RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 1,106.30 | 1,229.22 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 7,374,223.70 | 8,193,582.78 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | 1,979,702.05 | 2,199,668.94 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | 297.95 | 331.06 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 3,892.39 | 5,892.70 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 25,945,389.94 | 39,278,868.30 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | 116,982.45 | 129,980.50 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Utilities | 17.55 | 19.50 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | OP MOT VEH/INTOX-TEA21 | Safety | 220.82 | 245.35 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | OP MOT VEH/INTOX-TEA21 | Safety | 1,471,874.18 | 1,635,416.65 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 7.24 | 8.04 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 48,267.76 | 53,630.96 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 3,220,685.00 | 4,025,857.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Other | 3,238,400.00 | 4,048,000.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < | State | FAST ACT NATIONAL FREIGHT | Debt Service | 2,487,900.00 | 3,109,875.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Debt Service | 180,613.00 | 225,767.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 12,568,912.00 | 17,067,142.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 1,153,520.00 | 1,441,900.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 24,636,000.00 | 43,955,000.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 3,565,669.00 | 4,457,086.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 6,149,241.00 | 7,686,552.00 |
Mississippi | 0071079 | Marshall | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | Right of Way | 4,587,044.00 | 4,587,044.00 |
Mississippi | 0071079 | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 5,307,704.00 | 14,634,630.00 |
Mississippi | 0071079 | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,692,296.00 | 5,865,370.00 |
Mississippi | 0071079 | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 4,000,000.00 | 5,000,000.00 |
Mississippi | 0071079 | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 11,754,480.00 | 14,693,100.00 |
Mississippi | 0071079 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 6,256,274.00 | 7,820,343.00 |
Mississippi | 0082105 | Covington | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 1,631,816.00 | 2,193,745.00 |
Mississippi | 0082105 | Covington | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | 1,729,076.00 | 2,014,935.00 |
Mississippi | 0082105 | Covington | >= 5,000 AND < | State | HSIP LIMITING FLEXIBLE | Safety | 33,056,689.00 | 36,729,657.00 |
Mississippi | 0082105 | Covington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 1,939,194.00 | 2,154,663.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 3,899,372.00 | 4,874,216.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 6,205,599.00 | 7,757,000.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 984,939.00 | 1,231,174.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 4,666,020.00 | 5,832,525.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 16,621,458.00 | 20,776,823.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | 613,980.00 | 767,475.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | 4,537,483.00 | 5,671,854.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 93,872.00 | 117,340.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 53,383,370.00 | 72,053,028.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 14,090,979.00 | 28,616,077.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 552,534.00 | 690,668.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,412,521.00 | 1,765,652.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 2,952,482.00 | 3,690,603.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 1.00 | 2.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | 1,765,118.00 | 2,206,398.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | 3,782,683.00 | 4,728,354.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 139,968,062.45 | 174,960,078.45 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 6,671,659.00 | 8,339,575.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 2,296,055.00 | 2,870,068.00 |
Mississippi | 0111056 | Washington | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 24,337,154.00 |
Mississippi | 0111056 | Washington | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 0.00 | 121,685,772.00 |
Mississippi | 0111056 | Washington | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,120,000.00 | 1,400,000.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | 11,825,524.00 | 14,781,905.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 900,000.00 | 6,245,355.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 80,000.00 | 8,403,332.00 |
Mississippi | 0201216 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 43,162.00 | 53,953.00 |
Mississippi | 0201216 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 215,811.00 | 269,764.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,280,000.00 | 2,850,000.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 400,000.00 | 500,000.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | 465,483.00 | 563,212.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | 47,667.00 | 59,584.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 15,893,283.32 | 19,866,606.00 |
Mississippi | 0201234 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 4,298,012.00 | 33,624,384.00 |
Mississippi | 0201234 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 5,379,900.00 | 6,724,876.00 |
Mississippi | 0224063 | Pontotoc | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 17,236,000.00 | 21,544,999.00 |
Mississippi | 0224063 | Pontotoc | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,447,120.00 | 4,308,901.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | HIGH PRIORITY PROJECTS-TEA-21 | Other | 2,187,203.00 | 2,734,004.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | 13,172,796.00 | 19,624,865.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 0.00 | 4,390,681.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Other | 5,240,380.00 | 9,035,098.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | 1,086,824.00 | 1,358,530.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 2,928,048.00 | 3,660,060.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | SURFACE TRANSPORTATION PROJECT | Other | 818,566.00 | 1,093,295.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | SURFACE TRANSPORTATION PROJECT | Rail/Hwy Crossing | 598,096.00 | 598,096.00 |
Mississippi | 0261080 | Neshoba | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Maintenance Resurfacing | 25,000,000.00 | 25,000,000.00 |
Mississippi | 0261080 | Neshoba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 8,468,938.00 | 22,301,314.00 |
