RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
California | 0001002 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | 13,062,193.05 | 26,043,617.00 |
California | 0001002 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | 1,776,566.99 | 4,114,999.99 |
California | 0001002 | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | 4R - Added Capacity | 5,904,857.00 | 7,381,071.00 |
California | 0001002 | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Preliminary Engineering | 5,602,266.12 | 7,006,499.99 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | 1,100,000.00 | 1,375,000.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | 4R - Added Capacity | 3,853,073.02 | 4,816,342.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Construction Engineering | 4,476,983.99 | 6,055,096.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Preliminary Engineering | 3,019,999.99 | 5,524,028.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | PRIORITY INTERMODAL PROJECTS | Right of Way | 160,000.00 | 1,561,507.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | SECTION 149(B) | 4R - Added Capacity | 1,097,400.00 | 1,371,750.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | SECTION 149(D) | 4R - Added Capacity | 658,440.00 | 823,050.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 3,460,000.00 | 12,639,700.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | URBAN ACCESS/URBAN MOBILITY | 4R - Added Capacity | 6,925,543.00 | 8,656,929.00 |
California | 0004001 | Los Angeles | >= 200,000 | N/A | URBAN ACCESS/URBAN MOBILITY | Construction Engineering | 0.00 | 0.00 |
California | 000C355 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 6,697,107.00 | 94,540,981.00 |
California | 000C355 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 3,606,134.00 | 50,906,682.00 |
California | 000C355 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,295,778.00 | 7,636,002.00 |
California | 000C355 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,406,444.00 | 14,181,146.00 |
California | 000C355 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 6,615,000.00 |
California | 000C355 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 53,760.00 |
California | 000C438 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 123,286.14 | 132,826.52 |
California | 000C438 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 65,728,813.86 | 70,815,173.48 |
California | 000C438 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 14,752.68 | 15,969.59 |
California | 000C438 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,865,247.32 | 8,514,030.41 |
California | 000C438 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 8,187.07 | 13,179.19 |
California | 000C438 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 12.93 | 20.81 |
California | 000C466 | Tuolumne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 18,302,330.23 | 18,566,569.18 |
California | 000C466 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 4,679,569.77 | 4,747,130.82 |
California | 000C466 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,831,182.34 | 1,831,182.34 |
California | 000C466 | Tuolumne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 178,817.66 | 178,817.66 |
California | 000C469 | San Diego | >= 200,000 | N/A | COORD BORDER INFRA PROGRAM | Construction Engineering | 3,350,000.00 | 19,050,000.00 |
California | 000C469 | San Diego | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | 49,280,000.00 | 107,457,700.00 |
California | 000C470 | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 6,260,263.60 |
California | 000C470 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 12,520,527.20 |
California | 000C470 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 18,044,289.20 |
California | 000C470 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 1,407,600.00 |
California | 000C470 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 2,028,600.00 |
California | 000C470 | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 703,800.00 |
California | 000C470 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 3,880.80 |
California | 000C470 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 2,692.80 |
California | 000C470 | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 1,346.40 |
California | 000C494 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 12,256,050.00 | 14,208,800.00 |
California | 000C494 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 12,256,050.00 | 14,208,800.00 |
California | 000C494 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,875,500.00 | 2,150,000.00 |
California | 000C494 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,875,500.00 | 2,150,000.00 |
California | 000C494 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 3,250.00 | 3,700.00 |
California | 000C494 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 3,250.00 | 3,700.00 |
California | 000C526 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,898,800.00 | 5,938,000.00 |
California | 000C526 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 12,622,600.00 | 21,494,200.00 |
California | 000C526 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 11,400.00 | 12,900.00 |
California | 0051625 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 9,695,616.00 | 67,364,819.00 |
California | 0051625 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,800,000.00 | 10,194,000.00 |
California | 0051625 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 23,844.00 | 26,040.00 |
California | 0051636 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 41,240,700.00 | 264,472,000.00 |
California | 0051636 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 18,000,000.00 | 37,153,107.00 |
California | 0051639 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,337,500.00 | 2,675,000.00 |
California | 0051639 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 17,803,300.00 | 19,442,300.00 |
California | 0051639 | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 64,074,100.00 | 227,064,300.00 |
California | 0051639 | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 4,644,700.00 | 9,289,400.00 |
California | 0051639 | San Diego | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 9,742,500.00 | 41,995,000.00 |
California | 0051993 | San Diego | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | 0.00 | 12,837,000.00 |
California | 0051993 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 49,447,600.00 |
California | 0051993 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 5,501,000.00 |
California | 0051993 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,544,000.00 |
California | 0051993 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 26,400.00 |
California | 0052019 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 20,000,000.00 | 63,237,000.00 |
California | 0052019 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 8,564,000.00 |
California | 0052019 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 15,600.00 |
California | 0052868 | Orange | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 138,348.00 | 225,500.00 |
California | 0052868 | Orange | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 19,611,050.00 | 33,012,582.00 |
California | 0052868 | Orange | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 10,066,287.00 | 17,550,967.00 |
California | 0052868 | Orange | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 6,952,621.00 | 7,618,348.00 |
California | 0052868 | Orange | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Training | 10,255.00 | 16,800.00 |
California | 0052868 | Orange | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 3,036,217.78 | 3,666,773.78 |
California | 0052868 | Orange | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 618,842.00 | 699,023.00 |
California | 0052868 | Orange | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 157,839.00 | 178,289.00 |
California | 0052949 | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 27,219,965.00 | 98,595,684.00 |
California | 0052949 | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | 8,343,423.00 | 14,789,352.00 |
California | 0052949 | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Rail/Hwy Crossing | 1,135,449.00 | 1,326,600.00 |
California | 0052949 | Los Angeles | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Training | 22,596.00 | 26,400.00 |
California | 0052949 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,350,000.00 | 8,302,271.00 |
California | 0052949 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 246,097.00 | 277,982.00 |
California | 0052949 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 1,640,653.00 | 1,853,217.00 |
California | 0052966 | Orange | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | 25,000,000.00 | 25,000,000.00 |
California | 0052966 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 12,357,180.00 | 13,747,567.41 |
California | 0052966 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 10,050,133.25 | 10,050,133.25 |
California | 0052966 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 21,120.00 | 21,120.00 |
California | 0052969 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 6,802,230.00 | 96,019,303.00 |
California | 0052969 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 576,857.00 | 16,675,000.00 |
California | 0052969 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 117,700.00 |
California | 0052969 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 29,040.00 |
California | 0052981 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 25,722,800.00 | 25,722,800.00 |
California | 0052981 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 20,180,700.00 | 34,534,000.00 |
California | 0053029 | Los Angeles | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | 14,275,319.00 | 14,275,319.00 |
California | 0053029 | Los Angeles | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Traffic Management/Engineering - HOV | 8,125,777.21 | 8,125,777.21 |
California | 0053029 | Los Angeles | >= 200,000 | State | ARRA AMERICAN RECOV & REINV AC | Traffic Management/Engineering - HOV | 24,987,085.00 | 43,445,301.00 |
California | 0053029 | Los Angeles | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Training | 18,480.00 | 18,480.00 |
California | 0053074 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 30,197,360.00 |
California | 0053074 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 2,175,200.00 |
California | 0053074 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,670,000.00 |
California | 0053074 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 13,440.00 |
California | 0053078 | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | 38,225,000.00 | 46,413,000.00 |
California | 0053078 | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | 3,559,000.00 | 8,000,000.00 |
California | 0053078 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 13,170,512.00 | 32,587,725.00 |
California | 0053078 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 20,842,247.00 | 41,827,292.00 |
California | 0053078 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 1,426,844.00 | 1,558,200.00 |
California | 0053078 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 26,493,000.00 | 194,197,957.00 |
California | 0053078 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 29,009.00 | 31,680.00 |
California | 0053122 | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Restoration & Rehabilitation | 59,767,385.77 | 59,767,385.77 |
California | 0053122 | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 4,500,000.00 | 4,500,000.00 |
California | 0053122 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 85,833,614.23 | 86,132,814.23 |
California | 0053122 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 28,200.00 | 28,200.00 |
California | 0053129 | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Traffic Management/Engineering - HOV | 0.00 | 533,596,550.00 |
California | 0054195 | Kern | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 44,545,519.00 | 44,745,019.00 |
California | 0054195 | Kern | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,500,000.00 | 4,500,000.00 |
California | 0054195 | Kern | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 15,960.00 | 15,960.00 |
California | 0054204 | Kern | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | 4,739,762.79 | 5,176,108.75 |
California | 0054204 | Kings | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | 271,734.52 | 296,750.60 |
California | 0054204 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 25,271,775.73 | 27,931,912.13 |
California | 0054204 | Kings | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 2,373,187.93 | 2,628,728.52 |
California | 0054204 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,445,756.13 | 4,855,133.33 |
California | 0054204 | Kings | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 354,243.87 | 386,866.67 |
California | 0054204 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 11,700.00 | 12,870.00 |
California | 0054204 | Kings | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 1,300.00 | 1,430.00 |
California | 0055156 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 25,584,400.00 |
California | 0055156 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,150,000.00 |
California | 0056338 | San Joaquin | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 45,931,673.00 | 46,141,673.00 |
California | 0056338 | San Joaquin | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 6,889,751.00 | 6,921,251.00 |
California | 0056338 | San Joaquin | >= 200,000 | State | INTERSTATE MAINTENANCE | Training | 15,120.00 | 15,120.00 |
California | 0056338 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 6,900,207.00 | 6,900,207.00 |
California | 0056338 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,591,749.00 | 3,591,749.00 |
California | 0056349 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 34,850,600.00 |
California | 0056349 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 4,140,700.00 |
California | 0056349 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 260,131,500.00 |
California | 0056349 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 34,570,000.00 |
California | 0056349 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 630,100.00 |
California | 0056349 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 32,800.00 |
California | 0058337 | Shasta | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | 131,904,723.43 | 131,904,723.43 |
California | 0058337 | Shasta | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 35,267,400.00 | 35,267,400.00 |
California | 0058337 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 13,015,000.00 | 13,015,000.00 |
California | 0058337 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 5,962,600.00 | 5,962,600.00 |
California | 0058355 | Shasta | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 3,523,209.00 | 3,523,209.00 |
California | 0058355 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 15,863,111.52 | 29,428,511.52 |
California | 0058355 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,809,000.00 | 5,809,000.00 |
California | 0058355 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 744,500.00 | 744,500.00 |
California | 0058355 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 12,600.00 | 12,600.00 |
California | 0058355 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 1,820,179.48 | 1,820,179.48 |
California | 0058355 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 2,688,000.00 | 2,688,000.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 34,965,196.00 | 35,290,196.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | 6,177,833.00 | 6,177,833.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | 22,034,804.00 | 22,034,804.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 8,700,000.00 | 8,700,000.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 3,553,725.00 | 7,259,204.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 20,296,750.00 | 40,751,100.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 1,939,493.00 | 3,641,567.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 75,911.00 | 82,900.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 9,543,585.00 | 16,586,196.00 |
California | 0058359 | Shasta | >= 50,000 AND < | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 4,550,000.00 | 9,100,000.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 930,992.00 | 1,016,700.00 |
California | 0058359 | Shasta | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 13,864.00 | 18,500.00 |
California | 0059177 | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 62,314,100.00 | 62,445,500.00 |
California | 0059177 | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,610,000.00 | 7,610,000.00 |
California | 0059177 | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 48,500.00 | 48,500.00 |
California | 0059177 | Siskiyou | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 19,000.00 | 19,000.00 |
California | 0081329 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 37,997,900.00 |
California | 0081329 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,724,000.00 |
California | 0081329 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 15,100.00 |
California | 0082109 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 82,369,000.00 | 83,142,800.00 |
California | 0082109 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 14,920,000.00 | 14,920,000.00 |
California | 0082109 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 26,800.00 | 26,800.00 |
California | 0082110 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 44,502,100.00 | 45,044,200.00 |
California | 0082110 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,050,000.00 | 7,050,000.00 |
California | 0082110 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 19,200.00 | 19,200.00 |
California | 0082112 | Imperial | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 17,377,000.00 |
California | 0082112 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 9,434,360.26 |
California | 0082112 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,000,000.00 |
California | 0082112 | Imperial | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 16,800.00 |
California | 0089001 | Statewide | N/A | N/A | ADVANCE CONSTRUCTION NON - I | 4R - Maintenance Resurfacing | 0.00 | 37,250,104.00 |
California | 0101820 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 34,744,384.00 | 114,585,783.00 |
California | 0101820 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,395,616.00 | 43,223,068.00 |
California | 0101820 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 57,200.00 |
California | 0101829 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 28,385,500.00 | 34,471,500.00 |
California | 0101829 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 45,430,700.00 | 194,698,300.00 |
California | 0101829 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 60,700.00 | 60,700.00 |
California | 0101840 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 31,459,400.00 | 31,904,600.00 |
