RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
New York | 0016273 | Suffolk | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 5,280,000.00 | 6,600,000.00 |
New York | 0016273 | Suffolk | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 6,765,335.00 | 7,517,039.00 |
New York | 0016273 | Suffolk | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 730,823.00 | 812,026.00 |
New York | 0016273 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 14,856,111.00 | 18,570,139.00 |
New York | 0016273 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,237,580.00 | 2,796,975.00 |
New York | 0054203 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 18,391,454.00 | 31,489,318.00 |
New York | 0054203 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 445,771.00 | 557,214.00 |
New York | 0054213 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 19,264,209.00 | 34,266,159.00 |
New York | 0054213 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,600,000.00 | 2,557,700.00 |
New York | 0054213 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,260,470.00 | 1,575,587.00 |
New York | 0054233 | Suffolk | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | 3,325,780.00 | 4,157,225.00 |
New York | 0054233 | Suffolk | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 1,082,936.00 | 1,353,670.00 |
New York | 0054233 | Suffolk | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | 121,708.00 | 5,397,858.00 |
New York | 0054233 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 45,708,498.00 |
New York | 0054233 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 4,907,380.00 |
New York | 0054233 | Suffolk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 9,672,344.00 | 12,090,430.00 |
New York | 0054233 | Suffolk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,759,960.00 | 2,199,950.00 |
New York | 0072143 | Nassau | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 50,193,779.00 | 67,542,224.00 |
New York | 0072143 | Nassau | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,218,400.00 | 1,523,000.00 |
New York | 0072143 | Nassau | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 22,046,221.00 | 27,557,776.00 |
New York | 0229563 | Nassau | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 47,161.11 |
New York | 0229563 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 42,826,570.89 |
New York | 0229573 | Suffolk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 47,965,959.00 |
New York | 0760653 | Nassau | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 4,211.00 | 26,350,000.00 |
New York | 0760653 | Nassau | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 1,271,000.00 |
New York | 0760653 | Nassau | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 200,000.00 | 250,000.00 |
New York | 0760653 | Nassau | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 23,200.00 | 29,000.00 |
New York | 0761353 | Suffolk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 22,566,929.00 | 28,208,662.00 |
New York | 0761353 | Suffolk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,240,000.00 | 2,800,000.00 |
New York | 0761353 | Suffolk | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 863,482.00 |
New York | 1051573 | Albany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 24,513,013.00 | 28,740,147.00 |
New York | 1051573 | Albany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 8,039,116.00 | 8,932,352.00 |
New York | 1085423 | Saratoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 10,824,500.00 | 33,665,965.00 |
New York | 1306503 | Albany | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | 27,767,931.00 | 40,285,011.00 |
New York | 1306503 | Albany | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 2,920,500.00 | 3,497,739.00 |
New York | 1306503 | Albany | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 843,492.00 | 937,214.00 |
New York | 1306813 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 3,616,714.00 | 4,670,893.00 |
New York | 1306813 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 361,671.00 | 452,089.00 |
New York | 1306813 | Albany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 19,787,500.00 | 24,734,377.00 |
New York | 1306813 | Albany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,866,750.00 | 2,333,438.00 |
New York | 1306813 | Statewide | N/A | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - Maintenance Resurfacing | 100,000.00 | 125,000.00 |
New York | 1721513 | Albany | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | 2,159,760.00 | 2,699,700.00 |
New York | 1721513 | Albany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Archaeological Planning & Research | 630,000.00 | 700,000.00 |
New York | 1721513 | Albany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 17,639,817.00 | 19,599,797.00 |
New York | 1721513 | Albany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,151,000.00 | 2,390,000.00 |
New York | 1721903 | Albany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 28,680,343.00 | 31,917,048.00 |
New York | 1721903 | Albany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,510,000.00 | 3,900,000.00 |
New York | 2134413 | Oneida | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 49,799,429.00 | 62,249,286.00 |
New York | 2134413 | Oneida | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,172,821.00 | 5,216,026.00 |
New York | 3506413 | Onondaga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 67,257,000.00 | 74,730,000.00 |
