U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Washington

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Washington 0003129 Kitsap >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 54,017,732.35
Washington 0003129 Kitsap >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 2,225,594.06 2,400,727.15
Washington 0003129 Kitsap >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 19,200.00 19,200.00
Washington 0053971 King >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 1,149,108.00 1,217,820.00
Washington 0053971 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 25,339,520.00 25,647,680.00
Washington 0053971 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 167,714.07 167,714.07
Washington 0053974 King >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering 34,143.00 36,815.00
Washington 0053974 King >= 200,000 State HSIP LIMITING FLEXIBLE Safety 775,220.00 781,064.00
Washington 0053974 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 29,486,820.83 44,617,844.83
Washington 0053974 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 449,551.00 455,522.00
Washington 0053974 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity 6,500,552.00 6,519,536.00
Washington 0053974 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 35,448.00 1,527,386.00
Washington 0053977 King >= 200,000 State FAST ACT NATIONAL FREIGHT Bridge Rehabilitation - No Added Capacity 7,190,868.42 7,190,868.42
Washington 0053977 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity 16,640,737.61 17,117,375.92
Washington 0053977 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,191,863.13 1,317,543.40
Washington 0099097 King >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity 56,705,700.91 56,705,700.91
Washington 0099097 King >= 200,000 N/A PROJ OF REG AND NAT'L SIGNIF Bridge Rehabilitation - No Added Capacity 19,578,546.00 85,709,883.09
Washington 0099097 King >= 200,000 N/A PROJ OF REG AND NAT'L SIGNIF Preliminary Engineering 79,128,129.00 114,689,747.00
Washington 0099097 King >= 200,000 State PROJ OF REG AND NAT'L SIGNIF Safety 10,000,000.00 12,500,000.00
Washington 0099111 King >= 200,000 N/A EMERGENCY RELIEF New Construction Roadway 37,066,684.00 37,066,684.00
Washington 0099111 King >= 200,000 N/A EMERGENCY RELIEF New Construction Roadway 3,433,316.00 3,433,316.00
Washington 0099111 King >= 200,000 N/A EQUITY BONUS EXEMPT LIM New Construction Roadway 2,720,950.07 2,720,950.07
Washington 0099111 King >= 200,000 N/A EQUITY BONUS SP LIMITATION New Construction Roadway 7,562,729.21 7,562,729.21
Washington 0099111 King >= 200,000 N/A EXTENSION OF ALLOC PROGRAMS New Construction Roadway 1,471,327.00 1,471,327.00
Washington 0099111 King >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 212,426,864.21 506,726,596.21
Washington 0099111 King >= 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway 96,849,437.79 96,849,437.79
Washington 0099111 King >= 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH New Construction Roadway 3,937,588.94 3,937,588.94
Washington 0099111 King >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 101,596,292.88 945,064,642.54
Washington 0099122 King >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 5,948,153.00 58,998,618.15
Washington 0099137 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity 3,284,061.25 3,284,061.25
Washington 0099137 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 568,279.06 675,827.53
Washington 0099137 King >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Maintenance Resurfacing 3,140,247.00 3,204,334.00
Washington 0099137 King >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity 21,312,371.00 28,652,216.55
Washington 0101307 Clallam >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 3,685,045.00 3,686,485.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering 71,050.00 71,050.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 667,266.00 695,068.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 243,096.00 243,096.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 629,151.00 650,051.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 31,292,060.00 31,596,142.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 6,194,222.00 6,772,066.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way 4,736,197.00 10,252,707.00
Washington 0101307 Clallam >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Utilities 261,072.00 266,400.00
Washington 0101361 Clallam >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 30,504,378.00 31,256,491.00
Washington 0101361 Clallam >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 553,650.17 676,032.35
Washington 0101361 Clallam >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 91,200.00 93,024.00
Washington 0101361 Clallam >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering 2,065,739.77 2,152,503.77
Washington 0104025 Kitsap >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity 0.00 6,869.00
Washington 0104025 Kitsap >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity 12,482,561.49 12,482,561.49
Washington 0104025 Kitsap >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 120,206,592.37 233,324,736.37
Washington 0104025 Kitsap >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Right of Way 864,497.75 2,234,634.75
Washington 0104025 Kitsap >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - No Added Capacity 139,702,864.20 145,375,425.20
Washington 0104025 Kitsap >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering 2,562,375.77 2,562,375.77
Washington 0104025 Kitsap >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering 8,359,403.92 11,026,110.92
Washington 0104025 Kitsap >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Right of Way 1,777,060.00 2,221,325.00
Washington 0104025 Kitsap >= 200,000 N/A BRIDGE REPLAC & REHAB - DISC Bridge Replacement - No Added Capacity 1,592,520.00 2,306,713.00
Washington 0104025 Kitsap >= 200,000 N/A BRIDGE REPLAC & REHAB - DISC Right of Way 3,112,000.00 3,573,937.00
