SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B)
WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE AS OF SEPTEMBER 30, 2022 |
||||
---|---|---|---|---|
RECIPIENT | PROJECT NUMBER | PROJECT TITLE | TOTAL OBLIGATIONS | ESTIMATED TOTAL COST |
Alabama | 0002516 | ADD LANES ON SR-2 (US-72/FLORENCE BLVD) FROM CR-30 (INDIAN SPRINGS DR) TO SKY PARK ROAD | $23,454,630.38 | $45,389,987.65 |
Alabama | 0005512 | SR-5 (US-78) ADD LANES FROM I-59 TO FINLEY BLVD. (PHASE 1) | $25,702,401.30 | $32,170,377.44 |
Alabama | 0006521 | SR-6 (US-82) ADD LANES FROM EAST END OF LUBBUB CK BRIDGE E OF REFORM TO 4-LANE WEST OF GORDO | $42,527,042.47 | $53,958,088.41 |
Alabama | 0006562 | SR-6 (US-82) FROM WEST OF GORDO TO CR-33 | $50,725,647.97 | $62,744,695.47 |
Alabama | 0007549 | ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5 ALONG THE NORFOLK SOUTHERN RAILROAD | $74,248,992.40 | $91,546,686.26 |
Alabama | 0012507 | ADD LANES SR-12 (US-84) EAST OF SR-87 TO EAST OF CR-507 GRADE AND DRAIN. | $23,402,976.10 | $29,253,720.13 |
Alabama | 0013568 | SR-13 (US-43) RESURFACING AND PAVEMENT REHABILITATION FROM THE NORTH END OF THE I-359 BRIDGE TO THE HUGH THOMAS BRIDGE | $16,996,909.76 | $26,971,123.50 |
Alabama | 0014509 | SR-14 INTERSECTION IMPROVEMENT AT SR-143 IN ELMORE (CSX RR) INCLUDES BRIDGES | $24,733,077.60 | $30,916,347.01 |
Alabama | 0025556 | RELOCATION OF SR-25 (US-411) FROM TURKEYTOWN TO 0.65 MILES NORTH OF CHEROKEE CR-20 | $40,331,860.25 | $50,414,825.31 |
Alabama | 0035504 | BRIDGE REMOVAL SR35 @ Texas RIVER | $21,160,363.67 | $26,450,454.59 |
Alabama | 0035521 | SR108 (MGM Outer Loop) at I-85 Interchange Ramp Bridges 1, 2, 3, & 4 Superstructure - Phase 4A | $29,170,293.99 | $36,462,867.49 |
Alabama | 0042501 | Grade, Drain & Bridge SR42/US98 from Mississippi State Line to .5 Mile E of CR576/Glennwood Road | $66,970,770.42 | $83,713,463.04 |
Alabama | 0042509 | SR-42 (US-98) FR MISS LINE TO 0.5 MI EAST OF CR-576 (GLENNWOOD RD) | $27,475,252.29 | $34,344,065.37 |
Alabama | 0192901 | Anniston E Bypass - S of Lake Yahou to SR1/US431, Grade & Drain | $50,299,529.98 | $53,674,711.55 |
Alabama | 0210509 | ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM SOUTH OF MEADOWBROOK DRIVE SOUTH TO NORTH CHEROKEE AVENUE AND ON SR-53 (US-231) FROM GIRARD AVENUE TO | $44,400,505.74 | $55,500,632.18 |
Alabama | 0220253 | WATERWAY VILLAGE MULTIMODAL ACCESS PROJECT BUILD GRANT - PHASE 1 AND 2 MEDICAL VILLAGE ACCESS IMPROVEMENTS | $14,404,831.00 | $25,060,134.88 |
Alabama | 0355503 | Base & Pave Corridor V from Mississippi State Line to SR247 | $25,710,825.71 | $31,073,170.32 |
Alabama | 0471500 | CORRIDOR X FM E OF I-65 TO US31, GRADE, DRAIN, BASE, PAVE & BRIDGE | $36,537,341.27 | $45,247,234.60 |
Alabama | 0471501 | Grade, Drain, Base, Pave & Bridge Corridor X, I-65 NB from N of CR1107/41th Avenue to CR120/Walkers Chapel Road | $145,548,221.33 | $181,471,887.68 |
Alabama | 1602551 | SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM WEST OF SR-79 TO EAST OF SR-75; INCLUDES GRADE, DRAIN, BRIDGES (DUAL BRGS OVER SR-79, RAMP H OVER SR-79, DU | $69,695,808.12 | $73,092,161.19 |
Alabama | 3716258 | PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE | $8,719,942.22 | $44,070,851.32 |
Alabama | 4517252 | WIDENING FOR ADDITIONAL LANES ON CR-47 (BLAKE BOTTOM ROAD) FROM CR-19 (JEFF ROAD) TO SR-255 (RESEARCH PARK BOULEVARD) | $11,647,693.66 | $26,328,669.83 |
Alabama | 7002600 | CR-52 (MORGAN RD) ADDITIONAL LANES FROM I-459 TO CR-2 (SOUTH SHADES CREST RD) | $27,922,211.20 | $34,902,764.01 |
Alabama | 7009600 | BRIDGE REPLACEMENT AND RELOCATION ON SR-150 AT SHADES CREEK (BIN # 1502) AND THE CSX RAILROAD FROM MP 6.4 WEST OF SHADES CREEK TO MP 7.0 EAST OF SHADE | $22,563,876.56 | $28,230,654.13 |
Alabama | 7503600 | 5-LANE SCHILLINGER RD FROM HOWELLS FERRY RD TO SR-42 (US-98) | $31,363,290.38 | $39,211,941.95 |
Alabama | 9070900 | RECONSTRUCTION OF SLIDE AREA ON SR-53 (US-231) FROM MP 301.300 TO MP 301.900 (FHWA DISASTER AL2020-01, ALDOT EVENT 042, SITE IS 042-02-52-1 | $22,610,851.12 | $28,263,563.90 |
Alabama | ATRP001 | ATRIP #1: Aug-7, Sep-10, Nov-13, Dec-14, Jan-12, Feb-19, Apr-30, May-13, Jun-6, July-5, Aug-1, Sept-2, Oct-3, Dec-2, Jan-2, Mar-2, | $462,822,019.90 | $597,441,951.43 |
Alabama | ATRP002 | ATRIP # 2: Feb-1, Apr-4, May-8, Jun-6, Jul-4, Aug-1, Sep-2, Jan-3, Mar-1, Apr-2, May-2, Jun-1, Jul-1, Aug-1, Sep-3, Jan-1, Feb-1, Mar-1, Apr-1,Jun-1, | $2,626,405.56 | $64,497,366.34 |
Alabama | ATRP003 | ATRIP #3 - May-6, Jun-6, Jul-5, Aug-3, Sep-7, Oct-1, Dec-2, Jan-2, Mar-1, Apr-1, Jul-1, Aug-2, Sep-1, Dec-3, Feb-1, July-1, SEPT-1, May-3,Aug-1 | $4,374,979.18 | $75,476,249.96 |
Alabama | ATRP004 | ATRIP #4 | $2,753,797.51 | $45,715,882.91 |
Alabama | ATRP005 | ATRIP #5 | $1,479,788.39 | $50,200,399.43 |
Alabama | ATRP006 | ATRIP #6: Aug-5, Sep-2, Oct-2, Dec-1, Feb-1, Mar-2, Apr-1, Jun-1, Jul-3, Aug-4, Sep-1, Dec-1, Feb-1, Mar-2, Jun-1, July-1, SEPT-2, Nov-1, JAN-2, Apr-1 | $505,735.99 | $34,444,406.82 |
Alabama | ATRP007 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | $11,140,764.08 | $79,462,162.44 |
Alabama | ATRP008 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | $2,560,334.85 | $51,851,214.65 |
Alabama | ATRP009 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | $3,290,443.68 | $59,546,931.32 |
Alabama | ATRP010 | ATRIP #10 | $63,645,187.21 | |
Alabama | ATRP011 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | $3,212,055.64 | $43,304,068.97 |
Alabama | ATRP012 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | $9,741,533.30 | $74,647,739.11 |
Alabama | ATRP013 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | $13,138,283.42 | $57,500,454.83 |
Alabama | ATRP016 | ALABAMA TRANSPORTATION REHABILITATION IMPROVEMENT PROGRAM #16 | $11,742,218.95 | $48,490,941.70 |
Alabama | ATRP017 | ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM | $4,854,271.16 | $45,210,135.05 |
Alabama | I020341 | I-20 PAVEMENT REHAB AND ADDITIONAL LANES FROM CR-49 TO GEORGIA STATE LINE. (PRIORITY #7) | $27,059,173.90 | $31,574,298.60 |
Alabama | I022309 | RESURFACING ON I-22 FROM MP 6.00 JUST WEST OF REESE ROAD OVERPASS TO MP 16.95 AT EXIT 16 | $22,511,419.07 | $25,012,687.85 |
Alabama | I059383 | CBD BRIDGE INTERCHANGE MODIFICATIONS ON I-59/20 AT I-65 | $58,619,484.57 | $351,364,745.11 |
Alabama | I059385 | CBD I-20/59 BRIDGE REPLACEMENT AND APPROACHES FROM I-65 TO NORTH OF 31ST STREET NORTH AND INTERCHANGE MODIFICATIONS AT E. B. STEPHENS EXPRESSWAY. BIN | $162,161,955.50 | $587,329,820.11 |
Alabama | I059387 | ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR-6(MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD | $103,233,383.50 | $121,002,382.91 |
Alabama | I059394 | DRAINAGE IMPROVEMENTS AND STREETSCAPE FOR CBD I-20/59 BRIDGE REPLACEMENT ALONG BIRMINGHAM CENTRAL BUSINESS DISTRICT 9TH AVE N FROM 15TH ST N TO 23RD S | $11,795,616.68 | $28,421,933.25 |
Alabama | I059407 | RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60) | $30,848,697.73 | $34,276,330.81 |
Alabama | I059409 | RESURFACING AND TRAFFIC STRIPE ON I-59 FROM .39 MILES SOUTH OF CR-276 (STEPHENS GAP ROAD) TO THE DEKALB COUNTY LINE | $52,390,851.34 | $58,212,057.04 |
Alabama | I059423 | I-59 RECONSTRUCTION OF THE NORTHBOUND ROADWAY AND REHABILITATION OF THE SOUTHBOUND ROADWAY FROM NORTH OF SR-7 (MP 225.600) TO NORTH OF SR-117 (MP 233. | $43,687,386.50 | $55,705,950.97 |
Alabama | I065354 | I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2) | $77,850,464.11 | $96,338,080.14 |
Alabama | I065416 | BRG REPL ON I-65 OVER MURDER CREEK AND RELIEF. BIN #'S 006470, 006471, 006472 AND 006473 (SUFF = 48.7, STAT = 2) | $23,200,449.04 | $28,713,061.30 |
Alabama | I065497 | REPLACE BRIDGES I-65 OVER SEPULGA RIVER AND RELIEF,BIN 6808,6809,6810,6811,6812 AND 6813 | $37,408,131.66 | $41,564,590.73 |
Alabama | I085362 | I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL | $40,459,824.71 | $46,462,999.68 |
Alabama | I085365 | BRIDGE WIDENING ON I-85 NB AND SB OVER LINE CREEK (BIN # 007554 AND 007555) AND RELIEF BRIDGES (BIN # 007556, 007557, 007566 AND 007567) | $23,119,121.78 | $25,687,913.09 |
Alabama | I459315 | PAVEMENT REHABILITATION ON I-459 FROM SOUTH OF CR-52 AT MCCALLA TO NORTH OF SR-150 | $22,640,373.00 | $25,155,970.00 |
Alaska | 0001578 | SEWARD HWY: MP 75-90 INGRAM CR GIRDWOOD RD&BR REHAB (PH I) | $89,160,075.23 | $95,460,466.00 |
Alaska | 0001579 | SEWARD HWY: MP 75-90 INGRAM CR GIRDWOOD RD&BR REHAB (PH II) | $101,467,458.57 | $108,637,535.95 |
Alaska | 0002432 | KIVALINA EVAC & SCHL SITE ACCESS RD- KIVALINA LAGN TO K HILL | $46,017,016.22 | $50,584,826.00 |
Alaska | 0002469 | KOTZEBUE TO CAPE BLOSSOM ROAD - STAGE I | $36,249,509.72 | $43,750,099.00 |
Alaska | 0003209 | KTN REVILLA NEW FERRY BERTH & UPLAND IMPROVEMENTS | $38,379,395.10 | $42,361,879.66 |
Alaska | 0211065 | HSIP: STERLING HIGHWAY SHOULDER WIDENING, MP 97 TO MP 118 | $36,039,738.98 | $39,597,373.81 |
Alaska | 0212015 | STERLING HIGHWAY MILEPOST 44.5 TO 58 (MILEPOINT 7.6 TO 22), SUNRISE INN TO SKILAK LAKE ROAD, RECONSTRUCTION | $67,805,791.57 | $128,131,932.00 |
Alaska | 0311032 | SEWARD HWY: MP 17-22.5 REHABILITATION | $67,163,593.91 | $93,047,655.67 |
Alaska | 0441008 | HSIP: PALMER-WASILLA HWY, CENTER LEFT TURN LANE WIDENING | $23,117,855.38 | $25,540,693.87 |
Alaska | 0512005 | AMATS: O'MALLEY RD RECONST: NEW SEWARD HWY TO HILLSIDE DRIVE AK100 | $40,286,913.96 | $44,286,946.06 |
Alaska | 0525019 | KNIK-GOOSE BAY ROAD RECONSTRUCTION, PHASE 1 - FAIRVIEW LOOP TO CENTAUR AVENUE | $10,920,642.05 | $75,088,457.00 |
Alaska | 0617013 | UNIVERSITY AVENUE REHABILITATION & WIDENING SEGMENT 2A | $45,589,708.28 | $50,115,102.00 |
Alaska | 0652017 | DALTON HWY MP 18-37 RECONSTRUCTION | $22,942,789.48 | $63,596,925.00 |
Alaska | 0656005 | DALTON HWY MP 289-305 REHABILITATION | $2,456,190.00 | $42,004,162.00 |
Alaska | 0657003 | DALTON HWY MP 362-414 RECONSTRUCTION (MP 362-414 CONST) | $43,771,283.95 | $48,022,866.88 |
Alaska | 0670001 | 3RD STREET WIDENING | $34,854,424.83 | $45,069,919.00 |
Alaska | 0713013 | RICHARDSON HWY MP 159 - 167 RECONSTRUCTION | $26,011,015.59 | $41,017,511.00 |
Alaska | 0955016 | JNU:GLACIER HIGHWAY IMPROVMENTS (LEMON CREEK AREA) | $22,225,774.29 | $25,139,997.03 |
Alaska | 0956036 | HNS HWY RECONSTRUCTION MILEPOST 12.2-23.0 | $49,302,751.06 | $54,196,714.35 |
Alaska | 0972016 | SGY REPLACE CAPT. WILLIAM HENRY MOORE BRIDGE | $25,704,647.91 | $28,293,314.98 |
Alaska | 0A11016 | ALASKA HIGHWAY MP 1235-1252 REHABILITATION | $12,735,800.00 | $26,079,978.00 |
Alaska | 0A13021 | TOK CUTOFF MP 38-50 REHABILITATION | $39,798,111.73 | $42,610,398.00 |
Alaska | 0A16035 | Glenn Highway Gambell Street to Airport Heights Reconstruction Demo ID # AK169 | $41,092,014.31 | $44,416,380.85 |
Alaska | 0A24019 | RICHARDSON HWY MP 353-357 ACCESS IMPROVEMENTS | $24,762,891.60 | $26,519,391.24 |
Alaska | 0A31056 | SEWARD HWY: MP 98-104 (Milepost 100-105) BIRD AND INDIAN IMPROVEMENTS STAGE 2 | $32,946,974.45 | $44,475,133.25 |
Alaska | 0A31057 | SEWARD HWY: DIMOND TO DOWLING RECONSTRUCTION , PHASE 1 | $73,060,659.41 | $78,223,045.41 |
Alaska | 0A31065 | DOWLING RD / SEWARD HWY INTERCHANGE RECONSTRUCTION | $10,262,596.83 | $42,776,381.00 |
Alaska | 0A33014 | STERLING:MP 58-79-SKILAK LK RD-STERLING REHAB & PASSING LN | $75,980,298.84 | $81,433,149.68 |
Alaska | 0A33032 | STERLING HWY MP 8-25 SUNRISE INN TO SKILAK LAKE RD STG 3&4 | $41,684,521.41 | $128,127,069.70 |
Alaska | 0A41025 | PARKS HWY RECONST, MP 43.5 TO 44.5 LUCUS ROAD TO CHURCH | $27,691,284.55 | $29,725,136.83 |
Alaska | 0A41026 | PARKS HWY RECONST, MP 44.5 TO 48.8 CHURCH TO PITTMAN | $69,154,091.04 | $76,106,370.59 |
Alaska | 0A41029 | PARKS HWY: MP 48.8 TO 52.3, PITTMAN TO BIG LAKE RECONST | $100,967,116.17 | $108,753,194.54 |
Alaska | 0A41034 | PARKS HIGHWAY BRIDGE REPLACEMENT, MONTANA CR AND SHEEP CR | $19,344,484.76 | $32,555,784.69 |
Alaska | 0A44020 | PARKS HWY MP 231 ENHANCEMENTS | $26,332,206.90 | $28,393,941.00 |
Arizona | 008A237 | I-8; W OF AZTEC RD - E OF COUNTY LINE, YUMA | $29,505,365.00 | $31,275,562.00 |
Arizona | 008B213 | I-8, SW OF MARICOPA, MP 147.6 TO MP 158.5, SW OF STANFIELD | $9,525,041.74 | $35,108,957.45 |
Arizona | 010A232 | I-10; SR 85 TO VERRADO WAY, IN MARICOPA COUNTY | $92,017,641.00 | $105,416,181.00 |
Arizona | 010A235 | I-10; 443RD AVE - E OF WINTERSBURG RD | $24,955,472.00 | $26,452,695.00 |
Arizona | 010B201 | I-10, Sarival Ave to SR 101L in GOODYEAR & AVONDALE | $95,091,910.51 | $103,869,237.16 |
Arizona | 010B202 | I-10; Sarival Ave to Dysart Rd in GOODYEAR and AVONDALE (Reconstruct and Widen Freeway) | $34,152,594.31 | $36,201,631.72 |
Arizona | 010C206 | I-10; EARLY RD to I-8, E OF CASA GRANDE | $47,767,062.12 | $57,808,829.17 |
Arizona | 010C220 | I-17 SPLIT- I-10 SR 202L SANTAN | $409,444,599.56 | $776,193,694.00 |
Arizona | 010D013 | I-10, Rurthrauff Rd to Prince Rd in TUCSON | $99,336,163.22 | $143,927,100.29 |
Arizona | 010D201 | I-10 @ Twin Peaks Interchange in MARANA (Construct New Interchange) | $41,713,033.92 | $59,829,874.52 |
Arizona | 010D205 | I-10, SR-87 TI to Town of Picacho | $71,124,102.00 | $132,860,261.50 |
Arizona | 010D211 | I-10; INA ROAD TI TO RUTHRAUFF RD TI, TUCSON | $101,445,604.35 | $187,466,534.00 |
Arizona | 010D213 | I-10; Ruthrauff Rd (MP 252 - 253), Tucson | $124,637,580.84 | $148,048,004.52 |
Arizona | 010D216 | I-10;INA RD TI (MP 247.48 - 249.51), NORTH OF TUCSON | $120,256,264.30 | $176,143,076.84 |
Arizona | 010E200 | I-10 @ SR-90 west of BENSON | $35,041,715.83 | $37,148,423.98 |
Arizona | 010E221 | I-10; Houghton Road TI, SE Of Tucson | $34,969,602.00 | $37,067,631.91 |
Arizona | 015A216 | I-15; VIRGIN RIVER BRIDGE NUMBER 1, NE OF LITTLEFIELD | $78,172,005.00 | $79,236,401.00 |
Arizona | 017A228 | I-17; ANTHEM WAY TI (MP 229.00) - SR 69 (MP 262.00), N.OF PHOENIX | $104,151,000.00 | $461,120,000.00 |
Arizona | 017A248 | I-17; Pinnacle Peak Rd TI and Happy Valley Rd TI (MP 216.7 - 218.4), in Phoenix | $40,180,689.00 | $66,983,781.00 |
Arizona | 017B232 | I-17; Coconino County line (MP 311.60) - I-40 (MP 339.81) S of Flagstaff | $33,591,475.00 | $33,833,778.00 |
Arizona | 017B233 | I-17; NB MP 311.27-MP340.34 TO SB MP 322.79-MP 323.11 & SB MP 401.95-MP 402.05 (SR89A), S of Flagstaff | $38,483,996.00 | $45,918,579.00 |
Arizona | 019A220 | I-19 @ SR-86 (Ajo Way) in TUCSON | $36,678,993.19 | $70,748,668.11 |
Arizona | 019A239 | I-19; SR86, AJO WAY TI (MP 60.86-MP 62.25), TUCSON | $31,599,106.07 | $42,625,627.50 |
Arizona | 024A200 | SR 24; Ellsworth Rd to Ironwood Rd, Mesa | $120,637,977.00 | $147,168,696.00 |
Arizona | 040B226 | I-40; Markham Wash (MP 108) - East 40B (WB) (MP 123) W of Seligman | $5,697,522.83 | $39,932,033.50 |
Arizona | 040C213 | I-40; CATARACT LAKE RD (MP162.39) - PARKS TI (MP179.00), E OF WILLIAMS | $32,041,894.96 | $78,679,045.00 |
Arizona | 040C225 | I-40; DEVIL DOG (MP 156.500) TO WILLIAMS (MP 161.400) EB/WB | $26,067,499.34 | $77,086,957.34 |
Arizona | 040D236 | I-40; Jackrabbit Rd. (MP 268) to Joseph City (MP 278) E of Winslow | $6,495,402.98 | $26,316,904.98 |
Arizona | 0532043 | SR-260; Doubtful Canyon Section east of PAYSON | $34,956,601.05 | $55,204,681.48 |
Arizona | 060B006 | US-60, GRAND AVE-43RD & 51ST AVE INTERSECTIONS PHX&GLNDL Intersection Imps Bridge Construction Signals | $26,508,689.36 | $31,602,686.36 |
Arizona | 060D207 | US 60; Pinto Creek (Bridge #351) E OF SUPERIOR | $22,432,837.41 | $51,350,657.56 |
Arizona | 060D208 | US-60, Queen Creek (MP 222.25) to SR-177 in SUPERIOR (MP 226.85) | $40,384,497.00 | $59,831,947.49 |
Arizona | 077A204 | SR-77; Tangerine Rd to Pima/Pinal County Line (MP 81.91 to MP 88.10) north of ORO VALLEY | $38,653,878.00 | $53,685,461.00 |
Arizona | 077A215 | SR 77; River Rd to Calle Concordia, Tucson | $34,036,456.00 | $38,124,863.00 |
Arizona | 079A210 | SR 79: Gila River Bridge (Structure #501) MP 135.50, N of Florence | $31,306,864.00 | $31,785,479.00 |
Arizona | 086A210 | SR 86; VALENCIA RD (MP 159.1) to KINNEY RD (MP 166.6) west of TUCSON | $59,132,744.89 | $80,023,726.46 |
Arizona | 089D201 | US-89; SR-64 to LITTLE COLORADO RIVER thru CAMERON | $36,196,964.33 | $51,677,052.99 |
Arizona | 093A205 | US 93, White Hills Rd (MP 28.09)- 11th ST. (MP 38.00), N of Kingman | $5,861,113.15 | $28,616,387.89 |
Arizona | 093B205 | US-93; MP 115.75 to 119.65 N of WIKIEUP (Carrow to Stephens Section) | $45,607,661.66 | $48,364,433.27 |
Arizona | 093B215 | US 93, TEGNER RD TO SR 89, N OF WICKENBURG | $42,694,358.00 | $72,750,032.00 |
Arizona | 095B214 | US 95; RIFLE RANGE RD - WELLTON-MOHAWK, YUMA | $16,075,322.00 | $33,266,000.00 |
Arizona | 101B209 | SR 101L (PRICE FREEWAY) BASELINE RD - SR 202L (SANTAN), MP 55.10 - MP 61.50, IN MARICOPA CO. | $29,980,000.00 | $75,779,258.00 |
Arizona | 101B213 | SR101L; PIMA RD (MP 36.30) TO I-17 (MP 23.30) | $137,379,109.00 | $225,240,094.00 |
Arizona | 189A201 | SR-189; International Border (MP 0) to Grand Ave (MP 3.75), Nogales | $113,997,083.42 | $144,107,548.43 |
Arizona | 202A205 | SR202L, SR101 to Broadway Road--DESIGN BUILD. HOV Lane and General Purpose Lane--Design Build Project | $132,773,182.94 | $140,798,793.22 |
Arizona | 202C001 | SR 202L, ARIZONA AVE-GILBERT RD Construct Roadway | $53,616,970.53 | $66,416,136.70 |
Arizona | 202C002 | SR-202L, SANTAN DOBSON RD-ARIZONA AVE Construct Divided Freeway | $29,933,280.39 | $36,469,034.39 |
Arizona | 202C003 | SR-202L; SANTAN FRYE RD - POWER RD Construct Divided Fwy | $60,424,775.86 | $78,388,104.76 |
Arizona | 202C005 | SR-202L; SANTAN FWY ELLIOTT RD-BASELINE RD Construct Divided Freeway | $27,532,430.15 | $28,859,055.60 |
Arizona | 202C009 | SR-202L; SANTAN GILBERT RD-FRYE RD Const Divided Fwy | $49,363,956.99 | $60,888,032.95 |
Arizona | 202C207 | SR 202; LINDSAY RD TRAFFIC INTERCHANGE, GILBERT | $24,827,319.00 | $27,278,524.00 |
Arizona | 202D200 | 202 (SOUTH MOUNTAIN); I-10 MARICOPA (MP 54) TO I-10 PAPAGO (MP76) | $727,869,000.00 | $1,677,231,318.62 |
Arizona | 260A208 | SR 260; Thousand Trails (MP 214.79) to I-17 (MP 218.07) S of Cottonwood | $73,859,729.94 | $75,996,399.08 |
Arizona | 260B213 | SR-260; Rim Rd (MP 282.52) to Gibson Rd (MP 303.74) | $32,443,417.04 | $34,404,471.00 |
Arizona | 264A211 | SR-264; Burnside-Fish Wash ( MP 441.02) to Window Rock (MP 450) | $15,857,179.64 | $27,176,870.45 |
Arizona | 303A201 | SR303L, THOMAS ROAD TO CAMELBACK RD | $32,946,276.00 | $36,480,816.41 |
Arizona | 303A202 | SR303L; Camelback Road to Glendale Avenue | $40,212,203.72 | $53,101,826.54 |
Arizona | 303A203 | SR 303: Glendale Avenue - Peoria Avenue Within Cites of Surprise and Glendale | $71,645,076.00 | $76,644,989.74 |
Arizona | 303A204 | SR 303L (Estrella Frwy); Peoria Ave to Mountain View Blvd in Surprise | $135,454,559.00 | $144,386,970.90 |
Arizona | 303A206 | I-10 AND SR 303L Traffic Interchange - Phase 1 | $213,346,938.74 | $229,816,219.12 |
Arizona | 303A210 | US60 (GRAND AVENUE) @SR303L TI--INTERIM TRAFFIC INTERCHANGE | $51,209,641.00 | $54,568,606.91 |
Arizona | 303A216 | I-10@303L TI; Phase II, MP 103.170-105.090 | $64,428,517.00 | $98,561,837.00 |
Arizona | 303A227 | SR 303L; HAPPY VALLEY PARKWAY TO LAKE PLEASANT PARKWAY, PEORIA | $23,956,713.00 | $25,834,338.00 |
Arizona | 347A204 | SR-347 @ Union Pacific RR in Maricopa | $44,990,849.00 | $63,839,786.00 |
Arizona | GGI0204 | TONTO CREEK BRIDGE @ PUNKIN CENTER, GILA COUNTY | $24,009,138.24 | $28,118,067.26 |
Arizona | MMA0239 | Northern Parkway: Dysart Road to 111th Avenue | $54,717,836.00 | $63,480,310.00 |
Arizona | MMA0249 | NORTHERN PARKWAY: DYSART AND EL MIRAGE ROAD | $19,630,513.00 | $33,146,462.00 |
Arizona | MRN0014 | INA RD; SILVERBELL RD TO STARCOMMERCE WAY, IN MARANA | $16,490,276.00 | $25,740,729.00 |
Arizona | PPM0268 | SUNSET RD: SANTA CRUZ RIVER TO RIVER RD, IN TUCSON, AZ | $10,732,000.00 | $33,101,000.00 |
Arkansas | 0002031 | Co. Rd. 411-Hwy. 425 (East of Crossett) (Hwy. 82) Widening | $25,215,409.00 | $34,499,262.00 |
Arkansas | 0002032 | Louisiana State Line - Hwy. 82 (Widening) (S) | $4,826,064.80 | $64,015,494.49 |
Arkansas | 0004031 | Avoca-North Garfield | $24,742,710.00 | $30,928,387.50 |
Arkansas | 0004045 | Hwy. 264 - Pleasant Grove Rd. (S) | $20,439,985.77 | $25,549,982.21 |
Arkansas | 0004072 | Hwy. 72 North - Co. Rd. 34 (Add'l Lns.) (B.V. Bypass) | $24,313,711.00 | $30,256,083.06 |
Arkansas | 0007024 | Hwy. 274 - North (Widening) (S) | $1,737,849.00 | $32,707,813.00 |
Arkansas | 0007025 | Hwy. 79 - South (Widening) (S) | $1,676,873.60 | $34,444,378.63 |
Arkansas | 0014028 | Co. Rd. 27 - Hyw. 79 (Widening) (S) | $2,053,323.00 | $43,730,054.70 |
Arkansas | 0023044 | UPRR Overpass & Realign. (Mayflower) (Hwy. 89) (S) | $29,066,696.83 | $38,329,820.76 |
Arkansas | 0025014 | Hwy. 9 - South of Hwy. 342 (Mammoth Spring) | $20,033,599.00 | $25,041,998.75 |
Arkansas | 0038045 | Black River Str. & Apprs. (Black Rock) | $33,498,280.00 | $41,872,850.00 |
Arkansas | 0043028 | Hwy. 67 Interchange (N. of Cabot) | $22,604,337.23 | $28,255,421.54 |
Arkansas | 0044005 | Hindsville-Huntsville Bypass (Hwy. 412) | $26,173,683.00 | $32,717,103.75 |
Arkansas | 0047051 | Manila - East (Widening) | $15,000,000.00 | $45,381,582.60 |
Arkansas | 0047081 | Hwys. 77, 140, 158, & 181 Strs. & Apprs. (Mississippi Co.) (S) | $40,968,534.83 | $56,416,208.54 |
Arkansas | 0070033 | El Dorado-Hwy. 335 (Hwy. 167) Widening to 5-lanes with shoulders, includes 2 bridges | $21,857,008.00 | $26,980,418.25 |
Arkansas | 0070036 | Airport Dr. - Hwy. 82B (Widening) | $2,000,000.00 | $38,490,854.25 |
Arkansas | 0071030 | Bee Branch-North (Hwy. 65) | $30,860,916.00 | $38,576,145.00 |
Arkansas | 0071031 | Hwy. 110 - Clinton (Widening) (S) | $2,080,000.00 | $45,449,749.00 |
Arkansas | 0073080 | Lonoke Co. Line - Judsonia (S) | $21,830,903.60 | $27,288,629.50 |
Arkansas | 0076244 | Sevier St. - Geyer Springs Rd. (Conc. Pvmnt. Pres.) (S) | $39,923,813.36 | $44,459,792.63 |
Arkansas | 0301152 | Hwy. 67-Sheppard (I-30) | $28,770,073.00 | $31,929,737.00 |
Arkansas | 0302251 | Sevier St.-West of Alcoa Rd. (I-30) Gr., Dr., Paving, Widening | $36,223,652.00 | $41,436,888.00 |
Arkansas | 0302254 | I-430 - Geyer Springs Rd. (I-30) Gr., Dr., Surf, Widening | $59,816,057.00 | $68,888,106.00 |
Arkansas | 0302256 | West of Pulaski Co. Line - I-430 (I-30) Gr., Dr., Surf., Widening, Bridges | $33,547,148.00 | $38,709,417.00 |
Arkansas | 0302267 | Hwy. 70 - Sevier St. (Widening) (F) | $54,353,355.09 | $214,319,635.10 |
Arkansas | 0302268 | I-530 - Hwy. 67 (Widening & Reconst.) (I-30 & I-40)(F) | $195,490,943.00 | $662,233,778.00 |
Arkansas | 0401094 | Oklahoma State Line - East (I-40 & I-540) (Sel. Secs.) (S) | $53,756,078.00 | $60,002,723.00 |
Arkansas | 0401266 | Alma - Hwy. 164 (S) | $44,796,981.61 | $49,774,424.01 |
Arkansas | 0402076 | Lamar - Pope Co. Line (I-40) Base, surface, bridges | $22,461,507.00 | $25,693,997.00 |
Arkansas | 0403117 | I-430 - I-30 (I-40) Earthwork, base, surfacing, MDS, bridges, safety | $55,321,666.00 | $65,438,051.00 |
Arkansas | 0403138 | Atkins - Plumerville (S) | $30,274,174.04 | $33,637,971.16 |
Arkansas | 0404077 | Cache River - West (I-40) Replace White River Relief brs. at 2 locations, raise 2 overpasses and rehab lanes & shoulders | $50,065,261.00 | $55,628,069.00 |
Arkansas | 0404081 | White River Str. & Apprs. (I-40) | $109,233,753.67 | $123,865,281.84 |
Arkansas | 0404087 | Hwy. 31 - East (S) | $900,000.00 | $32,500,000.00 |
Arkansas | 0405143 | I-55 East Intchng-Hwy. 131 (I-40) Overpass replacement | $25,225,994.00 | $28,028,882.00 |
Arkansas | 0405153 | Forrest City-East (I-40) Rehabilitation | $43,517,632.29 | $48,917,044.07 |
Arkansas | 0405158 | Shearerville - West (Pvmt. Impvts.) | $29,331,459.52 | $32,508,889.47 |
Arkansas | 0491017 | Hwy. 264 - New Hope Rd. (Widening) | $1,373,317.39 | $41,385,811.32 |
Arkansas | 0551148 | Hwy. 148 - So. of Hwy. 61 (S) | $38,011,687.03 | $42,413,843.72 |
Arkansas | 1320001 | Saline River-South (Hwy. 167) | $26,816,252.10 | $33,520,315.13 |
Arkansas | 2221002 | Hwy. 278 - Hwy. 293 (S) | $50,493,693.00 | $65,532,118.75 |
Arkansas | 2373002 | Vilonia Bypass-East (Hwy. 64) | $20,340,539.76 | $25,425,674.69 |
Arkansas | 2662007 | Hot Springs - I-30 (Widening) (S) | $43,445,151.00 | $88,008,951.57 |
Arkansas | 4302265 | I-430/Hwy. 10 Interchange Impvt. (L.R.) | $26,214,940.07 | $29,257,145.23 |
Arkansas | 4302267 | Hwy. 365-I-430(Widening) & I-430 Intchng. Mod. | $34,460,136.00 | $43,066,887.92 |
Arkansas | 4302269 | Hwy. 10 - Hwy. 100 (System Preservation & ITS Impvts.) (S) | $33,490,738.40 | $37,211,931.55 |
Arkansas | 4401007 | Bankhead Dr.-Ark. River Bridge (I-440) | $32,462,781.00 | $36,069,756.00 |
Arkansas | 4928001 | Hwy. 16/112 Spur Intchng. Impvts. (F) | $35,528,859.90 | $40,846,132.00 |
Arkansas | 5305004 | Hwy. 65B-Hwy. 65 | $70,516,006.24 | $78,668,134.84 |
Arkansas | 5401078 | Hwy. 71B Intchng. Impvts. (I-49) | $29,490,930.00 | $38,600,662.50 |
Arkansas | 5401262 | Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (I-49) | $99,199,753.66 | $110,221,922.39 |
Arkansas | 5553001 | Hwy. 63B - Hwy. 18 (S) | $33,971,017.90 | $37,745,575.66 |
Arkansas | 6043002 | Vandenberg Blvd. - Hwy. 5 (Widening) | $6,011,634.00 | $102,381,622.50 |
Arkansas | 6301001 | Baptist Hospital - Univeristy Ave. (Widening) (F) | $24,363,095.63 | $99,427,198.59 |
Arkansas | 7007001 | Ouachita River Str. & Apprs. (Hwy. 167) | $48,117,842.68 | $60,147,303.35 |
Arkansas | 9013010 | Hwy. 67 - Hwy. 51 (Arkadelphia Bypass) (S) | $17,670,688.85 | $74,851,579.78 |
Arkansas | 9036020 | Hwy. 62/Hwy. 102 Intchng. Impvts. & 8th Street Widening (Bentonville) | $19,937,191.00 | $27,198,652.00 |
Arkansas | 9061006 | Alcoa Rd. - Hwy. 183 (S) | $28,370,571.60 | $35,463,214.50 |
Arkansas | 9065024 | Hwy 367 - Hwy. 89 (Cabot) (S) | $22,564,011.80 | $32,604,685.75 |
Arkansas | 9210035 | Hwy. 7S - Hwy. 5 (S) | $19,634,398.90 | $28,442,998.62 |
Arkansas | 9210038 | Hwy. 70 East - Hwy. 7 North (F) | $53,821,698.25 | $98,377,122.81 |
Arkansas | 9222010 | Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (Hwy. 67) | $42,465,045.13 | $53,081,306.41 |
Arkansas | 9222014 | Main St. - Vandenberg Blvd. (Widening) (Jacksonville) (F) | $84,931,000.00 | $157,553,494.00 |
Arkansas | 9227074 | I-555 - Hwy. 49 (Dr. Martin Luther King Jr. Dr. Extension) (Jonesboro) (S) | $3,612,715.16 | $93,904,945.95 |
Arkansas | 9227080 | BNSF Railroad Overpass (Hwy. 18) (Jonesboro) (S) | $22,068,822.00 | $27,071,606.00 |
Arkansas | 9227086 | Hwy. 49 - Hwy. 91 (Jonesboro) (S) | $1,895,048.46 | $40,239,559.75 |
Arkansas | 9253063 | Arkansas River Str. & Apprs. (Broadway)(LR/NLR) (Hwy. 70) | $80,391,602.00 | $120,489,503.00 |
Arkansas | 9253087 | Pleasant Ridge Rd. - Pleasant Valley Dr. (L.R.) (F) | $94,814,608.84 | $125,950,488.65 |
