RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
New York | 0016273 | NY 112 RECONS BETWEEN I-495(LIE) AND GRANNY ROAD | 29,869,849.00 | 36,296,179.00 |
New York | 0054203 | SMITHTOWN:RECONSTRUCT ROUTE 347 FROM ROUTE 111 TO MOUNT PLEASANT ROAD. | 18,837,225.00 | 32,046,532.00 |
New York | 0054213 | BROOKHAVEN:ROUTE 347 & ROUTE 112 INTERSECTION RECONSTRUCTION. | 22,124,679.00 | 38,399,446.00 |
New York | 0054233 | RECONSTRUCT NY 347 FROM GIBBS POND ROAD TO HALLOCK ROAD | 15,962,728.00 | 75,815,011.00 |
New York | 0072143 | NY878 OPERATIONAL IMPROVEMENTS | 73,458,400.00 | 96,623,000.00 |
New York | 0229563 | I495 PAVEMENT REHAB NASS LINE TO EXIT 55 | 0.00 | 42,873,732.00 |
New York | 0229573 | I495 Pavement Resurfacing Exit 55 to Exit 64 | 0.00 | 47,965,959.00 |
New York | 0760653 | NASSAU COUNTY BRIDGE REHAB | 227,411.00 | 27,900,000.00 |
New York | 0761353 | WALT WHITMAN RD OVER I495 BRIDGE WIDENING | 24,806,929.00 | 31,872,144.00 |
New York | 1051573 | ALBANY:INTERSTATE 787 & ROUTE 912S FROM ROUTE 9W TO ROUTE 5 FOR BRIDGE REHABILITATION AND HIGHWAY RESURFACING. | 32,552,129.00 | 37,672,499.00 |
New York | 1085423 | NISKAYUNA:ROUTE 146 OVER THE MOHAWK RIVER (REXFORD BRIDGE) AND ROUTE 146 AT AQUEDUCT ROAD-BRIDGE REPLACEMENT & INTERSECTION IMPROV | 10,824,500.00 | 33,665,965.00 |
New York | 1306503 | COLONIE:ROUTE 7 OVER INTERSTATE 87 AT EXIT 6 FOR BRIDGE REPLACEMENT. | 31,531,923.00 | 44,719,964.00 |
New York | 1306813 | RT. 7 OVER THE HUDSON RIVER, BRIDGE REPAIR | 25,732,635.00 | 32,315,797.00 |
New York | 1721513 | COLONIE:INTERSTATE 87 EXIT 4 ACCESS IMPROVEMENTS (PHASE 1) I-87 OVER ALBANY SHAKER RD-PAVEMENT RECONSTRUCTION & BRIDGE REPLACEMENT | 22,580,577.00 | 25,389,497.00 |
New York | 1721903 | I-87: EXIT 4, AIRPORT CONNECTOR, PART2 | 32,190,343.00 | 35,817,048.00 |
New York | 2134413 | UTICA:ROUTES 5, 8, & 12/NORTH SOUTH ARTERIAL & VIADUCT FROM BURRSTONE ROAD TO ORISKANY CIRCLE FOR RECONSTRUCTION. | 53,972,250.00 | 67,465,312.00 |
New York | 3506413 | SYRACUSE:INTERSTATE 690 OVER TEALL AVENUE AND BEECH STREET-BRIDGE REPLACEMENT PROJECT. | 67,257,000.00 | 74,730,000.00 |
New York | 4390303 | I390/490 NORTHBOUND RAMPS REALIGNMENT | 53,678,092.00 | 61,012,624.00 |
New York | 4390543 | I-390 INTERCHANGE IMPROVEMENTS @ I-490 (STAGES 3 & 4) [SEE COMPANION PROJECT 4390544 FOR NON-INTERSTATE 4390.54.322] | 40,140,949.00 | 68,429,791.00 |
New York | 4935793 | PORTAGE & GENESEE FALLS:NORFOLK SOUTHERN RAILROAD-OWNED PORTAGEVILLE RAILROAD BRIDGE OVER THE GENESEE RIVER FOR BRIDGE REPLACEMENT | 10,000,000.00 | 71,140,467.00 |
New York | 5134453 | RT 5 (SKYWAY) REHABILITATION | 27,802,266.00 | 35,204,458.00 |
New York | 5760803 | BUFFALO:NY GATEWAY CONNECTIONS IMPROVEMENT TO THE US PEACE BRIDGE PLAZA. | 46,087,513.00 | 66,198,804.00 |
New York | 6008223 | LINDLEY:ROUTE 15 FROM WATSONS CREEK TO PRESHO (PHASE 2) - CONSTRUCT 7 BRIDGES TO COMPLETE THE EXPRESSWAY. | 27,626,352.00 | 34,532,940.00 |
