U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
South Carolina

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
South Carolina 0039390 Berkeley >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 16,616,181.55 30,373,765.69
South Carolina 0039390 Berkeley >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 1,919,818.45 2,428,477.39
South Carolina 0039390 Berkeley >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 0.00 752,759.62
South Carolina 4084120 Richland >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity 2,320,446.00 2,320,446.00
South Carolina 4084120 Richland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity   0.00   4,000,000.00
South Carolina 4084120 Richland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Construction Engineering   2,121,661.00   2,652,076.25
South Carolina 4084120 Richland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Utilities   0.00   4,018,477.80
South Carolina 4084120 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity 0.00 2,770,160.09
South Carolina 4084120 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 727,018.94
South Carolina 4084120 Richland >= 200,000 State TRANSP ALTERNATIVES MAP-21 Facilities for Pedestrians and Bicycles   1,129,089.00   1,411,361.25
South Carolina 8805530 Dillon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 6,622,108.49 7,357,898.33
South Carolina 8805530 Clarendon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 5,353,069.84 5,947,855.37
South Carolina 8805530 Marlboro >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 145,744.15 161,937.95
South Carolina 8805530 Florence >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 9,630,156.75 10,700,174.15
South Carolina 8805530 Sumter >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 12,911.23 14,345.81
South Carolina 8805530 Clarendon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 355,002.08 394,446.76
South Carolina 8805530 Dillon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 410,691.40 456,323.78
South Carolina 8805530 Florence >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 716,891.32 796,545.90
South Carolina 8805530 Sumter >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 908.87 1,009.86
South Carolina 8805530 Marlboro >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 7,208.36 8,009.29
South Carolina 8888860 Spartanburg >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity 12,760,129.33 12,760,129.33
South Carolina 8888860 Cherokee >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity   6,419,382.67   6,419,382.67
South Carolina 8888860 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 40,172,843.25 167,779,105.16
South Carolina 8888860 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 32,585,583.00 32,585,583.00
South Carolina 8888860 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   6,512,734.20   6,512,734.20
South Carolina 8888860 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 4,341,822.80 4,341,822.80
South Carolina 8888860 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 11,700,000.00 26,445,786.62
South Carolina 8888860 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 13,656,031.50 24,867,673.15
South Carolina 8888860 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   11,233,600.00   11,233,600.00
South Carolina 8888860 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 24,766,200.00 33,282,200.00
South Carolina 8888860 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   2,750,000.00   12,418,904.56
South Carolina 8888860 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   0.00   4,864,245.24
South Carolina BEAU001 Beaufort >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 15,200,000.00 34,535,000.00
South Carolina BR10025 Charleston >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity 140,653.36 175,816.71
South Carolina BR10025 Charleston >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity   1,316,302.26   1,645,377.82
South Carolina BR10025 Charleston >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering 802,296.52 1,002,870.64
South Carolina BR10025 Charleston >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering   49,720.92   62,151.15
South Carolina BR10025 Charleston >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities 1,015,279.19 1,269,098.99
South Carolina BR10025 Charleston >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - No Added Capacity   5,990.29   7,487.87
South Carolina BR10025 Charleston >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering 346,597.05 433,246.31
South Carolina BR10025 Charleston >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Right of Way   25,521.61   31,902.01
South Carolina BR10025 Charleston >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Utilities   2,659.55   3,324.44
South Carolina BR10025 Charleston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity   9,696,085.42   12,120,106.77
South Carolina BR10025 Charleston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity   4,873,068.50   6,091,335.61
South Carolina BR10025 Charleston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 1,627,988.87 2,034,986.10
South Carolina BR10025 Charleston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   37,098.85   46,373.57
South Carolina BR10025 Charleston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   1,282,907.84   1,603,634.80
South Carolina BR26012 Horry >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity   7,497,233.85   66,712,987.97
South Carolina BR26012 Horry >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge New Construction   7,500,000.00   24,182,157.02
South Carolina BR26012 Horry >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity   2,766.15   3,457.69
South Carolina BR40004 Richland >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity   1,960,760.69   2,450,950.86
South Carolina BR40004 Richland >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity   9,310,344.92   11,637,931.10
South Carolina BR40004 Richland >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering 2,048,128.75 2,560,160.93
