RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
South Carolina | 0039390 | Clements Ferry Road | 18,536,000.00 | 33,555,002.70 |
South Carolina | 4084120 | Leesburg Road (SC 262); Intersection Improvements - SC 262 (Leesburg Road) at Patricia Drive | 5,571,196.00 | 43,726,503.74 |
South Carolina | 8805530 | Interstate Preventative Maintenance | 23,254,692.49 | 25,838,547.20 |
South Carolina | 8888860 | I-85 (Near MM 77 to near MM 80) & I-85 (Gossett Rd (S-57) to NC State Line) - Gossett Rd (S- 57) to SC 18 | 246,751,904.91 | 526,675,614.76 |
South Carolina | BEAU001 | Bluffton Parkway 5A Segment 2 - Construct new four lane roadway and bridge from Buckingham Plantation Drive to US 278 | 15,200,000.00 | 34,535,000.00 |
South Carolina | BR10025 | SC 174 Br Replacement over Store, Sand, and Russell Creeks north of Edisto - Charleston County | 21,378,032.62 | 26,722,540.78 |
South Carolina | BR26012 | New interchange at the existing US17 /SC707 intersection at the backgate of the former Myrtle Beach Air Force Base | 15,000,000.00 | 90,898,602.68 |
South Carolina | BR40004 | REPLACE US 176 BRIDGE OVER BROAD RIVER BETWEEN S-114 AND S-213 Sufficiency Rating: 35.8 | 27,437,679.98 | 32,055,442.78 |
South Carolina | BR88044 | US 701 over Great Pee Dee River | 47,608,527.28 | 59,555,755.70 |
South Carolina | BR88056 | SC 9 over Broad River, Broad River Canal, S-46 and S-31 | 27,538,638.03 | 34,743,852.28 |
South Carolina | BR88076 | Design Build Package E | 53,173,662.49 | 63,744,682.76 |
South Carolina | CHAT005 | Widen SC 165 (Bacons Bridge Road) from near SC 61 to existing 5-lane section | 13,758,000.00 | 41,023,000.00 |
South Carolina | CHAT006 | US 17 DRAINAGE IMPROVEMENTS | 12,500,000.00 | 25,842,372.77 |
South Carolina | EM05025 | Port Access Road | 8,000,000.00 | 311,713,403.65 |
South Carolina | EM13001 | Henry Brown Boulevard Extension - Phase I widening of S-136 from Liberty Hall Road( S-529) to Red Bank Road(S-29) | 5,039,440.00 | 27,956,140.23 |
South Carolina | FLMB006 | Widening S-29(South Cashua Dr) from SC 51 ( Second Loop Rd) to S-103(Knollwood Rd) as follows: South Cashua Dr. from SC 51 | 20,196,837.13 | 25,269,183.82 |
South Carolina | GPAT002 | Batesville Rd (S-164) (SC 14 to Roper Mountain Road) | 21,256,785.70 | 26,352,232.12 |
South Carolina | GRID010 | I385 FROM I85 TO US 276(STONE AVE), GR/DR/PAVE/WIDEN 6 LANES/BRIDGES | 85,284,269.14 | 118,119,611.51 |
South Carolina | GSLA003 | CAROLINA BAYS PKWY FR SC9 NR STEPHENS CROSS RDS TO US 501 NEW 6 LANES NEW LOCATION DESIGN BUILD, ROWA, CONSTRUCTION, & PE | 126,848,807.70 | 295,515,917.74 |
South Carolina | IM23009 | I-85 @ I-385 (Design Build) | 243,445,286.40 | 324,404,081.50 |
South Carolina | IM88030 | I-26 (near MM 60 to Near MM 75) | 23,160,343.43 | 25,733,714.92 |
South Carolina | LSCG004 | I-95 Interstate upgrade to full access and extension from US 301 over I-95 to SC 6. This is a design/build project. | 36,182,833.47 | 41,338,172.40 |
South Carolina | P026862 | US 21 over Harbor River | 61,390,365.44 | 77,287,956.80 |
South Carolina | P026929 | I-20 (near MM 106 to MM 121) (EB/WB) | 37,017,110.60 | 41,780,122.88 |