New York | 4390303 | Monroe | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 13,482,580.00 | 14,980,645.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | 22,338,536.00 | 24,820,596.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge New Construction | 4,202,258.00 | 4,669,176.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Rehabilitation - Added Capacity | 3,074,060.00 | 3,415,622.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Rehabilitation - No Added Capacity | 2,385,146.00 | 2,650,162.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 58,437.00 | 1,435,227.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 1,272,296.00 | 1,413,663.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 2,703,779.00 | 3,004,199.00 |
New York | 4390303 | Monroe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,161,000.00 | 4,623,334.00 |
New York | 4390543 | Monroe | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 5,664,014.00 | 6,293,350.90 |
New York | 4390543 | Monroe | >= 200,000 | Other | INTERSTATE MAINTENANCE | 4R - Added Capacity | 1,123,206.00 | 1,248,007.10 |
New York | 4390543 | Monroe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 28,473,000.00 | 54,250,453.41 |
New York | 4390543 | Monroe | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,527,000.00 | 2,911,613.59 |
New York | 4390543 | Monroe | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 2,795,333.10 | 3,105,926.05 |
New York | 4390543 | Monroe | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 558,395.90 | 620,439.95 |
New York | 4935793 | Statewide | N/A | Other | CONGESTION AIR QUALITY | Bridge Replacement - No Added Capacity | 10,000,000.00 | 71,140,467.00 |
New York | 5134453 | Erie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 16,953,941.76 | 21,493,480.42 |
New York | 5134453 | Erie | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 8,479,514.24 | 10,749,964.58 |
New York | 5134453 | Erie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,315,038.01 | 2,893,798.00 |
New York | 5134453 | Erie | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 53,771.99 | 67,215.00 |
New York | 5760803 | Erie | >= 200,000 | State | COORD BORDER INFRA PROGRAM | Bridge Rehabilitation - No Added Capacity | 13,152,352.00 | 13,152,352.00 |
New York | 5760803 | Erie | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge Rehabilitation - No Added Capacity | 806,832.00 | 1,008,540.00 |
New York | 5760803 | Erie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 15,847,188.00 | 15,847,188.00 |
New York | 5760803 | Erie | >= 200,000 | State | TRANSPORTATION IMP PROJ | Bridge Rehabilitation - No Added Capacity | 16,281,141.00 | 36,190,724.00 |
New York | 6008223 | Steuben | >= 50,000 AND < 200,000 | N/A | APPALACHIAN DEVEL HWY | Bridge New Construction | 22,051,972.00 | 27,564,965.00 |
New York | 6008223 | Steuben | >= 50,000 AND < 200,000 | N/A | APPALACHIAN DEVEL HWY | Construction Engineering | 2,205,198.00 | 2,756,497.00 |
New York | 6008223 | Steuben | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | 2,861,584.00 | 3,576,980.00 |
New York | 6008223 | Steuben | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 507,598.00 | 634,498.00 |
New York | 6066583 | Chemung | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | 1,799,770.00 | 2,249,713.00 |
New York | 6066583 | Chemung | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 2,000,000.00 | 2,500,000.00 |
New York | 6066583 | Chemung | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,309,519.00 | 4,136,899.00 |
New York | 6066583 | Chemung | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 40,915,518.00 | 51,144,398.00 |
New York | 6066583 | Chemung | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,500,000.00 | 1,875,000.00 |
New York | 6066583 | Chemung | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 800,298.00 | 1,000,372.00 |
New York | 8006723 | Orange | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 50,000.00 | 55,556.00 |
New York | 8006723 | Orange | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 1,318,770.00 | 1,465,300.00 |
New York | 8006723 | Orange | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 21,966,203.00 | 26,710,390.00 |
New York | 8006723 | Orange | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,936,800.00 | 6,171,000.00 |
New York | 8006723 | Orange | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 6,121,814.00 | 41,039,947.00 |
New York | 8006723 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 4,046,098.00 | 5,057,623.00 |
New York | 8006723 | Orange | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,177,440.00 | 1,471,800.00 |
New York | 8006843 | Orange | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 3,796,184.00 | 4,745,230.00 |
New York | 8006843 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 109,361,630.00 | 137,897,409.00 |
New York | 8018463 | Ulster | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,300,401.00 | 7,875,502.00 |
New York | 8018463 | Ulster | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 4,385,081.00 | 5,481,352.00 |
New York | 8062093 | Orange | >= 200,000 | State | BRIDGE REPLAC & REHAB - DISC | Bridge Rehabilitation - No Added Capacity | 1,881,810.00 | 2,352,263.00 |
New York | 8062093 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 23,410,737.00 | 38,424,873.00 |
New York | 8062093 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,023,994.00 | 6,424,001.00 |
New York | 8101463 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 54,031,200.00 | 69,511,344.60 |
New York | 8101463 | Westchester | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 36,020,800.00 | 46,340,896.40 |
New York | 8101463 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,728,000.00 | 2,160,000.00 |