South Carolina BR40004 Richland >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 19,108.11 23,885.73
South Carolina BR40004 Richland >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Right of Way   52,603.85   65,754.80
South Carolina BR40004 Richland >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities   7,580.11   9,475.14
South Carolina BR40004 Richland >= 200,000 State BRIDGE REP & REHAB-65% ON SYS 4R - No Added Capacity   163,053.66   203,817.08
South Carolina BR40004 Richland >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - No Added Capacity   801,910.40   1,002,388.00
South Carolina BR40004 Richland >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Construction Engineering 18,762.27 18,762.27
South Carolina BR40004 Richland >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering   909,766.69   1,138,598.23
South Carolina BR40004 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   66,926.12   66,926.12
South Carolina BR40004 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity   10,223,300.65   10,652,664.36
South Carolina BR40004 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 600,944.60 656,016.71
South Carolina BR40004 Richland >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity   1,221,590.03   1,526,987.54
South Carolina BR40004 Richland >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity   32,899.13   41,123.91
South Carolina BR88044 Horry >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 0.01 0.01
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering   78,223.44   97,779.30
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering 1,736,872.00 2,171,090.00
South Carolina BR88044 Horry >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering 0.00 0.00
South Carolina BR88044 Horry >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering 0.00 0.00
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering   364,941.79   456,177.24
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State REDISTRIBUTION OF TIFIA FUNDS Other 10,933,032.00 13,666,290.00
South Carolina BR88044 Horry >= 200,000 State REDISTRIBUTION OF TIFIA FUNDS Other 0.00 0.00
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   5,351,108.43   6,688,885.54
South Carolina BR88044 Horry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 617,314.59 771,643.24
South Carolina BR88044 Horry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   1,768,394.66   2,210,493.32
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   26,039,233.93   32,549,042.41
South Carolina BR88044 Horry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 0.00 0.00
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   575,075.76   718,844.70
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 111,642.11 139,552.64
South Carolina BR88044 Horry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 0.00 0.00
South Carolina BR88044 Horry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety   0.00   22,548.30
South Carolina BR88044 Georgetown >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety   0.00   22,548.30
South Carolina BR88044 Horry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 0.00 0.00
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity 319,394.64 399,243.30
South Carolina BR88056 Union >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity 159,745.22 199,681.53
South Carolina BR88056 Union >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 467,320.93 584,151.16
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 0.00 0.00
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 1,353,961.46 1,692,451.82
South Carolina BR88056 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 7,148,500.45 8,935,625.57
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 0.00 0.00
South Carolina BR88056 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 12,277,094.09 15,346,367.61
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 159,984.00 199,980.00
South Carolina BR88056 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,627,690.57 2,034,613.20
South Carolina BR88056 Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Other 73,356.00 91,695.00
South Carolina BR88056 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   346,520.00   753,704.76
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 0.00
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way 0.00 0.00
South Carolina BR88056 Union >= 5,000 AND < State NATIONAL HIGHWAY SYSTEM Right of Way 438,160.00 547,700.00
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 0.00 0.00
South Carolina BR88056 Union >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 1,000.00 1,250.00
South Carolina BR88056 Chester >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 0.00 0.00
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 15% OFF SYST 4R - No Added Capacity 66,852.71 83,565.89
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 15% OFF SYST 4R - No Added Capacity 603,988.53 754,985.66
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 15% OFF SYST 4R - No Added Capacity 304,694.08 380,867.60
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 15% OFF SYST 4R - No Added Capacity 404,458.90 505,573.63
South Carolina BR88076 York >= 200,000 State BRIDGE PROGRAM - 15% OFF SYST 4R - No Added Capacity 1,191,263.88 1,489,079.85
South Carolina BR88076 York >= 200,000 State BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity   1,634,809.49   2,043,511.86
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity 653,296.40 816,620.50
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity 979,944.60 1,224,930.75
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity 653,296.40 816,620.50
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 15% OFF SYST Construction Engineering 58,385.73 72,982.16
South Carolina BR88076 York >= 200,000 State BRIDGE PROGRAM - 15% OFF SYST Construction Engineering 171,965.10 214,956.39
South Carolina BR88076 Cherokee >= 50,000 AND < State BRIDGE PROGRAM - 15% OFF SYST Construction Engineering   9,650.53   12,063.16
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 15% OFF SYST Construction Engineering 43,984.17 54,980.21
