RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Alabama | 0003521 | SR-3 (US-31) FR SPANISH FT TO SR-181 WIDEN TO 5 LANES | 14,053,301.74 | 37,087,606.42 |
Alabama | 0005512 | SR-5 (US-78) ADD LANES FROM I-59 TO FINLEY BLVD. (PHASE 1) | 25,539,597.04 | 31,966,872.11 |
Alabama | 0006521 | SR-6 (US-82) ADD LANE FROM EAST END OF LUBBUB CK BRIDGE E OF REFORM TO 4- LANE WEST OF GORDO | 42,381,986.66 | 53,776,768.65 |
Alabama | 0006562 | SR-6 (US-82) FROM WEST OF GORDO TO CR-33 | 46,576,189.97 | 58,481,960.47 |
Alabama | 0007549 | ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5 ALONG THE NORFOLK SOUTHERN RAILROAD | 13,002,746.70 | 69,692,764.19 |
Alabama | 0012507 | ADD LANES SR-12 (US-84) EAST OF SR-87 TO EAST OF CR-507 GRADE AND DRAIN. | 24,959,826.72 | 31,224,318.08 |
Alabama | 0013568 | SR-13 (US-43) RESURFACING AND PAVEMENT REHABILITATION FROM THE NORTH END OF THE I-359 BRIDGE TO THE HUGH THOMAS BRIDGE | 16,996,909.76 | 26,971,123.50 |
Alabama | 0014509 | SR-14 INTERSECTION IMPROVEMENT AT SR-143 IN ELMORE (CSX RR) INCLUDES BRIDGES | 24,517,663.69 | 30,647,079.61 |
Alabama | 0025556 | RELOCATION OF SR-25 (US-411) FROM TURKEYTOWN TO 0.65 MILES NORTH OF CHEROKEE CR-20 | 40,331,860.25 | 50,414,825.31 |
Alabama | 0035504 | BRIDGE REMOVAL SR35 @ TENNESSEE RIVER | 21,160,363.67 | 26,450,454.59 |
Alabama | 0035521 | SR108 (MGM Outer Loop) at I-85 Interchange Ramp Bridges 1, 2, 3, & 4 Superstructure - Phase 4A | 29,170,293.99 | 36,462,867.49 |
Alabama | 0042501 | Grade, Drain & Bridge SR42/US98 from Mississippi State Line to .5 Mile E of CR576/Glennwood Road | 66,970,770.42 | 83,713,463.04 |
Alabama | 0042509 | SR-42 (US-98) FR MISS LINE TO 0.5 MI EAST OF CR-576 (GLENNWOOD RD) | 536,784.12 | 39,028,490.16 |
Alabama | 0053530 | SR53/Memorial Parkway from N of CR77/Whitesburg Drive to S of Golf Rd/Main L: includes Grade, Drain, Base, Pave & Bridge | 24,111,184.94 | 30,312,487.33 |
Alabama | 0192901 | Anniston E Bypass - S of Lake Yahou to SR1/US431, Grade & Drain | 50,076,219.43 | 53,406,223.43 |
Alabama | 0355503 | Base & Pave Corridor V from Mississippi State Line to SR247 | 25,710,825.71 | 31,073,170.32 |
Alabama | 0471500 | CORRIDOR X FM E OF I-65 TO US31, GRADE, DRAIN, BASE, PAVE & BRIDGE | 36,868,139.95 | 45,660,732.94 |
Alabama | 0471501 | Grade, Drain, Base, Pave & Bridge Corridor X, I-65 NB from N of CR1107/41th Avenue to CR120/Walkers Chapel Road | 145,548,221.33 | 181,471,887.68 |
Alabama | 1602551 | SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM WEST OF SR-79 TO EAST OF SR- 75; INCLUDES GRADE, DRAIN, BRIDGES (DUAL BRGS OVER SR-79, RAMP H OVER SR- 79, DU | 69,695,808.12 | 73,092,161.19 |
Alabama | 1702904 | FOUR-LANING CR83 (FOLEY BEACH EXTENSION) FROM CR32 (DIXIE RD) TO SR16 (US90) | 58,259,361.82 | 72,856,567.71 |
Alabama | 3716258 | PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE | 8,000,000.00 | 43,170,923.54 |
Alabama | 7002600 | Intersection Improvements at Interchange of CR52/Morgan Road & I-459 to CR2/S Shades Crest Road | 27,922,211.20 | 34,907,764.00 |
Alabama | 7009600 | BRIDGE REPLACEMENT AND RELOCATION ON SR-150 AT SHADES CREEK (BIN # 1502) AND THE CSX RAILROAD FROM MP 6.4 WEST OF SHADES CREEK TO MP 7.0 EAST OF SHADE | 22,563,876.56 | 28,230,654.13 |
Alabama | 7503600 | Additional Lanes Schillinger Road from Howells Ferry Road to SR42/US98 | 19,166,434.29 | 36,465,745.81 |
Alabama | 9070900 | RECONSTRUCTION OF SLIDE AREA ON SR-53 (US-231) FROM MP 301.300 TO MP 301.900 (FHWA DISASTER AL2020-01, ALDOT EVENT 042, SITE IS 042-02-52-1 | 21,954,071.60 | 27,442,589.50 |