Arkansas | 9271010 | Hwy. 79 No.-Co. Rd. 525 (Magnolia) (S) | $20,069,608.00 | $25,087,009.50 |
Arkansas | 9293009 | Hwy. 83 Spur - Hwy. 278 Connector (Monticello) (F) | $4,228,000.00 | $29,469,500.00 |
Arkansas | 9309002 | White River Str. & Apprs. (Newport) (Hwy. 367) Replacement of one bridge | $28,680,524.00 | $35,850,655.00 |
Arkansas | 9332011 | Hwy. 49 - Hwy. 412 East (Gr. & Strs.)(Hwy. 412 - New Location) New Location - 2 lanes of ultimate 4 | $24,608,472.00 | $30,760,590.00 |
Arkansas | B300001 | I-30 INTERSTATE REHABILITATION -BOND PROCEEDS, GR., MDS, BASE, SURFACE | $135,175,300.23 | $150,194,777.04 |
Arkansas | B300203 | Red River-East & West Rehabilitation (I-30) | $1,210,908.80 | $49,746,898.13 |
Arkansas | B300216 | Hwy. 299 - Gurdon Rest Area (S) | $57,349,254.94 | |
Arkansas | B400001 | I-40 INTERSTATE REHABILITATION-BOND PROCEEDS , GR., MDS. BASE, SURFACE | $461,264,561.39 | $512,510,184.57 |
Arkansas | B400201 | Cache River-Bayou DeView (I-40) | $34,810,223.00 | $38,678,024.00 |
Arkansas | B400207 | Shearerville-Hwy. 77 (I-40) | $5,072,885.00 | $56,018,499.00 |
Arkansas | B400223 | Mill Creek - Hwy. 331 (I-40) | $341,608.00 | $45,623,958.22 |
Arkansas | B400229 | Fishing Lake Str. & Apprs. (I-40) | $32,811,368.68 | $36,457,076.09 |
Arkansas | B400230 | Shell Lake Str. & Apprs. (I-40) | $1,281,361.40 | $44,418,558.22 |
Arkansas | B400231 | Blackfish Lake Str. & Apprs. (I-40) | $594,420.41 | $36,714,969.34 |
Arkansas | B440202 | Ark. River Bridge - I-40 | $2,180,946.00 | $58,687,538.47 |
Arkansas | B530201 | Jefferson-Hwy. 104 (I-530) | $29,600,669.00 | $32,889,633.00 |
Arkansas | B530202 | Hwy 104- Hwy 65B (I-530) | $33,819,559.54 | $37,577,288.38 |
Arkansas | B530203 | I-30-Bingham Rd. (I-530) | $70,058,197.00 | $81,224,680.00 |
Arkansas | B540230 | Hwy. 22-I-40 (I-540) | $82,973,062.39 | $92,192,291.54 |
Arkansas | B550001 | I-40 JERICHO (I-55), COLD MILLING, BINDER, PAVING BARDSTOWN REST AREA - HILTON REST ARE (I-55) - CONST SERVICES & UTILITY ADJUST. | $90,386,577.00 | $114,960,280.56 |
Arkansas | B550206 | Hwy. 181-Hwy. 158 (I-55) Rehabilitation | $34,801,569.00 | $38,668,410.00 |
Arkansas | B550209 | No. of Hwy. 18-Missouri St. Line (I-55) (S) | $30,984,763.00 | $34,357,785.00 |
California | 0001002 | IN LONG BEACH, ON STATE RTE 47 AT OCEAN BLVD, CONSTRUCT INTERCHANGE | $26,345,883.16 | $44,546,187.98 |
California | 0004001 | ALAMEDA ST: DEL AMO BLVD TO RTE 91, WIDEN FROM 4 TO 6 LANES, CONST | $24,751,440.00 | $42,823,402.00 |
California | 000C355 | SR60/SR91/I-215 TO ORANGE SHOW ROAD I/C NORTH OF THE I-215/I-10, CONSTRUCT HOV LANES IN EACH DIRECTION (TC) | $14,005,463.00 | $173,933,571.00 |
California | 000C438 | ON I-205 AND I-580 FROM SAN JOAQUIN COUNTY LINE TO GREENVILLE ROAD OVERHEAD. RESURFACE AND RESTORE PAVEMENT ON THE MAINLINE AND RAMPS. (TC) | $73,740,300.00 | $79,491,200.00 |
California | 000C466 | TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER R | $24,991,900.00 | $25,323,700.00 |
California | 000C469 | IN AND NEAR SAN DIEGO AT ROUTE 905/125/11 SEPARATION (SEGMENT 4) AND ON ROUTE 11 FROM 0.1 MILE WEST OF ENRICO FERMI DRIVE TO 1.2 MILE EAST OF ENRICO | $52,630,000.00 | $126,507,700.00 |
California | 000C470 | ALAMEDA, CONTRA COSTA, AND SOLANO COUNTIES AT VARIOUS LOCATIONS INSTALL TRAFFIC OPERATION SYSTEM (TC) | $40,973,000.00 | |
California | 000C494 | IN THE CITY OF SACRAMENTO, AT SACRAMENTO RIVER BRIDGE NO. 24-0053 AND NORTH SACRAMENTO UNDERCROSSING NO. 24-0111L; ALSO IN SAN JOAQUIN COUNTY, AT MOK | $30,527,115.00 | $35,275,000.00 |
California | 000C526 | IN SAN DIEGO COUNTY AND IMPERIAL COUNTY ON VARIOUS ROUTES AT VARIOUS LOCATIONS INSTALL FIBER OPTIC CABLE ALONG THE I-5, I-805, AND SR-905, CONNECT AL | $16,532,800.00 | $27,445,100.00 |
California | 0051625 | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO REPLACE BRIDGE, RAMP, IC, BUTTRESS, BIKE TRL | $11,519,460.00 | $77,584,859.00 |
California | 0051636 | IN SAN DIEGO COUNTY ON INTERSTATE 5 AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF SAN ELIJO LAGOON BRIDGE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD OVE | $59,240,700.00 | $301,625,107.00 |
California | 0051639 | I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE | $97,602,100.00 | $300,466,000.00 |
California | 0051993 | CONSTRUCT HOV LANES, AUXILARY LANES, AND ITS (CMGC) IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILES NOR | $52,989,300.00 | $75,755,000.00 |
California | 0052019 | IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVE | $65,748,450.00 | $71,816,600.00 |
California | 0052949 | ON ROUTE 5 FROM ALONDRA BLVD(KP 2.9/PM 1.8) TO SHOEMAKER AVE(KP 4.0/PM 3.1) INTERSECTION IMPROVEMENTS | $45,958,183.00 | $125,171,506.00 |
California | 0052969 | IN LA CTY IN LAMIRADA, SANTA FE SPRINGS, NORWALK & DOWNEY FROM OC TO LA CTY, WIDEN FREEWAY, RECONSTRUCT OH (TC) | $7,379,087.00 | $112,841,043.00 |
California | 0052981 | IN LOS ANGELES COUNTY IN LAMIRADA FROM ARTESIA BLVD TO NORTH FORK COYOTE CREEK OVERCROSSING WIDEN AND REALIEGN FREEWAY TO ADD ONE MIXED FLOW LANE AND | $45,903,500.00 | $60,256,800.00 |
California | 0053029 | LA CO RTE 5 FROM N. OF BUENA VISTA TO RTE 170, HOV AND ROADWAY REHAB | $47,406,661.21 | $65,864,877.21 |
California | 0053074 | NEAR CASTAIC, FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY. REPLACE APPROACH SLABS, UPGRADE DRAINAGE SYSTEMS, UPGRADING | $32,231,900.00 | $35,454,200.00 |
California | 0053078 | IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES & MODIFICATION AND ROADWAY REHABILITATION BASED ON THE CHA | $103,745,612.00 | $324,615,854.00 |
California | 0053129 | IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN | $179,000,000.00 | $533,596,550.00 |
California | 0054204 | IN KERN COUNTY NEAR KETTLEMEN CITY FROM 0.6 MILE SOUTH OF TWISSLEMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE. REHABILITATE AND | $37,469,460.97 | $48,424,800.00 |
California | 0055156 | MERCED COUNTY 0.4 MILE NORTH OF THE FRESNO COUNTY LINE AT THE JOHN "CHUCK" ERRECA SAFETY ROADSIDE REST AREA REPLACE SAFETY ROADSIDE REST AREA (SRRA) | $32,520,700.00 | $32,568,000.00 |
California | 0055157 | FRESNO COUNTY FROM 1.2 MILES SOUTH OF KAMM AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF PANOCHE ROAD OVERCROSSING PAVEMENT REHABILITATION, REPAIR CULVERT | $35,581,000.00 | |
California | 0056349 | IN SACRAMENTO, FROM 1.1 MILES SOUTH OF ELK GROVE BLVD OC TO AMERICAN RIVER BRIDGE CORRIDOR ENHANCEMENT - CONSTRUCT HOV LANE, ROADWAY REHABILITATION, | $87,782,291.57 | $352,355,700.00 |
California | 0056360 | IN SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILE SOUTH OF ARENA BLVD OVERCROSSING TO 0.4 MILE SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILE NO | $35,098,800.00 | |
California | 0058337 | IN SHA CO NR LAKEHEAD AT SACTO RVR,BR#06-0089 (TC) REPLACE BRIDGE (TC) | $186,149,723.43 | $186,149,723.43 |
California | 0058355 | IN SHA CO ABOUT 8 MI N OF SHA LAKE CITY & NEAR LAKEHEAD FRM TURNTABLE BAY OC TO BRIDGE REPLACEMENT AND SEISMIC RETROFIT (TC) | $30,460,600.00 | $44,026,000.00 |
California | 0058359 | IN SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING. WIDENING TO 6 LANES, BRIDGE REP | $112,782,153.00 | $150,659,000.00 |
California | 0081329 | IN SAN DIEGO COUNTY NEAR ALPINE ON INTERSTATE 8 FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE. PLACE CRCP, HMA, RSC, MGS, AND WATER POLLUITION | $47,769,700.00 | $52,554,000.00 |
California | 0082109 | IN IMPERIAL COUNTY NEAR EL CENTRO FROM 0.5 MILE WEST OF ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF ANDERHOLT ROAD OVERCROSSING AND FROM 0.5 MILE EAST | $97,315,800.00 | $98,089,600.00 |
California | 0082112 | IN IMPERIAL COUNTY IN EL CENTRO FROM 0.4 MILE WEST OF IMPERIAL AVENUE OVERCROSSING TO 0.1 MILE EAST OF 8TH STREET OVERCROSSING RECONSTRUCT INTERCHANG | $29,696,160.26 | $32,828,160.26 |
California | 0101820 | IN LA COUNTY IN CITY OF BALDWIN PARK AND WEST COVINA FR PUENTE AVE TO CITRUS ST CONSTRUCT HOV LANES AND SOUNDWALLS (TC) | $40,140,000.00 | $157,866,051.00 |
California | 0101829 | ROUTE 10 HOV LANES FROM CITRUS ST T ROUTE 57 IN LA COUNTY/CITRUS ST TO RTE 57 HOV, WIDENING, AND REALIGN (TC) | $78,553,900.00 | $233,907,500.00 |
California | 0101840 | LA, 10, PM: 14-19 IN THE CITY OF LOS ANGELES AT SANTA MONICA VIADUCT (BR. NO. 53-1301). PAINT AND REHABILITATE BRIDGE. THE PURPOSE OF THIS PROJECT IS | $40,909,500.00 | $41,354,700.00 |
California | 0101844 | IN THE CITIES OF SANTA MONICA AND LOS ANGELES, FROM ROUTE 1 TO ROUTE 5/101 INTERCHANGE; ALSO ON ROUTE 1 FROM MCCLURE TUNNEL TO LINCOLN BOULEVARD. REP | $34,651,200.00 | $38,106,060.00 |
California | 0101855 | LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALON | $56,227,400.00 | $62,034,000.00 |
California | 0102266 | IN SAN BERNARDINO COUNTY IN
YUCAIPA FROM 0.2 MILE WEST OF LIVE OAK CANYON ROAD TO COUNTY LINE ROAD UNDERCROSSING PAVEMENT REHABILITATION AND CONTINO |
$18,144,700.00 | $36,589,100.00 |
California | 0102268 | IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR | $139,502,033.00 | $168,718,000.00 |
California | 0102269 | IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR | $62,041,969.00 | $117,755,000.00 |
California | 0103110 | RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS | $215,583,800.00 | |
California | 0103112 | IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS | $135,823,352.00 | $326,730,500.00 |
California | 0104064 | ON I-10 IN INDIO BETWEEN WASHINGTON ST & MONROE ST AT JEFFERSON ST INTERCHANGE RECONSTRUCT/REALIGN EXISTING INTERCHANGE | $33,310,000.00 | $56,760,364.00 |
California | 0104065 | RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. RE | $100,000,000.00 | $215,896,600.00 |
California | 0105052 | IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS | $281,738,899.00 | |
California | 0151237 | ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY IN AND NEAR VICTORVILLE *** ROADWAY RECONSTRUCTION (TC) | $98,451,300.00 | $102,718,300.00 |
California | 0151250 | IN SAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF CLEGHORN RD. UNDERCROSSING TO 0.5 MILE SOUTH OF ROUTE 138 AND FROM 0.5 MILE SOUTH OF TRUCK SAFETY CHE | $26,064,000.00 | |
California | 0153045 | ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY *** I 15 JOINT POINT OF ENTRY (SCALE - CVEF) (TC) | $12,573,994.00 | $52,150,417.00 |
California | 0154208 | IN SAN DIEGO AND RIVERSIDE COUNTY IN AND NEAR TEMECULA FROM 0.1 MILE SOUTH OF SAN DIEGO COUNTY LINE TO 0.1 MILE NORTH OF TEMECULA RIVER BRIDGE REPLAC | $34,015,553.51 | $37,620,800.00 |
California | 0154210 | IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATIONTO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERC | $57,403,900.00 | $63,222,100.00 |
California | 0155165 | IN SAN BERNARDINO COUNTY IN FONTANA AND NEAR DEVORE FROM 0.3 MILE SOUTH OF SIERRA AVENUE UNDERCROSSING TO GLEN HELEN PARKWAY UNDERCROSSING. REPLACE P | $26,479,014.50 | $29,213,800.00 |
California | 0155166 | IN RIVERSIDE COUNTY IN CORONA AND EASTVALE, FROM 0.5 MILE SOUTH OF ONTARIO AVENUE UNDERCROSSING TO ROUTE 60/15 SEPARATION CONCRETE PAVEMENT SLAB REP | $27,129,400.00 | $30,088,200.00 |
California | 0155167 | IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT | $34,093,500.00 | $149,303,000.00 |
California | 0401084 | IN SAN BERNARDINO COUNTYNEAR LUDLOW FROM 0.3 MILE EAST OF CRUCERO ROAD TO 0.4 MI W/O BADGER WASH REGRADE MEDIAN CROSS SLOPE (TC) | $41,220,800.00 | $41,550,100.00 |
California | 0401091 | IN SAN BERNARDINO COUNTY AT NEWBERRY SPRINGS AND LUDLOW FROM 1.6 MILES EAST OF FORT CADY ROAD OVERCROSSING TO CRUCERO ROAD UNDERCROSSING REGRADE MEDI | $29,143,994.00 | |
California | 0801119 | IN ALAMEDA COUNTY IN BERKELEY FROM 0.6 MILE NORTH OF UNIVERISTY AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF GILMAN STREET UNDERCROSSING CONSTRUCTION PED | $17,156,901.41 | $25,127,200.00 |
California | 0801120 | THE CITY AND COUNTY OF SAN FRANCISCO FROM 16TH STREET TO 4TH STREET. PAINT STEEL STRUCTURE | $28,697,100.00 | $31,725,500.00 |
California | 0801121 | ALAMEDA COUNTY IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD E | $21,662,500.00 | $30,787,200.00 |
California | 0801998 | ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CON | $84,940,900.00 | |
California | 0802375 | SOLANO COUNTY IN FAIRFIELD AND VACAVILLE FROM 1.0 MILE WEST OF RED TOP ROAD UNDER CROSSING TO 0.4 MILE EAST OF LEISURE TOWN ROAD CROSSING HIGHWAY WID | $6,859,000.00 | $26,800,000.00 |
California | 0803235 | PLA CO;ROCKLIN;I-80 @ SIERRA COLLEGE BLVD OC, INTERCHANGE RECONSTRUCTION - (TC) | $18,432,000.00 | $25,545,565.00 |
California | 0803237 | IN SACRAMENTO AND WEST SACRAMENTO FROM 80/84 SEPARATION TO WATT AVENUE OVERCROSS CONST. HOV LANES & REHAB. ROADWAY - (TC) | $73,653,185.91 | $127,190,346.57 |
California | 0803250 | IN YOLO AND SACRAMENTO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF REED AVENUE UNDERCROSSING TO 0.1 MILE EAST OF SACRAMENTO RIVE | $23,617,000.00 | $26,080,200.00 |
California | 0803252 | PLACER COUNTY IN AND NEAR ROSEVILLE AND ROCKLIN FROM 0.1 MILE WEST OF RIVERSIDE AVENUE OVERCROSSING TO ROCKLIN ROAD UNDERCROSSING. ROADWAY EXCAVATION | $37,478,000.00 | |
California | 0804194 | NEAR COLFAX ON RTE 80FROM LONG RAVINE RD TO EAST OF MAGRA RD OC TRUCK CLIMBING LANE (TC) | $53,602,900.00 | $53,812,700.00 |
California | 0804207 | N PLACER COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL SPRINGS ROAD OVERCROSSING TO CISCO OVERCROSSING. REPLACE BRIDGES AT FOUR LOCATIONS (#19-0112, #19-0 | $34,766,500.00 | $38,244,500.00 |
California | 0804213 | NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSINGTO ROUTE 89/267 SEPARATION ROADWAY EXCAVATION, JPCP AND FURNISH POLYE | $23,893,800.00 | $26,427,000.00 |
California | 1101841 | LA-110 - IN AND NEAR THE CITIES OF LOS ANGELES AND CARSON, FROM GAFFEY STREET TO COLLEGE STREET, EXTEND SERVICE LIFE OF EXISTING PAVEMENT AND INSTALL | $39,412,800.00 | $39,631,200.00 |
California | 1187011 | SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD CONSTRUCT TUNNELS, APPROACH RO | $498,589,217.34 | $502,809,766.87 |
California | 19FF004 | IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.4 TO 1.7 MILES EAST OF RODEO CREEK BR #10-237 STABILIZE ROADWAY | $26,337,100.00 | |
California | 2012001 | AT RTE 76/15 SEP & ON RTE 76 FR SOUTH MISSION RD TO 76/15 SEP, CONSTRUCT 4 LANE HIGHWAY | $300,000.00 | $100,146,000.00 |
California | 2056356 | SAN JOAQUIN COUNTY IN AND NEAR TRACY FROM JANNEY OVERHEAD TO 1.3 MILES EAST OF MACARTHUR DRIVE OVERCROSSING WIDENING BRIDGES, RAMPS AND ROADWAY | $27,002,000.00 | |
California | 27E8004 | IN VENTURA COUNTY, SOUTH OF POINT MUGU STATE PARK (PM 4.0) AND SYCAMORE CANYON ROAD (PM 4.2). CONSTRUCT SECANT WALLS AT TWO LOCATIONS AS A PERMANENT | $49,537,700.00 | $56,254,100.00 |
California | 2801150 | SANTA CLARA AND SAN MATEO COUNTIES IN LOS ALTOS HILLS AND MENLO PARK FROM FOOTHILL EXPRESSWAY UNDERCROSSING TO 0.5 MILE NORTH OF SAND HILL ROAD ROADW | $53,402,900.00 | $58,733,100.00 |
California | 29R4006 | IN MENDOCINO CO. NEAR WESTPORT, FROM 0.6 TO 1.4 MI NORTH OF BLUE SLIDE GULCH BRIDGE. EMERGENCY RELIEF - RECONSTRUCT ROADWAY | $23,118,014.96 | $38,650,000.00 |
California | 31D0001 | IN TRINITY CO., NEAR DEL LOMA AT BIG FRENCH CREEK ROAD EMERGENCY RELIEF - EMERGENCY OPENING STORM DAMAGE REPAIRS. | $43,231,326.00 | $43,853,000.00 |
California | 31PZ004 | BUTTE COUNTY NEAR PARADISE FROM 0.8 MILE WEST OF SHADY REST AREA TO 0.2 MILE EAST OFSHADY REST AREA. RAISE ALIGNMENT. PLACE HMA, STRUCTURAL CONCRETE | $35,259,500.00 | |
California | 31R0001 | MONTEREY COUNTY, NEAR POSTS, AT
PFEIFFER CANYON BRIDGE, NO. 44-0060 EMERGENCY PROJECT - EMERGENCY
OPENING REMOVE AND REPLACE DAMAGED BRIDGE, RESTORE |
$23,899,700.00 | $26,996,626.00 |
California | 31RH001 | MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REM | $84,480,300.00 | $94,217,533.34 |
California | 31TC001 | IN SANTA CLARA COUNTY, NEAR LOS GATOS, AT 1.2 MILES NORTH OF LAS CUMBRES ROAD CONSTRUCT SOLDIER PILE WALLS. | $11,958,000.00 | $34,558,500.00 |
California | 31TN001 | IN MARIN COUNTY, NEAR STINSON BEACH AT 0.6 MILE SOUTH OF PANORAMIC HIGHWAY NORTH JUNCTION CONSTRUCT SOLDIER PILE WALL | $22,060,700.00 | $31,650,000.00 |
California | 37B3004 | MEN CO;NR LEGGETT;S/O TO N/O RED MTN CK NEW FWY;2 BRIDGES;RET WALLS;PA | $65,894,389.11 | $89,545,023.43 |
California | 37Y0001 | ON STATE ROUTE 70 IN YUBA COUNTY AND STATE ROUTE 99 IN SUTTER COUNTY AT VARIOUS LOCATIONS. PAVEMENT DAMAGED AT VARIOUS LOCATIONS DUE TO FEMA DEBRIS R | $22,244,925.00 | $29,612,500.00 |
California | 37Y7001 | IN BUTTE COUNTY ON ROUTE 32, 70, 99, 149, AND 191 AT VARIES POSTMILE REMOVING/DISPOSING/CHIPPING HAZARD TREE AND DEBRIS; INSTALL EROSION CONTROL ON S | $26,250,000.00 | |
California | 38Y0012 | TOWN OF PARADISE - APPROXIMATELY 57 LOCATIONS DUE TO BURNT OUT CARS. PAVEMENT IMPROVEMENT OF 32 MILES OF ROADWAY. REPARING DAMAGED SECTIONS OF ROADW | $2,636,760.00 | $55,439,200.00 |
California | 4052003 | ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI | $189,900,000.00 | |
California | 4052986 | IN ORANGE COUNTY ON ROUTE 405 FROM STATE ROUTE 73 TO I-605 ADD ONE MIXED FLOW AND TOLL EXPRESS LANE IN EACH DIRECTION WITH OTHER OPERATIONAL IMPROVEM | $74,191,000.00 | $1,900,000,000.00 |
California | 4052999 | I-405 AT CRENSHAW BLVD. RAMP IMPROVEMENT; IN LOS ANGELES COUNTY, IN THE CITY OF TORRANCE BETWEEN WESTERN AVENUE AND WEST 182ND STREET / CRENSHAW BLVD. | $10,989,400.00 | $66,756,000.00 |
California | 4053015 | FROM PM 0.43 S/O LA-10 TO VENTURA BL. WIDEN FOR HOV LANE | $222,428,625.26 | $827,217,719.00 |
California | 4127001 | LA CO NON-INTERSTATE RTES VAR LOCATIONS, ER RELIEF STORM DAMAGE REPAIR | $26,537,637.51 | $29,114,534.00 |
California | 5004049 | W MISSION BAY DRIVE/SAN DIEGO RIVER BRIDGE REPLACEMENT (57C-0023) | $61,887,016.00 | $146,919,728.00 |
California | 5006181 | HYPERION VIADUCT OVER LA RIVER BRIDGE # 53C-1881 BRIDGE REHABILITATION AND SEISMIC RETROFIT | $5,148,407.00 | $77,336,126.00 |
California | 5006219 | N. SPRING ST. BRDG OVR L.A. RVR, BRIDGE # 53C0859 BRIDGE REHABILITATION/WIDENING | $36,048,438.00 | $45,996,471.46 |
California | 5006221 | RIVERSIDE DR. OVER L.A. RIVER, BRDG #53C0160 BRIDGE REPLACEMENT /WIDENING | $49,654,086.98 | $60,868,544.00 |
California | 5006336 | FIRST ST. OVER L.A. RIVER BRIDGE # 53C-1166 BRIDGE REHABILITATION | $58,331,222.66 | $66,314,332.22 |
California | 5006664 | SIXTH STREET VIADUCT OVER LA RIVER AND EAST SANTA ANNA FREEWAY, 53C1880 REPLACE STRUCT DEFICIENT VIADUCT WITH NEW (TC) | $125,530,142.05 | $148,909,901.00 |
California | 5006811 | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 CMGC PA | $28,978,113.00 | $33,088,934.00 |
California | 5006831 | SIXTH STREET VIADUCT OVER LA
RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS
BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 THIS I |
$26,125,154.00 | $29,509,945.00 |
California | 5006839 | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595THIS PRO | $123,862,444.00 | $230,364,054.00 |
California | 5006882 | IN THE PORT OF LOS ANGELES, TERMINAL ISLAND TERMINAL ISLAND RAILYARD ENHANCEMENT PROJECT: THIS PROJECT ENTAILS THE ADDITION OF 5 STAGING/STORAGE TRAC | $21,645,000.00 | $55,650,000.00 |
California | 5012037 | LAKE MERRITT CHANNEL BRIDGE (BR.NO.33C-0030) REPLACE BRIDGE (PER SEISMIC STRATEGY) | $27,595,632.00 | $31,446,836.00 |
California | 5012085 | 12TH & 14TH ST BRIDGES 33C0181 & 33C0182 BRIDGE REPLACEMENT (SEISMIC) | $11,060,488.42 | $55,410,000.00 |
California | 5059230 | STATE ROUTE 132 FROM NORTH DAKOTA AVE TO THE NEEDHAM STREET OVERCROSSING INCLUDING THE 132 / 99 INTERCHANGE. CONSTRUCT TWO-LANE EXPRESSWAY / HIGHWAY | $22,101,971.00 | $33,360,766.00 |
California | 5060384 | VETERANS BLVD./SH99/GOLDEN STATE BLVD. (PHASE 3) VETERANS BLVD./SH99 INTERCHANGE; NORTHERLY JUG HANDLE; VETERANS BLVD. OVERCROSSING OF GOLDEN STATE | $10,540,582.00 | $59,151,158.00 |
California | 5068001 | CYPRESS AVE. @ SAC RIVER, BR #. 06C0108 L&R (NEW BRIDGE # 06C0377) REPLACE BRIDGES | $79,976,316.00 | $92,138,624.00 |
California | 5104033 | AUTO CENTER DRIVE AT BNSF RAILROAD SOUTH OF RAILROAD STREET, NEW OVERHEAD | $8,061,892.00 | $32,238,599.00 |
California | 5108137 | GERALD DESMOND BRIDGE BR# 53C0065 BRIDGE REPLACEMENT | $173,115,000.00 | $888,400,000.00 |
California | 5108189 | PORT OF LONG BEACH-PIER G TO J DOUBLE TRACK ACCESS FRO PIER G TO J, CREATING 9,000 FOOT DEPARTURE TRACK FOR TRAIN SERVING FOUR MARINE TERMINALS ALONG | $14,000,000.00 | $26,700,780.00 |
California | 5109106 | SR58: FROM 0.60 MILE E/O COFFEE RD OVERCROSSING TO TRUXTUN AVE UNDERCROSSING, ELEMENT OF THE CITY OF BAKERSFIELD CENTENNIAL CORRIDOR PROJECT. CONSTRU | $113,362,209.00 | $127,729,712.00 |
California | 5109200 | 24TH/23RD STREETS (SR178) FROM 0.1 MI WEST OF SR99 (W/O KERN RIVER BR.) TO 0.2 MI EAST OF "M" STREET ROADWAY WIDENING AND INTERSECTION IMPROVEMENTS | $23,540,432.70 | $44,294,976.43 |
California | 5109242 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 99 FROM 0.3 MI SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 FROM | $4,280,000.00 | $36,549,100.00 |
California | 5109245 | SR99/ SR58 CONNECTOR, SR99 FROM BELLE TERRACE TO MING AVE. IMPROVEMENTS ON SR99/ SR58 CONNECTOR INCLUDING THE CONSTRUCTION OF A COLLECTOR-DISTRIBUTOR | $11,122,638.65 | $58,633,355.00 |
California | 5109251 | CENTENNIAL CORRIDOR CONNECTOR: WESTSIDE PARKWAY(WSP) AT KERN RIVER BR. TO SR58 SR99 NEW ROAD: CONSTRUCT NEW CENTENNIAL CORRIDOR MAINLINE AND INTERCH | $97,719,464.10 | $156,024,110.25 |
California | 5163027 | 5TH STREET AT 2ND STREET AND 5TH STREET OVER FEATHER RIVER BRIDGE REPLACEMENT (TC) | $76,942,547.91 | $79,048,216.00 |
California | 5166015 | BON AIR BRIDGE (BON AIR RD OVER CORTE MADERA CREEK). BR.# 27C0028 BRIDGE REPLACEMENT | $34,075,884.01 | $39,867,829.13 |
California | 5213039 | FAIR OAKS AVE OVER CALTRAIN
& UPRR, BRIDGE # 37C0765 THIS REQUEST IS TO CONVERT AC FUNDS UNDER CONSTRUCTION AND R/W TO REGULAR FEDERAL FUNDS. BRIDGE |
$25,971,994.00 | $29,831,941.00 |
California | 5282017 | INDIAN CANYON DRIVE OVERHEAD AT THE UNION PACIFIC RAILROAD SOUTH OF GARNET AVENUE, BR. NO. 56C-0025 BRIDGE WIDENING TO SIX LANES | $1,635,943.00 | $26,425,723.00 |
California | 5288046 | IN FOLSOM ON WHITE ROCK RD FROM PRAIRIE CITY RD TO EAST BIDWELL ST. CONSTRUCT 4 LANE ROAD WITH 8 FOOT SHOULDERS. (CLASS 1 TRAIL TO BE BUILT IN LATER | $15,000,000.00 | $31,201,500.00 |
California | 5380028 | GREEN TREE BOULEVARD FROM HESPERIA ROAD TO RIDGECREST BOULEVARD EXTENSION OF 4-LANE ROAD WITH NEW OVERHEAD | $25,696,701.07 | $46,469,279.91 |
California | 5381033 | VIA VERA CRUZ, BRDG NO. 57C0780 REPLACE 2-LANE BRIDGE WITH 4-LANE BRIDGE | $20,538,960.00 | $32,885,590.00 |
California | 5459025 | I-15/SR 79 INTERCHANGE FROM 0.4 MILES SOUTH OF SR 79 TO 0.6 MILES NORTH OF THE I-15/SR 79 SEPARATION IN THE CITY OF TEMECULA WIDEN INTERCHANGE RAMPS | $14,415,839.50 | $27,271,373.50 |
California | 5459031 | I-15 FROM WINCHESTER RD IC LOOP ENTRY RAMPS TO JEFFERSON AVE. WINCHESTER RD IC NB ENTRY RAMP POST MILES: BEGIN 6.40 END 9.70 FRENCH VALLEY PKWY IC/AR | $51,439,839.50 | $108,280,138.00 |
California | 5464029 | I-215 / CLINTON-KEITH ROAD INTERCHANGE , RECONSTRUCT INTERCHANGE | $9,999,452.00 | $26,437,922.00 |
California | 5801051 | ON I-580 IN ALAMEDA COUNTY NEAR LIVERMORE 1 MILE EAST OF NORTH FLYNN ROAD CONSTRUCT RETAINING WALL AND CLIMBING LANE (TC) | $53,480,532.41 | $54,003,380.41 |
California | 5801054 | ISABEL AVEN (LIVERMORE) TO FOOTHILL (DUBLIN) CONSTRUCT A WESTBOUND HOV LANE | $9,609,605.39 | $51,907,082.00 |
California | 5801055 | GREENVILLE ROAD TO ISABEL AVENUE (LIVERMORE) CONSTRUCT A WESTBOUND HOV LANE | $12,404,356.26 | $68,826,847.67 |
California | 5801076 | ALAMEDA COUNTY FROM ROUTE 580/ROUTE 238 SEPERATION TO FRUITEVALE AVENUE UNDERCROSSING TO REPLACE SLAPBS, RESURFACE SHLDS & RAMPS, & CONSTRUCT MGS, & | $39,410,700.00 | $43,446,500.00 |
California | 5908031 | JELLYS FERRY RD OVER SACRAMENTO RIVER BRIDGE (BR. #08C0043) BRIDGE REPLACEMENT ON NEW ALIGNMENT | $46,452,532.00 | $53,014,641.00 |
California | 5912085 | MIDWAY RD @ BUTTE CREEK 3.9 MILES SOUTH OF NELSON RD. BRIDGE NO. 12C0052 & 12C0053 BRIDGE REPLACEMENT | $24,076,840.00 | $27,196,250.00 |
California | 5925098 | MOSQUITO RD OVER SOUTH FORK AMERICAN RIVER 5.7 MILES NORTH OF US 50 BR#25C0061 BRIDGE REPLACEMENT (TC) | $25,114,000.00 | $79,314,000.00 |
California | 5929166 | MCHENRY AVENUE OVER STANISLAUS RIVER (BRIDGE 38C0032) BRIDGE REPLACEMENT | $22,651,344.00 | $25,943,318.00 |
California | 5934171 | 2ND STREET FROM MARKET TO KING BICYCLE & PED IMPROVEMENTS, REPAVE | $11,116,386.00 | $25,883,895.00 |
California | 5934177 | IN SAN FRANCISCO, ON 3RD STREET, CROSSING OVER THE MISSION CREEK CHANNEL BETWEEN BERRY STREET AND TERRY A FRANCOIS BOULEVARD; BR. # 34C0025 BRIDGE RE | $32,060,268.00 | $36,214,015.00 |
California | 5934185 | MARKET STREET, 5TH STREET TO 8TH STREET. WORK MAY EXTEND OFF MARKET STREET, UP TO 50 FEET AT INTERSECTIONS. ROADWAY IMPROVEMENTS, INCLUDING ROADWAY R | $18,366,000.00 | $191,108,886.00 |
California | 5938076 | CROWS LANDING ROAD OVER SAN JOAQUIN RIVER (BRIDGE 38C0010) REPLACE BRIDGE (SEISMIC) | $12,216,407.00 | $25,617,720.09 |
California | 5943043 | UNION RD @ SAN BENITO RIVER (BR# 43C0002) BRIDGE REPLACEMENT | $4,427,301.00 | $48,240,893.00 |
California | 5956221 | 66TH AVENUE FROM EAST OF STATE ROUTE 86 TO DALE KILER ROAD IN THE COMMUNITY OF MECCA NEW OVERHEAD | $24,479,641.00 | $47,974,058.00 |
California | 5956230 | HAMNER AVENUE OVER SANTA ANA RIVER, BR. NO. 56C-0446 REPLACE 2-LANE BRIDGE WITH 6-LANE BRIDGE | $41,311,467.00 | $69,888,540.00 |
California | 6003010 | GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE II | $176,753,580.79 | $176,753,580.79 |
California | 6003028 | GOLDEN GATE BRIDGE . SEISMIC RETROFIT PHASE 3A | $108,688,703.94 | $108,688,704.94 |
California | 6003051 | GOLDEN GATE BRIDGE. BR. # 27 0052 SUICIDE DETERRENT SYSTEM | $133,050,000.00 | $204,092,868.00 |
California | 6053122 | US 395 FROM PALMDALE ROAD (SR 18) IN PALMDALE TO CHAMBERLAINE WAY IN ADELANTO, PHASE 1 WIDEN HIGHWAY FROM TWO TO FOUR LANES (TC) | $8,027,804.64 | $40,003,413.00 |
California | 6053130 | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN | $207,167,533.00 | $287,061,533.00 |
California | 6054066 | STATE ROUTE 71/91 INTERCHANGE REPLACE CONNECTOR & RECONSTRUCT RAMP (TC) | $34,362,820.55 | $174,729,970.32 |
California | 6054081 | I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 60 IN THE CITIES OF EASTVALE AND JURUPA VALLEY CONSTRUCT TOLL EXPRESS LANES IN EACH DIREC | $98,418,952.00 | $329,521,881.00 |
California | 6054090 | STATE ROUTE 60 FROM GILMAN SPRINGS ROAD TO 1.37 MILES WEST OF JACK RABBIT TRAIL CONSTRUCT EASTBOUND AND WESTBOUND TRUCK LANES | $45,401,000.00 | $109,133,000.00 |