South Carolina BR88076 Statewide N/A N/A BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity 3,227,424.88 4,034,281.14
South Carolina BR88076 York >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity   66,812.77   83,515.97
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity   22,684.33   28,355.41
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity 17,088.96 21,361.20
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity 33,875.07 42,343.84
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity 3,749.50 4,686.86
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 1,819,513.30 2,274,391.62
South Carolina BR88076 York >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 4,552,332.43 5,690,415.55
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 2,729,269.95 3,411,587.43
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 1,819,513.30 2,274,391.62
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 909,756.65 1,137,195.81
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering 429,143.30 536,429.13
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering 216,465.76 270,582.20
South Carolina BR88076 Lancaster >= 50,000 AND < State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering 250,455.19 313,068.99
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering 13,209.69 16,512.11
South Carolina BR88076 Statewide N/A N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 18,803.10 23,503.88
South Carolina BR88076 York >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering   897,039.20   1,121,299.01
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering   304,563.49   380,704.37
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 229,439.12 286,798.90
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 454,812.23 568,515.29
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 50,341.07 62,926.32
South Carolina BR88076 Statewide N/A State BRIDGE PROGRAM - 85% ON/OFF Rail/Hwy Crossing 720,000.00 900,000.00
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities   80,582.01   100,727.52
South Carolina BR88076 Statewide N/A N/A BRIDGE PROGRAM - 85% ON/OFF Utilities 185,225.97 231,532.45
South Carolina BR88076 York >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities   134,408.13   168,010.14
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities   53,721.34   67,151.68
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities 26,860.67 33,575.84
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities 53,721.34 67,151.68
South Carolina BR88076 Lancaster >= 50,000 AND < State BRIDGE REP & REHAB-15% OFF SYS 4R - No Added Capacity 80,974.95 101,218.68
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-15% OFF SYS 4R - No Added Capacity 13,384.27 16,730.36
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State BRIDGE REP & REHAB-15% OFF SYS 4R - No Added Capacity 120,921.90 151,152.37
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State BRIDGE REP & REHAB-15% OFF SYS 4R - No Added Capacity 61,001.47 76,251.84
South Carolina BR88076 Statewide N/A N/A BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering 39,183.49 48,979.36
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State GRANTS SUP PLAN SECTION 117 Bridge Replacement - No Added Capacity   557,869.96   557,869.96
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State GRANTS SUP PLAN SECTION 117 Bridge Replacement - No Added Capacity 278,934.98 278,934.98
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State GRANTS SUP PLAN SECTION 117 Bridge Replacement - No Added Capacity 557,869.96 557,869.96
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State GRANTS SUP PLAN SECTION 117 Bridge Replacement - No Added Capacity 836,804.94 836,804.94
South Carolina BR88076 York >= 200,000 State GRANTS SUP PLAN SECTION 117 Bridge Replacement - No Added Capacity 1,395,763.13 1,395,763.13
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State HIGHWAY BRIDGE PROGRAM 4R - No Added Capacity 8,600.49 10,750.61
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State HIGHWAY BRIDGE PROGRAM 4R - No Added Capacity 1,887.02 2,358.79
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State HIGHWAY BRIDGE PROGRAM 4R - No Added Capacity 17,048.56 21,310.70
South Carolina BR88076 York >= 200,000 State HIGHWAY BRIDGE PROGRAM 4R - No Added Capacity 33,625.37 42,031.70
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State HIGHWAY BRIDGE PROGRAM 4R - No Added Capacity   11,416.51   14,270.64
South Carolina BR88076 Lancaster >= 50,000 AND < State HIGHWAY BRIDGE PROGRAM Preliminary Engineering 8,963.18 11,203.97
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State HIGHWAY BRIDGE PROGRAM Preliminary Engineering 13,384.94 16,731.17
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State HIGHWAY BRIDGE PROGRAM Preliminary Engineering 1,481.48 1,851.88
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State HIGHWAY BRIDGE PROGRAM Preliminary Engineering 6,752.30 8,440.37
South Carolina BR88076 Statewide N/A N/A HIGHWAY PRIORITY PROJECTS 4R - No Added Capacity 5,712,338.49 5,712,338.49
South Carolina BR88076 Lancaster >= 50,000 AND < 200,000 State SEC 115 UNOBL BAL TRANSF Bridge Replacement - No Added Capacity   238,390.00   238,390.00
South Carolina BR88076 York >= 200,000 State SEC 115 UNOBL BAL TRANSF Bridge Replacement - No Added Capacity 596,440.00 596,440.00
South Carolina BR88076 Cherokee >= 50,000 AND < 200,000 State SEC 115 UNOBL BAL TRANSF Bridge Replacement - No Added Capacity 357,585.00 357,585.00
South Carolina BR88076 Chester >= 5,000 AND < 50,000 State SEC 115 UNOBL BAL TRANSF Bridge Replacement - No Added Capacity 238,390.00 238,390.00
South Carolina BR88076 Fairfield >= 5,000 AND < 50,000 State SEC 115 UNOBL BAL TRANSF Bridge Replacement - No Added Capacity 119,195.00 119,195.00
South Carolina BR88076 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity 11,239,497.29 14,049,371.61
South Carolina BR88076 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity   1,560,733.11   1,950,916.39
South Carolina BR88076 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 1,759,769.60 2,199,712.00