California | 0101840 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,024,000.00 | 7,024,000.00 |
California | 0101840 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 826,900.00 | 826,900.00 |
California | 0101840 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 4,200.00 | 4,200.00 |
California | 0101844 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 30,009,600.00 | 33,037,000.00 |
California | 0101844 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,629,400.00 | 5,055,660.00 |
California | 0101844 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 12,200.00 | 13,400.00 |
California | 0101855 | Los Angeles | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 2,954,270.38 | 3,226,242.64 |
California | 0101855 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 45,526,729.62 | 50,348,057.36 |
California | 0101855 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,732,100.00 | 8,444,000.00 |
California | 0101855 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 14,300.00 | 15,700.00 |
California | 0102266 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 15,365,283.21 | 31,030,166.42 |
California | 0102266 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,610,000.00 | 5,220,000.00 |
California | 0102266 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 5,400.00 | 10,900.00 |
California | 0102266 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 164,016.79 | 328,033.58 |
California | 0102268 | San Bernardino | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 104,292,088.43 | 117,804,234.42 |
California | 0102268 | Los Angeles | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 23,695.57 | 26,765.58 |
California | 0102268 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 11,559.10 |
California | 0102268 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 50,875,440.90 |
California | 0102269 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 7,260,508.76 | 8,201,184.52 |
California | 0102269 | Los Angeles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 10,460.24 | 11,815.48 |
California | 0102269 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 49,200,117.21 | 98,400,234.42 |
California | 0102269 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 70,882.79 | 141,765.58 |
California | 0102269 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,912.47 | 15,824.94 |
California | 0102269 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,492,087.53 | 10,984,175.06 |
California | 0103110 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 202,637,500.00 |
California | 0103110 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 11,611,000.00 |
California | 0103110 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 35,300.00 |
California | 0103112 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 289,189,600.00 |
California | 0103112 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 37,509,000.00 |
California | 0103112 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 31,900.00 |
California | 0104064 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 33,310,000.00 | 56,760,364.00 |
California | 0151237 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 20,000,000.00 | 20,000,000.00 |
California | 0151237 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 64,158,700.00 | 68,425,700.00 |
California | 0151237 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 14,280,000.00 | 14,280,000.00 |
California | 0151237 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 12,600.00 | 12,600.00 |
California | 0153045 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,823,283.00 | 11,725,000.00 |
California | 0153045 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 21,870.00 | 21,870.00 |
California | 0153045 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Vehicle Weight Enforcement Program | 9,728,841.00 | 40,403,547.00 |
California | 0154208 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 28,082,306.62 | 31,128,140.89 |
California | 0154208 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 795,558.67 | 881,845.74 |
California | 0154208 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,012,211.97 | 4,381,623.55 |
California | 0154208 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 37,888.03 | 41,376.45 |
California | 0154208 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 7,390.63 | 8,168.59 |
California | 0154208 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 209.37 | 231.41 |
California | 0154208 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 13,549.59 | 14,796.98 |
California | 0154208 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 478,285.12 | 522,316.39 |
California | 0154210 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 58,444,000.00 |
California | 0154210 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 10,994,000.00 |
California | 0154210 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 26,000.00 |
California | 0155165 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 23,416,000.00 | 25,868,700.00 |
California | 0155165 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,053,814.50 | 3,335,000.00 |
California | 0155165 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 9,200.00 | 10,100.00 |
California | 0155166 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 18,321,197.00 | 20,468,963.76 |
California | 0155166 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,426,400.00 | 4,834,000.00 |
California | 0155166 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 11,500.00 | 12,600.00 |
California | 0155166 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 4,370,303.00 | 4,772,636.24 |
California | 0155167 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 148,172,900.00 |
California | 0155167 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 15,391,000.00 |
California | 0155167 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 51,300.00 |
California | 0155167 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 32,800.00 |
California | 0401084 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 4,974,000.00 | 4,974,000.00 |
California | 0401084 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 36,246,000.00 | 36,575,300.00 |
California | 0401084 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 800.00 | 800.00 |
California | 0801117 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 36,645,600.00 | 37,151,600.00 |
California | 0801117 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,498,400.00 | 5,500,000.00 |
California | 0801117 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 3,500.00 | 3,500.00 |
California | 0801120 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 0.00 | 24,225,500.00 |
California | 0801120 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 7,500,000.00 |
California | 0801121 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 25,440,900.00 |
California | 0801121 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,347,000.00 |
California | 0801121 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 15,100.00 |
California | 0802375 | Solano | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | 0.00 | 1,859,000.00 |
California | 0802375 | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 24,941,000.00 |
California | 0803235 | Placer | >= 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS | 4R - Added Capacity | 18,027,914.00 | 22,241,479.00 |
California | 0803235 | Placer | >= 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS | Construction Engineering | 404,086.00 | 3,304,086.00 |
California | 0803237 | Sacramento | >= 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS | 4R - Restoration & Rehabilitation | 56,028,625.00 | 56,733,175.00 |
California | 0803237 | Sacramento | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Construction Engineering | 3,850,624.20 | 3,850,624.20 |
California | 0803237 | Yolo | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Construction Engineering | 642,870.80 | 642,870.80 |
California | 0803237 | Sacramento | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 2,142,314.01 | 2,142,314.01 |
California | 0803237 | Yolo | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 357,685.99 | 357,685.99 |
California | 0803237 | Yolo | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 1,517,875.64 | 2,233,210.53 |
California | 0803237 | Sacramento | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 9,091,669.27 | 13,376,334.04 |
California | 0803237 | Sacramento | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Rail/Hwy Crossing | 0.00 | 1,575,000.00 |
California | 0803237 | Sacramento | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Traffic Management/Engineering - HOV | 0.00 | 46,243,852.00 |
California | 0803237 | Sacramento | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Training | 21,521.00 | 35,280.00 |
California | 0803243 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 26,319,167.00 | 26,363,167.00 |
California | 0803243 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,093,157.00 | 4,100,000.00 |
California | 0803243 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,460,000.00 | 3,460,000.00 |
California | 0803243 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 11,000.00 | 11,000.00 |
California | 0803243 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 3,520.00 | 3,520.00 |
California | 0803250 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 7,995,778.09 | 8,851,499.83 |
California | 0803250 | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 11,311,521.91 | 12,522,100.17 |
California | 0803250 | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,306,853.76 | 2,519,230.77 |
California | 0803250 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,630,646.24 | 1,780,769.23 |
California | 0803250 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 324,563.00 | 354,472.80 |
California | 0803250 | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 25,937.00 | 28,327.20 |
California | 0803250 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 20,094.20 | 22,038.80 |
California | 0803250 | Yolo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 1,605.80 | 1,761.20 |
California | 0804194 | Placer | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - No Added Capacity | 1,237,337.00 | 1,237,337.00 |
California | 0804194 | Placer | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | 3,368,384.39 | 3,368,384.39 |
California | 0804194 | Placer | >= 200,000 | N/A | INTERSTATE MAINT DISC | Right of Way | 1,581,615.61 | 1,581,615.61 |
California | 0804194 | Placer | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 7,718,572.00 | 7,718,572.00 |
California | 0804194 | Placer | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 8,695,900.00 | 8,700,000.00 |
California | 0804194 | Placer | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 570,000.00 | 570,000.00 |
California | 0804194 | Placer | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 40,000.00 | 40,000.00 |
California | 0804194 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 10,380,991.00 | 10,586,691.00 |
California | 0804194 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 10,100.00 | 10,100.00 |
California | 0804194 | Placer | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | 4R - No Added Capacity | 20,000,000.00 | 20,000,000.00 |
California | 0804207 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 6,452,298.00 | 7,108,277.08 |
California | 0804207 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 22,407,902.00 | 24,686,022.92 |
California | 0804207 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,316,362.52 | 1,437,560.24 |
California | 0804207 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,571,537.48 | 4,992,439.76 |
California | 0804207 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 14,286.28 | 15,683.84 |
California | 0804207 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 4,113.72 | 4,516.16 |
California | 0804213 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 3,699,600.00 |
California | 0804213 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 20,820,700.00 |
California | 0804213 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 6,700.00 |
California | 1101841 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 33,665,200.00 | 33,883,600.00 |
California | 1101841 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,740,000.00 | 5,740,000.00 |
California | 1101841 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 7,600.00 | 7,600.00 |
California | 1187011 | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 9,928,083.47 | 9,928,083.47 |
California | 1187011 | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 231,555,478.82 | 235,176,378.82 |
California | 1187011 | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 123,651,555.97 | 123,651,555.97 |
California | 1187011 | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 88,528,052.90 | 88,528,052.90 |
California | 1187011 | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | Construction Engineering | 34,800,000.00 | 34,800,000.00 |
California | 1187011 | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | Construction Engineering | 436,201.45 | 492,715.98 |
California | 1187011 | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | 7,518,664.73 | 8,061,799.73 |
California | 1187011 | San Mateo | >= 200,000 | N/A | EMERGENCY RELIEF | Training | 48,800.00 | 48,800.00 |
California | 1187011 | Los Angeles | >= 200,000 | State | EMERGENCY RELIEF(P.L.101-130) | 4R - Restoration & Rehabilitation | 2,122,380.00 | 2,122,380.00 |
California | 19FF004 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 0.00 | 21,283,500.00 |
California | 19FF004 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 4,600,000.00 |
California | 2012001 | San Diego | >= 200,000 | N/A | FREIGHT INTERMODAL GRANT PRG | 4R - Added Capacity | 300,000.00 | 100,146,000.00 |
California | 2056356 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 19,974,600.00 |
California | 2056356 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,562,000.00 |
California | 2056356 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 8,400.00 |
California | 2101823 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 128,275,983.00 | 133,127,983.00 |
California | 2101823 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 19,090,300.00 | 19,090,300.00 |
California | 2101823 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 24,360.00 | 24,360.00 |
California | 2101823 | Los Angeles | >= 200,000 | State | STRATEGIC HIGHWAY RESEARCH | 4R - Restoration & Rehabilitation | 250,000.00 | 250,000.00 |
California | 2151219 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 0.00 | 73,871,139.00 |
California | 2151219 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 0.00 | 60,866,668.00 |
California | 2151219 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | 0.00 | 405,300.00 |
California | 2151219 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 0.00 | 618,120.00 |
California | 2151219 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 0.00 | 30,067,337.00 |
California | 2151219 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 0.00 | 25,000.00 |
California | 27E8004 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 51,095,600.00 |
California | 27E8004 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 4,400.00 |
California | 2801150 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 21,457,122.00 | 23,846,234.00 |
California | 2801150 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,036,300.00 | 5,500,000.00 |
California | 2801150 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 7,800.00 | 8,600.00 |
California | 2801150 | Santa Clara | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | 26,901,678.00 | 29,378,266.00 |
California | 29R4006 | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 19,360,263.55 | 21,868,590.95 |
California | 29R4006 | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Construction Engineering | 3,718,259.99 | 4,200,000.00 |
California | 29R4006 | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Right of Way | 39,491.42 | 44,607.95 |
California | 29R4006 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 0.00 | 12,231,409.05 |
California | 29R4006 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 300,000.00 |
California | 29R4006 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 0.00 | 5,392.05 |
California | 31D0001 | Trinity | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 40,023,086.00 | 40,553,000.00 |
California | 31D0001 | Trinity | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Construction Engineering | 3,208,240.00 | 3,300,000.00 |
California | 31R0001 | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Bridge Replacement - No Added Capacity | 19,317,000.00 | 21,820,000.00 |
California | 31R0001 | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | 2,700,000.00 | 3,049,900.00 |
California | 31R0001 | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Right of Way | 699,300.00 | 790,000.00 |
California | 31RH001 | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | 1,428,550.68 | 1,476,300.33 |
California | 31RH001 | Monterey | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | 68,574.09 | 77,458.60 |
California | 31RH001 | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 0.00 | 84,086,200.00 |
California | 31RH001 | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 3,991,274.41 |
California | 31RH001 | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 0.00 | 1,186,300.00 |
California | 31RH001 | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 0.00 | 3,400,000.00 |
California | 31TC001 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 27,610,000.00 |
California | 31TC001 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,900,000.00 |
California | 31TC001 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 345,500.00 |
California | 31TC001 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 703,000.00 |
California | 31TN001 | Marin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 0.00 | 28,600,000.00 |
California | 31TN001 | Marin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 3,050,000.00 |
California | 37B3004 | Mendocino | >= 50,000 AND < 200,000 | N/A | EMERGENCY RELIEF | Construction Engineering | 10,367,253.60 | 11,813,266.21 |
California | 37B3004 | Mendocino | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | New Construction Roadway | 17,282,178.22 | 20,206,768.10 |
California | 37B3004 | Mendocino | >= 50,000 AND < 200,000 | N/A | EMERGENCY RELIEF | New Construction Roadway | 28,549,824.02 | 32,248,755.89 |
California | 37B3004 | Mendocino | >= 50,000 AND < 200,000 | N/A | EMERGENCY RELIEF | Training | 20,361.00 | 23,000.00 |
California | 37B3004 | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 9,674,772.27 | 10,928,241.58 |
California | 37B3004 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 0.00 | 14,324,991.65 |
California | 37Y0001 | Statewide | N/A | N/A | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 19,369,300.00 | 25,740,000.00 |