California | 6065198 | I-405 NB HOV LANE, WIDENING: I-10 TO I-101 ROAD WIDENING FOR HOV LANE | $92,600,000.00 | $104,597,312.00 |
California | 6065240 | NORTHERN LOS ANGELES COUNTY FROM I-5/SR14 JCT. TO PARKER ROAD. THE INTERSTATE 5 (I-5) GOLDEN STATE CHOKEPOINT RELIEF PROJECT (THE PROJECT) OFFERS A C | $47,000,000.00 | $533,596,550.00 |
California | 6065251 | I-210 FREEWAY FROM 0.2 MILES WEST OF MARENGO AVE TO W ILSON AVE IN THE CITY OF PASADENA AND APPROXIMATELY 1.5 MILES OF SOUNDWALLS FROM BALDWIN AVE TO | $48,649,000.00 | $48,649,000.00 |
California | 6066104 | NCTD RAIL R/W FOR SPRINTER COMMUTER TRAIN IN CITIES OF VISTA, SAN MARCOS, OCEANSIDE AND THE COUNTY OF SAN DIEGO BUILD 7.1 MILES OF CLASS I BICYCLE TR | $17,827,622.64 | $28,374,000.00 |
California | 6071122 | INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION | $1,000.00 | $1,900,000,000.00 |
California | 6071129 | STATE ROUTE 55 FROM INTERSTATE 405 TO INTERSTATE 5 ADD ONE MIXED-FLOW AND HIGH-OCCUPANCY LANE IN EACH DIRECTION AND REPAIR CHOKEPOINTS (TC) | $155,345,407.00 | $231,469,718.00 |
California | 6164023 | ALONG THE WHITEWATER RIVER STORM CHANNEL FROM THE CITY OF PALM SPRINGS TO THE CITY OF COACHELLA, PHASE 1, SEGMENT 1 CONSTRUCT 13.47 MILES OF NEW BIKE | $18,655,000.00 | $33,009,000.00 |
California | 6164024 | EASTERN RIVERSIDE COUNTY (18 CORRIDORS): MONTEREY, COOK, PALM DR, BOB HOPE, FRED WARING, DINAH SHORE, GENE AUTRY, DATE PALM, INDIO BLVD, JEFFERSON, P | $35,148,603.00 | $62,573,714.00 |
California | 6202007 | HWY 299 BETWEEN TRINITY & SHASTA COUNTIES; APPROX 20 MILES WEST OF REDDING, HWY REALIGNMENT (TC) | $839,440.00 | $30,298,000.00 |
California | 6203055 | SR-99 FROM ASH ST TO RAMSDELL DR STREETSCAPE IMPROVEMENTS (TC) | $10,810,000.00 | $39,563,000.00 |
California | 6203058 | RECONFIGURE I-80/SR-65 I/C & WIDEN NB SR-65 FROM I-80 WB RAMP TO PLEASANT GROVE BL RECONFIGURE I-80/SR-65 INTERCHANGE AND WIDEN SR-65 | $6,830,000.00 | $43,180,600.00 |
California | 6203059 | SR-49 FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK REHABILITATE PAVEMENT (TC) | $2,338,000.00 | $36,052,100.00 |
California | 6203060 | NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. PM23.50 CONSTRUCT AN UNDERCROSSING AND A | $6,091,900.00 | $30,688,902.12 |
California | 6203067 | IN ROCKLIN: BETWEEN SR-65 (PM 4.1) AND ROCKLIN RD. (PM 6.0); CONSTRUCT I-80 EASTBOUND AUXILIARY LANE, INCLUDING TWO-LANE OFF-RAMP. IN ROSEVILLE: BET | $4,632,588.00 | $37,478,000.00 |
California | 6204105 | I-580 LIVERMORE; GREENVILLE RD TO ISABEL AVE, CONSTRUCT W/B HOV LANE | $6,187,759.00 | $73,055,000.00 |
California | 6204113 | US 101 BROADWAY INTERCHANGE IN BURLINGAME RECONSTRUCT INTERCHANGE INCLUDE BIKE/PED FACILITY | $3,559,977.49 | $50,043,250.63 |
California | 6204117 | WB I-80 TO SR12 CONNECTOR, INTERCHANGE RECONSTRUCTION (TC) | $999,962.00 | $52,215,503.00 |
California | 6204120 | US 101 MARIN SONOMA NARROWS; NEAR PENTALUMA .8MIL S. TO 2MIL N. OF MARIN-SON LNS REALIGN US101 & CONSTRUCT WIDENING FOR HOV (TC) | $127,845.25 | $55,486,000.00 |
California | 6204123 | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PH II CONCESSIONARE PMTS P3 (TC) | $34,000,000.00 | $34,000,000.00 |
California | 6204127 | US 101 MARIN & SONOMA CO. BETWEEN KASTANIA RD. & SOUTH OF MARIN/SONOMA COUNTY LINE CONSTRUCT HOV LANES (TC) | $32,200,000.00 | $38,368,000.00 |
California | 6204131 | ON I-80 THROUGH THE CITIES OF FAIRFIELD AND VACAVILLE IN SOLANO COUNTY, FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVER | $63,464,510.00 | $178,700,000.00 |
California | 6204132 | ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. | $75,651,097.00 | $103,646,000.00 |
California | 6205010 | STATE HWY 46 CORRIDOR SAN LUIS OBISPO COUNTY ROAD WIDENING | $14,510,070.80 | $25,734,967.65 |
California | 6205015 | ROUTE 46 CORRIDOR, ROAD WIDENING | $2,477,410.47 | $63,244,534.42 |
California | 6205026 | IN SANTA BARBARA COUNTY, IN AND NEAR SUMMERLAND FROM 0.2 MI NORTH OF PADARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. RECONSTRUCT PAVEMENT WITH C | $3,098,688.99 | $127,191,000.00 |
California | 6205028 | NEAR THE CITY OF SANTA CRUZ AND CAPITOLA ON HIGHWAY 1, FROM 41ST AVENUE TO SOQUEL AVENUE CONSTRUCT AUXILIARY LANES AND CONSTRUCT BICYCLE/PEDESTRIAN O | $1,640,000.00 | $28,110,000.00 |
California | 6205029 | ON SR156 IN SAN JUAN BAUTISTA, FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH ST. ROADWAY WIDENING | $404,017.00 | $58,711,000.00 |
California | 6206010 | ROUTE 99 FROM GOSHEN TO KINGSBURG WIDEN FROM 4-LANE TO 6-LANE | $6,987,904.14 | $99,254,688.29 |
California | 6206011 | ROUTE 99 FROM GOSHEN TO KINGSBURG WIDEN FROM 4-LANE TO 6-LANE | $5,822,225.77 | $99,383,881.20 |
California | 6206021 | SR 46 FROM THE INTERSECTION OF LOST HILLS ROAD TO 0.9 MI. E OF I5 WIDENING FROM 2 TO 4 LANES | $17,701,000.00 | $49,972,000.00 |
California | 6206025 | KINGS CANYON EXPRESSWAY SEGMENT 3, ON SR 180 FROM WEST OF SMITH AVENUE TO EAST OF FRANKWOOD AVENUE, PM R74.1/R78.6 CONSTRUCT 4 LANE EXPRESSWAY | $2,666,318.70 | $53,598,170.00 |
California | 6206033 | ON SR-99 AT COMMERCIAL AVE: BETWEEN 0.9 MI N/O AVE 200 OC AND PAIGE AVE OC CONSTRUCT NEW INTERCHANGE AND CONSTRUCT NORTH AND SOUTHBOUND AUXILLARY LA | $16,000,000.00 | $57,398,000.00 |
California | 6207028 | ON SR 14:PEARBLOSSOM TO AVE P-8 , CONSTRUCT HOV LANES | $32,127,808.86 | $36,812,808.86 |
California | 6207042 | IN NORWALK AND SANTA FE SPRING(CARMENITA INT), INTERCHANGE RECONSTRUTION | $98,527,001.00 | $179,624,855.00 |
California | 6207046 | I-5/SR-14 SEPARATION NR CITY OF SANTA CLARITA CONSTR. 2 LANE ELEV. HOV CONNE | $116,062,579.72 | $164,015,944.00 |
California | 6207055 | I-5 : FROM RTE 134 TO MAGNOLIA BLVD HOV LANES | $72,706,000.00 | $113,213,945.00 |
California | 6207059 | ROUTE 10: PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES AND SOUNDWALLS (TC) | $116,546,051.00 | $157,866,051.00 |
California | 6207063 | SR-138, SEGMENT 6, (IN LITTLEROCK FROM 87TH ST E TO 96 ST. E) WIDENING OF SR-138 FROM 2 LANES TO 4 LANES (TC) | $25,130,000.00 | $25,130,000.00 |
California | 6207067 | LA COUNTY LINE TO MOORPARK RD. IN THOUSAND OAKS ADD ONE LANE IN EACH DIRECTION, WIDEN RAMPS ETC. | $15,417,915.00 | $40,083,904.38 |
California | 6207068 | ROUTE 005: (SEG. 5) ARTESIA BLVD. TO 0.4 MILE NORTH OF SAN GABRIEL RIVER BRIDGE WIDEN I-5 WITH HOV MIXED FLOW LANES ETC. (TC) | $96,114,000.00 | $124,714,000.00 |
California | 6207070 | RT. 10 : FROM CITRUS AVE. TO RT. 57 CONSTRUCT HOV LANE IN BOTH DIRECTIONS. (TC) | $162,885,020.00 | $237,395,520.00 |
California | 6207072 | IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD. TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES AND IC MODIFICATIONS | $31,568,000.00 | $325,040,000.00 |
California | 6207078 | I-5 CARPOOL LANE-ORANGE COUNTY
LINE TO I-605 (SEGMENT 2) IN LA MIRADA WIDEN HOV LOCATION DETAILS SEGMENT 2.: IN LA MIRADA FROM ARTESIA BL TO NOR |
$100,079,000.00 | $199,898,000.00 |
California | 6208009 | STATE ROUTE 91 FROM ADAMS STREET TO THE 60/91/215 INTERCHANGE HOV LANES | $57,796,950.00 | $181,141,569.00 |
California | 6208013 | I-215: ORANGE SHOW RD. - RIALTO AVE. (SEG. 3) , CONSTRUCT HOV & MIXED-FLOW LANES | $46,940,000.00 | $87,997,100.00 |
California | 6208016 | I-15/I-215 INTERCHANGE S/O GLEN HELEN PARKWAY TO KENWOOD & I-215 S/O DEVORE ROAD, RECONSTRUCT INTERCHANGE, ADD MIXED-FLOW LANES TC | $65,708,000.00 | $258,659,000.00 |
California | 6208018 | SR 91 FROM SPRUCE ST. IN RIVERSIDE TO I-215 AT ORANGE SHOW RD. IN SAN BERNARDINO, HOV LANES, BRIDGE REPLACEMENT, ROAD REHABILITATI | $44,871,000.00 | $180,391,000.00 |
California | 6208023 | I-215 INTERCHANGE AT BARTON ROAD IN THE CITY OF GRAND TERRACE RECONSTRUCT OVERCROSSING AND RAMPS (TC) | $18,756,086.83 | $65,708,645.83 |
California | 6208029 | I-15 FROM 0.5 MILES N/O MOJAVE DRIVE TO 1.5 MILES N/O STODDARD WELLS ROAD, RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS (TC) | $3,637,000.00 | $84,990,000.00 |
California | 6208032 | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 QUALIT | $21,300,000.00 | $84,926,325.00 |
California | 6211114 | I15-PM R46.2/R46.8 & SR76-PM R12.1/R17.7 INTERCHANGE SR76 EAST - ROADWAY WIDENING FROM 2 TO 4 LANES | $86,750,801.30 | $121,682,757.37 |
California | 6211119 | IN SAN DIEGO COUNTY IN SAN DIEGO ON I-5 FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO THE SORRENTO VALLEY OVERHEAD REPLACE BRIDGE, RAMP, IC, BUTTRESS, BI | $50,929,838.10 | $70,925,715.00 |
California | 6211121 | I-805 SOUTH FROM PALOMAR STREET TO SR54 CONSTRUCT NOISE WALL (TC) | $31,302,000.00 | $32,092,210.06 |
California | 6211126 | IN IMPERIAL COUNTY IN THE CITY OF EL CENTRO AT I-8 AND IMPERIAL AVE INTERCHANGE RECONSTRUCTION OF INTERCHANGE (TC) | $2,399,999.74 | $31,342,999.74 |
California | 6211131 | IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS ALONG 1-5 FROM LOMAS SANTA FE DRIVE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD REPLACE THE SAN ELIJO LAGOON B | $186,740,594.00 | $246,122,594.00 |
California | 6211149 | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.6 MILE NORTH FROM DEL MAR HEIGHTS ROAD OVERCROSSING TO VILLA DE LA VALLE OVERCROSSING. RESTORE WETLANDS AT SA | $37,284,000.00 | $82,422,068.00 |
California | 6212018 | INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION | $36,130,000.00 | $256,189,516.00 |
California | 6212021 | INTERSTATE 5 FROM STATE ROUTE 73 TO OSO PARKWAY, SEGMENT 1 ADD MIXED-FLOW LANES IN EACH DIRECTION AND RECONSTRUCT THE I-5 INTERCHANGE INTERCHANGE (TC | $19,848,000.00 | $87,810,000.00 |
California | 6212022 | INTERSTATE 5 FROM OSO CREEK TO ALICIA PARKWAY CONSTRUCT ONE GENERAL PURPOSE LANE ON EACH DIRECTION, RECONSTRUCT LA PAZ ROAD INTERCHANGE AND ADD AUXIL | $43,930,000.00 | $158,080,000.00 |
California | 6212024 | INTERSTATE 5 FROM ALICIA PARKWAY TO EL TORO ROAD (SEGMENT 3) ADD GENERAL PURPOSE LANE, EXTEND 2ND HOV LANE IN BOTH DIRECTIONS, AND ADD AUXILIARY LANE | $44,915,000.00 | $149,817,000.00 |
California | 6272023 | YERBA BUENA ISLAND EASTSIDE WESTBOUND ON & OFF RAMPS RECONST EXISTING WB ON & OFF RAMPS ON EAST OF YBI | $75,747,201.00 | $85,581,736.00 |
California | 6272047 | ON YERBA BUENA ISLAND, SAN FRANCISCO - I-80 ON AND OFF RAMPS APPROACH ROADWAY REALIGNMENTS | $9,769,288.00 | $49,895,730.00 |
California | 6303005 | NOGALES ST. AT UPRR IN THE CITY OF INDUSTRY , GRADE SEPARATION ON NOGALES ST. | $40,069,700.95 | $50,129,010.95 |
California | 6303030 | RAMONA ST, MISSION RD, DEL MAR AVE, SAN GABRIEL BL UPTO WALNUT GROVE AVE W/UPRR, CONST. 2.6M LONG RAILROAD TRENCH | $12,404,576.45 | $399,597,000.00 |
California | 6303039 | DURFEE AVENUE AT UPRR (LA SUBDIVISION) IN CITY OF PICO RIVERA CONSTRUCTION OF RAIL ROAD GRADE SEPARATION | $19,737,808.21 | $78,030,062.20 |
California | 6480017 | IN THE CITY OF OAKLAND, WITHIN THE PORT OF OAKLAND'S SEAPORT FACILITIES AND ADJACENT AREA IN THE CITY OF OAKLAND ALONG WEST GRAND AVE., MARITIME HAR | $9,741,364.11 | $28,562,849.11 |
California | 6507003 | MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT | $92,790,871.00 | $229,198,602.00 |
California | 6507011 | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN | $21,992,329.00 | $32,860,264.00 |
California | 6507027 | N 1ST AVENUE OVER BNSF RY, UP RR, AMTRAK, 0.2 MI N MAIN ST IN BARSTOW, BR. NO. 54C-0088 REPLACE EXISTING 2 LANE BRIDGE WITH 2 LANE BRIDGE, EXISTING B | $61,790,667.00 | |
California | 6801079 | IN FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING. ROADWAY REHABILITATION, BRIDGE REPLACEMENT, RETAINING WALLS, | $32,796,100.00 | $145,178,000.00 |
California | 6801081 | IN FREMONT FROM SOUTH OF SCOTT CREEK ROAD TO AUTO MALL PARKWAY. RAMP METERING (TC) | $27,415,200.00 | $27,916,900.00 |
California | 6801082 | CONTRA COSTA COUNTY ON I-680 FROM NORTH MAIN STREET TO LIVORNA IN THE SOUTHBOUND DIRECTION. CONSTRUCT AN HOV LANE | $14,759,200.00 | $76,295,900.00 |
California | 6801946 | ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA | $74,992,200.00 | $82,130,000.00 |
California | 6801990 | ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON FROM KOOPMANN ROADUNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING PRECA | $226,773,000.00 | |
California | 7101807 | IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE BRIDGE REPLACEMENT | $394,303,000.00 | $836,532,728.00 |
California | 7101839 | IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . | $112,901,800.00 | $113,434,400.00 |
California | 8051640 | IN SAN DIEGO COUNTY IN CHULA VISTA AND NATIONAL CITY FROM 0.2 MILE SOUTH OF SWEETWATER RIVER BRIDGE TO ROUTE 805/54 SEPARATION. UPGRADE BRIDGE RAILS, | $25,209,100.00 | |
California | 8801053 | I-880 AT COLEMAN AVENUE INTERCHANGE , RECON 880/COLEMAN____(2004A GARVEE) | $71,460,660.00 | |
California | 8801070 | IN OAKLAND FROM SOUTH OF 29TH AVENUE TO NORTH OF 23RD AVENUE IMPROVE ON AND OFF RAMPS (TC) | $78,497,887.00 | $79,331,752.00 |
California | 8801081 | IN AND NEAR FREMONT, UNION CITY, HAYWARD, SAN LEANDRO, AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET SEPARATION AN | $61,935,300.00 | $64,663,400.00 |
California | E2CA018 | WALERGA RD AT DRY CREEK BR #19C-159 BRIDGE REPLACEMENT | $31,231,307.00 | $36,721,268.00 |
California | ERI8005 | IN MARIPOSA COUNTY ABOUT 8 MILES WEST OF EL PORTAL FROM 1.2 MILES WEST OF SOUTH FORK MERCED RIVER BRIDGE TO 0.5 MILE WEST OF SOUTH FORK MERCED RIVER | $26,862,300.00 | $30,717,000.00 |
California | NBIS017 | STATEWIDE BRIDGE INSPECTION & MANAGEMENT (TC) | $33,000,000.00 | $33,000,000.00 |
California | NBIS018 | STATEWIDE BRIDGE INSPECTION & MANAGEMENT | $34,664,063.22 | $39,155,240.00 |
California | P001529 | MEN CO;NR FORT BRAGG;N & S OF TEN MILE RV BR , REPLACE BRIDGE, REALIGN ROADWAY | $18,939,549.00 | $54,949,796.00 |
California | P001590 | SLO CO ABOUT 9 MI N OF SAN SIMEON FR PIEDRAS BLANCAS LIGHTHOUSE RD TO ARROYO... CONSTRUCT 3 BRIDGES & REALIGN 2 LANE HIGHWAY (TC) | $30,723,700.00 | $30,908,500.00 |
California | P001649 | SANTA CRUZ COUNTY IN AND NEAR SANTA CRUZ FROM NORTH APTOS UP TO JUNCTION ROUTE 9. COLD PLANE AND RESURFACE PAVEMENT, UPGRADE RAILING AND BARRIERS. | $24,074,787.03 | $30,114,900.04 |
California | P001662 | MONTEREY COUNTY FROM TORRE CANYON BRIDGE NEAR BIG SUR TO SAN LUIS AVENUE IN CARMEL. RHMA OVERLAY ON EXISTING ROADWAY AND UPGRADE GUARDRAIL. | $24,668,600.00 | $28,328,000.00 |
California | P001675 | SANTA CRUZ COUNTY IN AND NEAR CITY OF CAPITOLA FROM 0.2 MILE SOUTH OF 41ST AVENUE OVERCROSSING TO 0.2 MILE NORTH OF SOQUEL DRIVE OVERCROSSING. CONSTR | $31,870,000.00 | |
California | P001682 | ORANGE COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL HEIGHTS DRIVE TO LOS ANGELES/ORANGE COUNTY LINE COLD PLANE, PLACE RHMA AND MODIFY CURB RAMPS AND ELEC | $33,876,000.00 | |
California | P011009 | IN SAN DIEGO COUNTY NEAR SAN DIEGO AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING. OTAY MESA EAST PORT OF ENTRY SITE PREPARATION, DRAINAGE, AND UTIL | $22,079,699.45 | $35,706,100.00 |
California | P012106 | IN NAPA COUNTY FROM STATE ROUTE 29 TO 0.1 MILE WEST OF SOLANO COUNTY LINE WIDEN HWY TO 4 LANES AND CONSTR RET WALLS | $15,382,680.87 | $33,906,364.87 |
California | P012107 | IN NAPA AND SOLANO COUNTIES FROM 0.5 MILE WEST OF NAPA CO LINE TO RED TOP ROAD. WIDEN RTE 12 FROM 2 TO 4 LANE CONV HWY | $7,172,513.69 | $53,837,664.39 |
California | P012112 | IN SJ COUNTY NEAR TERMINOUS FROM MOKELUMNE RIVER BRIDGE TO POTATO SLOUGH BRIDGE PAVEMENT REHABILITATION AND WIDENING (TC) | $53,429,122.00 | $53,700,760.00 |
California | P014081 | IN KERN COUNTY AT AND NEAR ROSAMOND AND MOJAVE FROM 1.4 MILES SOUTH OF DAWN ROAD OVERCROSSING TO 0.5 MILE NORTH OF SILVER QUEEN ROAD OVERCROSSING. CO | $44,616,500.00 | $50,941,700.00 |
California | P014106 | LOS ANGELES COUNTY, ROUTE 14, POSTMILE R60.7/R77.0. IN AND NEAR PALMDALE AND LANDCASTER, FROM AVENUE P-8 TO THE KERN COUNTY LINE. REPLACE DISTRESSED | $314,833,800.00 | |
California | P017117 | SANTA CLARA COUNTY IN AND NEAR LOS GATOS AND SAN JOSE FROM HEBARD ROAD TO ROUTE 17/280 SEPERATION COLD PLAN AND PAVE AC, REMOVE AND INSTALL CULVERTS, | $51,614,800.00 | $58,733,500.00 |
California | P020184 | NEAR YUBA CITY, FROM EAST END OF SUTTER BYPASS TO LYTLE ROAD. REHABILITATE ROADWAY, WIDEN SHOULDERS, AND REPLACE WADSWORTH CANAL BRIDGE NO.I8-0003. T | $23,097,900.00 | $26,246,200.00 |
California | P020189 | NEAR SMARTSVILLE, FROM THE YUBA RIVER BRIDGE TO EAST OF SMARTSVILLE ROAD. REALIGN AND WIDEN ROADWAY. THE NEED FOR THE FOLLOWING IMPROVEMENTS ARE ANAL | $39,900,700.00 | $44,855,100.00 |
California | P020191 | NEAR MARYSVILLE, FROM MARYSVILLE ROAD TO YUBA RIVER (PARKS BAR) BRIDGE. REHABILITATE ROADWAY. EXTEND SERVICE LIFE OF PAVEMENT, BRING HIGHWAY GEOMETRI | $43,232,870.00 | $49,400,100.00 |
California | P020196 | NEVADA COUNTY NEAR OMEGA AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CONSERVATION ROAD (WASHINGTON RIDGE ROAD) TO 1.2 MILES WEST OF ZIEBRIGHT ROAD. RO | $36,674,500.00 | $41,096,100.00 |
California | P020198 | IN MENDOCINO COUNTY NEAR UKIAH FROM 0.3 MILE WEST OF RUSSIAN RIVER BRIDGE AND OVERHEAD TO 0.4 MILE EAST OF COUNTY ROAD 144 REPLACE TWO BRIDGES | $32,273,900.00 | $36,949,000.00 |
California | P023041 | IN VENTURA COUNTY, ON STATE ROUTE 23, PM R3.3/R11.5. IN AND NEAR CITIES OF THOUSAND OAKS AND MOORPARK, FROM ROUTE 101 TO ROUTE 118. REHABILITATE PAVE | $91,342,600.00 | |
California | P024029 | RT 24 FROM CALDECOTT TUNNEL TO EL CURTOLA O/C, ROADWAY REHABILITATION | $41,284,906.00 | $46,634,305.00 |
California | P029148 | IN LAKE COUNTY NEAR KELSEYVILLE ON RTE 29 FROM 0.6 MI TO 3.7 MILES NORTH OF RTE 281 AND ON RTE 175 FROM SOUTH JCT RTE 29 TO 0.3 MI EAST OF SO JCT RTE | $60,679,000.00 | $68,278,700.00 |
California | P046062 | IN SAN LUIS OBISPO COUNTY NEAR SHANDON FROM 0.2 MILE EAST OF SHANDON SAFETY ROADSIDEREST AREA TO 0.1 MILE WEST OF DAVIS ROAD CONVERT TO A FOUR LANE E | $119,580,400.00 | $135,441,000.00 |
California | P047010 | LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) | $368,659,356.00 | $368,785,856.00 |
California | P049177 | IN AUBURN, FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK ROAD. REHABILITATE PAVEMENT | $33,926,043.29 | $38,894,100.89 |
California | P050139 | IN SOUTH LAKE TAHOE, NORTH OF ROUTE 89 TO TROUT CREEK BRIDGE. WATER QUALITY IMPROVEMENTS - (TC) | $41,368,400.00 | $42,093,600.00 |
California | P050152 | (03-4E620) NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. INSTALL MEDIAN BARRIER, WIDEN | $27,348,100.00 | $36,018,900.00 |
California | P050154 | IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB. | $54,496,300.00 | $434,546,200.00 |
California | P051037 | SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD. DREDGE, CONSTRUCT IN-WATER FOUNDATI | $53,284,500.00 | $60,427,100.00 |
California | P052021 | IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILE WEST OF CONVOY STREET OVERCROSSING TO 0.3 MILE EAST OF SANTO ROAD OVERCROSSING ROADWAY REHABILITATION | $55,394,000.00 | |
California | P057067 | IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT | $63,147,650.00 | $71,876,400.00 |
California | P057069 | LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANG | $33,118,900.00 | $80,120,300.00 |
California | P057073 | IN LOS ANGELES COUNTY. ROUTE 57/60 CONFLUENCE CHOKEPOINT RELIEF PROGRAM. RECONSTRUCT GRAND AVENUE OVERCROSSING. RECONSTRUCT NORTHBOUND SR-57 CONNECTO | $74,000,000.00 | $338,900,000.00 |
California | P058119 | ON STATE ROUTE 58 IN SAN BERNARDINO COUNTY A HENKLEY *** RECONSTRUCTION (2 LANE TO 4 LANE EXPRESSWAY) (TC) | $139,313,220.00 | $139,827,720.00 |
California | P058126 | NEAR BAKERSFIELD FROM COTTONWOOD ROAD UNDERCROSSING TO 0.3 MILE EAST OF ROUTE 58/184 SEPARATION. CONSTRUCT CRCP, HMA PAVEMENT, MGS, AND MODIFYING ELE | $39,401,100.00 | $39,628,100.00 |
California | P058127 | IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O | $207,775,600.00 | $208,375,000.00 |
California | P058128 | KERN COUNTY IN BAKERSFIELD FROM RTE 58/99 SEPARATION TO COTTONWOOD ROAD UNDERCROSSING REPLACE LANES AND SHOULDERS WITH CONTINUOUSLY REINFORCED CONCRE | $28,516,300.00 | $29,022,400.00 |
California | P060153 | IN SAN BERNARDINO COUNTY IN AND
NEAR CHINO AT VARIOUS LOCATIONS FROM 0.1 MI WEST OF PIPELINE AVE OC TO 0.1 MI EAST OF BENSON AVE OC REMOVE AND REPLA |
$26,041,300.00 | |
California | P060154 | IN RIVERSIDE COUNTY NEAR BEAUMONT ON SR 60 FROM GILMAN SPRINGS ROAD OVERCROSSING TO 1.4 MILES WEST OF JACK RABBIT TRAIL. CONSTRUCT A TRUCK CLIMBING L | $62,120,400.00 | $121,915,500.00 |
California | P060155 | IN SAN BERNARDINO AND RIVERSIDE COUNTIES IN ONTARIO, JURUPA VALLEY AND RIVERSIDE, FROM EUCLID AVENUE UNDERCROSSING TO ROUTE 60/91/215 SEPARATION. REP | $162,158,000.00 | |
California | P060159 | IN SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE ADD WEST BOUND AUXILIARY LANE, ADD EAST-BOUND DEC | $28,650,500.00 | $32,806,300.00 |
California | P062046 | IN RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR YUCCA VALLEY AND IN TWENTYNINE PALMS FROM 0.2 MILE NORTH OF INDIAN CANYON DRIVE TO 0.6 MILE WEST | $30,577,900.00 | $32,746,700.00 |
California | P065108 | IN AND NEAR ROSEVILLE AND ROCKLIN, FROM ROUTE 80 TO 0.5 MILES SOUTH OF PLEASANT GROVE OVERCROSSING INCLUDING WIDENING OF THE GALLERIA BLVD/STANFORD R | $24,480,600.00 | $43,180,600.00 |
California | P070137 | NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE NO. I 6-00 I 9. REPL | $45,899,180.00 | $52,445,800.00 |
California | P070143 | IN YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD WIDEN ROADW | $43,145,400.00 | $48,518,000.00 |
California | P070144 | YUBA COUNTY NEAR MARYSVILLE FROM 0.2 MILE NORTH OF LAURELLEN ROAD TO SOUTH HONCUT CREEK BRIDGE WIDEN SHOULDERS AND IMPROVE CLEAR RECOVERY ZONE. | $64,896,000.00 | $72,938,200.00 |
California | P074067 | IN RIVERSIDE COUNTY ON ROUTE 74 FROM 0.6 MILES EAST OF ROUTE 215 TO 0.8 MILES WEST OF ACACIA AVENUE IN THE CITY OF HEMET CONSTRUCT RAISED CURB MEDIAN | $25,824,020.00 | $29,030,900.00 |
California | P074071 | ORANGE COUNTY NEAR SAN JUAN CAPISTRANO FROM 1.0 MILE WEST OF SAN JUAN HOT SPRINGS ROAD TO ORANGE COUNTY LINE APPLY HFST, OVERLAY OGAC AND INSTALL MGS | $25,766,000.00 | $29,137,100.00 |
California | P074072 | IN RIVERSIDE COUNTY IN AND NEAR HEMET FROM WINCHESTER ROAD TO FAIRVIEW AVENUE REHAB PAVEMENT, INSTALL FO/ VDS/ UPGRADE ADA RAMPS | $37,016,678.00 | |
California | P084042 | IN/NEAR LIVERMORE & PLEASANTON FROM S/O RUBY HILL DRIVE TO N/O CONCANNON BLVD WIDEN AND UPGRADE 2.8 MILES OF SR 84 (TC) | $46,709,000.00 | $53,248,900.00 |
California | P084054 | ALAMEDA COUNTY NEAR FREMONT AT ALAMEDA CREEK BRIDGE REPLACE BR PAVING, SOIL NAIL WALL, DRAINAGE & CHANNEL RESTORATION | $21,851,100.00 | $25,221,800.00 |
California | P091151 | IN THE CITY OF CORONA AT THE JUNCTION OF SR-91 AND SR-71 NEAR THE ORANGE COUNTY LINE. REPLACE THE EB 91 TO NB 71 CONNECTOR WITH A DIRECT CONNECTOR AN | $151,327,818.00 | |
California | P099629 | STANISLAUS COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF MERCED STANISLAUS COUNTY LINE TO 0.2 MILE SOUTH OF STANISLAUS SAN JOAQUIN COUNTY LINE C | $13,985,600.00 | $28,348,000.00 |
California | P099635 | MADERA COUNTY IN AND NEAR MADERA FROM AVENUE 12 OVERCROSSING TO 0.9 MILE NORTH OF AVENUE 17 OVERCROSSING REHABILITATE PAVEMENT AND CONSTRUCT NEW LANE | $58,293,200.00 | $65,925,900.00 |
California | P099636 | KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LAN | $58,859,700.00 | $71,341,800.00 |
California | P099637 | IN GALT, FROM THE SAN JOAQUIN COUNTY LINE TO SIMMERHOM ROAD; ALSO, IN THE CITIES OF ELK GROVE AND SACRAMENTO, FROM 0.7 MILE SOUTH OF ELK GROVE BOULEV | $35,473,568.00 | $40,312,800.00 |
California | P099639 | MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUE OVERCROSSING TO STANISLAUS COUNTY LINE NORTHBOUND LANE WIDENING FROM 2 TO | $29,679,574.00 | $42,383,800.00 |
California | P099644 | FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILES SOUTH OF SECOND STREET UNDERCROSSING. REPLACE CONCRETE AND AS | $35,418,100.00 | $40,420,100.00 |
California | P099646 | MERCED COUNTY IN AND NEAR ATWATER FROM 0.4 MILE SOUTH OF BUHACH OVERCROSSING TO 0.8 MILE NORTH OF WEST ATWATER OVERHEAD REPLACE CONCRETE AND ASPHALT | $1,396,600.00 | $72,340,200.00 |
California | P099654 | IN SUTTER COUNTY, IN AND NEAR LIVE OAK, FROM SOUTH OF COLEMAN AVENUE TO NEVADA STREET (NORTH INTERSECTION). REHABILITATE PAVEMENT, IMPROVE PEDESTRIAN | $25,129,741.37 | $36,746,000.00 |
California | P099660 | KERN COUNTY, IN AND NEAR BAKERSFIELD, FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRE | $54,176,800.00 | $61,831,100.00 |
California | P099662 | MERCED COUNTY IN MERCED FROM 0.2 MILE SOUTH OF CHILDS AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF FRANKLIN ROAD OVERCROSSING RECONSTRUCT PAVEMENT | $54,775,200.00 | $65,929,100.00 |
California | P099663 | IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE | $73,158,900.00 | |
California | P099665 | TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES | $59,190,000.00 | $67,376,000.00 |
California | P099666 | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PA | $71,509,800.00 | $81,481,800.00 |
California | P099669 | SACRAMENTO COUNTY IN AND NEAR
ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD BRIDGE REPLACEMENT AND |
$50,329,800.00 | $57,173,100.00 |
California | P099671 | IN MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING. REPLACE BRIDGES AND CONSTRUC | $26,510,300.00 | $30,461,200.00 |
California | P099672 | MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUEOVERCROSSING TO STANISLAUS COUNTY LINE WIDEN CONCRETE PAVEMENT LANES AND BR | $29,454,200.00 | $34,102,100.00 |
California | P125021 | IN SAN DIEGO COUNTY IN AN NEAR LEMON GROVE FROM 0.3 MILE SOUTH OF ELKELTON PLACE UNDERCROSSING TO 0.2 MILE SOUTH OF ROUTE 125/94 SEPARATION PAVEMENT | $42,799,997.00 | |
California | P134040 | IN LOS ANGELES COUNTY IN CITIES OF LOS ANGELES, BURBANK, GLENDALE AND PASADENA FROM 0.0 MILE EAST OF ROUTE 101/134 SEPARATION TO JUNCTION OF ROUTE 21 | $22,077,100.00 | $47,748,300.00 |
California | P138049 | IN SAN BERNARDINO COUNTY ON STATE ROUTE 138 NEAR PHELAN *** ROADWAY RECONSTRUCTION (ADDED CAPACITY) (TC) | $63,153,528.00 | $63,678,528.00 |
California | P138055 | NEAR HESPERIA FROM 1.9 MI E/O RTE 15 TO 0.1 MI W/O SUMMIT POST OFFICE ROAD REALIGN AND CONSTRUCT 2-LANE PAVED SECTION WITH OUTSIDE SHOULDERS, 3 WILDL | $22,578,900.00 | $32,975,900.00 |
California | P140040 | MARIPOSA COUNTY FROM WHITLOCK ROAD NEAR MIDPINES TO YOSEMITE NATIONAL PARK COLD PLANE EXISTING PAVEMENT AND RESURFACE WITH HMA. | $676.56 | $27,117,000.00 |
California | P156024 | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE | $69,711,000.00 | |