South Carolina BR88076 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities   42,935.66   53,669.57
South Carolina CHAT005 Dorchester >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Safety   1,350,000.00   1,500,000.00
South Carolina CHAT005 Dorchester >= 50,000 AND < N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 12,408,000.00 39,523,000.00
South Carolina CHAT006 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 5,000.00 10,000.00
South Carolina CHAT006 Charleston >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering   37,500.00   75,000.00
South Carolina EM05025 Charleston >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering   340,703.59   425,879.49
South Carolina EM05025 Charleston >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities   7,659,296.41   9,574,120.51
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   0.00   39,522,284.50
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity   0.00   57,089,449.50
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 30,898,104.30
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway   0.00   127,954,956.35
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 0.00 2,755,077.00
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   0.00   3,493,532.00
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing   0.00   2,500,000.00
South Carolina EM05025 Charleston >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   0.00   37,500,000.00
South Carolina EM13001 Berkeley >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Construction Engineering   235,091.79   3,000,000.00
South Carolina EM13001 Berkeley >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Other 4,804,348.21 24,456,135.23
South Carolina EM13001 Berkeley >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities 0.00 500,005.00
South Carolina FLMB006 Florence >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity 11,188,293.38 13,985,366.73
South Carolina FLMB006 Florence >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 2,000,000.00 2,500,000.00
South Carolina FLMB006 Florence >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,057,490.08 1,345,000.00
South Carolina FLMB006 Florence >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 4,800,000.00 6,000,000.00
South Carolina FLMB006 Florence >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 1,151,053.67 1,438,817.09
South Carolina GPAT002 Greenville >= 200,000 State HSIP LIMITING FLEXIBLE Safety 1,575,000.00 1,750,000.00
South Carolina GPAT002 Greenville >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   2,891,379.70   3,614,224.63
South Carolina GPAT002 Greenville >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   8,469,972.06   10,587,465.07
South Carolina GPAT002 Greenville >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity   1,442,975.96   1,803,719.94
South Carolina GPAT002 Greenville >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 2,615,562.54 3,269,453.17
South Carolina GPAT002 Greenville >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   1,000,000.00   1,250,000.00
South Carolina GPAT002 Greenville >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   935,925.31   1,169,906.64
South Carolina GPAT002 Greenville >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way   1,891,741.34   2,364,676.68
South Carolina GPAT002 Greenville >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   434,228.79   542,785.99
South Carolina GRID010 Greenville >= 200,000 N/A HIGHWAY INFRA PRGM - COVID APP Other   2,290,912.78   2,863,640.98
South Carolina GRID010 Greenville >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Other   22,255,907.72   27,819,883.91
South Carolina GRID010 Greenville >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other   60,737,448.64   87,436,086.62
South Carolina GSLA003 Horry >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Other 563,936.23 704,920.29
South Carolina GSLA003 Horry >= 200,000 N/A HIGHWAY INFRA PRGM - COVID APP Other   14,889,776.26   18,612,220.33
South Carolina GSLA003 Horry >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Other   58,347,780.54   72,934,725.92
South Carolina GSLA003 Horry >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Other   11,276,580.63   14,095,725.28
South Carolina GSLA003 Horry >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other   41,770,734.04   189,168,325.92
South Carolina IM23009 Spartanburg >= 200,000 State INTERSTATE MAINTENANCE Other   457,758.44   463,680.73
South Carolina IM23009 Greenville >= 200,000 State INTERSTATE MAINTENANCE Other   55,967,666.94   56,691,744.65
South Carolina IM23009 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   160,431,665.52   231,797,164.70
South Carolina IM23009 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   19,683,136.88   28,502,637.69
South Carolina IM23009 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   25,679.72   25,679.72
South Carolina IM23009 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   3,139,747.05   3,139,747.05
South Carolina IM23009 Spartanburg >= 200,000 State NATIONAL HIGHWAY SYSTEM Other   3,197.68   3,552.97
South Carolina IM23009 Greenville >= 200,000 State NATIONAL HIGHWAY SYSTEM Other   390,958.32   434,398.14
South Carolina IM23009 Spartanburg >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   368,762.00   368,762.00
South Carolina IM23009 Greenville >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   2,976,713.85   2,976,713.85
South Carolina IM88030 Laurens >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing   2,213,538.41   2,459,487.12
South Carolina IM88030 Newberry >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing 4,427,740.94 4,919,712.16
South Carolina IM88030 Newberry >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering 1,802,349.75 2,002,610.84
South Carolina IM88030 Laurens >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering 166,785.78 185,317.53
South Carolina IM88030 Laurens >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 6,058,848.44 6,732,053.82
South Carolina IM88030 Newberry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 6,058,848.43 6,732,053.81