California | 37Y0001 | Statewide | N/A | N/A | EMERGENCY RELIEF | Construction Engineering | 2,868,100.00 | 3,862,500.00 |
California | 37Y0001 | Statewide | N/A | N/A | EMERGENCY RELIEF | Right of Way | 7,525.00 | 10,000.00 |
California | 4052986 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 55,846,374.34 | 1,879,966,554.92 |
California | 4052986 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 18,344,625.66 | 20,033,445.08 |
California | 4052999 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 54,756,000.00 |
California | 4052999 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 12,000,000.00 |
California | 4053015 | Los Angeles | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Construction Engineering | 5,000,000.00 | 5,000,000.00 |
California | 4053015 | Los Angeles | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Traffic Management/Engineering - HOV | 188,547,625.26 | 188,547,626.00 |
California | 4053015 | Los Angeles | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Traffic Management/Engineering - HOV | 18,781,000.00 | 20,509,993.00 |
California | 4053015 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 5,000,000.00 | 28,000,000.00 |
California | 4053015 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 5,100,000.00 | 585,160,100.00 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Bridge Rehabilitation - Added Capacity | 13,449,302.00 | 15,191,810.00 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | 5,989,652.54 | 9,205,975.00 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Traffic Management/Engineering - HOV | 31,133,796.23 | 47,215,556.76 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 8,583,267.00 | 9,695,321.00 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 22,992,227.00 | 26,702,183.00 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Traffic Management/Engineering - HOV | 45,443,931.39 | 74,611,944.00 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 16,997.00 | 19,200.00 |
California | 4053048 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 8,000,000.00 | 9,036,486.00 |
California | 4127001 | Statewide | N/A | N/A | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | 24,242,406.35 | 25,928,004.00 |
California | 4127001 | Statewide | N/A | N/A | EMERGENCY RELIEF | Construction Engineering | 2,295,231.16 | 3,186,530.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 4,040,000.00 | 5,050,000.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 400,000.00 | 500,000.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 2,200,000.00 | 2,750,000.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - Added Capacity | 13,076,189.00 | 14,770,348.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 13,727,972.21 | 101,157,261.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,886,844.00 | 16,334,368.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 680,000.00 | 850,000.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 132,795.00 | 150,000.00 |
California | 5004049 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 4,743,215.79 | 5,357,751.00 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | 18,503,075.00 | 22,448,413.00 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 2,714,560.00 | 4,069,806.50 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 2,568,082.06 | 3,210,103.00 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 5,434,238.03 | 6,138,299.98 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 20,985.52 | 26,232.00 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 1,410,932.42 | 1,763,665.00 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM | Right of Way | 165,258.97 | 186,670.02 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 2,984,818.00 | 5,433,071.99 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 729,821.00 | 824,375.97 |
California | 5006219 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,516,667.00 | 1,895,834.00 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 35,917,802.51 | 44,379,974.61 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 4,705,280.00 | 5,834,259.00 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 2,544,853.00 | 3,181,066.00 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 1,218,400.00 | 1,523,000.00 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 2,721,388.87 | 3,073,973.60 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 526,127.02 | 594,292.27 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 1,767,569.43 | 1,996,576.79 |
California | 5006221 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 252,666.15 | 285,401.73 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | 7,845,610.97 | 8,862,092.31 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 1,327,950.00 | 1,500,000.00 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | 29,128,327.00 | 32,902,211.00 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Construction Engineering | 3,559,313.00 | 4,020,460.00 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 1,134,400.00 | 1,418,000.00 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Right of Way | 8,645,240.25 | 9,765,311.48 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 2,400,000.00 | 3,000,000.00 |
California | 5006336 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,290,381.44 | 4,846,257.43 |
California | 5006664 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 17,706,000.00 | 20,000,000.00 |
California | 5006664 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 65,291,212.00 | 67,909,312.12 |
California | 5006664 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 4,577,975.00 | 8,507,400.00 |
California | 5006664 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 624,269.00 | 768,850.00 |
California | 5006664 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 4,452,625.00 | 5,029,510.00 |
California | 5006664 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 27,313,788.00 | 46,694,828.88 |
California | 5006811 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 25,893,786.00 | 29,605,000.00 |
California | 5006811 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,084,327.00 | 3,483,934.00 |
California | 5006831 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 22,859,510.00 | 25,821,202.00 |
California | 5006831 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,265,644.00 | 3,688,743.00 |
California | 5006839 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 325,944.91 | 368,174.53 |
California | 5006839 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 87,894,499.09 | 112,294,906.99 |
California | 5006839 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,000,000.00 | 13,777,894.94 |
California | 5006839 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 10,242,000.00 | 93,133,954.08 |
California | 5006839 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 10,789,123.46 |
California | 5006882 | Los Angeles | >= 200,000 | N/A | FAST ACT NATIONAL FREIGHT | Construction Engineering | 2,000.00 | 4,050,000.00 |
California | 5006882 | Los Angeles | >= 200,000 | N/A | FAST ACT NATIONAL FREIGHT | New Construction Roadway | 21,643,000.00 | 51,600,000.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 208,000.00 | 260,000.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 741,600.00 | 927,000.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM | Preliminary Engineering | 1,032,468.00 | 1,321,825.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 6,511,120.00 | 7,354,706.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,146,214.00 | 1,295,430.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 15,572,888.00 | 17,595,745.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,123,950.00 | 2,399,130.00 |
California | 5012037 | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 259,392.00 | 293,000.00 |
California | 5012085 | Alameda | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 0.00 | 7,067,125.00 |
California | 5012085 | Alameda | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 1,060,488.42 | 5,041,300.00 |
California | 5012085 | Alameda | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM (PLUS) | Bridge Replacement - No Added Capacity | 10,000,000.00 | 43,301,575.00 |
California | 5059230 | Stanislaus | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | 3,357,834.00 | 4,197,293.00 |
California | 5059230 | Stanislaus | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 3,395,081.00 | 4,243,851.00 |
California | 5059230 | Stanislaus | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | 9,000,000.00 | 11,250,000.00 |
California | 5059230 | Stanislaus | >= 200,000 | N/A | REPURPOSED SPECIAL | Right of Way | 132,800.00 | 166,000.00 |
California | 5059230 | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 4,135,256.00 | 8,263,680.00 |
California | 5059230 | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 2,081,000.00 | 5,239,942.00 |
California | 5060263 | Fresno | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 1,000.00 | 2,877,486.13 |
California | 5060263 | Fresno | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction | 15,923,620.00 | 22,488,761.05 |
California | 5060263 | Fresno | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Preliminary Engineering | 1,000,000.00 | 2,650,511.84 |
California | 5060384 | Fresno | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 0.00 | 9,023,058.00 |
California | 5060384 | Fresno | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | 10,540,582.00 | 50,128,100.00 |
California | 5068001 | Shasta | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | 56,489,875.00 | 65,155,759.00 |
California | 5068001 | Shasta | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 7,353,378.00 | 8,306,085.00 |
California | 5068001 | Shasta | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - Added Capacity | 48,000.00 | 60,000.00 |
California | 5068001 | Shasta | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 3,397,423.00 | 4,246,780.00 |
California | 5068001 | Shasta | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Right of Way | 320,000.00 | 400,000.00 |
California | 5068001 | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 8,467,009.00 | 9,564,000.00 |
California | 5068001 | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,900,631.00 | 4,406,000.00 |
California | 5104033 | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | 933,400.00 | 2,306,128.00 |
California | 5104033 | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Preliminary Engineering | 1,000,000.00 | 1,400,000.00 |
California | 5104033 | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Rail/Hwy Crossing | 4,353,992.00 | 22,747,855.61 |
California | 5104033 | Riverside | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Right of Way | 1,100,000.00 | 2,570,455.00 |
California | 5104033 | Riverside | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Rail/Hwy Crossing | 674,500.00 | 3,214,160.39 |
California | 5108137 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - | 88,529,900.00 | 603,034,003.00 |
California | 5108137 | Los Angeles | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 6,197,100.00 | 107,200,000.00 |
California | 5108137 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 18,814,000.00 | 21,251,553.00 |
California | 5108137 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 11,315,000.00 | 12,780,978.00 |
California | 5108137 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 48,259,000.00 | 144,133,466.00 |
California | 5108189 | Los Angeles | >= 200,000 | N/A | FAST ACT NATIONAL FREIGHT | Construction Engineering | 1,448,300.00 | 2,430,765.00 |
California | 5108189 | Los Angeles | >= 200,000 | N/A | FAST ACT NATIONAL FREIGHT | Other | 12,551,700.00 | 24,270,015.00 |
California | 5109106 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Other | 40,614,648.00 | 45,876,707.00 |
California | 5109106 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Preliminary Engineering | 60,830,983.00 | 68,712,282.00 |
California | 5109106 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Utilities | 7,020,000.00 | 7,020,000.00 |
California | 5109106 | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | 4,896,578.00 | 6,120,723.00 |
California | 5109200 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | 4R - Added Capacity | 10,786,138.36 | 29,888,227.76 |
California | 5109200 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Preliminary Engineering | 4,957,680.00 | 5,600,000.00 |
California | 5109200 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Right of Way | 7,619,554.34 | 8,606,748.67 |
California | 5109200 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Utilities | 177,060.00 | 200,000.00 |
California | 5109242 | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | 3,080,000.00 | 3,850,000.00 |
California | 5109242 | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Other | 1,200,000.00 | 32,699,100.00 |
California | 5109245 | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | 1,000.27 | 5,500,000.00 |
California | 5109245 | Kern | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Other | 11,121,638.38 | 53,133,355.00 |
California | 5109251 | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | 259,334.78 | 324,168.48 |
California | 5109251 | Kern | >= 200,000 | N/A | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | 50,000,000.00 | 62,500,000.00 |
California | 5109251 | Kern | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | 47,351,086.38 | 93,063,638.09 |
California | 5109251 | Kern | >= 200,000 | N/A | REPURPOSED EARMARKS EXEMPT | New Construction Roadway | 381.00 | 476.25 |
California | 5109251 | Kern | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | 64,593.62 | 80,742.03 |
California | 5109251 | Kern | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 44,068.32 | 55,085.40 |
California | 5133035 | Orange | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 990,391.00 | 3,485,190.66 |
California | 5133035 | Orange | >= 200,000 | N/A | CONGESTION AIR QUALITY | Other | 0.00 | 1,895,323.95 |
California | 5133035 | Orange | >= 200,000 | N/A | CONGESTION AIR QUALITY | Preliminary Engineering | 0.00 | 5,498,000.00 |
California | 5133035 | Orange | >= 200,000 | N/A | CONGESTION AIR QUALITY | Rail/Hwy Crossing | 6,602,609.00 | 20,507,954.00 |
California | 5133035 | Orange | >= 200,000 | N/A | CONGESTION AIR QUALITY | Right of Way | 10,397,841.70 | 11,852,255.37 |
California | 5133035 | Orange | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 10,823,317.46 | 14,579,950.66 |
California | 5133035 | Orange | >= 200,000 | N/A | SURFACE TRANS PRIORITIES S129 | Construction Engineering | 63,913.00 | 1,838,721.00 |
California | 5133035 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 834,391.00 | 2,946,459.38 |
California | 5133035 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 4,852,443.77 | 22,185,190.16 |
California | 5133035 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,317,468.49 | 5,317,299.34 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - Added Capacity | 3,919,346.00 | 3,919,346.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 44,732,475.00 | 44,910,343.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,727,254.00 | 5,749,937.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 192,914.00 | 217,908.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 166,168.00 | 166,168.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | 2,450,791.00 | 2,936,572.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | REPURPOSED SPECIAL | Construction Engineering | 313,783.91 | 367,585.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 11,912,993.00 | 12,654,027.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,015,730.00 | 2,119,501.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,826,283.00 | 4,322,019.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 1,564,810.00 | 1,564,810.00 |
California | 5163027 | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 120,000.00 | 120,000.00 |
California | 5166015 | Marin | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 1,306,238.04 | 1,632,797.55 |
California | 5166015 | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No | 25,284,772.92 | 29,250,683.86 |
California | 5166015 | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,270,875.54 | 3,798,152.27 |
California | 5166015 | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 148,561.96 | 185,702.45 |
California | 5166015 | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 73,796.08 | 83,357.14 |
California | 5166015 | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 187,111.46 | 211,353.73 |
California | 5166015 | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,133,200.00 | 2,666,500.00 |
California | 5203016 | San Diego | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 445,230.00 | 556,538.00 |
California | 5203016 | San Diego | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 265,590.00 | 300,000.00 |
California | 5203016 | San Diego | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 500,000.00 | 625,000.00 |
California | 5203016 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 14,445,743.00 | 16,705,333.00 |
California | 5203016 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,274,195.00 | 2,629,915.00 |
California | 5203016 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,120,362.00 | 3,900,453.00 |
California | 5203016 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 3,343,822.00 | 4,362,837.00 |
California | 5282017 | Riverside | >= 200,000 | N/A | BRIDGE REP & REHAB-15% OFF SYS | Preliminary Engineering | 173,991.00 | 237,500.00 |
California | 5282017 | Riverside | >= 200,000 | N/A | HIGHWAY BRIDGE PROGRAM | Preliminary Engineering | 80,000.00 | 100,000.00 |
California | 5282017 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 739,805.10 | 835,655.00 |
California | 5282017 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - | 0.00 | 21,835,023.00 |
California | 5282017 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 2,692,200.00 |
California | 5282017 | Riverside | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 622,365.00 | 703,000.00 |
California | 5282017 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 19,781.90 | 22,345.00 |
California | 5288046 | Sacramento | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 12,890,000.00 | 28,365,000.00 |
California | 5288046 | Sacramento | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,110,000.00 | 2,836,500.00 |
California | 5380028 | San Bernardino | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | 2,957,535.00 | 2,957,535.00 |
California | 5380028 | San Bernardino | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | New Construction Roadway | 8,627,382.00 | 9,745,151.03 |
California | 5380028 | San Bernardino | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | Preliminary Engineering | 230,000.00 | 230,000.00 |
California | 5380028 | San Bernardino | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | Right of Way | 760,000.00 | 1,922,710.00 |
California | 5380028 | San Bernardino | >= 200,000 | N/A | REPURPOSED SPECIAL | Construction Engineering | 5,000.00 | 6,126,359.40 |