Mississippi | 0261080 | Neshoba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 693,788.00 | 8,874,506.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Debt Service | 6,212,620.00 | 7,765,776.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | Debt Service | 8,000,000.00 | 10,000,000.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Debt Service | 333,084.00 | 416,355.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 10,489,176.00 | 13,111,471.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 886,385.00 | 1,107,982.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 9,462,876.00 | 11,828,596.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Debt Service | 5,066,973.00 | 6,333,717.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | Debt Service | 1,342,862.00 | 1,678,578.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 15,435,558.00 | 111,630,161.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 23,973,327.00 | 55,222,834.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 115,340,000.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 25,152,100.00 | 31,440,125.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 24,325,481.00 | 279,836,852.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 5,602,505.00 | 7,003,132.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 48,315,154.00 | 60,393,944.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 10,923,043.00 | 13,653,805.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 13,733,610.00 | 17,167,013.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 22,630,510.00 | 28,288,138.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 14,696,738.00 | 18,370,923.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 1,178,531.00 | 1,473,164.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 26,548,482.00 | 33,185,603.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,608,000.00 | 5,760,000.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | TRANSPORTATION IMP PROJ | Debt Service | 2,317,983.00 | 2,897,479.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION IMP PROJ | Debt Service | 552,757.00 | 690,947.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | 3,599,629.00 | 4,499,537.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | 3,566,497.00 | 4,458,122.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | 408,662.00 | 510,828.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | Right of Way | 42,371.00 | 52,964.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | 964,847.00 | 1,206,059.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 2,800,000.00 | 3,500,000.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 12,457,487.00 | 15,571,859.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,081,087.00 | 2,601,359.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,600,000.00 | 5,750,000.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | 5,845,618.00 | 7,307,023.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 2,981,425.00 | 3,726,782.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Debt Service | 4,158,731.00 | 4,620,813.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 18,411,518.00 | 20,457,243.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | New Construction Roadway | 9,583,848.00 | 69,183,720.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 9,014,710.00 | 11,268,388.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 11,195,713.00 | 12,732,334.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 12,840,702.00 | 14,267,447.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 27,033,003.00 | 30,036,670.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 2,453,015.00 | 12,271,896.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 1,857,565.00 | 2,321,956.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 13,570,884.00 | 16,963,606.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 6,674,546.00 | 8,134,762.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 20,212,165.00 | 25,265,207.00 |
Mississippi | 0553094 | Montgomery | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 9,900,000.00 | 11,000,000.00 |
Mississippi | 0553094 | Montgomery | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 1,560,677.00 |
Mississippi | 0553094 | Montgomery | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | 16,252.00 | 20,315.00 |
Mississippi | 0553094 | Montgomery | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 8,892,460.00 | 9,880,511.00 |
Mississippi | 0553094 | Montgomery | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,357,540.00 | 2,619,489.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 15,000,000.00 | 24,508,317.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 3,898,636.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,065,298.00 | 1,331,623.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 22,360,074.00 | 27,950,093.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 5,274,436.00 | 6,593,046.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 1,080,000.00 | 1,200,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 364,500.00 | 405,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 4,234,500.00 | 4,705,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 2,250,000.00 | 2,500,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 4,126,538.00 | 5,158,173.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | 273,944.00 | 342,430.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Safety | 4,063.00 | 5,079.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Safety | 35,996.00 | 44,995.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,871,500.00 | 4,839,376.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,230,000.00 | 4,700,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 14,916,962.00 | 18,646,203.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | 9,000,000.00 | 10,000,000.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Restoration & Rehabilitation | 3,235,316.00 | 3,594,796.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 21,267,645.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 7,047,031.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | 121,890.00 | 152,363.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | 176,280.00 | 220,350.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Debt Service | 1,226,744.00 | 1,363,049.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 11,505,000.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < | N/A | INTERSTATE MAINTENANCE | Debt Service | 5,360,437.00 | 7,405,416.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 4,200,795.00 | 4,667,550.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 9,849,576.00 | 10,943,975.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 38,227.00 | 42,475.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 2,064,307.00 | 2,293,675.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 5,538,148.00 | 6,153,498.00 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | 8,881,167.13 | 9,867,964.14 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | 1,331.87 | 1,479.86 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 3,103.94 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 20,697,673.06 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,302,404.86 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 945.14 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | 109.70 | 137.13 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | 731,228.30 | 914,035.87 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | 29,196.62 | 32,352.15 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < | State | REPURPOSED SPECIAL | 4R - Restoration & | 4.38 | 4.85 |