South Carolina IM88030 Laurens >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 899,838.66 999,820.73
South Carolina IM88030 Newberry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 899,838.65 999,820.72
South Carolina IM88030 Laurens >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 53,577.36 59,530.40
South Carolina IM88030 Newberry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 578,977.01 643,307.79
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 N/A INTERSTATE MAINT DISC 4R - No Added Capacity 8,030,660.00 8,922,955.56
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 N/A INTERSTATE MAINT DISC Utilities 1,800,000.00 2,000,000.00
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 0.00 500,000.00
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 7,521,635.55 9,402,044.44
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction 193,930.35 242,412.94
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 4,527,687.57 5,659,609.46
South Carolina LSCG004 Orangeburg >= 50,000 AND < N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 640,000.00 800,000.00
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 N/A NATL INTRASTRUCTURE INVESTMENT 4R - No Added Capacity 5,045,649.15 5,045,649.15
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 N/A NATL INTRASTRUCTURE INVESTMENT Bridge New Construction 5,019,441.95 5,019,441.95
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 N/A NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 2,034,908.90 2,034,908.90
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity 43,383.48 54,229.35
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,236,616.52 1,545,770.65
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 State TRAN COMM SYS PRES PILOT-TEA21 4R - No Added Capacity 79,619.30 99,524.13
South Carolina LSCG004 Orangeburg >= 50,000 AND < 200,000 State TRAN COMM SYS PRES PILOT-TEA21 Preliminary Engineering 9,300.70 11,625.87
South Carolina P026862 Beaufort >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 7,984,847.70 9,981,059.62
South Carolina P026862 Beaufort >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 7,505,719.53 9,382,149.41
South Carolina P026862 Beaufort >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 42,042,280.47 52,552,850.59
South Carolina P026862 Beaufort >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 3,192,000.00 3,990,000.00
South Carolina P026862 Beaufort >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 665,517.74 1,381,897.18
South Carolina P026929 Lee >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering 1,158,773.49 1,287,526.10
South Carolina P026929 Lee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 30,857,779.96 34,286,422.18
South Carolina P026929 Lee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity 1,965,856.88 2,184,285.42
South Carolina P026929 Lee >= 5,000 AND < State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 2,344,741.91 2,605,268.78
South Carolina P026929 Lee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 585,000.00 1,300,000.00
South Carolina P026929 Lee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 104,958.36 116,620.40
South Carolina P027002 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 26,129,900.11 54,506,843.10
South Carolina P027002 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   19,417,297.59   19,417,297.59
South Carolina P027002 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   14,504,526.75   14,504,526.75
South Carolina P027002 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 4,567,524.21 5,421,698.54
South Carolina P027002 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   0.00   2,768,882.68
South Carolina P027002 Richland >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing   52,708.00   52,708.00
South Carolina P027002 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity   3,276,625.73   4,095,782.16
South Carolina P027002 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 264,858.58 331,073.22
South Carolina P027003 Lexington >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity   0.00   87,989,212.15
South Carolina P027003 Lexington >= 200,000 State HSIP LIMITING FLEXIBLE Bridge Replacement - Added Capacity   0.00   3,959,775.75
South Carolina P027003 Lexington >= 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering 0.00 16,267,796.35
South Carolina P027003 Lexington >= 200,000 State HSIP LIMITING FLEXIBLE Safety   500,000.00   500,000.00
South Carolina P027003 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   12,000,000.00   12,000,000.00
South Carolina P027077 Berkeley >= 50,000 AND < State FAST ACT NATIONAL FREIGHT 4R - Added Capacity   10,000,000.00   12,500,000.00
South Carolina P027077 Berkeley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 28,850,636.99 37,964,828.23
South Carolina P027077 Berkeley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 4,742,246.90 5,927,808.62
South Carolina P027077 Berkeley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 5,600,000.00 7,000,000.00
South Carolina P027077 Berkeley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 340,000.00 425,000.00
South Carolina P027077 Berkeley >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 2,182,707.78 2,728,384.73
South Carolina P027116 Cherokee >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Other 45,886,712.00 57,358,390.00
South Carolina P027116 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 18,900,439.48 23,625,549.35
South Carolina P027116 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 112,470,766.28 140,588,457.85
South Carolina P027116 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing 373,040.00 466,300.00
South Carolina P027116 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV 1,062,400.00 1,328,000.00
South Carolina P027116 Cherokee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 5,456,000.00 6,820,000.00
South Carolina P027223 Greenville >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering 180,000.00 200,000.00
South Carolina P027223 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   25,975,486.63   28,861,651.80
