RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Minnesota | 0005006 | MN 5: FROM I-494 IN BLOOMINGTON TO SOUTH END OF THE MISSISSIPPI RIVER BR #9300- CONCRETE PAVEMENT REHAB & RESURFACE, LIGHTING, TMS & REHAB 12 BRIDGES | 20,779,466.36 | 25,974,332.95 |
Minnesota | 0010338 | US 10: FROM ANOKA/RAMSEY CITY LIMITS (0.48 MI E OF CSAH 57) TO W OF GREEN HAVEN RD (0.28 MI W OF MN 47)- R/W ACQUISITION FOR CONST OF NEW INTERCHANGE | 0.00 | 64,469,905.00 |
Minnesota | 0012300 | TH 12: CR 6 to Wayzata Blvd; Reconstruction, New Bridges, Replace Br 90650 w/Br27274, Signals, and Signs | 45,822,305.53 | 58,197,503.65 |
Minnesota | 0014336 | TH 14: BROADWAY ST TO 0.6 MI E OF TH 14/TH 15/CR 21 INT & TH 15: TH 14/TH15/CR 21 INT TO 0.1 MI N OF 428TH LN, RECONST, REPL BRS 9200 & 9294 (cont) | 24,898,696.56 | 31,452,543.59 |
Minnesota | 0023324 | MN 23: 0.1 MI N OF CSAH 24 TO US 212 IN GRANITE FALLS- BIT MILL, CONC & BIT PAVING, RWIS, SIGNAL, LIGHTING, TURN LN'S, TENSION CABLE GUARDRAIL, (CONT) | 29,806,735.71 | 37,173,294.34 |
Minnesota | 0036310 | TH 36:W of NW Ave to TH 95 & TH 95:S of 10th Av to N of Lookout Trl, Reconst Frntg Rds, intersections, & repl Br #9116 | 47,457,672.18 | 61,407,573.18 |
Minnesota | 0036314 | TH36: OVER ST CROIX RIVER, CONST NEW BR #82045 INCL WB/EB RAMPS #82047 & 82048 ON/OFF TH95 & XCEL BARGE UNLOADER FACILITY REMOVAL | 106,648,640.85 | 333,685,951.65 |
Minnesota | 0043302 | TH 43: *WORK PACKAGE 5* 4TH ST TO LATSCH ISLAND IN THE CITY OF WINONA- REHAB BR 5900 (THROUGH-TRUSS REHAB & APPROACH SPAN REMOVALS) | 31,117,750.42 | 39,135,311.46 |
Minnesota | 0043303 | TH 43: CMGC WINONA WORK PACKAGE #6, COMPLETE ROADWAY APPROACHES FOR BRS. 85851 & 5900, RECONST BR #5900 | 21,237,741.62 | 28,321,417.18 |
Minnesota | 0052315 | TH 52: Oronoco ''Design Build' - New Interchange at CR 112 & New Overpass at CSAH 12, Repl brs 9234 & 9235 | 25,028,944.00 | 40,294,392.00 |
Minnesota | 0060319 | TH 60: 1.4 MI W OF W JCT TH 4 TO W JCT TH 15, CONC SURF, ADA, REHAB BR #91543 & TH 4: REHAB BR #83026 & CSAH 12: REHAB BR #83027 & TH 15: REMOVE(cont) | 24,248,889.58 | 30,495,245.67 |
Minnesota | 0063306 | TH 63: AT TH 61 IN REDWING TO 0.2 MI N OF 825TH ST IN WI & ON TH 61, FROM 0.47 MI E OF TH 58 TO 0.09 MI E OF TH 58- BIT & CONC PVMT, ADA, (CONT BELOW) | 28,112,178.88 | 63,436,184.27 |
Minnesota | 0169348 | TH 169:0.3 MI N OF TH 19 TO 0.5 MI S OF TH 25, CONC OVLY, CONC PVMT REHAB, BIT MILL & OVLY, DRAINAGE REPAIRS & TH 169:0.6 MI E OF TH 25 TO 0.1 (cont.) | 21,452,541.71 | 26,981,534.84 |
Minnesota | 0212308 | TH 212: CARVER CR 147 IN CHASKA TO CSAH 4 IN EDEN PRAIRIE, DESIGN BUILD, GR, SURF, BRS. | 124,041,073.12 | 253,585,892.17 |
Minnesota | 0212326 | US 212: FROM 0.30 MI E OF CSAH 36 TO CSAH 11 IN DAHLGREN TWP- RECONSTRUCT & EXPAND FROM A 2-LANE TO A 4-LANE DIVIDED HWY, REDUCED CONFLICT INT. (CONT) | 0.00 | 39,089,000.00 |