New York | 8101463 | Westchester | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,152,000.00 | 1,440,000.00 |
New York | 8127263 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 21,051,363.00 | 28,828,463.00 |
New York | 8127263 | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,220,000.00 | 3,625,000.00 |
New York | 8239453 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 9,528,025.76 | 11,910,032.20 |
New York | 8239453 | Orange | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 9,351,974.24 | 11,689,967.80 |
New York | 8239453 | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,995,200.00 | 3,744,000.00 |
New York | 8239453 | Orange | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,164,800.00 | 1,456,000.00 |
New York | 8808623 | Ulster | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 4,013,670.00 |
New York | 8813543 | Westchester | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 15,641,348.00 | 17,379,276.00 |
New York | 8813543 | Westchester | >= 200,000 | State | INTERSTATE 4R | 4R - No Added Capacity | 787,499.00 | 874,999.00 |
New York | 8813543 | Westchester | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 4,724,991.00 | 5,249,991.00 |
New York | 8813543 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 20,022,636.00 | 22,247,373.00 |
New York | 8813543 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,817,208.00 | 6,463,565.00 |
New York | 8813683 | Westchester | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 15,147,422.00 | 21,044,157.00 |
New York | 8813683 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 2,557,579.00 |
New York | 8813683 | Westchester | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 2,557,579.00 |
New York | 8813683 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 527,324.87 |
New York | 8813683 | Westchester | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 2,557,504.13 |
New York | 8814073 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,160,000.00 | 2,400,000.00 |
New York | 8814073 | Westchester | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 24,193,756.00 | 26,881,952.00 |
New York | 8LHT113 | Westchester | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 3,156,735.88 | 3,945,919.84 |
New York | 8LHT113 | Rockland | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 1,577,184.12 | 1,971,480.16 |
New York | 8LHT113 | Westchester | >= 200,000 | State | CONGESTION AIR QUALITY | Transit | 18,472,047.77 | 34,265,550.93 |
New York | 8LHT113 | Rockland | >= 200,000 | State | CONGESTION AIR QUALITY | Transit | 33,853,578.23 | 62,569,800.07 |
New York | 8LHT113 | Rockland | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 343,679.72 | 381,866.36 |
New York | 8LHT113 | Rockland | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Construction Engineering | 171,633.70 | 190,704.10 |
New York | 8LHT113 | Westchester | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 515,519.58 | 572,799.54 |
New York | 8LHT113 | Rockland | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 965,856.14 | 1,073,173.60 |
New York | 8LHT113 | Rockland | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | 482,348.65 | 535,943.00 |
New York | 8LHT113 | Westchester | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 1,448,784.21 | 1,609,760.40 |
New York | 8LHT113 | Westchester | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 134,386.56 | 167,983.20 |
New York | 8LHT113 | Rockland | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 44,795.52 | 55,994.40 |
New York | 8LHT113 | Rockland | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 22,417.92 | 28,022.40 |
New York | 8LHT113 | Rockland | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Transit | 6,580,047.23 | 8,225,059.04 |
New York | 8LHT113 | Rockland | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Transit | 23,516.16 | 29,395.20 |
New York | 8LHT113 | Westchester | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Transit | 3,194,836.61 | 3,993,545.76 |
New York | 8TZ1003 | Statewide | N/A | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 3,216,685,500.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS | 4R - Added Capacity | 2,659,264.00 | 3,324,080.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 1,490,462.00 | 1,863,078.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Ferry Boats | 6,559,249.00 | 8,199,062.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRASTRUCTURE | 4R - Added Capacity | 4,999,995.00 | 6,249,994.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 4,383,144.00 | 4,870,160.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,384,435.00 | 1,730,544.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 30,767,375.00 | 61,359,219.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 7,039,999.00 | 8,799,999.00 |
New York | 9066743 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 160,125.00 | 200,157.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Bridge Replacement - Added Capacity | 5,248,764.00 | 5,248,764.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | Bridge Replacement - Added Capacity | 1,089,114.00 | 1,089,114.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 5,884,794.00 | 7,355,993.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,736,000.00 | 2,170,000.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 5,899,693.00 | 7,374,617.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 15,692.00 | 19,615.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | SEC 115 UNOBL BAL TRANSF | Bridge Replacement - Added Capacity | 2,601,742.00 | 2,601,742.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 60,000.00 | 75,000.00 |