South Carolina P027223 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   1,806,536.35   2,007,262.61
South Carolina P027413 Spartanburg >= 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - No Added Capacity   4,000,000.00   5,000,000.00
South Carolina P027413 Spartanburg >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Bridge Replacement - No Added Capacity   6,253,008.69   7,816,260.86
South Carolina P027413 Spartanburg >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Construction Engineering 400,000.00 500,000.00
South Carolina P027413 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   0.00   4,137,186.17
South Carolina P027413 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity   0.00   2,612,323.67
South Carolina P027413 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 1,399,589.39
South Carolina P027413 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   2,835,200.00   3,544,000.00
South Carolina P027413 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing   601,102.40   751,378.00
South Carolina P027413 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   210,060.00   1,050,300.00
South Carolina P027413 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   226,253.00   282,816.25
South Carolina P027550 Colleton >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity   1,229,004.70   1,365,560.78
South Carolina P027550 Colleton >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering 1,052,667.46 1,169,630.51
South Carolina P027550 Colleton >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 0.00 58,151,221.29
South Carolina P027550 Colleton >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 4,622,662.68
South Carolina P027550 Colleton >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,332,332.54 1,480,369.49
South Carolina P027551 Jasper >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity 5,000.00 5,555.56
South Carolina P027551 Jasper >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering 990,000.00 1,100,000.00
South Carolina P027551 Jasper >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 19,173,187.99 21,303,542.21
South Carolina P027551 Jasper >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,861,960.00 2,068,844.44
South Carolina P027551 Jasper >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only 577,575.00 641,750.00
South Carolina P029074 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 64,658,211.84 71,842,457.61
South Carolina P029074 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   4,361,072.40   4,845,635.99
South Carolina P029074 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   103,648.35   289,051.81
South Carolina P029074 Spartanburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing   15,309.40   17,010.44
South Carolina P029074 Spartanburg >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Construction Engineering   308,785.00   343,094.45
South Carolina P029074 Spartanburg >= 200,000 State REPURPOSED EARMARKS EXEMPT Preliminary Engineering   234,853.37   260,948.19
South Carolina P029208 Richland >= 200,000 State FAST ACT NATIONAL FREIGHT Other   21,199,010.04   26,498,762.53
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State FAST ACT NATIONAL FREIGHT Other   10,950,422.74   13,688,028.44
South Carolina P029208 Lexington >= 200,000 State FAST ACT NATIONAL FREIGHT Other 9,066,913.67 11,333,642.09
South Carolina P029208 Richland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Other   3,611,281.95   3,611,281.95
South Carolina P029208 Lexington >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Other   3,614,533.29   3,614,533.29
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State HIGHWAY INFRA PROGRAM APPORT Other   3,615,618.30   3,615,618.30
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,360,038.82 7,986,545.74
South Carolina P029208 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 2,976,666.73 17,479,857.75
South Carolina P029208 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,063,294.45 6,243,976.03
South Carolina P029208 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   72,767,795.75   88,622,130.46
South Carolina P029208 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   114,660,127.71   149,135,445.84
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other   79,289,755.10   98,035,420.84
South Carolina P029208 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 177,215.74 1,150,917.81
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   226,673.14   1,472,116.08
South Carolina P029208 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 496,111.12 3,221,966.11
South Carolina P029208 Lexington >= 200,000 State REPURPOSED EARMARKS EXEMPT Other   88,541.74   98,379.71
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State REPURPOSED EARMARKS EXEMPT Other   113,238.12   125,820.12
South Carolina P029208 Richland >= 200,000 State REPURPOSED EARMARKS EXEMPT Other 247,722.17 275,246.87
South Carolina P029208 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   396,888.90   5,930,476.88
South Carolina P029208 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   3,456,976.35   3,841,084.83
South Carolina P029208 Lexington >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   141,772.60   2,118,424.31
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   181,338.50   2,709,634.46
South Carolina P029208 Lexington >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 8,823,674.53 14,395,732.75
South Carolina P029208 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   9,510,215.38   21,306,276.24
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 8,933,914.70 15,472,670.98
South Carolina P029208 Newberry >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,531,302.96 1,914,128.70
South Carolina P029208 Lexington >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,197,190.79 1,496,488.48
South Carolina P029208 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   3,351,506.25   4,189,382.82
South Carolina P029503 Berkeley >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   13,424,470.57   46,211,499.66
