RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
California | 0001002 | IN LONG BEACH, ON STATE RTE 47 AT OCEAN BLVD, CONSTRUCT INTERCHANGE | 26,345,883.16 | 44,546,187.98 |
California | 0004001 | ALAMEDA ST: DEL AMO BLVD TO RTE 91, WIDEN FROM 4 TO 6 LANES, CONST | 24,751,440.00 | 42,823,402.00 |
California | 000C355 | SR60/SR91/I-215 TO ORANGE SHOW ROAD I/C NORTH OF THE I-215/I-10, CONSTRUCT HOV LANES IN EACH DIRECTION (TC) | 14,005,463.00 | 173,933,571.00 |
California | 000C438 | ON I-205 AND I-580 FROM SAN JOAQUIN COUNTY LINE TO GREENVILLE ROAD OVERHEAD. RESURFACE AND RESTORE PAVEMENT ON THE MAINLINE AND RAMPS. (TC) | 73,740,300.00 | 79,491,200.00 |
California | 000C466 | TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER R | 24,991,900.00 | 25,323,700.00 |
California | 000C469 | IN AND NEAR SAN DIEGO AT ROUTE 905/125/11 SEPARATION (SEGMENT 4) AND ON ROUTE 11 FROM 0.1 MILE WEST OF ENRICO FERMI DRIVE TO 1.2 MILE EAST OF ENRICO | 52,630,000.00 | 126,507,700.00 |
California | 000C470 | ALAMEDA, CONTRA COSTA, AND SOLANO COUNTIES AT VARIOUS LOCATIONS INSTALL TRAFFIC OPERATION SYSTEM (TC) | 0.00 | 40,973,000.00 |
California | 000C494 | IN THE CITY OF SACRAMENTO, AT SACRAMENTO RIVER BRIDGE NO. 24-0053 AND NORTH SACRAMENTO UNDERCROSSING NO. 24-0111L; ALSO IN SAN JOAQUIN COUNTY, AT MOK | 28,269,600.00 | 32,725,000.00 |
California | 000C526 | IN SAN DIEGO COUNTY AND IMPERIAL COUNTY ON VARIOUS ROUTES AT VARIOUS LOCATIONS INSTALL FIBER OPTIC CABLE ALONG THE I-5, I-805, AND SR-905, CONNECT AL | 16,532,800.00 | 27,445,100.00 |
California | 0051625 | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO REPLACE BRIDGE, RAMP, IC, BUTTRESS, BIKE TRL | 11,519,460.00 | 77,584,859.00 |
California | 0051636 | IN SAN DIEGO COUNTY ON INTERSTATE 5 AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF SAN ELIJO LAGOON BRIDGE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD OVE | 59,240,700.00 | 301,625,107.00 |
California | 0051639 | I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE | 97,602,100.00 | 300,466,000.00 |
California | 0051993 | CONSTRUCT HOV LANES, AUXILARY LANES, AND ITS (CMGC) IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILES NOR | 0.00 | 74,356,000.00 |
California | 0052019 | IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVE | 20,000,000.00 | 71,816,600.00 |
California | 0052868 | I-5 IN ORA CO-CRESCENT AV/LA PALMA AV WIDEN FREEWAY & HOV LANES | 40,591,459.78 | 62,968,282.78 |
California | 0052949 | ON ROUTE 5 FROM ALONDRA BLVD(KP 2.9/PM 1.8) TO SHOEMAKER AVE(KP 4.0/PM 3.1) INTERSECTION IMPROVEMENTS | 45,958,183.00 | 125,171,506.00 |
California | 0052966 | ON INTERSTATE ROUTE 5 IN ORANGE COUNTY IN SAN CLEMENTE AND DANA POINT *** RECONSTRUCTION (WIDENING FOR HOV LANES) (TC) | 47,428,433.25 | 48,818,820.66 |
California | 0052969 | IN LA CTY IN LAMIRADA, SANTA FE SPRINGS, NORWALK & DOWNEY FROM OC TO LA CTY, WIDEN FREEWAY, RECONSTRUCT OH (TC) | 7,379,087.00 | 112,841,043.00 |
California | 0052981 | IN LOS ANGELES COUNTY IN LAMIRADA FROM ARTESIA BLVD TO NORTH FORK COYOTE CREEK OVERCROSSING WIDEN AND REALIEGN FREEWAY TO ADD ONE MIXED FLOW LANE AND | 45,903,500.00 | 60,256,800.00 |
California | 0053029 | LA CO RTE 5 FROM N. OF BUENA VISTA TO RTE 170, HOV AND ROADWAY REHAB | 47,406,661.21 | 65,864,877.21 |
California | 0053074 | NEAR CASTAIC, FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY. REPLACE APPROACH SLABS, UPGRADE DRAINAGE SYSTEMS, UPGRADING | 0.00 | 39,056,000.00 |
California | 0053078 | IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES & MODIFICATION AND ROADWAY REHABILITATION BASED ON THE CHA | 103,745,612.00 | 324,615,854.00 |
California | 0053122 | LA-005-45.4R/61.2R. IN AND NEAR SANTA CLARITA, FROM 0.5 MILES SOUTH OF I-5/SR- 14 SEPARATION TO 1.7 MILES NORTH OF LAKE HUGHES ROAD UNDERCROSSING. RO | 155,881,000.00 | 156,180,200.00 |
California | 0053129 | IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN | 0.00 | 533,596,550.00 |
California | 0054195 | KERN CO NR LOST HILLS FRM LERDO AVE OC TO ROUTE 5/46 SEPARATION CONC LANE & PANEL REPLACEMENT & GRIND CONC (TC) | 49,061,479.00 | 49,260,979.00 |
California | 0054204 | IN KERN COUNTY NEAR KETTLEMEN CITY FROM 0.6 MILE SOUTH OF TWISSLEMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE. REHABILITATE AND | 37,469,460.97 | 41,289,800.00 |
California | 0055156 | MERCED COUNTY 0.4 MILE NORTH OF THE FRESNO COUNTY LINE AT THE JOHN "CHUCK" ERRECA SAFETY ROADSIDE REST AREA REPLACE SAFETY ROADSIDE REST AREA (SRRA) | 0.00 | 28,752,000.00 |
California | 0056338 | SJ CO IN/NR STOCKTON FR 0.3 MI S CHARTER WY UC TO 0.2 MI N COUNTRY CLUB BLVD UC ROADWAY REHABILITATION (TC) | 63,328,500.00 | 63,570,000.00 |
California | 0056349 | IN SACRAMENTO, FROM 1.1 MILES SOUTH OF ELK GROVE BLVD OC TO AMERICAN RIVER BRIDGE CORRIDOR ENHANCEMENT - CONSTRUCT HOV LANE, ROADWAY REHABILITATION, | 0.00 | 334,355,700.00 |
California | 0058337 | IN SHA CO NR LAKEHEAD AT SACTO RVR,BR#06-0089 (TC) REPLACE BRIDGE (TC) | 186,149,723.43 | 186,149,723.43 |
California | 0058355 | IN SHA CO ABOUT 8 MI N OF SHA LAKE CITY & NEAR LAKEHEAD FRM TURNTABLE BAY OC TO BRIDGE REPLACEMENT AND SEISMIC RETROFIT (TC) | 30,460,600.00 | 44,026,000.00 |
California | 0058359 | IN SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING. WIDENING TO 6 LANES, BRIDGE REP | 112,782,153.00 | 150,659,000.00 |
California | 0059177 | IN SISKIYOU COUNTY IN AND NEAR DUNSMUIR FROM SACRAMENTO RIVER BRIDGE TO 0.6 MILE SOUTH OF NORTH MOUNT SHASTA UNDERPASS. 2 R ROADWAY REHABILIATION - S | 69,991,600.00 | 70,123,000.00 |
California | 0081329 | IN SAN DIEGO COUNTY NEAR ALPINE ON INTERSTATE 8 FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE. PLACE CRCP, HMA, RSC, MGS, AND WATER POLLUITION | 0.00 | 43,737,000.00 |
California | 0082109 | IN IMPERIAL COUNTY NEAR EL CENTRO FROM 0.5 MILE WEST OF ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF ANDERHOLT ROAD OVERCROSSING AND FROM 0.5 MILE EAST | 97,315,800.00 | 98,089,600.00 |
California | 0082110 | IN IMPERIAL COUNTY ABOUT 6 MILES WEST OF WINTERHAVEN FROM 0.7 MILE WEST OF OGILBY ROAD OVERCROSSING TO 0.7 MILE WEST OF ROUTE 186/8 SEPARATION. PAVEM | 51,571,300.00 | 52,113,400.00 |
California | 0082112 | IN IMPERIAL COUNTY IN EL CENTRO FROM 0.4 MILE WEST OF IMPERIAL AVENUE OVERCROSSING TO 0.1 MILE EAST OF 8TH STREET OVERCROSSING RECONSTRUCT INTERCHANG | 0.00 | 32,828,160.26 |
California | 0089001 | STATEWIDE COMBINED ROAD PLAN, PROJECT CONSTRUCTION ACTIVITIES | 0.00 | 37,250,104.00 |
California | 0101820 | IN LA COUNTY IN CITY OF BALDWIN PARK AND WEST COVINA FR PUENTE AVE TO CITRUS ST CONSTRUCT HOV LANES AND SOUNDWALLS (TC) | 40,140,000.00 | 157,866,051.00 |
California | 0101829 | ROUTE 10 HOV LANES FROM CITRUS ST T ROUTE 57 IN LA COUNTY/CITRUS ST TO RTE 57 HOV, WIDENING, AND REALIGN (TC) | 73,876,900.00 | 229,230,500.00 |
California | 0101840 | LA, 10, PM: 14-19 IN THE CITY OF LOS ANGELES AT SANTA MONICA VIADUCT (BR. NO. 53-1301). PAINT AND REHABILITATE BRIDGE. THE PURPOSE OF THIS PROJECT IS | 39,314,500.00 | 39,759,700.00 |
California | 0101844 | IN THE CITIES OF SANTA MONICA AND LOS ANGELES, FROM ROUTE 1 TO ROUTE 5/101 INTERCHANGE; ALSO ON ROUTE 1 FROM MCCLURE TUNNEL TO LINCOLN BOULEVARD. REP | 34,651,200.00 | 38,106,060.00 |