Washington 0104025 Kitsap >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity 3,556,683.00 3,556,689.00
Washington 0104025 Kitsap >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity 5,933,704.81 5,957,704.81
Washington 0104025 Kitsap >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering 31,246.76 31,246.76
Washington 0104025 Kitsap >= 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Bridge Replacement - No Added Capacity 1,824,517.10 1,824,517.10
Washington 0104025 Kitsap >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 5,270,000.00 5,270,000.00
Washington 0104025 Kitsap >= 200,000 N/A SURFACE TRANSPORTATION PROJECT Bridge Replacement - No Added Capacity 2,980,500.00 2,980,500.00
Washington 0104025 Kitsap >= 200,000 N/A TECHNOLOGY DEPLOYMENT GRANTS T Bridge Replacement - No Added Capacity 300,000.00 300,000.00
Washington 0104025 Kitsap >= 200,000 N/A TECHNOLOGY DEPLOYMENT GRANTS T Preliminary Engineering 400,000.00 400,000.00
Washington 0104033 Kitsap >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity 44,579,127.93 72,832,082.18
Washington 0104033 Kitsap >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - No Added Capacity 10,484,841.66 12,058,643.66
Washington 0104033 Kitsap >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 16,382,711.73 16,382,711.73
Washington 0104033 Kitsap >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity 364.43 364.43
Washington 0167055 Pierce >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 8,406,490.98 16,065,410.09
Washington 0167055 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 4,878,338.02 9,329,493.91
Washington 0167055 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 371,314.05 1,105,736.45
Washington 0167055 Pierce >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 639,858.95 1,905,436.55
Washington 0167055 Pierce >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 4,700,000.00 4,700,000.00
Washington 0167055 Pierce >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 873,000.00 935,820.00
Washington 0167057 Pierce >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 6,000,000.00 425,879,527.57
Washington 0290025 Spokane >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 5,380,940.00 22,727,003.92
Washington 0290025 Spokane >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,570,721.58 1,764,873.85
Washington 0290025 Spokane >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 349,800.00
Washington 0290025 Spokane >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 727,000.00 937,000.00
Washington 0509034 King >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 0.00 73,664,340.00
Washington 0509034 King >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 8,500,000.00 273,613,746.46
Washington 0520046 King >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 0.00 391,858,250.00
Washington 0520046 King >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 0.00 1,722,011.00
Washington 0520047 King >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity 94,572,617.00 757,705,973.00
Washington 0520047 King >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - Added Capacity 4,795,135.00 4,795,135.00
Washington 0520047 King >= 200,000 State HSIP LIMITING FLEXIBLE Bridge Replacement - Added Capacity 14,015,000.00 14,015,000.00
Washington 0520047 King >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 3,826,916.75 3,826,916.75
Washington 0520047 King >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity 21,797,702.60 44,214,547.60
Washington 0520048 King >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge Replacement - Added Capacity 0.00 469,950,882.46
Washington 0520053 King >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 4,617,568.00 18,936,652.00
Washington 0520053 King >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Right of Way 0.00 4,836,650.00
Washington 0520053 King >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity 48,528,933.42 234,966,528.46
Washington 0524011 Snohomish >= 200,000 State CONGESTION AIR QUALITY Preliminary Engineering 1,730,000.00 2,000,000.00
Washington 0524011 Snohomish >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 7,260,000.00 32,977,965.00
Washington 0701063 Snohomish >= 200,000 Local EMERGENCY RELIEF 4R - Restoration & Rehabilitation 11,792,129.00 16,500,449.00
Washington 0701063 Snohomish >= 200,000 N/A EMERGENCY RELIEF Preliminary Engineering 1,395,245.00 1,613,000.00
Washington 0701063 Snohomish >= 200,000 Local EMERGENCY RELIEF Preliminary Engineering 3,384,307.00 3,912,494.00
Washington 0701063 Snohomish >= 200,000 Local FEDERAL LAND ACCESS PROGRAM 4R - Restoration & Rehabilitation 5,000,000.00 5,000,000.00
Washington 0901490 King >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Maintenance Resurfacing 470,400.00 470,400.00
Washington 0901490 King >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Maintenance Resurfacing 22,307,796.64 22,892,745.64
Washington 0901490 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 10,752,502.36 10,779,311.36
Washington 0901490 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 939,103.00
Washington 0901490 Kittitas >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity 0.00 2,188,976.00
Washington 0901490 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity 0.00 13,205,777.00
Washington 0901490 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 853,571.69 911,680.89
Washington 0901496 King >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing 27,613,043.62 28,161,970.56
Washington 0901496 King >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 665,126.93 745,466.55
Washington 1402003 Snohomish >= 200,000 N/A EMERGENCY RELIEF Preliminary Engineering 1,351,117.00 1,415,747.00
Washington 1402003 Snohomish >= 200,000 N/A EMERGENCY RELIEF Right of Way 454,094.16 458,094.16
Washington 1402003 Snohomish >= 200,000 State EMERGENCY RELIEF Safety 28,491,052.84 29,077,328.84