New York | 9067173 | Sullivan | >= 50,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,752,834.00 | 4,691,044.00 |
New York | 9358223 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 32,430,129.00 | 45,569,898.00 |
New York | 9358223 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,000,000.00 | 4,632,340.00 |
New York | 9358433 | Otsego | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 2,000,400.00 | 10,579,438.80 |
New York | 9358433 | Otsego | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 3,999,600.00 | 21,152,531.20 |
New York | 9358433 | Otsego | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,000,200.00 | 1,210,958.80 |
New York | 9358433 | Otsego | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,999,800.00 | 2,421,191.20 |
New York | 9500613 | Broome | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 60,021,494.00 | 66,690,549.00 |
New York | 9500613 | Broome | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 5,630,130.00 | 6,255,700.00 |
New York | 9500613 | Broome | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 461,915.00 | 513,239.00 |
New York | 9500613 | Broome | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 59,384,074.00 | 71,452,316.00 |
New York | 9500613 | Broome | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,565,705.00 | 8,207,132.00 |
New York | 9500613 | Broome | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 7,587,605.00 | 9,484,507.00 |
New York | 9500613 | Broome | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 58,651.00 | 73,314.00 |
New York | 9500804 | Broome | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 12,155,883.00 | 15,194,854.00 |
New York | 9500804 | Broome | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 11,289,071.00 | 152,049,009.00 |
New York | NYCD001 | New York | >= 200,000 | State | EMERGENCY RELIEF | Safety | 97,604,976.00 | 97,604,976.00 |
New York | X021523 | Kings | >= 200,000 | N/A | CONGESTION AIR QUALITY | Bridge Rehabilitation - No Added Capacity | 15,140,000.00 | 18,925,000.00 |
New York | X021523 | Kings | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 149,049,918.00 | 264,312,396.00 |
New York | X021523 | Kings | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 10,400,000.00 | 13,000,000.00 |
New York | X021543 | Kings | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | 5,526,343.00 | 6,907,929.00 |
New York | X021543 | Kings | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 30,974,834.00 | 38,718,543.00 |
New York | X021543 | Kings | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 48,382,104.00 | 60,477,633.00 |
New York | X021623 | Kings | >= 200,000 | Local | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | 238,319,176.00 | 297,898,970.00 |
New York | X021623 | Kings | >= 200,000 | N/A | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | 18,320,000.00 | 22,900,000.00 |
New York | X027083 | Bronx | >= 200,000 | Local | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | 89,314.00 | 2,447,643.00 |
New York | X027083 | Bronx | >= 200,000 | Local | HIGH PRIORITY PROJECTS-TEA-21 | Facilities for Pedestrians and Bicycles | 3,900,000.00 | 4,875,000.00 |
New York | X027083 | Bronx | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 2,799,791.00 | 3,499,739.00 |
New York | X027083 | Bronx | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | 7,200,209.00 | 9,000,261.00 |
New York | X027083 | Bronx | >= 200,000 | Local | REPURPOSED SPECIAL | Facilities for Pedestrians and Bicycles | 10,564,621.00 | 13,205,777.00 |
New York | X027083 | Bronx | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 3,453,128.00 | 4,316,410.00 |
New York | X051603 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 1,191,914.46 | 121,889,810.13 |
New York | X051603 | Queens | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 2,384,186.54 | 243,816,190.87 |
New York | X071483 | New York | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 72,857,883.00 | 108,306,433.00 |
New York | X110263 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 828,100.00 |
New York | X110263 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 45,424,085.00 |
New York | X110263 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 5,300,000.00 |
New York | X110263 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 6,600,000.00 | 9,000,000.00 |
New York | X110263 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 14,490,252.00 | 18,112,815.00 |
New York | X228693 | Queens | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 986,700.00 | 1,096,334.21 |
New York | X228693 | Queens | >= 200,000 | Local | FAST ACT NATIONAL FREIGHT | Construction Engineering | 13,300.00 | 14,777.79 |
New York | X228693 | Queens | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | New Construction Roadway | 8,880,300.00 | 9,867,000.00 |
New York | X228693 | Queens | >= 200,000 | Local | FAST ACT NATIONAL FREIGHT | New Construction Roadway | 119,700.00 | 133,000.00 |
New York | X228693 | Queens | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 10,963,050.60 |
New York | X228693 | Queens | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Other | 0.00 | 147,949.40 |
New York | X228693 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 21,844,206.39 |
New York | X228693 | Queens | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 294,793.61 |
New York | X228693 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 986,684.42 |
New York | X228693 | Queens | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 13,315.58 |