California | 0101855 | LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALON | 56,227,400.00 | 62,034,000.00 |
California | 0102266 | IN SAN BERNARDINO COUNTY IN YUCAIPA FROM 0.2 MILE WEST OF LIVE OAK CANYON ROAD TO COUNTY LINE ROAD UNDERCROSSING PAVEMENT REHABILITATION AND CONTINO | 18,144,700.00 | 36,589,100.00 |
California | 0102268 | IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR | 104,315,784.00 | 168,718,000.00 |
California | 0102269 | IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR | 62,041,969.00 | 117,755,000.00 |
California | 0103110 | RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS | 0.00 | 214,283,800.00 |
California | 0103112 | IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS | 0.00 | 326,730,500.00 |
California | 0104064 | ON I-10 IN INDIO BETWEEN WASHINGTON ST & MONROE ST AT JEFFERSON ST INTERCHANGE RECONSTRUCT/REALIGN EXISTING INTERCHANGE | 33,310,000.00 | 56,760,364.00 |
California | 0151237 | ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY IN AND NEAR VICTORVILLE *** ROADWAY RECONSTRUCTION (TC) | 98,451,300.00 | 102,718,300.00 |
California | 0153045 | ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY *** I 15 JOINT POINT OF ENTRY (SCALE - CVEF) (TC) | 12,573,994.00 | 52,150,417.00 |
California | 0154208 | IN SAN DIEGO AND RIVERSIDE COUNTY IN AND NEAR TEMECULA FROM 0.1 MILE SOUTH OF SAN DIEGO COUNTY LINE TO 0.1 MILE NORTH OF TEMECULA RIVER BRIDGE REPLAC | 33,427,400.00 | 36,978,500.00 |
California | 0154210 | IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATION TO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVE | 0.00 | 69,464,000.00 |
California | 0155165 | IN SAN BERNARDINO COUNTY IN FONTANA AND NEAR DEVORE FROM 0.3 MILE SOUTH OF SIERRA AVENUE UNDERCROSSING TO GLEN HELEN PARKWAY UNDERCROSSING. REPLACE P | 26,479,014.50 | 29,213,800.00 |
California | 0155166 | IN RIVERSIDE COUNTY IN CORONA AND EASTVALE, FROM 0.5 MILE SOUTH OF ONTARIO AVENUE UNDERCROSSING TO ROUTE 60/15 SEPARATION CONCRETE PAVEMENT SLAB REP | 27,129,400.00 | 30,088,200.00 |
California | 0155167 | IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT | 0.00 | 163,648,000.00 |
California | 0401084 | IN SAN BERNARDINO COUNTYNEAR LUDLOW FROM 0.3 MILE EAST OF CRUCERO ROAD TO 0.4 MI W/O BADGER WASH REGRADE MEDIAN CROSS SLOPE (TC) | 41,220,800.00 | 41,550,100.00 |
California | 0801117 | CONTRA COSTA COUNTY, IN AND NEAR RICHMOND, EL CERRITO, SAN PABLO, PINOLE AND HERCULES, FROM ALAMEDA/CONTRA COSTA COUNTY LINE TO ROUTE 80/4 SEPARATION. | 42,147,500.00 | 42,655,100.00 |
California | 0801120 | THE CITY AND COUNTY OF SAN FRANCISCO FROM 16TH STREET TO 4TH STREET. PAINT STEEL STRUCTURE | 0.00 | 31,725,500.00 |
California | 0801121 | ALAMEDA COUNTY IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD E | 0.00 | 28,803,000.00 |
California | 0802375 | SOLANO COUNTY IN FAIRFIELD AND VACAVILLE FROM 1.0 MILE WEST OF RED TOP ROAD UNDER CROSSING TO 0.4 MILE EAST OF LEISURE TOWN ROAD CROSSING HIGHWAY WID | 0.00 | 26,800,000.00 |
California | 0803235 | PLA CO;ROCKLIN;I-80 @ SIERRA COLLEGE BLVD OC, INTERCHANGE RECONSTRUCTION - (TC) | 18,432,000.00 | 25,545,565.00 |
California | 0803237 | IN SACRAMENTO AND WEST SACRAMENTO FROM 80/84 SEPARATION TO WATT AVENUE OVERCROSS CONST. HOV LANES & REHAB. ROADWAY - (TC) | 73,653,185.91 | 127,190,346.57 |
California | 0803243 | IN AND NEAR LOOMIS AT VARIOUS LOCATIONS FROM BRACE ROAD OVERCROSSING TO MAGRA RO IMPROVE VERTICAL CLEARANCE - (TC) | 33,886,844.00 | 33,937,687.00 |
California | 0803250 | IN YOLO AND SACRAMENTO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF REED AVENUE UNDERCROSSING TO 0.1 MILE EAST OF SACRAMENTO RIVE | 23,617,000.00 | 26,080,200.00 |
California | 0804194 | NEAR COLFAX ON RTE 80FROM LONG RAVINE RD TO EAST OF MAGRA RD OC TRUCK CLIMBING LANE (TC) | 53,602,900.00 | 53,812,700.00 |
California | 0804207 | N PLACER COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL SPRINGS ROAD OVERCROSSING TO CISCO OVERCROSSING. REPLACE BRIDGES AT FOUR LOCATIONS (#19-0112, #19-0 | 34,766,500.00 | 38,244,500.00 |
California | 0804213 | NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSING TO ROUTE 89/267 SEPARATION ROADWAY EXCAVATION, JPCP AND FURNISH POL | 0.00 | 27,027,000.00 |
California | 1101841 | LA-110 - IN AND NEAR THE CITIES OF LOS ANGELES AND CARSON, FROM GAFFEY STREET TO COLLEGE STREET, EXTEND SERVICE LIFE OF EXISTING PAVEMENT AND INSTALL | 39,412,800.00 | 39,631,200.00 |
California | 1187011 | SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD CONSTRUCT TUNNELS, APPROACH RO | 498,589,217.34 | 502,809,766.87 |
California | 19FF004 | IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.4 TO 1.7 MILES EAST OF RODEO CREEK BR #10-237 STABILIZE ROADWAY | 0.00 | 25,902,000.00 |
California | 2012001 | AT RTE 76/15 SEP & ON RTE 76 FR SOUTH MISSION RD TO 76/15 SEP, CONSTRUCT 4 LANE HIGHWAY | 300,000.00 | 100,146,000.00 |
California | 2056356 | SAN JOAQUIN COUNTY IN AND NEAR TRACY FROM JANNEY OVERHEAD TO 1.3 MILES EAST OF MACARTHUR DRIVE OVERCROSSING WIDENING BRIDGES, RAMPS AND ROADWAY | 0.00 | 26,545,000.00 |
California | 2101823 | IN AND NEAR GLENDALE & LA CANADA FLINTRIDGE FR DUNSMORE TO HAMPTON RD/FOOTHILL PAVEMENT PRESERVATION (TC) | 147,640,643.00 | 152,492,643.00 |
California | 2151219 | IN RIVERSIDE COUNTY, IN RIVERSIDE, *** , WIDEN 215 (6 TO 8) (2004A GARVEE) | 0.00 | 165,853,564.00 |
California | 27E8004 | IN VENTURA COUNTY, SOUTH OF POINT MUGU STATE PARK (PM 4.0) AND SYCAMORE CANYON ROAD (PM 4.2). CONSTRUCT SECANT WALLS AT TWO LOCATIONS AS A PERMANENT | 0.00 | 56,254,000.00 |
California | 2801150 | SANTA CLARA AND SAN MATEO COUNTIES IN LOS ALTOS HILLS AND MENLO PARK FROM FOOTHILL EXPRESSWAY UNDERCROSSING TO 0.5 MILE NORTH OF SAND HILL ROAD ROADW | 53,402,900.00 | 58,733,100.00 |
California | 29R4006 | IN MENDOCINO CO. NEAR WESTPORT, FROM 0.6 TO 1.4 MI NORTH OF BLUE SLIDE GULCH BRIDGE. EMERGENCY RELIEF - RECONSTRUCT ROADWAY | 23,118,014.96 | 38,650,000.00 |
California | 31D0001 | IN TRINITY CO., NEAR DEL LOMA AT BIG FRENCH CREEK ROAD EMERGENCY RELIEF - EMERGENCY OPENING STORM DAMAGE REPAIRS. | 43,231,326.00 | 43,853,000.00 |
California | 31R0001 | MONTEREY COUNTY, NEAR POSTS, AT PFEIFFER CANYON BRIDGE, NO. 44-0060 EMERGENCY PROJECT - EMERGENCY OPENING REMOVE AND REPLACE DAMAGED BRIDGE, RESTORE | 23,899,700.00 | 26,996,626.00 |
California | 31RH001 | MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REM | 1,497,124.77 | 94,217,533.34 |
California | 31TC001 | IN SANTA CLARA COUNTY, NEAR LOS GATOS, AT 1.2 MILES NORTH OF LAS CUMBRES ROAD CONSTRUCT SOLDIER PILE WALLS. | 0.00 | 34,558,500.00 |
California | 31TN001 | IN MARIN COUNTY, NEAR STINSON BEACH AT 0.6 MILE SOUTH OF PANORAMIC HIGHWAY NORTH JUNCTION CONSTRUCT SOLDIER PILE WALL | 0.00 | 31,650,000.00 |
California | 37B3004 | MEN CO;NR LEGGETT;S/O TO N/O RED MTN CK NEW FWY;2 BRIDGES;RET WALLS;PA | 65,894,389.11 | 89,545,023.43 |
California | 37Y0001 | ON STATE ROUTE 70 IN YUBA COUNTY AND STATE ROUTE 99 IN SUTTER COUNTY AT VARIOUS LOCATIONS. PAVEMENT DAMAGED AT VARIOUS LOCATIONS DUE TO FEMA DEBRIS R | 22,244,925.00 | 29,612,500.00 |