Washington 1613005 King >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 8,000,000.00 30,683,273.00
Washington 1613005 King >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,255,315.00 1,569,144.00
Washington 1613005 King >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 744,685.00 1,764,189.00
Washington 2012028 Statewide N/A N/A FERRY BOATS & TERMINAL Ferry Boats 15,251,632.00 15,251,632.00
Washington 2012028 Statewide N/A State FERRY BOATS & TERMINAL Ferry Boats 8,584,899.38 8,584,899.38
Washington 2012028 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Ferry Boats 4,422,629.64 4,422,629.64
Washington 2016024 Statewide N/A State FERRY BOATS & TERMINAL Ferry Boats 36,679,241.48 37,473,790.48
Washington 2016024 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Ferry Boats 4,030,000.00 4,110,600.00
Washington 2016024 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Ferry Boats 1,691,000.00 1,724,820.00
Washington 2022076 King >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 6,160,755.05 24,624,380.48
Washington 2022076 King >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 3,060,748.94 6,590,009.63
Washington 2411003 King >= 200,000 Local BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 300,000.00 338,487.00
Washington 2411003 King >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 9,011,642.00 34,716,353.00
Washington 2411003 King >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,752,401.00 2,276,667.00
Washington 2411003 King >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way 257,436.00 616,108.00
Washington 2411003 King >= 200,000 Local REPURPOSED EARMARK SUBJ TO LIM Right of Way 678,521.00 678,521.00
Washington 2411003 King >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 424,819.00 960,234.00
Washington 2411003 King >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 639,175.00 800,190.00
Washington 3246012 Pierce >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 879,500.00 879,500.00
Washington 3246012 Pierce >= 200,000 Local BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 879,500.00 879,500.00
Washington 3246012 Pierce >= 200,000 Local BRIDGE REP & REHAB-20% ON/OFF Bridge Replacement - Added Capacity 160,521.00 160,521.00
Washington 3246012 Pierce >= 200,000 N/A BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering 250,000.00 250,000.00
Washington 3246012 Pierce >= 200,000 Local BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering 1,631,598.00 8,326,693.00
Washington 3246012 Pierce >= 200,000 Local HIGHWAY INFRASTRUCTURE Right of Way 118,170.45 118,170.45
Washington 3246012 Pierce >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity 781,228.00 4,627,667.00
Washington 3246012 Pierce >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way 714,925.55 737,425.55
Washington 3246012 Pierce >= 200,000 Local REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - Added Capacity 81,260.00 81,260.00
Washington 3246012 Pierce >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity 22,200,000.00 25,817,998.00
Washington 3246012 Pierce >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 155,190.00 155,190.00
Washington 3440001 Benton >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering 300,000.00 346,821.00
Washington 3440001 Benton >= 50,000 AND < 200,000 N/A GRANTS SUP PLAN SECTION 117 Preliminary Engineering 325,382.77 325,382.77
Washington 3440001 Benton >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 789,449.00 33,465,578.00
Washington 3440001 Benton >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 224,990.00 260,104.00
Washington 3440001 Benton >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 411,387.00 4,575,492.00
Washington 3440001 Benton >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way 644,613.00 933,009.00
Washington 4123005 Spokane >= 200,000 Local FAST ACT NATIONAL FREIGHT 4R - Added Capacity 6,000,000.00 6,000,000.00
Washington 4123005 Spokane >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity 6,568,149.00 14,540,000.00
Washington 4123005 Spokane >= 200,000 Other NATL INTRASTRUCTURE INVESTMENT Preliminary Engineering 620,000.00 945,000.00
Washington 4123005 Spokane >= 200,000 Other NATL INTRASTRUCTURE INVESTMENT Right of Way 1,832,000.00 3,376,079.00
Washington 4123005 Spokane >= 200,000 Other REPURPOSED SPECIAL Preliminary Engineering 603,000.00 1,935,000.00
Washington 4123005 Spokane >= 200,000 Other REPURPOSED SPECIAL Right of Way 116,921.00 116,921.00
Washington 9927056 Pierce >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 11,396,555.00 32,880,752.00
Washington 9927056 Pierce >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,604,131.00 3,916,828.00
Washington 9927056 Pierce >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,725,814.00 1,995,160.00
Washington 9932062 Spokane >= 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity 10,169,213.00 29,696,007.00
Washington 9932062 Spokane >= 200,000 State NATL INTRASTRUCTURE INVESTMENT New Construction Roadway 3,503,037.00 8,466,256.00
Washington 9932062 Spokane >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Preliminary Engineering 537,750.00 1,191,750.00
Washington 9932062 Spokane >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way 90,000.00 2,213,258.00
Washington F045001 Chelan >= 50,000 AND < 200,000 Local BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 247,298.52 309,123.15
Washington F045001 Chelan >= 50,000 AND < 200,000 Local BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering 53,253.87 66,567.34
Washington F045001 Chelan >= 50,000 AND < 200,000 Local HIGHWAY INFRA PROGRAM APPORT Bridge Replacement - No Added Capacity 149,963.00 149,963.00
Washington F045001 Chelan >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 10,923,051.00 17,414,118.00
Washington F045001 Chelan >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 6,262,746.00 6,367,579.00
Washington F045001 Chelan >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 713,687.61 2,082,603.51