RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Minnesota | 0005006 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 13,935,323.07 | 17,419,153.84 |
Minnesota | 0005006 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 5,379,370.20 | 6,724,212.75 |
Minnesota | 0005006 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 1,464,773.09 | 1,830,966.36 |
Minnesota | 0010338 | Anoka | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 0.00 | 32,722,276.00 |
Minnesota | 0010338 | Anoka | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Right of Way | 0.00 | 5,248,260.00 |
Minnesota | 0010338 | Anoka | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 0.00 | 15,045,517.00 |
Minnesota | 0010338 | Anoka | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 0.00 | 6,935,844.00 |
Minnesota | 0010338 | Anoka | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 0.00 | 329,305.00 |
Minnesota | 0010338 | Anoka | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 0.00 | 2,983,703.00 |
Minnesota | 0010338 | Anoka | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 0.00 | 1,205,000.00 |
Minnesota | 0012300 | Hennepin | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | 867,374.50 | 1,084,218.12 |
Minnesota | 0012300 | Hennepin | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Construction Engineering | 61,525.11 | 78,777.03 |
Minnesota | 0012300 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 37,776,375.87 | 48,057,603.77 |
Minnesota | 0012300 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | 3,778,535.00 | 4,723,169.00 |
Minnesota | 0012300 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 863,048.00 | 1,078,810.00 |
Minnesota | 0012300 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 2,475,447.05 | 3,174,925.73 |
Minnesota | 0014336 | Brown | >= 5,000 AND < 50,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | 77,185.21 | 96,481.51 |
Minnesota | 0014336 | Nicollet | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 10,573,804.28 | 13,217,255.34 |
Minnesota | 0014336 | Brown | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 4,575,890.92 | 5,754,245.13 |
Minnesota | 0014336 | Nicollet | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 1,028,134.52 | 1,285,168.15 |
Minnesota | 0014336 | Brown | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 8,643,681.63 | 10,804,602.04 |
Minnesota | 0014336 | Brown | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 500.00 |
Minnesota | 0014336 | Brown | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 87,269.91 |
Minnesota | 0014336 | Brown | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 207,021.51 |
Minnesota | 0023324 | Lyon | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 1,526,835.62 | 1,696,484.02 |
Minnesota | 0023324 | Yellow Medicine | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 1,222.45 | 1,358.28 |
Minnesota | 0023324 | Chippewa | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 128,847.83 | 161,059.79 |
Minnesota | 0023324 | Yellow Medicine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 21,340,044.84 | 26,675,056.04 |
Minnesota | 0023324 | Lyon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 4,999,652.37 | 6,249,565.46 |
Minnesota | 0023324 | Yellow Medicine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 453,043.80 | 566,304.75 |
Minnesota | 0023324 | Yellow Medicine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 1,158,188.80 | 1,447,736.00 |
Minnesota | 0023324 | Chippewa | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 503.51 |
Minnesota | 0023324 | Yellow Medicine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 43,726.49 |
Minnesota | 0023324 | Yellow Medicine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 99,450.00 | 165,750.00 |
Minnesota | 0023324 | Yellow Medicine | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | 99,450.00 | 165,750.00 |
Minnesota | 0036310 | Washington | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | 912,288.00 | 1,140,360.00 |
Minnesota | 0036310 | Washington | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | 815,200.00 | 1,019,000.00 |
Minnesota | 0036310 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 40,408,253.95 | 50,855,953.22 |
Minnesota | 0036310 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 1,996,125.11 | 2,495,156.39 |
Minnesota | 0036310 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 901,782.39 | 2,074,687.95 |
Minnesota | 0036310 | Washington | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 787,814.67 |
Minnesota | 0036310 | Washington | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 73,440.00 | 96,372.54 |
Minnesota | 0036310 | Washington | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 940,659.92 | 1,175,824.90 |
Minnesota | 0036310 | Washington | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 1,409,922.81 | 1,762,403.51 |
Minnesota | 0036314 | Washington | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge New Construction | 44,198.00 | 55,247.50 |
Minnesota | 0036314 | Washington | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | 3,231,337.34 | 4,039,172.00 |
Minnesota | 0036314 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 1,185,388.01 |
Minnesota | 0036314 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 3,294,882.96 |