California | 4052986 | IN ORANGE COUNTY ON ROUTE 405 FROM STATE ROUTE 73 TO I-605 ADD ONE MIXED FLOW AND TOLL EXPRESS LANE IN EACH DIRECTION WITH OTHER OPERATIONAL IMPROVEM | 74,191,000.00 | 1,900,000,000.00 |
California | 4052999 | I-405 AT CRENSHAW BLVD. RAMP IMPROVEMENT; IN LOS ANGELES COUNTY, IN THE CITY OF TORRANCE BETWEEN WESTERN AVENUE AND WEST 182ND STREET / CRENSHAW BLVD. | 0.00 | 66,756,000.00 |
California | 4053015 | FROM PM 0.43 S/O LA-10 TO VENTURA BL., WIDEN FOR HOV LANE | 222,428,625.26 | 827,217,719.00 |
California | 4053048 | LA 405, FROM ROUTE 90 TO ROUTE 10, CONSTRUCT HOV LANES | 135,609,173.16 | 191,678,475.76 |
California | 4127001 | LA CO NON-INTERSTATE RTES VAR LOCATIONS, ER RELIEF STORM DAMAGE REPAIR | 26,537,637.51 | 29,114,534.00 |
California | 5004049 | W MISSION BAY DRIVE/SAN DIEGO RIVER BRIDGE REPLACEMENT (57C-0023) | 41,887,016.00 | 146,919,728.00 |
California | 5006219 | N. SPRING ST. BRDG OVR L.A. RVR, BRIDGE # 53C0859 BRIDGE REHABILITATION/WIDENING | 36,048,438.00 | 45,996,471.46 |
California | 5006221 | RIVERSIDE DR. OVER L.A. RIVER, BRDG #53C0160 BRIDGE REPLACEMENT /WIDENING | 49,654,086.98 | 60,868,544.00 |
California | 5006336 | FIRST ST. OVER L.A. RIVER BRIDGE # 53C-1166 BRIDGE REHABILITATION | 58,331,222.66 | 66,314,332.22 |
California | 5006664 | SIXTH STREET VIADUCT OVER LA RIVER AND EAST SANTA ANNA FREEWAY, 53C1880 REPLACE STRUCT DEFICIENT VIADUCT WITH NEW (TC) | 119,965,869.00 | 148,909,901.00 |
California | 5006811 | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 CMGC PA | 28,978,113.00 | 33,088,934.00 |
California | 5006831 | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 THIS I | 26,125,154.00 | 29,509,945.00 |
California | 5006839 | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 | 102,462,444.00 | 230,364,054.00 |
California | 5006882 | THIS IN THE PORT OF LOS ANGELES, TERMINAL ISLAND TERMINAL ISLAND RAILYARD | 21,645,000.00 | 55,650,000.00 |
ENHANCEMENT PROJECT: THIS PROJECT ENTAILS THE ADDITION OF 5 STAGING/STORAGE TRAC | ||||
California | 5012037 | LAKE MERRITT CHANNEL BRIDGE (BR.NO.33C-0030) REPLACE BRIDGE (PER SEISMIC STRATEGY) | 27,595,632.00 | 31,446,836.00 |
California | 5012085 | 12TH & 14TH ST BRIDGES 33C0181 & 33C0182 BRIDGE REPLACEMENT (SEISMIC) | 11,060,488.42 | 55,410,000.00 |
California | 5059230 | STATE ROUTE 132 FROM NORTH DAKOTA AVE TO THE NEEDHAM STREET OVERCROSSING INCLUDING THE 132 / 99 INTERCHANGE. CONSTRUCT TWO-LANE EXPRESSWAY / HIGHWAY | 22,101,971.00 | 33,360,766.00 |
California | 5060263 | FULTON MALL & MARIPOSA MALL ROAD RECONSTRUCTION | 16,924,620.00 | 28,016,759.02 |
California | 5060384 | VETERANS BLVD./SH99/GOLDEN STATE BLVD. (PHASE 3) VETERANS BLVD./SH99 INTERCHANGE; NORTHERLY JUG HANDLE; VETERANS BLVD. OVERCROSSING OF GOLDEN STATE | 10,540,582.00 | 59,151,158.00 |
California | 5068001 | CYPRESS AVE. @ SAC RIVER, BR #. 06C0108 L&R (NEW BRIDGE # 06C0377) REPLACE BRIDGES | 79,976,316.00 | 92,138,624.00 |
California | 5104033 | AUTO CENTER DRIVE AT BNSF RAILROAD SOUTH OF RAILROAD STREET, NEW OVERHEAD | 8,061,892.00 | 32,238,599.00 |
California | 5108137 | GERALD DESMOND BRIDGE BR# 53C0065 BRIDGE REPLACEMENT | 173,115,000.00 | 888,400,000.00 |
California | 5108189 | PORT OF LONG BEACH-PIER G TO J DOUBLE TRACK ACCESS FRO PIER G TO J, CREATING 9,000 FOOT DEPARTURE TRACK FOR TRAIN SERVING FOUR MARINE TERMINALS ALONG | 14,000,000.00 | 26,700,780.00 |
California | 5109106 | SR58: FROM 0.60 MILE E/O COFFEE RD OVERCROSSING TO TRUXTUN AVE UNDERCROSSING, ELEMENT OF THE CITY OF BAKERSFIELD CENTENNIAL CORRIDOR PROJECT. CONSTRU | 113,362,209.00 | 127,729,712.00 |
California | 5109200 | 24TH/23RD STREETS (SR178) FROM 0.1 MI WEST OF SR99 (W/O KERN RIVER BR.) TO 0.2 MI EAST OF "M" STREET ROADWAY WIDENING AND INTERSECTION IMPROVEMENTS | 23,540,432.70 | 44,294,976.43 |
California | 5109242 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 99 FROM 0.3 MI SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 FROM | 4,280,000.00 | 36,549,100.00 |
California | 5109245 | SR99/ SR58 CONNECTOR, SR99 FROM BELLE TERRACE TO MING AVE. IMPROVEMENTS ON SR99/ SR58 CONNECTOR INCLUDING THE CONSTRUCTION OF A COLLECTOR- DISTRIBUTOR | 11,122,638.65 | 58,633,355.00 |
California | 5109251 | CENTENNIAL CORRIDOR CONNECTOR: WESTSIDE PARKWAY(WSP) AT KERN RIVER BR. TO SR58 SR99 NEW ROAD: CONSTRUCT NEW CENTENNIAL CORRIDOR MAINLINE AND INTERCH | 97,719,464.10 | 156,024,110.25 |
California | 5133035 | STATE COLLEGE BOULEVARD FROM 700 FEET SOUTH OF VALENICA DRIVE TO SANTA FE AVENUE NEW UNDERPASS | 38,882,375.42 | 90,106,344.52 |
California | 5163027 | 5TH STREET AT 2ND STREET AND 5TH STREET OVER FEATHER RIVER BRIDGE REPLACEMENT (TC) | 76,942,547.91 | 79,048,216.00 |
California | 5166015 | BON AIR BRIDGE (BON AIR RD OVER CORTE MADERA CREEK). BR.# 27C0028 BRIDGE REPLACEMENT | 32,404,556.00 | 37,828,547.00 |
California | 5203016 | WILLOW ST @ SWEETWATER RIVER, BRIDGE 57C0011 REPLACE TWO LANE BRIDGE WITH FOUR LANE BRIDGE | 24,394,942.00 | 29,080,076.00 |
California | 5282017 | INDIAN CANYON DRIVE OVERHEAD AT THE UNION PACIFIC RAILROAD SOUTH OF GARNET AVENUE, BR. NO. 56C-0025 BRIDGE WIDENING TO SIX LANES | 1,635,943.00 | 26,425,723.00 |
California | 5288046 | IN FOLSOM ON WHITE ROCK RD FROM PRAIRIE CITY RD TO EAST BIDWELL ST. CONSTRUCT 4 LANE ROAD WITH 8 FOOT SHOULDERS. (CLASS 1 TRAIL TO BE BUILT IN LATER | 15,000,000.00 | 31,201,500.00 |
California | 5380028 | GREEN TREE BOULEVARD FROM HESPERIA ROAD TO RIDGECREST BOULEVARD EXTENSION OF 4-LANE ROAD WITH NEW OVERHEAD | 25,696,701.07 | 46,758,408.45 |
California | 5381033 | VIA VERA CRUZ, BRDG NO. 57C0780 REPLACE 2-LANE BRIDGE WITH 4-LANE BRIDGE | 2,832,960.00 | 32,885,590.00 |
California | 5459025 | I-15/SR 79 INTERCHANGE FROM 0.4 MILES SOUTH OF SR 79 TO 0.6 MILES NORTH OF THE I-15/SR 79 SEPARATION IN THE CITY OF TEMECULA WIDEN INTERCHANGE RAMPS | 14,415,839.50 | 27,271,373.50 |
California | 5464029 | I-215 / CLINTON-KEITH ROAD INTERCHANGE , RECONSTRUCT INTERCHANGE | 9,999,452.00 | 26,437,922.00 |
California | 5801051 | ON I-580 IN ALAMEDA COUNTY NEAR LIVERMORE 1 MILE EAST OF NORTH FLYNN ROAD CONSTRUCT RETAINING WALL AND CLIMBING LANE (TC) | 53,480,532.41 | 54,003,380.41 |
California | 5801054 | ISABEL AVEN (LIVERMORE) TO FOOTHILL (DUBLIN) CONSTRUCT A WESTBOUND HOV LANE | 9,609,605.39 | 51,907,082.00 |
California | 5801055 | GREENVILLE ROAD TO ISABEL AVENUE (LIVERMORE) CONSTRUCT A WESTBOUND HOV LANE | 12,404,356.26 | 68,826,847.67 |
California | 5801076 | ALAMEDA COUNTY FROM ROUTE 580/ROUTE 238 SEPERATION TO FRUITEVALE AVENUE UNDERCROSSING TO REPLACE SLAPBS, RESURFACE SHLDS & RAMPS, & CONSTRUCT MGS, & | 39,410,700.00 | 43,446,500.00 |
California | 5908031 | JELLYS FERRY RD OVER SACRAMENTO RIVER BRIDGE (BR. #08C0043) BRIDGE REPLACEMENT ON NEW ALIGNMENT | 37,025,766.00 | 53,014,639.00 |
California | 5912085 | MIDWAY RD @ BUTTE CREEK 3.9 MILES SOUTH OF NELSON RD. BRIDGE NO. 12C0052 & 12C0053 BRIDGE REPLACEMENT | 21,264,112.00 | 27,196,250.00 |
California | 5925098 | MOSQUITO RD OVER SOUTH FORK AMERICAN RIVER 5.7 MILES NORTH OF US 50 BR#25C0061 BRIDGE REPLACEMENT (TC) | 8,814,000.00 | 79,314,000.00 |
California | 5929166 | MCHENRY AVENUE OVER STANISLAUS RIVER (BRIDGE 38C0032) BRIDGE REPLACEMENT | 22,651,344.00 | 25,943,318.00 |