Minnesota | 0215210 | CSAH83: IN RAMSEY- CONST INTRCHG, INCL NEW BR #02007 & #02586, PED/BIKE IMP., DRAINAGE, BARRIERS, LIGHTING, STRIPING, SIGS & SIGN. | 10,000,000.00 | 27,696,263.87 |
Minnesota | 0371313 | TH 371: 0.5 mi N of CSAH 18 in Nisswa to 0.5 mi Nof CSAH 16 in Jenkins, const to 4 ln, new brs #18002, 18009, repl br #6495 | 4,722,054.89 | 50,497,729.08 |
Minnesota | 0610309 | TH 610:CR 81 TO I-94 & CONST OF 105TH AV FR MAPLE GROVE PKWY TO 0.5 MI W OF I- 94, 4 LN FREEWAY CONST, 9 NEW BRIDGES | 4,346,171.64 | 81,001,000.00 |
Minnesota | 0903187 | I-90: OVER MISSISSIPPI RIVER, REPL BR #9320 W BRS 85801 & 85802, NEW BRS, & TH 61: S JCT I-90 TO 0.5 MI S, GR, SURF, ETC. | 124,411,799.87 | 193,470,955.32 |
Minnesota | 1912258 | STH13: CONST INTERCHANGE (NEW BR #19036), ACCESS CLOSURES, FRONTAGE ROADS AT TH13 AND CSAH 5 IN THE CITY OF BURNSVILLE | 9,359,291.75 | 27,590,196.74 |
Minnesota | 1920071 | CSAH 70: FROM KENRICK AVE/KENSINGTON BLVD TO CSAH 23 IN LAKEVILLE- RECONSTRUCT FROM A 2-LN UNDIVIDED TO A 4 -LN DIVIDED HWY, PED/BIKE TRAIL & SIGNALS | 0.00 | 28,168,224.61 |
Minnesota | 1921116 | MN156: I-494 IN SOUTH ST PAUL TO ANNAPOLIS ST IN ST PAUL- CONCRETE PVMT REHAB & RECONSTRUCT, SIGNAL IMPS, BIKE LANES, SIDEWALKS, RETAINING WALL & ADA | 27,315.54 | 26,298,492.54 |
Minnesota | 1921136 | CSAH 26 (LONE OAK RD/70TH ST): FROM MN 55 IN EAGAN TO MN 3 & ON CSAH 63 FROM AMANA TRAIL TO 0.4 MI S OF O'NEIL DR IN INVER GROVE HEIGHTS- (CONT) | 0.00 | 27,041,000.00 |
Minnesota | 2714124 | CSAH5 (FRANKLIN AV): IN MPLS, OVER W. RIVER RD & MISSISSIPPI RIVER, RECONDITION BR# 2441 | 8,320,000.00 | 43,097,946.99 |
Minnesota | 2716123 | CSAH 53: XERXES AV S TO RICHFIELD PKWY, CONST ROUNDABOUT, TURN LANES, & BIKE/PED FACILITY | 9,677,392.20 | 36,731,877.55 |
Minnesota | 2720177 | MN 65 (3RD AVE S): FROM 1ST ST S TO 180' S OF 2ND ST SE IN MINNEAPOLIS- REHAB BRIDGE 2440 OVER THE MISSISSIPPI RIVER *CMGC* | 88,072,363.93 | 129,347,958.55 |
Minnesota | 4944254 | I-494: TH5 TO 0.1 MI S OF TH55 - RECONST, GR, SURF, REPL BRS, & ADD 3RD LN EACH DIRECTION | 80,156,404.35 | 143,797,249.42 |
Minnesota | 6213094 | I- 35E: TO N OF MARYLAND AV & I-94: SB I-35E TO SB TH 52, RECONST INTCHG WITH CAYUGA ST, FRNTG RDS, ADD, REPL, REMOVE BRS. | 81,420,064.09 | 136,511,885.74 |
Minnesota | 6218067 | TH 149: TH 5 (W 7TH ST) TO GEORGE ST, OVER MISSISSIPPI RIVER IN ST. PAUL, REHAB BR #62090, APPROACH WORK, ADA | 34,280,538.40 | 44,375,535.44 |
Minnesota | 7018262 | US 169: 0.6 MI N OF MN41/CSAH 78 TO 0.5 MI S OF CSAH 14- RECONSTRUCTION, INCLS INTERCHANGES AT CSAH 14 & MN41/CSAH 78 & CONST NEW FRONTAGE RD'S(CONT) | 37,438,933.00 | 44,619,364.23 |
Minnesota | 8606002 | TH 101:PRELIM ENG & 147 TH AV TO MISSIPPI RIVER, GR, SURF, WALLS, LIGHTS, SIG, BRS. - "BAP" PROJECT | 36,733,284.00 | 63,262,521.00 |
Minnesota | I350120 | I-35E:"ELLA", 0.6 MI N OF 80TH ST E TO JCT OF I-35/I-35W/I-35E & I-35W:2.3 MI N OF MAIN ST TO JCT I-35/I-35W/I-35E & I-35:JCT I-35/I-35W/I-35E(cont) | 53,468,478.52 | 63,989,564.66 |