New York | 6066583 | ELMIRA, ASHLAND, & CHEMUNG:RECONSTRUCTION OF ROUTE 17 (WATER ST INTERCHANGE-CHEMUNG RIVER) & COUNTY ROUTE 60 (JERUSALEM HILL-CR 8) | 50,325,105.00 | 62,906,382.00 |
New York | 8006723 | WARWICK:ROUTE 17 EXIT 122 INTERCHANGE RECONSTRUCTION. | 39,617,125.00 | 81,971,616.00 |
New York | 8006843 | ROUTE 17 @ ROUTE 32 (EXIT 131) INTERCHANGE RECONSTRUCTION TOWNS OF MONROE AND WOODBURY ORANGE COUNTY. NY DEMO #583 | 113,157,814.00 | 142,642,639.00 |
New York | 8018463 | 801846 - ROUTE 28 / ESOPUS CREEK-BRIDGE REPLACEMENT - BIN 1091290, CIN C870151 | 20,837,454.00 | 26,046,819.00 |
New York | 8062093 | DEERPARK:INTERSTATE 84 OVER THE DELAWARE RIVER BETWEEN NEW YORK AND PENNSYLVANIA AND COUNTY ROUTE 16 FOR BRIDGE REHABILITATION. | 29,316,541.00 | 47,201,137.00 |
New York | 8101463 | WESTCHESTER COUNTY BRIDGES: HRP, SMRP, ROUTE 1 | 92,932,000.00 | 119,452,241.00 |
New York | 8127263 | TACONIC STATE PARKWAY @ PUDDING STREET INTERCHANGE, NEW GRADE SEPARATED INTERCHANGE, TOWN OF PUTNAM VALLEY PUTNAM COUNTY | 22,271,363.00 | 32,453,463.00 |
New York | 8239453 | ROUTE 9W: SEVEN BRIDGE REPLACEMENTS AND REHABILITATIONS IN THE TOWNS OF HIGHLANDS, CORNWALL, AND NEW WINDSOR, ORANGE COUNTY | 23,040,000.00 | 28,800,000.00 |
New York | 8808623 | WURTS STREET / DOCK STREET & RONDOUT CREEK | 32,328,043.00 | 48,940,670.00 |
New York | 8813543 | NORTH SALEM & SOUTHEAST:INTERSTATE 684 RESURFACING FROM HARDSCRABBLE ROAD TO INTERSTATE 84. | 46,993,682.00 | 52,215,204.00 |
New York | 8813683 | BRIDGE REHABILITATION/REPLACE: WESTCHESTER COUNTY | 15,147,422.00 | 29,244,144.00 |
New York | 8814073 | I-684 PMI PAVING: HUTCHINSON RIVER PARKWAY TO ROUTE 172 OVERPASS, TOWN OF BEDFORD, WESTCHESTER COUNTY | 26,353,756.00 | 29,281,952.00 |
New York | 8LHT113 | Lower Hudson Transit Link (8823.50 & 8823.51) | 70,987,368.00 | 119,616,998.00 |
New York | 8TZ1003 | ROCKLAND AND WESTCHESTER COUNTIES:TAPPEN ZEE BRIDGE OVER THE HUDSON RIVER FOR BRIDGE REPLACEMENT (DESIGN/BUILD CONTRACT). | 0.00 | 3,216,685,500.00 |
New York | 9066743 | LIBERTY:ROUTE 17 @ PARKSVILLE BETWEEN MORRSTON EB ENT RAMP & FOX MOUNTAIN RD END 2 KM E OF COOLEY RD FOR RECONSTRUCT & NEW CONST. | 59,444,048.00 | 96,596,293.00 |
New York | 9067173 | THOMPSON:UPGRADE ROUTE 17 TO INTERSTATE STANDARDS BETWEEN EXITS 107 & 108 INCL REPL OF BRIDGE OVER THE NEVERSINK RIVER. | 26,288,633.00 | 30,625,889.00 |
New York | 9358223 | I-88 PAVEMENT & BRIDGE PROJECT, OTSEGO AND SCHOHARIE COUNTIES | 35,430,129.00 | 50,202,238.00 |
New York | 9358433 | I-88 EXIT 17 TO 18, CRACK & SEAT | 9,000,000.00 | 35,364,120.00 |
New York | 9500613 | BINGHAMTON:INTERSTATE 81/ROUTE 17 INTERCHANGE RECONSTRUCTION ROUTE 17 FROM EXIT 71 E TO EXIT 4 ON 17/ I-81OVERLAP & N TO EXIT 5 ON I-81. | 139,709,574.00 | 162,676,757.00 |