California | 5934171 | 2ND STREET FROM MARKET TO KING BICYCLE & PED IMPROVEMENTS, REPAVE | 11,116,386.00 | 25,883,895.00 |
California | 5934177 | IN SAN FRANCISCO, ON 3RD STREET, CROSSING OVER THE MISSION CREEK CHANNEL BETWEEN BERRY STREET AND TERRY A FRANCOIS BOULEVARD; BR. # 34C0025 BRIDGE RE | 32,060,268.00 | 36,214,015.00 |
California | 5934185 | MARKET STREET, 5TH STREET TO 8TH STREET. WORK MAY EXTEND OFF MARKET STREET, UP TO 50 FEET AT INTERSECTIONS. ROADWAY IMPROVEMENTS, INCLUDING ROADWAY R | 18,366,000.00 | 191,108,886.00 |
California | 5938076 | CROWS LANDING ROAD (BRIDGE 38C0010) OVER SAN JOAQUIN RIVER REPLACE BRIDGE (SEISMIC) | 11,016,825.00 | 25,617,720.09 |
California | 5956221 | 66TH AVENUE FROM EAST OF STATE ROUTE 86 TO DALE KILER ROAD IN THE COMMUNITY OF MECCA NEW OVERHEAD | 24,479,641.00 | 47,974,058.00 |
California | 5956230 | HAMNER AVENUE OVER SANTA ANA RIVER, BR. NO. 56C-0446 REPLACE 2-LANE BRIDGE WITH 6-LANE BRIDGE | 22,690,484.00 | 72,163,126.00 |
California | 5956234 | NEWPORT ROAD OVER I-215 FROM HAUN ROAD TO ANTELOPE ROAD IN THE CITY OF MENIFEE WIDEN OVERPASS AND RECONSTRUCT ON- AND OFF-RAMPS | 14,625,000.00 | 34,907,563.00 |
California | 5956235 | I-10 INTERCHANGE WITH JEFFERSON STREET IN THE CITY OF INDIO RECONSTRUCT INTERCHANGE | 12,252,248.00 | 57,292,064.00 |
California | 5956262 | SCOTT ROAD AT I-215 INTERCHANGE FROM HAUN ROAD TO ANTELOPE ROAD, BR. NO. 56 0649 RECONSTRUCT INTERCHANGE | 8,000,000.00 | 35,127,620.00 |
California | 6003010 | GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE II | 176,766,529.00 | 179,829,873.49 |
California | 6003051 | GOLDEN GATE BRIDGE SUICIDE DETERRENT SYSTEM | 126,992,886.00 | 204,092,868.00 |
California | 6053122 | US 395 FROM PALMDALE ROAD (SR 18) IN PALMDALE TO CHAMBERLAINE WAY IN ADELANTO, PHASE 1 WIDEN HIGHWAY FROM TWO TO FOUR LANES (TC) | 8,027,804.64 | 40,003,413.00 |
California | 6053130 | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN | 207,167,533.00 | 319,461,533.00 |
California | 6054081 | I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 60 IN THE CITIES OF EASTVALE AND JURUPA VALLEY CONSTRUCT TOLL EXPRESS LANES IN EACH DIREC | 98,418,952.00 | 341,863,797.00 |
California | 6054090 | STATE ROUTE 60 FROM GILMAN SPRINGS ROAD TO 1.37 MILES WEST OF JACK RABBIT TRAIL CONSTRUCT EASTBOUND AND WESTBOUND TRUCK LANES | 45,401,000.00 | 109,133,000.00 |
California | 6065198 | I-405 NB HOV LANE, WIDENING: I-10 TO I-101 ROAD WIDENING FOR HOV LANE | 92,600,000.00 | 104,597,312.00 |
California | 6065240 | NORTHERN LOS ANGELES COUNTY FROM I-5/SR14 JCT. TO PARKER ROAD. THE INTERSTATE 5 (I-5) GOLDEN STATE CHOKEPOINT RELIEF PROJECT (THE PROJECT) OFFERS A C | 47,000,000.00 | 533,596,550.00 |
California | 6065251 | I-210 FREEWAY FROM 0.2 MILES WEST OF MARENGO AVE TO W ILSON AVE IN THE CITY OF PASADENA AND APPROXIMATELY 1.5 MILES OF SOUNDWALLS FROM BALDWIN AVE TO | 48,649,000.00 | 48,649,000.00 |
California | 6066104 | NCTD RAIL R/W FOR SPRINTER COMMUTER TRAIN IN CITIES OF VISTA, SAN MARCOS, OCEANSIDE AND THE COUNTY OF SAN DIEGO BUILD 7.1 MILES OF CLASS I BICYCLE TR | 17,827,622.64 | 28,374,000.00 |
California | 6071122 | INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION | 1,000.00 | 1,900,000,000.00 |
California | 6164023 | ALONG THE WHITEWATER RIVER STORM CHANNEL FROM THE CITY OF PALM SPRINGS TO THE CITY OF COACHELLA, PHASE 1, SEGMENT 1 CONSTRUCT 13.47 MILES OF NEW BIKE | 18,655,000.00 | 33,009,000.00 |
California | 6202007 | HWY 299 BETWEEN TRINITY & SHASTA COUNTIES; APPROX 20 MILES WEST OF REDDING, HWY REALIGNMENT (TC) | 839,440.00 | 30,298,000.00 |
California | 6203055 | SR-99 FROM ASH ST TO RAMSDELL DR STREETSCAPE IMPROVEMENTS (TC) | 10,810,000.00 | 39,563,000.00 |
California | 6203058 | RECONFIGURE I-80/SR-65 I/C & WIDEN NB SR-65 FROM I-80 WB RAMP TO PLEASANT GROVE BL RECONFIGURE I-80/SR-65 INTERCHANGE AND WIDEN SR-65 | 6,830,000.00 | 43,180,600.00 |
California | 6203059 | SR-49 FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK REHABILITATE PAVEMENT (TC) | 1,450,000.00 | 34,750,000.00 |
California | 6203060 | NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. PM23.50 CONSTRUCT AN UNDERCROSSING AND A | 6,091,900.00 | 30,688,902.12 |
California | 6204105 | I-580 LIVERMORE; GREENVILLE RD TO ISABEL AVE, CONSTRUCT W/B HOV LANE | 6,187,759.00 | 73,055,000.00 |
California | 6204113 | US 101 BROADWAY INTERCHANGE IN BURLINGAME, RECONSTRUCT INTERCHANGE INCLUDE BIKE/PED FACILITY | 3,613,000.00 | 50,647,000.00 |
California | 6204117 | WB I-80 TO SR12 CONNECTOR, INTERCHANGE RECONSTRUCTION (TC) | 999,962.00 | 52,215,503.00 |
California | 6204120 | US 101 MARIN SONOMA NARROWS; NEAR PENTALUMA .8MIL S. TO 2MIL N. OF MARIN- SON LNS REALIGN US101 & CONSTRUCT WIDENING FOR HOV (TC) | 127,845.25 | 55,486,000.00 |
California | 6204123 | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PH II CONCESSIONARE PMTS P3 (TC) | 34,000,000.00 | 34,000,000.00 |
California | 6204127 | US 101 MARIN & SONOMA CO. BETWEEN KASTANIA RD. & SOUTH OF MARIN/SONOMA COUNTY LINE CONSTRUCT HOV LANES (TC) | 32,200,000.00 | 38,368,000.00 |
California | 6204131 | ON I-80 THROUGH THE CITIES OF FAIRFIELD AND VACAVILLE IN SOLANO COUNTY, FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVER | 63,464,510.00 | 178,700,000.00 |
California | 6204132 | ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. | 75,651,097.00 | 103,646,000.00 |
California | 6205010 | STATE HWY 46 CORRIDOR SAN LUIS OBISPO COUNTY ROAD WIDENING | 14,510,070.80 | 25,734,967.65 |
California | 6205015 | ROUTE 46 CORRIDOR, ROAD WIDENING | 2,477,410.47 | 63,244,534.42 |
California | 6205026 | IN SANTA BARBARA COUNTY, IN AND NEAR SUMMERLAND FROM 0.2 MI NORTH OF PADARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. RECONSTRUCT PAVEMENT WITH C | 3,098,688.99 | 127,191,000.00 |
California | 6205028 | NEAR THE CITY OF SANTA CRUZ AND CAPITOLA ON HIGHWAY 1, FROM 41ST AVENUE TO SOQUEL AVENUE CONSTRUCT AUXILIARY LANES AND CONSTRUCT BICYCLE/PEDESTRIAN O | 1,640,000.00 | 28,110,000.00 |
California | 6205029 | ON SR156 IN SAN JUAN BAUTISTA, FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH ST. ROADWAY WIDENING | 404,017.00 | 58,711,000.00 |
California | 6206010 | ROUTE 99 FROM GOSHEN TO KINGSBURG, WIDEN FROM 4-LANE TO 6-LANE | 7,198,215.85 | 99,465,000.00 |
California | 6206011 | ROUTE 99 FROM GOSHEN TO KINGSBURG, WIDEN FROM 4-LANE TO 6-LANE | 5,903,344.57 | 99,465,000.00 |
California | 6206021 | SR 46 FROM THE INTERSECTION OF LOST HILLS ROAD TO 0.9 MI. E OF I5 WIDENING FROM 2 TO 4 LANES | 17,701,000.00 | 49,972,000.00 |
California | 6206025 | KINGS CANYON EXPRESSWAY SEGMENT 3, ON SR 180 FROM WEST OF SMITH AVENUE TO EAST OF FRANKWOOD AVENUE, PM R74.1/R78.6 CONSTRUCT 4 LANE EXPRESSWAY | 2,666,318.70 | 53,598,170.00 |
California | 6207028 | ON SR 14:PEARBLOSSOM TO AVE P-8 , CONSTRUCT HOV LANES | 32,127,808.86 | 36,812,808.86 |
California | 6207042 | IN NORWALK AND SANTA FE SPRING(CARMENITA INT), INTERCHANGE RECONSTRUTION | 98,527,001.00 | 179,624,855.00 |
California | 6207046 | I-5/SR-14 SEPARATION NR CITY OF SANTA CLARITA CONSTR. 2 LANE ELEV. HOV CONNE | 116,062,579.72 | 164,015,944.00 |
