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $7,144,137.00 | $8,960,171.25 |
| Montana | 0143020 | Wheatland | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $725,891.04 | $838,405.00 |
| Montana | 0143020 | Meagher | < 5,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $32,234.81 | $37,231.24 |
| Montana | 0143020 | Wheatland | < 5,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $2,206,517.23 | $2,548,529.95 |
| Montana | 0143020 | Wheatland | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $22,567,326.58 | $26,065,288.27 |
| Montana | 0143020 | Meagher | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $476,136.95 | $549,938.73 |
| Montana | 0143020 | Meagher | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $43,798.66 | $50,587.50 |
| Montana | 0143020 | Wheatland | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,075,912.64 | $2,397,681.50 |
| Montana | 0146023 | Rosebud | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $13,294,098.88 | $15,354,699.61 |
| Montana | 0146023 | Rosebud | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,041,966.92 | $1,203,473.00 |
| Montana | 0146023 | Rosebud | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $11,876,336.53 | $13,717,182.47 |
| Montana | 0146023 | Rosebud | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $885,650.19 | $1,022,927.00 |
| Montana | 0146023 | Rosebud | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $43,371.38 | $50,094.00 |
| Montana | 0154138 | Statewide | N/A | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $3,855,227.37 | $3,855,227.37 |
| Montana | 0154138 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $27,121,081.06 | $29,896,591.21 |
| Montana | 0154138 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,053,024.04 | $4,442,157.00 |
| Montana | 0154138 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $42,545.76 | |
| Montana | 0154138 | Statewide | N/A | N/A | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $13,100,000.00 | $14,357,737.84 |
| Montana | 0154168 | Lewis and Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,346,647.68 | $24,492,161.00 |
| Montana | 0154168 | Lewis and Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,234,666.48 | $2,449,218.00 |
| Montana | 0513014 | Richland | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $24,151,932.55 | $27,895,510.00 |
| Montana | 0513014 | Richland | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,322,273.00 | $2,682,228.00 |
| Montana | 0513014 | Richland | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,458.00 | $2,839.00 |
| Montana | 0575047 | Garfield | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $2,253,680.86 | $2,603,004.00 |
| Montana | 0575047 | Garfield | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,168,784.48 | $27,914,974.00 |
| Montana | 0575047 | Garfield | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,073,484.36 | $3,549,878.00 |
| Montana | 0575047 | Garfield | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $10,000.00 | |
| Montana | 0575056 | McCone | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $2,396,221.32 | $2,767,638.39 |
| Montana | 0575056 | Garfield | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $871,980.60 | $1,007,138.61 |
| Montana | 0575056 | McCone | < 5,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $1,319,746.60 | $1,319,746.60 |
| Montana | 0575056 | Garfield | < 5,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $480,253.40 | $480,253.40 |
| Montana | 0575056 | McCone | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,124,976.59 | $15,159,363.12 |
| Montana | 0575056 | Garfield | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,775,973.47 | $5,516,254.88 |
| Montana | 0575056 | McCone | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,666,371.71 | $1,924,661.25 |
| Montana | 0575056 | Garfield | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $606,389.65 | $700,380.75 |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $725,490.61 | $837,942.49 |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,515,255.78 | $19,075,139.51 |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,428,929.03 | $3,960,417.00 |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,441,527.45 | $2,819,967.04 |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $107,252.67 | $123,876.96 |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $10,952.50 | |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | $5,477.89 | |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $227,371.00 | $262,613.77 |
| Montana | 0602101 | Cascade | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $9,988.07 | $11,536.23 |
| Montana | 0614026 | Phillips | < 5,000 | State | HSIP LIMITING FLEXIBLE | 4R - Restoration & Rehabilitation | $79,200.00 | $88,000.00 |
| Montana | 0614026 | Phillips | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $25,020,969.72 | $28,919,249.00 |
| Montana | 0614026 | Phillips | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,173,688.65 | $2,510,612.91 |
| Montana | 0614026 | Phillips | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $41,088.27 | $47,457.00 |
| Montana | 0614026 | Phillips | < 5,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $167,737.57 | $193,737.09 |
| Montana | 0821006 | Flathead | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Rehabilitation - Added Capacity | $5,000,000.00 | $5,775,005.78 |
| Montana | 0821006 | Flathead | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - Added Capacity | $23,462,652.00 | $27,099,390.16 |