Mississippi | 0593099 | Lauderdale | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 4,875,000.00 |
Mississippi | 0593099 | Lauderdale | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 337,935.60 | 375,484.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | 10,251,779.00 | 12,814,725.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Bridge Replacement - Added Capacity | 3,629,299.00 | 3,629,299.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Right of Way | 710,500.00 | 710,500.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Utilities | 248,500.00 | 248,500.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 3,802,312.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 4,320,783.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | 3,538,253.00 | 4,422,817.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | 142,205.00 | 177,757.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | 207,182.00 | 258,978.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 451,246.00 | 564,060.00 |
Mississippi | 0703022 | Panola | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,000,000.00 | 6,791,503.00 |
Mississippi | 0703022 | Panola | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | 9,309,303.00 | 33,957,797.00 |
Mississippi | 0725011 | Tate | >= 5,000 AND < | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - | 4,095,474.00 | 5,119,343.00 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 285,286.00 | 5,105,218.00 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 187,520.00 | 234,400.00 |
Mississippi | 0725011 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 187,520.00 | 234,400.00 |
Mississippi | 0725011 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 41,139.00 | 51,423.50 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 41,139.00 | 51,423.50 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | 52,400,000.00 | 65,500,000.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 18,000,000.00 | 22,500,000.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 288,414.00 | 9,147,591.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 800,000.00 | 1,000,000.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | GRANTS SUP PLAN SECTION 117 | 4R - No Added Capacity | 43,065.00 | 43,065.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | 13,000,000.00 | 29,899,722.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 0.00 | 1,217,656.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 575,356.00 | 762,260.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 2,102,965.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < | Local | SURFACE TRANSPORTATION PROJECT | 4R - No Added Capacity | 1,499,744.00 | 1,499,744.00 |
Mississippi | 2170022 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,737,285.00 | 2,171,607.00 |
Mississippi | 2170022 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 5,504,752.00 | 6,880,940.00 |
Mississippi | 2170022 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,760,000.00 | 2,200,000.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 488,000.00 | 610,000.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 156,000.00 | 195,000.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 560,000.00 | 700,000.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Right of Way | 290,560.00 | 363,200.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 256,000.00 | 320,000.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 11,254,170.00 | 20,782,759.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,348,391.00 | 1,685,489.00 |
Mississippi | 2901015 | Grenada | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,981,138.00 | 3,483,676.00 |
Mississippi | 9371101 | Harrison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Inspection and Bridge Related Training | 400,000.00 | 400,000.00 |
Mississippi | 9371101 | Harrison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 17,997,210.00 | 22,496,513.00 |
Mississippi | 9371101 | Harrison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,599,442.00 | 4,499,303.00 |
Mississippi | 9371101 | Harrison | >= 50,000 AND < | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 900,000.00 | 900,000.00 |
Mississippi | FY01001 | Montgomery | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,261,706.00 | 1,577,132.00 |
Mississippi | FY01001 | Grenada | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 101,441.00 | 126,802.00 |
Mississippi | FY01001 | Smith | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 524,589.00 | 655,736.00 |
Mississippi | FY01001 | Marion | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 987,851.00 | 1,234,814.00 |
Mississippi | FY01001 | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,821,481.00 | 2,276,851.00 |
Mississippi | FY01001 | Lincoln | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 523,780.00 | 654,725.00 |
Mississippi | FY01001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 219,473.00 | 274,341.00 |
Mississippi | FY01001 | Jasper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 863,649.00 | 1,079,561.00 |
Mississippi | FY01001 | Benton | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 584,242.00 | 730,303.00 |
Mississippi | FY01001 | Covington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,083,493.00 | 1,354,366.00 |
Mississippi | FY01001 | Quitman | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 843,877.00 | 1,054,846.00 |
Mississippi | FY01001 | Walthall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,007,751.00 | 1,259,689.00 |
Mississippi | FY01001 | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 872,153.00 | 1,090,191.00 |
Mississippi | FY01001 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 597,520.00 | 746,900.00 |
Mississippi | FY01001 | Yazoo | >= 5,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & | 57,668.00 | 72,085.00 |
Mississippi | FY01001 | Pearl River | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 1,644,069.00 | 2,055,086.00 |
Mississippi | FY01001 | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 854,848.00 | 1,068,560.00 |
Mississippi | FY01001 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 1,105,248.00 | 1,381,560.00 |
Mississippi | FY01001 | Copiah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Acquisition of Scenic Easements and Scenic or Historic Sites | 147,210.00 | 184,013.00 |
Mississippi | FY01001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 514,233.00 | 642,792.00 |
Mississippi | FY01001 | Clay | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 323,776.00 | 404,720.00 |
Mississippi | FY01001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 2,356,614.00 | 2,945,767.00 |
Mississippi | FY01001 | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Historic Preservation | 198,790.00 | 248,487.00 |
