U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Colorado

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Colorado 007A034 PR SH7 Flood Repairs CP1 41,663,135.00 42,543,792.00
Colorado 0131057 SH13 GarCo RioBlanco Hill 1,737,757.00 32,017,123.00
Colorado 0171105 SH 17 MP 84.5 to US 285&SH 17 Widening 11,672,402.00 32,772,294.00
Colorado 0212011 CO21 RESEARCH INTERCHANGE CONSTRUCTION 17,379,387.00 38,574,619.00
Colorado 0252475 I25 SOUTH OF CASTLE ROCK TO MONUMENT-ADD LANES, RECONSTRUCT BRIDGES AND UPGRADE DRAINAGE FACILITIES 0.00 77,218,402.00
Colorado 0252476 I-25 SOUTH GAP PACKAGE 2 68,500,235.00 149,797,342.00
Colorado 0252477 I-25 SOUTH GAP PACKAGE 3 2,534,896.00 174,847,324.00
Colorado 0253234 I-25: 120th Avenue (SH 128) to SH 7 51,478,431.00 71,074,322.00
Colorado 0253255 I-25 North: SH 402 to SH 14 156,097,164.00 451,527,198.36
Colorado 0253268 I-25 SEG3A RE-PKG 120TH TO E470 18,873,673.00 28,992,063.00
Colorado 025A019 I25A PUEBLO ILEX DB - BE 693,322.00 59,912,091.58
Colorado 0343041 US 34 Resurfacing Ft Morgan to Brush 22,037,670.00 29,776,918.00
Colorado 050A034 US50A Pueblo West Purcell Interchange wi 3,259,537.00 47,089,862.00
Colorado 0703445 I-70 WESTBOUND PEAK PERIOD SHOULDER LANE 28,292,877.00 85,988,632.05
Colorado 0704241 CENTRAL 70 50,000,000.00 926,923,969.61
Colorado 0852106 US-85 Louviers To MP 191.75 12,072,363.00 28,050,297.00
Colorado 0853107 Peckham Grade Separated Intersection 12,227,703.00 43,805,414.00
Colorado 119A065 PR SH 119A Boulder Canyon 26,426,759.00 26,871,935.00
Colorado 1211086 WADS BLVD WIDENING:35TH AVE TO 48TH AVE 15,779,546.00 63,610,964.00
Colorado 2873172 FEDERAL BLVD:6TH TO HOWARD RECONSTRUCT - 18,881,866.00 27,828,091.00
Colorado 4701124 C-470 TOLLED EXPRESS LANES SEGMENT 1 21,974,944.00 306,792,044.00
Colorado 5501029 US 550/160 CONNECTION SOUTH DESIGN-BUILD 15,051,084.50 106,605,715.50
Colorado C100038 ILIFF AVE OP IMP:PARKER RD-QUEBEC ST- Ar 2,744,454.00 27,668,212.10
Colorado GBLD001 BUILD Vehicle Tech, Safety & Mobility 20,009,700.00 38,722,660.00
Colorado GBLD002 BUILD: North Interstate 25 Phase 2 23,405,620.00 272,044,228.00
Colorado GBLD003 BUILD MAMS Improvement Project 18,350,003.00 136,444,461.49
Colorado R200266 R2B2 (REGION 2 BRIDGE BUNDLE) (GRANT) 12,475,000.00 56,879,300.00
Colorado SW01498 HPTE US 36 Phase II to Foothills Blvd 14,403,946.00 137,152,364.64