Minnesota | 0036314 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 81,451,546.10 | 297,298,454.91 |
Minnesota | 0036314 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 410,857.00 |
Minnesota | 0036314 | Washington | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 21,921,559.41 | 27,401,949.27 |
Minnesota | 0043302 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 31,117,750.42 | 38,897,188.02 |
Minnesota | 0043302 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 238,123.44 |
Minnesota | 0043303 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 17,110,426.22 | 21,447,418.11 |
Minnesota | 0043303 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 4,127,315.40 | 6,873,999.07 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 1,330,492.00 | 1,663,091.00 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 10,890.00 | 149,635.00 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | New Construction Roadway | 330,667.00 | 330,667.00 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | Bridge New Construction | 2,912,604.00 | 3,501,143.03 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | Construction Engineering | 37,772.61 | 1,344,953.25 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | New Construction Roadway | 1,693,812.39 | 1,916,924.72 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 151,259.00 | 256,559.00 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 18,441,259.00 | 30,979,419.00 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 115,200.00 | 144,000.00 |
Minnesota | 0052315 | Olmsted | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | 4,988.00 | 8,000.00 |
Minnesota | 0060319 | Watonwan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - No Added Capacity | 6,556,318.01 | 8,195,397.51 |
Minnesota | 0060319 | Watonwan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 16,792,635.30 | 21,174,927.82 |
Minnesota | 0060319 | Watonwan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 859,936.27 | 1,074,920.34 |
Minnesota | 0060319 | Watonwan | >= 5,000 AND < 50,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | Research | 40,000.00 | 50,000.00 |
Minnesota | 0063306 | Goodhue | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 392,074.75 |
Minnesota | 0063306 | Goodhue | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 10,470,548.89 | 13,171,860.87 |
Minnesota | 0063306 | Goodhue | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 1,667,572.62 | 2,084,465.77 |
Minnesota | 0063306 | Goodhue | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 15,420,649.88 | 46,811,130.56 |
Minnesota | 0063306 | Goodhue | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 625.00 |
Minnesota | 0063306 | Goodhue | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 553,407.49 | 976,027.32 |
Minnesota | 0169348 | Scott | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 21,445,044.11 | 26,972,162.84 |
Minnesota | 0169348 | Scott | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 7,497.60 | 9,372.00 |
Minnesota | 0212308 | Statewide | N/A | N/A | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | 10,565,292.00 | 19,550,873.00 |
Minnesota | 0212308 | Statewide | N/A | N/A | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | 3,638,430.00 | 6,732,846.00 |
Minnesota | 0212308 | Statewide | N/A | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 82,067,214.50 | 160,719,967.65 |
Minnesota | 0212308 | Statewide | N/A | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | 24,773,924.26 | 45,876,281.14 |
Minnesota | 0212308 | Statewide | N/A | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,010,270.80 | 6,877,504.89 |
Minnesota | 0212308 | Statewide | N/A | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 800,000.00 | 1,000,000.00 |
Minnesota | 0212308 | Statewide | N/A | N/A | NATIONAL HIGHWAY SYSTEM | Transit | 0.00 | 7,599,387.14 |
Minnesota | 0212308 | Statewide | N/A | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 1,185,941.56 | 5,229,032.35 |
Minnesota | 0212326 | Carver | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 0.00 | 18,750,000.00 |
Minnesota | 0212326 | Carver | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 18,544,000.00 |
Minnesota | 0212326 | Carver | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 0.00 | 956,000.00 |
Minnesota | 0212326 | Carver | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 0.00 | 839,000.00 |
Minnesota | 0215210 | Anoka | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 0.00 | 5,965,940.00 |
Minnesota | 0215210 | Anoka | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 7,941,358.36 | 17,259,082.84 |
Minnesota | 0215210 | Anoka | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | 2,056,241.64 | 4,468,241.03 |
Minnesota | 0215210 | Anoka | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Training | 2,400.00 | 3,000.00 |
Minnesota | 0371313 | Crow Wing | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 3,807,685.47 | 39,618,191.32 |
Minnesota | 0371313 | Crow Wing | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 289,541.95 | 4,350,419.40 |
Minnesota | 0371313 | Crow Wing | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 58,499.00 | 584,990.00 |
Minnesota | 0371313 | Crow Wing | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 566,328.47 | 5,944,128.36 |