| Montana | 0821006 | Flathead | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $2,781,764.17 | $3,212,940.84 |
| Montana | 0821006 | Flathead | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,799,059.68 | $4,387,918.32 |
| Montana | 0821006 | Flathead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $412,004.97 | $475,866.22 |
| Montana | 0821006 | Flathead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,409.52 | $2,783.00 |
| Montana | 0831046 | Missoula | >= 50,000 AND < 200,000 | State | FEDERAL LAND ACCESS PROGRAM | 4R - No Added Capacity | $5,000,000.00 | $5,000,000.00 |
| Montana | 0831046 | Missoula | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $20,374,558.02 | $20,374,558.02 |
| Montana | 0831046 | Missoula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $18,190,380.04 | $21,009,909.98 |
| Montana | 0831046 | Missoula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,462,964.63 | $2,844,727.00 |
| Montana | 0831046 | Missoula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $7,458.00 | |
| Montana | 0901228 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,780,510.45 | $1,951,458.20 |
| Montana | 0901228 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,912,143.96 | $6,479,772.00 |
| Montana | 0901228 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $5,180.60 | $5,678.00 |
| Montana | 0901228 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $13,100,000.00 | $14,357,737.86 |
| Montana | 0901228 | Mineral | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - No Added Capacity | $22,453,007.50 | $28,066,259.38 |
| Montana | 0901252 | Mineral | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | 4R - Maintenance Resurfacing | $3,879,875.99 | $6,611,061.33 |
| Montana | 0901252 | Mineral | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - Added Capacity | $13,341,965.01 | $15,409,985.00 |
| Montana | 0901252 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $318,894.63 | $368,323.67 |
| Montana | 0901252 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $333,029.97 | $384,650.00 |
| Montana | 0901252 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,017,896.43 | $6,125,799.00 |
| Montana | 0901252 | Mineral | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,002,577.94 | $3,467,981.00 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $29,624,586.80 | $34,216,432.00 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,862,346.69 | $2,151,012.59 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $211,374.38 | $244,137.65 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,168,818.49 | $9,223,083.93 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,840,057.56 | $2,101,216.95 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $13,471,050.00 | $15,559,078.33 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | Other | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $1,528,950.00 | $1,765,939.01 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,253,801.95 | $16,463,157.71 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,617,791.51 | $1,868,551.07 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $277,765.62 | $320,819.62 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,447,296.86 | $2,826,630.70 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Other | $8,869.78 | |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $32,102.22 | |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $280,869.57 | $340,617.55 |
| Montana | 0908177 | Yellowstone | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $31,878.16 | $38,659.45 |
| Montana | 0908188 | Statewide | N/A | State | CONGESTION AIR QUALITY | 4R - Restoration & Rehabilitation | $505,823.61 | $554,388.00 |
| Montana | 0908188 | Yellowstone | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $4,412,264.64 | $5,096,170.81 |
| Montana | 0908188 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $16,335,957.68 | $17,904,381.51 |
| Montana | 0908188 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,156,323.75 | $1,267,343.00 |
| Montana | 0908188 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $125,983.77 | |
| Montana | 0908188 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $59,267.99 | $64,958.35 |
| Montana | 0945042 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,294,926.07 | $3,611,273.64 |
| Montana | 0945042 | Dawson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $704,136.64 | $771,741.17 |
| Montana | 0945042 | Prairie | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $10,217,303.69 | $11,198,272.35 |
| Montana | 0945042 | Dawson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $135,297.98 | $148,288.00 |
| Montana | 0945042 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $633,111.31 | $693,896.66 |
| Montana | 0945042 | Prairie | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,963,227.80 | $2,151,718.34 |
| Montana | 0945042 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $3,036,185.93 | $3,327,691.73 |
| Montana | 0945042 | Prairie | < 5,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $9,414,971.07 | $10,318,907.35 |
| Montana | 0945042 | Dawson | >= 5,000 AND < 50,000 | Other | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $648,843.00 | $711,138.76 |
| Montana | 2012015 | Richland | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Other | $1,650,645.96 | $1,906,498.00 |
| Montana | 2012015 | Richland | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $2,264,474.78 | $2,615,471.00 |
| Montana | 2012015 | Richland | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $30,107,117.59 | $34,773,755.63 |
