U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
New Hampshire

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
New Hampshire A000124 SALEM TO MANCHESTER,I93,MAINLINE,X1 TO STA 1130 & NH38 BR 077/063 & 073/063 (RED LIST) [PARTIAL GARVEE BONDED PROJECT] 22,989,049.04 49,770,742.63
New Hampshire A000125 SALEM TO MANCHESTER I-93 I-93 Exit 2 Interchange reconstruction & Pelham Rd - debt service project for 13933E (Salem) 45,946,857.01 46,246,464.60
New Hampshire A000128 SALEM TO MANCHESTER I-93 I-93 Exit 3 area -NB ML connections, NB Ramps & NH 111A relocation - debt service project for 13933H 31,050,978.51 34,434,854.64
New Hampshire A000129 SALEM TO MANCHESTER I-93 I-93 Exit 3 area - Reconstruct SB ML, NH111 & SB on ramp (Windham) - debt service project for 13933I 35,552,058.27 36,127,804.28
New Hampshire A000143 BEDFORD NH 101 Widen NH 101 to 5 lanes from NH 114 to Wallace Road 26,954,061.66 27,194,815.95
New Hampshire A000501 SALEM-MANCHESTER,I93,X5 AREA,RECON INTERCHANGE,INCLUDE NB/SB MAINLINE,NB OFF-RAMP,BR#'S 96/163, 097/163, 099/160, 100/160.[GARVEE] 21,196,235.70 55,947,210.02
New Hampshire A000909 PORTSMOUTH, NH - KITTERY, ME US 1 Bypass Bridge Replacement, US 1 Bypass over Piscataqua River (Sarah Mildred Long Bridge) (Red List) 98,397,890.05 221,873,444.55
New Hampshire A001154 LEBANON, NH - HARTFORD, VT I-89 NB & SB Superstructure Replace & Widening, I-89 NB & SB over Connecticut River (Br No 044/103 & 044/104) 31,133,417.45 52,165,394.22
New Hampshire A004115 SALEM TO MANCHESTER I-93 NB & SB Mainline, Weigh Station to Kendall Pond Rd (Windham & Derry) 2,614,085.80 50,180,397.17
New Hampshire A004152 HINSDALE, NH - BRATTLEBORO, VT NH 119 Reconstruction of the new bridge over the Connecticut River 30,524,972.15 81,567,721.24
New Hampshire A004375 SALEM TO MANCHESTER I-93 Exit 4 Interchange, NB & SB Mainline & NH 102 approach work 8,538,525.32 68,190,984.42
New Hampshire A004376 SALEM TO MANCHESTER I-93 I-93 NB & SB mainline reconstruction, Exit 5 to I-293 split (Londonderry & Manchester) 3,176,990.34 50,140,252.43
New Hampshire A004377 SALEM TO MANCHESTER I-93 NB & SB mainline between Exits 4 and 5 (Londonderry) 1,754,048.03 28,146,735.00