Mississippi | FY01001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 1,265,377.00 | 1,581,721.00 |
Mississippi | FY01001 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 13,296.00 | 16,620.00 |
Mississippi | FY01001 | Itawamba | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 12,160.00 | 15,200.00 |
Mississippi | FY01001 | Tippah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 261,469.00 | 326,836.00 |
Mississippi | FY01001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 249,062.00 | 311,328.00 |
Mississippi | FY01001 | Neshoba | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 201,120.00 | 251,400.00 |
Mississippi | FY01001 | Pike | >= 5,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 541,601.00 | 677,001.00 |
Mississippi | FY01001 | Warren | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 44,178.00 | 55,223.00 |
Mississippi | FY01001 | Sharkey | < 5,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 889.00 | 1,111.00 |
Mississippi | FY01001 | Prentiss | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 164,620.00 | 205,775.00 |
Mississippi | FY01001 | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 48,000.00 | 60,000.00 |
Mississippi | FY01001 | Lawrence | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 4,000.00 | 5,000.00 |
Mississippi | FY01001 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 880,000.00 | 1,100,000.00 |
Mississippi | FY01001 | Lauderdale | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 32,601.00 | 40,752.00 |
Mississippi | FY01001 | Lincoln | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 86,661.00 | 108,327.00 |
Mississippi | FY01001 | Holmes | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,080.00 | 2,600.00 |
Mississippi | FY01001 | Issaquena | < 5,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 774.00 | 968.00 |
Mississippi | FY01001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 986,942.00 | 1,233,678.00 |
Mississippi | FY01001 | Benton | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 60,000.00 | 75,000.00 |
Mississippi | FY01001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 523,379.00 | 654,224.00 |
Mississippi | FY01001 | Choctaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 16,000.00 | 20,000.00 |
Mississippi | FY01001 | Chickasaw | >= 5,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 107,200.00 | 134,000.00 |
Mississippi | FY01001 | Grenada | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 40,000.00 | 50,000.00 |
Mississippi | FY01001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 80,000.00 | 100,000.00 |
Mississippi | FY01001 | Scott | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 681,810.00 | 852,262.00 |
Mississippi | FY01001 | Neshoba | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,489,959.00 | 5,612,449.00 |
Mississippi | FY01001 | Coahoma | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 40,000.00 | 50,000.00 |
Mississippi | FY01001 | Clay | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 98,374.00 | 122,968.00 |
Mississippi | FY01001 | Calhoun | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 40,000.00 | 50,000.00 |
Mississippi | FY01001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 40,000.00 | 50,000.00 |
Mississippi | FY01001 | Bolivar | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 346,054.00 | 432,567.00 |
Mississippi | FY01001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 1,423,567.00 | 1,715,569.00 |
Mississippi | FY01001 | Oktibbeha | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | 20,000.00 | 25,000.00 |
Mississippi | FY01001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | 25,000.00 | 31,250.00 |
Mississippi | FY01001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | 19,580.00 | 24,475.00 |
Mississippi | FY01001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | 20,467.00 | 25,584.00 |
Mississippi | FY01001 | Lee | >= 50,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation | 6,655.00 | 8,319.00 |
Mississippi | FY02001 | Greene | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 535,348.00 | 669,185.00 |
Mississippi | FY02001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,000,693.00 | 2,500,866.00 |
Mississippi | FY02001 | Oktibbeha | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 909,583.00 | 1,136,979.00 |
Mississippi | FY02001 | Pearl River | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,053,983.00 | 1,317,479.00 |
Mississippi | FY02001 | Copiah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,507,268.00 | 1,884,085.00 |
Mississippi | FY02001 | Lauderdale | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 5,417,651.00 | 6,772,063.00 |
Mississippi | FY02001 | Lowndes | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,217,808.00 | 2,772,260.00 |
Mississippi | FY02001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 248,100.00 | 310,125.00 |
Mississippi | FY02001 | Marion | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,582,281.00 | 3,227,851.00 |
Mississippi | FY02001 | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,464,988.00 | 1,831,235.00 |
Mississippi | FY02001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,133,369.00 | 1,416,711.00 |
Mississippi | FY02001 | Carroll | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,134,607.00 | 1,418,259.00 |
Mississippi | FY02001 | Grenada | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 347,923.00 | 434,904.00 |
Mississippi | FY02001 | Union | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 523,158.00 | 653,948.00 |
Mississippi | FY02001 | Montgomery | >= 5,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance | 209,449.00 | 261,811.00 |
Mississippi | FY02001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 479,917.00 | 599,896.00 |
Mississippi | FY02001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 331,473.00 | 414,341.00 |
Mississippi | FY02001 | Sunflower | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 3,095,944.00 | 3,869,930.00 |
Mississippi | FY02001 | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 1,647,344.00 | 2,059,180.00 |
Mississippi | FY02001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 2,000,000.00 | 2,500,000.00 |
Mississippi | FY02001 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 148,747.00 | 185,934.00 |
Mississippi | FY02001 | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 304,800.00 | 381,000.00 |
Mississippi | FY02001 | Marion | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 586,661.00 | 733,326.00 |
Mississippi | FY02001 | Oktibbeha | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 11,147,021.00 | 13,933,776.00 |
Mississippi | FY02001 | Benton | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 51,228.00 | 64,035.00 |
Mississippi | FY02001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 243,520.00 | 304,400.00 |
Mississippi | FY02001 | Winston | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 454,012.00 | 567,515.00 |
Mississippi | FY02001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 2,278,082.00 | 2,847,602.00 |
