U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Alabama

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Alabama 0003521 SR-3 (US-31) FR SPANISH FT TO SR-181 WIDEN TO 5 LANES 14,053,301.74 37,087,606.42
Alabama 0005512 SR-5 (US-78) ADD LANES FROM I-59 TO FINLEY BLVD. (PHASE 1) 25,539,597.04 31,966,872.11
Alabama 0006521 SR-6 (US-82) ADD LANE FROM EAST END OF LUBBUB CK BRIDGE E OF REFORM TO 4- LANE WEST OF GORDO 42,381,986.66 53,776,768.65
Alabama 0006562 SR-6 (US-82) FROM WEST OF GORDO TO CR-33 46,576,189.97 58,481,960.47
Alabama 0007549 ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5 ALONG THE NORFOLK SOUTHERN RAILROAD 13,002,746.70 69,692,764.19
Alabama 0012507 ADD LANES SR-12 (US-84) EAST OF SR-87 TO EAST OF CR-507 GRADE AND DRAIN. 24,959,826.72 31,224,318.08
Alabama 0013568 SR-13 (US-43) RESURFACING AND PAVEMENT REHABILITATION FROM THE NORTH END OF THE I-359 BRIDGE TO THE HUGH THOMAS BRIDGE 16,996,909.76 26,971,123.50
Alabama 0014509 SR-14 INTERSECTION IMPROVEMENT AT SR-143 IN ELMORE (CSX RR) INCLUDES BRIDGES 24,517,663.69 30,647,079.61
Alabama 0025556 RELOCATION OF SR-25 (US-411) FROM TURKEYTOWN TO 0.65 MILES NORTH OF CHEROKEE CR-20 40,331,860.25 50,414,825.31
Alabama 0035504 BRIDGE REMOVAL SR35 @ TENNESSEE RIVER 21,160,363.67 26,450,454.59
Alabama 0035521 SR108 (MGM Outer Loop) at I-85 Interchange Ramp Bridges 1, 2, 3, & 4 Superstructure - Phase 4A 29,170,293.99 36,462,867.49
Alabama 0042501 Grade, Drain & Bridge SR42/US98 from Mississippi State Line to .5 Mile E of CR576/Glennwood Road 66,970,770.42 83,713,463.04
Alabama 0042509 SR-42 (US-98) FR MISS LINE TO 0.5 MI EAST OF CR-576 (GLENNWOOD RD) 536,784.12 39,028,490.16
Alabama 0053530 SR53/Memorial Parkway from N of CR77/Whitesburg Drive to S of Golf Rd/Main L: includes Grade, Drain, Base, Pave & Bridge 24,111,184.94 30,312,487.33
Alabama 0192901 Anniston E Bypass - S of Lake Yahou to SR1/US431, Grade & Drain 50,076,219.43 53,406,223.43
Alabama 0355503 Base & Pave Corridor V from Mississippi State Line to SR247 25,710,825.71 31,073,170.32
Alabama 0471500 CORRIDOR X FM E OF I-65 TO US31, GRADE, DRAIN, BASE, PAVE & BRIDGE 36,868,139.95 45,660,732.94
Alabama 0471501 Grade, Drain, Base, Pave & Bridge Corridor X, I-65 NB from N of CR1107/41th Avenue to CR120/Walkers Chapel Road 145,548,221.33 181,471,887.68
Alabama 1602551 SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM WEST OF SR-79 TO EAST OF SR- 75; INCLUDES GRADE, DRAIN, BRIDGES (DUAL BRGS OVER SR-79, RAMP H OVER SR- 79, DU 69,695,808.12 73,092,161.19
Alabama 1702904 FOUR-LANING CR83 (FOLEY BEACH EXTENSION) FROM CR32 (DIXIE RD) TO SR16 (US90) 58,259,361.82 72,856,567.71
Alabama 3716258 PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE 8,000,000.00 43,170,923.54
Alabama 7002600 Intersection Improvements at Interchange of CR52/Morgan Road & I-459 to CR2/S Shades Crest Road 27,922,211.20 34,907,764.00
Alabama 7009600 BRIDGE REPLACEMENT AND RELOCATION ON SR-150 AT SHADES CREEK (BIN # 1502) AND THE CSX RAILROAD FROM MP 6.4 WEST OF SHADES CREEK TO MP 7.0 EAST OF SHADE 22,563,876.56 28,230,654.13
Alabama 7503600 Additional Lanes Schillinger Road from Howells Ferry Road to SR42/US98 19,166,434.29 36,465,745.81
Alabama 9070900 RECONSTRUCTION OF SLIDE AREA ON SR-53 (US-231) FROM MP 301.300 TO MP 301.900 (FHWA DISASTER AL2020-01, ALDOT EVENT 042, SITE IS 042-02-52-1 21,954,071.60 27,442,589.50