California | 5380028 | San Bernardino | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | 4,214,198.07 | 5,643,798.07 |
California | 5380028 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 8,902,586.00 | 20,132,854.95 |
California | 5381033 | San Diego | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 442,650.00 | 500,000.00 |
California | 5381033 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 25,974,990.00 |
California | 5381033 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,710,600.00 |
California | 5381033 | San Diego | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,505,010.00 | 1,700,000.00 |
California | 5381033 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 442,650.00 | 500,000.00 |
California | 5381033 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 442,650.00 | 500,000.00 |
California | 5459025 | Riverside | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 1,439,839.50 | 2,942,542.00 |
California | 5459025 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 12,976,000.00 | 24,328,831.50 |
California | 5464029 | Riverside | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Bridge Rehabilitation - Added Capacity | 9,999,452.00 | 26,437,922.00 |
California | 5801051 | Alameda | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 42,430,966.00 | 42,885,616.00 |
California | 5801051 | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 6,191,095.00 | 6,259,293.00 |
California | 5801051 | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Training | 21,000.00 | 21,000.00 |
California | 5801051 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,837,471.41 | 4,837,471.41 |
California | 5801054 | San Joaquin | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 1,862,890.64 | 8,729,884.77 |
California | 5801054 | Alameda | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 7,746,714.75 | 36,302,682.23 |
California | 5801054 | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 0.00 | 6,874,515.00 |
California | 5801055 | Alameda | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 12,404,356.26 | 60,716,847.67 |
California | 5801055 | Alameda | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 0.00 | 8,110,000.00 |
California | 5801076 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 34,455,400.00 | 38,034,900.00 |
California | 5801076 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,944,700.00 | 5,400,000.00 |
California | 5801076 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 10,600.00 | 11,600.00 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,720,000.00 | 2,150,000.00 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 464,328.57 | 524,487.00 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 386,294.06 | 482,867.57 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 25,110,327.00 | 38,791,737.00 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,664,944.00 | 6,398,898.00 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | 858,740.00 | 1,190,000.00 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 913,705.94 | 1,142,132.43 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 670,626.43 | 788,517.00 |
California | 5908031 | Tehama | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,236,800.00 | 1,546,000.00 |
California | 5912085 | Butte | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 2,832,960.00 | 3,200,000.00 |
California | 5912085 | Butte | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 354,120.00 | 400,000.00 |
California | 5912085 | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 15,509,662.00 | 20,696,250.00 |
California | 5912085 | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,390,310.00 | 2,700,000.00 |
California | 5912085 | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 132,795.00 | 150,000.00 |
California | 5912085 | Butte | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 44,265.00 | 50,000.00 |
California | 5925098 | El Dorado | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 15% OFF SYST | Preliminary Engineering | 2,000,000.00 | 2,000,000.00 |
California | 5925098 | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 0.00 | 62,040,000.00 |
California | 5925098 | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 8,460,000.00 |
California | 5925098 | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 6,000,000.00 | 6,000,000.00 |
California | 5925098 | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 664,000.00 | 664,000.00 |
California | 5925098 | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 150,000.00 | 150,000.00 |
California | 5929166 | San Joaquin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,928,106.00 | 2,410,132.00 |
California | 5929166 | San Joaquin | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 132,960.00 | 166,200.00 |
California | 5929166 | San Joaquin | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 905,174.00 | 1,131,468.00 |
California | 5929166 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 16,740,846.00 | 18,909,800.00 |
California | 5929166 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,944,258.00 | 3,325,718.00 |
California | 5934171 | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 8,608,440.00 | 21,038,599.00 |
California | 5934171 | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,173,878.00 | 2,868,900.00 |
California | 5934171 | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,334,068.00 | 1,976,396.00 |
California | 5934177 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 23,896,087.00 | 26,992,078.00 |
California | 5934177 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,584,413.00 | 4,048,812.00 |
California | 5934177 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 4,269,913.00 | 4,823,125.00 |
California | 5934177 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 309,855.00 | 350,000.00 |
California | 5934185 | San Francisco | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 15,000,000.00 | 115,000,000.00 |
California | 5934185 | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 2,366,000.00 | 29,035,403.00 |
California | 5934185 | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,000,000.00 | 47,073,483.00 |
California | 5938076 | Stanislaus | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,265,271.09 | 1,429,200.91 |
California | 5938076 | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 7,440,974.00 | 19,994,020.00 |
California | 5938076 | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,014,678.00 | 2,726,457.00 |
California | 5938076 | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 553,313.00 | 625,000.00 |
California | 5938076 | Stanislaus | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 442,650.00 | 504,243.00 |
California | 5938076 | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 167,143.91 | 188,799.18 |
California | 5938076 | Stanislaus | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 132,795.00 | 150,000.00 |
California | 5956221 | Riverside | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Rail/Hwy Crossing | 3,000,000.00 | 5,897,594.34 |
California | 5956221 | Riverside | >= 200,000 | N/A | REPURPOSED SPECIAL | Rail/Hwy Crossing | 3,239,641.00 | 6,368,695.66 |
California | 5956221 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 4,000,000.00 | 7,713,854.99 |
California | 5956221 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 14,226,995.00 | 27,968,345.97 |
California | 5956221 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 13,005.00 | 25,567.04 |
California | 5956230 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 13,005,000.00 | 14,689,936.00 |
California | 5956230 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,295,000.00 | 2,592,342.00 |
California | 5956230 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 5,311,800.00 | 6,000,000.00 |
California | 5956230 | Riverside | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,620,099.00 | 1,830,000.00 |
California | 5956230 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 0.00 | 38,667,564.00 |
California | 5956230 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 7,865,284.00 |
California | 5956230 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 458,585.00 | 518,000.00 |
California | 5956234 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 10,086,667.00 | 24,077,446.70 |
California | 5956234 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 4,533,403.00 | 10,820,516.30 |
California | 5956234 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 4,930.00 | 9,600.00 |
California | 5956235 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 6,601,720.00 | 27,240,045.00 |
California | 5956235 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 394,887.00 | 20,538,019.00 |
California | 5956235 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 5,252,248.00 | 9,500,000.00 |
California | 5956235 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 3,393.00 | 14,000.00 |
California | 5956262 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 8,000,000.00 | 35,127,620.00 |
California | 6003010 | San Francisco | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | 46,049,514.00 | 46,049,514.00 |
California | 6003010 | San Francisco | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Construction Engineering | 21,968,286.00 | 21,968,286.00 |
California | 6003010 | San Francisco | >= 200,000 | N/A | BRIDGE REPLAC & REHAB - DISC | Bridge Rehabilitation - No Added Capacity | 80,271,125.51 | 80,271,126.00 |
California | 6003010 | San Francisco | >= 200,000 | N/A | BRIDGE REPLAC & REHAB - DISC | Construction Engineering | 2,027,121.00 | 2,027,121.00 |
California | 6003010 | San Francisco | >= 200,000 | N/A | BRIDGE REPLAC & REHAB - DISC | Preliminary Engineering | 847,593.00 | 847,593.00 |
California | 6003010 | Marin | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge Rehabilitation - No Added Capacity | 506,812.49 | 3,570,156.49 |
California | 6003010 | San Francisco | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Bridge Rehabilitation - No Added Capacity | 25,096,077.00 | 25,096,077.00 |
California | 6003051 | Marin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | 3,941,091.12 | 6,057,293.96 |
California | 6003051 | Marin | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Bridge Rehabilitation - No Added Capacity | 38,963,134.00 | 58,747,833.00 |
California | 6003051 | Santa Clara | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 619,868.00 | 2,425,000.00 |
California | 6003051 | Marin | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 5,656,330.00 | 10,162,981.00 |
California | 6003051 | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 31,737,502.88 | 55,543,980.88 |
California | 6003051 | Marin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,461,847.00 | 14,249,675.00 |
California | 6003051 | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 34,939,290.00 | 49,824,678.18 |
California | 6003051 | Marin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,673,823.00 | 7,081,425.98 |
California | 6053122 | San Bernardino | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 359,960.00 | 359,960.00 |
California | 6053122 | San Bernardino | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | 1,637,883.64 | 21,354,992.00 |
California | 6053122 | San Bernardino | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 719,921.00 | 10,266,921.00 |
California | 6053122 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 5,310,040.00 | 8,021,540.00 |
California | 6053130 | Los Angeles | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 20,151,473.14 | 27,875,702.03 |
California | 6053130 | San Bernardino | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 59,771,262.86 | 82,643,713.75 |
California | 6053130 | San Bernardino | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | 25,213,507.06 | 45,057,268.26 |
California | 6053130 | Los Angeles | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | 8,548,492.94 | 15,276,404.74 |
California | 6053130 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 39,802,301.00 | 50,501,303.00 |
California | 6053130 | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 5,124,592.66 | 9,843,451.29 |
California | 6053130 | Los Angeles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,737,463.34 | 3,337,364.93 |
California | 6053130 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 13,497,700.00 | 48,872,373.00 |
California | 6053130 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 10,223,914.00 | 10,223,914.00 |
California | 6053130 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 23,096,826.00 | 25,830,038.00 |
California | 6054081 | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 55,000,000.00 | 184,148,505.00 |
California | 6054081 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 39,806,998.00 | 133,279,986.00 |
California | 6054081 | Riverside | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 3,611,954.00 | 24,435,306.00 |
California | 6054090 | Riverside | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | 45,401,000.00 | 109,133,000.00 |
California | 6065198 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 37,973,881.00 | 42,893,800.00 |
California | 6065198 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 54,626,119.00 | 61,703,512.00 |
California | 6065240 | Los Angeles | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | 35,000,000.00 | 518,596,550.00 |
California | 6065240 | Los Angeles | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | 12,000,000.00 | 15,000,000.00 |
California | 6065251 | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 1,514,517.93 | 1,514,517.93 |
California | 6065251 | Los Angeles | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | New Construction Roadway | 47,134,482.07 | 47,134,482.07 |
California | 6066104 | San Diego | >= 200,000 | N/A | REPURPOSED SPECIAL | Construction Engineering | 91,798.64 | 103,692.00 |
California | 6066104 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,483,379.00 | 4,157,308.00 |
California | 6066104 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 12,838,621.00 | 15,002,000.00 |
California | 6066104 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,413,824.00 | 9,111,000.00 |
California | 6071122 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 1,000.00 | 1,900,000,000.00 |
California | 6164023 | Riverside | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 18,655,000.00 | 33,009,000.00 |
California | 6202007 | Shasta | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | 839,440.00 | 30,298,000.00 |
California | 6203055 | Sutter | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | 5,448,000.00 | 32,041,000.00 |
California | 6203055 | Sutter | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 104,000.00 | 2,264,000.00 |
California | 6203055 | Kern | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 1,218,000.00 | 1,218,000.00 |
California | 6203055 | Kern | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | 3,230,000.00 | 3,230,000.00 |
California | 6203055 | Sutter | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 810,000.00 | 810,000.00 |
California | 6203058 | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 1,500,000.00 | 9,323,532.00 |
California | 6203058 | Kern | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 800,000.00 | 5,700,000.00 |
California | 6203058 | Kern | >= 200,000 | State | NAT'L COOR INF IM PROGRAM | 4R - Added Capacity | 4,530,000.00 | 28,157,068.00 |
California | 6203059 | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 1,450,000.00 | 34,750,000.00 |
California | 6203060 | Sacramento | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 1,500,000.00 | 1,500,000.00 |
California | 6203060 | Sacramento | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 3,641,900.00 | 28,238,902.12 |
California | 6203060 | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 194,274.00 | 194,274.00 |
California | 6203060 | El Dorado | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 755,726.00 | 755,726.00 |
California | 6204105 | Alameda | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Traffic Management/Engineering - HOV | 3,597,913.00 | 42,478,308.00 |
California | 6204105 | Alameda | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Traffic Management/Engineering - HOV | 2,589,846.00 | 30,576,692.00 |
California | 6204113 | San Mateo | >= 200,000 | N/A | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | 3,613,000.00 | 50,647,000.00 |
California | 6204117 | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 999,962.00 | 52,215,503.00 |
California | 6204120 | Sonoma | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 107,760.76 | 46,766,897.00 |
California | 6204120 | Sonoma | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | 20,084.49 | 8,719,103.00 |
California | 6204123 | San Francisco | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 34,000,000.00 | 34,000,000.00 |
California | 6204127 | Sonoma | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 691,382.11 | 864,227.64 |
California | 6204127 | Marin | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 108,617.89 | 135,772.36 |
California | 6204127 | Sonoma | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 7,778,048.78 | 9,722,560.98 |
California | 6204127 | Marin | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 1,221,951.22 | 1,527,439.02 |
California | 6204127 | Sonoma | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | 5,185,365.85 | 5,185,365.85 |
California | 6204127 | Marin | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | 814,634.15 | 814,634.15 |
California | 6204127 | Sonoma | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 16,400,000.00 | 20,118,000.00 |
California | 6204131 | Solano | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 63,464,510.00 | 178,700,000.00 |
California | 6204132 | Marin | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | 61,708,245.00 | 84,664,065.46 |
California | 6204132 | Sonoma | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Traffic Management/Engineering - HOV | 602,206.00 | 819,849.12 |
California | 6204132 | Contra Costa | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Traffic Management/Engineering - HOV | 1,745,875.00 | 2,376,851.23 |
California | 6204132 | San Francisco | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Traffic Management/Engineering - HOV | 2,878,677.00 | 3,919,058.92 |
California | 6204132 | Marin | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Traffic Management/Engineering - HOV | 5,464,085.00 | 7,438,858.54 |
California | 6204132 | Santa Clara | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Traffic Management/Engineering - HOV | 3,252,009.00 | 4,427,316.73 |
California | 6205010 | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 12,561,207.71 | 23,298,888.79 |
California | 6205010 | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 1,948,863.09 | 2,436,078.86 |
California | 6205015 | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | 1,132,000.00 | 61,561,000.00 |
California | 6205015 | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 745,410.47 | 933,534.42 |
