Colorado | 007A034 | Boulder | >= 200,000 | State | EMERGENCY RELIEF | 4R - No Added Capacity | 41,663,135.00 | 42,543,792.00 |
Colorado | 0131057 | Garfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,737,757.00 | 3,017,123.00 |
Colorado | 0131057 | Garfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 0.00 | 29,000,000.00 |
Colorado | 0171105 | Saguache | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 9,884,927.11 | 28,632,550.93 |
Colorado | 0171105 | Alamosa | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 1,202,362.89 | 3,482,748.66 |
Colorado | 0171105 | Alamosa | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 63,452.56 | 64,556.64 |
Colorado | 0171105 | Saguache | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 521,659.44 | 530,736.36 |
Colorado | 0171105 | Alamosa | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 6,691.22 |
Colorado | 0171105 | Saguache | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 55,010.19 |
Colorado | 0212011 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | 309,387.00 | 309,387.00 |
Colorado | 0212011 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | 17,070,000.00 | 17,070,000.00 |
Colorado | 0212011 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 21,195,232.00 |
Colorado | 0252475 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 67,466,248.63 |
Colorado | 0252475 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 9,752,153.37 |
Colorado | 0252476 | El Paso | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 1,173,008.96 | 8,310,157.57 |
Colorado | 0252476 | Douglas | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 2,327,226.04 | 16,487,184.43 |
Colorado | 0252476 | Douglas | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | 43,217,010.45 | 83,109,635.48 |
Colorado | 0252476 | El Paso | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | 21,782,989.55 | 41,890,364.52 |
Colorado | 0252477 | Douglas | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 650,000.00 | 712,641.16 |
Colorado | 0252477 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,884,896.00 | 174,134,682.84 |
Colorado | 0253234 | Weld | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 1,702,545.04 | 2,128,181.28 |
Colorado | 0253234 | Adams | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 747,462.14 | 934,327.70 |
Colorado | 0253234 | Broomfield | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 368,996.82 | 461,246.02 |
Colorado | 0253234 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 25,344,761.46 | 35,404,626.33 |
Colorado | 0253234 | Broomfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 5,493,033.26 | 7,673,332.82 |
Colorado | 0253234 | Adams | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 11,127,018.28 | 15,543,564.10 |
Colorado | 0253234 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 371,617.50 | 464,521.85 |
Colorado | 0253234 | Broomfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 297,294.00 | 371,617.52 |
Colorado | 0253234 | Adams | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 74,323.50 | 92,904.38 |
Colorado | 0253234 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,594,351.35 | 4,831,621.50 |
Colorado | 0253234 | Adams | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,578,014.95 | 2,121,209.17 |
Colorado | 0253234 | Broomfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 779,012.70 | 1,047,169.33 |
Colorado | 0253255 | Larimer | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 3,640,000.00 | 238,852,019.61 |
Colorado | 0253255 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 125,875,871.00 | 157,344,838.75 |
Colorado | 0253255 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 4,611,293.00 | 5,857,565.00 |
Colorado | 0253255 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | 21,970,000.00 | 49,472,775.00 |
Colorado | 0253268 | Adams | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Rehabilitation - No Added Capacity | 437,340.00 | 546,675.00 |
Colorado | 0253268 | Broomfield | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 78,637.42 | 98,296.77 |
Colorado | 0253268 | Adams | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 5,102,358.58 | 6,377,948.23 |
Colorado | 0253268 | Broomfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 3,578.45 | 4,473.06 |
Colorado | 0253268 | Adams | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 232,186.55 | 290,233.19 |
Colorado | 0253268 | Adams | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 13,019,572.00 | 21,674,436.75 |
Colorado | 025A019 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 693,322.00 | 59,912,091.58 |
Colorado | 025A024 | Pueblo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 163,381.00 | 179,126.19 |
Colorado | 025A024 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 9,789,890.00 | 40,844,229.81 |
Colorado | 0343041 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 19,418,645.00 | 27,122,810.00 |
Colorado | 0343041 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,846,525.00 | 1,881,608.00 |
Colorado | 0343041 | Morgan | >= 5,000 AND < 50,000 | State | TRANSP ALTERNATIVES MAP-21 | 4R - Restoration & Rehabilitation | 772,500.00 | 772,500.00 |
Colorado | 050A034 | Pueblo | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Maintenance Resurfacing | 1,010,228.00 | 5,597,553.99 |
Colorado | 050A034 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 1,460,867.00 | 8,066,631.70 |
Colorado | 050A034 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 100.00 | 1,860,698.49 |