Minnesota | 0610309 | Hennepin | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | 92,985.64 | 116,232.05 |
Minnesota | 0610309 | Hennepin | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | New Construction Roadway | 490,000.00 | 490,000.00 |
Minnesota | 0610309 | Hennepin | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | Bridge New Construction | 0.00 | 20,300,000.00 |
Minnesota | 0610309 | Hennepin | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | New Construction Roadway | 399,932.00 | 49,173,462.03 |
Minnesota | 0610309 | Hennepin | >= 200,000 | State | TRANSPORTATION IMP PROJ | Bridge New Construction | 184,249.26 | 6,125,000.00 |
Minnesota | 0610309 | Hennepin | >= 200,000 | State | TRANSPORTATION IMP PROJ | New Construction Roadway | 3,179,004.74 | 4,249,755.92 |
Minnesota | 0610309 | Hennepin | >= 200,000 | State | TRANSPORTATION IMP PROJ | Utilities | 0.00 | 546,550.00 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | GRANTS SUP PLAN SECTION 117 | 4R - Added Capacity | 1,253,935.84 | 1,253,935.84 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 46,918,081.88 | 59,956,769.12 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Other | 0.00 | 1,500,000.00 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 288,108.53 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 14,059,083.66 | 17,573,854.57 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 371,138.09 | 412,375.65 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 3,852,164.88 | 4,280,183.20 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 57,269,643.95 | 107,517,976.84 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | SEC 115 UNOBL BAL TRANSF | 4R - Added Capacity | 677,035.86 | 677,035.86 |
Minnesota | 0903187 | Winona | >= 50,000 AND < 200,000 | State | STP DEMOS | 4R - Added Capacity | 10,715.71 | 10,715.71 |
Minnesota | 1912258 | Dakota | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Maintenance Resurfacing | 1,527,604.19 | 1,909,505.24 |
Minnesota | 1912258 | Dakota | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 6,198,077.87 | 22,805,239.38 |
Minnesota | 1912258 | Dakota | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 682,089.69 | 1,923,552.12 |
Minnesota | 1912258 | Dakota | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | 1,520.00 | 1,900.00 |
Minnesota | 1912258 | Dakota | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | 4R - Maintenance Resurfacing | 950,000.00 | 950,000.00 |
Minnesota | 1920071 | Dakota | >= 200,000 | Local | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 0.00 | 13,955,453.13 |
Minnesota | 1920071 | Dakota | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 11,742,092.47 |
Minnesota | 1920071 | Dakota | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | 0.00 | 2,450,679.01 |
Minnesota | 1920071 | Dakota | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | 0.00 | 20,000.00 |
Minnesota | 1921116 | Ramsey | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 0.00 | 21,816.15 |
Minnesota | 1921116 | Dakota | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 0.00 | 26,249,360.85 |
Minnesota | 1921116 | Dakota | >= 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | 27,274.56 | 27,274.56 |
Minnesota | 1921116 | Ramsey | >= 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | 40.98 | 40.98 |
Minnesota | 1921136 | Dakota | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 0.00 | 17,632,136.00 |
Minnesota | 1921136 | Dakota | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 0.00 | 9,408,864.00 |
Minnesota | 2714124 | Hennepin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 8,317,120.00 | 43,094,346.99 |
Minnesota | 2714124 | Hennepin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | 2,880.00 | 3,600.00 |
Minnesota | 2716123 | Hennepin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 9,631,999.64 | 36,686,484.35 |
Minnesota | 2716123 | Hennepin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | 45,392.56 | 45,393.20 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Rehabilitation - No Added Capacity | 55,903,683.00 | 69,879,603.75 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Restoration & Rehabilitation | 2,254,065.76 | 2,817,582.20 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | 767,662.60 | 959,578.25 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 5,478,537.59 | 6,848,171.99 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 23,668,414.98 | 39,088,018.73 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 0.00 | 6,440,060.00 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 0.00 | 33,221.82 |
Minnesota | 2720177 | Hennepin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 0.00 | 33,221.81 |
Minnesota | 2720177 | Hennepin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 3,248,500.00 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 58,680,306.05 | 69,453,464.49 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | 12,775,860.00 | 14,195,400.00 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 377,957.73 | 2,291,168.04 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 396,000.00 | 440,000.00 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 1,290,946.39 | 1,803,827.28 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 5,420,324.10 | 43,466,913.37 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 1,180,110.92 | 9,463,600.00 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 34,899.16 | 1,482,876.24 |