California | P162041 | GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY | $79,228,200.00 | $90,972,100.00 |
California | P210016 | IN SAN BERNARDINO COUNTY IN SAN BERNARDINO, HIGHLAND, AND REDLANDS FROM 0.1 MILE WEST OF DEL ROSA AVENUE TO LUGONIA AVENUE BASELINE INTERCHANGE IMPRO | $47,764,600.00 | $149,679,901.00 |
California | P217003 | IN SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE REPLACE BRIDGE | $34,506,600.00 | |
California | P299185 | IN SHASTA COUNTY ABOUT 20 MILES WEST OF REDDING FROM 0.3 MILE EAST OF TRINITY COUNTY LINE TO 0.9 MILES WEST OF CRYSTAL CREEK ROAD. HIGHWAY REALIGNMEN | $44,998,502.00 | $45,932,442.00 |
California | P299214 | NEAR WILLOW CREEK, FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 0.2 MILE EAST OF EAST FORK WILLOW CREEK BRIDGE. WIDEN SHOULDERS AND IMPROVE CURVES AT TH | $31,632,300.00 | |
California | P395236 | IN SBD COUNTY FR 7.9 MI N/O SR-18 TO 10.4 MI S/O KRAMER JCT (RTE)58 WIDEN MEDIAN & SHOULDERS, CONSTRUCT TURNOUTS (TC) | $31,415,318.00 | $32,032,678.00 |
California | P395276 | IN SAN BERNARDINO COUNTY IN ADELANTO AND IN VICTORVILLE ON ROUTE 395 FROM ROUTE 18-PALMDALE ROAD TO CHAMBERLAINE WAY WIDEN HIGHWAY FROM TWO TO FOUR L | $9,547,000.00 | $31,613,553.00 |
California | P395348 | IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE E | $76,343,500.00 | $86,360,100.00 |
California | Q101153 | SF ON RTE 101 FROM PM 8.8-9.2, DOYLE DR REPL REPLACE/REHABILITATE ROADWAY | $122,574,329.58 | $160,696,807.58 |
California | Q101237 | IN SAN MATEO COUNTY ON US 101 IN THE CITY OF BURLINGAME RECONFIGURE THE BROADWAY INTERCHANGE (TC) | $19,850,958.37 | $60,085,142.37 |
California | Q101247 | IN AND NEAR THE CITIES OF LOS ANGELES, CALABASAS AND AGOURA HILLS FROM SR170 TO REHABILITATION PAVEMENT CONDITIONS (TC) | $63,199,100.39 | $63,408,100.39 |
California | Q101261 | MRN & SON COUNTIES ON US 101 SAN ANTONIO CURVE CORRECTION (TC) | $75,275,041.00 | $75,791,241.00 |
California | Q101290 | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE RECONSTRUCT 3 BRIDGES, CONSTRUCT 1 BRIDG | $54,846,100.00 | $80,591,000.00 |
California | Q101306 | SAN LUIS OBISPO AND MONTEREY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING. | $69,860,400.00 | $70,452,900.00 |
California | Q101338 | MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE P | $81,681,100.00 | $105,748,900.00 |
California | Q101342 | MONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD RECONSTRUCT, CRACK AND SEAT PAVEMENT AND RECONSTR | $42,102,080.00 | $48,037,600.00 |
California | Q101348 | MONTEREY COUNTY NEAR SAN LUCAS FROM 0.1 MILE SOUTH OF PARIS VALLEY ROAD OVERCROSSING TO RANCHO UNDERCROSSING CONSTRUCT CONTINUOUSLY REINFORCED CONCRE | $27,497,400.00 | $31,230,600.00 |
California | Q101350 | MONTEREY COUNTY NEAR CHUALAR FROM 0.5 MILE NORTH OF NORTH GONZALES OVERCROSSING TO EAST MARKET STREET UNDERCROSSING REPLACE CONCRETE PANEL AND RESURF | $26,578,449.00 | $30,164,400.00 |
California | Q101353 | SONOMA COUNTY IN PETALUMA FROM ROUTE 101/116 SEPERATION TO 0.4 MILE NORTH OF CORONA ROAD OVERCROSSING ROADWAY, BRIDGES, RETAINING WALLS, SOUND WALL A | $104,750,100.00 | |
California | Q101363 | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING; UPGRADE MEDIAN CONCRETE BARRIER TO MEET THE | $43,822,300.00 | $44,130,700.00 |
California | Q101365 | SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION. CRACK, SEAT AND OVERLAY, AND REHABILITATE AND REPLACE | $87,903,000.00 | |
California | Q101366 | THE CITY AND COUNTY OF SAN FRANCISCO AT ALEMANY CIRCLE UNDERCROSSING REPLACE BRIDGE DECK | $12,265,254.00 | $43,170,200.00 |
California | Q101373 | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE. CONSTRUCT HOV LANES AN | $48,147,600.35 | $108,459,352.52 |
California | Q101379 | CITY AND COUNTY OF SAN FRANCISCO FROM THE SAN MATEO COUNTY LINE TO THE BAYSHORE VIADUCT COLD PLANE AND OVERLAY WITH RHMA. REPLACE EXISTING PCC SLAB. | $22,612,400.00 | $25,361,400.00 |
California | Q101381 | SANTA BARBARA COUNTY IN AND NEAR SUMMERLAND FROM 0.2 MILE NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. CONSTRUCT NEW HOV LANES AND | $39,857,600.00 | $127,191,000.00 |
California | Q101385 | VEN-101- IN VENTURA COUNTY, ON STATE ROUTE 101, PM R36.3/R40.6. NEAR SEA CLIFF, FROM 0.4 MILE SOUTH OF PADRE JUAN CANYON ROAD OVERCROSSING TO 0.3 MIL | $38,098,900.00 | $43,287,200.00 |
California | Q101389 | THE CITY AND COUNTY OF SAN FRANCISCO FROM 17TH STREET TO SOUTH VAN NESS AVENUE CLEAN AND PAINT STEEL STRUCTURE | $33,735,800.00 | $38,493,100.00 |
California | Q101394 | IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY | $63,701,000.00 | |
California | Q101395 | SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE | $99,251,600.00 | $193,632,000.00 |
California | Q101398 | IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE | $78,032,000.00 | |
California | Q101399 | IN HUMBOLDT COUNTY IN AND NEAR TRINIDAD FROM 1.3 MILES SOUTH OF SCHOOL ROAD OC TO 0.4 MILE NORTH OF BIG LAGOON BRIDGE CAPITAL PREVENTATIVE MAINTENANC | $29,786,600.00 | $33,880,100.00 |
California | Q101403 | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEADTO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE CIP BRIDGES, CONSTRUCT R | $103,646,000.00 | |
California | Q101409 | SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARKTO OLD COAST HIGHWAY REHABILITATE PAVEMENT | $60,954,000.00 | |
California | Q101410 | SANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE. REPLACE BRIDGES. | $25,281,000.00 | |
California | Q101411 | IN MONTEREY COUNTY AT AND NEAR PRUNEDALE AND SALINAS FROM 0.3 MILE NORTH OF BORONDA ROAD OVERCROSSING TO 0.4 MILE NORTHOF CRAZY HORSE CANYON ROAD OVE | $46,210,000.00 | |
California | S036115 | IN LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD. REHABILITATE ROADWAY AND REPLACE | $35,264,888.10 | $40,079,808.00 |
California | S074071 | IN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE/RIVERSIDE COUNTY LINE TO MONTE VISTA STREET WIDEN EXISTING LANES TO PROVIDE 12' LANES, 4' SHOULDER | $46,115,460.00 | $51,869,500.00 |
California | S087026 | IN SAN JOSE RT 87 FROM JULIAN ST TO 280 U/C , WIDEN FWY (4 TO 6)___(2004A GARVEE) | $27,948,674.00 | |
California | S180059 | IN FRESNO COUNTY ABOUT 8.4 MILES EAST OF FRESNO FROM 0.7 MILE WEST OF SMITH AVENUE TO 0.7 MILE EAST OF FRANKWOOD AVENUE. CONSTRUCT 4 LANE EXPRESSWAY | $39,274,300.00 | $65,206,600.00 |
California | X023033 | HUM CO;NR MCKIN'LYVL;SR-101;FR 0.2 KM S/O * REPLACE BRIDGES | $46,858,060.00 | $52,929,020.00 |
California | X029126 | KERN COUNTY NEAR INDIAN WELLS ON ROUTE 14 FROM 2.4 MILES SOUTH OF JUNCTION ROUTE 178 TO 1.7 MILES NORTH OF JUNCTION ROUTE 178 AND ON ROUTE 178 FROM R | $27,853,200.00 | $28,251,600.00 |
California | X029141 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 | $34,259,394.00 | $40,522,000.00 |
California | X029143 | KERN COUNTY IN BAKERSFIELD ON
ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUE OVERCROSSING TO BEARSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEP |
$41,404,800.00 | $83,744,700.00 |
California | X029144 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 58 AND RTE 99 FROM 0.1 MILE WEST OF RTE 99 TO 0.2 MILE EAST OF RTE 99 AND FROM 0.3 MILE SOUTH OF MING A | $25,000,000.00 | $58,633,355.00 |
California | X029147 | KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 58 FROM 0.1 MILE WEST OF MOHAWK STREET TO COTTONWOOD ROAD AND ROUTE 99 FROM 0.8 MILE SOUTH OF ROUTE 5 | $186,679,411.00 | |
California | X037165 | NEAR THOUSAND OAKS, FROM VENTURA CNTY LINE TO RTE 101/23 INTERCHANGE , INTERCHANGE IMPROVEMENT | $16,646,289.49 | $38,055,456.00 |
California | X037199 | IN LOS ANGELES COUNTY IN AND NEAR CARSON ON ROUTE 110 FROM 0.2 MILE NORTH OF TORRANCE BLVD UC TO 190TH STREET UC AND ON ROUTE 405 FROM MAIN STREET UC | $25,656,200.00 | $25,930,700.00 |
California | X037204 | IN LOS ANGELES COUNTY ON ROUTES 2, 5, 10, 47, 90, 91, 105, 110, 405, 605 AND 710 REPAIR AND REPLACE THE PROJECT WILL IS MAXIMIZE THE USE OF THE EXI | $29,044,200.00 | $29,044,200.00 |
California | X037211 | IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 | $154,604,749.00 | $175,051,477.00 |
California | X037218 | IN LOS ANGELES COUNTY, AT VARIOUS LOCATIONS UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATION SYSTEM UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATIO | $33,916,000.00 | $38,613,000.00 |
California | X037232 | IN VARIOUS CITIES, FROM ORANGE COUNTY LINE TO 0.1 MILE NORTH OF TELEGRAPH ROAD; ALSO ON ROUTE 91 FROM 0.2 MILE WEST OF ROUTE 605TO ROUTE 605 (PM R16. | $72,804,000.00 | |
California | X055060 | NAPA COUNTY NEAR NAPA ON ROUTE 29 FROM 0.7 MILES SOUTH TO 0.5 MILES NORTH OF ROUTE 221 AND ON ROUTE 221 FROM 0.2 MILES NORTH OF ROUTE 29 TO ROUTE 29 | $18,797,500.00 | $42,523,300.00 |
California | X059083 | IN ORANGE COUNTY AT VARIOUS LOCATIONS UPGRADE AND INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) ELEMENTS. | $21,837,800.00 | $25,171,300.00 |
California | X059084 | CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERC | $196,429,800.00 | $255,018,400.00 |
California | X059087 | ORANGE COUNTY AT VARIOUS LOCATIONS REHABILITATE PVMT BY REPAIR BROKE CONC SLABS & REPLACE AC W/ RHMA-G | $32,530,000.00 | |
California | X071063 | IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTES 15 AND 215 *, 1-15/1-215 DEVORE INTERCHANGE IMPROVEMENT ** | $134,351,000.00 | $266,213,136.00 |
California | X071071 | IN SAN BERNARDINO COUNTY ON ROUTE 62 FROM 3.8 MILES WEST OF ROUTE 95 TO ARIZONA STATE LIN AND ON ROUTE 95 FROM ROUTE 62 TO 2.0 MILES SOUTH OF TURTLE | $24,047,800.00 | $27,490,700.00 |
California | X073151 | IN SAN DIEGO COUNTY ON ROUTE 94 FROM E94 / N125 SEPARATION IN LEMON GROVE TO 0.1 MILE EAST OF SPRING STREET UNDERCROSSING IN LA MESA AND ON ROUTE 125 | $36,216,100.00 | |
California | X075027 | SF 101/1 SEPARATION TO GOLDEN GATE TOLL PLAZA REPLACE/REHABILITATE ROADWAY | $82,124,382.00 | $104,451,807.00 |
California | X075041 | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PHASE II CONCESSIONAIRE PMTS P3 (TC) | $204,172,033.16 | $731,328,837.00 |
California | X075046 | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PARK PRESIDIO P3, DEPT DIRECTED CHANGES& SUPPT(TC) | $156,252,688.00 | $169,572,970.00 |
California | X077014 | SJ CO RTE205 IN TRACY 0.6KM W/11TH ST OC RTE5 WIDEN 4 LANE TO 6 LANE FREEWAY | $72,879,005.00 | $90,778,579.00 |
California | X077028 | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 FROM 0.2 MILE EAST OF FRESNO AVENUE TO EL DORADO STREET AND ON ROUTE 5 FROM TAYLOR STREET OVERHEAD TO STOC | $14,499,000.00 | $37,712,800.00 |
California | X093010 | IN SISKIYOU COUNTY IN YREKA ON ROUTE 3 FROM 0.4 MILE NORTH OF LAURA LANE TO JUNIPER DRIVE AND ON ROUTE 263 FROM ROUTE 3 TO 1.0 MILE SOUTH OF LONG GUL | $24,311,937.39 | $81,293,400.00 |
California | X095025 | IN FAIRFIELD AT I-80 AND SR 12 CONSTRUCT A TWO-LANE WB I-80/WB SR 12 (TC) | $19,569,973.18 | $61,959,006.00 |
California | X099645 | IN AND NEAR THE CITY OF MODESTO ON SR 132 NEAR NORTH DAKOTA AVE TO NEAR 6TH ST AND ON SR 99 FROM 0.5 M SOUTH OF TUOLUMNE RIVER BRIDGE TO 0.1 M NORTH | $38,923,100.00 | $103,335,641.00 |
California | X111079 | ON ROUTE 101, BETWEEN LOS ANGELES / VENTURA COUNTY LINE AND OLD PACIFIC COAST HIGHWAY (POSTMILE 0.2 / 40.8 AND ON ROUTE 23, BETWEEN ROUTE 23 AND 101 | $28,712,000.00 | |
California | X113036 | YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE | $266,596,700.00 | |
Colorado | 007A034 | PR SH7 Flood Repairs CP1 | $41,663,135.00 | $42,543,792.00 |
Colorado | 0131057 | SH13 GarCo RioBlanco Hill | $1,781,267.00 | $36,777,118.00 |
Colorado | 0212011 | CO21 RESEARCH INTERCHANGE CONSTRUCTION | $24,147,273.00 | $38,574,619.00 |
Colorado | 0252457 | I-25:ALAMEDA RIVER PH 2.0 | $24,502,000.00 | $33,640,000.00 |
Colorado | 0252475 | I-25 SOUTH GAP PACKAGE 1 | $1.00 | $72,956,566.00 |
Colorado | 0252476 | I-25 SOUTH GAP PACKAGE 2 | $75,500,000.00 | $149,797,342.00 |
Colorado | 0252477 | I-25 SOUTH GAP PACKAGE 3 | $5,866,651.00 | $186,002,724.00 |
Colorado | 0253234 | I-25: 120th Avenue (SH 128) to SH 7 | $55,001,113.00 | $76,130,685.00 |
Colorado | 0253255 | I-25 North: SH 402 to SH 14 | $164,234,146.00 | $557,017,748.36 |
Colorado | 0253268 | I-25 SEG3A RE-PKG 120TH TO E470 | $19,211,230.00 | $26,792,799.00 |
Colorado | 025A019 | I25A PUEBLO ILEX DB - BE | $693,322.00 | $59,912,091.58 |
Colorado | 025A024 | I25A PUEBLO ILEX DB - NON-BE | $28,425,994.00 | $41,023,356.00 |
Colorado | 050A034 | US50A Pueblo West Purcell Interchange wi | $7,189,862.00 | $49,300,465.00 |
Colorado | 0702383 | I-70 EB Aux Frisco to Silverthorne | $9,670,582.00 | $35,094,932.00 |
Colorado | 0702413 | Vail Pass Aux Phase 1 CAP 2 | $30,060,934.00 | |
Colorado | 0703445 | I-70 WESTBOUND PEAK PERIOD SHOULDER LANE | $28,292,877.00 | $85,988,632.05 |
Colorado | 0704241 | CENTRAL 70 | $50,000,000.00 | $933,536,830.74 |
Colorado | 0704251 | I70 AND PICADILLY INTERCHANGE | $25,000,000.00 | $92,000,002.00 |
Colorado | 0852106 | US-85 Louviers To MP 191.75 | $22,299,664.00 | $28,079,679.00 |
Colorado | 0852118 | US-85 HIGHLANDS RANCH PKWY TO DAD CLARK | $3,652,877.00 | $92,771,688.50 |
Colorado | 0853107 | Peckham Grade Separated Intersection | $17,077,848.81 | $44,169,056.00 |
Colorado | 1151038 | SH115 PAVEMENT RECONSTRUCTION MP 27 to M | $53,083,710.00 | |
Colorado | 119A065 | PR SH 119A Boulder Canyon | $25,715,079.00 | $26,127,817.00 |
Colorado | 1211086 | WADS BLVD WIDENING:35TH AVE TO 48TH AVE | $29,920,000.00 | $64,970,964.00 |
Colorado | 1601083 | US 160 FOUR CORNERS TO AZTEC CR MP 0-8 | $6,583,572.00 | $29,350,898.00 |
Colorado | 2873172 | FEDERAL BLVD:6TH TO HOWARD RECONSTRUCT - | $23,360,000.00 | $27,828,091.00 |
Colorado | 4701124 | C-470 TOLLED EXPRESS LANES SEGMENT 1 | $21,974,944.00 | $306,792,044.00 |
Colorado | 5501029 | US 550/160 CONNECTION SOUTH DESIGN-BUILD | $34,190,498.50 | $106,905,715.50 |
Colorado | C100038 | ILIFF AVE OP IMP:PARKER RD-QUEBEC ST- Ar | $14,077,250.00 | $27,668,212.10 |
Colorado | GBLD001 | BUILD Vehicle Tech, Safety & Mobility | $20,009,700.00 | $38,722,660.00 |
Colorado | GBLD002 | BUILD: North Interstate 25 Phase 2 | $30,756,963.00 | $294,921,972.00 |
Colorado | GBLD003 | BUILD MAMS Improvement Project | $56,185,480.00 | $136,560,952.49 |
Colorado | R200266 | R2B2 (REGION 2 BRIDGE BUNDLE) (GRANT) | $12,475,000.00 | $55,216,173.00 |
Colorado | SW01498 | HPTE US 36 Phase II to Foothills Blvd | $14,403,946.00 | $137,152,364.64 |
Connecticut | 0003109 | GLASTONBURY; RTE 3 BRIDGE REHABILITATION - NO ADDED CAPACITY (PUTNAM BR. #417) OVER THE CONNECTICUT RIVER. (CN) | $22,511,556.40 | $44,957,727.00 |
Connecticut | 0006113 | BRISTOL; PROVIDE A SECOND EASTBOUND THROUGH LANE FROM CAROL DRIVE TO PEGGY LANE, A ONE MILE SEGMENT OF THE ROUTE 6 CORRIDOR. (CN) | $20,186,524.85 | $27,168,595.02 |
Connecticut | 0008126 | BPORT, RTE 8, REPL OF BRIDGE #S 03761, 03762, 03764, 03765 O/LINDLEY ST & CAPITOL AVE (NO ADDED CAP) DESIGN BLD PILOT PROJECT CN. | $34,716,620.83 | $40,884,409.33 |
Connecticut | 0008130 | SHELTON/DERBY; REHABILITATION OF BRIDGE #00571A, (COMMODORE HULL) ROUTE 8 OVER THE HOUSATONIC RIVER, ROUTE 110 & LOCAL ROADS. (CN) | $28,521,949.60 | $35,652,437.00 |
Connecticut | 0008134 | WATERBURY; REHABILITATION OF BRIDGES (NO ADDED CAPACITY) IN THE ROUTE 8/I-84 INTERCHANGE AREA (CN). | $123,871,585.60 | $160,013,036.01 |
Connecticut | 0008141 | D-B RBC PROJECT - RESURFACING, BRIDGE REHABILITATION, & SAFETY IMPROVEMENTS ON APPROX. 6.43 MILES OF MAINLINE (CN). | $72,421,739.20 | $98,258,407.03 |
Connecticut | 000T285 | Middletown; Reconfiguration of Route 17 On-Ramp onto Route 9 North. | $39,862,544.00 | $53,944,840.00 |
Connecticut | 000T323 | Bridge Painting/Metalizing along the I-395 Corridor in District 2. | $29,767,424.00 | $37,209,280.00 |
Connecticut | 000T328 | DISTRICT 1; Address Steel Beam end deterioration on various Bridges using Ultra High Performance Concrete (UHPC). | $26,818,544.00 | $33,523,180.00 |
Connecticut | 0015105 | NEW CANAAN/NORWALK - MERRITT PARKWAY (RTE 15) IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS (CN). | $70,928,725.00 | |
Connecticut | 0015134 | WESTPORT - SAFETY IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS ON THE MERRITT PKWY (CT15) IN THE TOWNS OF WESTPORT & FAIRFIELD (CN). | $66,014,459.41 | $82,522,757.02 |
Connecticut | 0015145 | NORWALK - MERRITT PARKWAY (ROUTE 15) RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS (CN) | $34,963,744.80 | $43,708,449.01 |
Connecticut | 0032203 | EAST HARTFORD - RESURFACING, BRIDGE & SAFETY IMPROVEMENTS ON RTE 2 FROM THE CHARTER OAK BRIDGE AREA (CN) | $68,814,621.60 | $86,018,277.00 |
Connecticut | 0034122 | NEWTOWN - MAJOR INTERSECTION IMPROVEMENTS, CT 34 at I-84 (CN). | $24,163,793.19 | $33,429,952.13 |
Connecticut | 0044139 | HARTFORD - SAFETY IMPROVEMENTS, HOMESTEAD AVE TO GARDEN STREET, RT44 (CN). | $23,510,222.40 | $31,073,020.25 |
Connecticut | 0066121 | MIDDLETOWN, REHABILITATION OF BRIDGE #00524 (ARRIGONI) WHICH CARRIES ROUTE 66 OVER THE CONNECTICUT RIVER (CN). | $31,345,909.60 | $57,508,431.00 |
Connecticut | 0082141 | EAST HADDAM - REHABILITATION OF BRIDGE #01138, ROUTE 82 OVER CONNECTICUT RIVER (CN) | $54,081,084.80 | $78,440,121.00 |
Connecticut | 0841095 | DANBURY; IMPROVEMENTS TO I-84 INTERCHANGE 5, 6 & ROUTE 37 TO ADDRESS SAFETY & TRAFFIC OPERATIONS-ADDED CAPACITY. (CN) | $23,885,980.20 | $26,956,221.00 |
Connecticut | 0842195 | WATERBURY, I-84 RECONSTRUCT EXPRESSWAY (ADDED CAP) & OPERATIONAL IMPROVEMENTS INCLUDING INTERCHANGES - PHASE 3 (CN). | $256,807,457.22 | $335,107,487.04 |
Connecticut | 0842306 | WATERBURY; REHABILITATION OF BR. 03191B CARRYING I-84 WB OVER RTE. 8 AND THE NAUGATUCK RIVER. (CN) | $44,352,312.30 | $50,844,997.02 |
Connecticut | 0842307 | WATERBURY; REHABILITATION OF BR. 03191A CARRYING I-84 EB OVER I-84 WB, RTE. 8, AND THE NAUGATUCK RIVER. (CN) | $52,640,191.80 | $61,307,321.00 |
Connecticut | 0842310 | NEWTOWN; RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS ON I-84. | $38,486,323.80 | $42,762,582.04 |
Connecticut | 0843236 | HARTFORD; REHABILITATION OF BR #03160A-D, BR #03301, AND BR #03303 (I - 84 HARTFORD VIADUCT). (CN) | $55,622,232.26 | $61,961,168.46 |
Connecticut | 0912136 | WETHERSFIELD/HARTFORD; I-91 IMPROVEMENTS AND UPGRADES. | $58,866,211.50 | $65,325,235.06 |
Connecticut | 0913182 | Windsor Locks; Rehabilitation of Bridge #00454, I-91 over CT River, Amtrak and Rte. 159 (Dexter Coffin Bridge). | $22,739,814.00 | $25,266,460.02 |
Connecticut | 0951181 | NEW HAVEN; I-95/Q BR.RPL(NO ADDED CAPACITY) & DEMOLITION (CONTRACT B) FR. VIC EAST ST TO VIC. WOODWARD AVE, E. SHORE (CN). | $427,528,518.33 | $492,192,934.00 |
Connecticut | 0951189 | NEW HAVEN; I-95, OVER WEST RIVER & SR745 BRIDGE REPLACEMENT (ADDED CAPACITY) BRIDGE #00163A (CN). | $155,197,500.30 | $174,630,678.00 |
Connecticut | 0951191 | NORWALK/WESTPORT; I-95 RECONSTRUCT THE MEDIAN AND INSTALL 45" CONCRETE BARRIER CURB IN NORWALK & WESTPORT | $73,166,838.30 | $130,677,425.05 |
Connecticut | 0951204 | NEW HAVEN; ADVANCE SOIL PRELOAD CONTRACT FOR S. P. #92-531 - I-91/I-95/CT RTE. 34 INTERCHANGE (CONTRACT E1)(CN) | $25,882,832.80 | $32,400,274.00 |
Connecticut | 0951222 | NEW HAVEN; I-95 - NB APPROACH AND RIVER PIERS FOR NEW PEARL HARBOR MEMORIAL BR., CONTRACT B1 (CN) | $135,771,245.61 | $156,113,746.00 |
Connecticut | 0951243 | NEW HAVEN; BREAKOUT OF PROJ 92-531. RECONST OF I-95 / I-91 / ROUTE 34 INTERCHANGE ASSOC WITH Q BR. REPL. CONTRACT E-2 (CN) | $98,935,740.54 | $113,777,781.00 |
Connecticut | 0951372 | NORWALK; REHAB OF BRIDGE #00059 (YANKEE DOODLE BRIDGE), I-95 OVER NORWALK RIVER AND HENDRICKS RD. (CN) | $36,260,541.90 | $40,945,421.01 |
Connecticut | 0951377 | STRATFORD; PROVIDE A FULL INTERCHANGE ON I-95 AT INTERCHANGE 33 BY CONSTRUCTING A NEW SB OFF-RAMP AND A NEW NB ON-RAMP. | $35,645,277.60 | $39,605,864.02 |
Connecticut | 0951378 | STAMFORD; REHABILITATION OF BRIDGE NO. 00032 CARRYING I-95 AND I-95 RAMPS OVER MNRR AND LOCAL ROADS. (CN) | $24,054,682.50 | $26,727,425.03 |
Connecticut | 0951384 | West Haven; Replace Bridge Nos. 161 & 162 carrying I-95 over SR 745 & Metro North RR, respectively. | $61,468,363.59 | $113,320,580.01 |
Connecticut | 0951386 | I-95 Pavement Preservation from NY State Line to Exit 6 in Stamford (CN). | $20,000,000.00 | $45,778,100.02 |
Connecticut | 0953073 | NEW LONDON/GROTON; PHASE 1A OF REHAB FOR BR #03819 NB (GOLD STAR MEMORIAL BRIDGE) CARRYING I-95 OVER THAMES RIVER & LOCAL ROADS. | $69,743,408.00 | |
Connecticut | 0953078 | East Lyme - Improvement of I-95 Interchange 74 at Rte 161 & Replacement of Bridge #00250 | $49,400,000.00 | $180,475,780.00 |
Connecticut | 0954118 | Safety Improvements and Pavement Rehabilitation on I-95 NB in Groton, Stonington & North Stonington | $41,311,332.00 | $49,849,440.00 |
Connecticut | 1063143 | HARTFORD; INTERCHANGE 29 @ I-91N & RTE 15N IMPROVEMENTS | $236,795,793.00 | |
Connecticut | 1092144 | NEW HAVEN; MAJOR REHABILITATION OF BRIDGE #03810 OVER QUINNIPIAC RIVER. | $4,916,605.11 | $27,929,200.00 |
Connecticut | 1096111 | NEWTOWN; REHABILITATION OF BRIDGES 01218 & 04180, I-84 EB & WB O/ HOUSATONIC RIVER. SUPERSTRUCTURE REPLACEMENTS. | $54,860,356.80 | $66,243,253.34 |
Connecticut | H017003 | NEW HAVEN; RECONST. OF I-95/I-91/RTE 34 INTERCH. ASSOC WITH Q BRIDGE REPLACEMENT (CONTRACT E) (CN). | $293,831,426.19 | $328,260,102.88 |
Connecticut | H100002 | DERBY; RECONSTRUCTION OF APPROXIMATELY 2,400 FEET OF ROUTE 34. | $18,188,643.20 | $29,863,804.03 |
Connecticut | H121002 | STAMFORD; REPLACEMENT OF DEFICIENT MNRR BRIDGE #08012R OVER ATLANTIC ST (CN). | $4,214,710.77 | $69,702,343.76 |
Delaware | 2015019 | SR299, SR 1 to Catherine Street | $31,458,112.00 | $37,323,035.64 |
Delaware | K008006 | SR 1, Little Heaven Grade Separated Intersection | $67,870,726.49 | $79,474,811.16 |
Delaware | K008011 | SR 1, South Frederica Grade Separated Intersection | $21,032,574.48 | $27,035,329.87 |
Delaware | N011031 | Elkton Road, MD Line to Casho Mill Road | $40,047,194.31 | $44,806,905.44 |
Delaware | N029003 | Christina River Bridge Approaches | $43,306,693.65 | $61,071,148.29 |
Delaware | N029005 | Christina River Bridge | $28,980,311.07 | $35,784,407.81 |
Delaware | N032013 | US 40 / SR 72 Intersection Improvements | $20,548,082.12 | $25,214,249.93 |
Delaware | N056041 | SR141 Improvements, I-95 Interchange to Jay Drive | $72,651,652.50 | $94,491,697.90 |
Delaware | N060044 | I-95 and SR896 Interchange | $14,949,411.46 | $243,677,492.98 |
Delaware | N356007 | SR 72, McCoy Road to SR 71 | $15,408,270.29 | $29,866,691.77 |
Delaware | S014014 | HEP Sussex County, SR 1 and SR 16 Grade Separated Intersection | $15,808,864.90 | $43,819,395.41 |
Delaware | S318005 | Park Avenue Relocation, Phase 1 | $12,863,200.00 | $25,507,174.39 |
District Of Columbia | 1104013 | Key Bridge NW over Potomac River | $24,544,125.90 | $31,005,077.12 |
District Of Columbia | 1116033 | H Street Bridge over Railroad | $20,827,012.23 | $33,760,656.32 |
District Of Columbia | 1501042 | South Capitol Street Corridor Phase 2 | $88,982,790.96 | $111,287,988.70 |
District Of Columbia | 2016006 | Minnesota Avenue from Dix St. to Sheriff Road NE | $21,912,159.12 | $26,852,014.80 |
District Of Columbia | 2016010 | Traffic Signal Construction | $21,837,313.95 | $26,182,708.92 |
District Of Columbia | 2016016 | South Capitol Street Corridor | $43,791,506.92 | $537,899,739.93 |
District Of Columbia | 2016049 | Multi-modal Traffic & Safety Construction | $20,335,801.99 | $60,265,256.05 |
District Of Columbia | 2016051 | Tunnel Preservation | $47,666,084.75 | $57,430,902.63 |
District Of Columbia | 2018005 | Interstate 295/Malcolm X Avenue Interchange Improvement Project | $137,011,947.07 | $138,463,628.07 |
District Of Columbia | 2018006 | Arlington Memorial Bridge Rehabilitation | $90,000,000.00 | $90,000,000.00 |
District Of Columbia | 2018017 | PAVEMENT RESTORATION - STBG STREETS | $46,160,738.58 | $64,737,519.33 |
District Of Columbia | 2018022 | Oregon Avenue NW, Military Rd to Western Ave. | $21,729,506.57 | $32,858,491.52 |
District Of Columbia | 2018023 | MARYLAND AVENUE NE ROAD DIET | $12,285,399.88 | $26,076,177.26 |
District Of Columbia | 2018031 | Highway Structures Preventive Maintenance and Repairs | $31,261,995.56 | $37,610,128.30 |
District Of Columbia | 2018045 | Traffic Signal Maintenance | $24,109,694.75 | $28,995,423.62 |
District Of Columbia | 2019026 | Massachusetts Ave from 20th Street to Waterside Drive NW | $25,953,835.12 | $31,257,319.83 |
District Of Columbia | 2020037 | Pavement Restoration - NHPP Streets | $34,119,893.46 | $42,649,868.39 |
District Of Columbia | 2021023 | Florida Avenue 2nd to H St NE | $12,892,230.83 | $34,050,905.09 |
District Of Columbia | 2022022 | Florida Ave and New York Ave NE Intersection | $2,400,000.00 | $26,414,101.47 |
District Of Columbia | 2952185 | GARVEE Bond Debt Service - 11th Street Bridge SE Replacement | $288,653,875.19 | $437,997,916.89 |
District Of Columbia | 8888412 | Urban Forestry Program | $5,559,684.80 | $26,340,305.15 |
District Of Columbia | 8888452 | HIGHWAY STRUCTURES PREVENTIVE MAINTENANCE AND REPAIRS | $19,816,994.82 | $25,250,821.51 |
District Of Columbia | 8888468 | PAVEMENT RESTORATION-NHPP STREETS | $74,357,043.94 | $93,511,627.58 |
District Of Columbia | 8888483 | STREETLIGHT ASSET MANAGEMENT | $26,147,855.20 | $50,831,488.60 |
Florida | 0041228 | I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING; DB | $857,919,759.00 | $4,539,283,593.00 |
Florida | 0105152 | I-10 (SR 8) / SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVEMENTS;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $96,410,670.00 | $150,743,635.00 |
Florida | 0751184 | I-75 FROM HERNANDO CO LINE TO SR 470;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $78,842,976.00 | $85,137,965.00 |
Florida | 0751185 | I-75 FROM SR 470 TO SR91(FLORIDA TURNPIKE);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $14,603,840.00 | $51,940,645.00 |
Florida | 0751191 | I-75 (SR 93) FROM N OF SR 50 TO HERNANDO/SUMTER CO/L;ADD LANES & REHABILITATE PVMNT;PRELIMINARY ENGINEER;DB | $30,912,760.00 | $35,068,767.00 |
Florida | 0754177 | SR-93/I-75 ML SYSTEM FR S OF SHERIDAN ST INTRG TO N OF GRIFFIN ROAD;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $3,121,777.00 | $100,427,741.00 |
Florida | 0754180 | SR 93/I-75 ML SYSTEM FROM NW 170 STREET TO S OF HEFT INTERCHANGE;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $6,724,472.00 | $39,480,256.00 |
Florida | 0755096 | I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE;INTERCHANGE IMPROVEMENT;PRELIMINARY ENGINEER | $39,454,706.00 | $61,517,724.00 |
