U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
New Hampshire

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT NUMBER COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
New Hampshire A000124 Hillsborough >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service 730,404.56 730,404.56
New Hampshire A000124 Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service 22,402.15 22,402.15
New Hampshire A000124 Hillsborough >= 200,000 N/A CONGESTION AIR QUALITY Debt Service 1,838,760.53 1,838,760.53
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 64,897.38 64,897.38
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 8,869,173.47 27,921,874.34
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 0.00 88,537.27
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 1,674,255.04 9,235,736.31
New Hampshire A000124 Hillsborough >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service 9,789,155.91 9,789,155.91
New Hampshire A000125 Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service 6,138,310.43 6,138,310.43
New Hampshire A000125 Rockingham >= 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity 0.00 11,896.00
New Hampshire A000125 Rockingham >= 200,000 N/A INTERSTATE MAINTENANCE Debt Service 366,108.89 366,108.89
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 22,179,629.74 22,179,629.74
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 0.00 34,455.44
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 5,955,256.37 5,955,256.37
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Utilities 0.00 153,943.36
New Hampshire A000125 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 0.00 99,312.79
New Hampshire A000125 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service 11,307,551.58 11,307,551.58
New Hampshire A000128 Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service 2,534,083.87 3,016,004.77
New Hampshire A000128 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 582,788.40
New Hampshire A000128 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 20,886,704.64 23,044,367.26
New Hampshire A000128 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing 0.00 35,243.85
New Hampshire A000128 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service 7,630,190.00 7,630,190.00
New Hampshire A000129 Hillsborough >= 200,000 N/A CONGESTION AIR QUALITY Debt Service 4,763,883.19 4,763,883.19
New Hampshire A000129 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 575,746.01
New Hampshire A000129 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 14,366,895.37 14,366,895.37
New Hampshire A000129 Hillsborough >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service 16,421,279.71 16,421,279.71
New Hampshire A000143 Hillsborough >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity 261,906.99 261,906.99
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 16,927,117.34 16,927,117.34
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,082,231.87 1,082,231.87
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff 1,050,177.65 1,050,177.65
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 46,594.78 46,594.78
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 2,337,500.00 2,337,500.00
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 2,603,653.82 2,603,653.82
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering 243,044.38 263,805.47
New Hampshire A000143 Hillsborough >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way 150,000.00 150,000.00
New Hampshire A000143 Hillsborough >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 12,373.20
New Hampshire A000143 Hillsborough >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 495,000.00 495,000.00
New Hampshire A000143 Hillsborough >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,726,834.83 1,726,834.83
New Hampshire A000143 Hillsborough >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 0.00 207,620.00
New Hampshire A000501 Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service 1,667,225.73 9,854,228.36
New Hampshire A000501 Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Utilities 0.00 15,099.66
New Hampshire A000501 Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service 981,897.76 981,897.76
New Hampshire A000501 Rockingham >= 200,000 N/A GRANTS SUP PLAN SECTION 117 Other 2.00 2.00
New Hampshire A000501 Rockingham >= 200,000 N/A HIGHWAY PRIORITY PROJECTS 4R - Added Capacity 1,980,000.00 1,980,000.00
New Hampshire A000501 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 65,182.95 136,786.21
New Hampshire A000501 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 923,941.76 1,244,754.64
New Hampshire A000501 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 8,275,722.58 34,432,178.47
New Hampshire A000501 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service 7,302,262.92 7,302,262.92
New Hampshire A000909 Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 239,437.14 25,239,437.14
New Hampshire A000909 Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 29,156.47 29,156.47
New Hampshire A000909 Rockingham >= 200,000 State HIGHWAY BRIDGE PROGRAM Bridge Replacement - No Added Capacity 216,274.90 216,274.90
New Hampshire A000909 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 61,513,660.17 131,486,849.67
New Hampshire A000909 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 5,447,601.50 10,399,966.50
New Hampshire A000909 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,386,000.00 1,386,000.00
New Hampshire A000909 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 5,250,000.00 20,800,000.00
New Hampshire A000909 Rockingham >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity 190,000.00 190,000.00
New Hampshire A000909 Rockingham >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering 1,100,000.00 1,100,000.00
New Hampshire A000909 Rockingham >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Bridge Replacement - No Added Capacity 721,476.00 721,476.00
New Hampshire A000909 Rockingham >= 200,000 State REDISTRIBUTION OF TIFIA FUNDS Bridge Replacement - No Added Capacity 178,854.83 178,854.83
New Hampshire A000909 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 14,844,585.52 14,844,585.52
New Hampshire A000909 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 7,183,000.00 7,183,000.00
New Hampshire A000909 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 49,999.99 149,999.99
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Bridge Rehabilitation - Added Capacity 13,646,127.59 13,646,127.59
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering 1,084,600.00 1,084,600.00
New Hampshire A001154 Grafton >= 50,000 AND < State HIGHWAY INFRA PROGRAM APPORT Bridge Rehabilitation - 3,864,659.86 3,864,659.86
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Right of Way 4,950.00 49,450.00
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 0.00 1,559,601.28
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Other 0.00 7,250.98
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 700,040.00 700,040.00
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Rehabilitation - Added Capacity 10,000,000.00 12,719,895.88
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity 0.00 13,173,728.63
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 2,799,800.00
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,251,360.00 1,488,960.00
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 30,971,161.39
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 10,323,720.46
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction 0.00 589,383.00
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction 0.00 196,461.00
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 0.00 3,567,767.90
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 2,559,085.80 2,599,827.08
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 13,580.43
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff 0.00 1,847,163.91
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff 0.00 7,975.00
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 55,000.00 55,000.00
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 8,357.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - No Added Capacity 2,637,060.74 2,637,060.74
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT Bridge New Construction 15,874,418.05 15,874,418.05
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT Construction Engineering 2,124,650.00 2,124,650.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT Environmental Only 167,486.97 167,486.97
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT Other 1,122,152.06 1,122,152.06
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 87,413.33 87,413.33
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity 0.00 3,871,690.15
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction 5,500,000.00 40,703,902.94
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 1,386,000.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 1,695.98 1,167,837.98
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 2,713,095.02 3,229,115.02
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 297,000.00 8,377,000.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 0.00 818,994.00
New Hampshire A004375 Rockingham >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Bridge Replacement - No Added Capacity 2,769,912.20 2,769,912.20
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 40,141,481.66
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 1,711,799.19
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 0.00 1,969,577.09
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 0.00 12,914,107.24
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 0.00 674,656.00
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 4,252,203.12 4,832,082.16
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 479,977.91 737,840.84
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff 0.00 203,624.14
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff 0.00 101,842.61
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 1,052,736.16
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 44,893.04
New Hampshire A004375 Rockingham >= 200,000 Local REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity 26,995.80 26,995.80
New Hampshire A004375 Rockingham >= 200,000 Local REPURPOSED SPECIAL Bridge Replacement - No Added Capacity 1,009,436.29 1,009,436.29
New Hampshire A004376 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 16,465,739.38
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 25,775,767.49
New Hampshire A004376 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction 0.00 184,175.30
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction 0.00 288,311.35
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 0.00 4,049,825.40
New Hampshire A004376 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 857,571.96 857,571.96
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 2,319,418.38 2,416,022.34
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff 0.00 102,839.21
New Hampshire A004377 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 22,984,019.63
New Hampshire A004377 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 0.00 1,618,880.11
New Hampshire A004377 Grafton >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 0.00 1,764,376.34
New Hampshire A004377 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,528,184.71 1,528,184.71
New Hampshire A004377 Grafton >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 225,863.32 251,274.21