California | 6207055 | I-5 : FROM RTE 134 TO MAGNOLIA BLVD HOV LANES | 72,706,000.00 | 113,213,945.00 |
California | 6207059 | ROUTE 10: PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES AND SOUNDWALLS (TC) | 116,546,051.00 | 157,866,051.00 |
California | 6207063 | SR-138, SEGMENT 6, (IN LITTLEROCK FROM 87TH ST E TO 96 ST. E) WIDENING OF SR- 138 FROM 2 LANES TO 4 LANES (TC) | 25,130,000.00 | 25,130,000.00 |
California | 6207067 | LA COUNTY LINE TO MOORPARK RD. IN THOUSAND OAKS ADD ONE LANE IN EACH DIRECTION, WIDEN RAMPS ETC. | 15,417,915.00 | 40,083,904.38 |
California | 6207068 | ROUTE 005: (SEG. 5) ARTESIA BLVD. TO 0.4 MILE NORTH OF SAN GABRIEL RIVER BRIDGE WIDEN I-5 WITH HOV MIXED FLOW LANES ETC. (TC) | 96,114,000.00 | 124,714,000.00 |
California | 6207070 | RT. 10 : FROM CITRUS AVE. TO RT. 57 CONSTRUCT HOV LANE IN BOTH DIRECTIONS | 154,720,000.00 | 222,884,000.00 |
California | 6207072 | IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD. TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES AND IC MODIFICATIONS | 31,568,000.00 | 325,040,000.00 |
California | 6207078 | I-5 CARPOOL LANE-ORANGE COUNTY LINE TO I-605 (SEGMENT 2) IN LA MIRADA WIDEN HOV | 100,079,000.00 | 199,898,000.00 |
California | 6208009 | LOCATION DETAILS SEGMENT 2.: IN LA MIRADA FROM ARTESIA BL TO NOR STATE ROUTE 91 FROM ADAMS STREET TO THE 60/91/215 INTERCHANGE HOV LANES | 57,796,950.00 | 181,141,569.00 |
California | 6208013 | I-215: ORANGE SHOW RD. - RIALTO AVE. (SEG. 3) , CONSTRUCT HOV & MIXED-FLOW LANES | 46,940,000.00 | 87,997,100.00 |
California | 6208016 | I-15/I-215 INTERCHANGE S/O GLEN HELEN PARKWAY TO KENWOOD & I-215 S/O DEVORE ROAD, RECONSTRUCT INTERCHANGE, ADD MIXED-FLOW LANES TC | 65,708,000.00 | 258,659,000.00 |
California | 6208018 | SR 91 FROM SPRUCE ST. IN RIVERSIDE TO I-215 AT ORANGE SHOW RD. IN SAN BERNARDINO, HOV LANES, BRIDGE REPLACEMENT, ROAD REHABILITATI | 44,871,000.00 | 180,391,000.00 |
California | 6208023 | I-215 INTERCHANGE AT BARTON ROAD IN THE CITY OF GRAND TERRACE RECONSTRUCT OVERCROSSING AND RAMPS (TC) | 18,756,086.83 | 65,708,645.83 |
California | 6208029 | I-15 FROM 0.5 MILES N/O MOJAVE DRIVE TO 1.5 MILES N/O STODDARD WELLS ROAD, RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS (TC) | 3,637,000.00 | 84,990,000.00 |
California | 6208032 | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 QUALIT | 21,300,000.00 | 84,926,325.00 |
California | 6211073 | IN SD C .6 KM E OF CACTUS RD & .3 KM W MEXICO , 6 LANES CONSTRUCTION | 0.00 | 73,498,982.00 |
California | 6211114 | I15-PM R46.2/R46.8 & SR76-PM R12.1/R17.7 INTERCHANGE SR76 EAST - ROADWAY WIDENING FROM 2 TO 4 LANES | 86,750,801.30 | 121,682,757.37 |
California | 6211119 | IN SAN DIEGO COUNTY IN SAN DIEGO ON I-5 FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO THE SORRENTO VALLEY OVERHEAD REPLACE BRIDGE, RAMP, IC, BUTTRESS, BI | 49,546,999.50 | 69,363,715.00 |
California | 6211121 | I-805 SOUTH FROM PALOMAR STREET TO SR54 CONSTRUCT NOISE WALL (TC) | 31,302,000.00 | 32,092,210.06 |
California | 6211126 | IN IMPERIAL COUNTY IN THE CITY OF EL CENTRO AT I-8 AND IMPERIAL AVE INTERCHANGE RECONSTRUCTION OF INTERCHANGE (TC) | 2,399,999.74 | 31,342,999.74 |
California | 6211131 | IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS ALONG 1-5 FROM LOMAS SANTA FE DRIVE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD REPLACE THE SAN ELIJO LAGOON B | 182,074,475.00 | 246,122,594.00 |
California | 6212018 | INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION | 36,130,000.00 | 256,189,516.00 |
California | 6212021 | INTERSTATE 5 FROM STATE ROUTE 73 TO OSO PARKWAY, SEGMENT 1 ADD MIXED- FLOW LANES IN EACH DIRECTION AND RECONSTRUCT THE I-5 INTERCHANGE INTERCHANGE (TC | 19,848,000.00 | 87,810,000.00 |
California | 6212022 | INTERSTATE 5 FROM OSO CREEK TO ALICIA PARKWAY CONSTRUCT ONE GENERAL PURPOSE LANE ON EACH DIRECTION, RECONSTRUCT LA PAZ ROAD INTERCHANGE AND ADD AUXIL | 43,930,000.00 | 158,080,000.00 |
California | 6212024 | INTERSTATE 5 FROM ALICIA PARKWAY TO EL TORO ROAD (SEGMENT 3) ADD GENERAL PURPOSE LANE, EXTEND 2ND HOV LANE IN BOTH DIRECTIONS, AND ADD AUXILIARY LANE | 44,915,000.00 | 149,817,000.00 |
California | 6212025 | INTERSTATE 5 FROM STATE ROUTE 55 TO STATE ROUTE 57 ADD ONE HOV LANE IN EACH DIRECTION (TC) | 29,603,000.00 | 32,843,000.00 |
California | 6272023 | YERBA BUENA ISLAND EASTSIDE WESTBOUND ON & OFF RAMPS RECONST EXISTING WB ON & OFF RAMPS ON EAST OF YBI | 75,747,201.00 | 85,581,736.00 |
California | 6272047 | ON YERBA BUENA ISLAND, SAN FRANCISCO - I-80 ON AND OFF RAMPS APPROACH ROADWAY REALIGNMENTS | 3,629,730.00 | 42,559,511.00 |
California | 6303005 | NOGALES ST. AT UPRR IN THE CITY OF INDUSTRY , GRADE SEPARATION ON NOGALES ST. | 40,069,700.95 | 50,129,010.95 |
California | 6303030 | RAMONA ST, MISSION RD, DEL MAR AVE, SAN GABRIEL BL UPTO WALNUT GROVE AVE W/UPRR, CONST. 2.6M LONG RAILROAD TRENCH | 12,404,576.45 | 399,597,000.00 |
California | 6303032 | NOGALES ST. AT RAILROAD STREET/UPRR(SCRRA) GRADE SEPERATION | 20,502,039.70 | 66,260,431.70 |
California | 6303039 | DURFEE AVENUE AT UPRR (LA SUBDIVISION) IN CITY OF PICO RIVERA CONSTRUCTION OF RAIL ROAD GRADE SEPARATION | 19,737,808.21 | 78,030,062.20 |
California | 6480017 | IN THE CITY OF OAKLAND, WITHIN THE PORT OF OAKLAND'S SEAPORT FACILITIES AND ADJACENT AREA IN THE CITY OF OAKLAND ALONG WEST GRAND AVE., MARITIME HAR | 9,741,364.11 | 28,562,849.11 |
California | 6507003 | MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT | 28,218,653.00 | 224,564,085.00 |
California | 6507011 | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN | 22,570,956.00 | 33,438,891.00 |
California | 6801079 | IN FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING. ROADWAY REHABILITATION, BRIDGE REPLACEMENT, RETAINING WALLS, | 32,796,100.00 | 145,178,000.00 |
California | 6801081 | IN FREMONT FROM SOUTH OF SCOTT CREEK ROAD TO AUTO MALL PARKWAY. RAMP METERING (TC) | 27,415,200.00 | 27,916,900.00 |
California | 6801082 | CONTRA COSTA COUNTY ON I-680 FROM NORTH MAIN STREET TO LIVORNA IN THE SOUTHBOUND DIRECTION. CONSTRUCT AN HOV LANE | 14,759,200.00 | 76,295,900.00 |
California | 6801946 | ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA | 0.00 | 75,364,000.00 |
California | 7101807 | IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE BRIDGE REPLACEMENT | 394,303,000.00 | 836,532,728.00 |
California | 7101809 | ON RTE 710 FROM LOS ANGELES RIVER BRIDGE TO RAMONA BLVD UNDERCROSSING PAVE AND WIDEN ROADWAY AND BRIDGES (TC) | 174,024,056.52 | 174,479,456.52 |
California | 7101839 | IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . | 112,901,800.00 | 113,434,400.00 |
California | 8051640 | IN SAN DIEGO COUNTY IN CHULA VISTA AND NATIONAL CITY FROM 0.2 MILE SOUTH OF SWEETWATER RIVER BRIDGE TO ROUTE 805/54 SEPARATION. UPGRADE BRIDGE RAILS, | 0.00 | 25,209,100.00 |
California | 8801053 | I-880 AT COLEMAN AVENUE INTERCHANGE , RECON 880/COLEMAN (2004A GARVEE) | 0.00 | 71,460,660.00 |
California | 8801070 | IN OAKLAND FROM SOUTH OF 29TH AVENUE TO NORTH OF 23RD AVENUE IMPROVE ON AND OFF RAMPS (TC) | 78,497,887.00 | 79,331,752.00 |
California | 8801074 | IN ALAMEDA COUNTY FROM 0.4 MI S/O FREMONT BLVD O/C TO 0.3 MI S/O HIGH STREET INSTALL MEDIAN CONCRETE BARRIER | 41,717,500.62 | 67,955,933.93 |