New York | 9500804 | BINGHAMTON:INTERSTATE 81/ROUTE 17 INTERCHANGE RECONSTRUCTION (PROSPECT MOUNTAIN PHASE 2) RECONST INTERCHANGE 4, INCL NEW BRIDGES, | 23,444,954.00 | 167,243,863.00 |
New York | NYCD001 | NEW YORK CITY:VARIOUS HIGHWAYS IN THE VICINITY OF THE WORLD TRADE CENTER FOR AN ER PROJECT (9/11/2001 ATTACK). | 97,604,976.00 | 97,604,976.00 |
New York | X021523 | NEW YORK CITY (BROOKLYN):REPLACEMENT OF THE BELT PARKWAY BRIDGE OVER MILL BASIN IN BROOKLYN, NY TO BRING TO A STATE OF GOOD REPAIR | 174,589,918.00 | 296,237,396.00 |
New York | X021543 | NEW YORK CITY:REHABILITATION OF THE BELT PARKWAY BRIDGE OVER GERRITSON INLET. | 84,883,281.00 | 106,104,105.00 |
New York | X021623 | NEW YORK CITY (BROOKLYN):REPLACEMENT OF SHORE (BELT) PARKWAY BRIDGES OVER PAERDEGAT BASIN, ROCKWAY PARKWAY, AND FRESH CREEK. | 256,639,176.00 | 320,798,970.00 |
New York | X027083 | BRONX RIVER GREENWAY SEGMENT PHASE 2 | 28,007,063.00 | 37,344,830.00 |
New York | X051603 | KGI INFRASTRUCTURE & OPERATIONAL IMPROVEMENT IN QUEENS CO. | 3,576,101.00 | 365,706,001.00 |
New York | X071483 | NEW YORK CITY:RECONSTRUCT THE HARLEM RIVER DRIVE VIADUCT BETWEEN E 125th & E 132nd ST INCLUDE CONST OF ENTRANCE RAMP FROM 3rd AVE ONTO SOUTHBOUND HRD. | 72,857,883.00 | 108,306,433.00 |
New York | X110263 | REPLACEMENT OF BRONX RIVER PARKWAY BRIDGES OVER MNRR, BRONX CO. (BINS 1075049 & 1075059) | 21,090,252.00 | 78,665,000.00 |
New York | X228693 | MOBILITY IMPROVEMENT ON LIE EB B/T CLEARVIEW EXPWY & SPRINGFIELD BLVD, REPLACEMENT OF OCEANIA ST BRIDGE OVER LIE IN QUEENS COUNTY, NYC (BIN: 1055300) | 10,000,000.00 | 83,750,002.00 |
New York | X550663 | NYC:RECONSTRUCTION OF TILLARY ST AREA TO IMPROVE RIDEABILITY, DRAINAGE AND ACCESSIBILITY AMONG BICYCLISTS AND PEDESTRIANS. | 12,867,048.00 | 30,624,560.00 |
New York | X720303 | NYC:DECK REPL & MINOR REHAB OF STRUCTURAL STEEL ON MAJOR DEEGAN EXPWY BETWEEN 138TH ST & 161ST ST/MACOMBS DAM BR INTERCHANGE. | 111,290,173.00 | 149,879,247.00 |
New York | X720313 | REPLACEMENT OF EAST 138TH STREET BRIDGE OVER MAJOR DEEGAN EXPRESSWAY | 0.00 | 52,860,002.00 |
New York | X720393 | Rehab of Major Deegan Expy Between W.161st St & Highbridge Interchange (BINS 1067451, 1066840) & Depot Pl Bridge Rehab over MDE (BIN 1067452) in Bronx | 112,881,833.00 | 128,310,051.00 |
New York | X726993 | NEW YORK CITY:REHAB 3 BRIDGES ALONG THE CROSS BRONX EXPRESSWAY HIGH- BRIDGE INTERCHANGE. | 45,350,697.00 | 84,509,372.00 |
New York | X727163 | REPLACEMENT OF RAMP OCH, SHERIDAN BLVD. NORTH TO CBE WEST | 25,948,514.00 | 49,144,912.00 |
New York | X729773 | NEW YORK CITY:KOSCIUSZKO BRIDGE REPLACEMENT - Phase II. | 349,186,006.00 | 355,340,360.00 |
New York | X730813 | NEW YORK CITY:MAJOR REHABILITATION OF THE GOWANUS EXPRESSWAY FROM THE VERRAZANO NARROWS BRIDGE TO BROOKLYN BATTERY TUNNEL. | 203,918,152.00 | 252,410,260.00 |