Colorado | 050A034 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 7.00 | 2,747.00 |
Colorado | 050A034 | Pueblo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 788,335.00 | 31,562,230.82 |
Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | 23,103,837.00 | 78,606,810.93 |
Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 359,415.00 | 1,239,362.07 |
Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 4,829,625.00 | 6,142,459.05 |
Colorado | 0704241 | Adams | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 14,316,380.45 | 265,403,923.92 |
Colorado | 0704241 | Denver | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 35,683,619.55 | 661,520,045.69 |
Colorado | 0852106 | Douglas | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 6,100,000.00 | 10,586,469.24 |
Colorado | 0852106 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 5,972,363.00 | 17,463,827.76 |
Colorado | 0853107 | Weld | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | 1,963,334.00 | 1,963,334.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Right of Way | 268,316.00 | 268,317.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Utilities | 16,770.00 | 671,350.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 756,902.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 24,693,804.67 |
Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 168,655.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | 90,499.00 | 340,499.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | 295,948.00 | 503,239.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | 6,917,839.00 | 11,674,883.33 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Right of Way | 395,333.00 | 395,333.00 |
Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Utilities | 2,279,664.00 | 2,369,097.00 |
Colorado | 119A065 | Boulder | >= 200,000 | State | EMERGENCY RELIEF | 4R - No Added Capacity | 23,820,887.00 | 24,202,943.00 |
Colorado | 119A065 | Boulder | >= 200,000 | State | EMERGENCY RELIEF | Other | 27,750.00 | 27,750.00 |
Colorado | 119A065 | Boulder | >= 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | 2,578,122.00 | 2,641,242.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 0.00 | 7,807,017.04 |
Colorado | 1211086 | Jefferson | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | 0.00 | 15,616,376.43 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | 3,360,000.00 | 3,360,000.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 1,209,068.92 |
Colorado | 1211086 | Jefferson | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 2,418,500.61 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 11,072,320.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | 1,142,145.00 | 1,427,681.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,777,401.00 | 5,700,000.00 |
Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 7,500,000.00 | 15,000,000.00 |
Colorado | 2873172 | Denver | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 9,491,852.00 | 13,702,510.75 |
Colorado | 2873172 | Denver | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 7,367,330.00 | 9,838,559.00 |
Colorado | 2873172 | Denver | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 2,022,684.00 | 4,287,021.25 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 1,556,303.25 | 1,945,379.06 |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 334,935.55 | 418,669.43 |
Colorado | 4701124 | Douglas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 4,408,761.20 | 5,510,951.51 |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 536,318.10 | 670,397.62 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 2,492,042.45 | 3,115,053.06 |
Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 7,059,562.45 | 8,824,453.07 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 1,348,792.66 | 70,534,148.69 |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 290,276.73 | 15,179,813.86 |
Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 3,820,916.61 | 199,812,097.70 |
Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 6,753.74 | 41,525.63 |
Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 31,381.75 | 192,951.96 |
Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 88,899.51 | 546,602.41 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | 2,000,000.00 | 3,487,706.83 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 10,118,043.84 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Maintenance Relocation | 12,312,886.50 | 41,527,441.82 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | 0.00 | 34,151,276.56 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 750,000.00 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | 0.00 | 839,797.64 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 738,198.00 | 891,651.17 |
Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 14,839,797.64 |
Colorado | C100038 | Denver | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - No Added Capacity | 0.00 | 23,425,145.10 |
Colorado | C100038 | Denver | >= 200,000 | Local | CONGESTION AIR QUALITY | Preliminary Engineering | 1,704,454.00 | 2,130,567.00 |
Colorado | C100038 | Denver | >= 200,000 | Local | CONGESTION AIR QUALITY | Right of Way | 1,040,000.00 | 1,300,000.00 |
Colorado | C100038 | Denver | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 812,500.00 |
Colorado | GBLD001 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 895,183.96 | 895,183.96 |
Colorado | GBLD001 | Douglas | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 604,482.06 | 604,482.06 |