California | 8801081 | IN AND NEAR FREMONT, UNION CITY, HAYWARD, SAN LEANDRO, AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET SEPARATION AN | 61,935,300.00 | 64,663,400.00 |
California | A905019 | IN SD 1.2 KM E/O 805/905 TO 0.8KM E/O BRI. OC , CON | 73,654,279.62 | 74,477,833.62 |
California | E2CA018 | WALERGA RD AT DRY CREEK BR #19C-159 BRIDGE REPLACEMENT | 31,231,307.00 | 36,721,268.00 |
California | ERI8005 | IN MARIPOSA COUNTY ABOUT 8 MILES WEST OF EL PORTAL FROM 1.2 MILES WEST OF SOUTH FORK MERCED RIVER BRIDGE TO 0.5 MILE WEST OF SOUTH FORK MERCED RIVER | 0.00 | 30,717,000.00 |
California | NBIL512 | FOOTHILL RD (1.5 MI W OF SR33) @ CUYAMA RIVER, SANTA BARBARA COUNTY. REPLACE LWC #00L0047 WITH 2-LANE BRIDGE (TC). | 2,585,000.00 | 25,960,300.00 |
California | NBIS017 | STATEWIDE BRIDGE INSPECTION & MANAGEMENT (TC) | 33,000,000.00 | 33,000,000.00 |
California | NBIS018 | STATEWIDE BRIDGE INSPECTION & MANAGEMENT | 34,664,063.22 | 39,155,240.00 |
California | P001529 | MEN CO;NR FORT BRAGG;N & S OF TEN MILE RV BR , REPLACE BRIDGE, REALIGN ROADWAY | 18,939,549.00 | 54,949,796.00 |
California | P001590 | SLO CO ABOUT 9 MI N OF SAN SIMEON FR PIEDRAS BLANCAS LIGHTHOUSE RD TO ARROYO... CONSTRUCT 3 BRIDGES & REALIGN 2 LANE HIGHWAY (TC) | 30,723,700.00 | 30,908,500.00 |
California | P001649 | SANTA CRUZ COUNTY IN AND NEAR SANTA CRUZ FROM NORTH APTOS UP TO JUNCTION ROUTE 9. COLD PLANE AND RESURFACE PAVEMENT, UPGRADE RAILING AND BARRIERS. | 24,074,787.03 | 30,114,900.04 |
California | P001662 | MONTEREY COUNTY FROM TORRE CANYON BRIDGE NEAR BIG SUR TO SAN LUIS AVENUE IN CARMEL. RHMA OVERLAY ON EXISTING ROADWAY AND UPGRADE GUARDRAIL. | 24,668,600.00 | 28,328,000.00 |
California | P001675 | SANTA CRUZ COUNTY IN AND NEAR CITY OF CAPITOLA FROM 0.2 MILE SOUTH OF 41ST AVENUE OVERCROSSING TO 0.2 MILE NORTH OF SOQUEL DRIVE OVERCROSSING. CONSTR | 0.00 | 31,870,000.00 |
California | P012106 | IN NAPA COUNTY FROM STATE ROUTE 29 TO 0.1 MILE WEST OF SOLANO COUNTY LINE, WIDEN HWY TO 4 LANES AND CONSTR RET WALLS | 20,510,000.00 | 39,033,684.00 |
California | P012107 | IN NAPA AND SOLANO COUNTIES FROM 0.5 MILE WEST OF NAPA CO LINE TO RED TOP ROAD., WIDEN RTE 12 FROM 2 TO 4 LANE CONV HWY | 7,985,146.00 | 49,784,651.00 |
California | P012112 | IN SJ COUNTY NEAR TERMINOUS FROM MOKELUMNE RIVER BRIDGE TO POTATO SLOUGH BRIDGE PAVEMENT REHABILITATION AND WIDENING (TC) | 53,429,122.00 | 53,700,760.00 |
California | P014081 | IN KERN COUNTY AT AND NEAR ROSAMOND AND MOJAVE FROM 1.4 MILES SOUTH OF DAWN ROAD OVERCROSSING TO 0.5 MILE NORTH OF SILVER QUEEN ROAD OVERCROSSING. CO | 44,616,500.00 | 50,941,700.00 |
California | P017117 | SANTA CLARA COUNTY IN AND NEAR LOS GATOS AND SAN JOSE FROM HEBARD ROAD TO ROUTE 17/280 SEPERATION COLD PLAN AND PAVE AC, REMOVE AND INSTALL CULVERTS, | 0.00 | 58,733,500.00 |
California | P020184 | NEAR YUBA CITY, FROM EAST END OF SUTTER BYPASS TO LYTLE ROAD. REHABILITATE ROADWAY, WIDEN SHOULDERS, AND REPLACE WADSWORTH CANAL BRIDGE NO.I8-0003. T | 23,097,900.00 | 26,246,200.00 |
California | P020189 | NEAR SMARTSVILLE, FROM THE YUBA RIVER BRIDGE TO EAST OF SMARTSVILLE ROAD. REALIGN AND WIDEN ROADWAY. THE NEED FOR THE FOLLOWING IMPROVEMENTS ARE ANAL | 39,900,700.00 | 44,855,100.00 |
California | P020191 | NEAR MARYSVILLE, FROM MARYSVILLE ROAD TO YUBA RIVER (PARKS BAR) BRIDGE. REHABILITATE ROADWAY. EXTEND SERVICE LIFE OF PAVEMENT, BRING HIGHWAY GEOMETRI | 40,665,500.00 | 46,500,100.00 |
California | P020196 | NEVADA COUNTY NEAR OMEGA AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CONSERVATION ROAD (WASHINGTON RIDGE ROAD) TO 1.2 MILES WEST OF ZIEBRIGHT ROAD. RO | 0.00 | 49,914,000.00 |
California | P020198 | IN MENDOCINO COUNTY NEAR UKIAH FROM 0.3 MILE WEST OF RUSSIAN RIVER BRIDGE AND OVERHEAD TO 0.4 MILE EAST OF COUNTY ROAD 144 REPLACE TWO BRIDGES | 0.00 | 36,949,000.00 |
California | P023041 | IN VENTURA COUNTY, ON STATE ROUTE 23, PM R3.3/R11.5. IN AND NEAR CITIES OF THOUSAND OAKS AND MOORPARK, FROM ROUTE 101 TO ROUTE 118. REHABILITATE PAVE | 0.00 | 91,342,600.00 |
California | P024029 | RT 24 FROM CALDECOTT TUNNEL TO EL CURTOLA O/C, ROADWAY REHABILITATION | 41,284,906.00 | 46,634,305.00 |
California | P029148 | IN LAKE COUNTY NEAR KELSEYVILLE ON RTE 29 FROM 0.6 MI TO 3.7 MILES NORTH OF RTE 281 AND ON RTE 175 FROM SOUTH JCT RTE 29 TO 0.3 MI EAST OF SO JCT RTE | 60,679,000.00 | 68,278,700.00 |
California | P047010 | LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) | 368,659,356.00 | 368,785,856.00 |
California | P049177 | IN AUBURN, FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK ROAD. REHABILITATE PAVEMENT | 30,494,000.00 | 35,017,400.00 |
California | P050139 | IN SOUTH LAKE TAHOE, NORTH OF ROUTE 89 TO TROUT CREEK BRIDGE. WATER QUALITY IMPROVEMENTS - (TC) | 41,368,400.00 | 42,093,600.00 |
California | P050152 | (03-4E620) NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. INSTALL MEDIAN BARRIER, WIDEN | 27,348,100.00 | 36,018,900.00 |
California | P050154 | IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB. | 54,496,300.00 | 434,546,200.00 |
California | P057067 | IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT | 63,147,650.00 | 71,876,400.00 |
California | P057069 | LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANG | 0.00 | 80,120,300.00 |
California | P058119 | ON STATE ROUTE 58 IN SAN BERNARDINO COUNTY A HENKLEY *** RECONSTRUCTION (2 LANE TO 4 LANE EXPRESSWAY) (TC) | 139,313,220.00 | 139,827,720.00 |
California | P058126 | NEAR BAKERSFIELD FROM COTTONWOOD ROAD UNDERCROSSING TO 0.3 MILE EAST OF ROUTE 58/184 SEPARATION. CONSTRUCT CRCP, HMA PAVEMENT, MGS, AND MODIFYING ELE | 39,401,100.00 | 39,628,100.00 |
California | P058127 | IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O | 207,775,600.00 | 208,375,000.00 |
California | P058128 | KERN COUNTY IN BAKERSFIELD FROM RTE 58/99 SEPARATION TO COTTONWOOD ROAD UNDERCROSSING REPLACE LANES AND SHOULDERS WITH CONTINUOUSLY REINFORCED CONCRE | 28,516,300.00 | 29,022,400.00 |
California | P060153 | IN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM 0.1 MI WEST OF PIPELINE AVE OC TO 0.1 MI EAST OF BENSON AVE OC REMOVE AND REPLA | 0.00 | 26,041,300.00 |
California | P060154 | IN RIVERSIDE COUNTY NEAR BEAUMONT ON SR 60 FROM GILMAN SPRINGS ROAD OVERCROSSING TO 1.4 MILES WEST OF JACK RABBIT TRAIL. CONSTRUCT A TRUCK CLIMBING L | 62,120,400.00 | 121,915,500.00 |
California | P060155 | IN SAN BERNARDINO AND RIVERSIDE COUNTIES IN ONTARIO, JURUPA VALLEY AND RIVERSIDE, FROM EUCLID AVENUE UNDERCROSSING TO ROUTE 60/91/215 SEPARATION. REP | 0.00 | 162,158,000.00 |
California | P060159 | IN SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE ADD WEST BOUND AUXILIARY LANE, ADD EAST- BOUND DEC | 0.00 | 32,806,300.00 |
California | P062046 | IN RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR YUCCA VALLEY AND IN TWENTYNINE PALMS FROM 0.2 MILE NORTH OF INDIAN CANYON DRIVE TO 0.6 MILE WEST | 0.00 | 30,011,400.00 |
California | P065108 | IN AND NEAR ROSEVILLE AND ROCKLIN, FROM ROUTE 80 TO 0.5 MILES SOUTH OF PLEASANT GROVE OVERCROSSING INCLUDING WIDENING OF THE GALLERIA BLVD/STANFORD R | 24,480,600.00 | 43,180,600.00 |