South Carolina P029503 Berkeley >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 2,595,828.16
South Carolina P029503 Berkeley >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Other 0.00 80,000.00
South Carolina P029525 Dorchester >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity 13,250,000.00 13,250,000.00
South Carolina P029525 Dorchester >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 3,758,635.54 13,430,086.75
South Carolina P029525 Dorchester >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 1,000,000.00 1,300,000.00
South Carolina P029525 Dorchester >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 1,607,640.00 2,009,550.00
South Carolina P029525 Dorchester >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,608,061.60 4,606,477.00
South Carolina P029525 Dorchester >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 441,631.30 552,039.13
South Carolina P029938 Orangeburg >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 42,195,867.28
South Carolina P029938 Dorchester >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 6,242,312.52
South Carolina P029938 Orangeburg >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 3,214,923.21
South Carolina P029938 Dorchester >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 475,604.77
South Carolina P029938 Dorchester >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 0.00
South Carolina P029938 Orangeburg >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 970,418.56 4,181,559.36
South Carolina P029938 Dorchester >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 143,522.12 618,440.64
South Carolina P029938 Dorchester >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 0.00 0.00
South Carolina P030176 Richland >= 200,000 State GRANTS SUP PLAN SECTION 117 Facilities for Pedestrians and Bicycles 1,010,000.00 1,010,000.00
South Carolina P030176 Richland >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Facilities for Pedestrians and Bicycles 16,656,966.50 20,821,208.13
South Carolina P030176 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 65,000.00
South Carolina P030176 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles   0.00   18,039,389.56
South Carolina P030487 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 3,598,532.49 3,998,369.44
South Carolina P030487 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   23,615,369.51   26,239,299.45
South Carolina P030487 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   720,000.00   800,000.00
South Carolina P030487 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV   180,000.00   200,000.00
South Carolina P030711 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 900,000.00 6,793,875.69
South Carolina P030711 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   28,807,314.55   55,608,611.30
South Carolina P030711 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   1,780,920.00   2,411,900.37
South Carolina P030711 Lexington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 3,155,479.37
South Carolina P038111 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   17,909,003.28   19,898,892.53
South Carolina P038111 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   10,085,581.82   11,206,202.02
South Carolina P038111 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 3,979,940.72 4,422,156.36
South Carolina P038111 Greenville >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   1,080,000.00   1,290,000.00
South Carolina P038652 York >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction   0.00   53,672,052.86
South Carolina P038652 York >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   0.00   6,780,000.00
South Carolina P038652 York >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   0.00   4,513,947.14
South Carolina P038652 York >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   0.00   534,000.00
South Carolina P039718 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   11,772,000.00   89,359,700.13
South Carolina P039718 Richland >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   6,134,848.81   46,568,828.55
South Carolina P039718 Lexington >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   4,593,151.19   34,866,005.19
South Carolina P039718 Richland >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity   9,000,000.00   47,300,000.00
South Carolina P039718 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 376,704.00 418,560.00
South Carolina P039718 Richland >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Other   196,315.16   218,127.96
South Carolina P039718 Lexington >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Other   146,980.84   163,312.04
South Carolina P039718 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing 470,880.00 523,200.00
South Carolina P039718 Richland >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing   245,393.95   272,659.94
South Carolina P039718 Lexington >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing   183,726.05   204,140.06
South Carolina P039718 Lexington >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Utilities   0.00   40,923.17
South Carolina P039718 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   0.00   104,883.87
South Carolina P039718 Richland >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Utilities   0.00   54,659.09
South Carolina P039719 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   9,639,000.00   53,367,723.04
South Carolina P039719 Richland >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   12,861,000.00   70,982,276.96
South Carolina P039719 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity   0.00   9,000,000.00
South Carolina P039719 Richland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other 0.00 265,062.00
South Carolina P039719 Richland >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Other   0.00   154,938.00
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Safety   900,000.00   1,000,000.00
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 1,142,902.84 1,428,628.55
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other 7,632,000.00 9,540,000.00