Mississippi | FY02001 | Union | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 226,158.00 | 282,697.00 |
Mississippi | FY02001 | Washington | >= 50,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & | 2,639,580.00 | 3,299,474.00 |
Mississippi | FY02001 | Lamar | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 660,560.00 | 825,700.00 |
Mississippi | FY02001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 108,000.00 | 135,000.00 |
Mississippi | FY02001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 499,970.00 | 624,962.00 |
Mississippi | FY02001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Historic Preservation | 1,218,912.00 | 1,523,640.00 |
Mississippi | FY02001 | Prentiss | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 192,080.00 | 240,100.00 |
Mississippi | FY02001 | Harrison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 36,374,752.00 | 45,468,440.00 |
Mississippi | FY02001 | Greene | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 371,271.00 | 464,088.00 |
Mississippi | FY02001 | Harrison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 439,600.00 | 549,500.00 |
Mississippi | FY02001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 8,560.00 | 10,700.00 |
Mississippi | FY02001 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 39,453.00 | 49,316.00 |
Mississippi | FY02001 | Humphreys | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 75,000.00 | 93,750.00 |
Mississippi | FY02001 | Alcorn | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,626.00 | 4,533.00 |
Mississippi | FY02001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 4,480.00 | 5,600.00 |
Mississippi | FY02001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 48,000.00 | 60,000.00 |
Mississippi | FY02001 | Lowndes | >= 50,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 160,000.00 | 200,000.00 |
Mississippi | FY02001 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 160,000.00 | 200,000.00 |
Mississippi | FY02001 | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 20,000.00 | 25,000.00 |
Mississippi | FY02001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 300,000.00 | 375,000.00 |
Mississippi | FY02001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 4,492,667.00 | 5,615,834.00 |
Mississippi | FY02001 | Harrison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 80,000.00 | 100,000.00 |
Mississippi | FY02001 | Lafayette | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rehabilitation and Operation of Historic Transportation | 830,290.00 | 1,037,862.00 |
Mississippi | FY02001 | Prentiss | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Buildings, Structures, or Facilities Rehabilitation and | 181,300.00 | 226,625.00 |
Mississippi | FY02001 | Webster | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Operation of Historic Transportation Buildings, Structures, or Facilities Rehabilitation and | 436,209.00 | 545,261.00 |
Mississippi | FY02001 | Amite | 50,000 >= 5,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Operation of Historic Transportation Buildings, Structures, or Facilities Right of Way | 320,000.00 | 400,000.00 |
50,000 | ||||||||
Mississippi | FY02001 | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 2,593,579.00 | 3,241,974.00 |
Mississippi | FY02001 | Humphreys | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 80,000.00 | 100,000.00 |
Mississippi | FY02001 | Tallahatchie | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 47,304.00 | 59,130.00 |
Mississippi | FY02001 | Wayne | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 219,360.00 | 274,200.00 |
Mississippi | FY02001 | Washington | >= 50,000 AND < | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 387,718.00 | 387,718.00 |
Mississippi | FY02001 | Forrest | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 102,835.00 | 102,835.00 |
Mississippi | FY02001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 583,775.00 | 729,719.00 |
Mississippi | FY02001 | Statewide | N/A | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 305,407.00 | 381,760.00 |
Mississippi | FY02001 | Tishomingo | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 193,360.00 | 241,700.00 |
Mississippi | FY02001 | Clarke | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 1,129,356.00 | 1,411,695.00 |
Mississippi | FY02001 | Oktibbeha | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 74,024.00 | 92,530.00 |
Mississippi | FY02001 | DeSoto | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 306,080.00 | 382,600.00 |
Mississippi | FY02001 | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 551,464.00 | 689,330.00 |
Mississippi | FY02001 | Lee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 272,511.00 | 340,638.00 |
Mississippi | FY02001 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 1,236,636.00 | 1,545,795.00 |
Mississippi | FY02001 | Chickasaw | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 77,796.00 | 97,245.00 |
Mississippi | FY02001 | Jackson | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 116,814.00 | 116,814.00 |
Mississippi | FY02001 | Jasper | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 568,354.00 | 710,443.00 |
Mississippi | FY03001 | Lafayette | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 880,140.00 | 1,100,175.00 |
Mississippi | FY03001 | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Relocation | 370,513.00 | 463,141.00 |
Mississippi | FY03001 | Lafayette | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,268,932.00 | 1,586,165.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 149,920.00 | 187,400.00 |
Mississippi | FY03001 | Clay | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,480,320.00 | 1,850,400.00 |
Mississippi | FY03001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 2,199,374.00 | 2,749,217.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 966,482.00 | 1,208,103.00 |
Mississippi | FY03001 | Tallahatchie | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 865,620.00 | 1,082,025.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,629,578.00 | 3,286,972.00 |
Mississippi | FY03001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 80,112.00 | 100,140.00 |
Mississippi | FY03001 | Carroll | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,420,037.00 | 1,775,047.00 |
Mississippi | FY03001 | Attala | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 119,542.00 | 149,428.00 |
Mississippi | FY03001 | Chickasaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,036,102.00 | 1,295,128.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 203,632.00 | 254,540.00 |
Mississippi | FY03001 | Holmes | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 433,520.00 | 541,900.00 |
Mississippi | FY03001 | Alcorn | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 746,308.00 | 932,885.00 |
Mississippi | FY03001 | Choctaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 667,008.00 | 833,760.00 |
Mississippi | FY03001 | Itawamba | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 399,996.00 | 499,995.00 |
Mississippi | FY03001 | Kemper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,590,784.00 | 1,988,480.00 |