Colorado | GBLD001 | Denver | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 288,067.66 | 288,067.66 |
Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 51,329.53 | 51,329.53 |
Colorado | GBLD001 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 266,096.57 | 266,096.57 |
Colorado | GBLD001 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 81,966.90 | 81,966.90 |
Colorado | GBLD001 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 2,145,723.65 | 2,145,723.65 |
Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 906,350.84 | 906,350.84 |
Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 2,443,954.49 | 2,443,954.49 |
Colorado | GBLD001 | Washington | < 5,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 683,192.00 | 683,192.00 |
Colorado | GBLD001 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 740,412.72 | 740,412.72 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 745,585.76 | 745,585.76 |
Colorado | GBLD001 | Logan | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 979,120.09 | 979,120.09 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 568,270.77 | 568,270.77 |
Colorado | GBLD001 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 1,618,790.64 | 1,618,790.64 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 428,718.50 | 428,718.50 |
Colorado | GBLD001 | Logan | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 738,674.09 | 738,674.09 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 562,489.61 | 562,489.61 |
Colorado | GBLD001 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 558,586.93 | 558,586.93 |
Colorado | GBLD001 | Washington | < 5,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 515,418.11 | 515,418.11 |
Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 1,843,783.89 | 1,843,783.89 |
Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 683,775.05 | 683,775.05 |
Colorado | GBLD001 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 61,838.00 | 61,838.00 |
Colorado | GBLD001 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 200,750.28 | 200,750.28 |
Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 38,724.35 | 38,724.35 |
Colorado | GBLD001 | Denver | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 217,325.86 | 217,325.86 |
Colorado | GBLD001 | Douglas | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 456,037.24 | 456,037.24 |
Colorado | GBLD001 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 675,350.45 | 675,350.45 |
Colorado | GBLD001 | Denver | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.08 | 459,111.20 |
Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.01 | 81,807.04 |
Colorado | GBLD001 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.16 | 963,400.33 |
Colorado | GBLD001 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.23 | 1,426,709.87 |
Colorado | GBLD001 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.57 | 3,419,772.14 |
Colorado | GBLD001 | Washington | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.18 | 1,088,845.23 |
Colorado | GBLD001 | Logan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.25 | 1,560,484.07 |
Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.64 | 3,895,081.02 |
Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.26 | 1,444,507.28 |
Colorado | GBLD001 | Larimer | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.19 | 1,180,041.42 |
Colorado | GBLD001 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.02 | 130,635.71 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.19 | 1,188,286.01 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.15 | 905,688.18 |
Colorado | GBLD001 | Adams | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.07 | 424,094.50 |
Colorado | GBLD001 | Washington | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 581.15 | 33,213.25 |
Colorado | GBLD001 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,825.23 | 104,313.93 |
Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 483.40 | 27,626.39 |
Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 634.21 | 36,246.50 |
Colorado | GBLD001 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 69.72 | 3,984.80 |
Colorado | GBLD001 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 761.50 | 43,519.20 |
Colorado | GBLD001 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 514.19 | 29,386.77 |
Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 43.66 | 2,495.36 |
Colorado | GBLD001 | Denver | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 245.04 | 14,004.34 |
Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 770.98 | 44,062.11 |
Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,078.90 | 118,812.37 |
Colorado | GBLD001 | Logan | >= 5,000 AND < | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 832.87 | 47,599.75 |
Colorado | GBLD001 | Larimer | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 629.81 | 35,995.01 |
Colorado | GBLD001 | Adams | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 226.34 | 12,936.22 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 49,350.34 | 54,106.28 |
Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 121,629.66 | 133,351.24 |
Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 960,303.00 | 1,052,848.37 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 274,337.00 | 300,775.14 |
Colorado | GBLD002 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | 5,772,644.33 | 28,228,089.62 |