California | P070094 | SUT/YUB CO'S;NR NICOLAUS;FR 70/99 SEP TO * , WIDEN & REALIGN ROADWAY | 79,879,899.00 | 90,255,065.00 |
California | P070137 | NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE NO. I 6-00 I 9. REPL | 44,482,700.00 | 50,845,800.00 |
California | P070143 | IN YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD WIDEN ROADW | 0.00 | 48,518,000.00 |
California | P070144 | YUBA COUNTY NEAR MARYSVILLE FROM 0.2 MILE NORTH OF LAURELLEN ROAD TO SOUTH HONCUT CREEK BRIDGE WIDEN SHOULDERS AND IMPROVE CLEAR RECOVERY ZONE. | 0.00 | 108,710,800.00 |
California | P074067 | IN RIVERSIDE COUNTY ON ROUTE 74 FROM 0.6 MILES EAST OF ROUTE 215 TO 0.8 MILES WEST OF ACACIA AVENUE IN THE CITY OF HEMET CONSTRUCT RAISED CURB MEDIAN | 25,014,020.00 | 28,130,900.00 |
California | P074071 | ORANGE COUNTY NEAR SAN JUAN CAPISTRANO FROM 1.0 MILE WEST OF SAN JUAN HOT SPRINGS ROAD TO ORANGE COUNTY LINE APPLY HFST, OVERLAY OGAC AND INSTALL MGS | 25,766,000.00 | 29,137,100.00 |
California | P084042 | IN/NEAR LIVERMORE & PLEASANTON FROM S/O RUBY HILL DRIVE TO N/O CONCANNON BLVD WIDEN AND UPGRADE 2.8 MILES OF SR 84 (TC) | 46,709,000.00 | 53,248,900.00 |
California | P084054 | ALAMEDA COUNTY NEAR FREMONT AT ALAMEDA CREEK BRIDGE REPLACE BR PAVING, SOIL NAIL WALL, DRAINAGE & CHANNEL RESTORATION | 21,851,100.00 | 25,221,800.00 |
California | P089102 | NEAR TAHOE CITY FROM 0.2 MI SOUTH OF ED/PLA COUNTY LINE TO TRUCKEE RIVER BRIDGE PAVEMENT REHAB/ DRAINAGE SYSTEM IMPROVEMENT- (TC) | 49,472,273.00 | 50,713,238.00 |
California | P099629 | STANISLAUS COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF MERCED STANISLAUS COUNTY LINE TO 0.2 MILE SOUTH OF STANISLAUS SAN JOAQUIN COUNTY LINE C | 13,985,600.00 | 28,348,000.00 |
California | P099635 | MADERA COUNTY IN AND NEAR MADERA FROM AVENUE 12 OVERCROSSING TO 0.9 MILE NORTH OF AVENUE 17 OVERCROSSING REHABILITATE PAVEMENT AND CONSTRUCT NEW LANE | 58,293,200.00 | 65,925,900.00 |
California | P099636 | KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LAN | 58,859,700.00 | 71,341,800.00 |
California | P099637 | IN GALT, FROM THE SAN JOAQUIN COUNTY LINE TO SIMMERHOM ROAD; ALSO, IN THE CITIES OF ELK GROVE AND SACRAMENTO, FROM 0.7 MILE SOUTH OF ELK GROVE BOULEV | 34,977,800.00 | 39,752,800.00 |
California | P099639 | MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUE OVERCROSSING TO STANISLAUS COUNTY LINE NORTHBOUND LANE WIDENING FROM 2 TO | 29,166,100.00 | 41,803,800.00 |
California | P099644 | FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILES SOUTH OF SECOND STREET UNDERCROSSING. REPLACE CONCRETE AND AS | 35,418,100.00 | 40,420,100.00 |
California | P099646 | MERCED COUNTY IN AND NEAR ATWATER FROM 0.4 MILE SOUTH OF BUHACH OVERCROSSING TO 0.8 MILE NORTH OF WEST ATWATER OVERHEAD REPLACE CONCRETE AND ASPHALT | 1,396,600.00 | 72,340,200.00 |
California | P099654 | IN SUTTER COUNTY, IN AND NEAR LIVE OAK, FROM SOUTH OF COLEMAN AVENUE TO NEVADA STREET (NORTH INTERSECTION). REHABILITATE PAVEMENT, IMPROVE PEDESTRIAN | 22,843,100.00 | 34,163,100.00 |
California | P099660 | KERN COUNTY, IN AND NEAR BAKERSFIELD, FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRE | 54,176,800.00 | 61,831,100.00 |
California | P099662 | MERCED COUNTY IN MERCED FROM 0.2 MILE SOUTH OF CHILDS AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF FRANKLIN ROAD OVERCROSSING RECONSTRUCT PAVEMENT | 54,775,200.00 | 62,124,100.00 |
California | P099663 | IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE | 0.00 | 73,158,900.00 |
California | P099665 | TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES | 59,190,000.00 | 67,376,000.00 |
California | P099666 | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PA | 71,509,800.00 | 81,481,800.00 |
California | P099669 | SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD BRIDGE REPLACEMENT AND | 50,329,800.00 | 57,173,100.00 |
California | P118065 | IN AND NEAR THE CITY OF LOS ANGELES, FROM COUNTY LINE TO ROUTE 210; ALSO ON ROUTE 27 (TOPANGA CANYON BLVD) FROM DEVONSHIRE STREET TO ROUTE 118. REHAB | 26,431,500.00 | 26,633,900.00 |
California | P132050 | SAN JOAQUIN COUNTY NEAR VERNALIS FROM 0.4 MILE EAST OF ROUTE 580 TO STANISLAUS COUNTY LINE REPAIR PAVEMENT AND INSTALL ITS ELEMENTS (TC) | 29,773,992.00 | 30,210,800.00 |
California | P134040 | IN LOS ANGELES COUNTY IN CITIES OF LOS ANGELES, BURBANK, GLENDALE AND PASADENA FROM 0.0 MILE EAST OF ROUTE 101/134 SEPARATION TO JUNCTION OF ROUTE 21 | 0.00 | 43,785,600.00 |
California | P138049 | IN SAN BERNARDINO COUNTY ON STATE ROUTE 138 NEAR PHELAN *** ROADWAY RECONSTRUCTION (ADDED CAPACITY) (TC) | 63,153,528.00 | 63,678,528.00 |
California | P138055 | NEAR HESPERIA FROM 1.9 MI E/O RTE 15 TO 0.1 MI W/O SUMMIT POST OFFICE ROAD REALIGN AND CONSTRUCT 2-LANE PAVED SECTION WITH OUTSIDE SHOULDERS, 3 WILDL | 22,578,900.00 | 32,975,900.00 |
California | P162041 | GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY | 0.00 | 98,488,000.00 |
California | P198077 | TULARE COUNTY, IN AND NEAR VISALIA, FROM LOVERS LANE UNDERCROSSING TO 0.1 MI EAST OF FRIANT-KERN CANAL BRIDGE REMOVE AND REPLACE HMA PAVEMENT AND MO | 26,491,600.00 | 26,765,100.00 |
California | P210016 | IN SAN BERNARDINO COUNTY IN SAN BERNARDINO, HIGHLAND, AND REDLANDS FROM 0.1 MILE WEST OF DEL ROSA AVENUE TO LUGONIA AVENUE BASELINE INTERCHANGE IMPRO | 47,764,600.00 | 149,679,901.00 |
California | P299185 | IN SHASTA COUNTY ABOUT 20 MILES WEST OF REDDING FROM 0.3 MILE EAST OF TRINITY COUNTY LINE TO 0.9 MILES WEST OF CRYSTAL CREEK ROAD. HIGHWAY REALIGNMEN | 44,998,502.00 | 45,932,442.00 |
California | P395236 | IN SBD COUNTY FR 7.9 MI N/O SR-18 TO 10.4 MI S/O KRAMER JCT (RTE)58 WIDEN MEDIAN & SHOULDERS, CONSTRUCT TURNOUTS (TC) | 31,415,318.00 | 32,032,678.00 |
California | P395276 | IN SAN BERNARDINO COUNTY IN ADELANTO AND IN VICTORVILLE ON ROUTE 395 FROM ROUTE 18-PALMDALE ROAD TO CHAMBERLAINE WAY WIDEN HIGHWAY FROM TWO TO FOUR L | 9,547,000.00 | 31,613,553.00 |
California | P395348 | IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE E | 0.00 | 92,966,000.00 |
California | Q101153 | SF ON RTE 101 FROM PM 8.8-9.2, DOYLE DR REPL REPLACE/REHABILITATE ROADWAY | 122,574,329.58 | 160,696,807.58 |
California | Q101237 | IN SAN MATEO COUNTY ON US 101 IN THE CITY OF BURLINGAME RECONFIGURE THE BROADWAY INTERCHANGE (TC) | 19,989,548.00 | 60,223,732.00 |
California | Q101247 | IN AND NEAR THE CITIES OF LOS ANGELES, CALABASAS AND AGOURA HILLS FROM SR170 TO REHABILITATION PAVEMENT CONDITIONS (TC) | 63,199,100.39 | 63,408,100.39 |
California | Q101261 | MRN & SON COUNTIES ON US 101 SAN ANTONIO CURVE CORRECTION (TC) | 75,275,041.00 | 75,791,241.00 |
California | Q101290 | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE RECONSTRUCT 3 BRIDGES, CONSTRUCT 1 BRIDG | 54,846,100.00 | 80,591,000.00 |
California | Q101306 | SAN LUIS OBISPO AND MONTEREY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING. | 69,860,400.00 | 70,452,900.00 |
California | Q101338 | MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE P | 81,681,100.00 | 105,748,900.00 |
California | Q101342 | MONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD RECONSTRUCT, CRACK AND SEAT PAVEMENT AND RECONSTR | 41,570,900.00 | 47,437,600.00 |