Mississippi | FY03001 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,142,000.00 | 1,427,500.00 |
Mississippi | FY03001 | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,638,822.00 | 2,048,527.00 |
Mississippi | FY03001 | Perry | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,786,880.00 | 2,233,600.00 |
Mississippi | FY03001 | Pearl River | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 912,960.00 | 1,141,200.00 |
Mississippi | FY03001 | Greene | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 3,598,979.00 | 4,498,724.00 |
Mississippi | FY03001 | Quitman | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 682,869.00 | 853,586.00 |
Mississippi | FY03001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 315,546.00 | 394,433.00 |
Mississippi | FY03001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 140,197.00 | 175,247.00 |
Mississippi | FY03001 | Prentiss | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 318,011.00 | 397,514.00 |
Mississippi | FY03001 | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 255,825.00 | 319,781.00 |
Mississippi | FY03001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 1,452,000.00 | 1,815,000.00 |
Mississippi | FY03001 | Yazoo | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 2,017,033.00 | 2,521,292.00 |
Mississippi | FY03001 | Stone | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Acquisition of Scenic Easements and Scenic or Historic Sites | 200,000.00 | 250,000.00 |
Mississippi | FY03001 | Lowndes | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 939,111.00 | 1,173,889.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 2,073,232.00 | 2,591,540.00 |
Mississippi | FY03001 | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 3,000,000.00 | 3,750,000.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 1,575,349.00 | 1,969,186.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 3,042,200.00 | 3,802,750.00 |
Mississippi | FY03001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 566,106.00 | 707,632.00 |
Mississippi | FY03001 | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 27,202.00 | 34,002.00 |
Mississippi | FY03001 | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 330,000.00 | 412,500.00 |
Mississippi | FY03001 | Stone | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 64,000.00 | 80,000.00 |
Mississippi | FY03001 | Pontotoc | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 60,000.00 | 75,000.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 10,000.00 | 12,500.00 |
Mississippi | FY03001 | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 190,150.00 | 237,688.00 |
Mississippi | FY03001 | Warren | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 9,838.00 | 12,298.00 |
Mississippi | FY03001 | Harrison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 25,206.00 | 31,508.00 |
Mississippi | FY03001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 58,863.00 | 73,579.00 |
Mississippi | FY03001 | George | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 80,000.00 | 100,000.00 |
Mississippi | FY03001 | Tippah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 64,000.00 | 80,000.00 |
Mississippi | FY03001 | Lafayette | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 208,481.00 | 260,601.00 |
Mississippi | FY03001 | Lafayette | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 720,000.00 | 900,000.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 58,443.00 | 73,054.00 |
Mississippi | FY03001 | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 8,000.00 | 10,000.00 |
Mississippi | FY03001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 66,835.00 | 83,544.00 |
Mississippi | FY03001 | Jasper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 14,030.00 | 17,538.00 |
Mississippi | FY03001 | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 62,709.00 | 141,095.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 200,000.00 | 250,000.00 |
Mississippi | FY03001 | Holmes | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 24,000.00 | 30,000.00 |
Mississippi | FY03001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 106,923.00 | 133,654.00 |
Mississippi | FY03001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 24,000.00 | 30,000.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 89,600.00 | 112,000.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rehabilitation and Operation of Historic Transportation | 283,636.00 | 354,545.00 |
Mississippi | FY03001 | Franklin | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Buildings, Structures, or Facilities Right of Way | 120,000.00 | 150,000.00 |
Mississippi | FY03001 | Union | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 281,280.00 | 351,600.00 |
Mississippi | FY03001 | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 800,000.00 | 1,000,000.00 |
Mississippi | FY03001 | Kemper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 748,002.00 | 935,004.00 |
Mississippi | FY03001 | Marion | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 238,753.00 | 298,442.00 |
Mississippi | FY03001 | Jackson | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 525,948.00 | 657,435.00 |
Mississippi | FY03001 | Lamar | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 351,296.00 | 439,120.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 969,143.00 | 1,001,003.00 |
Mississippi | FY03001 | Clay | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 221,878.00 | 277,347.00 |
Mississippi | FY03001 | Benton | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 90,756.00 | 113,445.00 |
Mississippi | FY03001 | Marshall | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 432,710.00 | 540,888.00 |
Mississippi | FY03001 | Carroll | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 246,664.00 | 308,330.00 |
Mississippi | FY03001 | Tishomingo | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 125,342.00 | 156,678.00 |
Mississippi | FY03001 | Warren | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 501,712.00 | 501,712.00 |
Mississippi | FY03001 | Statewide | N/A | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 353,539.00 | 441,924.00 |
Mississippi | FY03001 | Greene | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 510,279.00 | 637,849.00 |
Mississippi | FY03001 | Harrison | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 448,155.00 | 560,194.00 |
Mississippi | FY03001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | 294,500.00 | 368,125.00 |
Mississippi | FY04001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 536,000.00 | 670,000.00 |
Mississippi | FY04001 | Chickasaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,775,680.00 | 2,219,600.00 |
Mississippi | FY04001 | Walthall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 483,920.00 | 604,900.00 |
Mississippi | FY04001 | Covington | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 484,880.00 | 606,100.00 |
Mississippi | FY04001 | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 428,590.00 | 535,738.00 |
Mississippi | FY04001 | Harrison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 229,611.00 | 287,014.00 |