Minnesota | I350122 | I-35: FROM CHISAGO CO LN TO 0.94 MI S OF CSAH 11- UNBONDED CONC OVLY, REPLC BR'S 58801 W/58825, BR 58802 W/58826, BR 58803 W/58823 & BR 58804 W/58824 | 26,030,843.52 | 30,387,467.22 |
Minnesota | I350129 | DULUTH TWIN PORTS INTERCHANGE ON I-35, I-535 & US 53 (CMGC WORK PACKAGES 1 & 2) | 163,478,106.83 | 275,839,504.55 |
Minnesota | I35E003 | TH 35E: BR4M & FMP DESIGN BUILD, FR TH 94 (ST PAUL) TO N OF LITTLE CANADA RD (MAPLWD & L CANADA)- CONST MNPASS LANE, REHAB PAVE, REMOVE BR 6512 (CONT) | 43,166,441.31 | 101,914,147.01 |
Minnesota | I35E004 | I-35E: S OF CSAH 15 TO N OF CSAH 96- GR. MILL & BIT SURF, CPR, ADA, REPL BRS 9567 & 9568, REHAB BR 62834, RETAIN WALL...CONT BELOW | 26,877,322.84 | 32,703,096.00 |
Minnesota | I35W005 | I-35W:72' S OF E 43RD ST TO 520' E OF CHICAGO AV S & I-94:NICOLLET AV S TO 70' E OF PARK AV S & TH 65:168' N OF 24TH ST TO 550' S OF E 15TH ST, (cont) | 80,313,693.61 | 239,129,843.40 |
Minnesota | I35W010 | I-35W: CLIFF RD IN BURNSVILLE THROUGH THE 106TH ST INTCHG IN BLOOMINGTON, PVMT RECONST, AUX LNS, REPL BR #5983 W BRS 27W38 27W39, REPL BRS 9043 (cont) | 116,987,940.79 | 130,190,886.45 |
Minnesota | I35W012 | I-35W:CR B2 IN ROSEVILLE TO 0.1 MI N OF SUNSET AV (CR 53) IN LINO LAKES,CONST MnPASS LN FROM CR C TO LEXINGTON AV (CSAH 17),CONC OVLY FR CR C (cont.) | 184,419,585.66 | 207,674,620.00 |
Minnesota | I35W014 | I-35W (NB): FROM E 42ND ST TO E 40TH ST IN MINNEAPOLIS- CONSTRUCT STORMWATER HOLDING CAVERN SYSTEM, INCLUDES LIGHTING, NOISE & RETAINING WALLS | 54,889,933.59 | 64,488,815.10 |
Minnesota | I494006 | I-494: (ELLA) FROM 3RD AVE S IN S ST PAUL TO E END OF MN RIVER BR IN EAGAN- M&O, DRAINAGE, REHAB 7 BR'S, GUARDRAIL, TMS, TURN LNS, SIGNALS, ADA (CONT) | 29,394,339.89 | 32,855,066.79 |
Minnesota | I694005 | I-694:IN OAKDALE, 10TH ST (CSAH 10) TO JCT I-694/494/94 & I-494:0.1 MI S OF TAMARACK RD TO JCT I-694/494/94, CONC OVLY, AUX LN SB FROM 10TH ST (cont.) | 27,013,493.53 | 30,411,706.05 |
Minnesota | I940022 | TH 94: 0.1 MI E OF NICOLLET AVE IN MPLS TO 0.3 MI W OF SHINGLE CREEK PKWY IN BROOKLYN CENTER- BIT OVLY, CPR, REHAB 50 BR'S, ADA RAMPS, C&G (CONT) | 45,838,377.59 | 50,931,530.66 |
Minnesota | I940025 | I-94: TH 79 TO 0.5 MI E OF TH 114, BIT MILL, CON & BIT SURF, LIGHTING, REHAB 7 BRS | 23,278,286.06 | 25,887,762.29 |
Minnesota | I940034 | I-94: 0.4 MI W OF CSAH 19 IN ALBERTVILLE TO 0.3 MI E OF MN 241 IN ST MICHAEL- RECONST, INCLS ADDITION OF EB THIRD LN FROM CSAH 19 TO MN 241 (CONT.) | 7,384,072.50 | 70,995,000.00 |
Minnesota | I940037 | I-94: FROM MN 24 IN CLEARWATER TO 0.3 MI E OF BR #86802 (CSAH 39) NEAR MONTICELLO (EBL & WBL)- RECONSTRUCTION, REHAB 5 BR'S & REPLC 1 BR W/NEW CULVERT | 81,401,519.20 | 103,918,000.00 |
Minnesota | M265001 | I-494/169: DESIGN BUILD, RECONT INTERCHANGE, WIDEN BRS, NEW BRS. | 78,821,368.13 | 145,513,079.35 |