New York | X731273 | BRUCKNER EXPWY-HUTCHINSON PKWY MOBILITY IMPROVEMENT PROJECT, BRONX CO., NYC | 1,439,840.00 | 39,871,634.00 |
New York | X731283 | NYC (BROOKLYN):GOWANUS EXPWAY VIADUCT (92nd STREET-48th STREET) STEEL INTERIM REPAIRS FOR STRUCTURAL DEFICIENCIES. | 48,438,472.00 | 57,954,848.00 |
New York | X731453 | REHABILITATION OF BRUCKNER BLVD VIADUCT (278I). BRONX, NYC | 32,752,000.00 | 209,100,000.00 |
New York | X731473 | DECK REPLACEMENT OF FIVE BRIDGES ON I-278, KINGS & RICHMOND | 51,848,443.00 | 80,341,790.00 |
New York | X731493 | ARTHUR SHERIDAN ENHANCEMENT (I-895) | 50,863,008.00 | 63,578,761.00 |
New York | X731613 | GOWANUS EXPRESSWAY STEEL REPAIRS & RAMP D DECK REPLACEMENT, KINGS COUNTY | 28,725,858.00 | 31,917,622.00 |
New York | X731633 | HUNTS POINT TRUCK ACCESS IMPROVEMENT PROJECT PHASE 1, BRONX CO. NYC | 331,874,646.00 | 571,215,162.00 |
New York | X731683 | REHABILITATION OF THE WOOLLEY AVE AND BRADLEY AVE BRIDGES OVER STATEN ISLAND EXPRESSWAY IN RICHMOND COUNTY, NY | 0.00 | 39,990,298.00 |
New York | X735753 | NEW YORK CITY:REPLACEMENT OF VAN WYCK EXPRESSWAY. | 120,455,188.00 | 120,455,188.00 |
New York | X735773 | NYC:REPL OF VAN WYCK EXPWY VIADUCTS AT THE KGI, NB VAN WYCK EXPWY/ GRAND CENTRAL PKWY, UNION TPKE & JACKIE ROBINSON PKWY. | 109,009,471.00 | 138,658,347.00 |
New York | X735803 | VAN WYCK EXPRESSWAY VIADUCT REHABILITATION, QUEENS COUNTY | 66,443,318.00 | 133,064,009.00 |
New York | X757003 | NEW YORK CITY:WILLIS AVENUE OVER THE HARLEM RIVER FOR BRIDGE REPLACEMENT. | 217,541,858.00 | 537,970,865.00 |
New York | X757533 | BROADWAY BRIDGE REHABILITATION (2240137) | 88,720,000.00 | 110,900,000.00 |
New York | X758863 | MADISON AVE. BRIDGE REHAB (BIN 2240079) | 21,400,000.00 | 30,353,000.00 |
New York | X758923 | NEW YORK CITY (QUEENS):ROOSEVELT AVENUE OVER THE VAN WYCK EXPRESSWAY/INTERSTATE 678 FOR BRIDGE REHABILITATION. | 53,333,335.00 | 70,266,669.00 |
New York | X759193 | NYC, ER EVENT 01-02, SEPTEMBERR 11, 2001, RECONSTRUCTION OF WORTH ST, HUDSON ST. TO EAST BROADWAY | 12,000,000.00 | 95,000,000.00 |
New York | X759213 | ER EVENT NY2001-02, 9/11, NYC, MANHATTAN RECONSTRUCTION OF WARREN AND JOHN STREETS. | 11,300,000.00 | 30,700,000.00 |
New York | X759843 | NEW YORK CITY:ROUTE 9A WEST STREET PROMENADE - SITE PROJECT FOR RECONSTRUCTION. | 105,415,792.00 | 119,050,170.00 |
New York | X759846 | NEW YORK CITY:ROUTE 9A NORTH AND WEST PROMENADE PROJECT EXTRA TASKS FOR CONSTRUCTION INSPECTION AND CONSTRUCTION SUPPORT SERVICES. | 38,781,817.00 | 38,781,817.00 |
New York | X761243 | IMPLEMENT PHASE FOUR OF GRAND CONCOURSE SAFETY IMPROVEMENTS | 18,456,401.00 | 60,566,864.00 |
New York | X761263 | REHAB BROOKLYN BRIDGE, MANHATTAN APPROACHES (CONTRACT 7) | 49,326,074.00 | 271,540,843.00 |
New York | X761264 | REHABILITATE THE MANHATTAN APPROACHES TO THE BROOKLYN BRIDGE IN NY COUNTY | 39,200,000.00 | 41,263,158.00 |
New York | X762074 | TMC OPERATIONAL SUPPORT FOR FFY 19 | 36,250,000.00 | 62,556,415.00 |