New York | X228693 | Queens | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 0.00 | 35,750,000.00 |
New York | X228693 | Queens | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 2,638,890.00 |
New York | X550663 | Kings | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | 10,866,600.00 | 19,074,000.00 |
New York | X550663 | Kings | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 1,600,000.00 | 11,000,000.00 |
New York | X550663 | Kings | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 448.00 | 560.00 |
New York | X550663 | Kings | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 400,000.00 | 550,000.00 |
New York | X720303 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 50,648,673.00 | 82,499,802.00 |
New York | X720303 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 40,000,000.00 | 44,444,445.00 |
New York | X720303 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 20,641,500.00 | 22,935,000.00 |
New York | X720313 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 35,252,205.00 |
New York | X720313 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,000,000.00 |
New York | X720313 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 2,377,762.31 |
New York | X720313 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 443,837.69 |
New York | X720313 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 0.00 | 208,212.00 |
New York | X720313 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 0.00 | 6,246,510.00 |
New York | X720313 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 0.00 | 416,435.00 |
New York | X720313 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 0.00 | 2,915,040.00 |
New York | X720393 | Bronx | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - Added Capacity | 39,039,659.00 | 43,377,400.00 |
New York | X720393 | Bronx | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 7,427,500.00 | 8,252,778.00 |
New York | X720393 | Bronx | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Bridge Replacement - Added Capacity | 3,561,919.00 | 3,957,688.00 |
New York | X720393 | Bronx | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Construction Engineering | 193,545.00 | 215,050.00 |
New York | X720393 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 49,334,740.00 | 56,938,896.00 |
New York | X720393 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 7,250,920.00 | 8,056,578.00 |
New York | X720393 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 578,000.00 | 642,223.00 |
New York | X720393 | Bronx | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 5,315,550.00 | 6,644,438.00 |
New York | X720393 | Bronx | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 180,000.00 | 225,000.00 |
New York | X726993 | Bronx | >= 200,000 | Other | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | 16,918,000.00 | 21,147,501.00 |
New York | X726993 | Bronx | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | 10,000,000.00 | 12,500,000.00 |
New York | X726993 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 18,432,697.00 | 50,861,871.00 |
New York | X727163 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | 565,219.20 | 8,917,012.30 |
New York | X727163 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | 242,236.80 | 3,821,576.70 |
New York | X727163 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 25,141,058.00 | 31,426,3 |
New York | X727163 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 643,050.00 |
New York | X727163 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,356,950.00 |
New York | X727163 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 980,000.00 |
New York | X729773 | Kings | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | 18,500,000.00 | 24,654,354.00 |
New York | X729773 | Kings | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Bridge Replacement - Added Capacity | 15,600,000.00 | 15,600,000.00 |
New York | X729773 | Kings | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 281,513,903.00 | 281,513,903.00 |
New York | X729773 | Kings | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 33,572,103.00 | 33,572,103.00 |
New York | X730813 | Kings | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | 2,769,905.38 | 3,462,381.72 |
New York | X730813 | Kings | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | 152,842,756.62 | 191,053,445.28 |
New York | X730813 | Kings | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 15,036,000.00 | 18,795,000.00 |
New York | X730813 | Kings | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,760,000.00 | 2,200,000.00 |
New York | X730813 | Kings | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - Added Capacity | 17,764,950.00 | 19,738,833.00 |
New York | X730813 | Kings | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 35,640.00 | 39,600.00 |
New York | X730813 | Kings | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 108,900.00 | 121,000.00 |
New York | X730813 | Kings | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - | 13,600,000.00 | 17,000,000.00 |
New York | X731273 | Bronx | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | 0.00 | 11,117,621.00 |
New York | X731273 | Bronx | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 0.00 | 661,149.30 |
New York | X731273 | Bronx | >= 200,000 | Local | CONGESTION AIR QUALITY | Construction Engineering | 0.00 | 448,850.70 |
New York | X731273 | Bronx | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 1,439,840.00 | 1,799,800.00 |
New York | X731273 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 1,413,910.40 |
New York | X731273 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 1,876,089.60 |