Alabama | ATRP001 | ATRIP #1: Aug-7, Sep-10, Nov-13, Dec-14, Jan-12, Feb-19, Apr-30, May-13, Jun-6, July-5, Aug-1, Sept-2, Oct-3, Dec-2, Jan-2, Mar-2, | 418,327,257.50 | 589,640,247.38 |
Alabama | ATRP002 | ATRIP # 2: Feb-1, Apr-4, May-8, Jun-6, Jul-4, Aug-1, Sep-2, Jan-3, Mar-1, Apr-2, May-2, Jun-1, Jul-1, Aug-1, Sep-3, Jan-1, Feb-1, Mar-1, Apr-1,Jun-1, | 1,721,513.90 | 64,502,848.00 |
Alabama | ATRP003 | ATRIP #3 - May-6, Jun-6, Jul-5, Aug-3, Sep-7, Oct-1, Dec-2, Jan-2, Mar-1, Apr-1, Jul-1, Aug-2, Sep-1, Dec-3, Feb-1, July-1, SEPT-1, May-3,Aug-1 | 1,834,756.23 | 73,540,011.57 |
Alabama | ATRP004 | ATRIP #4 | 2,749,055.06 | 45,710,928.36 |
Alabama | ATRP005 | ATRIP #5 | 1,556,368.69 | 50,260,467.98 |
Alabama | ATRP006 | ATRIP #6: Aug-5, Sep-2, Oct-2, Dec-1, Feb-1, Mar-2, Apr-1, Jun-1, Jul-3, Aug-4, Sep-1, Dec-1, Feb-1, Mar-2, Jun-1, July-1, SEPT-2, Nov-1, JAN-2, Apr-1 | 505,735.99 | 34,446,031.64 |
Alabama | ATRP007 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | 1,636,862.08 | 69,011,832.84 |
Alabama | ATRP008 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | 2,704,678.99 | 51,044,865.32 |
Alabama | ATRP009 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | 3,290,443.68 | 59,433,021.60 |
Alabama | ATRP010 | ATRIP #10 | 239,166.40 | 64,213,845.15 |
Alabama | ATRP011 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | 3,215,379.59 | 43,153,247.42 |
Alabama | ATRP012 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | 9,620,302.57 | 72,834,969.79 |
Alabama | ATRP013 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | 13,063,723.42 | 56,666,504.55 |
Alabama | ATRP016 | ALABAMA TRANSPORTATION REHABILITATION IMPROVEMENT PROGRAM #16 | 11,357,077.90 | 47,421,780.43 |
Alabama | ATRP017 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | 765,019.58 | 40,638,078.90 |
Alabama | I020339 | I-20 PAVEMENT REHAB & ADDITIONAL LANES FR SR-46 TO WEST OF TALLAPOOSA RIVER | 30,613,582.23 | 35,490,332.70 |
Alabama | I020341 | I-20 PAVEMENT REHAB AND ADDITIONAL LANES FROM CR-49 TO GEORGIA STATE LINE. (PRIORITY #7) | 27,029,681.59 | 31,615,196.33 |
Alabama | I059376 | I-59 (I-20) ADD'L LANES FROM SOUTH OF CR-85 (BUTTERMILK ROAD) TO SOUTH OF SR- 7 (US-11). | 25,375,001.88 | 31,718,752.35 |
Alabama | I059377 | I-59 (I-20) ADDITIONAL LANES & BR REPL FROM SOUTH OF SR-7 (US-11) TO SOUTH OF CR-32 BIN #008555 | 29,131,495.21 | 34,930,672.53 |
Alabama | I059383 | CBD BRIDGE INTERCHANGE MODIFICATIONS ON I-59/20 AT I-65 | 61,770,983.33 | 354,866,410.39 |
Alabama | I059385 | CBD I-20/59 BRIDGE REPLACEMENT AND APPROACHES FROM I-65 TO NORTH OF 31ST STREET NORTH AND INTERCHANGE MODIFICATIONS AT E. B. STEPHENS EXPRESSWAY. BIN | 127,010,456.75 | 551,605,932.61 |
Alabama | I059387 | ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR- 6(MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD | 84,461,908.50 | 102,230,907.91 |
Alabama | I059407 | RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60) | 30,314,555.40 | 33,682,839.33 |
Alabama | I059409 | RECONSTRUCTION OF THE NORTHBOUND ROADWAY AND THE SOUTHBOUND OUTSIDE SHOULDER ON I-59 FROM 0.39 MILES SOUTH OF CR-276 (STEPHENS GAP ROAD) TO APPROXIMAT | 45,281,860.21 | 50,313,178.00 |
Alabama | I065353 | I65 ADD LANES FROM CR52 TO SOUTH END OVERPASS CR17 (VALLEYDALE RD) (PHASE I) | 83,484,062.60 | 104,228,655.81 |
Alabama | I065354 | I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2) | 77,480,125.49 | 95,892,661.99 |
Alabama | I085362 | I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL | 40,459,824.71 | 46,462,999.68 |
Alabama | I459315 | PAVEMENT REHABILITATION ON I-459 FROM SOUTH OF CR-52 AT MCCALLA TO NORTH OF SR-150 | 22,638,600.00 | 25,154,000.00 |