California | 6205015 | San Luis Obispo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 600,000.00 | 750,000.00 |
California | 6205026 | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 3,098,688.99 | 127,191,000.00 |
California | 6205028 | Santa Cruz | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 1,640,000.00 | 28,110,000.00 |
California | 6205029 | San Benito | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 404,017.00 | 58,711,000.00 |
California | 6206010 | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 3,100,000.00 | 76,671,000.00 |
California | 6206010 | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 1,084,546.00 | 14,794,000.00 |
California | 6206010 | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 3,013,669.85 | 8,000,000.00 |
California | 6206011 | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 3,895,000.00 | 76,671,000.00 |
California | 6206011 | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 709,453.88 | 14,794,000.00 |
California | 6206011 | Tulare | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 1,298,890.69 | 8,000,000.00 |
California | 6206021 | San Luis Obispo | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 4,659,000.00 | 27,490,000.00 |
California | 6206021 | San Luis Obispo | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 1,600,000.00 | 5,560,000.00 |
California | 6206021 | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 3,050,000.00 | 5,180,000.00 |
California | 6206021 | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 6,092,000.00 | 8,742,000.00 |
California | 6206021 | Kern | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | 2,300,000.00 | 3,000,000.00 |
California | 6206025 | Fresno | >= 200,000 | N/A | REPURPOSED EARMARKS EXEMPT | New Construction Roadway | 1,061,148.70 | 29,402,328.00 |
California | 6206025 | Fresno | >= 200,000 | N/A | REPURPOSED SPECIAL | Construction Engineering | 775,170.00 | 1,198,170.00 |
California | 6206025 | Fresno | >= 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | 830,000.00 | 22,997,672.00 |
California | 6207028 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Preliminary Engineering | 2,530,977.66 | 3,013,977.66 |
California | 6207028 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 26,316,742.44 | 30,053,152.44 |
California | 6207028 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,280,088.76 | 3,745,678.76 |
California | 6207042 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Bridge New Construction | 40,000,000.00 | 111,810,000.00 |
California | 6207042 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Right of Way | 44,370,000.00 | 50,118,604.00 |
California | 6207042 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | 14,157,001.00 | 17,696,251.00 |
California | 6207046 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 4,499,156.20 | 23,921,834.00 |
California | 6207046 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 111,563,423.52 | 140,094,110.00 |
California | 6207055 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 6,807,200.00 | 7,689,145.00 |
California | 6207055 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 61,345,800.00 | 100,381,800.00 |
California | 6207055 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 4,553,000.00 | 5,143,000.00 |
California | 6207059 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 34,770,000.00 | 39,990,000.00 |
California | 6207059 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 81,776,051.00 | 117,876,051.00 |
California | 6207063 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 12,480,000.00 | 12,480,000.00 |
California | 6207063 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 4,750,000.00 | 4,750,000.00 |
California | 6207063 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 4,100,000.00 | 4,100,000.00 |
California | 6207063 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,800,000.00 | 3,800,000.00 |
California | 6207067 | Ventura | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 2,300,000.00 | 2,597,989.38 |
California | 6207067 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,888,000.00 | 7,285,000.00 |
California | 6207067 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 9,730,000.00 | 29,701,000.00 |
California | 6207067 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Construction Engineering | 99,915.00 | 99,915.00 |
California | 6207067 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | New Construction Roadway | 400,000.00 | 400,000.00 |
California | 6207068 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 15,975,000.00 | 25,768,000.00 |
California | 6207068 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 33,000,000.00 | 50,935,053.00 |
California | 6207068 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 47,139,000.00 | 48,010,947.00 |
California | 6207070 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 6,086,000.00 | 32,500,000.00 |
California | 6207070 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 148,634,000.00 | 190,384,000.00 |
California | 6207072 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 8,356,000.00 | 46,715,000.00 |
California | 6207072 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 23,212,000.00 | 278,325,000.00 |
California | 6207078 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | 4R - Added Capacity | 87,235,000.00 | 165,364,000.00 |
California | 6207078 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 12,844,000.00 | 34,534,000.00 |
California | 6208009 | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 30,101,635.23 | 129,924,035.23 |
California | 6208009 | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 9,556,499.77 | 30,727,999.77 |
California | 6208009 | Riverside | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | 18,138,815.00 | 20,489,534.00 |
California | 6208013 | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | 12,658,000.00 | 20,583,651.00 |
California | 6208013 | San Bernardino | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Traffic Management/Engineering - HOV | 4,975,000.00 | 19,756,232.00 |
California | 6208013 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 29,307,000.00 | 47,657,217.00 |
California | 6208016 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 59,323,000.00 | 225,528,000.00 |
California | 6208016 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 26,551,000.00 |
California | 6208016 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 6,385,000.00 | 6,580,000.00 |
California | 6208018 | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 3,283,000.00 | 17,431,000.00 |
California | 6208018 | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Preliminary Engineering | 10,844,000.00 | 10,844,000.00 |
California | 6208018 | San Bernardino | >= 200,000 | N/A | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | 30,744,000.00 | 152,116,000.00 |
California | 6208023 | San Bernardino | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 2,256,987.00 | 2,256,987.00 |
California | 6208023 | San Bernardino | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 557,000.00 | 657,000.00 |
California | 6208023 | San Bernardino | >= 200,000 | State | HIGHWAY PRIORITY PROJECTS | Preliminary Engineering | 1,980,000.00 | 1,980,000.00 |
California | 6208023 | San Bernardino | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | 1,710,000.00 | 1,710,000.00 |
California | 6208023 | San Bernardino | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Preliminary Engineering | 500,646.00 | 650,646.00 |
California | 6208023 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 4,265,240.00 | 50,967,799.00 |
California | 6208023 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 6,366,759.83 | 6,366,759.83 |
California | 6208023 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 909,454.00 | 909,454.00 |
California | 6208023 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 210,000.00 | 210,000.00 |
California | 6208029 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 3,637,000.00 | 74,690,000.00 |
California | 6208029 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 10,300,000.00 |
California | 6208032 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 21,000,000.00 | 59,096,287.00 |
California | 6208032 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 300,000.00 | 25,830,038.00 |
California | 6211073 | San Diego | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | New Construction Roadway | 0.00 | 73,498,982.00 |
California | 6211114 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 69,401,792.00 | 100,146,000.00 |
California | 6211114 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 13,598,208.00 | 17,300,000.00 |
California | 6211114 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,750,801.30 | 4,236,757.37 |
California | 6211119 | San Diego | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 1,599,999.50 | 8,329,032.61 |
California | 6211119 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 41,543,000.00 | 49,561,386.39 |
California | 6211119 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 6,404,000.00 | 11,473,296.00 |
California | 6211121 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,778,000.00 | 2,778,000.00 |
California | 6211121 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 13,511,000.00 | 14,301,210.06 |
California | 6211121 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 12,611,000.00 | 12,611,000.00 |
California | 6211121 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 1,852,000.00 | 1,852,000.00 |
California | 6211121 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 550,000.00 | 550,000.00 |
California | 6211126 | Imperial | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | 240,239.74 | 27,533,239.74 |
California | 6211126 | Imperial | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Other | 100,000.00 | 100,000.00 |
California | 6211126 | Imperial | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | 2,059,760.00 | 3,709,760.00 |
California | 6211131 | San Diego | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 9,423,107.00 | 9,423,107.00 |
California | 6211131 | San Diego | >= 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 102,764,802.00 | 102,764,802.00 |
California | 6211131 | Orange | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | New Construction Roadway | 60,626.00 | 60,626.00 |
California | 6211131 | San Diego | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | New Construction Roadway | 25,593,241.00 | 25,593,241.00 |
California | 6211131 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 9,730,000.00 | 27,730,000.00 |
California | 6211131 | San Diego | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 34,502,699.00 | 80,550,818.00 |
California | 6212018 | Orange | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | 1,130,000.00 | 6,976,172.00 |
California | 6212018 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 25,126,600.00 | 132,696,162.00 |
California | 6212018 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 774,600.00 | 4,282,303.00 |
California | 6212018 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 8,353,200.00 | 61,927,879.00 |
California | 6212018 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 745,600.00 | 50,307,000.00 |
California | 6212021 | Orange | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 6,433,000.00 | 56,111,000.00 |
California | 6212021 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 10,872,515.00 | 24,719,149.00 |
California | 6212021 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 2,542,485.00 | 6,979,851.00 |
California | 6212022 | Orange | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 5,554,363.00 | 24,674,580.00 |
California | 6212022 | Orange | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 2,367,000.00 | 4,691,394.00 |
California | 6212022 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 22,342,637.00 | 99,254,420.00 |
California | 6212022 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 9,522,000.00 | 18,872,606.00 |
California | 6212022 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,144,000.00 | 10,587,000.00 |
California | 6212024 | Orange | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 2,728,000.00 | 11,643,192.49 |
California | 6212024 | Orange | >= 200,000 | N/A | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 2,000,000.00 | 4,017,444.29 |
California | 6212024 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 23,036,000.00 | 98,318,395.22 |
California | 6212024 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 7,732,000.00 | 15,583,968.00 |
California | 6212024 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 6,312,533.00 | 12,886,280.00 |
California | 6212024 | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,106,467.00 | 7,367,720.00 |
California | 6212025 | Orange | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 26,695,000.00 | 26,695,000.00 |
California | 6212025 | Orange | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 2,900,000.00 | 6,140,000.00 |
California | 6212025 | Orange | >= 200,000 | State | CONGESTION AIR QUALITY | Training | 8,000.00 | 8,000.00 |
California | 6272023 | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | 1,074,868.00 | 1,214,128.00 |
California | 6272023 | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 6,197,100.00 | 7,000,000.00 |
California | 6272023 | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 885,300.00 | 1,000,000.00 |
California | 6272023 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 53,797,092.00 | 60,787,758.00 |
California | 6272023 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 13,736,445.00 | 15,516,147.00 |
California | 6272023 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 56,396.00 | 63,703.00 |
California | 6272047 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 31,925,339.00 |
California | 6272047 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,034,172.00 |
California | 6272047 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,629,730.00 | 5,600,000.00 |
California | 6303005 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | 2,559,999.98 | 4,032,999.98 |
California | 6303005 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | 12,438,565.00 | 15,548,206.00 |
California | 6303005 | Los Angeles | >= 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Right of Way | 2,397,435.00 | 2,996,794.00 |
California | 6303005 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,113,511.97 | 3,516,899.97 |
California | 6303005 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 18,001,799.00 | 22,283,111.00 |
California | 6303005 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 1,558,390.00 | 1,751,000.00 |
California | 6303030 | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Preliminary Engineering | 11,909,661.45 | 33,387,000.00 |
California | 6303030 | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Right of Way | 0.00 | 3,557,000.00 |
California | 6303030 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Bridge New Construction | 0.00 | 287,750,000.00 |
California | 6303030 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Construction Engineering | 0.00 | 48,850,000.00 |
California | 6303030 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Right of Way | 494,915.00 | 26,053,000.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | CONGESTION AIR QUALITY | Bridge New Construction | 6,347,000.00 | 6,347,000.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Bridge New Construction | 688,750.00 | 1,715,246.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 58,304.00 | 72,880.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Bridge New Construction | 2,097,265.00 | 39,467,969.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | 129,102.00 | 346,293.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | 932,000.00 | 4,706,000.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Bridge New Construction | 2,552,000.00 | 3,190,000.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Construction Engineering | 6,983,126.70 | 9,674,387.70 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 144,492.00 | 170,656.00 |
California | 6303032 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Bridge New Construction | 570,000.00 | 570,000.00 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 3,335,401.00 | 4,169,251.00 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 845,649.45 | 4,661,112.19 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Bridge New Construction | 1,094,681.00 | 1,368,351.25 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Bridge New Construction | 2,814,794.85 | 8,981,558.45 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Preliminary Engineering | 3,648,599.00 | 4,560,749.00 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | PROJ OF REG AND NAT'L SIGNIF | Right of Way | 400,848.00 | 2,209,423.18 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 57,450.00 | 71,812.50 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Right of Way | 1,348,770.00 | 1,348,770.00 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Rail/Hwy Crossing | 3,882,543.91 | 37,931,729.00 |
California | 6303039 | Los Angeles | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | 2,309,071.00 | 12,727,305.63 |
California | 6480017 | Alameda | >= 200,000 | N/A | REPURPOSED SPECIAL | Other | 21,364.11 | 26,705.14 |
California | 6480017 | Alameda | >= 200,000 | N/A | SURFACE TRANS RESEARCH-TEA21 | Construction Engineering | 2,696.48 | 4,717,499.88 |
California | 6480017 | Alameda | >= 200,000 | N/A | SURFACE TRANS RESEARCH-TEA21 | Other | 9,717,303.52 | 23,818,644.09 |
California | 6507003 | San Bernardino | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Right of Way | 287.42 | 324.66 |
California | 6507003 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 117,844,686.00 |
California | 6507003 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 10,431,009.00 |
California | 6507003 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 11,113,891.00 | 24,051,774.00 |
California | 6507003 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 17,100,016.99 | 68,320,470.22 |
California | 6507003 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 3,910,786.00 |
California | 6507003 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,457.59 | 5,035.12 |
California | 6507011 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 9,729,613.00 | 10,379,613.00 |
California | 6507011 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 12,841,343.00 | 23,059,278.00 |
California | 6801079 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 28,596,100.00 | 120,664,000.00 |
California | 6801079 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,200,000.00 | 24,514,000.00 |
California | 6801081 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 7,906,800.00 | 8,072,400.00 |
California | 6801081 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 14,508,400.00 | 14,844,500.00 |
California | 6801081 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,000,000.00 | 5,000,000.00 |