New York | X731273 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 6,178,150.00 |
New York | X731283 | Kings | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | 20,980,916.00 | 23,312,130.00 |
New York | X731283 | Kings | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | 35,345.00 | 39,273.00 |
New York | X731283 | Kings | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | 6,900,096.00 | 7,666,775.00 |
New York | X731283 | Kings | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 16,758,315.00 | 18,620,350.00 |
New York | X731283 | Kings | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,763,800.00 | 8,316,320.00 |
New York | X731453 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 12,240,000.00 | 82,000,000.00 |
New York | X731453 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 12,240,000.00 | 82,000,000.00 |
New York | X731453 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - | 6,120,000.00 | 41,000,000.00 |
New York | X731453 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 860,800.00 | 1,640,000.00 |
New York | X731453 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 430,400.00 | 820,000.00 |
New York | X731473 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 19,980,337.20 | 31,187,916.00 |
New York | X731473 | Richmond | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 19,980,337.20 | 31,187,916.00 |
New York | X731473 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 9,990,168.60 | 15,593,958.00 |
New York | X731473 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 759,040.00 | 948,800.00 |
New York | X731473 | Richmond | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 759,040.00 | 948,800.00 |
New York | X731473 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 379,520.00 | 474,400.00 |
New York | X731493 | Bronx | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 3,372,555.00 | 4,215,694.00 |
New York | X731493 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 40,866,453.00 | 51,083,067.00 |
New York | X731493 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,624,000.00 | 8,280,000.00 |
New York | X731613 | Kings | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | 21,569,881.71 | 23,966,536.09 |
New York | X731613 | Kings | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | 4,788,976.29 | 5,321,084.91 |
New York | X731613 | Kings | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,936,442.70 | 2,151,603.81 |
New York | X731613 | Kings | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 430,557.30 | 478,397.19 |
New York | X731633 | Bronx | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - | 86,946,702.64 | 108,683,379.36 |
New York | X731633 | Bronx | >= 200,000 | Other | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - Added Capacity | 10,878,120.36 | 13,597,650.64 |
New York | X731633 | Bronx | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 208,023,482.72 | 399,012,656.56 |
New York | X731633 | Bronx | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 26,026,340.28 | 49,921,475.44 |
New York | X731683 | Richmond | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 0.00 | 39,990,298.00 |
New York | X735753 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 120,455,188.00 | 120,455,188.00 |
New York | X735773 | Queens | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | 33,201,706.00 | 41,502,133.00 |
New York | X735773 | Queens | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 2,060,544.00 | 2,575,681.00 |
New York | X735773 | Queens | >= 200,000 | State | HIGHWAY PROJECTS,DEMOS S378 | 4R - Added Capacity | 997,800.00 | 997,800.00 |
New York | X735773 | Queens | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | 14,882,621.00 | 16,536,246.00 |
New York | X735773 | Queens | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 150,000.00 | 10,747,513.00 |
New York | X735773 | Queens | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | 98,336.00 | 109,262.00 |
New York | X735773 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 40,245,910.00 | 44,717,678.00 |
New York | X735773 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 9,334,090.00 | 11,429,296.00 |
New York | X735773 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 38,464.00 | 42,738.00 |
New York | X735773 | Queens | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 8,000,000.00 | 10,000,000.00 |
New York | X735803 | Queens | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No | 201,722.25 | 201,722.25 |
New York | X735803 | Queens | >= 200,000 | Other | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | 67,240.75 | 67,240.75 |
New York | X735803 | Queens | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | 239,879.25 | 239,879.25 |
New York | X735803 | Queens | >= 200,000 | Other | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | 79,959.75 | 79,959.75 |
New York | X735803 | Queens | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | 162,288.75 | 162,288.75 |
New York | X735803 | Queens | >= 200,000 | Other | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | 54,096.25 | 54,096.25 |
New York | X735803 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 49,228,598.25 | 92,744,116.50 |
New York | X735803 | Queens | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 16,409,532.75 | 30,914,705.50 |
New York | X735803 | Queens | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,450,000.00 |
New York | X735803 | Queens | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 2,150,000.00 |
New York | X757003 | Statewide | N/A | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 188,498,435.00 | 501,666,595.00 |