Florida | 0757443 | I-75 AT SR 64; INTERCHANGE IMPROVEMENT;CONSTRUCTION | $44,967,112.00 | $51,708,749.00 |
Florida | 0951641 | SR-9/I-95 (SPANISH RIVER) FROM NORTH OF GLADES ROAD TO SOUTH OF CONGRESS AVE;INTERCHANGE (NEW);CONSTRUCTION | $69,102,417.00 | $86,900,865.00 |
Florida | 0951671 | SR-9/I-95 FR S. OF SR-842/BROWARD BLVD TO N. OF SR-870/COMMERCIAL BLVD; ADD SPECIAL USE LANE;CONSTRUCTION;DB | $75,335,922.00 | $198,662,559.00 |
Florida | 0951685 | SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER;DB | $35,345,470.00 | $40,922,511.00 |
Florida | 0951689 | SR 9A/I-95 FROM NW 29 STREET TO NW 79 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER AND CONSTRUCTION;DB | $64,970,638.00 | $204,580,476.00 |
Florida | 0951691 | SR-9/I-95 FROM SW 10TH STREET TO BROWARD/PALM BEACH COUNTY LINE;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $32,718,464.00 | $119,425,719.00 |
Florida | 0951694 | SR-9/I-95 FROM BROW/PALM BCH CO LINE TO SOUTH OF GLADES RD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $50,266,785.00 | $58,031,379.00 |
Florida | 0951695 | SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $30,937,972.00 | $50,406,075.00 |
Florida | 0953112 | I-95 FROM SR 406 TO 0.5 MILE N OF SR 44;ADD LANES & REHABILITATE PVMN;CONSTRUCTION | $122,876,465.00 | $136,937,342.00 |
Florida | 0953133 | I-95 INT @ ELLIS RD /ST JOHNS HERITAGE PKWY;INTERCHANGE (NEW);CONSTRUCTION | $46,184,911.00 | $52,452,099.00 |
Florida | 0955313 | I-95 (SR 9) AT NORTH I-295 INTERCHANGE ;INTERCHANGE RAMP (NEW);CONSTRUCTION;DB | $86,073,163.00 | $236,430,104.00 |
Florida | 0955314 | I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $3,235,689.00 | $149,366,236.00 |
Florida | 1001069 | SR 80 FROM DALTON LANE TO INDIAN HILLS DRIVE ;ADD LANES & RECONSTRUCT;CONSTRUCTION | $31,003,147.00 | $41,058,163.00 |
Florida | 1002062 | SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION | $47,236,462.00 | $118,964,473.00 |
Florida | 1171052 | SR 77 FROM NORTH OF CR 279 TO N SUNNY HILLS ENTRANCE;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $56,079,437.00 | $90,348,591.00 |
Florida | 1190014 | SR 83 (US 331) FROM NORTH OF SR 20 TO SR 8 (I-10);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $53,169,675.00 | $61,802,483.00 |
Florida | 1316003 | GATEWAY EXPRESSWAY FM SR690 @ US19 & SR686 EXT @ CR611 TO W OF I-275;NEW ROAD CONSTRUCTION;PRELIMINARY ENGINEER;DB | $256,147,065.00 | $2,593,207,101.00 |
Florida | 1356011 | SR 694 (GANDY BLVD) FROM W OF 9TH ST NORTH E OF 4TH ST NORTH;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $85,308,415.00 | $108,977,456.00 |
Florida | 1600003 | SR 95 (US 29) FROM SR 8 (I-10) TO N OF SR 10 (US 90A) 9 MILE ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $59,369,458.00 | $67,675,713.00 |
Florida | 1852019 | US 19 (SR 55) FROM W JUMP COURT TO W FORT ISLAND TRAIL;ADD LANES & RECONSTRUCT;CONSTRUCTION | $23,353,151.00 | $136,277,409.00 |
Florida | 2757410 | I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB | $138,331,419.00 | $233,126,149.00 |
Florida | 2955310 | I-295 (SR 9A) FROM BUCKMAN BRIDGE TO I-95 AUX-LANES;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB-E2S01 | $91,742,836.00 | $94,732,580.00 |
Florida | 2955314 | I-295 (SR 9A) FROM SR202 JTB BLVD TO SR 9B (MANAGED LANES);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $151,453,824.00 | $228,788,707.00 |
Florida | 3115028 | SR201 FROM S OF BALDWIN TO N OF BALDWIN (BYPASS);NEW ROAD CONSTRUCTION;CONSTRUCTION | $69,659,932.00 | $77,052,248.00 |
Florida | 3141036 | SR429/46(WEKIVA PKW) FROM W OF OLD MCDONALD RD TO E OF WEKIVA RIVER RD;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $29,094,914.00 | $295,389,024.00 |
Florida | 3141042 | SR429/46(WEKIVA PKWY)FROM E OF WEKIVA RIVER RD TO ORANGE BOULEVARD;NEW ROAD CONSTRUCTION;CONSTRUCTION | $57,891,755.00 | $245,617,965.00 |
Florida | 3951501 | SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE;BRIDGE-REPLACE AND ADD LANES;CONSTRUCTION;DB | $181,072,527.00 | $728,076,726.00 |
Florida | 4002027 | SR20 FROM SW 56TH AVENUE TO CR315 IN INTERLACHEN;ADD LANES & RECONSTRUCT; UTILITY WORK IN PREP FOR CONSTRUCTION. | $30,594,904.00 | $36,875,894.00 |
Florida | 4031035 | SR 997/KROME AVENUE FROM SW 232 STREET TO S OF SW 184TH ST/EUREKA DR.;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT | $25,360,595.00 | $41,569,754.00 |
Florida | 4047203 | CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $22,110,822.00 | $31,956,263.00 |
Florida | 4221091 | SR 30 (US 98) PENSACOLA BAY BRIDGE NO. 480035;BRIDGE REPLACEMENT;CONSTRUCTION;DB | $18,344,966.00 | $479,301,796.00 |
Florida | 4221093 | SR 30 (US 98) FROM CR 30F AIRPORT ROAD TO WALTON COUNTY LINE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $44,805,607.00 | $62,416,234.00 |
Florida | 4222077 | SR 30 (US 98) @ SR 368 23RD STREET INTERSECTION PHASE I;ADD LANES & RECONSTRUCT;CONSTRUCTION | $78,896,731.00 | $97,613,456.00 |
Florida | 4222081 | SR 30 (US 98) FROM EMERALD BAY DRIVE TO TANG-O-MAR DRIVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $48,206,351.00 | $59,112,783.00 |
Florida | 4751163 | SR-7/US-441 FROM N. OF FILLMORE TO S OF STIRLING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $3,901,446.00 | $45,203,759.00 |
Florida | 4881064 | SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $58,984,735.00 | $81,465,943.00 |
Florida | 4881072 | SR200(A1A) FROM I-95 TO W OF STILL QUARTERS RD/INCLUDES I95 LIGHTING;ADD LANES & RECONSTRUCT;CONSTRUCTION | $45,619,740.00 | $59,674,296.00 |
Florida | 4913014 | SRA1A(3RD ST) FROM SEAGATE AVE TO BEACH BLVD ;DRAINAGE IMPROVEMENTS;CONSTRUCTION | $28,655,682.00 | $32,532,198.00 |
Florida | 5951553 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $665,714,135.00 | $3,093,214,708.00 |
Florida | 5951556 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $80,952,434.00 | |
Florida | 5951557 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $124,950,849.00 | |
Florida | 5951560 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB - AVAILABILITY PAYMENTS & OPERATIONS UNDER CRRSSA | $160,390,282.00 | $160,390,282.00 |
Florida | 6107003 | SR 847/NW 47 AVENUE FROM SR 860/NW 183 STREET TO N. OF NW 199 STREET;ADD LANES & RECONSTRUCT;CONSTRUCTION | $20,730,369.00 | $29,539,605.00 |
Florida | 6268021 | SR 826 FROM FLAGLER ST TO NW 154 ST. & I-75 FROM SR 826 TO NW 170 ST.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $219,608,452.00 | $319,224,304.00 |
Florida | 7079006 | SR-713/KINGS HWY FR 800' S OF SR-70 TO N OF PICOS ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $11,268,652.00 | $35,354,354.00 |
Florida | 7810035 | SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $28,295,602.00 | $52,270,655.00 |
Florida | 8886496 | CR 4050 ORANGE AVE BR#794003 VETERANS MEMORIAL BRIDGE;BRIDGE REPLACEMENT;CONSTRUCTION;LAP | $43,069,676.00 | $50,241,167.00 |
Florida | 8886535 | CROSSTOWN PARKWAY FROM MANTH LANE TO SR-5/US-1;NEW BRIDGE CONSTRUCTION;CONSTRUCTION;LAP | $46,175,530.00 | $107,650,063.00 |
Florida | 8886777 | W. MIDWAY RD/CR-712 FROM S. 25TH STREET/SR-615 TO SR-5/US-1;ADD LANES & RECONSTRUCT;CONSTRUCTION | $31,834,499.00 | $40,939,291.00 |
Florida | 8886919 | SR 46 / US 441 FROM W OF US 441 TO E OF VISTA VIEW LANE;ADD LANES & RECONSTRUCT;CONSTRUCTION; WEKIVA SECTIONS 3A AND 3B | $8,051,024.00 | $65,946,899.00 |
Florida | ARR1134 | SR 826/SR 836 FROM N OF SW 8 ST TO S OF NW 25 ST & FM NW 87 TO 57 AVE';INTERCHANGE (MODIFY);CONSTRUCTION;DB | $309,200,121.00 | $567,489,632.00 |
Florida | ARR1279 | I-4/SELMON EXPRESSWY FROM S OF SELMON EXPRSSW TO I-4;INTERCHANGE (NEW);CONSTRUCTION | $220,736,422.00 | $226,120,955.00 |
Florida | D117027 | I-75 FROM S OF N JONES LOOP TO N OF US 17 ;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,988,881.00 | $36,279,243.00 |
Florida | D117115 | I-75 AT SR 70 INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $90,316,085.00 | $121,214,487.00 |
Florida | D118021 | US 41 - VENICE BYPASS FROM CENTER RD TO GULF COAST BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $13,753,429.00 | $26,751,246.00 |
Florida | D118039 | US 41 (SR 45) FROM WINKLER AVENUE TO SR 82 ;RESURFACING;CONSTRUCTION | $6,475,366.00 | $29,516,783.00 |
Florida | D118043 | I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB | $81,212,836.00 | $90,879,516.00 |
Florida | D118127 | I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $153,078,498.00 | $171,267,894.00 |
Florida | D119037 | US 27 AT SR 60;INTERCHANGE - ADD LANES;CONSTRUCTION | $36,592,357.00 | $56,252,638.00 |
Florida | D119075 | SR 542 FROM BUCKEYE LOOP ROAD TO US 27;ADD LANES & RECONSTRUCT;CONSTRUCTION | $42,921,635.00 | $52,952,907.00 |
Florida | D120030 | I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $54,954,114.00 | $63,745,036.00 |
Florida | D120059 | I-4 (SR 400) AT CSX RAILROAD;BRIDGE REPLACEMENT;CONSTRUCTION | $9,148,458.00 | $32,736,647.00 |
Florida | D121032 | SR 70 FROM PEACE RIVER TO SE BAKER STREET;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION | $4,595,914.00 | $31,580,277.00 |
Florida | D122041 | SR 25 (US 27) FROM N OF SR 540 TO N OF KOKOMO RD;RESURFACING;CONSTRUCTION;DB | $11,939,575.00 | $25,064,677.00 |
Florida | D122068 | SR 70 FROM LORRAINE ROAD TO BOURNSIDE BLVD ;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $50,750,975.00 | |
Florida | D217011 | FCX SOUTH OF US17 TO NORTH OF SR16; NEW ROAD CONSTRUCTION;CONSTRUCTION | $100,251,819.00 | $910,874,555.00 |
Florida | D217069 | SR200(US301) FROM: BRADFORD C/L TO: NORTH OF CR218;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION; CONCRETE PROJECT WITH STATE MATERIALS | $19,505,530.00 | $26,300,250.00 |
Florida | D217080 | SR15(US17) FROM: W. OF DUNNS CREEK TO: HORSE LANDING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $42,495,844.00 | $52,034,347.00 |
Florida | D217103 | I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION | $13,652,290.00 | $26,165,437.00 |
Florida | D217128 | I-10 FROM I-295 TO I-95;ADD MANAGED LANES;PRELIMINARY ENGINEER;DB | $167,915,467.00 | $269,495,953.00 |
Florida | D218017 | SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD);NEW ROAD CONSTRUCTION;CONSTRUCTION | $112,350,402.00 | $278,649,798.00 |
Florida | D218123 | SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $681,123,882.00 | |
Florida | D219037 | I-95(SR9) FROM: FLAGLER C/L TO: SR207;RESURFACING;CONSTRUCTION | $24,608,583.00 | $26,940,924.00 |
Florida | D219120 | URBAN CORE RIVERFRONT REVITALIZATION & COMPLETE STREETS;MISCELLANEOUS CONSTRUCTION;PRELIMINARY ENGINEER;LAP | $12,571,580.00 | $51,137,073.00 |
Florida | D219130 | I-95(SR9) FROM SR207 TO INTL GOLF PARKWAY;RESURFACING;CONSTRUCTION | $11,011,250.00 | $25,773,118.00 |
Florida | D221010 | SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE;RESURFACING;CONSTRUCTION | $15,238,332.00 | $36,200,358.00 |
Florida | D221018 | I-295(SR9A) @ US17 TO SOUTH OF WELLS ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION | $24,413,299.00 | $27,243,701.00 |
Florida | D222030 | I-95(SR9) @ SR115(US1)/ML KING/20TH STREET ;INTERCHANGE - ADD LANES;CONSTRUCTION | $50,538,346.00 | $50,538,346.00 |
Florida | D317016 | SR 30 (US 98) ELEVATED ROADWAY E TO W OF TYNDALL AFB ENTRANCE;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $24,175,731.00 | $36,981,239.00 |
Florida | D317035 | SR 388 WEST BAY PARKWAY FROM SR 79 TO E OF NWF BEACHES INTL AIRPORT;ADD LANES & RECONSTRUCT;CONSTRUCTION | $57,663,832.00 | $90,167,187.00 |
Florida | D319003 | SR 390 ST ANDREWS FROM SR 368 23RD ST TO E OF CR 2312 BALDWIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $35,880,191.00 | $52,970,277.00 |
Florida | D319075 | SR 77 FROM BAY COUNTY LINE TO NORTH OF CR 279;ADD LANES & RECONSTRUCT;CONSTRUCTION | $7,107,422.00 | $42,244,925.00 |
Florida | D319079 | SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | $68,516,903.00 | $84,763,989.00 |
Florida | D319080 | SR 369 (US 319) FROM EAST IVAN ROAD TO NORTH OF SR 267;ADD LANES & RECONSTRUCT;CONSTRUCTION | $9,955,555.00 | $31,791,349.00 |
Florida | D320013 | SR 8 (I-10) INTERCHANGE WEST OF CRESTVIEW;INTERCHANGE (NEW);CONSTRUCTION SUPPORT;DB | $546,487.00 | $96,781,957.00 |
Florida | D320016 | SR 263 CAPITAL CIRCLE FROM CR 2203 SPRINGHILL RD TO SR 371 ORANGE AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $71,263,374.00 | |
Florida | D320021 | SR 10 (US 90) OVER SIMPSON RIVER BRIDGE NO. 580056 & 580108;BRIDGE REPLACEMENT;CONSTRUCTION | $8,451,501.00 | $26,851,548.00 |
Florida | D417080 | SR-80 FROM W OF LION COUNTRY SAFARI RD TO FOREST HILL/CRESTWOOD BLVD.;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $33,542,326.00 | $47,203,251.00 |
Florida | D418011 | SR-9/I-95 @ SR-808/GLADES ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $21,704,745.00 | $29,674,592.00 |
Florida | D419098 | SR-9/I-95 @COPANS RD FR S OF NB EXIT RAMP TO N OF SB TO WB EXIT RAMP;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION | $24,490,304.00 | $28,452,535.00 |
Florida | D420092 | SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 ;BRIDGE REPLACEMENT;CONSTRUCTION | $13,084,579.00 | $130,724,213.00 |
Florida | D421056 | SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD;BRIDGE REPLACEMENT;CONSTRUCTION SUPPORT | $3,828,159.00 | $129,647,501.00 |
Florida | D517015 | SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400);NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $133,298,723.00 | $320,045,179.00 |
Florida | D518022 | SR 46 (WEKIVA PKWY) FROM ORANGE BLVD TO N. OREGON ST/WAYSIDE DR; ADD LANES & RECONSTRUCT; CONSTRUCTION | $15,044,749.00 | $26,079,015.00 |
Florida | D519013 | SR 500 (US 441) FROM LAKE ELLA RD TO AVENIDA CENTRAL; ADD LANES & RECONSTRUCT; CONSTRUCTION | $42,796,342.00 | $51,641,349.00 |
Florida | D520035 | I-4 (SR 400) AT DARYL CARTER PARKWAY INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION | $15,288,332.00 | $84,647,491.00 |
Florida | D520075 | SR 93 (I-75) FROM SUMTER COUNTY TO SR 200; RESURFACING; CONSTRUCTION | $2,164,019.00 | $31,573,246.00 |
Florida | D521023 | I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $175,210,269.00 | $227,872,595.00 |
Florida | D521092 | SPACE COMMERCE WAY;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $16,500,000.00 | $29,722,571.00 |
Florida | D617032 | GOLDEN GLADES MULTI-MODAL TERMINAL (GGMMT);INTERMODAL HUB CAPACITY; PRELIMINARY ENGINEER; DB | $30,449,740.00 | $73,089,021.00 |
Florida | D617044 | SR 968/SW 1ST STREET AT MIAMI RIVER (BRIDGE #870660);BRIDGE REPLACEMENT;CONSTRUCTION | $65,436,952.00 | $89,233,891.00 |
Florida | D620056 | SR 25/OKEECHOBEE RD FROM E. OF NW 107 AVE TO E. OF NW 116 WAY(CNCRETE);ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $62,230,569.00 | $123,088,197.00 |
Florida | D621008 | SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO WEST OF HEFT;ADD LANES & RECONSTRUCT;CONSTRUCTION | $48,947,799.00 | $52,095,406.00 |
Florida | D717045 | I-75 (SR 93A) FM WB SR60 ENTRANCE RAMP TO S OF CSX RR/CR 574;INTERCHANGE - ADD LANES;CONSTRUCTION | $19,157,668.00 | $59,109,093.00 |
Florida | D717046 | I-75 (SR93A)& SR 60 FM S OF SR60 @ SLIP RMP TO S OF CSX BRIDGE 100471;INTERCHANGE - ADD LANES;CONSTRUCTION | $18,527,306.00 | $33,212,406.00 |
Florida | D717060 | I-4/SR 400 FROM E OF 50TH ST TO E OF MCINTOSH;RESURFACING;CONSTRUCTION | $27,240,383.00 | $39,813,590.00 |
Florida | D717065 | I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I);INTERCHANGE - ADD LANES;CONSTRUCTION | $37,488,730.00 | $48,009,458.00 |
Florida | D718036 | SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45);ADD LANES & RECONSTRUCT;CONSTRUCTION | $33,281,656.00 | $56,764,991.00 |
Florida | D718055 | I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $225,210,519.00 | $383,892,268.00 |
Florida | D718056 | I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $33,377,721.00 | $51,682,122.00 |
Florida | D718067 | SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $35,720,989.00 | $42,623,396.00 |
Florida | D719008 | SR 50 FROM US 98/MCKETHAN RD TO US 301;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $11,469,044.00 | $25,470,918.00 |
Florida | D720029 | US 41/SR 45 FROM N OF 15TH AVE TO S OF BULLFROG CREEK;RESURFACING;CONSTRUCTION | $9,699,292.00 | $28,571,934.00 |
Florida | D720031 | I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $97,206,163.00 | $105,013,733.00 |
Florida | D721012 | I-275 (SR 93) FROM N OF MLK TO N OF HILLSBOROUGH AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $40,512,434.00 | $43,358,909.00 |
Florida | D721013 | I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION | $53,228,664.00 | $55,622,422.00 |
Florida | D721023 | US 19 (SR 55) FROM N OF SR 580 (MAIN ST) TO NORTHSIDE DR;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,129,294.00 | $123,713,683.00 |
Florida | D721027 | I-4/SR 400 FROM DOWNTOWN TAMPA TO POLK COUNTY LINE;ITS COMMUNICATION SYSTEM;CONSTRUCTION | $11,541,288.00 | $27,780,963.00 |
Florida | D721035 | US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $15,896,455.00 | $144,623,747.00 |
Florida | D722039 | US 19/SR55/34TH ST FROM SR 682/54TH AVE S TO 22ND AVE N;RESURFACING;CONSTRUCTION | $8,787,249.00 | $26,421,302.00 |
Florida | NASA002 | NASA CAUSEWAY BRIDGE; BRIDGE REPLACEMENT; CONSTRUCTION | $86,988,000.00 | $94,490,626.00 |
Florida | PMT1001 | PORT OF MIAMI TUNNEL FROM PORT OF MIAMI TO SR 836/I-395;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $214,270,573.00 | $2,365,899,035.00 |
Florida | SR20001 | SR20 FROM ALACHUA C/L TO SW 56TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $42,245,369.00 | $70,551,393.00 |
Florida | TAMI002 | SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURE S-333 TO STRUCTURE S-334;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION;DB | $60,069,034.00 | $73,010,341.00 |
Florida | TGER004 | BIG BEND ROAD/CR 672 @ I-75/SR93A FROM W OF COVINGTON TO E OF SIMMONS;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $25,000,000.00 | $104,015,237.00 |
Georgia | 0000297 | SR 3/US 19 FM CR 73/EAST-WEST COUNTY RD TO CR 8/ATWATER RD, CST | $27,873,244.49 | $34,841,555.61 |
Georgia | 0000425 | I-985 NEW INTERCHANGE N OF SR 13 CROSSOVER NEAR MARTIN RD, CST | $38,755,516.02 | $48,444,395.03 |
Georgia | 0000544 | SR 133 FM CR 10/PAULINE CH RD TO CR 1/OLD QUITMAN ADEL RD, CST | $31,867,583.29 | $39,834,479.12 |
Georgia | 0000545 | SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT, CST | $39,350,328.65 | $49,187,910.81 |
Georgia | 0000546 | SR 133 FROM CR 256/OLD BERLIN ROAD TO CR 388/HAWTHORNE DRIVE, CST | $30,116,864.32 | $37,646,080.40 |
Georgia | 0000566 | CR 717/SARDIS CHURCH RD EXT FM E OF SKIPPER RD OF TO SR 247, CST | $60,787,156.32 | $76,514,926.94 |
Georgia | 0000762 | I-75 FM NORTH OF SR 133 TO COOK COUNTY LINE - PHASE II, CST | $60,861,481.22 | $76,524,680.58 |
Georgia | 0001757 | SR 400 FM N SPRINGS MARTA STATION TO MCFARLAND RD-EXPRESS LN, CST | $273,720,979.82 | $3,828,612,218.76 |
Georgia | 0001817 | CR 1516 GRADE SEP @ NS RR; INCLUDING CONLEY RD & SR 3 RELOC - GRTA, CST | $48,304,767.48 | $61,525,959.35 |
Georgia | 0002392 | SR 20 FM CR 80/SAMPLES RD TO CR 450/JAMES BURGESS RD, CST | $33,611,752.69 | $42,278,103.79 |
Georgia | 0002626 | SR 3/US 41 AND SR 61/US 411 INTERCHANGE RECONSTRUCTION, CST | $48,323,829.24 | $60,404,786.55 |
Georgia | 0003161 | I-85 FROM N OF CR 417/FOREST ROAD TO N OF SR 34, CST | $175,120,894.70 | $218,901,118.38 |
Georgia | 0004086 | SR 316 FM W OF CR 104/COLLINS HILL RD TO CR 177/HI-HOPE RD, CST | $105,394,185.13 | $131,784,002.05 |
Georgia | 0004166 | SR 3/NORTHSIDE DRIVE AT CS 53/COLLIER RD; CS 364; 38; 6; 135, CST | $15,968,301.41 | $36,928,549.38 |
Georgia | 0004428 | CR 817/LEE RD FM I-20 TO SR 92/FAIRBURN RD - PHASE II - GRTA, CST | $19,788,818.63 | $31,074,679.48 |
Georgia | 0004915 | SR 140 FM SR 53/FLOYD TO OOTHKALOOGA CREEK/BARTOW, CST | $68,618,911.06 | $85,774,288.82 |
Georgia | 0005071 | I-95 FROM NORTH OF SR 303 TO CR 586, CST | $76,703,446.25 | $95,929,307.81 |
Georgia | 0005088 | I-95 @ TURTLE RIVER & GIBSON CREEK, CST | $113,221,625.13 | $141,527,031.43 |
Georgia | 0005320 | I-75 @ SR 215, CST | $23,331,693.37 | $29,164,616.72 |
Georgia | 0006049 | SR 360 FROM NEW MACLAND ROAD/COBB TO SR 120/PAULDING, CST | $68,039,712.74 | $90,993,918.95 |
Georgia | 0006073 | I-75 FM COOK COUNTY LINE TO CR 204/SOUTHWELL BLVD - PHASE 1, CST | $77,746,102.44 | $97,182,628.00 |
Georgia | 0006857 | SR 92 FROM OLD BURNT HICKORY ROAD TO PICKETTS MILL PLACE, CST | $23,464,169.78 | $29,330,212.22 |
Georgia | 0006866 | SR 92 FROM PICKETTS MILL PLACE TO SR 3/US 41, CST | $24,974,555.02 | $34,462,325.77 |
Georgia | 0006900 | SR 92 RELOC FM COOPER TO ELLIS RELOCS; INC UNDERPASS & RR - PHASE I, CST | $44,750,081.94 | $55,733,901.48 |
Georgia | 0006901 | SR 92 RELOC FROM PINE DRIVE TO COOPER STREET RELOC - PH II, CST | $41,055,448.70 | $53,800,310.88 |
Georgia | 0007037 | SR 135 @ ALTAMAHA RIVER- TIA, CST | $2,798,369.00 | $27,723,440.00 |
Georgia | 0007128 | CR 787/ISLANDS EXPRESSWAY @ WILMINGTON RIVER/BASCULE BRIDGE, CST | $60,721,267.43 | $75,939,176.28 |
Georgia | 0007386 | I-75 @ CR 274/LAKE PARK-BELLVILLE ROAD - PHASE II, CST | $39,435,109.82 | $49,331,882.52 |
Georgia | 0007414 | CR 90/COLERAIN ROAD FM W OF I-95 TO E OF KINGS BAY ROAD, CST | $44,254,763.41 | $56,040,907.50 |
Georgia | 0007526 | SR 400 @MCGINNIS FERRY ROAD, WIDENING & AUXILIARY LANES, CST | $60,425,049.85 | $79,861,312.31 |
Georgia | 0007691 | SR 92 FM CS 611/MALONE RD TO CS 519/NEBO RD-SEGMENT 1-PH IV,CST | $69,499,761.49 | $86,880,338.64 |
Georgia | 0007885 | CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25, CST | $26,764,390.77 | $30,444,137.50 |
Georgia | 0008219 | I-20 FROM SR 383/BELAIR ROAD TO E OF CR 601/WHEELER ROAD, CST | $20,735,358.97 | $25,919,198.72 |
Georgia | 0008256 | I-75/I-575 MANAGED LANES IN COBB & CHEROKEE, CST | $253,769,746.20 | $621,065,071.56 |
Georgia | 0008406 | SR 96 FM CS 1121/LAKE JOY ROAD TO CR 156/MOODY ROAD - PH II, CST | $20,880,733.88 | $45,609,359.27 |
Georgia | 0008407 | SR 96 FM E OF MOODY RD TO OLD HAWKINSVILLE RD-PHASE III, CST | $35,424,350.45 | $44,282,270.05 |
Georgia | 0008430 | SR 316/US 29 @ SR 11, CST | $33,428,896.98 | $43,164,637.17 |
Georgia | 0009157 | I-75 @ 1 LOC & I-675 @ 1 LOC - MANAGED LANES, CST | $60,897,915.29 | $76,122,394.11 |
Georgia | 0009316 | CR 455/BETHELVIEW ROAD FROM CR 8/CASTLEBERRY ROAD TO SR 20, CST | $30,611,259.44 | $41,684,664.30 |
Georgia | 0009323 | I-85 @ CR 103/POPLAR ROAD - NEW INTERCHANGE, CST | $24,295,642.91 | $31,003,169.63 |
Georgia | 0009400 | SR 13 FM CS 8/AFTON LANE TO CS 750/SHALLOWFORD TERRACE-PH II, CST | $45,458,203.86 | $50,509,115.40 |
Georgia | 0010212 | SR 53 WB @ CHATTAHOOCHEE RIVER , CST | $20,333,762.99 | $25,417,203.72 |
Georgia | 0010297 | I-75 @ SR 31 - PHASE II, CST | $27,053,815.62 | $53,262,269.53 |
Georgia | 0012683 | WEIGH-IN-MOTION SCALES, CST | $25,162,175.14 | $27,957,972.39 |
Georgia | 0012698 | I-85 @ SR 324, CST | $21,557,980.06 | $29,227,475.08 |
Georgia | 0012700 | I-75 NB FROM SR 19 TO I-16 - PHASE II, CST | $56,015,107.33 | $71,532,476.07 |
Georgia | 0012701 | I-16 WB FROM I-75 TO WALNUT CREEK - PHASE V, CST | $71,521,156.30 | $90,558,231.36 |
Georgia | 0012757 | I-16 FROM I-95 TO I-516, CST | $173,100,593.00 | $307,975,741.25 |
Georgia | 0012956 | TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - FY 2019, CST | $38,216,000.00 | $47,770,000.00 |
Georgia | 0012957 | TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - FY 2020, CST | $27,200,000.00 | $34,000,000.00 |
Georgia | 0013239 | S BARRETT PKWY FROM BARRETT LAKES BLVD TO SR 5 CONN - PH III, CST | $26,703,252.00 | $45,022,637.02 |
Georgia | 0013545 | I-85 FROM N OF SR 53 TO N OF SR 11/US 129, CST | $87,608,072.75 | $109,510,090.94 |
Georgia | 0013546 | I-285 @ SR 400; INC CD LANES & ABERNATHY ROAD INTERCHANGE, CST | $500,182,324.17 | $629,434,468.15 |
Georgia | 0013727 | I-16 @ SR 307, CST | $32,482,065.79 | $47,739,010.07 |
Georgia | 0013741 | SR 25 @ SAVANNAH RIVER IN PORT WENTWORTH, CST | $55,707,495.98 | $69,634,369.97 |
Georgia | 0013915 | I-285 @ I-20 - EAST SIDE INTERCHANGE RECONSTRUCTION, CST | $63,489,901.04 | $955,949,415.38 |
Georgia | 0015245 | I-85 FROM SR 11 TO SR 15, CST | $125,200,000.00 | $157,010,000.00 |
Georgia | 0017129 | I-285 @ SR 12; @ REDWING CIRCLE & @ GLENWOOD RD, CST | $29,282,148.80 | $57,823,114.00 |
Georgia | 0017130 | I-285 WB AUX LANE EXT FM SR 9 TO RIVERSIDE DR; INC MT VERNON, CST | $20,534,640.00 | $42,678,111.00 |
Georgia | 0026051 | SR 11/US 129 FM SR 332 @TALMO/JACKSON CO TO SR 323/HALL CO, CST | $43,652,450.52 | $76,019,928.29 |
Georgia | 0042031 | SR 899/GRAY NORTH BYPASS FM SR 18 NE TO SR 22, CST | $47,807,470.99 | $59,775,227.23 |
Georgia | 0084023 | SR 38/US 84 FROM W OF WOODYARD CREEK TO W OF GREASY BRANCH, CST | $66,701,897.52 | $75,571,128.14 |
Georgia | 0084026 | SR 38/US 84 FM W OF GREASY BRANCH CK TO W OF CR 88/RUSKIN RD, CST | $24,951,203.80 | $29,210,003.61 |
Georgia | 0084027 | SR 38/US 84 FM W OF CR 88/RUSKIN RD TO E OF CR 294/WADLEY RD, CST | $39,678,010.37 | $44,866,708.33 |
Georgia | 00MS007 | SOUTH CALHOUN BYPASS FM SR 53 @ CR 13 EAST TO SR 53 @ CR 64, CST | $51,733,318.33 | $64,666,647.92 |
Georgia | 0111053 | SR 1/US 27 FM OLD MOON ROAD TO TURNBERRY LANE, CST | $29,597,129.90 | $38,101,698.99 |
Georgia | 0121071 | SR 20 FM I-75 TO SR 61 /US 411 PART RELOCATION, CST | $29,623,896.17 | $37,029,870.20 |
Georgia | 0121080 | SR 369 @ CHATTAHOOCHEE RIVER/LAKE LANIER, CST | $5,349,613.22 | $32,366,610.43 |
Georgia | 0131063 | SR 13 FROM CS 1120/SAWNEE AVE/GWINNETT TO SR 347/HALL, CST | $28,525,222.32 | $37,656,527.90 |
Georgia | 0161092 | I-16 FROM I-75 TO SR 87; INCL SR 87 INTERCHANGE - PHASE I, CST | $93,752,407.80 | $115,725,818.19 |
Georgia | 0161104 | I-75 SB FROM SR 19 TO I-16 INTERCHANGE - PHASE III, CST | $85,475,823.81 | $106,210,251.05 |
Georgia | 0161131 | I-16 EB FROM I-75 TO WALNUT CREEK - PHASE IV, CST | $120,914,321.33 | $151,367,045.64 |
Georgia | 0181067 | VILLA RICA BYPASS FROM SR 101 TO SR 61, CST | $23,563,054.39 | $29,468,779.64 |
Georgia | 0201073 | I-20 @ SR 92/FAIRBURN RD & APPROACHES IN DOUGLASVILLE, CST | $50,204,060.02 | $55,782,288.94 |
Georgia | 0202117 | I-20 @ SAVANNAH RIVER & AUGUSTA CANAL; INC WIDENING, CST | $79,313,250.97 | $90,086,145.69 |
Georgia | 0202141 | .I-20 @ SR 142/COVINGTON (INCL RELOC OF CR 72/FRONTAGE RD), CST | $25,440,320.70 | $31,790,741.43 |
Georgia | 0202145 | I-20 FROM E OF CR 842/WARREN RD TO W OF AUGUSTA CANAL, CST | $55,784,021.45 | $69,730,026.84 |
Georgia | 0202167 | I-20 FM ALCOVY ROAD INCL INTERCHANGE TO SR 142 IN COVINGTON, CST | $44,747,420.50 | $55,993,492.63 |
Georgia | 0511023 | SR 10 LOOP/ATHENS PERIMETER @ SR 10/US 78/LEXINGTON RD, CST | $29,675,645.66 | $37,748,791.37 |
Georgia | 0545040 | SR 10/SR 17/US 78 FROM SR 43 TO CR 6/SMITH MILL ROAD - TIA, CST | $24,742,734.31 | $36,591,810.44 |