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,320,000.00 1,650,000.00
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 101,680.00 127,100.00
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering 498,217.50 622,771.88
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way 42,320.00 52,900.00
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 10,890,482.23 40,790,949.97
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 4,182,702.95 5,228,378.67
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 800,000.00 1,000,000.00
South Carolina RU27001 Jasper >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety 0.00 764,272.50
South Carolina SB02002 Aiken >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Other 2,505,158.48 3,131,448.10
South Carolina SB02002 Aiken >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PRGM - COVID APP Other 6,988,614.55 8,735,768.19
South Carolina SB02002 Aiken >= 50,000 AND < 200,000 N/A INTERSTATE MAINT DISC Other 855,000.00 950,000.00
South Carolina SB02002 Aiken >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Other 46,588,383.12 58,235,479.42
South Carolina SB02002 Aiken >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Other 7,677,429.20 9,595,706.63
South Carolina SB02002 Aiken >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other 26,050,413.83 79,156,974.42
South Carolina SB07001 Beaufort >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PRGM - COVID APP Other 8,588,285.19 10,735,356.49
South Carolina SB07001 Beaufort >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other 56,455,764.41 84,292,143.35
South Carolina SB26001 Horry >= 200,000 N/A HIGHWAY INFRA PRGM - COVID APP Other 204,774.09 255,967.62
South Carolina SB26001 Horry >= 200,000 N/A INNOVATIVE PROJECTS Other   155,371.35   194,214.18
South Carolina SB26001 Horry >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other 71,494,228.63 104,266,339.94
South Carolina SPMC028 Lexington >= 200,000 N/A ARRA AMERICAN RECOV & REINV AC 4R - Added Capacity   13,997,320.00   13,997,320.00
South Carolina SPMC028 Lexington >= 200,000 N/A EQUITY BONUS SP LIMITATION 4R - Added Capacity   7,324,640.84   9,275,801.07
South Carolina SPMC028 Lexington >= 200,000 N/A EQUITY BONUS SP LIMITATION Construction Engineering   1,825,436.29   2,281,795.41
South Carolina SPMC028 Lexington >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 4R - Added Capacity   1,745,116.92   2,181,396.16
South Carolina SPMC028 Lexington >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 Construction Engineering   68,998.90   86,248.63
South Carolina SPMC028 Lexington >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   1,166,277.71   1,457,847.14
South Carolina SPMC028 Lexington >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   340,789.31   425,986.65
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   9,688.41   12,110.51
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 31,913,324.41 40,025,500.51
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 811.98 1,014.97
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 3,096,095.57 3,870,119.47
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 202.54 253.17
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 319,623.15 399,528.94
South Carolina SU19001 Edgefield >= 5,000 AND < State NATIONAL HIGHWAY SYSTEM Preliminary Engineering 239,848.02 299,810.02
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way 789.63 987.04
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way 1,230,129.25 1,537,661.56
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities 542.11 677.64
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities 855,506.29 1,069,382.76
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 687.37 859.21
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 528,056.65 660,070.82
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles 5,305.66 6,632.07
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles 3,603,994.67 4,504,993.34
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 645.05 806.31
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 905,847.78 1,132,309.73
South Carolina SU19001 Saluda >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 244.37 305.46
South Carolina SU19001 Edgefield >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 385,638.39 482,047.99
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing 116,000.00 145,000.00
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction 5,287,994.32 6,609,992.90
South Carolina SU39002 Pickens >= 50,000 AND < State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 3,275,129.47 4,093,911.83
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 11,799,563.75 14,749,454.70
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 2,789,662.68 3,487,078.36
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 60,899.73 76,124.66
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing 217,284.00 271,605.00
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 2,447,714.70 3,059,643.37
South Carolina SU39002 Pickens >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 28,755.80 35,944.74
South Carolina SU39002 Anderson >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 348.15 435.19
South Carolina SU40013 Richland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 14,266,880.00 56,032,329.65
South Carolina SU40013 Richland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity   1,066,720.00   3,222,290.36
South Carolina SU40013 Richland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 1,500,000.00 4,514,637.72
South Carolina SU40013 Richland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   2,700,000.00   3,375,000.00
South Carolina SU40013 Richland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   500,000.00   625,000.00
South Carolina SU40013 Richland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing   195,514.40   880,117.00
South Carolina SU40013 Richland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way   12,900,400.00   16,125,500.00
South Carolina SU40013 Richland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities   1,422,370.42   3,778,521.31