New York | X764203 | PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES | 4,823,955.00 | 25,444,625.00 |
New York | X764263 | WILLIAMSBURG BRIDGE REHABILITATION CONTRACT # 9 (BIN2240039), NEW YORK COUNTY | 0.00 | 153,495,936.00 |
New York | X770183 | NEW YORK CITY:GRAND CONCOURSE IMPROVEMENTS FROM EAST 166th STREET TO EAST 171st STREET. | 19,894,600.00 | 26,176,750.00 |
New York | X770783 | NYC:REPLACEMENT OF CITY ISLAND ROAD BRIDGE OVER EASTCHESTER BAY WITH A SINGLE SPAN CABLE-STAYED STRUCTURE. | 99,612,848.00 | 124,516,060.00 |
New York | X772433 | NEW YORK CITY:UNIONPORT BRIDGE REPLACEMENT | 148,887,200.00 | 219,812,003.00 |
New York | X772483 | NEW YORK CITY:REHABILITATION OF ATLANTIC AVENUE BRIDGE | 27,512,200.00 | 77,785,931.00 |
New York | X772513 | REHABILITATE RIVERSIDE DRIVE BRIDGE/W 158TH STREET (2246720) | 53,333,600.00 | 82,758,144.00 |
New York | X772563 | NEW YORK CITY:REHABILITATE THE WESTCHESTER AVENUE BRIDGE OVER THE HUTCHINSON RIVER PARKWAY. | 34,859,000.00 | 45,408,750.00 |
New York | X772843 | REHABILITATION MANHATTAN BRIDGE STRUCTURAL COMPONENTS (2240028) | 37,336,000.00 | 73,019,628.00 |
New York | X772863 | NEW YORK CITY:THE MACOMBS DAM BRIDGE OVER THE HARLEM RIVER FOR BRIDGE REHABILITATION. | 32,109,825.00 | 49,652,282.00 |
New York | X773093 | BROOKLYN WATERFRONT GREENWAY GOWANUS CONNECTOR | 0.00 | 30,948,284.00 |
New York | X773113 | SAFETY IMPROVEMENTS ON 4TH AVENUE IN BROOKLYN (REPURPOSED EARMARK NY650 - PROGRAM CODE RPS9) | 6,907,375.00 | 50,677,414.00 |
New York | X773363 | RECONSTRUCTION OF TILLARY STREET (PHASE 2) (BROOKLYN), NEW YORK CITY. | 14,667,000.00 | 41,600,000.00 |
New York | X777013 | EMERGENCY RELIEF NY2013-01, HURRICANE SANDY, NYCDOT (QUEENS COUNTY) PERMANENT FLOOD REPAIRS TO METROPOLITAN AVE BRIDGE BY CONTRACT | 22,600,000.00 | 28,250,000.00 |
New York | X777044 | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO MOVEABLE BRIDGES BY CONTRACT FORCES. | 41,673,232.00 | 52,091,540.00 |
New York | X777114 | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO BATTERY PARK AND WEST STREET UNDERPASSES BY CONTRACT FORCES. | 53,418,887.00 | 66,773,609.00 |
New York | X777811 | ER EVENT NY13-01, HURRICANE SANDY, QUEENS CO., PERMANENT REPAIRS TO PAVEMENT FROM STORM SURGE, ROCKAWAY BEACH BLVD FR 73 TO 88 ST | 16,332,765.00 | 30,534,013.00 |
New York | X807233 | REPAIR CONCRETE SUBSTRUCTURES AND OTHER DETERIORATED ELEMENTS IN THE BRONX, KINGS & QUEENS | 44,295,654.00 | 55,369,567.00 |
New York | XM12533 | NEW YORK CITY:BRIDGE CORRECTIVE MAINTENANCE AT VARIOUS LOCATIONS. | 26,323,738.00 | 71,485,914.00 |
New York | XM16563 | BRIDGE EXPANSION JOINTS REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN NYC | 23,289,640.00 | 31,963,325.00 |
New York | XM17033 | FDR Drive Cleaning and Painting - South Street, NY, NY | 4,122,656.00 | 38,123,007.00 |