Georgia | 0545053 | SR 10/SR 17 FM CR 6/SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA, CST | $35,536,391.76 | $52,414,621.00 |
Georgia | 0561059 | SR 400 FROM SR 140/HOLCOMB BRIDGE RD TO MCFARLAND RD GRTA, CST | $59,230,445.92 | $74,038,057.40 |
Georgia | 0562029 | SR 2/SR 515 FM YOUNG HARRIS ST/UNION TO TIMBERLINE DR/TOWNS, CST | $150,926,350.78 | $160,559,555.78 |
Georgia | 0630010 | SR 144 EB FROM S OF CR 100 TO S OF CR 154, CST | $30,948,878.27 | $38,706,368.85 |
Georgia | 0751156 | I-75 FM SR 300 TO DOOLY COUNTY LINE, CST | $176,372,262.26 | $219,756,409.17 |
Georgia | 0751192 | I-75/I-475 INTERCHANGE @ CR 740/HARTLEY BRIDGE ROAD (P.I. #311465), CST FOR CONTRACT 2 PHASE OF PROJECT | $126,618,642.43 | $140,956,938.38 |
Georgia | 0751205 | I-75 FM SR 37 TO CR 246/KINARD BRIDGE RD - PHASE 1, CST | $123,856,642.81 | $154,820,803.53 |
Georgia | 0751206 | I-75 FM CR 246/KINARD BRIDGE RD TO TIFT COUNTY LINE - PHASE 1, CST | $29,013,316.23 | $36,266,645.30 |
Georgia | 0751215 | I-75 FM TIFT COUNTY LINE TO SR 32 - CONTRACT 1, CST | $31,646,101.07 | $39,557,626.32 |
Georgia | 0751227 | I-75 @ SR 27 - WIDEN BRIDGE & RAMPS, CST | $25,652,558.22 | $32,037,707.75 |
Georgia | 0752213 | I-75 @ CR 824/JODECO ROAD - INTERCHANGE IMPROVEMENT, CST | $29,497,689.15 | $37,037,991.88 |
Georgia | 0791042 | SR 135 FM SR 31/US 441 EAST TO SR 32 INCLUDING RR SEPARATION, CST | $34,485,422.09 | $43,106,777.64 |
Georgia | 0852164 | I 85 FM N OF OLD PEACHTREE TO HAMILTON MILL RD-MANAGED LANES, CST | $155,251,312.80 | $194,064,140.99 |
Georgia | 0852165 | I-85 FM N OF CR 134/HAMILTON MILL ROAD TO N OF SR 211, CST | $42,142,857.20 | $74,174,884.00 |
Georgia | 0951117 | I-95 FM N OF CSX RR TO N OF S ALTAMAHA RIVER; EXCL SR 99 INT, CST | $112,472,735.77 | $140,590,919.78 |
Georgia | 0951118 | I-95 FM US 17/SR 520 SOUTH OF BRUNSWICK TO NORTH OF SR 303, CST | $32,723,459.68 | $40,904,324.62 |
Georgia | 0951120 | I-95 FM JUST N OF ALTAMAHA RIVER BRIDGE TO SR 251, CST | $48,617,323.54 | $60,771,654.41 |
Georgia | 0951121 | I-95 FM 1 MILE NORTH OF SR 251 TO NORTH OF SR 57 - PHASE I, CST | $65,651,944.13 | $82,064,930.16 |
Georgia | 0951150 | I-95 @ CHAMPNEYS RIVER - BUTLER RIVER - DARIEN CREEK - CATHEAD CREEK, CST | $42,239,748.84 | $52,799,686.06 |
Georgia | 1105004 | CR 65/WINDSOR SPRINGS RD FM SR 88 TO CR 1515/WILLIS FOREMAN - TIA, CST | $20,038,370.30 | $26,564,476.31 |
Georgia | 1551023 | SR 96 FM 0.48 W OF SR 87 TO S OF I-16, CST | $27,569,262.58 | $80,422,864.09 |
Georgia | 1801006 | SR 151 FM S OF ROLLINS IND PARK/HOLCOMB RD TO SR 2/US 41, CST | $45,197,416.73 | $56,496,770.92 |
Georgia | 1851317 | I-185/COLUMBUS FM SR 520 TO ST MARYS ROAD, CST | $50,164,128.18 | $62,705,160.24 |
Georgia | 1861011 | SR 92 RELOC FM ELLIS ST RELOC TO N OF MALONE RD - PHASE III, CST | $30,758,395.87 | $38,206,269.43 |
Georgia | 2851346 | I-75 NB CD SYSTEM FROM SR 331 TO I-285, CST | $71,770,861.97 | $89,274,364.19 |
Georgia | 2851347 | I-285 @ SR 8/US 29/LAWRENCEVILLE HIGHWAY, CST | $44,656,744.31 | $51,316,430.02 |
Georgia | 2851352 | I 285 @ BOULDERCREST RD, CST | $103,379,999.63 | $129,695,999.53 |
Georgia | 2851353 | I-285 @ SR 10/MEMORIAL DR & RELOCATE GEORGE LUTHER DR, CST | $88,561,116.45 | $98,681,997.59 |
Georgia | 2946001 | OLD ALABAMA ROAD RELOC FROM SR 113 TO PAGA MINE ROAD, MCST | $78,441,952.66 | $98,052,440.84 |
Georgia | 5201015 | I-20 @ I-520 INTERCHANGE RECONSTRUCTION, CST | $191,172,934.20 | $247,196,712.22 |
Georgia | 7007006 | CR 65/WINDSOR SPRINGS RD FM WILLIS FORMAN RD TO TOBACCO RD-TIA, CST | $29,242,061.31 | $42,365,451.64 |
Georgia | 7063001 | OLD PETERSBURG RD/OLD EVANS FM BASTON RD TO WASHINGTON RD, CST | $34,226,068.81 | $65,776,069.04 |
Georgia | 8060002 | WHITTLESEY RD & VETERANS PKWY FM ROLLINS WAY TO GEPCA DR, CST | $21,274,031.21 | $26,594,670.81 |
Georgia | 9004008 | CR 4455/CANTON ROAD & RR BR OVER SR 3/US 41 N OF MARIETTA, CST | $20,467,976.09 | $25,584,970.14 |
Georgia | 9108004 | BATTLECREEK/MT ZION BLVD FM SOUTHLAKE PKWY TO SOMERTON DR, CST | $21,454,628.00 | $29,377,701.80 |
Georgia | 9851322 | I-985 SPLIT DIAMOND INTERCHANGE @ SR 13 & SR 53 & CD SYSTEM, CST | $108,059,174.91 | $135,073,968.64 |
Georgia | M003308 | I-20 FROM SR 1/US 27 TO SR 61, MCST | $88,384,974.59 | $98,205,527.32 |
Georgia | M004417 | I-285 FROM ASHFORD DUNWOODY ROAD TO HENDERSON MILL ROAD, MCST | $34,024,131.21 | $37,804,590.24 |
Georgia | M005713 | I-75 FM CHATTAHOOCHEE RVR TO 0.45 MI N OF CS 3905/ALLGOOD RD, MCST | $43,239,235.47 | $48,043,594.97 |
Georgia | M005874 | I-75 FROM SR 42/MONROE TO SR 36/BUTTS, MCST | $22,605,481.67 | $25,117,201.86 |
Georgia | M006050 | I-75 FROM I-85 TO CHATTAHOOCHEE RIVER, MCST | $23,266,764.00 | $25,851,960.00 |
Georgia | M006105 | I-85 FROM SR 140 TO 0.35 MI N OF CR 3761/OLD PEACHTREE ROAD, MCST | $38,144,281.62 | $42,382,535.13 |
Guam | 0003105 | ROUTE 3 WIDENING FROM ROUTE 28 TO CHALAN KARETA | $51,765,076.38 | $51,765,076.38 |
Hawaii | 0001041 | HON CNTY - ALAPAI TRANSPORTATION MANAGEMENT CENTER (P, C) | $40,604,813.60 | $75,623,620.00 |
Hawaii | 0011261 | HON STATE - INTERSTATE ROUTE H-1, ADDITION AND MODIFICATION OF FREEWAY ACCESS (KAPOLEI INTERCHANGE COMPLEX), PHASE 2 | $68,043,041.45 | $73,132,579.29 |
Hawaii | 0011271 | Hon St - Interstate Route H-1, Addition and Modification of Freeway Access, Kapolei Interchange Complex, Phase 3 | $9,497,358.60 | $46,943,522.22 |
Hawaii | 0011273 | Hon St - INTERSTATE ROUTE H-1, AIRPORT VIADUCT IMPROVEMENTS VICINITY OF VALKENBURG STREET TO MIDDLE STREET, PHASE 3 (CON) | $9,729,336.70 | $43,876,295.04 |
Hawaii | 0011274 | HON STATE - INTERSTATE RTE H-1, SHOULDER WORK & PORTLAND CONCRETE PAVEMENT REHAB FROM THE VICINITY OF WAIMALU VIADUCT TO THE VICINITY OF HALAWA (P, C) | $65,132,524.86 | $81,791,050.00 |
Hawaii | 0011275 | HON STATE - INTERSTATE ROUTE H-1 REHABILITATION, SALT LAKE BOULEVARD TO AIRPORT VIADUCT (CON) | $8,560,742.28 | $30,396,584.92 |
Hawaii | 0011276 | HON STATE - INTERSTATE ROUTE H-1, AIRPORT VIADUCT IMPROVEMENTS VICINITY OF VALKENBURG STREET TO MIDDLE STREET, PHASE 2 (CON) | $26,996,269.26 | $30,456,930.44 |
Hawaii | 0011279 | HON STATE - INTERSTATE ROUTE H-1 RESURFACING, MILLER PEDESTRIAN OVERPASS TO KAPIOLANI INTERCHANGE (CON) | $7,181,589.69 | $36,037,059.10 |
Hawaii | 0031075 | HON STATE - INTERSTATE ROUTE H-3, H-3 FINISH (CON) | $200,711,451.12 | $228,480,547.79 |
Hawaii | 0100077 | HI STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, HAWAII (CON) | $50,109,139.27 | $62,636,424.12 |
Hawaii | 0192061 | HI STATE - HAWAII BELT ROAD, REHABILITATION OF UMAUMA BRIDGE (P, R, C) | $37,151,930.84 | $46,608,672.18 |
Hawaii | 0300155 | HON STATE - INSTALLATION OF ENHANCED PAVEMENT MARKING AND NEW MILLED RUMBLE STRIP AT VARIOUS LOCATIONS, OAHU (CON) | $33,292,602.35 | $35,461,923.76 |
Hawaii | 0300158 | HON STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, OAHU (CON) | $30,870,595.86 | $37,274,477.00 |
Hawaii | 0300184 | Hon State - Asphalt Pavement Preservation, Resurfacing and Reconstruction at Various Locations, Oahu (CON) | $22,469,285.60 | $60,634,829.09 |
Hawaii | 0300189 | Hon St - Traffic Signal Controller Installation and Adapptive Signal Technology at Various Locations, Oahu (CON) | $3,214,299.04 | $37,289,127.47 |
Hawaii | 0301035 | MAUI STATE - HONOAPIILANI HWY REALIGNMENT, LAHAINA, MAUI, HI; PE PHASE 1A, FUTURE KEAWE ST EXTSN TO LAHAINALUNA RD-DESIGN BUILD | $66,726,439.41 | $83,905,997.67 |
Hawaii | 0301038 | MAUI STATE - HONOAPIILANI HIGHWAY REALIGNMENT, PHASE 1B-1, LAHAINALUNA ROAD TO HOKIOKIO PLACE (ROW & CON) | $29,273,454.80 | $38,116,164.14 |
Hawaii | 0380010 | MAUI STATE - KAHULUI AIRPORT ACCESS ROAD, PUUNENE AVENUE TO HANA HIGHWAY | $20,851,716.60 | $27,426,068.19 |
Hawaii | 0501031 | KAUAI STATE - KAUMUALII HIGHWAY WIDENING, VICINITY OF ANONUI STREET TO VICINITY OF LIHUE MILL BRIDGE (CON) | $35,550,381.72 | $48,680,560.14 |
Hawaii | 0561051 | KAUAI STATE - KUHIO HIGHWAY SHORT TERM IMPROVEMENTS, WAILUA CANE HAUL BRIDGE WIDENING (CON) | $25,389,119.97 | $33,537,553.49 |
Hawaii | 0611035 | HON STATE - PALI HWY RESURFACING, WAOKANAKA ST TO KAMEHAMEHA HWY AND PALI HWY LIGHTING REPLACEMENT, VINEYARD BLVD TO KAMEHAMEHA HWY (CON) | $65,049,707.64 | $81,407,542.70 |
Hawaii | 0611036 | HON STATE - PALI HIGHWAY RESURFACING, VINEYARD BOULEVARD TO WAOKANAKA STREET (C) | $29,209,275.68 | $50,299,308.97 |
Hawaii | 0700082 | KAUAI STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, ISLAND OF KAUAI | $26,398,725.00 | $39,248,406.25 |
Hawaii | 0761009 | HON STATE - FORT WEAVER ROAD WIDENING, VICINITY OF AAWA DRIVE TO GEIGER ROAD (DESIGN BUILD AND ROW) | $51,637,101.64 | $65,825,096.70 |
Hawaii | 0831048 | HON STATE - KAMEHAMEHA HIGHWAY, KAIPAPAU STREAM BRIDGE REPLACEMENT (ROW & CON) | $8,789,306.28 | $26,311,141.47 |
Hawaii | 0900097 | MAUI STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, ISLAND OF MAUI, MOLOKAI AND LANAI | $21,510,053.43 | $26,887,566.81 |
Hawaii | 0921027 | HON STATE - NIMITZ HIGHWAY & ALA MOANA BOULEVARD, RESURFACING & HIGHWAY LIGHTING REPLACEMENT, FORT STREET TO KALAKAUA AVENUE (CON) | $51,166,349.34 | $67,788,029.14 |
Hawaii | 0921029 | HON STATE - ALA MOANA BOULEVARD ELEVATED PEDESTRIAN WALKWAY (CON) | $19,976,642.72 | $25,604,501.40 |
Hawaii | 0931020 | HON STATE - RTE 93, FARRINGTON HWY AT MAKAHA BR NO. 3 & MAKAHA BR NO. 3A; PE, ROW & CON FOR BRIDGE REPLACEMENT, NO ADDED CAPACITY | $12,583,933.19 | $28,665,310.63 |
Hawaii | 0931021 | HON STATE - FARRINGTON HIGHWAY AT MAIPALAOA BRIDGE; PE, ROW & CON FOR BRIDGE REPLACEMENT | $23,603,937.68 | $32,329,895.48 |
Hawaii | 0931022 | HON STATE - FARRINGTON HIGHWAY INTERSECTION IMPROVEMENTS AT NANAKULI AVENUE AND HALEAKALA AVENUE (C) | $22,039,451.99 | $28,655,107.42 |
Hawaii | 0991031 | HON STATE - KAMEHAMEHA HIGHWAY, KAMANANUI ROAD AND WILIKINA DRIVE REHABILITATION, VICINITY OF WEED CIRCLE TO H-2 | $22,952,593.92 | $28,731,828.63 |
Hawaii | 2000004 | HI CNTY - PUAINAKO ST EXTENSION, KOMOHANA ST TO COUNTRY CLUB RD, ROW & CON FOR NEW ROADWAY | $26,886,000.00 | $33,775,032.00 |
Hawaii | 8930002 | HON STATE - NORTH-SOUTH ROAD, PHASE 1B (KAPOLEI PARKWAY TO FARRINGTON HIGHWAY) (CON) | $52,944,757.06 | $82,937,614.65 |
Hawaii | A191003 | Waikoloa Road Rehabilitation, Mamalahoa Highway to Queen Kaahumanu Highway | $3,510,553.43 | $38,940,514.03 |
Hawaii | A191038 | HI STATE - QUEEN KAAHUMANU HIGHWAY WIDENING, PHASE 2, KEALAKEHE PARKWAY TO KEAHOLE AIRPORT ROAD (DESIGN-BUILD) | $29,494,726.80 | $37,084,561.52 |
Hawaii | B191038 | HI STATE - QUEEN KAAHUMANU HIGHWAY WIDENING, PHASE 2, KEALAKEHE PARKWAY TO KEAHOLE AIRPORT ROAD (DESIGN-BUILD) | $29,133,274.66 | $36,416,784.34 |
Hawaii | C191038 | HI STATE - QUEEN KAAHUMANU HIGHWAY WIDENING, PHASE 2, KEALAKEHE PARKWAY TO KEAHOLE AIRPORT ROAD (DESIGN-BUILD) | $42,143,189.00 | $65,785,224.63 |
Hawaii | ER19002 | KAUAI STATE - KUHIO HIGHWAY, EMERGENCY SLOPE STABILIZATION IN THE VICINITY OF WAINIHA (P, R, C) | $33,316,505.35 | $36,134,661.33 |
Hawaii | ER19007 | KAUAI STATE - KUHIO HIGHWAY, REPAIRS OF WAIOLI, WAIPA AND WAIKOKO BRIDGES | $29,009,592.95 | $36,261,991.16 |
Hawaii | ER23001 | KAUAI STATE - KUHIO HIGHWAY, EMERGENCY WAILUA RIVER BRIDGE DEBRIS REMOVAL AND SCOUR MITIGATION (P, C) | $26,024,238.93 | $69,061,137.15 |
Hawaii | H201005 | HON STATE - MOANALUA FREEWAY HIGHWAY LIGHTING IMPROVEMENTS, HALAWA HEIGHTS OFF-RAMP TO MIDDLE STREET OVERPASS (CON) | $20,763,741.90 | $30,888,213.05 |
Idaho | 1568001 | SH-55, SMITH'S FERRY TO ROUND VALLEY | $51,784,451.09 | $58,701,636.70 |
Idaho | 4110156 | US 95, THORN CREEK ROAD TO MOSCOW, PH 1 | $56,753,928.50 | $82,029,740.34 |
Idaho | A013057 | I 84, MERIDIAN IC TO FIVE MILE RD | $28,031,695.99 | $30,463,076.10 |
Idaho | A018881 | I 84, I 86 SALT LAKE SYSTEM INTERCHANGE | $39,420,987.30 | $42,768,515.46 |
Idaho | A019261 | US 95, CULDESAC CANYON PASSING LANE PHASE 2 | $27,121,328.84 | $38,492,968.91 |
Idaho | A019682 | SH 41, MULLAN AVE TO E. PRAIRIE AVE, POST FALLS | $39,415,615.96 | $48,694,187.62 |
Idaho | A020083 | I 15, FORT HALL IC# 80, BANNOCK CO | $31,146,394.28 | $33,755,710.74 |
Idaho | A020098 | SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO | $44,572,612.52 | $49,229,737.97 |
Idaho | A020139 | I 84, COLD SPRINGS IC TO GLENNS FERRY IC | $33,710,865.50 | $36,535,022.79 |
Idaho | A020442 | I 90, SH-41 INTERCHANGE, KOOTENAI CO | $12,253,613.96 | $103,647,355.19 |
Idaho | A020513 | US 12, CLEARWATER RV MEMORIAL BR, NEZ PERCE COUNTY | $37,833,290.60 | $40,830,229.52 |
Idaho | A020589 | STATE, FY24 I-86/I-15 SYSTEM IC, POCATELLO | $4,381,039.63 | $40,613,620.01 |
Idaho | A020798 | INFRAFY18: I 84, NORTHSIDE BLVD TO FRANKLIN BLVD, NAMPA | $44,387,534.00 | $74,477,876.80 |
Idaho | A020799 | INFRAFY18: I 84, KARCHER IC TO NORTHSIDE BLVD | $16,743,152.75 | $28,059,890.77 |
Illinois | 000S658 | I-70 - Bridge replacement and new interchange on I-55/70 under IL 162 at Troy in Madison County. | $26,155,295.30 | $27,110,914.46 |
Illinois | 000V127 | 0.72 miles reconstruction/widening of I-290 EB mainline pavmt. from Racine to Congress Parkway (i-9094) retain wall, lighting | $29,610,659.43 | $33,360,580.97 |
Illinois | 0020074 | CREATE - Construction on CREATE project EW1: Plan number EW1-BRC-TSX-001-Z-BD | $58,652,208.00 | |
Illinois | 0055410 | FAI55/I55 OUTBND BDG, I-55 (OUTBOUND BRIDGES) @ I-94 (DAN RYAN EXPY)**. | $69,043,433.23 | $79,638,899.84 |
Illinois | 0055455 | Resurfacing, bridge repairs etc on I-55 through Will, DuPage and Cook Counties | $29,478,421.41 | $33,182,785.81 |
Illinois | 0055475 | 1.0 miles of roadway reconstruction and the removal and replacement of the 3 inbound bridge structures of I-55 & US41, 3 new** | $56,668,039.83 | $63,087,543.96 |
Illinois | 0057309 | Bourbonnais road improvements, Bourbonnais. 1.42 miles of a new structure an interchange on I-57 at 6000N and improvements at** | $46,105,899.29 | $51,787,033.35 |
Illinois | 0057312 | 9.28 mi of milling, rubblizing & 11.75" of HMA resurf, guardrail, striping etc on I-57 from Old IL 13 to Johnson Cty | $26,438,888.53 | $30,285,436.37 |
Illinois | 0064403 | 0.711 mi of proposed bridge & additional lane on I-64 from MLK Bridge EB to I-55/64 WB | $29,321,246.02 | $32,620,141.26 |
Illinois | 0070027 | 6.6 miles of resurfacing, bridge repairs etc. on I 70 in Bond and Madison Counties | $24,288,210.63 | $27,735,905.31 |
Illinois | 0070047 | 9.05 miles of rebbilization/overlay of I-70 - starts at abandoned RR bridge in Altamont to Little Wabash River W of Effingham | $53,561,297.13 | $59,512,552.36 |
Illinois | 0070405 | Appr 9 mi of milling, patching, resurfacing, grdrl & bridge repair on I-70 from 2.5 mi east of I-55/70 int just west of Prairie Rd | $28,064,642.27 | $31,284,519.13 |
Illinois | 0074324 | 0.5 miles added lanes & ramps, bridge replacement/rehab, lighting & drainage improvements on I-74 from Mississippi River to 7th Ave Moline | $83,228,205.05 | $94,651,112.00 |
Illinois | 0074326 | 2 miles of reconstruction of I-74 starting (7th ave) south to (Avenue in Cities) - within the City of Moline | $84,587,618.00 | $96,169,621.00 |
Illinois | 0075156 | Construct 4 lane ext. of IL.Rte.29 from Rochester to Taylorville - new 4 lanes expressway around Edinburg incl. ** | $34,925,049.85 | $43,952,254.25 |
Illinois | 0080408 | Remove & repl stw structures over Green Rvr, two over BN&SF RR & two over Barstow Rd & resurf from .8 mi N of IL5/IL92 to Henry* | $23,348,529.82 | $26,008,312.21 |
Illinois | 0090401 | Removal & replacement of structure carrying EB I-90 over CTA BLue Line & EB I-90, retaining walls, recons of East River Rd bridge* | $13,634,730.00 | $25,266,246.00 |
Illinois | 0090403 | 2.67 miles of a new lane on I-90 from Cumberland Ave to Harlem Ave in Chicago | $22,695,886.00 | $28,671,955.41 |
Illinois | 0290201 | 0.49 miles of the construction of 2 new WB expressway lanes along I-290 from Peoria to Racine St inc 4 new retaining walls and** | $27,346,416.25 | $33,212,207.99 |
Illinois | 0310139 | 5.5 miles of new 4-lane roadway; Seminary Road to US 67 in Godfrey including grading, paving, box culvert and signing. | $23,502,425.43 | $29,378,031.79 |
Illinois | 0321015 | TIGER PROJECT-US 54, PIKE CO. REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA | $25,182,100.00 | $29,626,000.00 |
Illinois | 0322096 | 4.5 mi of grading, paving, new bridge and an additional lane to an existing bridge on US.51 from 1.4 mi S.of Assumption ** | $22,203,584.77 | $27,764,886.77 |
Illinois | 0326088 | 4.47 mi of addition of 2 or more lanes on IL 47 from N of I-80 in Morris to just N of Sherrill Rd in Kendall Cty inc 32' median * | $31,582,122.16 | $40,090,294.93 |
Illinois | 0326093 | Const. of the US. I-80 to I-88 North-South Connector in Illinois - 7.023 mi of reconst. of IL.47 from 2-4 lanes inc. pvmnt, ** | $37,588,133.34 | $49,842,824.18 |
Illinois | 0330070 | Reconst./widening of 1.64 mi of US.12-45 (Manheim Rd) from IL.19 to I-94 inc. const. of Balmoral Underpass, retaining walls, ** | $35,268,688.40 | $44,468,015.70 |
Illinois | 0330073 | 1.8 miles of reconstruction on US 45 from 143rd St. to 159th St., including signals, culverts, pavement marking, additional** | $20,188,052.73 | $29,964,765.33 |
Illinois | 0330074 | 2.8 miles of additional lanes and roadway reconstruction inc signals, lighting, pavement marking, etc. on US 45 from 159th to** | $24,374,900.08 | $32,592,125.68 |
Illinois | 0331068 | 10.828 of the addition of a new lane to IL 13, a new bridge over IL 13, new frontage rds, etc on IL 13 from 0.2 miles east on** | $20,721,081.24 | $25,921,525.93 |
Illinois | 0332119 | 6.02 miles of the reconstruction of the existing 2-lanes and the addition of two more on US 45 beginning in Eldorado from just** | $20,948,092.99 | $26,195,055.45 |
Illinois | 0338048 | 1.57 miles of roadway reconstruction, resurfacing, lighting, retaining walls, storm sewers, traffic signals, etc. on IL 59** | $28,019,725.03 | $37,895,544.43 |
Illinois | 0341025 | Lakefront Bike Trail: Navy Pier Flyover consisting of new pedestrian bridge, furnishing structural steel, lighting, concrete** | $20,933,600.00 | $28,952,200.00 |
Illinois | 0345056 | 1.33 mi of interchange reconst. on US.20 inc lghtng, traff sgnls, structure work, retaining wall etc from Fleetwood Dr. to ** | $30,568,574.44 | $40,041,517.55 |
Illinois | 0345062 | 1.4 miles of new interchange ramps, flyover bridge structures, retaining walls, noise wall, drainage improvements, lighting, etc** | $29,318,875.29 | $37,128,469.25 |
Illinois | 0351027 | 5.15 mi of roadway reconst inc adding lanes, multi-use path, traffic signals lighting etc on IL 7 from Gougar Rd to Will-Cook* | $49,078,337.36 | $67,903,453.66 |
Illinois | 0351028 | 2.5 mi of rdwy reconst, add lanes, add multi-use path, drainage improvements, signals, lighting, landscaping etc on US6/IL7* | $46,548,707.62 | $61,002,451.05 |
Illinois | 0365012 | Wide for add. lanes, reconst. & bridge repl, lndscpng, etc on IL.56 from W.of IL.59 (Joliet Rd.) toE.of Winfield Rd in Wrrnvlle | $23,572,903.42 | $29,936,368.31 |
Illinois | 0373028 | 2.03 mi of bridge rehab, widening, ramp modification & lighting on IL 171 through Vil of McCook, Lyons & Summit | $24,625,889.44 | $27,402,112.79 |
Illinois | 0556246 | 2.3 mi of relocate I-55 @ Arsenal Rd. interchange inc new Arsenal bridge, fly-over bridge, lighting, rem exist ** | $34,252,726.00 | $38,075,577.17 |
Illinois | 0557203 | STEVENSON EXPWY W DAMEN TO S FORK S.BRANCH, PAVEMENT RECONS & BR REHAB | $31,051,347.32 | $37,488,163.87 |
Illinois | 0591028 | Construction of Route 34 Interchange and improvements. 3.65 miles of reconstructing US 34 to 5 lanes inc storm sewers, curb &** | $30,158,245.00 | $38,193,683.00 |
Illinois | 0595034 | 2.56 mi of pavement reconst. & widening to 6 lanes of IL.5 in Moline from 0.2 mi W.of 38th St. to 0.3 mi E.of 70th St. inc., ** | $46,938,191.00 | $58,759,353.00 |
Illinois | 0698037 | 0.83 mile of the removal and replacement of the structure carrying IL 89 over the Illinois River located 1 mile south of US 6 in** | $35,413,629.00 | $44,396,158.00 |
Illinois | 0734046 | Reconstruction of IL 2 in Rockford | $22,954,376.10 | $34,514,297.23 |
Illinois | 0745305 | 7.957 mi of repl of bridge carrying IL104 over IL Rvr in Meredosia, bridge rehab, earthwork, lighting, sidewalks, landscaping etc | $62,241,919.60 | $78,036,879.40 |
Illinois | 1279114 | 5,110' of the removal and replacement of the structure carrying IL 178 over the Illinois River in Utica | $22,899,350.00 | $29,317,862.00 |
Illinois | 1987002 | New I-74 Mississippi River Bridges | $185,112,599.41 | $205,904,989.60 |
Illinois | 2081100 | Pre-construction and construction activities on US 45/La Grange Road from 131st Street to 179th Street. 1.8 miles of additional** | $24,231,153.57 | $32,886,784.24 |
Illinois | 34FV643 | Bridge replacement of four structures on I-57 in Kankakee County | $22,574,795.00 | $25,088,206.00 |
Illinois | 3ELT222 | CONSTRUCTION OF A GRADE SEPARATION STRUCTURE TO CARRY FAU 7448 (BRUSH COLLEGE RD.) OVER THE NORFOLK SOUTHERN RAILROAD & FAIRIES PKWY. IN DECATUR. | $45,625,824.00 | |
Illinois | 47CA169 | Replace four structures within Lincoln Park near Montrose Harbor in the City of Chicago. | $31,425,000.00 | |
Illinois | 5181057 | MCORE PROJECTS 1, 2 & 3. | $15,705,327.00 | $26,176,116.00 |
Illinois | 5JZQ983 | CREATE Project P3: Stage II construction of a rail-to-rail flyover and for a rail grade separation CREATE Project GS19 at 71st street. | $85,785,037.00 | $297,717,362.00 |
Illinois | 6000238 | Undertake access improvements to US.Rte.41, Chicago | $13,600,000.00 | $30,150,000.00 |
Illinois | 6000325 | Wacker Dr.: Monroe St. to Van Buren St. | $82,943,758.72 | $120,850,462.09 |
Illinois | 6000326 | 130th and Torrence Intersection Improvement, Chicago | $76,606,782.66 | $141,855,478.60 |
Illinois | 6000418 | The improvement of Bloomingdale Trail, Ridgeway Av. to the Kennedy Expressway | $49,656,683.64 | $62,070,854.69 |
Illinois | 6000443 | For the improvement of 35th St bicycle & pedestrian bridge over south Lake Shore Drive. | $22,845,000.00 | $28,556,250.00 |
Illinois | 6000448 | For the improvement of the Adams Street Viaduct over Union Station | $18,155,400.00 | $42,183,000.00 |
Illinois | 622K195 | Intersection and roadway reconstruction, bridge rehab, lighting and sidewalk on Wood Street, N of Little Calumet River to S of US 6 (159th St) | $29,332,244.50 | $45,844,819.01 |
Illinois | 69NC103 | Interchange reconstruction on I-55 from I-80 to US 52 | $20,000,000.00 | $54,155,000.00 |
Illinois | 6BY3902 | Roadway reconstruction and bridge preservation on I-74 from W of the Tazewell County line to e of the Carlock Interchange. | $52,502,280.01 | $58,555,217.23 |
Illinois | 6FQN827 | RECONSTRUCTION OF FAU 2755 (80TH AVE.) FROM GREENWAY BLVD. TO TIMBER DR. AND REPLACE THE BRIDGE CARRYING 80TH AVE. OVER I-80. | $19,618,077.00 | $49,723,996.00 |
Illinois | 6FXA534 | Pavement reconstruction, bridge replacement and widening and lighting on I-80 from Gardner St to Roswell Ave (Group A Structures WB) | $36,492,111.00 | $43,720,157.00 |
Illinois | 8012014 | Demo IL416: City of Springfield, IL for improvements to Cockrell Lane; Demo IL512: Improvements to Cockrell Lane in the City of** | $20,830,431.40 | $26,299,325.65 |
Illinois | 9TJY262 | NEW ROADWAY, INTERSECTION RECONSTRUCTION (LONGMEADOW PARKWAY CORRIDOR) | $4,222,377.00 | $27,777,277.00 |
Illinois | APXQ831 | Construction and widening the Kennedy mainline Expwy NB from Roosevelt Rd to Lake/Madison St in Chicago. | $55,415,768.00 | $61,641,767.00 |
Illinois | C9B9786 | Reconstruction, designed overlay, bridge deck overlay and repair on I-74 from US 150 W of Danville to Vermilion River in Danville | $62,672,779.00 | $69,636,424.00 |
Illinois | CLGU392 | Additional lane work with bridge replacement on I-57 over Middle Fork Big Muddy River N of West Frankfurt to 2.5 Mi S of IL 154 | $42,253,518.25 | $71,592,762.00 |
Illinois | CRP1462 | Single bridge replacement with dual bridges carrying I-270 over the Mississippi River | $198,000,000.00 | $220,000,000.00 |
Illinois | F866342 | Bridge rehabilitation on I-74 over the IC RR/TR 158 and over FAU 7169 (Market St.) in Champaign. | $32,537,559.00 | $36,152,848.00 |
Illinois | FB4M631 | Reconstruction, ramp modification and retaining walls on I-90/94/290. | $43,996,278.00 | $49,322,937.00 |
Illinois | FF3X145 | CREATE Project P3: Stage I construction of a rail-to-rail flyover at Forest Hill Junction and for a grade separation at 71st street. | $15,000,000.00 | $27,800,000.00 |
Illinois | G3Q5348 | Designed overlay with patching, pavement markings, drainage and ITS improvements on I-55 from S of I-80 to S of Weber Road (SB) | $26,773,734.00 | $27,087,166.00 |
Illinois | GYUQ685 | Resurfacing project with bridge improvements on I-39 from 1 Mi N of IL 116 to 2 MI S of IL 17 | $25,709,179.00 | $28,565,756.00 |
Illinois | H8EV623 | Rubblization and overlay on I-72 from 4.4 Mi W to 0.3 Mi W of Piatt County Line | $27,451,603.00 | $30,501,782.00 |
Illinois | HB1K096 | Pavement reconstruction, bridge replacement and widening and lighting improvements on I-80 from IL 53 (Chicago St) to Roswell Ave | $42,357,942.00 | $47,064,381.00 |
Illinois | HJVN698 | RECONSTRUCTION | $22,747,966.79 | $28,650,326.24 |
Illinois | IH44562 | Reconstruction with drainage improvements on US 20 from Gear Street to Main Street in Galena | $36,229,402.16 | $36,254,516.16 |
Illinois | J7VU032 | Reconstruction of the Adams St and Jackson Blvd bridges over I-90/94, includes ramps, retaining walls, and lighting, in Chicago. | $44,058,083.00 | $49,005,558.00 |
Illinois | KC9D768 | Pavement reconstruction and bridge repairs on I-57 from Jefferson County Line to 0.7 Mi N of IL 161 | $59,134,655.78 | $75,411,353.25 |
Illinois | KENY416 | Bridge replacement, Bridge rehabilitations, Retaining walls, and lighting on The MLK ramps in East St. Louis. | $25,136,277.64 | $30,519,201.75 |
Illinois | KKGI625 | Bridge rehabilitation on I-180 over the Illinois River. | $23,949,112.50 | $26,610,125.00 |
Illinois | L3MU512 | Rehab of Reversible Lane Access Control System on I-90/94 at Foster Avenue and Lawrence Avenue to Ohio Street | $27,900,000.00 | $31,000,000.00 |
Illinois | LPYF801 | Interchange reconstruction and bridge replacement on I-80 at US 30 in the Village of New Lenox. | $48,712,788.00 | $54,158,984.00 |
Illinois | MAMH434 | Resurfacing and Bridge rehabilitation on I-55 from 0.8 mile N of IL 16 to 0.6 mile N of IL 108. | $33,822,128.00 | $37,580,141.00 |
Illinois | MID2911 | Interchange rehabilitation and reconstruction at I-57 and I-74 | $80,000,000.00 | $130,299,740.00 |
Illinois | N60V808 | Roadway reconstruction and bridge repairs on I-55 from 1.7 miles S of IL 116 to 0.6 mile N of IL 23 in Pontiac. | $39,452,582.65 | $43,850,609.42 |
