RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Washington | 0003129 | SR 3/Chico Creek - Remove Fish Barrier | 2,244,794.06 | 56,437,659.50 |
Washington | 0053971 | I-5 / SB S 320TH ST TO DUWAMISH RIVER BRIDGE - CONCRETE PAVEMENT REHAB | 26,656,342.07 | 27,033,214.07 |
Washington | 0053974 | I-5/ NB MARTIN LUTHER KING JR WY TO NE RAVENNA BR - PAVEMENT REPAIR AND MORE | 37,281,734.83 | 53,938,167.83 |
Washington | 0053977 | I-5/S Bailey St Ramp to I-90 W-S Ramp - Deck Overlay & Expansion Joints | 25,023,469.16 | 25,625,787.74 |
Washington | 0099097 | SR99 / ALASKAN WAY VIADUCT (HOLGATE ST. TO S. KING ST.- VIADUCT REPLACEMENT) STAGE 2 (AWV) | 165,412,375.91 | 269,605,331.00 |
Washington | 0099111 | SR99 / ALASKAN WAY TUNNEL ALTERNATIVE -TUNNEL DESIGN/BUILD (S. KING ST VIC TO ROY ST VIC) (AWV) | 467,065,190.10 | 1,604,833,271.76 |
Washington | 0099122 | SR 99/TUNNEL ALTERNATIVE, NORTH ACCESS CONNECTION SR 99 MP 32.55 TO MP 34.12 | 5,948,153.00 | 58,998,618.15 |
Washington | 0099137 | SR 99/Aurora Ave - George Washington Memorial Br 99/560 (Stage 2) | 28,304,958.31 | 35,816,439.33 |
Washington | 0101307 | SR101 / SHORE ROAD TO KITCHEN-DICK ROAD - WIDENING | 47,779,159.00 | 54,233,065.00 |
Washington | 0101361 | US 101/SIEBERT CREEK - REMOVE FISH BARRIER | 33,214,967.94 | 34,178,051.12 |
Washington | 0104025 | HOOD CANAL BRIDGE RETROFIT AND REPLACEMENT EAST | 310,956,527.17 | 435,435,346.17 |
Washington | 0104033 | HOOD CANAL BRIDGE RETROFIT AND REPLACEMENT EAST DEBT SERVICE PAYMENT | 71,447,045.75 | 101,273,802.00 |
Washington | 0167055 | SR 167/SR 410 to SR 18 - Congestion Management | 19,869,002.00 | 34,041,897.00 |
Washington | 0167057 | SR 167/I-5 to SR 509 - Corridor Construction | 6,000,000.00 | 425,879,527.57 |
Washington | 0290025 | SR 290 / Spokane River E Trent Br- Replace Bridge | 7,678,661.58 | 25,778,677.77 |
Washington | 0509034 | SR 509/I-5 & SR 516 I/C to 28th/24th Ave S - Widening and Toll Lanes | 8,500,000.00 | 347,278,086.46 |
Washington | 0520046 | MEDINA TO SR202 VICINITY - EASTSIDE TRANSIT AND H.O.V. SR520-VICINITY JUNCTION SR202 TO 9.00 MILES SOUTHWEST. | 0.00 | 393,580,261.00 |
Washington | 0520047 | SR 520 / I-5 TO MEDINA - STGE 1 EVERGREEN POINT FLOATING BRIDGE AND LANDINGS | 139,007,371.35 | 824,557,572.35 |
Washington | 0520048 | LAKE WASHINGTON FLOATING BRIDGE - PONTOON CONSTRUCTION SR520-1.63 TO 3.98 MILES EAST OF JUNCTION SR5. | 0.00 | 469,950,882.46 |
Washington | 0520053 | SR 520/WEST APPROACH BRIDGE NORTH (WABN) | 53,146,501.42 | 258,739,830.46 |
Washington | 0524011 | 196th Street SW (SR 524) | 8,990,000.00 | 34,977,965.00 |
Washington | 0701063 | Index Galena Rd MP 6.4 to MP 6.9 | 21,571,681.00 | 27,025,943.00 |
Washington | 0901490 | I-90 / 468TH AVE SE TO W SUMMIT RD EB - REHAB CONCRETE | 34,384,270.69 | 51,387,993.89 |
Washington | 0901496 | I-90/468th Ave SE to W Summit Rd WB - Rehab Concrete | 28,278,170.55 | 28,907,437.11 |
Washington | 1402003 | SR 530/SKAGLUND HILL VIC TO C-POST VIC - ER ROADWAY RECONSTRUCTION SR 530: MP 35.89 TO MP 39.44 | 30,296,264.00 | 30,951,170.00 |
Washington | 1613005 | Fairview Ave. Bridge Replacement | 10,000,000.00 | 34,016,606.00 |
Washington | 2012028 | WSF SYSTEMWIDE VESSEL PRESERVATION & IMPROVEMENTS (MAP-21) | 28,259,161.02 | 28,259,161.02 |
Washington | 2016024 | WSF SYSTEMWIDE VESSEL PRESERVATION & IMPROVEMENTS (FFY 2016) | 42,400,241.48 | 43,309,210.48 |
Washington | 2022076 | NE 15th St (aka Spring Blvd.) Multi-Modal Corridor | 9,221,503.99 | 31,214,390.11 |
Washington | 2411003 | West Sammamish River Bridge | 13,063,994.00 | 40,386,560.00 |
Washington | 3246012 | Puyallup Rv Br A&B Replacement | 27,851,893.00 | 42,033,925.00 |
Washington | 3440001 | Duportail Street Bridge | 2,695,821.77 | 39,906,386.77 |
Washington | 4123005 | Barker Rd/BNSF Grade Separation | 15,740,070.00 | 26,913,000.00 |
Washington | 9927056 | Port of Tacoma Interchange - Phase 1 | 14,726,500.00 | 38,792,740.00 |
Washington | 9932062 | Geiger Boulevard Infrastructure Improvements | 14,300,000.00 | 41,567,271.00 |
Washington | F045001 | West Cashmere Bridge Replacement | 18,350,000.00 | 26,389,954.00 |