New York | X757003 | Statewide | N/A | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 2,349,461.00 | 2,936,826.00 |
New York | X757003 | Statewide | N/A | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,061,586.00 | 1,326,983.00 |
New York | X757003 | Statewide | N/A | N/A | EXTENSION OF ALLOC PROGRAMS | Bridge Replacement - No Added Capacity | 1,331,443.00 | 1,664,304.00 |
New York | X757003 | Statewide | N/A | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | 6,096,249.00 | 7,620,302.00 |
New York | X757003 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 8,969,792.00 | 11,212,240.00 |
New York | X757003 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 114,400.00 | 143,000.00 |
New York | X757003 | Statewide | N/A | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 9,120,492.00 | 11,400,615.00 |
New York | X757533 | New York | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 88,720,000.00 | 110,900,000.00 |
New York | X758863 | New York | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 21,400,000.00 | 30,353,000.00 |
New York | X758923 | Queens | >= 200,000 | Local | CONGESTION AIR QUALITY | Bridge Rehabilitation - No Added Capacity | 1,498,000.00 | 1,872,500.00 |
New York | X758923 | Queens | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 51,835,335.00 | 68,394,169.00 |
New York | X759193 | New York | >= 200,000 | Local | EMERGENCY RELIEF | 4R - No Added Capacity | 12,000,000.00 | 95,000,000.00 |
New York | X759213 | New York | >= 200,000 | Local | EMERGENCY RELIEF | 4R - Added Capacity | 9,100,000.00 | 28,500,000.00 |
New York | X759213 | New York | >= 200,000 | Local | EMERGENCY RELIEF | 4R - Added Capacity | 2,200,000.00 | 2,200,000.00 |
New York | X759843 | New York | >= 200,000 | N/A | EMERGENCY RELIEF | Preliminary Engineering | 415,792.00 | 415,792.00 |
New York | X759843 | New York | >= 200,000 | N/A | FTA TRANSFER AGREEMENT 9/11 | 4R - No Added Capacity | 83,183,700.00 | 96,818,078.00 |
New York | X759843 | New York | >= 200,000 | N/A | FTA TRANSFER AGREEMENT 9/11 | Construction Engineering | 14,514,500.00 | 14,514,500.00 |
New York | X759843 | New York | >= 200,000 | N/A | FTA TRANSFER AGREEMENT 9/11 | Preliminary Engineering | 7,301,800.00 | 7,301,800.00 |
New York | X759846 | New York | >= 200,000 | N/A | FTA TRANSFER AGREEMENT 9/11 | 4R - No Added Capacity | 8,147,000.00 | 8,147,000.00 |
New York | X759846 | New York | >= 200,000 | N/A | FTA TRANSFER AGREEMENT 9/11 | Construction Engineering | 26,634,817.00 | 26,634,817.00 |
New York | X759846 | New York | >= 200,000 | N/A | FTA TRANSFER AGREEMENT 9/11 | Preliminary Engineering | 4,000,000.00 | 4,000,000.00 |
New York | X761243 | Bronx | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | 18,016,401.00 | 60,016,863.00 |
New York | X761243 | Bronx | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | 394,322.00 | 492,903.00 |
New York | X761243 | Bronx | >= 200,000 | Local | REPURPOSED SPECIAL | 4R - No Added Capacity | 45,678.00 | 57,098.00 |
New York | X761263 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 209,883,250.00 |
New York | X761263 | Kings | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | 25,000,000.00 | 31,250,000.00 |
New York | X761263 | Kings | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Rehabilitation - Added Capacity | 12,495,502.00 | 15,619,377.00 |
New York | X761263 | Kings | >= 200,000 | Local | REPURPOSED SPECIAL | Bridge Rehabilitation - Added Capacity | 11,830,572.00 | 14,788,216.00 |
New York | X761264 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 39,200,000.00 | 41,263,158.00 |
New York | X762074 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 600,000.00 | 750,000.00 |
New York | X762074 | New York | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 600,000.00 | 750,000.00 |
New York | X762074 | Queens | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 600,000.00 | 750,000.00 |
New York | X762074 | Richmond | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 600,000.00 | 750,000.00 |
New York | X762074 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 600,000.00 | 750,000.00 |
New York | X762074 | New York | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 6,650,000.00 | 11,761,283.00 |
New York | X762074 | Bronx | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 6,650,000.00 | 11,761,283.00 |
New York | X762074 | Kings | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 6,650,000.00 | 11,761,283.00 |
New York | X762074 | Queens | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 6,650,000.00 | 11,761,283.00 |
New York | X762074 | Richmond | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | 6,650,000.00 | 11,761,283.00 |
New York | X764203 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 2,894,373.00 | 15,266,775.00 |
New York | X764203 | New York | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 964,791.00 | 5,088,925.00 |
New York | X764203 | New York | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 964,791.00 | 5,088,925.00 |
New York | X764263 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 136,706,936.00 |
New York | X764263 | New York | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 0.00 | 16,789,000.00 |
New York | X770183 | Bronx | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Safety | 7,199,200.00 | 8,999,000.00 |
New York | X770183 | Bronx | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | 11,840,400.00 | 16,109,000.00 |
New York | X770183 | Bronx | >= 200,000 | Local | SURFACE TRANSPORTATION PROJECT | Safety | 855,000.00 | 1,068,750.00 |