Minnesota | 4944254 | Hennepin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Transit | 0.00 | 1,200,000.00 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 8,684,196.42 | 10,855,245.53 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | 4R - No Added Capacity | 719,612.06 | 719,612.06 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | 9,718,921.00 | 12,148,651.25 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | 4R - No Added Capacity | 35,717.21 | 44,646.51 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 1,118,137.93 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge New Construction | 344,802.70 | 15,893,497.46 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 925,266.24 | 3,785,000.53 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | INTERSTATE MAINTENANCE | Other | 0.00 | 561,794.05 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | INTERSTATE MAINTENANCE | Traffic Management/Engineering - HOV | 0.00 | 171,745.09 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 41,494,330.50 | 60,242,611.45 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 12,470,939.32 | 16,701,479.19 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 6,852,507.62 | 11,819,392.91 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 2,232,858.00 |
Minnesota | 6213094 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | 173,771.02 | 217,213.78 |
Minnesota | 6218067 | Ramsey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 129,970.66 | 162,463.33 |
Minnesota | 6218067 | Ramsey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 4,617,460.94 | 5,771,826.17 |
Minnesota | 6218067 | Ramsey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 29,533,106.80 | 38,420,796.41 |
Minnesota | 6218067 | Ramsey | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 20,449.53 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 14,004,278.25 | 14,004,278.25 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | 3,695,721.75 | 3,695,721.75 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 14,708,346.66 | 19,366,950.36 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 206,760.11 | 273,885.00 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 4,778,826.23 | 6,330,277.22 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | 0.00 | 78,006.65 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 0.00 | 825,245.00 |
Minnesota | 7018262 | Scott | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | 45,000.00 | 45,000.00 |
Minnesota | 8606002 | Wright | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 26,875,297.00 | 44,439,975.00 |
Minnesota | 8606002 | Wright | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 8,118,127.00 | 13,247,599.00 |
Minnesota | 8606002 | Wright | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 287,649.00 | 3,658,545.00 |
Minnesota | 8606002 | Wright | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 560,215.00 | 700,269.00 |
Minnesota | 8606002 | Wright | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 132,450.00 | 266,700.00 |
Minnesota | 8606002 | Wright | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 759,546.00 | 949,433.00 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,280,000.00 | 4,113,655.10 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 19,767,122.28 | 22,007,731.53 |
Minnesota | I350120 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 19,134,656.48 | 21,278,735.34 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 198,512.55 | 220,569.50 |
Minnesota | I350120 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 2,129,300.00 | 3,661,625.00 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 2,942,160.60 | 3,269,067.33 |
Minnesota | I350120 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 1,904,619.56 | 2,116,243.96 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 5,775.00 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 568,044.00 | 631,160.00 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,225,270.33 | 2,801,362.98 |
Minnesota | I350120 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 221,214.60 | 432,114.00 |
Minnesota | I350120 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,650,438.82 | 1,836,647.92 |
Minnesota | I350120 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Vehicle Weight Enforcement Program | 1,397,139.30 | 1,552,377.00 |
Minnesota | I350120 | Washington | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | Research | 50,000.00 | 62,500.00 |
Minnesota | I350122 | Pine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 19,956,348.54 | 23,154,325.55 |
Minnesota | I350122 | Pine | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 16,758.18 |
Minnesota | I350122 | Chisago | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 147.17 |
Minnesota | I350122 | Pine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 6,074,494.98 | 7,206,816.32 |
Minnesota | I350122 | Pine | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 9,420.00 |
Minnesota | I350129 | St. Louis | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 3,690,000.00 | 4,612,500.00 |
Minnesota | I350129 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 102,680,423.11 | 156,270,522.46 |