Mississippi | FY04001 | Tate | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 183,840.00 | 229,800.00 |
Mississippi | FY04001 | Franklin | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 639,840.00 | 799,800.00 |
Mississippi | FY04001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 80,000.00 | 100,000.00 |
Mississippi | FY04001 | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,619,000.00 | 2,023,750.00 |
Mississippi | FY04001 | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,305,056.00 | 1,631,320.00 |
Mississippi | FY04001 | Oktibbeha | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 883,920.00 | 1,104,900.00 |
Mississippi | FY04001 | Clay | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 426,880.00 | 533,600.00 |
Mississippi | FY04001 | Lincoln | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 572,738.00 | 715,922.00 |
Mississippi | FY04001 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,640,080.00 | 3,300,100.00 |
Mississippi | FY04001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,754,876.00 | 3,443,595.00 |
Mississippi | FY04001 | Smith | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 551,412.00 | 689,265.00 |
Mississippi | FY04001 | Adams | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 148,305.00 | 185,381.00 |
Mississippi | FY04001 | Attala | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,109,520.00 | 1,386,900.00 |
Mississippi | FY04001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 572,738.00 | 715,922.00 |
Mississippi | FY04001 | Montgomery | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 138,640.00 | 173,300.00 |
Mississippi | FY04001 | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 213,866.00 | 267,332.00 |
Mississippi | FY04001 | Scott | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 662,560.00 | 828,200.00 |
Mississippi | FY04001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 630,640.00 | 788,300.00 |
Mississippi | FY04001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 674,800.00 | 843,500.00 |
Mississippi | FY04001 | Attala | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 380,080.00 | 475,100.00 |
Mississippi | FY04001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 1,088,000.00 | 1,360,000.00 |
Mississippi | FY04001 | Winston | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 279,920.00 | 349,900.00 |
Mississippi | FY04001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 2,733,682.00 | 3,417,103.00 |
Mississippi | FY04001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 866,442.00 | 1,083,053.00 |
Mississippi | FY04001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 910,080.00 | 1,137,600.00 |
Mississippi | FY04001 | Marion | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 2,291,893.00 | 2,864,866.00 |
Mississippi | FY04001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Administration | 28,000.00 | 35,000.00 |
Mississippi | FY04001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | 800,000.00 | 1,000,000.00 |
Mississippi | FY04001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 1,187,572.00 | 1,484,468.00 |
Mississippi | FY04001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 144,220.00 | 180,275.00 |
Mississippi | FY04001 | Claiborne | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 971,320.00 | 1,214,150.00 |
Mississippi | FY04001 | Lauderdale | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 214,720.00 | 268,400.00 |
Mississippi | FY04001 | Lafayette | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 100,000.00 | 125,000.00 |
Mississippi | FY04001 | Oktibbeha | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 961,340.00 | 1,201,675.00 |
Mississippi | FY04001 | Stone | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 974,800.00 | 1,218,500.00 |
Mississippi | FY04001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 387,010.00 | 483,763.00 |
Mississippi | FY04001 | Claiborne | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 800.00 | 1,000.00 |
Mississippi | FY04001 | Oktibbeha | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 25,983.00 | 32,479.00 |
Mississippi | FY04001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 40,000.00 | 50,000.00 |
Mississippi | FY04001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 100,000.00 | 125,000.00 |
Mississippi | FY04001 | Jefferson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 23,200.00 | 29,000.00 |
Mississippi | FY04001 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 100,000.00 | 125,000.00 |
Mississippi | FY04001 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 240,000.00 | 300,000.00 |
Mississippi | FY04001 | Harrison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 59,409.00 | 74,261.00 |
Mississippi | FY04001 | Sunflower | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 212,000.00 | 265,000.00 |
Mississippi | FY04001 | Smith | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 149,000.00 | 186,250.00 |
Mississippi | FY04001 | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,200.00 | 4,000.00 |
Mississippi | FY04001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 650,000.00 | 812,500.00 |
Mississippi | FY04001 | Alcorn | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rehabilitation and Operation of Historic Transportation | 520,000.00 | 650,000.00 |
Mississippi | FY04001 | Copiah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Buildings, Structures, or Facilities Rehabilitation and | 604,112.00 | 755,140.00 |
Mississippi | FY04001 | Attala | 50,000 >= 5,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Operation of Historic Transportation Buildings, Structures, or Facilities Right of Way | 3,200,000.00 | 4,000,000.00 |
50,000 | ||||||||
Mississippi | FY04001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 10,000.00 | 12,500.00 |
Mississippi | FY04001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,156.00 | 3,945.00 |
Mississippi | FY04001 | Pontotoc | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 172,000.00 | 215,000.00 |
Mississippi | FY04001 | Chickasaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 400,000.00 | 500,000.00 |
Mississippi | FY04001 | George | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 748,740.00 | 935,925.00 |
Mississippi | FY04001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 1,560,800.00 | 1,951,000.00 |
Mississippi | FY04001 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 299,600.00 | 374,500.00 |
Mississippi | FY04001 | Warren | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 69,920.00 | 87,400.00 |
Mississippi | FY04001 | Grenada | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 46,880.00 | 58,600.00 |
Mississippi | FY04001 | Grenada | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 30,560.00 | 38,200.00 |
Mississippi | FY04001 | Stone | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 373,280.00 | 466,600.00 |
Mississippi | FY04001 | Sunflower | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 240,000.00 | 300,000.00 |
Mississippi | FY04001 | Scott | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 61,200.00 | 76,500.00 |
Mississippi | FY04001 | Rankin | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 82,480.00 | 103,100.00 |