| Montana | 2012015 | Richland | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,897,089.40 | $4,501,142.76 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $855,386.15 | $987,972.00 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $2,773,692.05 | $3,203,617.53 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $343,838.70 | $397,134.10 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Utilities | $48,190.42 | $55,660.00 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | RURAL SURFAC TRANS GRT PG IIJA | 4R - Added Capacity | $16,007,070.00 | $16,007,070.00 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | RURAL SURFAC TRANS GRT PG IIJA | Construction Engineering | $1,749,984.00 | $1,749,984.00 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | RURAL SURFAC TRANS GRT PG IIJA | Preliminary Engineering | $2,250,205.00 | $2,250,205.00 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | RURAL SURFAC TRANS GRT PG IIJA | Right of Way | $1,761,819.00 | $1,761,819.00 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | RURAL SURFAC TRANS GRT PG IIJA | Utilities | $3,230,922.00 | $3,230,922.00 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,786,559.21 | $10,148,486.05 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $705,597.33 | $814,965.74 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,811,782.24 | $2,092,610.60 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $476,612.28 | $550,487.74 |
| Montana | 2671007 | Flathead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $874,412.72 | $1,009,947.71 |
| Montana | STWD788 | Fergus | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $26,170,954.83 | $30,227,483.16 |
| Montana | STWD788 | Fergus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,368,997.88 | $15,441,208.00 |
| Montana | STWD788 | Fergus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,819,101.36 | $7,876,069.97 |
| Montana | STWD788 | Fergus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,686,978.67 | $6,568,466.96 |
| Montana | STWD788 | Fergus | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $1,090,695.01 | $1,284,854.00 |
| Montana | STWD790 | Daniels | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $10,537,009.85 | $12,170,258.62 |
| Montana | STWD790 | Roosevelt | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $2,641,868.03 | $3,051,360.64 |
| Montana | STWD790 | Valley | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $15,851,313.70 | $18,308,285.71 |
| Montana | STWD790 | Roosevelt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,338,600.48 | $2,686,922.13 |
| Montana | STWD790 | Valley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,526,024.68 | $14,410,916.30 |
| Montana | STWD790 | Daniels | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,508,530.70 | $10,939,871.43 |
| Montana | STWD790 | Valley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $5,569,988.55 | $6,433,343.22 |
| Montana | STWD790 | Valley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,115,955.55 | $2,443,931.12 |
| Montana | STWD790 | Daniels | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,624,884.63 | $1,876,743.64 |
| Montana | STWD790 | Roosevelt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $265,285.67 | $306,405.24 |
| Montana | STWD790 | Roosevelt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $5,251.74 | $6,065.77 |
| Montana | STWD790 | Valley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,888.71 | $48,381.52 |
| Montana | STWD790 | Daniels | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $32,167.16 | $37,153.11 |
| Montana | STWD899 | Carbon | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - No Added Capacity | $16,522,352.02 | $19,083,335.67 |
| Montana | STWD899 | Stillwater | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - No Added Capacity | $389,306.38 | $449,649.33 |
| Montana | STWD899 | Carbon | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Bridge Protection | $320,346.00 | $370,000.00 |
| Montana | STWD899 | Stillwater | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Bridge Protection | $3,046,759.72 | $3,519,011.00 |
| Montana | STWD899 | Carbon | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Bridge Rehabilitation - Added Capacity | $2,724,940.28 | $3,147,309.18 |
| Montana | STWD899 | Carbon | >= 5,000 AND < 50,000 | Local | EMERGENCY RELIEF | Bridge Rehabilitation - Added Capacity | $1,865,696.54 | $2,154,881.67 |
| Montana | STWD899 | Stillwater | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Bridge Rehabilitation - Added Capacity | $286,414.58 | $330,809.16 |
| Montana | STWD899 | Carbon | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Construction Engineering | $1,609,937.08 | $1,859,479.18 |
| Montana | STWD899 | Stillwater | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Construction Engineering | $37,934.00 | $43,813.82 |
| Montana | STWD899 | Carbon | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Other | $146.70 | |
| Montana | STWD899 | Carbon | >= 5,000 AND < 50,000 | Local | EMERGENCY RELIEF | Other | $9,329.20 | |
| Montana | STWD899 | Stillwater | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Other | $524.10 | |
| Montana | STWD899 | Yellowstone | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Safety | $8,849,029.02 | $10,220,638.75 |
| Montana | STWD899 | Yellowstone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $91,162.03 | $105,292.25 |
| Montana | STWD899 | Yellowstone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $32,364.69 | $37,381.26 |