California | Q101348 | MONTEREY COUNTY NEAR SAN LUCAS FROM 0.1 MILE SOUTH OF PARIS VALLEY ROAD OVERCROSSING TO RANCHO UNDERCROSSING CONSTRUCT CONTINUOUSLY REINFORCED CONCRE | 27,497,400.00 | 31,230,600.00 |
California | Q101350 | MONTEREY COUNTY NEAR CHUALAR FROM 0.5 MILE NORTH OF NORTH GONZALES OVERCROSSING TO EAST MARKET STREET UNDERCROSSING REPLACE CONCRETE PANEL AND RESURF | 26,578,449.00 | 30,164,400.00 |
California | Q101353 | SONOMA COUNTY IN PETALUMA FROM ROUTE 101/116 SEPERATION TO 0.4 MILE NORTH OF CORONA ROAD OVERCROSSING ROADWAY, BRIDGES, RETAINING WALLS, SOUND WALL A | 0.00 | 104,750,100.00 |
California | Q101363 | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING; UPGRADE MEDIAN CONCRETE BARRIER TO MEET THE | 43,822,300.00 | 44,130,700.00 |
California | Q101365 | SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION. CRACK, SEAT AND OVERLAY, AND REHABILITATE AND REPLACE | 0.00 | 87,903,000.00 |
California | Q101366 | THE CITY AND COUNTY OF SAN FRANCISCO AT ALEMANY CIRCLE UNDERCROSSING REPLACE BRIDGE DECK | 12,265,254.00 | 43,170,200.00 |
California | Q101373 | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE. CONSTRUCT HOV LANES AN | 48,147,600.35 | 108,459,352.52 |
California | Q101379 | CITY AND COUNTY OF SAN FRANCISCO FROM THE SAN MATEO COUNTY LINE TO THE BAYSHORE VIADUCT COLD PLANE AND OVERLAY WITH RHMA. REPLACE EXISTING PCC SLAB. | 22,612,400.00 | 25,361,400.00 |
California | Q101381 | SANTA BARBARA COUNTY IN AND NEAR SUMMERLAND FROM 0.2 MILE NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. CONSTRUCT NEW HOV LANES AND | 39,857,600.00 | 127,191,000.00 |
California | Q101385 | VEN-101- IN VENTURA COUNTY, ON STATE ROUTE 101, PM R36.3/R40.6. NEAR SEA CLIFF, FROM 0.4 MILE SOUTH OF PADRE JUAN CANYON ROAD OVERCROSSING TO 0.3 MIL | 38,098,900.00 | 43,287,200.00 |
California | Q101389 | THE CITY AND COUNTY OF SAN FRANCISCO FROM 17TH STREET TO SOUTH VAN NESS AVENUE CLEAN AND PAINT STEEL STRUCTURE | 0.00 | 38,493,100.00 |
California | Q101394 | IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY | 0.00 | 58,721,000.00 |
California | Q101395 | SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE | 0.00 | 193,632,000.00 |
California | Q101398 | IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE | 0.00 | 78,032,000.00 |
California | Q101399 | IN HUMBOLDT COUNTY IN AND NEAR TRINIDAD FROM 1.3 MILES SOUTH OF SCHOOL ROAD OC TO 0.4 MILE NORTH OF BIG LAGOON BRIDGE CAPITAL PREVENTATIVE MAINTENANC | 0.00 | 34,300,000.00 |
California | S036115 | IN LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD. REHABILITATE ROADWAY AND REPLACE | 33,295,000.00 | 37,854,700.00 |
California | S074071 | IN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE/RIVERSIDE COUNTY LINE TO MONTE VISTA STREET WIDEN EXISTING LANES TO PROVIDE 12' LANES, 4' SHOULDER | 45,413,100.00 | 51,089,100.00 |
California | S087026 | IN SAN JOSE RT 87 FROM JULIAN ST TO 280 U/C , WIDEN FWY (4 TO 6) (2004A GARVEE) | 0.00 | 27,948,674.00 |
California | S180059 | IN FRESNO COUNTY ABOUT 8.4 MILES EAST OF FRESNO FROM 0.7 MILE WEST OF SMITH AVENUE TO 0.7 MILE EAST OF FRANKWOOD AVENUE. CONSTRUCT 4 LANE EXPRESSWAY | 39,274,300.00 | 65,206,600.00 |
California | X023033 | HUM CO;NR MCKIN'LYVL;SR-101;FR 0.2 KM S/O * REPLACE BRIDGES | 46,858,060.00 | 52,929,020.00 |
California | X029126 | KERN COUNTY NEAR INDIAN WELLS ON ROUTE 14 FROM 2.4 MILES SOUTH OF JUNCTION ROUTE 178 TO 1.7 MILES NORTH OF JUNCTION ROUTE 178 AND ON ROUTE 178 FROM R | 27,853,200.00 | 28,251,600.00 |
California | X029141 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 | 0.00 | 40,522,000.00 |
California | X029143 | KERN COUNTY IN BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUE OVERCROSSING TO BEARSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEP | 41,404,800.00 | 83,744,700.00 |
California | X029144 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 58 AND RTE 99 FROM 0.1 MILE WEST OF RTE 99 TO 0.2 MILE EAST OF RTE 99 AND FROM 0.3 MILE SOUTH OF MING A | 25,000,000.00 | 58,633,355.00 |
California | X029147 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 58 FROM 0.1 MILE WEST OF MOHAWK STREET TO COTTONWOOD ROAD AND ROUTE 99 FROM 0.8 MILE SOUTH OF ROUTE 5 | 0.00 | 186,679,411.00 |
California | X037165 | NEAR THOUSAND OAKS, FROM VENTURA CNTY LINE TO RTE 101/23 INTERCHANGE , INTERCHANGE IMPROVEMENT | 16,646,289.49 | 38,055,456.00 |
California | X037169 | IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS REPLACE AND REPAIR ELEC WIRE (TC) | 28,750,000.00 | 28,750,000.00 |
California | X037199 | IN LOS ANGELES COUNTY IN AND NEAR CARSON ON ROUTE 110 FROM 0.2 MILE NORTH OF TORRANCE BLVD UC TO 190TH STREET UC AND ON ROUTE 405 FROM MAIN STREET UC | 25,656,200.00 | 25,930,700.00 |
California | X037204 | IN LOS ANGELES COUNTY ON ROUTES 2, 5, 10, 47, 90, 91, 105, 110, 405, 605 AND 710 REPAIR AND REPLACE THE PROJECT WILL IS MAXIMIZE THE USE OF THE EXI | 29,044,200.00 | 29,044,200.00 |
California | X037211 | IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 | 32,910,097.00 | 175,051,477.00 |
California | X037218 | IN LOS ANGELES COUNTY, AT VARIOUS LOCATIONS UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATION SYSTEM UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATIO | 33,916,000.00 | 38,613,000.00 |
California | X059083 | IN ORANGE COUNTY AT VARIOUS LOCATIONS UPGRADE AND INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) ELEMENTS. | 0.00 | 25,171,300.00 |
California | X071063 | IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTES 15 AND 215 *, 1-15/1-215 DEVORE INTERCHANGE IMPROVEMENT ** | 134,351,000.00 | 266,213,136.00 |
California | X071071 | IN SAN BERNARDINO COUNTY ON ROUTE 62 FROM 3.8 MILES WEST OF ROUTE 95 TO ARIZONA STATE LIN AND ON ROUTE 95 FROM ROUTE 62 TO 2.0 MILES SOUTH OF TURTLE | 24,047,800.00 | 27,490,700.00 |
California | X075027 | SF 101/1 SEPARATION TO GOLDEN GATE TOLL PLAZA REPLACE/REHABILITATE ROADWAY | 82,124,382.00 | 104,451,807.00 |
California | X075041 | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PHASE II CONCESSIONAIRE PMTS P3 (TC) | 188,339,626.16 | 731,328,837.00 |
California | X075046 | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PARK PRESIDIO P3, DEPT DIRECTED CHANGES& SUPPT(TC) | 156,252,688.00 | 169,572,970.00 |
California | X077014 | SJ CO RTE205 IN TRACY 0.6KM W/11TH ST OC RTE5 WIDEN 4 LANE TO 6 LANE FREEWAY | 72,879,005.00 | 90,778,579.00 |
California | X077023 | SAN JOAQUIN COUNTY NEAR TRACY FROM STANISLAUS COUNTY LINE TO ALAMEDA COUNTY LINE REPAIR PVMNT/HMA RESURF & INSTALL ITS ELEMENT (TC) | 34,196,100.00 | 34,353,600.00 |
California | X077028 | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 FROM 0.2 MILE EAST OF FRESNO AVENUE TO EL DORADO STREET AND ON ROUTE 5 FROM TAYLOR STREET OVERHEAD TO STOC | 0.00 | 37,712,800.00 |
California | X095025 | IN FAIRFIELD AT I-80 AND SR 12 CONSTRUCT A TWO-LANE WB I-80/WB SR 12 (TC) | 19,569,973.18 | 61,959,006.00 |
California | X099645 | IN AND NEAR THE CITY OF MODESTO ON SR 132 NEAR NORTH DAKOTA AVE TO NEAR 6TH ST AND ON SR 99 FROM 0.5 M SOUTH OF TUOLUMNE RIVER BRIDGE TO 0.1 M NORTH | 0.00 | 114,049,200.00 |