Illinois | NI5S589 | NEW CONSTRUCTION, RECONSTRUCTION, NEW BRIDGE | $5,000,450.00 | $49,068,150.00 |
Illinois | NUW3186 | 43rd Street Pedestrian Bridge over Metra and South Lake Shore Drive | $29,600,000.00 | $37,000,000.00 |
Illinois | NWQA467 | Widening, resurfacing, lighting, and retaining walls on I-90 fron Cumberland Ave to Harlem Ave in Chicago. | $39,424,153.00 | $47,536,800.00 |
Illinois | PW2V306 | RECONSTRUCTION | $23,248,831.00 | $42,993,892.00 |
Illinois | R0J4100 | Concrete overlay, patching, deck replacement and expansion joints on I-55/I-64, Poplar Street Collector-Distributor ramps | $29,546,377.00 | $32,829,306.00 |
Illinois | RTYU738 | Resurfacing and bridge repairss at various locations on I-55 from S of Bus 55 to N of IL 10, west of Lincoln. | $23,153,391.70 | $25,895,986.00 |
Illinois | SBVK122 | Roadway reconstruction on IL 79 from 0.5 Mi E of IL 126 to W of Orchard Road W of Oswego | $37,000,000.00 | |
Illinois | TJQZ898 | 1.55 miles interchange reconstruction & additional lanes I-55 at Weber Road and 1.6 M recon Weber Road from Normantown Rd to Rodeo Dr. | $39,536,657.00 | $53,708,837.00 |
Illinois | TRTJ747 | Pump station reconstruction on I-290 at the DesPlaines River in the Village of Forrest Park. | $53,877,414.00 | $53,877,414.00 |
Illinois | UI98917 | Resurfacing and bridge rehabilitation on I-255 from IL 15 to collinsville Road in East St. Louis. | $66,666,043.00 | $74,073,382.00 |
Illinois | V02M043 | County Line Road, I-294 to North Avenue | $23,921,870.00 | $29,902,337.51 |
Illinois | VDCD210 | Interchange reconstruction and bridge replacement reconstruction on I-57 at I-74 Interchange | $124,739,991.00 | $138,599,992.00 |
Illinois | VQ14255 | Bridge replacement/rehabilitation, reconstruction, retaining walls at various locations on I-90/94 from SB taylor exit ramp to EB Taylo exit ramp. | $71,552,443.45 | $80,087,903.94 |
Illinois | W166112 | Designed overlay with pavement markings, drainage, ITS and landscaping improvements on I-55 from S of I-80 to S of Weber Road (NB) | $26,555,512.00 | $26,868,944.00 |
Illinois | W46U596 | Lakefront Bicycle Trail #3 over the Chicago River | $29,820,000.00 | $50,598,000.00 |
Illinois | W793945 | Roadway reconstruction and bridge replacement on US 20 from Simson Road to Rock River and S of Southrock Dr to S of US 20 in Rockford. | $22,196,891.00 | $27,819,048.00 |
Illinois | X5LE481 | NEW ROADWAY AND BRIDGE CONSTRUCTION | $32,000,000.00 | $45,000,000.00 |
Illinois | X8AF608 | RECONSTRUCTION OF FAU 3533 (FRANKLIN AVENUE) FROM RUNGE ST. TO MANNHEIM RD. | $22,511,723.00 | $28,146,404.00 |
Illinois | XBRG797 | Rubblization and overlay with culvert removal and replacement and bridge deck replacement on I-70 from 1 Mi E of I-57 Intchg to Cumberland County Line | $46,763,999.99 | $51,960,000.00 |
Illinois | XIL3358 | Standard Overlay, Resurfacing, Rest Area Improvements, Weigh Station Repairs, and Bridge Deck Sealing on I-57 from Kankakee Co Rd to Steger Rd | $41,843,831.40 | $46,722,371.00 |
Illinois | XPV5974 | Resurfacing and bridge rehabilitation on I-70 from W of Sugar Loaf Rd to the BNSF railroad. | $27,262,757.35 | $30,303,352.17 |
Illinois | Y4TH575 | Bridge rehabilitation on I-74/IL 29 (Murray Baker Bridge) over the Illinois River in Peoria. | $37,070,509.00 | $45,965,496.00 |
Illinois | YA23869 | Patching, resurfacing and bridge repairs on I-24 from Johnson County Line to Ohio River | $23,263,749.00 | $25,848,611.00 |
Illinois | YJLB572 | Removal and replacement of concrete bridge deck and resurfacing on I-280 from the Mississippi River Bridge to east of the IL 92 interchange | $30,593,481.00 | $52,818,817.00 |
Illinois | YQT9213 | Standard overlay resurfacing and various bridge repairs on I-70/ 270 from I-55 to 2.5 miles east of the I-55/70/270 interchange | $24,970,789.19 | $27,765,321.33 |
Illinois | YRP3905 | Bridge replacement on US 150 (McClugage Bridge) over the Illinois River in Peoria. | $144,184,306.00 | $181,823,828.00 |
Illinois | ZDW0068 | Standard overlay, Class A patching, drainage, ITS improvements and bridge deck sealing on I-57 from S of I-294 (Tri-State Tlwy) to IL 1 (Halstad St) | $32,566,997.00 | $36,195,552.00 |
Illinois | ZEC3030 | Widening, reconstruction, bridge replacement, and retaining walls on I-290/Congress Pkwy (Jane Byrne Intchg(EB ramp to I-90/94 (NB). | $38,506,218.67 | $43,080,093.71 |
Illinois | ZZKI017 | Lake Cook Road, Raupp Boulevard to Hasting Lane | $22,087,000.00 | $48,843,276.00 |
Indiana | 0194014 | US41, Bridge Replacement, Bridge over Cady March Ditch, 4.1 miles N of US 30 (Phase I), Lake County, R-25895 | $21,594,123.04 | $26,962,858.82 |
Indiana | 0200699 | I70, Added Travel Lanes, PCC, From 0.6 mi E of Post Road to 1.3 mi E of Mt Comfort Road, Marion County, IR-31104 | $34,223,142.42 | $34,589,503.25 |
Indiana | 0200903 | I65, Added Travel Lanes, From I-865 (formerly I-465 NW Connector) to 0.5 mile S of CR 100E (Phase I), Boone County, IR-30704 | $36,469,648.82 | $42,908,530.94 |
Indiana | 0201296 | PR265, New Road Construction, East End ORB - New I-265 Bridge (Parsons & Milestone Funds), Clark County, PLC-30335 | $270,999,078.17 | $507,260,007.49 |
Indiana | 0500430 | PR69, New Road Construction, Martinsville Segment, from S of Indian Creek via SR 37 to 1 mi N of SR44, Morgan County, R-33493 | $76,057,993.74 | $189,055,739.33 |
Indiana | 0500431 | PR69, Road Reconstruction (3R/4R Standards), Morgan Co from 1 mi N of SR44 via SR 37 to 1 mi N of Henderson Ford Rd. S-line, Morgan County, R-33541 | $28,215,286.84 | $46,583,000.61 |
Indiana | 0500432 | PR69, New Road Construction, Johnson Co Segment, From 1 mi S of SR144 to 0.5 mi N of Wicker Rd Contract 4, Johnson County, R-41542 | $21,012,292.66 | $170,022,452.59 |
Indiana | 0500440 | I69, New Road Construction, 0.5 mi N of SR 64 to Patoka River, Pike County, IR-33038 | $37,123,940.12 | $37,452,422.58 |
Indiana | 0500446 | PR69, New Road Construction, US 231 near Crane Naval Center to 4.1 mi N of US 231 (Taylor Ridge Rd) (D/B), Greene County, IR-33734 | $33,116,701.61 | $38,223,276.60 |
Indiana | 0500448 | PR69, New Road Construction, SR 45 to SR 54, Greene County, IR-33737 | $11,380,129.81 | $75,136,885.42 |
Indiana | 0500449 | PR69, New Road Construction, Carmichael Rd to Greene/Monroe County Line, Greene County, IR-33739 | $71,730,168.38 | $77,465,280.51 |
Indiana | 0500450 | PR69, New Road Construction, Harmony Rd to Branch of Clear Creek, Monroe County, IR-33741 | $54,684,211.17 | $72,257,057.17 |
Indiana | 0500597 | SR25, New Road Construction, From 0.1 mi E CR 750 E to 0.1 mi W of NS RR (Segment 1- Phase B), Montgomery County, SIR-30843 | $28,582,107.11 | $29,288,114.49 |
Indiana | 0500599 | SR25, New Road Construction, Fr 0.6 mi S of Main St to 0.21 mi E of relocated SR 218 (Segment 2 - Phase C), Carroll County, IR-30847 | $8,054,065.57 | $30,672,038.47 |
Indiana | 0500620 | SR25, New Road Construction, From 0.11 mi E of CR 100 W to 0.16 mi E of CR 500 S (Segment 3 -Phase B), Carroll County, IR-30850 | $20,244,464.61 | $26,629,356.93 |
Indiana | 0501212 | I65, Added Travel Lanes, From US 50 to SR 58, Bartholomew County, SR-28940 | $132,966,766.05 | $168,041,179.97 |
Indiana | 0600438 | US31, New Interchange Construction, Monon Trail to Greyhound Pass, Hamilton County, IR-30201 | $28,801,520.78 | $28,997,371.32 |
Indiana | 0624012 | SR45, Added Travel Lanes, HMA, From Kinser Pike to Pete Ellis Dr, Monroe County, IR-29982 | $30,946,861.95 | $33,270,286.93 |
Indiana | 0710056 | ST1037, New Road Construction, Reconstruction of 45th St. from 0.2 miles E of Calumet Avenue, Lake County, B-36229 | $22,363,368.96 | $28,943,443.52 |
Indiana | 0715010 | SR25, New Road Construction, From I-65 to 0.1 mi E of CR 750 E (Segment 1 - Phase A), Tippecanoe County, IR-30840 | $39,903,016.94 | $43,565,718.81 |
Indiana | 0715016 | SR25, New Road Construction, Fr 0.42 mi E of Tipp/Carroll CL to 0.15 mi E of US 421 (Segment 2 - Phase A ), Carroll County, IR-30845 | $20,339,064.15 | $25,397,580.20 |
Indiana | 0715017 | SR25, New Road Construction, From 0.61 mi E of CR 325 W to 0.21 mi E of CR 115 W (Segment 4 - Phase A), Cass County, IR-30853 | $25,596,771.04 | $26,798,400.59 |
Indiana | 0753025 | I64, New Br, Comp.Cont.Pres.Conc.Bulb T-Beam, NW ramp over Branch of N Fork Little Pigeon Creek, Spencer County, R-28507 | $27,822,132.40 | $33,824,485.09 |
Indiana | 0800272 | I65, Rest Area Modernization, I-65 Northern Rest Area- Kankakee Rest Area Replacement, Jasper County, R-33588 | $32,471,020.89 | $37,397,451.36 |
Indiana | 0819029 | US231, New Road Construction, From SR 26 to US 52 around the W side of W Lafayette, Tippecanoe County, IR-29161 | $13,734,205.99 | $33,674,949.65 |
Indiana | 0902199 | I65, HMA Overlay Minor Structural, SR-250 to US-50 Interchange (Seymour), Jackson County, R-33091 | $28,453,421.46 | $31,656,362.72 |
Indiana | 0902256 | US421, Replace Superstructure, Madison, IN (Replace truss superstructure), Jefferson County, IB-33023 | $57,659,783.12 | $59,276,757.92 |
Indiana | 0902297 | I65, Interchange Modification, I-465 and I-65 S of Indianapolis, Marion County, IR-33066 | $31,661,069.45 | $35,386,591.90 |
Indiana | 1006075 | PR69, New Road Construction, Branch of Clear Creek to SR 37, Monroe County, IR-33742 | $22,630,223.24 | $28,149,922.26 |
Indiana | 1172430 | I65, Added Travel Lanes, I-65 ATL from US 231 to US 30, Lake County, R-37450 | $8,132,512.42 | $34,968,477.08 |
Indiana | 1173374 | US50, New Road Construction, Continuation of North Vernon Bypass from SR 3 to US 50 East of the town, Jennings County, IR-34408 | $21,321,364.86 | $27,996,871.95 |
Indiana | 1296427 | US31, Added Travel Lanes, 96th Street to 146th, Hamilton County, IR-35600 | $91,066,893.08 | $104,995,459.46 |
Indiana | 1296429 | I469, Pavement Replacement, From 0.85 mi E of US 27 to 2.73 miles S of US 30., Allen County, R-35099 | $15,561,027.50 | $26,429,801.44 |
Indiana | 1297885 | PR69, New Road Construction, From S of Bloomington via SR37 corridor to SR39, Monroe County, PLC-37991 | $140,048,168.07 | $209,507,337.32 |
Indiana | 1298685 | US31, Added Travel Lanes, 169th to 203rd Street, Hamilton County, IR-35602 | $46,916,038.90 | $54,748,734.95 |
Indiana | 1382656 | I65, HMA Overlay Minor Structural, From 4.59 mi S of SR 28 to 3.44 mi S of SR 38, Clinton County, RS-36714 | $26,347,160.80 | $29,589,044.38 |
Indiana | 1383650 | I69, PCCP on PCC Pavement, From SR 18 to 5.59 miles N. of SR 18., Grant County, R-37704 | $29,215,120.14 | $33,176,259.09 |
Indiana | 1400034 | I465, Br Repl, Comp. Cont. Conc. Construction, EB over W 96th Street, 1.22 miles W US 421, Marion County, B-42569 | $28,569,885.36 | $34,709,085.21 |
Indiana | 1400597 | I65, Added Travel Lanes, 1.02 mi N of SR 60 to 2.8 mi S of SR 160 (.75 mi N of Memphis Rd), Clark County, R-37383 | $12,146,087.70 | $78,162,813.87 |
Indiana | 1592349 | SR37, New Interchange Construction, Intersection Improvement at 146th Street and SR 37, Hamilton County, R-39504 | $26,515,709.83 | $26,516,904.83 |
Indiana | 1592397 | I74, Road Reconstruction (3R/4R Standards), From 6.41 miles W of SR 229 (New Point) to SR 101, Ripley County, R-39226 | $55,284,477.34 | $61,877,914.76 |
Indiana | 1592426 | I69, Added Travel Lanes, From 0.8 miles N of SR 38 to 0.5 miles N of SR 9/SR 109, Madison County, R-39093 | $20,819,910.80 | $64,616,269.67 |
Indiana | 1592433 | I70, Road Rehabilitation (3R/4R Standards), From 0.8 mi W of SR 39 to 0.5 mi E of Ronald Reagan Pkwy, 2.40 mi E of SR 267, Hendricks County, R-38773 | $43,841,940.08 | $50,129,890.26 |
Indiana | 1592546 | I70, HMA Overlay, Preventive Maintenance, From 0.5 mi W of SR 3 to 0.47 mi W of SR 1, Wayne County, RS-39784 | $33,694,699.13 | $37,867,180.84 |
Indiana | 1600808 | I65, Interchange Modification, Multi-Level, I-65/70 N Jct. bounded by Vermont St, Central Ave and Commerce St, Marion County, B-36910 | $264,194,169.50 | $404,729,862.44 |
Indiana | 1700897 | I70, HMA Overlay Minor Structural, From 5.03 miles E of SR 9 to 0.24 mi E of SR 109 (Montgomery Creek), Henry County, R-40616 | $32,815,026.22 | $36,635,706.67 |
Indiana | 1702255 | I64, Bridge Rehabilitation Or Repair, Sherman Minton Bridge over Ohio River 3.95 miles W of I-65, Painting, MOT, Inter, Floyd County, B-40719 | $8,305,429.64 | $159,547,125.51 |
Indiana | 1801695 | PR69, New Road Construction, Marion Co Segment, 0.5 miles N of Wicker Rd via SR 37 to I-465, Marion County, R-41536 | $252,900,726.70 | $726,517,526.80 |
Indiana | 1801697 | PR69, New Road Construction, Morgan Co Segment 2, from 1 mi N of Henderson Ford Rd to 1 mi S of SR144, Johnson County, R-41542 | $26,592,503.01 | $100,871,616.37 |
Indiana | 1802075 | I465, Road Reconstruction (3R/4R Standards), Reconfiguration from I-70 to Mann Rd. & from US-31 to I-65, Marion County, R-41536 | $9,026,787.80 | $66,878,576.93 |
Indiana | 1901381 | PR69, Road Reconstruction (3R/4R Standards), Johnson Co Segment, From 1 mi S of SR144 to 0.5 mi N of Wicker Rd Contract 5, Morgan County, R-41536 | $41,829,351.51 | $57,958,461.25 |
Indiana | 1901383 | PR69, New Road Construction, Morgan/Johnson Co, from 1 mi N of SR44 via SR 37 to SR 144, S-Lines only Contrac, Morgan County, R-41542 | $16,388,024.48 | $66,125,815.25 |
Indiana | 1902139 | I70, Patch And Rehab Pavement, State Route 1 to the Ohio State Line, Wayne County, R-42555 | $23,708,319.14 | $26,570,048.32 |
Indiana | 2001172 | I65, Added Travel Lanes, 1.33 mi N of SR 25 to 0.8 mi N of SR 43, Tippecanoe County, R-42909 | $7,641,955.29 | $52,530,904.60 |
Indiana | 2652002 | PR265, New Road Construction, Section 6 ORB - R/W Alignment to I-265 Bridge (B&N; BLN), Clark County, PLC-30335 | $23,094,812.63 | $26,392,262.84 |
Indiana | 2911004 | PR641, New Road Construction, From 0.25 mile N of existing Feree Rd to approx 3.50 mi N of Riley Rd, (Ph IIIA), Vigo County, IR-30089 | $30,847,940.51 | $38,518,349.25 |
Indiana | 2911007 | SR 641, NEW ROAD CONSTRUCTION, FROM WOODSMALL RD TO 0.25 MILE N OF EXISTING FEREE RD, (PHASE IIB), VIGO COUNTY, R-28177 | $35,453,757.30 | $44,287,133.59 |
Indiana | 70BG020 | I-70, Added Travel Lanes, 2020 BUILD Grant I-70 Rehabilitation and Modernization, Hancock County, R-41501 | $94,080,688.51 | $161,962,452.84 |
Indiana | B282018 | US40, New Sign Installation, From Franklin Rd to Grassy Creek 1.66 miles W of Marion/Hancock County Line, Marion County, IR-29133 | $23,017,370.82 | $28,514,105.99 |
Indiana | CPIG121 | I-465, Interchange Modification, 2021 INFRA Grant Clear Path I-465, Marion County, R-38526 | $50,059,621.24 | $177,151,627.31 |
Indiana | I69S518 | PR69, New Road Construction, From S of Bloomington via SR37 corridor to SR39, Monroe County, PLC-37991 | $238,691,279.10 | $303,385,057.66 |
Indiana | N881008 | SR152, Lighting Installation / Maintenance, SR 152 bridge over CSX and IHB Railroad, 3.48 km N of I-80/94, Lake County, B-33357 | $20,658,013.39 | $25,628,589.85 |
Indiana | NCBG018 | I65, Added Travel Lanes, 2018 BUILD Grant I65 Added Travel Lanes Project in Boone County, R-41841 | $51,595,642.00 | $78,253,292.00 |
Indiana | SCBG018 | I65, Added Travel Lanes, 2018 BUILD Grant I65 Added Travel Lanes Project in Bartholomew County, R-41849 | $25,775,251.16 | $54,414,103.44 |
Indiana | WTBG019 | I65, Interchange Modification, 2019 BUILD Grant I65 Mobility and Access Project in Whitestown, Boone County, R-39231 | $36,445,145.60 | $67,452,009.68 |
Iowa | 0209183 | Dubuque County, from 0.2 miles east of Cottingham Road to 1.5 miles east of Swiss Valley Road - Pavement, Grade and New | $31,917,562.80 | $40,260,211.50 |
Iowa | 0293115 | Pottawattamie Co, I 29/80 in Council Bluffs, I 29 NB from N of US 275 to Ramp F/Ramp D Berm I 80 WB to W of S Expsswy - PCC Pavement, Grade & Replace | $36,248,994.15 | $42,472,378.99 |
Iowa | 0293141 | In Pottawattamie County & the city of Council Bluffs at The Nebraska Ave. Interchange - Portland Cement Concrete (PCC) Pavement | $26,297,329.61 | $30,803,653.00 |
Iowa | 0293171 | Pottawattamie County, in Council Bluffs, I-29 SB from Indian Creek Bridge to I-29 SB and I-80 EB - PCC Pavement, Grade and New | $36,984,931.73 | $43,307,882.59 |
Iowa | 0293190 | I-29 in Council Bluffs from N of UPRR to 0.9 mi. N of Ave. G & I-480 from E of Missouri River to I-29 in Pottawattamie County - PCC Pavement | $88,860,058.00 | $89,679,453.00 |
Iowa | 0295245 | Harrison County, I 29, 0.4 mi N of UP RR to 0.5 mi N of IA 127 (SBL) - PCC Pavement, Grade and Replace | $28,674,498.60 | $31,863,179.00 |
Iowa | 0297049 | In city of Sioux City, Downtown (NBL), Woodbury County - Portland Cement Concrete (PCC) Pavement - Grade and replace. | $27,468,787.58 | $33,004,143.43 |
Iowa | 0297050 | I 29, Woodbury County, in the city of Sioux City Downtown Median & SBL - Portland Cement Concrete (PCC) Pavement, Grade and new | $26,265,132.67 | $31,054,350.93 |
Iowa | 0306181 | Along U.S. 30 from West of Co Rd V44(16th Ave.) to 1 mi W of U.S. 218 (EB/WB) in Benton County - Portland Cement Concrete(PCC) Pavement & Grading | $30,722,619.20 | $38,604,915.00 |
Iowa | 0306191 | Tama County, US 30, Tama Bypass to W of IA 21 - PCC pavement, new | $23,681,348.00 | $29,816,927.00 |
Iowa | 0353195 | Along I-35 Northbound over I-80/I-235 Ramps in Polk County NE of the city of Des Moines - Bridge New - Steel Girder | $39,651,202.80 | $44,056,892.00 |
Iowa | 0694068 | Along U.S. 69 from I-80 to S of SW Springfield Dr./SE 33rd St in Polk County & the city of Ankeny. - PCC Pavement -Grade and New | $25,491,948.00 | $34,500,722.00 |
Iowa | 0741197 | Scott County, I 74 Approaches to Arch Bridge over the Mississippi River- Bridge Replacement, Steel Girder | $67,932,489.49 | $78,695,880.51 |
Iowa | 0741198 | Scott County Mississippi River Bridges between Bettendorf, IA and Moline, IL - Bridges replacement, other | $104,953,148.60 | $156,667,544.23 |
Iowa | 0741200 | EB I-74 and U.S. 67 Ramp C in Scott County & the city of Bettendorf. - Bridge Replacement | $30,522,259.02 | $34,575,525.00 |
Iowa | 0741206 | Scott County, I-74 from 12th Avenue in Moline to North of Lincoln Road in Bettendorf - Portland Cement Concrete (PCC) Pavement, Grade and Replace | $33,224,142.80 | $37,984,758.50 |
Iowa | 0801378 | Pottawattamie County, Eastbound I-80 (Viaduct) over Northbound I-29, Railroads and Harry Langdon Blvd - Bridge New, Steel Girder | $31,548,951.88 | $36,986,666.61 |
Iowa | 0801447 | Madison Ave Interchange (EB) in Pottawattamie County and the city of Council Bluffs - Portland Cement Concrete(PCC) Pavement - Grade and New | $38,874,173.00 | |
Iowa | 0803184 | Polk County, I 80, Douglas Ave to E of 100th St, includes IA 141 interchange in Urbandale - PCC Pavement, grades and new | $19,882,924.40 | $25,644,043.00 |
Iowa | 0806355 | Johnson County, EB I-80 to NB I-380 Ramp H over I-80, I-380 Ramps & EB I-80 to SB I-380 Ramp B over Ramp G - Bridge, Steel Girder | $25,634,154.40 | $32,042,693.00 |
Iowa | 0806371 | Johnson County, I-80/380/US218 interchange near Iowa City - Portland Cement Concrete (PCC) Pavement, Grade and Replace | $31,639,034.40 | $41,018,793.00 |
Iowa | 0806372 | Johnson County, I-80, I-80/380/US 218 Interchange near Iowa City - Portland Cement Concrete (PCC) Pavement - Grade and Replace | $86,809,516.00 | $108,511,895.00 |
Iowa | 0806488 | I-80/1st Ave Interchange in Johnson County and city of Coralville - PE/ROW/Portland Cement Concrete (PCC) Pavement - Grade and New/Bridge Replacement | $20,525,359.00 | $42,321,904.00 |
Iowa | 0807174 | Along I-80 Approx. 1.5 mi E of IA 1 to 0.5 mi E of Wapsi Ave (EB/WB) in Johnson County - Portland Cement Concrete (PCC) Pavement - Grade and Pave | $16,667,363.00 | $40,094,861.00 |
Iowa | 0977650 | TIGER IX: City of Burlington Downtown/Riverfront Revitalization Project in Des Moines County - PE/CE/PCC Pavement | $17,000,000.00 | $26,071,562.50 |
Iowa | 3715652 | Along Dubuque St. from Foster Rd. to Church St. & Along Park Rd. from Dubuque St. to Holt Ave. in Johnson County and Iowa City. - PCC Pavement | $7,617,603.74 | $42,985,293.00 |
Iowa | C077227 | In Polk County, on NE Broadway Avenue from IA Hwy 415 to US Hwy 6 - Hot-Mix Asphalt Pavement - Grade and Replace | $25,000,000.00 | $44,040,405.00 |
Iowa | PA26001 | In Polk County, Phase I Dam Modifications and User Access Project at Birdland Marina, Prospect Park, Harriet Access, and Scott Avenue sites - PCC Pave | $25,550,000.00 | $42,364,153.00 |
Kansas | 0702047 | I-70 Improvements in Gove County | $40,445,896.33 | $45,016,857.91 |
Kansas | 0706125 | Bridges for the Lewis & Clark Viaduct, Kansas City, KS | $67,660,627.30 | $75,575,195.52 |
Kansas | 2351200 | Roadway improvements in Sedgwick County | $57,346,130.75 | $69,954,845.10 |
Kansas | A100502 | US-166/US-400: Pittsburg Bypass, SE to the KS/MOSt Ln | $53,367,712.42 | $70,862,987.08 |
Kansas | A100702 | K-14 (K-96) Improvements in Reno County | $42,410,840.01 | $58,897,935.21 |
Kansas | A100703 | K-14(K-96): from RN/RC Co Ln, N to Jct K-96/RS-571 | $40,511,774.74 | $54,339,586.40 |
Kansas | A126606 | I-70 Polk/Quincy Viaduct: ROW/ Building Demolition | $1,752,056.54 | $25,012,046.37 |
Kansas | A155302 | Construct upgradable expressway in Bourbon County | $21,355,261.56 | $28,271,318.70 |
Kansas | A155402 | Construct upgradable expressway in Crawford County | $24,677,245.47 | $31,476,899.87 |
Kansas | A155403 | Road Improvements in Crawford County | $22,455,280.29 | $28,713,448.30 |
Kansas | A158601 | K-7 from K-7/US-160 Jct(Columbus), North to CK/CR Co Ln | $34,478,220.95 | $46,518,956.62 |
Kansas | A236801 | Grading and Surfacing on K-177 in Morris County | $33,746,372.01 | |
Kansas | A236901 | Grading and Surfacing on K-177 in Geary County | $36,155,855.52 | |
Kansas | A237003 | Grading and Surfacing on US-281 Russell County | $41,969,852.49 | |
Kansas | A237303 | DELAYED: Highway improvements on K-68 in Miami County | $17,255,806.41 | $28,002,514.55 |
Kansas | A238001 | Roadway reconstruction in Anderson County | $20,917,417.34 | $27,470,844.61 |
Kansas | A238201 | Reconstruct 4-Lane on US-54 in Sedgwick County | $63,107,486.92 | $87,854,521.68 |
Kansas | A238301 | Roadway reconstruction in Gray County | $45,569,385.53 | |
Kansas | A238401 | Construct 4-Lane expressway on US-50 in Ford County | $71,365,199.79 | |
Kansas | A238501 | Construct 4-Lane on US-54 in Seward County | $34,429,247.03 | |
Kansas | A238503 | Construct 4-Lane on US-54 in Seward County | $29,227,381.69 | $37,215,042.01 |
Kansas | A307901 | Bridges #104 & #105 on K-32 in Wyandotte County | $26,377,251.29 | |
Kansas | A323203 | SB I-135 and WB I-235 Fly Over Brg Option #2-Wichita | $48,909,100.23 | $57,110,567.54 |
Kansas | A323222 | I-235, I-135, K-254 & K-96 Intchg-Gold Project-Wichita | $38,100,000.00 | $132,930,000.00 |
Kansas | A325501 | Roadway reconstruction and bridges in Neosho County | $27,811,536.56 | $36,620,122.16 |
Kentucky | 0011038 | Fulton,Hickman,Graves | I-69 Corridor Improvement | $6,888,032.96 | $33,539,500.00 |
Kentucky | 0061061 | Mountain Parkway widening/safety improvements from MP 73.4, 1.1 mi west of Licking River Bridge to MP 75.3 Burning Fork Bridge. | $24,372,427.00 | $26,953,431.00 |
Kentucky | 0061066 | Wolfe County - Mountain Pkwy (INFRA) | $93,355,914.00 | $148,288,354.00 |
Kentucky | 0061072 | WOLFE, MORGAN, MAGOFFIN - KY 9009-RECONSTRUCT TO WIDEN THE MOUNTAIN PARKWAY TO 4 LANES | $98,306,579.90 | $98,306,579.90 |
Kentucky | 0061076 | Magoffin Co. | Mountain Parkway Corridor | $69,307,938.40 | $69,307,938.40 |
Kentucky | 0151078 | Perry County - KY 15 RECONSTRUCTION | $58,037,800.00 | $58,037,800.00 |
Kentucky | 0151086 | PERRY CO., KY 15 - IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUES | $48,205,200.00 | $48,205,200.00 |
Kentucky | 0241090 | Reconstruct I-24/Purchase Parkway Interchange (I-69 Corridor Improvement). | $42,648,486.00 | $42,648,486.00 |
Kentucky | 0242075 | Lyon-Caldwell-Trigg | I-24 Resurfacing & Rehab | $31,723,650.00 | $31,723,650.00 |
Kentucky | 0243057 | Christian Co. | I-24 Pavement Rehab | $25,684,000.00 | $25,684,000.00 |
Kentucky | 0302025 | Owsley-Jackson | KY 30 Reconstruction | $66,462,915.10 | $66,462,915.10 |
Kentucky | 0302026 | Lee-Owsley Co. | KY 11 Reconstruction | $21,164,000.00 | $26,455,000.00 |
Kentucky | 0311034 | Jefferson- Dixie Highway TIGER project | $24,690,000.00 | $37,921,970.50 |
Kentucky | 0411026 | Christian & Hopkins Cos. | Remove & Replace concrete pavement on Pennyrile Pkwy | $55,264,110.00 | $55,264,110.00 |
Kentucky | 0601196 | Livingston Co. | US 60 over Cumberland River Bridge Replacement | $56,342,464.00 | $70,340,580.00 |
Kentucky | 0643058 | Franklin Co. | I-64 Bridges | $26,615,160.00 | $33,268,950.00 |
Kentucky | 0649009 | Jefferson Co. | I-64 Sherman Minton Bridge Maintence | $77,264,791.00 | $85,285,441.00 |
Kentucky | 0654041 | Hardin Co. | I-65/KY222 Interchange at Glendale | $19,520,000.00 | $46,934,160.00 |
Kentucky | 0654048 | Widen I-65 to 6 lanes from 0.6 mi north of Old Sonora Road to the Western Kentucky Parkway. | $75,446,855.00 | $75,446,855.00 |
Kentucky | 0655120 | Bullitt Co- Construct new I-65 interchange | $27,707,722.20 | $27,707,722.20 |
Kentucky | 0659023 | Louisville/Southern Indiana Ohio River Br "Downtown Crossing" general project mgmt/oversight including construction eng inspection | $85,060,407.86 | $85,060,407.86 |
Kentucky | 0659024 | Jefferson - Construct the Downtown Ohio River Crossing and associated roadway approaches in Louisville and Jeffersonville, Indiana"Design-Buil | $72,863,423.14 | $72,863,423.14 |
Kentucky | 0659025 | Jefferson - Construct the Downtown Ohio River Crossing & associated roadway approaches in Louisville & Jeffersonville, Indiana "Design-Build". | $219,382,945.17 | $309,155,689.10 |
Kentucky | 0752059 | Laurel Co. | I-75 Widening | $81,442,056.71 | $82,255,095.15 |
Kentucky | 0752095 | ROCKCASTLE CO., I-75 - WIDEN I-75 TO 6 LANES | $45,475,091.09 | $45,970,900.00 |
Kentucky | 0752098 | ROCKCASTLE CO., I-75 - WIDEN I-75 TO 6 LANES | $44,968,600.00 | $44,968,600.00 |
Kentucky | 0752100 | Laurel Co; widen I-75 to 6 lanes | $60,403,800.00 | $60,403,800.00 |
Kentucky | 0753092 | Rockcastle County I-75 Widening | $36,577,240.14 | $36,653,340.14 |
Kentucky | 0754065 | Fayette Co. | I-75 Improvements | Section 2 | $14,000,000.00 | $45,744,600.00 |
Kentucky | 0757144 | Boone Co. | I-71/75 INFRA Project | $146,598,062.39 | $193,585,628.00 |
Kentucky | 0758107 | Kenton Co. | Brent Spence Bridge Maintenance | $31,550,024.00 | $39,437,530.00 |
Kentucky | 0801098 | Trigg | Marshall - Construct a bridge and approaches on US 68/KY 80 over Kentucky Lake. | $72,117,599.97 | $192,397,360.20 |
Kentucky | 0801101 | Trigg - Construct a bridge and approaches on US 68/KY 80 over Lake Barkley. | $89,080,443.83 | $201,235,582.00 |