New York | X770783 | Bronx | >= 200,000 | N/A | BRIDGE PROGRAM - 15% OFF SYST | Bridge Replacement - Added Capacity | 76,000,000.00 | 95,000,000.00 |
New York | X770783 | Bronx | >= 200,000 | N/A | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | 5,000,000.00 | 6,250,000.00 |
New York | X770783 | Bronx | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 18,612,848.00 | 23,266,060.00 |
New York | X772433 | Bronx | >= 200,000 | Local | BRIDGE PROGRAM - 15% OFF SYST | Bridge Replacement - No Added Capacity | 3,075,427.00 | 3,844,286.00 |
New York | X772433 | Bronx | >= 200,000 | Local | BRIDGE REP & REHAB-15% OFF SYS | Bridge Replacement - No Added Capacity | 156,884.00 | 196,105.00 |
New York | X772433 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 136,767,689.00 | 204,662,612.00 |
New York | X772433 | Bronx | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 8,887,200.00 | 11,109,000.00 |
New York | X772483 | Kings | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 24,570,200.00 | 45,745,431.00 |
New York | X772483 | Kings | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 2,942,000.00 | 32,040,500.00 |
New York | X772513 | New York | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 53,333,600.00 | 82,758,144.00 |
New York | X772563 | Bronx | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 33,000,000.00 | 43,085,000.00 |
New York | X772563 | Bronx | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 1,859,000.00 | 2,323,750.00 |
New York | X772843 | New York | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 18,668,000.00 | 36,509,814.00 |
New York | X772843 | Kings | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 18,668,000.00 | 36,509,814.00 |
New York | X772863 | New York | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 20,813,000.00 | 35,531,250.00 |
New York | X772863 | New York | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | 11,296,825.00 | 14,121,032.00 |
New York | X773093 | Kings | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 919,000.00 |
New York | X773093 | Kings | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 0.00 | 30,029,284.00 |
New York | X773113 | Kings | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | 0.00 | 42,043,195.00 |
New York | X773113 | Kings | >= 200,000 | Local | REPURPOSED SPECIAL | Facilities for Pedestrians and Bicycles | 5,007,375.00 | 6,259,219.00 |
New York | X773113 | Kings | >= 200,000 | Local | TRANSP ALTERNATIVES MAP-21 | Facilities for Pedestrians and Bicycles | 1,900,000.00 | 2,375,000.00 |
New York | X773363 | Kings | >= 200,000 | Local | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | 2,800,000.00 | 3,500,000.00 |
New York | X773363 | Kings | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | 6,867,000.00 | 31,850,000.00 |
New York | X773363 | Kings | >= 200,000 | Local | TRANSP ALTERNATIVES MAP-21 | Facilities for Pedestrians and Bicycles | 5,000,000.00 | 6,250,000.00 |
New York | X777013 | Queens | >= 200,000 | Local | EMERGENCY RELIEF | Bridge Rehabilitation - No Added Capacity | 22,600,000.00 | 28,250,000.00 |
New York | X777044 | Statewide | N/A | Local | EMERGENCY RELIEF | Bridge Rehabilitation - Added Capacity | 41,673,232.00 | 52,091,540.00 |
New York | X777114 | New York | >= 200,000 | Local | EMERGENCY RELIEF | Safety | 53,418,887.00 | 66,773,609.00 |
New York | X777811 | Queens | >= 200,000 | Local | EMERGENCY RELIEF | Safety | 16,332,765.00 | 30,534,013.00 |
New York | X807233 | Queens | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Preventive Maintenance | 10,538,000.00 | 13,172,500.00 |
New York | X807233 | New York | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Preventive Maintenance | 10,538,000.00 | 13,172,500.00 |
New York | X807233 | Kings | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Preventive Maintenance | 21,076,000.00 | 26,345,000.00 |
New York | X807233 | Kings | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 484,000.00 | 605,000.00 |
New York | X807233 | New York | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 242,000.00 | 302,500.00 |
New York | X807233 | Queens | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 242,000.00 | 302,500.00 |
New York | X807233 | New York | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 293,913.50 | 367,391.75 |
New York | X807233 | Bronx | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 293,913.50 | 367,391.75 |
New York | X807233 | Kings | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 293,913.50 | 367,391.75 |
New York | X807233 | Queens | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 293,913.50 | 367,391.75 |
New York | XM12533 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No | 23,616,730.00 | 66,320,914.00 |
New York | XM12533 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,707,008.00 | 5,165,000.00 |
New York | XM16563 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 18,843,059.00 | 24,213,325.00 |
New York | XM16563 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,581.00 | 2,200,000.00 |
New York | XM16563 | Statewide | N/A | State | REPURPOSED EARMARKS EXEMPT | Bridge Rehabilitation - Added Capacity | 4,000,000.00 | 5,000,000.00 |
New York | XM16563 | Statewide | N/A | State | REPURPOSED EARMARKS EXEMPT | Construction Engineering | 440,000.00 | 550,000.00 |
New York | XM17033 | New York | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | 271,656.00 | 3,773,000.00 |
New York | XM17033 | New York | >= 200,000 | State | EMERGENCY RELIEF | Safety | 1,611,000.00 | 31,550,007.00 |
New York | XM17033 | New York | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 2,240,000.00 | 2,800,000.00 |