California | 6801082 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 14,754,600.00 | 76,272,100.00 |
California | 6801082 | Contra Costa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 4,600.00 | 23,800.00 |
California | 6801946 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 65,955,200.00 |
California | 6801946 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 9,400,000.00 |
California | 6801946 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 8,800.00 |
California | 7101807 | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | 32,960,000.00 | 37,230,318.00 |
California | 7101807 | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 15,000,000.00 | 16,943,410.00 |
California | 7101807 | Los Angeles | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - Added Capacity | 43,000,000.00 | 48,571,106.00 |
California | 7101807 | Los Angeles | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | 220,000,000.00 | 632,646,925.00 |
California | 7101807 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 16,945,500.00 | 19,140,969.00 |
California | 7101807 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 66,397,500.00 | 82,000,000.00 |
California | 7101809 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 32,364,306.34 | 32,364,306.34 |
California | 7101809 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 748,003.28 | 748,003.28 |
California | 7101809 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 98,424,274.54 | 98,820,274.54 |
California | 7101809 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 42,436,432.36 | 42,495,832.36 |
California | 7101809 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Training | 51,040.00 | 51,040.00 |
California | 7101839 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 90,544,500.00 | 91,077,100.00 |
California | 7101839 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 21,300,000.00 | 21,300,000.00 |
California | 7101839 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 1,023,000.00 | 1,023,000.00 |
California | 7101839 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 34,300.00 | 34,300.00 |
California | 8051640 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 0.00 | 20,172,000.00 |
California | 8051640 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,023,000.00 |
California | 8051640 | San Diego | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 14,100.00 |
California | 8801053 | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 0.00 | 26,877,505.00 |
California | 8801053 | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - Added Capacity | 0.00 | 19,113,075.00 |
California | 8801053 | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 0.00 | 6,570,080.00 |
California | 8801053 | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 0.00 | 10,287,000.00 |
California | 8801053 | Santa Clara | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 0.00 | 8,613,000.00 |
California | 8801070 | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 61,332,927.00 | 62,128,557.00 |
California | 8801070 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 950,000.00 | 950,000.00 |
California | 8801070 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 16,200,000.00 | 16,238,235.00 |
California | 8801070 | Alameda | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 14,960.00 | 14,960.00 |
California | 8801074 | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 6,477,224.09 | 9,997,527.67 |
California | 8801074 | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 35,230,376.53 | 57,941,706.26 |
California | 8801074 | Alameda | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 9,900.00 | 16,700.00 |
California | 8801081 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 54,728,300.00 | 57,056,400.00 |
California | 8801081 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,200,000.00 | 7,600,000.00 |
California | 8801081 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 7,000.00 | 7,000.00 |
California | A905019 | San Diego | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Added Capacity | 66,056,815.62 | 66,880,369.62 |
California | A905019 | San Diego | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Construction Engineering | 7,567,000.00 | 7,567,000.00 |
California | A905019 | San Diego | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Training | 30,464.00 | 30,464.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,959,788.00 | 2,213,700.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 21,528,035.00 | 25,889,267.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,630,119.00 | 5,230,001.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,589,107.00 | 1,794,993.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 249,655.00 | 282,000.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 88,530.00 | 100,000.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 17,706.00 | 20,000.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 177,060.00 | 200,000.00 |
California | E2CA018 | Placer | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Preliminary Engineering | 991,307.00 | 991,307.00 |
California | ERI8005 | Merced | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 0.00 | 22,706,400.00 |
California | ERI8005 | Merced | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 8,000,000.00 |
California | ERI8005 | Merced | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 0.00 | 10,600.00 |
California | NBIL512 | Santa Barbara | >= 200,000 | N/A | BRIDGE PROGRAM - 15% OFF SYST | Special Bridge | 1,685,000.00 | 1,685,000.00 |
California | NBIL512 | Santa Barbara | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 0.00 | 20,410,300.00 |
California | NBIL512 | Santa Barbara | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 2,965,000.00 |
California | NBIL512 | Santa Barbara | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 600,000.00 | 600,000.00 |
California | NBIL512 | Santa Barbara | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | 300,000.00 | 300,000.00 |
California | NBIS017 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Inspection and Bridge Related Training | 33,000,000.00 | 33,000,000.00 |
California | NBIS018 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Inspection and Bridge Related Training | 34,664,063.22 | 39,155,240.00 |
California | P001529 | Mendocino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | 9,913,977.00 | 14,377,939.00 |
California | P001529 | Mendocino | >= 50,000 AND < | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | 1,487,095.00 | 2,156,690.00 |
California | P001529 | Mendocino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Training | 12,040.00 | 13,600.00 |
California | P001529 | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 3,092,058.00 | 33,392,667.00 |
California | P001529 | Mendocino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 4,434,379.00 | 5,008,900.00 |
California | P001590 | San Luis Obispo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 22,838,100.00 | 23,022,900.00 |
California | P001590 | San Luis Obispo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 7,878,000.00 | 7,878,000.00 |
California | P001590 | San Luis Obispo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 7,600.00 | 7,600.00 |
California | P001649 | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 19,367,100.00 | 21,972,200.00 |
California | P001649 | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 2,387,800.00 | 4,875,800.00 |
California | P001649 | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,315,887.03 | 3,261,900.04 |
California | P001649 | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 4,000.00 | 5,000.00 |
California | P001662 | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 21,699,400.00 | 24,974,000.00 |
California | P001662 | Monterey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,969,200.00 | 3,354,000.00 |
California | P001675 | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 27,990,400.00 |
California | P001675 | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,872,000.00 |
California | P001675 | Santa Cruz | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 7,600.00 |
California | P012106 | Napa | >= 50,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 12,008,124.00 | 30,526,124.00 |
California | P012106 | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 8,500,000.00 | 8,500,000.00 |
California | P012106 | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 1,876.00 | 7,560.00 |
California | P012107 | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,110,555.00 | 6,923,989.00 |
California | P012107 | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 5,830,414.00 | 36,350,941.00 |
California | P012107 | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 166,583.00 | 1,038,599.00 |
California | P012107 | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 874,563.00 | 5,452,642.00 |
California | P012107 | Napa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 485.00 | 2,957.00 |
California | P012107 | Solano | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 2,546.00 | 15,523.00 |
California | P012112 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 5,500,000.00 | 5,500,000.00 |
California | P012112 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 32,261,800.00 | 32,431,900.00 |
California | P012112 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 6,647,200.00 | 6,715,900.00 |
California | P012112 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,228,162.00 | 6,261,000.00 |
California | P012112 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,776,000.00 | 2,776,000.00 |
California | P012112 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 15,960.00 | 15,960.00 |
California | P014081 | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 40,396,600.00 | 46,174,900.00 |
California | P014081 | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 4,205,100.00 | 4,750,000.00 |
California | P014081 | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 14,800.00 | 16,800.00 |
California | P017117 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 52,828,000.00 |
California | P017117 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,900,000.00 |
California | P017117 | Santa Clara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 5,500.00 |
California | P020184 | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 18,764,200.00 | 21,350,900.00 |
California | P020184 | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 1,682,200.00 | 1,900,200.00 |
California | P020184 | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,647,000.00 | 2,990,000.00 |
California | P020184 | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 4,500.00 | 5,100.00 |
California | P020189 | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 6,300,000.00 | 7,000,000.00 |
California | P020189 | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 33,582,600.00 | 37,834,900.00 |
California | P020189 | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 18,100.00 | 20,200.00 |
California | P020191 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 5,303,800.00 | 5,991,000.00 |
California | P020191 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,092,300.00 | 6,900,000.00 |
California | P020191 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 29,257,600.00 | 33,595,700.00 |
California | P020191 | Yuba | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 11,800.00 | 13,400.00 |
California | P020196 | Nevada | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 38,785,600.00 |
California | P020196 | Nevada | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 0.00 | 16,800.00 |
California | P020196 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 5,401,400.00 |
California | P020196 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 940,000.00 |
California | P020196 | Nevada | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 4,200.00 |
California | P020198 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 0.00 | 29,415,000.00 |
California | P020198 | Mendocino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 7,534,000.00 |
California | P023041 | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.00 | 76,596,400.00 |
California | P023041 | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 14,721,000.00 |
California | P023041 | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 0.00 | 25,200.00 |
California | P024029 | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 4,991,807.00 | 5,638,549.00 |
California | P024029 | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 31,552,443.00 | 35,640,397.00 |
California | P024029 | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 4,732,866.00 | 5,346,059.00 |
California | P024029 | Contra Costa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 7,790.00 | 9,300.00 |
California | P029148 | Lake | >= 50,000 AND < | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 7,226,100.00 | 8,029,000.00 |
California | P029148 | Lake | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 11,400.00 | 12,700.00 |
California | P029148 | Lake | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 18,837,100.00 | 21,429,400.00 |
California | P029148 | Lake | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,991,000.00 | 2,249,000.00 |
California | P029148 | Lake | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 6,600.00 | 7,500.00 |
California | P047010 | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 198,081,915.27 | 198,081,915.27 |
California | P047010 | Los Angeles | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 33,515,357.00 | 33,515,357.00 |
California | P047010 | Los Angeles | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | 9,185,186.73 | 9,185,186.73 |
California | P047010 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 21,179,264.00 | 21,179,264.00 |
California | P047010 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 5,000,000.00 | 5,000,000.00 |
California | P047010 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 35,726,551.36 | 35,726,551.36 |
California | P047010 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 56,176,030.00 | 56,286,030.00 |
California | P047010 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 9,758,091.64 | 9,774,591.64 |
California | P047010 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Rail/Hwy Crossing | 26,400.00 | 26,400.00 |
California | P047010 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Training | 10,560.00 | 10,560.00 |
California | P049177 | Placer | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 3,942.28 | 4,453.04 |
California | P049177 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 26,672,257.72 | 30,700,346.96 |
California | P049177 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,806,700.00 | 4,300,000.00 |
California | P049177 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 11,100.00 | 12,600.00 |
California | P050139 | El Dorado | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 11,308,500.00 | 11,450,000.00 |
California | P050139 | El Dorado | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 16,707,412.52 | 17,291,112.52 |
California | P050139 | El Dorado | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 20,200.00 | 20,200.00 |
California | P050139 | El Dorado | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | 13,332,287.48 | 13,332,287.48 |
California | P050152 | El Dorado | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 5,220,000.00 | 7,300,000.00 |
California | P050152 | El Dorado | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 19,498,900.00 | 25,715,000.00 |
California | P050152 | El Dorado | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 11,600.00 | 16,200.00 |
California | P050152 | El Dorado | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 2,190,800.00 | 2,505,500.00 |
California | P050152 | El Dorado | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 424,900.00 | 480,000.00 |
California | P050152 | El Dorado | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 1,900.00 | 2,200.00 |
California | P050154 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 50,000,000.00 | 396,892,300.00 |
California | P050154 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,496,300.00 | 36,800,000.00 |
California | P050154 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 793,200.00 |
California | P050154 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 60,700.00 |
California | P057067 | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 37,003,847.00 | 41,798,087.00 |
California | P057067 | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | 3,921,192.00 | 4,429,224.00 |
California | P057067 | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 14,164,800.00 | 16,000,000.00 |
California | P057067 | Orange | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | 19,573.00 | 22,109.00 |
California | P057067 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 7,273,635.00 | 8,763,315.00 |
California | P057067 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 760,805.00 | 859,375.00 |
California | P057067 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 3,798.00 | 4,290.00 |
California | P057069 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 67,097,600.00 |
California | P057069 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 13,000,000.00 |
California | P057069 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 22,700.00 |
California | P058119 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 124,506,420.00 | 125,020,920.00 |
California | P058119 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 13,980,000.00 | 13,980,000.00 |
California | P058119 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 810,000.00 | 810,000.00 |
California | P058119 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 16,800.00 | 16,800.00 |
California | P058126 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 35,504,200.00 | 35,731,200.00 |
California | P058126 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,875,100.00 | 3,875,100.00 |
California | P058126 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 21,800.00 | 21,800.00 |
California | P058127 | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge New Construction | 19,764,115.00 | 19,764,115.00 |
California | P058127 | San Bernardino | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | New Construction Roadway | 97,897,600.00 | 97,897,600.00 |
California | P058127 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 5,646,085.00 | 5,646,085.00 |
California | P058127 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 20,000,000.00 | 20,000,000.00 |
California | P058127 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 48,662,262.24 | 49,261,662.24 |
California | P058127 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 2,595,000.00 | 2,595,000.00 |
California | P058127 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 22,200.00 | 22,200.00 |
California | P058127 | San Bernardino | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | 13,188,337.76 | 13,188,337.76 |
California | P058128 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 24,461,300.00 | 24,967,400.00 |