Mississippi | FY04001 | Yalobusha | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 139,680.00 | 174,600.00 |
Mississippi | FY04001 | Humphreys | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 653,040.00 | 816,300.00 |
Mississippi | FY04001 | Bolivar | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 43,283.00 | 54,104.00 |
Mississippi | FY04001 | Calhoun | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 196,560.00 | 245,700.00 |
Mississippi | FY04001 | Coahoma | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 46,320.00 | 57,900.00 |
Mississippi | FY04001 | Perry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 502,240.00 | 627,800.00 |
Mississippi | FY04001 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 1,530,960.00 | 1,913,700.00 |
Mississippi | FY04001 | Copiah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 265,600.00 | 332,000.00 |
Mississippi | FY04001 | Jasper | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 231,576.00 | 289,470.00 |
Mississippi | FY04001 | Madison | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 338,880.00 | 423,600.00 |
Mississippi | FY04001 | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 14,106.00 | 14,106.00 |
Mississippi | FY04001 | Jackson | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 381,654.00 | 457,594.00 |
Mississippi | FY04001 | Lafayette | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 688,240.00 | 860,300.00 |
Mississippi | FY04001 | Leflore | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 50,320.00 | 62,900.00 |
Mississippi | FY04001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | 297,107.00 | 371,384.00 |
Mississippi | FY05001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 3,837,447.00 | 4,796,809.00 |
Mississippi | FY05001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,292,640.00 | 1,615,800.00 |
Mississippi | FY05001 | Sunflower | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,349,463.00 | 1,686,829.00 |
Mississippi | FY05001 | Prentiss | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 582,400.00 | 728,000.00 |
Mississippi | FY05001 | Pontotoc | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 760,960.00 | 951,200.00 |
Mississippi | FY05001 | Grenada | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 931,098.00 | 1,163,873.00 |
Mississippi | FY05001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 320,160.00 | 400,240.00 |
Mississippi | FY05001 | Alcorn | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,588,000.00 | 1,985,000.00 |
Mississippi | FY05001 | Lafayette | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,940,000.00 | 3,675,000.00 |
Mississippi | FY05001 | Lauderdale | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,318,027.00 | 1,647,534.00 |
Mississippi | FY05001 | Lauderdale | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 2,258,791.00 | 2,823,489.00 |
Mississippi | FY05001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 549,200.00 | 686,500.00 |
Mississippi | FY05001 | Lincoln | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 907,840.00 | 1,134,800.00 |
Mississippi | FY05001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,130,560.00 | 1,413,200.00 |
Mississippi | FY05001 | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 450,800.00 | 563,500.00 |
Mississippi | FY05001 | Union | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,168,240.00 | 1,460,300.00 |
Mississippi | FY05001 | Wayne | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,812,240.00 | 2,265,300.00 |
Mississippi | FY05001 | Winston | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,031,600.00 | 1,289,500.00 |
Mississippi | FY05001 | Yazoo | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 1,285,600.00 | 1,607,000.00 |
Mississippi | FY05001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 3,990,000.00 | 4,987,500.00 |
Mississippi | FY05001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 1,185,875.00 | 1,482,344.00 |
Mississippi | FY05001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 636,080.00 | 795,100.00 |
Mississippi | FY05001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 496,400.00 | 620,500.00 |
Mississippi | FY05001 | Tippah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 190,000.00 | 237,500.00 |
Mississippi | FY05001 | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 826,103.00 | 1,032,629.00 |
Mississippi | FY05001 | Wilkinson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 442,080.00 | 552,600.00 |
Mississippi | FY05001 | Jefferson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 426,687.00 | 533,359.00 |
Mississippi | FY05001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 854,240.00 | 1,067,800.00 |
Mississippi | FY05001 | Oktibbeha | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 1,020,900.00 | 1,276,125.00 |
Mississippi | FY05001 | Alcorn | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | 192,005.00 | 240,006.00 |
Mississippi | FY05001 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Historic Preservation | 83,590.00 | 104,488.00 |
Mississippi | FY05001 | Claiborne | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Historic Preservation | 20,258.00 | 25,323.00 |
Mississippi | FY05001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | 74,449.00 | 93,061.00 |
Mississippi | FY05001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 3,960,845.00 | 4,951,059.00 |
Mississippi | FY05001 | Pearl River | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 16,922.00 | 21,153.00 |
Mississippi | FY05001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 26,000.00 | 32,500.00 |
Mississippi | FY05001 | Harrison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 416,000.00 | 520,000.00 |
Mississippi | FY05001 | Tippah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 290,000.00 | 362,500.00 |
Mississippi | FY05001 | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 16,000.00 | 20,000.00 |
Mississippi | FY05001 | Clay | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 8,000.00 | 10,000.00 |
Mississippi | FY05001 | Tippah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 80,000.00 | 100,000.00 |
Mississippi | FY05001 | Union | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 152,000.00 | 190,000.00 |
Mississippi | FY05001 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 240,000.00 | 300,000.00 |
Mississippi | FY05001 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 500,000.00 | 625,000.00 |
Mississippi | FY05001 | Jackson | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 138,961.00 | 138,961.00 |
Mississippi | FY05001 | Madison | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 115,750.00 | 144,688.00 |
Mississippi | FY05001 | Lauderdale | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 745,000.00 | 825,000.00 |
Mississippi | FY05001 | Alcorn | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 100,000.00 | 100,000.00 |
Mississippi | FY05001 | Warren | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 939,388.00 | 1,174,235.00 |
Mississippi | FY05001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | 255,718.00 | 319,648.00 |