Minnesota | I350129 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 37,107,683.72 | 89,941,482.09 |
Minnesota | I350129 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 15,000.00 |
Minnesota | I350129 | St. Louis | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 20,000,000.00 | 25,000,000.00 |
Minnesota | I350129 | St. Louis | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 0.00 | 0.00 |
Minnesota | I35E003 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 42,838,352.55 | 83,064,890.96 |
Minnesota | I35E003 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 17,659,443.92 |
Minnesota | I35E003 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 328,088.76 | 1,189,812.13 |
Minnesota | I35E004 | Ramsey | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 1,793,712.03 |
Minnesota | I35E004 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 18,805,121.52 | 21,631,680.23 |
Minnesota | I35E004 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 1,862,563.51 | 2,069,515.01 |
Minnesota | I35E004 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 6,145,333.06 | 7,079,164.01 |
Minnesota | I35E004 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 57,575.00 |
Minnesota | I35E004 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 64,304.75 | 71,449.72 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | CONGESTION AIR QUALITY | Traffic Management/Engineering - HOV | 7,000,000.00 | 29,613,100.92 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | 9,899.00 | 12,373.75 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge Rehabilitation - No Added Capacity | 471,355.20 | 589,194.00 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | 825,251.80 | 1,031,564.50 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 384,181.82 | 426,868.69 |
Minnesota | I35W005 | Hennepin | >= 200,000 | Local | MISC. LONG TERM IMPROVEMENTS | 4R - No Added Capacity | 731,520.09 | 914,400.11 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | MISC. LONG TERM IMPROVEMENTS | Bridge New Construction | 800,753.83 | 1,000,942.29 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | MISC. LONG TERM IMPROVEMENTS | Bridge Replacement - No Added Capacity | 625,949.00 | 782,436.25 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 56,701,305.95 | 131,063,318.00 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 9,394,214.90 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 0.00 | 6,756,616.61 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 41,106,812.94 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 101,535.00 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 926,731.52 | 1,029,701.68 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | 205,179.80 | 256,474.75 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | TRANSP ALTERNATIVES MAP-21 | Facilities for Pedestrians and Bicycles | 2,921,337.58 | 3,651,671.98 |
Minnesota | I35W005 | Hennepin | >= 200,000 | Local | TRANSP ALTERNATIVES MAP-21 | Facilities for Pedestrians and Bicycles | 532,934.80 | 666,168.50 |
Minnesota | I35W005 | Hennepin | >= 200,000 | Local | TRANSPORTATION IMP PROJ | 4R - No Added Capacity | 4,463,526.34 | 5,579,407.92 |
Minnesota | I35W005 | Hennepin | >= 200,000 | State | TRANSPORTATION IMP PROJ | Bridge Replacement - No Added Capacity | 839,973.66 | 1,049,967.08 |
Minnesota | I35W010 | Dakota | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 4,214,495.88 | 4,682,773.20 |
Minnesota | I35W010 | Hennepin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 2,785,771.03 | 3,095,301.14 |
Minnesota | I35W010 | Hennepin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | 5,689,624.80 | 6,321,805.34 |
Minnesota | I35W010 | Dakota | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | 671,691.15 | 746,323.50 |
Minnesota | I35W010 | Hennepin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | 671,691.15 | 746,323.50 |
Minnesota | I35W010 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 13,853,251.86 | 15,460,263.59 |
Minnesota | I35W010 | Dakota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 20,694,048.13 | 23,129,910.85 |
Minnesota | I35W010 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 56,231,400.48 | 62,479,333.87 |
Minnesota | I35W010 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 117,022.50 | 130,025.00 |
Minnesota | I35W010 | Dakota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 117,022.50 | 130,025.00 |
Minnesota | I35W010 | Dakota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 5,970,960.65 | 6,634,400.72 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | 10,800.00 | 12,000.00 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 540,594.00 | 600,660.00 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 13,402,418.72 | 16,753,023.40 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 2,951,626.32 | 3,279,584.80 |
Minnesota | I35W012 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 1,264,828.95 | 1,405,365.50 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 15,230,631.60 | 16,922,924.00 |
Minnesota | I35W012 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 3,875,445.00 | 4,306,050.00 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 8,355,985.00 | 9,481,950.00 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 90,000.00 | 100,000.00 |