South Carolina | P027002 | I-77 (I-20 to Killian Road (Exit 22) | 68,213,440.97 | 101,098,812.04 |
South Carolina | P027003 | I-20 Widening (US 378 to Longs Pond) - Design Build | 12,500,000.00 | 120,716,784.25 |
South Carolina | P027077 | I-26 from near Jedburg Road (Exit 194) to near Nexton Parkway (Exit 197) | 51,715,591.67 | 66,546,021.58 |
South Carolina | P027116 | I-85 - Widening from near SC 18 (Exit 96) to near NC State Line (Phase 3) | 184,149,357.76 | 230,186,697.20 |
South Carolina | P027223 | I-385 (near MM 37 to near MM 42) (Northbound/Southbound) | 27,962,022.98 | 31,068,914.41 |
South Carolina | P027413 | SC 85 over Southern R.R. and S-995 | 14,525,624.09 | 27,093,854.34 |
South Carolina | P027550 | I-95 RECONSTRUCTION (near MM 33 to near MM 64 Northbound/Southbound) | 3,614,004.70 | 66,789,444.75 |
South Carolina | P027551 | I-95 (Near MM 23 to near MM 33) (NB/SB) | 22,607,722.99 | 25,119,692.21 |
South Carolina | P029074 | I-85 (Near MM 69 to near MM 77) | 69,681,880.36 | 77,598,198.49 |
South Carolina | P029208 | I-26 widening from near SC 202 (Exit 85) to near US 176 (Exit 101) | 363,049,741.54 | 509,583,990.41 |
South Carolina | P029503 | Clements Ferry Road - Phase II | 13,424,470.57 | 48,887,327.82 |
South Carolina | P029525 | US 78 (US 178 to SC 27S) Widening Phase IIA & US 78 (SC 27 to S-22) Widening Phase IIB | 21,665,968.44 | 35,148,152.88 |
South Carolina | P029938 | I-26 (Near MM 149 to near MM 172) | 1,113,940.68 | 56,928,707.78 |
South Carolina | P030176 | Seamless City Revitalization Project | 17,666,966.50 | 39,935,597.69 |
South Carolina | P030487 | SC 277 NB over I-77 | 28,113,902.00 | 31,237,668.89 |
South Carolina | P030711 | US 1 over I-20 | 31,488,234.55 | 67,969,866.73 |
South Carolina | P038111 | I-85 over Rocky Creek Bridge Design Build | 33,054,525.82 | 36,817,250.91 |
South Carolina | P038652 | I-77 Panther's Interchange (MM81) Design Build | 0.00 | 65,500,000.00 |
South Carolina | P039718 | I-20/I-26/I-126 - Corridor Improvements - Phase 1 DB Construction | 33,120,000.00 | 220,095,000.00 |
South Carolina | P039719 | I-20/I-26/I-126 - Corridor Improvements - Phase 2 DB Construction | 22,500,000.00 | 133,770,000.00 |
South Carolina | RU27001 | US 17 Widening | 27,510,305.52 | 62,205,001.57 |
South Carolina | SB02002 | FROM US 1 TO I-20 (PHASE 2) - PALMETTO PARKWAY | 90,664,999.18 | 159,805,376.76 |
South Carolina | SB07001 | SC 170 - FROM ROAD S-20 TO SC ROUTE 280. | 65,044,049.60 | 95,027,499.84 |
South Carolina | SB26001 | CAROLINA BAYS PARKWAY FROM SC 501 NEAR FORESTBROOK ROAD(S-137) TO SC 544 NEAR THE INTRACOASTAL WATERWAY | 71,854,374.07 | 104,716,521.74 |
South Carolina | SPMC028 | ARRA WIDENING OF SC-602 PLATT SPRINGS ROAD IN LEXINGTON COUNTY. FROM S- 168 (EMMANUAL CHURCH RD.) TO .05 MILES WEST OF S-244 | 26,468,579.97 | 29,706,395.06 |
South Carolina | SU19001 | US 25 - Phase I | 43,097,133.28 | 54,005,261.50 |
South Carolina | SU39002 | SC 153 New Construction | 26,696,833.44 | 33,371,041.80 |
South Carolina | SU40013 | Hardscrabble Road (S-83) | 34,551,884.82 | 88,553,396.04 |