Colorado | GBLD002 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | 14,227,355.67 | 69,571,421.38 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,999,996.00 | 2,192,737.64 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 1.00 | 116,649,278.33 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1.00 | 34,210,312.00 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 1.00 | 13,600,000.00 |
Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1.00 | 6,051,308.00 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 956,982.81 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 446,944.45 |
Colorado | GBLD003 | Huerfano | >= 5,000 AND < | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 98,248.04 |
Colorado | GBLD003 | Las Animas | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 128,903.92 |
Colorado | GBLD003 | Pueblo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 0.00 | 156,698.56 |
Colorado | GBLD003 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 4,145,308.48 |
Colorado | GBLD003 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 2,599,057.16 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 25,316,056.46 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 11,823,483.82 |
Colorado | GBLD003 | Las Animas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 3,410,029.34 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 1.00 | 1.21 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.53 | 0.63 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.25 | 0.30 |
Colorado | GBLD003 | Las Animas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.06 | 0.08 |
Colorado | GBLD003 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.11 | 0.13 |
Colorado | GBLD003 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.05 | 0.07 |
Colorado | GBLD003 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 6,659.90 |
Colorado | GBLD003 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 10,622.05 |
Colorado | GBLD003 | Las Animas | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 8,737.95 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 64,870.60 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 30,296.84 |
Colorado | GBLD003 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 707,759.30 | 884,699.14 |
Colorado | GBLD003 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 582,219.67 | 727,774.58 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 4,322,398.44 | 5,402,998.04 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 2,018,711.25 | 2,523,389.06 |
Colorado | GBLD003 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 443,756.34 | 554,695.43 |
Colorado | GBLD003 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety | 564,675.25 | 3,787,353.51 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety | 5,500,206.38 | 36,890,629.71 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Safety | 2,568,788.75 | 17,229,214.34 |
Colorado | GBLD003 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety | 740,868.36 | 4,969,104.50 |
Colorado | GBLD003 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety | 900,616.26 | 6,040,555.31 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.53 | 0.63 |
Colorado | GBLD003 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.25 | 0.30 |
Colorado | GBLD003 | Las Animas | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.06 | 0.08 |
Colorado | GBLD003 | Huerfano | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.05 | 0.07 |
Colorado | GBLD003 | Pueblo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.11 | 0.13 |
Colorado | GBLD003 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 0.00 | 8,231,143.86 |
Colorado | R200266 | Otero | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Bridge Replacement - No Added Capacity | 7,242,172.00 | 37,952,600.00 |
Colorado | R200266 | Park | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Bridge Replacement - No Added Capacity | 3,103,788.00 | 16,265,400.00 |
Colorado | R200266 | Chaffee | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Preliminary Engineering | 6,294.01 | 7,867.51 |
Colorado | R200266 | Fremont | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Preliminary Engineering | 268,098.62 | 335,123.28 |
Colorado | R200266 | Las Animas | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Preliminary Engineering | 274,035.73 | 342,544.66 |
Colorado | R200266 | Teller | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Preliminary Engineering | 81,619.46 | 102,024.32 |
Colorado | R200266 | Park | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Preliminary Engineering | 1,240,767.91 | 1,550,959.89 |
Colorado | R200266 | Otero | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Preliminary Engineering | 258,224.27 | 322,780.34 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 205,266.38 | 9,490,529.21 |
Colorado | SW01498 | Boulder | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 2,437,945.62 | 112,718,864.93 |
Colorado | SW01498 | Boulder | >= 200,000 | State | CONGESTION AIR QUALITY | Utilities | 6,547,510.78 | 8,407,644.14 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Utilities | 551,277.22 | 707,893.86 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 3,612.34 | 4,515.42 |
Colorado | SW01498 | Boulder | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 42,903.66 | 53,629.58 |
Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 28,299.87 | 35,374.84 |
Colorado | SW01498 | Boulder | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 336,117.13 | 420,146.41 |
Colorado | SW01498 | Boulder | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 4,251,013.00 | 5,313,766.25 |