Minnesota | I35W012 | Anoka | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 60,472,055.73 | 67,191,173.03 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 78,225,200.34 | 86,916,889.27 |
Minnesota | I35W012 | Ramsey | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 705,000.00 |
Minnesota | I35W014 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 54,471,368.72 | 64,023,743.02 |
Minnesota | I35W014 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | 418,564.87 | 465,072.08 |
Minnesota | I494006 | Dakota | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | 39,041.01 | 43,378.90 |
Minnesota | I494006 | Dakota | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 3,124,684.15 | 3,471,871.28 |
Minnesota | I494006 | Dakota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 22,575,100.91 | 25,083,445.47 |
Minnesota | I494006 | Dakota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 2,719,071.91 | 3,021,191.00 |
Minnesota | I494006 | Dakota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 11,883.27 |
Minnesota | I494006 | Dakota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 717,626.48 | 797,362.75 |
Minnesota | I494006 | Dakota | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 182,805.86 |
Minnesota | I494006 | Dakota | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | 175,204.08 | 194,671.20 |
Minnesota | I494006 | Dakota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 43,611.35 | 48,457.06 |
Minnesota | I694005 | Washington | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 236,290.24 | 262,544.71 |
Minnesota | I694005 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 18,665,200.36 | 20,739,111.51 |
Minnesota | I694005 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 724,913.10 | 805,459.00 |
Minnesota | I694005 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 49,993.63 | 55,548.48 |
Minnesota | I694005 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 7,337,096.20 | 8,152,329.10 |
Minnesota | I694005 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 1,450.00 |
Minnesota | I694005 | Washington | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 395,263.25 |
Minnesota | I940022 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 29,944,176.49 | 33,271,307.21 |
Minnesota | I940022 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 15,894,201.10 | 17,660,223.45 |
Minnesota | I940025 | Douglas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 21,420,241.46 | 23,800,268.29 |
Minnesota | I940025 | Douglas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 1,858,044.60 | 2,064,494.00 |
Minnesota | I940025 | Douglas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 23,000.00 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 46,789,244.85 |
Minnesota | I940034 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 1,395,755.15 |
Minnesota | I940034 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 35,150.53 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 2,522,015.71 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 490,633.76 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 0.00 | 338,500.00 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 6,009,840.00 | 11,278,200.00 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | 693,450.00 | 770,500.00 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 5,776,453.48 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 584,100.00 | 1,261,125.00 |
Minnesota | I940034 | Wright | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 96,682.50 | 170,212.80 |
Minnesota | I940034 | Hennepin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 167,208.72 |
Minnesota | I940037 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 73,027,669.73 | 91,284,587.16 |
Minnesota | I940037 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 883,098.40 | 1,103,873.00 |
Minnesota | I940037 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 665,761.60 | 832,202.00 |
Minnesota | I940037 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 5,200,000.00 | 6,500,000.00 |
Minnesota | I940037 | Wright | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Vehicle Weight Enforcement Program | 0.00 | 2,166,101.00 |
Minnesota | I940037 | Wright | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 1,624,989.47 | 2,031,236.84 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 30,400.00 | 38,000.00 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 29,417,086.27 | 41,826,112.97 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 29,520,739.86 | 44,418,808.53 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 7,699,200.00 | 25,686,985.47 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 0.00 | 4,350,000.00 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,362,702.00 | 6,293,361.08 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 0.00 | 6,045,619.37 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 0.00 | 185,000.00 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 7,946,708.00 | 15,713,509.93 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | 4R - Added Capacity | 399,932.00 | 399,932.00 |
Minnesota | M265001 | Hennepin | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | 4R - Added Capacity | 444,600.00 | 555,750.00 |