California | P058128 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,055,000.00 | 4,055,000.00 |
California | P060153 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 21,284,200.00 |
California | P060153 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 4,742,000.00 |
California | P060153 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 15,100.00 |
California | P060154 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 11,522,700.00 | 65,119,500.00 |
California | P060154 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 13,450,000.00 | 15,192,600.00 |
California | P060154 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 15,503,300.00 | 17,512,000.00 |
California | P060154 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 9,400.00 | 52,500.00 |
California | P060154 | Riverside | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 21,635,000.00 | 24,038,900.00 |
California | P060155 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 103,983,654.93 |
California | P060155 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 46,733,345.07 |
California | P060155 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 7,888,815.42 |
California | P060155 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,552,184.58 |
California | P060159 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 24,610,800.00 |
California | P060159 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 2,077,900.00 |
California | P060159 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,100,000.00 |
California | P060159 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 17,600.00 |
California | P062046 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 1,471,708.08 |
California | P062046 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 23,879,191.92 |
California | P062046 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 4,658,000.00 |
California | P062046 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 2,401.68 |
California | P062046 | Riverside | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 98.32 |
California | P065108 | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 3,100,000.00 | 3,100,000.00 |
California | P065108 | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Rail/Hwy Crossing | 98,800.00 | 176,400.00 |
California | P065108 | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 17,676,800.00 | 17,876,200.00 |
California | P065108 | Placer | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 15,000.00 | 15,000.00 |
California | P065108 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 2,583,100.00 | 19,405,300.00 |
California | P065108 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,000,000.00 | 2,600,000.00 |
California | P065108 | Placer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 6,900.00 | 7,700.00 |
California | P070094 | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 62,505,283.00 | 70,623,755.00 |
California | P070094 | Yuba | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 6,945,031.00 | 7,847,084.00 |
California | P070094 | Yuba | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,041,754.00 | 1,177,063.00 |
California | P070094 | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 9,375,791.00 | 10,593,563.00 |
California | P070094 | Sutter | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 10,836.00 | 12,240.00 |
California | P070094 | Yuba | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 1,204.00 | 1,360.00 |
California | P070137 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 39,320,500.00 | 45,014,700.00 |
California | P070137 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,134,700.00 | 5,800,000.00 |
California | P070137 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 27,500.00 | 31,100.00 |
California | P070143 | Butte | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 0.00 | 3,200,000.00 |
California | P070143 | Butte | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 28,544,000.00 |
California | P070143 | Butte | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 0.00 | 11,600.00 |
California | P070143 | Butte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 14,554,600.00 |
California | P070143 | Butte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 2,200,000.00 |
California | P070143 | Butte | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 7,800.00 |
California | P070144 | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 0.00 | 9,030,000.00 |
California | P070144 | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 75,303,600.00 |
California | P070144 | Yuba | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 0.00 | 6,700.00 |
California | P070144 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 21,168,500.00 |
California | P070144 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,200,000.00 |
California | P070144 | Yuba | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 2,000.00 |
California | P074067 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 4,227,120.00 | 4,696,800.00 |
California | P074067 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 20,785,400.00 | 23,432,400.00 |
California | P074067 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 1,500.00 | 1,700.00 |
California | P074071 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 55,259.55 | 61,399.50 |
California | P074071 | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 6,070,140.45 | 6,744,600.50 |
California | P074071 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 177,128.41 | 201,394.12 |
California | P074071 | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 19,457,171.59 | 22,122,705.88 |
California | P074071 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 56.83 | 63.15 |
California | P074071 | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 6,243.17 | 6,936.85 |
California | P084042 | Alameda | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 13,151,900.00 | 13,151,900.00 |
California | P084042 | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 25,996,700.00 | 32,079,200.00 |
California | P084042 | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 7,550,000.00 | 8,005,000.00 |
California | P084042 | Alameda | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 10,400.00 | 12,800.00 |
California | P084054 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 17,677,000.00 | 20,506,800.00 |
California | P084054 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,160,900.00 | 4,700,000.00 |
California | P084054 | Alameda | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 13,200.00 | 15,000.00 |
California | P089102 | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 40,609,738.00 | 41,688,838.00 |
California | P089102 | El Dorado | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,757,012.57 | 2,757,012.57 |
California | P089102 | Alpine | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 9,662.43 | 9,662.43 |
California | P089102 | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 6,091,460.00 | 6,253,325.00 |
California | P089102 | Placer | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 4,400.00 | 4,400.00 |
California | P099629 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 8,421,400.00 | 17,219,400.00 |
California | P099629 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 3,530,600.00 | 7,061,300.00 |
California | P099629 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,028,500.00 | 4,057,000.00 |
California | P099629 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 500.00 | 1,100.00 |
California | P099629 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 4,600.00 | 9,200.00 |
California | P099635 | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 51,638,100.00 | 58,408,400.00 |
California | P099635 | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,639,700.00 | 7,500,000.00 |
California | P099635 | Madera | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 15,400.00 | 17,500.00 |
California | P099636 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 4,147,000.00 | 8,442,700.00 |
California | P099636 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 49,342,900.00 | 56,179,000.00 |
California | P099636 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,353,500.00 | 6,700,000.00 |
California | P099636 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 16,300.00 | 20,100.00 |
California | P099637 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 31,781,900.00 | 36,142,700.00 |
California | P099637 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,187,000.00 | 3,600,000.00 |
California | P099637 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 8,900.00 | 10,100.00 |
California | P099639 | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 22,146,722.95 | 25,440,002.51 |
California | P099639 | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 21,677.05 | 24,900.49 |
California | P099639 | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | 2,063.23 | 2,330.61 |
California | P099639 | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | 2,107,936.77 | 2,381,105.39 |
California | P099639 | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Rail/Hwy Crossing | 210.92 | 238.40 |
California | P099639 | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Rail/Hwy Crossing | 215,489.08 | 243,561.60 |
California | P099639 | Stanislaus | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | 10.27 | 11.67 |
California | P099639 | Merced | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | 10,489.73 | 11,918.33 |
California | P099639 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 840,976.86 | 6,649,988.04 |
California | P099639 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 823.14 | 6,508.96 |
California | P099639 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 79,721.97 | 631,745.66 |
California | P099639 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 78.03 | 618.34 |
California | P099639 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,727,851.21 | 6,336,797.59 |
California | P099639 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,648.79 | 6,202.41 |
California | P099639 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 8,092.08 | 64,636.73 |
California | P099639 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 7.92 | 63.27 |
California | P099639 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 299.71 | 3,166.90 |
California | P099639 | Stanislaus | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.29 | 3.10 |
California | P099644 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 30,978,300.00 | 35,405,000.00 |
California | P099644 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,426,500.00 | 5,000,000.00 |
California | P099644 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 13,300.00 | 15,100.00 |
California | P099646 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 1,268,200.00 | 60,985,200.00 |
California | P099646 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 27,900.00 | 1,330,600.00 |
California | P099646 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 100,000.00 | 10,000,000.00 |
California | P099646 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 500.00 | 24,400.00 |
California | P099654 | Sutter | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 594,000.00 | 660,000.00 |
California | P099654 | Sutter | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 3,505,900.00 | 4,154,400.00 |
California | P099654 | Sutter | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 10,700.00 | 11,900.00 |
California | P099654 | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 17,386,000.00 | 27,697,200.00 |
California | P099654 | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,327,900.00 | 1,604,000.00 |
California | P099654 | Sutter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 18,600.00 | 35,600.00 |
California | P099660 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 49,118,800.00 | 56,117,700.00 |
California | P099660 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,046,200.00 | 5,700,000.00 |
California | P099660 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 11,800.00 | 13,400.00 |
California | P099662 | Merced | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Restoration & Rehabilitation | 2,243,381.00 | 2,534,035.00 |
California | P099662 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 43,311,419.00 | 49,174,965.00 |
California | P099662 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 9,207,100.00 | 10,400,000.00 |
California | P099662 | Merced | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 13,300.00 | 15,100.00 |
California | P099663 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 67,650,500.00 |
California | P099663 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,500,000.00 |
California | P099663 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 8,400.00 |
California | P099665 | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 39,344,000.00 | 44,958,500.00 |
California | P099665 | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 9,203,800.00 | 10,396,400.00 |
California | P099665 | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 10,623,600.00 | 12,000,000.00 |
California | P099665 | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 18,600.00 | 21,100.00 |
California | P099666 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 60,948,400.00 | 69,551,900.00 |
California | P099666 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 800,600.00 | 904,400.00 |
California | P099666 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 9,738,300.00 | 11,000,000.00 |
California | P099666 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 22,500.00 | 25,500.00 |
California | P099669 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 45,185,500.00 | 51,362,200.00 |
California | P099669 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,134,700.00 | 5,800,000.00 |
California | P099669 | Sacramento | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 9,600.00 | 10,900.00 |
California | P118065 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 22,274,500.00 | 22,476,900.00 |
California | P118065 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,148,559.13 | 4,148,559.13 |
California | P118065 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,440.87 | 1,440.87 |
California | P118065 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 7,000.00 | 7,000.00 |
California | P132050 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 26,427,392.00 | 26,864,200.00 |
California | P132050 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,334,000.00 | 3,334,000.00 |
California | P132050 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 12,600.00 | 12,600.00 |
California | P134040 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 38,037,000.00 |
California | P134040 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,735,000.00 |
California | P134040 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 13,600.00 |
California | P138049 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 52,433,368.00 | 52,958,368.00 |
California | P138049 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 7,054,000.00 | 7,054,000.00 |
California | P138049 | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,646,000.00 | 3,646,000.00 |
California | P138049 | San Bernardino | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 20,160.00 | 20,160.00 |
California | P138055 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 7,986,900.00 | 7,986,900.00 |
California | P138055 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 14,577,700.00 | 24,974,700.00 |
California | P138055 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 14,300.00 | 14,300.00 |
California | P162041 | Glenn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 88,456,300.00 |
California | P162041 | Glenn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 10,000,000.00 |
California | P162041 | Glenn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 31,700.00 |
California | P198077 | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 22,784,900.00 | 23,058,400.00 |
California | P198077 | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,700,000.00 | 3,700,000.00 |
California | P198077 | Tulare | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 6,700.00 | 6,700.00 |
California | P210016 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 21,728,300.00 | 120,270,185.00 |
California | P210016 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 25,986,500.00 | 29,353,400.00 |
California | P210016 | San Bernardino | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 49,800.00 | 56,316.00 |
California | P299185 | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 29,942,322.00 | 30,876,262.00 |
California | P299185 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 7,345,260.00 | 7,345,260.00 |
California | P299185 | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,700,000.00 | 5,700,000.00 |
California | P299185 | Shasta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,000,000.00 | 2,000,000.00 |
California | P299185 | Shasta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 10,920.00 | 10,920.00 |
California | P395236 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 3,780,318.00 | 3,825,678.00 |
California | P395236 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 27,631,640.00 | 28,203,640.00 |
California | P395236 | San Bernardino | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 3,360.00 | 3,360.00 |
California | P395276 | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 9,547,000.00 | 31,613,553.00 |
California | P395348 | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 80,380,100.00 |
California | P395348 | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 2,715,700.00 |
California | P395348 | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 9,850,000.00 |
California | P395348 | Inyo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 20,200.00 |
California | Q101153 | San Francisco | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | 90,349,207.78 | 113,636,207.78 |
California | Q101153 | Santa Clara | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | 795,847.43 | 795,847.43 |
California | Q101153 | Sonoma | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | 84,147.23 | 84,147.23 |
California | Q101153 | San Francisco | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Construction Engineering | 15,228,790.22 | 20,064,268.22 |
California | Q101153 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & | 15,251,053.02 | 25,251,053.02 |
California | Q101153 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 865,283.90 | 865,283.90 |
California | Q101237 | Los Angeles | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 2,028,983.00 | 2,028,983.00 |
California | Q101237 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 8,939,565.00 | 49,173,749.00 |
California | Q101237 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 9,000,000.00 | 9,000,000.00 |
California | Q101237 | San Mateo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 21,000.00 | 21,000.00 |
