RECIPIENT | PROJECT NUMBER | COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | 730,404.56 | 730,404.56 |
New Hampshire | A000124 | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | 22,402.15 | 22,402.15 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | 1,838,760.53 | 1,838,760.53 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 64,897.38 | 64,897.38 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 8,869,173.47 | 27,921,874.34 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 0.00 | 88,537.27 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,674,255.04 | 9,235,736.31 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 9,789,155.91 | 9,789,155.91 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | 6,138,310.43 | 6,138,310.43 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 0.00 | 11,896.00 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 366,108.89 | 366,108.89 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 22,179,629.74 | 22,179,629.74 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 0.00 | 34,455.44 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 5,955,256.37 | 5,955,256.37 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 0.00 | 153,943.36 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 99,312.79 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 11,307,551.58 | 11,307,551.58 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | 2,534,083.87 | 3,016,004.77 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 582,788.40 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 20,886,704.64 | 23,044,367.26 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.00 | 35,243.85 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 7,630,190.00 | 7,630,190.00 |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | 4,763,883.19 | 4,763,883.19 |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 575,746.01 |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 14,366,895.37 | 14,366,895.37 |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 16,421,279.71 | 16,421,279.71 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 261,906.99 | 261,906.99 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 16,927,117.34 | 16,927,117.34 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,082,231.87 | 1,082,231.87 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 1,050,177.65 | 1,050,177.65 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 46,594.78 | 46,594.78 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,337,500.00 | 2,337,500.00 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 2,603,653.82 | 2,603,653.82 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 243,044.38 | 263,805.47 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 150,000.00 | 150,000.00 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 12,373.20 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 495,000.00 | 495,000.00 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 1,726,834.83 | 1,726,834.83 |
New Hampshire | A000143 | Hillsborough | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 207,620.00 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | 1,667,225.73 | 9,854,228.36 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 0.00 | 15,099.66 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | 981,897.76 | 981,897.76 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Other | 2.00 | 2.00 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | 1,980,000.00 | 1,980,000.00 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 65,182.95 | 136,786.21 |
New Hampshire | A000501 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 923,941.76 | 1,244,754.64 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 8,275,722.58 | 34,432,178.47 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 7,302,262.92 | 7,302,262.92 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 239,437.14 | 25,239,437.14 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 29,156.47 | 29,156.47 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM | Bridge Replacement - No Added Capacity | 216,274.90 | 216,274.90 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 61,513,660.17 | 131,486,849.67 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,447,601.50 | 10,399,966.50 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,386,000.00 | 1,386,000.00 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 5,250,000.00 | 20,800,000.00 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 190,000.00 | 190,000.00 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,100,000.00 | 1,100,000.00 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | 721,476.00 | 721,476.00 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge Replacement - No Added Capacity | 178,854.83 | 178,854.83 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 14,844,585.52 | 14,844,585.52 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 7,183,000.00 | 7,183,000.00 |
New Hampshire | A000909 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 49,999.99 | 149,999.99 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | 13,646,127.59 | 13,646,127.59 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 1,084,600.00 | 1,084,600.00 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Rehabilitation - | 3,864,659.86 | 3,864,659.86 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | 4,950.00 | 49,450.00 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 1,559,601.28 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 7,250.98 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 700,040.00 | 700,040.00 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | 10,000,000.00 | 12,719,895.88 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 0.00 | 13,173,728.63 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 2,799,800.00 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,251,360.00 | 1,488,960.00 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 30,971,161.39 |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 10,323,720.46 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 589,383.00 |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 196,461.00 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 3,567,767.90 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,559,085.80 | 2,599,827.08 |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 13,580.43 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 0.00 | 1,847,163.91 |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 0.00 | 7,975.00 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 55,000.00 | 55,000.00 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 8,357.00 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - No Added Capacity | 2,637,060.74 | 2,637,060.74 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge New Construction | 15,874,418.05 | 15,874,418.05 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 2,124,650.00 | 2,124,650.00 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Environmental Only | 167,486.97 | 167,486.97 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Other | 1,122,152.06 | 1,122,152.06 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 87,413.33 | 87,413.33 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 0.00 | 3,871,690.15 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 5,500,000.00 | 40,703,902.94 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 1,386,000.00 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 1,695.98 | 1,167,837.98 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,713,095.02 | 3,229,115.02 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 297,000.00 | 8,377,000.00 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 818,994.00 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | 2,769,912.20 | 2,769,912.20 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 40,141,481.66 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 1,711,799.19 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 1,969,577.09 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 12,914,107.24 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 674,656.00 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,252,203.12 | 4,832,082.16 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 479,977.91 | 737,840.84 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 0.00 | 203,624.14 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 0.00 | 101,842.61 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 1,052,736.16 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 44,893.04 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | 26,995.80 | 26,995.80 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | 1,009,436.29 | 1,009,436.29 |
New Hampshire | A004376 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 16,465,739.38 |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 25,775,767.49 |
New Hampshire | A004376 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 184,175.30 |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 288,311.35 |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 4,049,825.40 |
New Hampshire | A004376 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 857,571.96 | 857,571.96 |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,319,418.38 | 2,416,022.34 |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 0.00 | 102,839.21 |
New Hampshire | A004377 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 22,984,019.63 |
New Hampshire | A004377 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 1,618,880.11 |
New Hampshire | A004377 | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 1,764,376.34 |
New Hampshire | A004377 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,528,184.71 | 1,528,184.71 |
New Hampshire | A004377 | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 225,863.32 | 251,274.21 |