Alabama ATRP001 ATRIP #1: Aug-7, Sep-10, Nov-13, Dec-14, Jan-12, Feb-19, Apr-30, May-13, Jun-6, July-5, Aug-1, Sept-2, Oct-3, Dec-2, Jan-2, Mar-2, 418,327,257.50 589,640,247.38
Alabama ATRP002 ATRIP # 2: Feb-1, Apr-4, May-8, Jun-6, Jul-4, Aug-1, Sep-2, Jan-3, Mar-1, Apr-2, May-2, Jun-1, Jul-1, Aug-1, Sep-3, Jan-1, Feb-1, Mar-1, Apr-1,Jun-1, 1,721,513.90 64,502,848.00
Alabama ATRP003 ATRIP #3 - May-6, Jun-6, Jul-5, Aug-3, Sep-7, Oct-1, Dec-2, Jan-2, Mar-1, Apr-1, Jul-1, Aug-2, Sep-1, Dec-3, Feb-1, July-1, SEPT-1, May-3,Aug-1 1,834,756.23 73,540,011.57
Alabama ATRP004 ATRIP #4 2,749,055.06 45,710,928.36
Alabama ATRP005 ATRIP #5 1,556,368.69 50,260,467.98
Alabama ATRP006 ATRIP #6: Aug-5, Sep-2, Oct-2, Dec-1, Feb-1, Mar-2, Apr-1, Jun-1, Jul-3, Aug-4, Sep-1, Dec-1, Feb-1, Mar-2, Jun-1, July-1, SEPT-2, Nov-1, JAN-2, Apr-1 505,735.99 34,446,031.64
Alabama ATRP007 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM 1,636,862.08 69,011,832.84
Alabama ATRP008 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM 2,704,678.99 51,044,865.32
Alabama ATRP009 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM 3,290,443.68 59,433,021.60
Alabama ATRP010 ATRIP #10 239,166.40 64,213,845.15
Alabama ATRP011 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM 3,215,379.59 43,153,247.42
Alabama ATRP012 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM 9,620,302.57 72,834,969.79
Alabama ATRP013 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM 13,063,723.42 56,666,504.55
Alabama ATRP016 ALABAMA TRANSPORTATION REHABILITATION IMPROVEMENT PROGRAM #16 11,357,077.90 47,421,780.43
Alabama ATRP017 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM 765,019.58 40,638,078.90
Alabama I020339 I-20 PAVEMENT REHAB & ADDITIONAL LANES FR SR-46 TO WEST OF TALLAPOOSA RIVER 30,613,582.23 35,490,332.70
Alabama I020341 I-20 PAVEMENT REHAB AND ADDITIONAL LANES FROM CR-49 TO GEORGIA STATE LINE. (PRIORITY #7) 27,029,681.59 31,615,196.33
Alabama I059376 I-59 (I-20) ADD'L LANES FROM SOUTH OF CR-85 (BUTTERMILK ROAD) TO SOUTH OF SR- 7 (US-11). 25,375,001.88 31,718,752.35
Alabama I059377 I-59 (I-20) ADDITIONAL LANES & BR REPL FROM SOUTH OF SR-7 (US-11) TO SOUTH OF CR-32 BIN #008555 29,131,495.21 34,930,672.53
Alabama I059383 CBD BRIDGE INTERCHANGE MODIFICATIONS ON I-59/20 AT I-65 61,770,983.33 354,866,410.39
Alabama I059385 CBD I-20/59 BRIDGE REPLACEMENT AND APPROACHES FROM I-65 TO NORTH OF 31ST STREET NORTH AND INTERCHANGE MODIFICATIONS AT E. B. STEPHENS EXPRESSWAY. BIN 127,010,456.75 551,605,932.61
Alabama I059387 ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR- 6(MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD 84,461,908.50 102,230,907.91
Alabama I059407 RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60) 30,314,555.40 33,682,839.33
Alabama I059409 RECONSTRUCTION OF THE NORTHBOUND ROADWAY AND THE SOUTHBOUND OUTSIDE SHOULDER ON I-59 FROM 0.39 MILES SOUTH OF CR-276 (STEPHENS GAP ROAD) TO APPROXIMAT 45,281,860.21 50,313,178.00
Alabama I065353 I65 ADD LANES FROM CR52 TO SOUTH END OVERPASS CR17 (VALLEYDALE RD) (PHASE I) 83,484,062.60 104,228,655.81
Alabama I065354 I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2) 77,480,125.49 95,892,661.99
Alabama I085362 I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL 40,459,824.71 46,462,999.68
Alabama I459315 PAVEMENT REHABILITATION ON I-459 FROM SOUTH OF CR-52 AT MCCALLA TO NORTH OF SR-150 22,638,600.00 25,154,000.00