California | Q101247 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 56,649,100.39 | 56,858,100.39 |
California | Q101247 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,550,000.00 | 6,550,000.00 |
California | Q101261 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 28,440,331.02 | 28,763,830.00 |
California | Q101261 | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 17,226,350.98 | 17,419,052.00 |
California | Q101261 | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,402,048.24 | 4,402,048.24 |
California | Q101261 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,347,951.76 | 7,347,951.76 |
California | Q101261 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 7,144.30 | 7,144.30 |
California | Q101261 | Marin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 4,255.70 | 4,255.70 |
California | Q101261 | Marin | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | 6,662,393.01 | 6,662,393.01 |
California | Q101261 | Sonoma | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | 11,184,565.99 | 11,184,565.99 |
California | Q101290 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & | 26,387,000.00 | 48,401,800.00 |
California | Q101290 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 1,327,000.00 | 1,499,000.00 |
California | Q101290 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 11,958,700.00 | 13,508,100.00 |
California | Q101290 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 15,152,600.00 | 17,158,600.00 |
California | Q101290 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 20,800.00 | 23,500.00 |
California | Q101306 | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 24,277,219.74 | 24,573,547.50 |
California | Q101306 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 24,149,780.26 | 24,444,552.50 |
California | Q101306 | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 5,944,300.00 | 5,944,300.00 |
California | Q101306 | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 3,975,700.00 | 3,975,700.00 |
California | Q101306 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,388,977.21 | 5,389,741.47 |
California | Q101306 | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,009,622.79 | 6,010,258.53 |
California | Q101306 | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 51,234.47 | 51,234.47 |
California | Q101306 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 50,965.53 | 50,965.53 |
California | Q101306 | San Luis Obispo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 6,316.58 | 6,316.58 |
California | Q101306 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 6,283.42 | 6,283.42 |
California | Q101338 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 54,240,600.00 | 61,489,100.00 |
California | Q101338 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No | 11,961,700.00 | 24,385,400.00 |
California | Q101338 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 12,493,000.00 | 16,851,000.00 |
California | Q101338 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 2,966,700.00 | 2,999,700.00 |
California | Q101338 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 19,100.00 | 23,700.00 |
California | Q101342 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 36,085,100.00 | 41,241,000.00 |
California | Q101342 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,479,100.00 | 6,189,000.00 |
California | Q101342 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 6,700.00 | 7,600.00 |
California | Q101348 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 19,621,969.55 | 22,334,670.00 |
California | Q101348 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,318,900.00 | 3,749,000.00 |
California | Q101348 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 10,400.00 | 11,800.00 |
California | Q101348 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 4,546,130.45 | 5,135,130.00 |
California | Q101350 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 24,246,500.00 | 27,530,200.00 |
California | Q101350 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,328,249.00 | 2,630,000.00 |
California | Q101350 | Monterey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 3,700.00 | 4,200.00 |
California | Q101353 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 17,867,300.00 |
California | Q101353 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 72,381,200.00 |
California | Q101353 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 14,000,000.00 |
California | Q101353 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 484,000.00 |
California | Q101353 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 17,600.00 |
California | Q101363 | Los Angeles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 6,500,000.00 | 6,500,000.00 |
California | Q101363 | Los Angeles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 37,308,000.00 | 37,616,400.00 |
California | Q101363 | Los Angeles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 14,300.00 | 14,300.00 |
California | Q101365 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 78,927,100.00 |
California | Q101365 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 8,968,000.00 |
California | Q101365 | Sonoma | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 7,900.00 |
California | Q101366 | San Francisco | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Rehabilitation - No Added Capacity | 12,265,254.00 | 13,854,348.00 |
California | Q101366 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 0.00 | 25,529,452.00 |
California | Q101366 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,775,000.00 |
California | Q101366 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 11,400.00 |
California | Q101373 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 36,397,122.60 | 83,205,831.10 |
California | Q101373 | Santa Barbara | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 2,850,554.69 | 6,758,345.42 |
California | Q101373 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 8,888,400.00 | 18,470,000.00 |
California | Q101373 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 11,523.06 | 25,176.00 |
California | Q101379 | San Francisco | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 2,700,000.00 | 3,000,000.00 |
California | Q101379 | San Francisco | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 19,905,300.00 | 22,353,500.00 |
California | Q101379 | San Francisco | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 7,100.00 | 7,900.00 |
California | Q101381 | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 30,562,700.00 | 98,496,500.00 |
California | Q101381 | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 0.00 | 8,263,819.74 |
California | Q101381 | Ventura | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 0.00 | 1,971,280.26 |
California | Q101381 | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 9,286,700.00 | 18,430,000.00 |
California | Q101381 | Santa Barbara | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 8,200.00 | 29,400.00 |
California | Q101385 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 32,469,100.00 | 36,927,900.00 |
California | Q101385 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,612,800.00 | 6,340,000.00 |
California | Q101385 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 17,000.00 | 19,300.00 |
California | Q101389 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 0.00 | 30,993,100.00 |
California | Q101389 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 7,500,000.00 |
California | Q101394 | Humboldt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 0.00 | 49,450,100.00 |
California | Q101394 | Humboldt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 9,252,000.00 |
California | Q101394 | Humboldt | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 0.00 | 18,900.00 |
California | Q101395 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 162,285,900.00 |
California | Q101395 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 31,315,000.00 |
California | Q101395 | Santa Barbara | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 31,100.00 |
California | Q101398 | Del Norte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 0.00 | 64,677,000.00 |
California | Q101398 | Del Norte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 13,355,000.00 |
California | Q101399 | Humboldt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 29,801,000.00 |
California | Q101399 | Humboldt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 4,499,000.00 |
California | S036115 | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 26,615,300.00 | 30,273,500.00 |
California | S036115 | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 3,389,400.00 | 3,864,400.00 |
California | S036115 | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,275,500.00 | 3,700,000.00 |
California | S036115 | Lassen | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 14,800.00 | 16,800.00 |
California | S074071 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 5,223,600.00 | 5,804,000.00 |
California | S074071 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 40,170,600.00 | 45,264,100.00 |
California | S074071 | Riverside | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | 18,900.00 | 21,000.00 |
California | S087026 | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 0.00 | 11,680,166.00 |
California | S087026 | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 0.00 | 12,774,925.00 |
California | S087026 | Santa Clara | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 0.00 | 3,493,583.00 |
California | S180059 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 23,888,500.00 | 47,827,100.00 |
California | S180059 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 3,682,124.87 | 4,159,200.00 |
California | S180059 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 718,000.00 | 811,100.00 |
California | S180059 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,993,800.00 | 7,900,000.00 |
California | S180059 | Fresno | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 21,000.00 | 23,800.00 |
California | S180059 | Fresno | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge New Construction | 3,970,875.13 | 4,485,400.00 |
California | X023033 | Humboldt | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 22,416,620.00 | 25,320,932.00 |
California | X023033 | Humboldt | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 3,362,493.00 | 3,798,139.00 |
California | X023033 | Humboldt | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | 18,320,467.00 | 20,694,078.00 |
California | X023033 | Humboldt | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | 2,748,069.00 | 3,104,111.00 |
California | X023033 | Humboldt | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Training | 10,411.00 | 11,760.00 |
California | X029126 | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 24,444,800.00 | 24,843,200.00 |
California | X029126 | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,400,000.00 | 3,400,000.00 |
California | X029126 | Kern | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 8,400.00 | 8,400.00 |
California | X029141 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 15,017,000.00 |
California | X029141 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 21,637,400.00 |
California | X029141 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,850,000.00 |
California | X029141 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 17,600.00 |
California | X029143 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 31,298,409.09 | 63,531,809.09 |
California | X029143 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 1,575,900.00 | 3,151,900.00 |
California | X029143 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,500,000.00 | 11,000,000.00 |
California | X029143 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 137,500.00 | 275,000.00 |
California | X029143 | Kern | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 9,700.00 | 19,400.00 |
California | X029143 | Kern | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 560,383.00 | 1,120,766.00 |
California | X029143 | Kern | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | 2,322,907.91 | 4,645,824.91 |
California | X029144 | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 20,239,200.00 | 43,118,030.00 |
California | X029144 | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge New Construction | 4,749,800.00 | 9,995,325.00 |
California | X029144 | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 1,000.00 | 5,500,000.00 |
California | X029144 | Kern | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Training | 10,000.00 | 20,000.00 |
California | X029147 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 22,680,000.00 |
California | X029147 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 163,947,411.00 |
California | X029147 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 52,000.00 |
California | X037165 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 12,545,389.77 | 29,958,582.00 |
California | X037165 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,100,898.84 | 8,076,714.00 |
California | X037165 | Ventura | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.88 | 20,160.00 |
California | X037169 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 25,000,000.00 | 25,000,000.00 |
California | X037169 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,750,000.00 | 3,750,000.00 |
California | X037199 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 19,051,600.00 | 19,326,100.00 |
California | X037199 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,594,000.00 | 6,594,000.00 |
California | X037199 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 10,600.00 | 10,600.00 |
California | X037204 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,374,200.00 | 5,374,200.00 |
California | X037204 | Los Angeles | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | 23,670,000.00 | 23,670,000.00 |
California | X037211 | Los Angeles | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Restoration & Rehabilitation | 32,810,097.00 | 37,060,993.00 |
California | X037211 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 107,830,284.00 |
California | X037211 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 30,000,000.00 |
California | X037211 | Los Angeles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 35,200.00 |
California | X037211 | Los Angeles | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - Restoration & Rehabilitation | 100,000.00 | 125,000.00 |
California | X037218 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,426,500.00 | 5,000,000.00 |
California | X037218 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 29,476,300.00 | 33,598,000.00 |
California | X037218 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 13,200.00 | 15,000.00 |
California | X059083 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 4,715,000.00 |
California | X059083 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 20,445,400.00 |
California | X059083 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 10,900.00 |
California | X071063 | San Bernardino | >= 200,000 | N/A | INTERSTATE MAINT DISC | 4R - Added Capacity | 3,341,000.00 | 3,773,862.00 |
California | X071063 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 102,459,000.00 | 230,189,188.00 |
California | X071063 | San Bernardino | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 26,551,000.00 | 29,990,964.00 |
California | X071063 | San Bernardino | >= 200,000 | N/A | PUBLIC LANDS - BEGINNING FY 83 | 4R - Added Capacity | 2,000,000.00 | 2,259,122.00 |
California | X071071 | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,682,800.00 | 4,160,000.00 |
California | X071071 | San Bernardino | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 20,365,000.00 | 23,330,700.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 27,317,594.00 | 31,406,879.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 4,097,637.00 | 4,711,030.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 1,359,485.00 | 1,535,621.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 12,156,466.00 | 13,731,464.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,257,264.00 | 1,420,156.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 24,547,337.00 | 37,340,605.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 6,690,315.00 | 7,557,117.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 4,685,642.00 | 6,734,655.00 |
California | X075027 | San Francisco | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 12,642.00 | 14,280.00 |
California | X075041 | San Francisco | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 16,166,539.31 | 16,166,539.31 |
California | X075041 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 137,636,910.13 | 163,473,522.91 |
California | X075041 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 34,536,176.72 | 551,688,774.78 |
California | X075046 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 133,252,688.00 | 144,933,200.00 |
California | X075046 | San Francisco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 8,000,000.00 | 8,000,000.00 |
California | X075046 | Contra Costa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 12,205,219.20 | 13,539,469.35 |
California | X075046 | Santa Clara | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 2,794,780.80 | 3,100,300.65 |
California | X077014 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 63,917,305.00 | 79,617,179.00 |
California | X077014 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 8,948,421.00 | 11,146,400.00 |
California | X077014 | San Joaquin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 13,279.00 | 15,000.00 |
California | X077023 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 29,688,600.00 | 29,846,100.00 |
California | X077023 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,489,000.00 | 4,489,000.00 |
California | X077023 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 18,500.00 | 18,500.00 |
California | X077028 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 0.00 | 32,614,800.00 |
California | X077028 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,082,000.00 |
California | X077028 | San Joaquin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 16,000.00 |
California | X095025 | Solano | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 7,868,780.00 | 15,386,643.00 |
California | X095025 | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 11,700,364.97 | 38,069,427.00 |
California | X095025 | Solano | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 828.21 | 8,460,936.00 |
California | X095025 | Solano | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | 0.00 | 42,000.00 |
California | X099645 | Stanislaus | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 0.00 | 105,688,441.00 |
California | X099645 | Stanislaus | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 8,313,559.00 |
California | X099645 | Stanislaus | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | 0.00 | 47,200.00 |