Kentucky | 0801104 | Trigg County - Aurora-Cadiz Road: Reconstruct (US 68) | $31,328,123.00 | $31,328,123.00 |
Kentucky | 0806044 | Pike Co., US 460 - Construct twin bridges on relocated US 460 at Pond Creek. | $29,624,550.00 | $29,624,550.00 |
Kentucky | 0806047 | Pike County | US 460 | $70,993,658.26 | $78,687,600.00 |
Kentucky | 0902008 | Whitley Co. | US 25W BUILD Grant Project | $15,050,000.00 | $41,281,000.00 |
Kentucky | 1271120 | RUSSELL CO, US 127 - RELOCATE US 127 FROM THE NORTH BANK OF THE CUMBERLAND RIVER TO THE JAMESTOWN BYPASS. | $38,749,477.80 | $38,749,477.80 |
Kentucky | 1271122 | Russell-Clinton- Relocation of US 127 | $34,568,612.00 | $117,644,675.00 |
Kentucky | 2653043 | Jefferson & Oldham Cos. | I-MOVE KY Design-Build | $113,829,084.68 | $189,000,000.00 |
Kentucky | 2681033 | FAYETTE CO., KY 4 - WIDEN NEW CIRCLE ROAD | $46,019,590.00 | $46,019,590.00 |
Kentucky | 2759135 | Boone Co. | I-275/Graves Rd XCHNG | Design-Build | $74,760,935.00 | $75,300,935.00 |
Kentucky | 2759136 | Kenton Co; address pavement condition on pcc pavement on I-275 | $34,471,030.00 | $34,471,030.00 |
Kentucky | 3020007 | Henderson - I-69 Bridge over Ohio River | $63,420,000.00 | $234,270,000.00 |
Kentucky | 4601053 | Bourbon Co. | US 460 Reconstruction (BUILD GRANT) | $11,200,000.00 | $25,017,175.00 |
Kentucky | 4611009 | Pulaski Co | KY 461 | BUILD Grant | $57,928,400.00 | $66,910,500.00 |
Kentucky | 5053031 | Henderson Co.- US 60 Bridge over Green River | $36,687,527.40 | $36,687,527.40 |
Kentucky | 5211123 | Boyd Co. | US 60 Improvements | $10,000,000.00 | $50,320,050.00 |
Kentucky | 5225005 | Boone Co. - KY 536-reconstruct to a 5-lane urban section | $29,121,600.00 | $29,216,400.00 |
Kentucky | 5283007 | Madison County - KY 52 | $15,531,517.60 | $35,657,700.00 |
Kentucky | 6000167 | Bridging KY Design-Build No.1 | $67,189,515.71 | $105,878,911.11 |
Kentucky | 6000205 | Jefferson-Oldham Co. | KY 3084 Extension | $27,600,665.00 | |
Kentucky | 6411039 | Calloway Co. BUILD | Improvements along US 641 | $29,300,000.00 | $55,369,152.75 |
Kentucky | 8200014 | Boone: Reconstruct & widen KY237 from Rogers Ln to KY18 - Grade, drain & surface | $24,928,420.00 | $25,088,420.00 |
Kentucky | 8200017 | Boone Co; Reconstruct and widen KY 237 | $26,085,420.00 | $26,085,420.00 |
Louisiana | 0021023 | I-49, I-49 NORTH (LA 2 TO MIRA-MYRTIS ROAD), LOCATED ON RT. I-49 FROM ITS JCT. WITH RT. LA 2, ITS JCT. WITH MIRA-M (CONSTR.-DEMO) | $21,103,197.84 | $25,954,547.24 |
Louisiana | 0806504 | BOSSIER PARISH CONGESTION RELIEF NORTH/SOUTH CORRIDOR, SWAN LAKE ROAD | $20,092,181.21 | $26,267,706.27 |
Louisiana | 0905504 | I-49 NORTH; (Mira-Myrtis Road - LA 168), New Construction Roadway (STIMULUS) | $33,480,197.85 | $33,714,740.31 |
Louisiana | 3621010 | US 190, US 190 Widening (LA 22 to Little Bayou Castine), LOC On Route US 190 From ITS Intersection with Route LA 22, Bayou Castine | $25,610,272.70 | $32,093,340.90 |
Louisiana | 3806500 | REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE | $79,495,534.86 | $222,814,244.31 |
Louisiana | 4507502 | I-310 MISSISSIPPI RIVER BRIDGE (LULING) CABLE STAY REPLACEMENT, LOCATED ON RT. 1-310 OVER MISS. RIVER BRIDGE (CONSTR.-BR) | $46,673,786.82 | $58,342,233.53 |
Louisiana | 5109501 | US 90 INTERCHANGE US 90 @ LA 318 (US 90 @ LA 318) | $18,456,617.51 | $77,473,132.89 |
Louisiana | H000343 | US 190; BEG LOG MILE 0.000 END LOG MILE 1.110; MISSISSIPPI RIVER BRIDGE CLEAN, PAINT & REPAIR PHASE 1 | $76,006,304.76 | $117,405,259.54 |
Louisiana | H000428 | ROUTE LA 12 | $25,155,095.91 | $31,443,869.91 |
Louisiana | H000665 | MISSOURRI PACIFIC RAILROAD OVERPASS NEAR BONITA, END. BEG LOG MI 9.061,END LOG MI 9.35 | $4,780,104.28 | $36,222,121.43 |
Louisiana | H001120 | ROUTE LA 8; EARTHWORK, GRADING ASPHALTIC CONCRETE DRAINAGE STRUCTURES | $36,529,210.38 | $45,661,512.99 |
Louisiana | H001234 | LA 1: PORT ALLEN CANAL BR REPL (PH1)(HBI) | $55,702,106.32 | $89,470,782.59 |
Louisiana | H001263 | LA 1 AT JCT LA 107 & JCT 1189; BEG. LOG. MILE 7.290 END LOG MILE 10.480 | $23,057,271.25 | $28,821,589.24 |
Louisiana | H001340 | LA 21 WIDENING; BEG LOG MILE 5.00 END LOG MILE 6.000; LA 1085-11TH; CONSTRUCT NEW 2 LANE BRIDGE | $23,356,991.88 | $29,146,262.78 |
Louisiana | H001344 | US 190: LA 437 - US 190 BUS (PH 1) | $19,480,734.65 | $42,685,014.78 |
Louisiana | H001498 | LA 24 DISTRICT 02 TERREBONNE PARISH BEG. LOG MILE 1.000 END LOG MILE 1.403 BRIDGE REPLACEMENT | $32,897,151.78 | $41,121,433.68 |
Louisiana | H002370 | LA 42: US 61 - LA 44; | $30,208,153.39 | $59,721,751.71 |
Louisiana | H002375 | AMITE R.BR. NEAR FRENCH SETTLEMENT; BEG: 700' BEFORE BRIDGE BEGIN; END: 700' AFTER BRIDGE END | $21,290,578.34 | $26,613,223.02 |
Louisiana | H002424 | LA 70: SUNSHINE BRIDGE - LA 22 | $40,574,264.57 | |
Louisiana | H002622 | ROUTE LA 616; ARKANSAS ROAD: (CALDWELL ROAD - LA 143) | $66,362,837.62 | $83,033,587.02 |
Louisiana | H002868 | I-49 S:AMB CAFFERY/US90 INTERCHANGE | $21,963,334.71 | $177,780,739.75 |
Louisiana | H002980 | I-10; REPLACE BRIDGE BEG. LOG MILE 0.570 END LOG MILE 0.970 | $18,356,328.45 | $98,064,722.72 |
Louisiana | H003003 | I-10: E. JCT I-49 TO LA 328; BEG: E. JCT I-49; END: LA 328 | $144,459,835.19 | $187,810,332.15 |
Louisiana | H003014 | I-10: CSLM 5.50 TO ATCHAFALAYA FLDWY BR; BEG: ST MARTIN PARISH LINE; END: W. END OF ATCHAFALAYA FLOODWAY BRIDGE | $69,589,657.87 | $88,354,253.69 |
Louisiana | H003047 | PECUE LANE/I-10 INTERCHANGE | $44,087,666.45 | $67,387,325.55 |
Louisiana | H003184 | I-10: TEXAS STATE LINE-E. OF COONE GULLY | $57,629,802.32 | $195,226,781.70 |
Louisiana | H003298 | I-20; BEG LOG MILE 9.900 END LOG MILE 13.300; CONCRETE WORK RELATED TO BUILDING NEW INTERCHANGE | $10,967,578.86 | $30,245,447.05 |
Louisiana | H003370 | I-220/1-20 INTERCHANGE IMP & BAFB ACCESS | $32,033,394.27 | $113,713,613.56 |
Louisiana | H003495 | I-49 NORTH ( I-220 TO MARTIN LUTHER KING DRIVE) BEG. LOG MILE 0.000 END LOG MILE 1.024 | $21,210,200.00 | $62,623,421.89 |
Louisiana | H003496 | I-49 North: Martin Luther King, Jr. Drive (LA 3194) - LA 1; New Roadway Construction, New Interstate | $740,360.85 | $66,259,721.07 |
Louisiana | H004100 | I-10; LA 415 TO ESSEN ON I-10 AND I-12 | $89,618,573.13 | $151,827,703.81 |
Louisiana | H004113 | LA 3241: LA 435 TO LA 40/LA 41(BUSH) | $17,251,187.69 | $71,363,172.82 |
Louisiana | H004435 | LA 3241: LA 36 TO LA 435 | $18,656,216.88 | $98,025,922.15 |
Louisiana | H005967 | Nelson Road, Extension of Nelson Road to Contraband Bayou, New Bridge over bayou for access to Port of Lake Charles | $18,678,081.15 | $94,372,252.58 |
Louisiana | H006196 | WISNER BLVD BRIDGE REPLACEMENT; BEG: EXIST. STRUCTURE: 24'W X 1423'L | $20,405,355.66 | $25,563,088.19 |
Louisiana | H008145 | LA 1: LEEVILLE TO GOLDEN MEADOW (PHASE 2) | $160,340,895.00 | $580,213,957.08 |
Louisiana | H009250 | I-10; HIGHLAND ROAD TO LA 73; WIDEN I-10 FROM 4 TO 6 LANES TOWARDS THE MEDIAN SIDE | $85,204,847.29 | $98,140,121.15 |
Louisiana | H009461 | I-10 ATCHAFALAYA FLDWY CLEAN & PAINT; | $25,727,590.45 | $28,586,211.63 |
Louisiana | H009479 | ROUTE LA 1; BEG LOG MILE 2.780 END LOG MILE 3.780; STRUCTURAL REPAIRS CLEANING AND PAINTING OF VERTICAL LIFT BRIDGE | $28,349,154.11 | $35,436,442.65 |
Louisiana | H009498 | LA 121: CALCASIEU RIVER BRIDGE | $10,220,238.83 | $29,883,001.74 |
Louisiana | H009620 | I-10:WEST OF LA 108 TO 1-210 INTERCHANG | $46,265,373.42 | $55,664,324.69 |
Louisiana | H010016 | US 11: LAKE PONTCHARTRAIN BRIDGE REHAB | $17,826,964.41 | $30,639,996.61 |
Louisiana | H010018 | I-10: NO EAST DRAIN CANAL BRIDGE REPLACE | $28,912,673.03 | $36,140,841.29 |
Louisiana | H010037 | NEW FERRY BOAT / CAMERON FERRY CROSSING | $53,643,844.31 | |
Louisiana | H010601 | I-10: LA 328 to LA 347 | $96,053,949.97 | $115,455,732.66 |
Louisiana | H010620 | US 90: ALBERTSON'S PKWY TO AMB. CAFFERY; Scope: 6 lane facility from Albertson's Pkwy to Amb. Caff. and frontage road construction | $87,136,141.18 | |
Louisiana | H010673 | US90Z : HARVEY CANAL TUNNEL REHABILITATION | $36,596,426.25 | $46,938,452.96 |
Louisiana | H010916 | PRIEN LAKE MAIN SPAN RE-DECKING (DDIR LA2020-01 I-210: C.S. 450-30: LM 1.02 - 4.00) | $45,151,128.74 | $53,931,489.33 |
Louisiana | H010960 | LA 30 ROUNDABOUTS @ TANGER MALL & I-10 | $9,700,571.04 | $32,641,935.50 |
Louisiana | H011111 | I-49 NORTH, SEGMENT K - PHASE 2; SCOPE: Construction of new roadway, including bridges for I-49 North, between I-220 and MLK Dr | $62,322,149.21 | $159,098,953.06 |
Louisiana | H011152 | I-12: US 190 TO LA 59; ROADWAY WIDENING AND OVERLAY | $61,167,429.78 | $74,033,563.09 |
Louisiana | H011487 | LA 182: BERWICK BAY BRIDGE REHAB (HBI) | $32,563,671.53 | $40,704,589.41 |
Louisiana | H011670 | I-10 / LOYOLA INTERCHANGE IMPROVEMENT | $41,574,987.39 | $213,649,660.08 |
Louisiana | H011705 | US 11: LAKE PONTCHARTRAIN BR. REHAB PH 2 | $34,240,968.79 | $42,863,074.44 |
Louisiana | H011915 | AIRPORT CONNECTOR ROAD AND BRIDGE | $17,528,716.80 | $31,022,192.07 |
Louisiana | H011965 | LA 47: IWGO BRIDGE REHABILITATION (HBI) | $48,383,124.75 | $60,544,781.01 |
Louisiana | H012174 | I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR) | $54,869,418.84 | $60,027,936.88 |
Louisiana | H012588 | I-10: ATCH BASIN BR - W BATON ROUGE P/L | $22,871,209.33 | $25,412,454.81 |
Louisiana | H012739 | I-20 MRB AT VICKSBURG OVERLAY AND REHAB | $36,588,225.38 | $40,808,548.27 |
Louisiana | H012889 | I-20 REHAB (W OF LA 3 TO AIRLINE DR) | $2,822,763.45 | $73,528,958.75 |
Louisiana | H013245 | MOTORIST ASSISTANCE PATROL (MAP) | $22,518,245.86 | $28,147,807.33 |
Louisiana | H013265 | US 90: LA 14 - LA 83 | $24,419,663.03 | $37,444,172.38 |
Louisiana | H013842 | CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1A | $20,286,305.98 | $72,034,194.58 |
Louisiana | H013866 | I-12: LA 21 TO US 190 | $54,643,306.51 | $68,304,133.12 |
Louisiana | H013897 | I-10 & I-12 COLLEGE DR FLYOVER RAMP | $11,371,905.00 | $70,898,611.98 |
Maine | 1015200 | Kittery, US 1, Memorial Bridge #2546, Bridge Replacement | $29,634,207.97 | $37,042,759.96 |
Maine | 1671000 | Kittery-Portsmouth, SML BR #3641 | $37,500,410.37 | $201,902,608.02 |
Maine | 1673100 | Falmouth - Portland, Route 1 Martin Point Br. # 2515, Bridge Replacement. Design-Build | $20,792,363.04 | $26,016,452.70 |
Maine | 1728001 | Western Maine Gateway BUILD Grant Bundle | $11,027,500.00 | $28,775,656.54 |
Maine | 1891500 | Brewer-Eddington, I-395/9 Connector & Brewer, Wilston Street/I-395 Bridge #1564 | $33,899,051.94 | $72,774,000.00 |
Maine | 1919700 | Bar Harbor, Route 3 | $7,207,488.48 | $25,534,824.47 |
Maine | 1927000 | Kittery- Portsmouth, I95, Piscataqua River Bridge #6330, I-95 | $2,412,000.00 | $42,227,372.75 |
Maine | 2173600 | Madawaska,Bridge Ave. International Br #2399 | $45,302,647.86 | $92,910,405.68 |
Maine | 2189401 | 2020 INFRA FRAME Project Bundle | $35,947,089.17 | |
Maine | 2262600 | BEALS-JONESPORT, Beals Island Bridge #5500 on the Beals/Jonesport town line, Bridge Replacement | $15,691,451.77 | $28,224,010.87 |
Maine | 2262701 | TIGER Penquis Bridge Replacement Bundle | $15,990,795.00 | $30,345,588.75 |
Maine | 2309401 | 2020 BUILD Grant Bundle, Bridging the Economy of Rural Maine (BERM) | $21,745,322.17 | $38,849,144.02 |
Maine | 2313800 | Waterville, Ticonic Bridge (#2854) | $26,308,000.00 | $48,418,000.00 |
Maine | 2392900 | Woolwich, Station 46 Bridge #3039 & U.S. Route 1 Safety Improvements BUILD grant | $25,000,000.00 | $32,520,000.00 |
Maryland | 0003801 | Latex Modified Concrete Overlays on Ten (10) Bridges in the I-95/I-695 Interchange South of Baltimore | $4,000,000.00 | $29,621,902.59 |
Maryland | 0701265 | Dual Bridges No. 21118 on I-70 over MD 65 and Dual Bridges No. 21119 on I-70 over CSX Transportation | $23,020,635.97 | $28,184,837.79 |
Maryland | 0811071 | I-81 from South of US Rte. 11 in W. VA to North of MD Rte. 68/63 in MD | $58,570,618.55 | $103,986,850.56 |
Maryland | 0832228 | Replacement of Dual Bridges No. 0306201 and 0306202 on I-83 over Padonia Road and Extension of Box Culvert No. 03392X0 Carrying Branch of Beaver Run | $21,848,389.35 | $25,254,468.78 |
Maryland | 0951514 | Replacement of Dual Bridge Nos. 1616005 and 1616006 on I-95/I-495 (Capital Beltway) over Suitland Parkway | $35,645,374.67 | $38,124,718.33 |
Maryland | 0951517 | I-95 Interchange at Belvidere Road | $20,000,000.00 | $64,414,000.00 |
Maryland | 0952270 | Replacement of Dual Bridge Nos. 1615305 and 1615306 on I-95/I-495 (Capital Beltway) over MD 214 | $28,620,256.52 | $30,567,590.27 |
Maryland | 1111029 | Replacement of Three Bridges over MD 295 - Waterview Avenue, Annapolis Road and Maisel Street Pedestrian Bridge | $24,000,000.00 | $40,680,173.14 |
Maryland | 1181069 | MD 32 from Linden Church Road to I-70 | $80,815,701.03 | $101,579,523.90 |
Maryland | 1211032 | MD 261: Replacement of Bridge No. 04011 on MD 261 (Bayside Rd.) over Fishing Creek - Constr. | $17,668,542.43 | $26,457,499.41 |
Maryland | 1211033 | MD 5 (Branch Ave.) Phase 2 from Auth Way to South of I-495/I-95 and Construct an Access Road to the Branch Ave. Metro Station. | $31,589,417.80 | $43,079,096.02 |
Maryland | 1211035 | MD 5 at Brandywine Road and MD 373 Interchange Phase 2 - Constr. | $29,880,171.02 | $46,674,749.28 |
Maryland | 1251066 | US 40 (Pulaski Highway) Dual Steel Beam Br. Nos. 0303503 & 0303504 over Gunpowder Falls & Br. Nos. 0303403 & 0303404 over Little Gunpowder Falls | $21,364,858.28 | $27,172,933.22 |
Maryland | 1553001 | MD 331: Steel and Prestressed Concrete Girder Bridge# 2003400 on MD 331 (Dover Rd) over Choptank River. (Constr.) | $47,592,217.54 | $55,874,789.97 |
Maryland | 2031003 | US 219 from I 68 to Old Salisbury Road | $60,210,141.59 | $60,539,764.53 |
Maryland | 2441026 | Edmondson Avenue over Gwynns Falls and CSXT - Bridge Replacement - Construction | $48,311,494.00 | $48,311,494.00 |
Maryland | 2471012 | MD 355 Underpass (BRAC Project): South of Jones Bridge Road/Center Drive to North of South Wood Drive/South Drive - Construction | $24,776,950.00 | $93,374,722.70 |
Maryland | 2511076 | US 1 – College Avenue/Regents Drive to MD 193 (University Blvd.) | $17,153,607.44 | $37,552,661.98 |
Maryland | 2511078 | US 1 (Washington Boulevard) Bridge No. 0300800 over CSX Railroad | $27,912,773.05 | $31,227,778.58 |
Maryland | 2591083 | MD 4 (Pennsylvania Avenue) at Suitland Parkway | $36,351,519.63 | $89,943,542.23 |
Maryland | 2631022 | MD 210 (Indian Head Highway): Livingston Road/ Kerby Hill Road - Interchange Constr. Design-Build (Construction) | $83,089,924.99 | $105,871,668.33 |
Maryland | 3001053 | MD 404 (Shore Highway): From US 50 to East of Holly Road | $102,146,855.16 | $135,111,195.45 |
Maryland | 3034016 | Replacement of 3 bridges in the MD 151 (Sparrows Point Blvd) / MD 151B (Wharf Rd) Interchange | $25,852,783.53 | $25,870,285.59 |
Maryland | 3049003 | Dundalk Avenue Streetscape from Eastern Avenue to Baltimore City Line | $15,279,424.28 | $25,249,336.48 |
Maryland | 3057004 | Rehabilitation of Central Avenue and Storm Drain from Eastern Ave. to North of Madison Street | $26,131,127.80 | $33,746,316.51 |
Maryland | 3057006 | Central Avenue Streetscape and Harbor Point Connector Bridge (Design Build) - Construction | $45,150,054.22 | $55,852,126.25 |
Maryland | 3071005 | North Charles Street Reconstruction from 25th Street to University Parkway | $18,878,650.24 | $27,260,052.00 |
Maryland | 3271037 | US 113 (Worcester Hwy) from North of Massey Branch to Five Mile Branch Road - Dualization (Construction - Design Build) | $37,219,782.24 | $44,017,605.00 |
Maryland | 3271039 | US 113 (Worcester Highway): From North of MD 365 to North of Five Mile Branch Road | $63,777,290.04 | $63,777,290.04 |
Maryland | 3617019 | MD 175 (Annapolis Road): From West of Reece Road to East of Disney Road | $21,256,601.07 | $26,081,908.48 |
Maryland | 3617020 | MD 175 from National Business Parkway to McCarron Court | $15,294,311.54 | $48,393,462.35 |
Maryland | 6956371 | I-695 IL over Benson Ave/Leeds Ave/US 1/AMTRAK/Herbert Run - Replace Bridge Nos. 0311305 & 0311405/Realignment of Ramp 8 Br.(Con.) | $41,961,288.42 | $46,566,383.00 |
Maryland | 6956376 | I-695 OL (Baltimore Beltway): From South of US 40 to MD 144 - Multi-lane Reconstruct (Construction) | $70,366,514.63 | $99,360,361.07 |
Maryland | 6956385 | I-695 Baltimore Beltway from I-70 to MD 43 Transportation Systems Management and Operations | $84,191,605.60 | $167,755,099.70 |
Maryland | 7816001 | MD 85 (Buckeystown Pike): From South of District 7 Office to North of Spectrum Drive at I-270 (Phase 1) | $60,424,575.77 | $75,391,033.09 |
Maryland | ICC1001 | MD 200: from I 270 to US 1 Inter-County Connector ICC Construction. | $953,612,187.90 | $2,330,518,244.46 |
Massachusetts | 001S977 | BOSTON- BRIDGE REHABILITATION, B-16-029, ROUTE 99 (ALFORD STREET) OVER MYSTIC RIVER | $48,952,697.40 | $61,291,671.75 |
Massachusetts | 002S318 | SHREWSBURY- WORCESTER- BRIDGE REHABILITATION, S-14-001=W-44-018, STATE ROUTE 9 (BELMONT STREET) OVER LAKE QUINSIGAMOND (AKA - KENNETH F. BURNS BRIDGE | $42,379,441.39 | $116,121,177.17 |
Massachusetts | 002S372 | QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON STREET) OVER THE FORE RIVER | $100,632,987.90 | $290,959,615.99 |
Massachusetts | 002S386 | BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE) (AKA - LONGFEL | $114,476,399.47 | $337,781,419.68 |
Massachusetts | 002S421 | AMESBURY- NEWBURYPORT- SALISBURY- BRIDGE REPLACEMENT ON ROUTE I-95, A-07-016=N-11-007, OVER MERRIMACK RIVER (WHITTIER BRIDGE) & A-07-017 OVER EVANS P | $106,949,743.43 | $345,599,248.01 |
Massachusetts | 002S425 | FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS | $130,483,195.64 | $278,751,904.97 |
Massachusetts | 002S748 | BEVERLY- RECONSTRUCTION & SIGNAL IMPROVEMENTS ON ROUTE 1A (RANTOUL STREET & CABOT STREET), FROM CABOT STREET (SOUTH) TO 440 FEET NORTH OF BLAINE AVEN | $22,083,688.07 | $28,530,310.45 |
Massachusetts | 002S760 | EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12-004=M-12-018 OVER THE MALDEN RIVER (WOODS MEMORIAL BRIDGE) & M-12-017 OV | $22,763,137.34 | $86,546,471.18 |
Massachusetts | 002S797 | CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET. | $57,269,890.66 | $70,809,808.53 |
Massachusetts | 002S937 | WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INC | $69,198,829.98 | $89,371,564.04 |
Massachusetts | 002S969 | BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) | $33,776,618.42 | $43,143,038.53 |
Massachusetts | 002S991 | HANOVER- NORWELL- BRIDGE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER HIGH STREET | $32,757,346.89 | $41,518,695.79 |
Massachusetts | 0032020 | HADLEY- RECONSTRUCTION ON ROUTE 9, FROM MIDDLE STREET TO MAPLE/SOUTH MAPLE STREET | $10,205,568.98 | $33,929,004.35 |
Massachusetts | 0032022 | WEST SPRINGFIELD- RECONSTRUCTION OF MEMORIAL AVENUE (ROUTE 147), FROM COLONY ROAD TO THE MEMORIAL AVENUE ROTARY (1.4 MILES) | $2,148,892.59 | $33,403,159.79 |
Massachusetts | 0034007 | EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET | $23,626,416.58 | $39,929,034.73 |
Massachusetts | 0034012 | WOBURN- BRIDGE REPLACEMENT, W-43-017, NEW BOSTON STREET OVER MBTA | $23,285,066.48 | $29,168,301.10 |
Massachusetts | 0035003 | WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER | $20,504,631.49 | $26,023,774.36 |
Massachusetts | 0035043 | BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD | $23,214,527.43 | $31,499,191.33 |
Massachusetts | 0036009 | NEEDHAM- NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO ROUTE 9 (NEWTON | $28,632,126.92 | $34,473,238.80 |
Massachusetts | 0036012 | BOSTON- SUPERSTRUCTURE REPLACEMENT, B-16-067 (3GV), MAFFA WAY & B-16-068=S-17-027 (3GW), MYSTIC AVENUE OVER ORANGE & MBTA/BMRR | $52,026,806.09 | $65,930,108.61 |
Massachusetts | 0036278 | BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD | $25,410,209.78 | $32,068,747.22 |
Massachusetts | 003S054 | BOSTON- BRIDGE REPLACEMENT, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR | $154,511,304.04 | $211,876,058.31 |
Massachusetts | 003S070 | AGAWAM- WEST SPRINGFIELD- BRIDGE REPLACEMENT, A-05-002=W-21-014, ROUTE 147 OVER THE WESTFIELD RIVER & INTERSECTION & SIGNAL IMPROVEMENTS @ 3 LOCATION | $21,718,892.61 | $28,384,361.14 |
Massachusetts | 003S103 | DANVERS- BRIDGE REPLACEMENT, D-03-018, ST 128 OVER WATERS RIVER | $20,409,854.68 | $25,852,223.18 |
Massachusetts | 003S113 | HAVERHILL- BRIDGE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER MERRIMACK RIVER | $84,819,896.64 | $107,311,915.85 |
Massachusetts | 003S179 | SOMERVILLE-BRIDGE PRESERVATION,S-17-031,I-93 NB AND SB FROM ROUTE 28 TO TEMPLE STREET | $26,998,522.48 | $40,539,523.10 |
Massachusetts | 003S180 | CHELSEA- ROUTE 1 VIADUCT REHABILITATION (SB/NB) ON C-09-007 & C-09-011 | $167,153,833.83 | $209,325,017.29 |
Massachusetts | 003S191 | FALL RIVER- CORRIDOR IMPROVEMENTS ON ROUTE 79/DAVOL STREET | $54,425,419.13 | $134,536,940.70 |
Massachusetts | 003S196 | CHARLTON- OXFORD- RECONSTRUCTION ON ROUTE 20, FROM RICHARDSON'S CORNER EASTERLY TO ROUTE 12, INCLUDES REHAB OF C-06-023 & REPLACEMENT OF O-06-002 | $41,422,972.34 | $120,770,001.87 |
Massachusetts | 003S201 | NORTHFIELD- BIKE/PED BRIDGE CONSTRUCTION TO REPLACE N-22-002, SCHELL BRIDGE OVER THE CONNECTICUT RIVER | $24,002,744.70 | $30,108,430.88 |
Massachusetts | 003S263 | LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) | $82,380,601.00 | $103,929,811.25 |
Massachusetts | 003S390 | ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. | $18,744,594.46 | $25,114,574.27 |
Massachusetts | 003S398 | TAUNTON- INTERCHANGE IMPROVEMENTS AT ROUTES 24 & 140, INCLUDING REPLACING T-01-045 AND T-01-046 | $91,306,365.37 | $142,076,039.78 |
Massachusetts | 003S468 | BOSTON- ROADWAY, CEILING, ARCH & WALL RECONSTRUCTION AND OTHER CONTROL SYSTEMS IN SUMNER TUNNEL | $119,681,186.92 | $163,834,233.65 |
Massachusetts | 00DB004 | DUXBURY- LAKEVILLE- MANSFIELD- PLYMOUTH- WAREHAM- BRIDGE DECK REPLACEMENTS, D-14-008, L-01-011, L-01-015, M-03-018, P-13-031, P-13-035, W-06-038 (DB) | $37,441,854.43 | $49,335,000.00 |
Massachusetts | 091S001 | NORTHAMPTON– BRIDGE REPLACEMENT, N-19-059, I-91 OVER US ROUTE 5 AND B&MRR, BRIDGE REPLACEMENT, N-19-060, I-91 OVER HOCKANUM ROAD AND IMPROVEMENTS ... | $40,939,927.45 | $51,934,809.31 |
Massachusetts | 0931524 | MEDFORD- BRIDGE REPLACEMENT ON I-93 CORRIDOR | $44,723,236.24 | $98,127,600.00 |
Massachusetts | 0931528 | METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRU | $57,287,750.10 | $71,901,206.00 |
Massachusetts | 093S001 | BOSTON- MILTON- QUINCY- SOUTHEAST EXPRESSWAY/INTERSTATE 93 REPLACEMENT OF BARRIERS FOR HIGH OCCUPANCY VEHICLE LANE (HOV) | $35,468,451.65 | $35,934,981.65 |
Massachusetts | 0951108 | ATTLEBORO- BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE | $22,035,711.95 | $27,624,439.93 |
Massachusetts | 0954001 | DANVERS- TOPSFIELD- BOXFORD- ROWLEY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 | $27,460,207.87 | $31,138,837.08 |
Massachusetts | 1906031 | WORCESTER- WEST BOYLSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I-190 OVER ROUTE 12 & RAMP B | $20,732,236.89 | $33,342,477.72 |
Massachusetts | 495S301 | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | $128,510,160.99 | $476,642,155.70 |
Michigan | 1482117 | M-1 Chandler Street to Adams Avenue | $40,796,426.48 | $49,842,915.68 |
Michigan | 1584216 | Southfield Regionwide | $27,219,139.41 | $133,200,051.03 |
Michigan | 1682303 | I-75 I-75 over Rouge River | $85,479,520.29 | $94,977,244.77 |
Michigan | 1682304 | I-75 NB and SB over Goddard Rd and Sexton Kilfoil | $53,188,022.54 | $59,097,802.83 |
Michigan | 1725028 | I-69 Ballenger Highway to Fenton Road | $26,718,969.06 | $30,797,614.88 |
Michigan | 1750008 | M-59 E M-53 to E. of Romeo Plank Rd. | $55,441,159.24 | $67,735,075.42 |
Michigan | 1782067 | I-75 S. of Springwells (Fort St.) to N. of Clark | $36,356,356.25 | $40,395,951.39 |
Michigan | 1800104 | M-20 over Tittabawassee River & CSX Rail Road (Abndn) | $21,464,555.44 | $26,224,258.30 |
Michigan | 1800183 | US-131 10 Mile Road north to 14 Mile Road | $25,315,069.48 | $30,928,612.68 |
Michigan | 1800261 | Dupont Street Dupont Road from University to Welch and Pasadena to Bishop | $20,000,000.00 | $25,000,000.00 |
Michigan | 1800426 | I-696 Dequindre Rd. to Neiman Rd. | $88,378,666.63 | $88,996,655.97 |
Michigan | 1800433 | I-75 from North of 13 Mile Rd to Coolidge Hwy | $231,458,350.83 | $266,109,227.57 |
Michigan | 1800754 | I-94 I-94 over Conrail and the Grand River | $33,350,230.19 | $33,350,230.19 |
Michigan | 1800762 | I-94 W M-60 to Sargent Road | $79,012,042.39 | $79,012,042.39 |
Michigan | 1800869 | I-475 Carpenter Rd to Clio Rd | $41,059,015.65 | $41,059,015.65 |
Michigan | 1801017 | I-94 Second Avenue over I-94, Wayne County | $29,757,095.43 | $34,361,221.01 |
Michigan | 1801046 | I-75 from 8 Mile Rd to North of 13 Mile Rd | $36,658,600.00 | $1,502,622,373.00 |
Michigan | 1900184 | I-196 I-196: Maryland Avenue east to I-96; I-96: Leonard Street e | $21,777,496.42 | $26,606,593.06 |
Michigan | 1900325 | I-75 N 9 bridges on I-75 in Monroe County | $30,729,970.77 | $34,144,411.97 |
Michigan | 1900326 | I-75 I-75 from Ohio State Line to Erie Road | $71,797,702.18 | $97,775,224.65 |
Michigan | 1900759 | US-31 North of Napier Avenue (Exit 24) to I-94 | $20,000,000.00 | $48,419,428.38 |
Michigan | 1901016 | I-75 Hess to South I-675 Interchange | $39,182,155.00 | $49,465,553.88 |
Michigan | 1901055 | Mound Road I-696 to M-59 | $98,471,195.00 | $253,318,030.89 |
Michigan | 20A0293 | M-24 S. of Goldengate to N. of Harriet | $29,686,709.72 | $36,454,446.56 |
Michigan | 20A0461 | I-94 E Britain Avenue to I-196 | $30,572,204.00 | $113,151,697.02 |
Michigan | 20A0759 | I-69 0.5 miles south of Calhoun/Eaton Co Line to Nye Hwy (Page D | $10,621,601.00 | $56,151,854.98 |
Michigan | 20A0760 | I-69 Nye Hwy (Page Drain) to Island Hwy | $73,996,510.23 | |
Michigan | 20A0903 | I-94 at Elm Road | $33,290,291.87 | $36,989,213.18 |
Michigan | 21A0133 | M-3 11 Mile Road to 14 Mile Road | $62,043,766.73 | $75,801,791.95 |
Michigan | 21A0134 | I-75 Beaver Road to Cottage Grove | $25,213,096.26 | $28,014,551.41 |
Michigan | 21A0236 | I-69 NEWARK ROAD TO EAST LAPEER COUNTY LINE | $30,864,431.41 | $34,293,812.67 |
Michigan | 21A0255 | I-94 EAST OF LOVERS LANE TO EAST OF PORTAGE ROAD | $52,254,992.91 | $63,842,385.95 |
Michigan | 21A0256 | I-94 Portage Road to Sprinkle Road | $28,031,107.62 | $34,246,924.41 |
Michigan | 21A0442 | I-69 I-96 to Airport Road | $60,381,319.57 | |
Michigan | 21A0741 | I-496 Lansing Road to the Grand River | $88,254,136.00 | |
Michigan | 21A1026 | US-127 Ingham/Jackson County Line to M-36 | $71,930,114.28 | |
Michigan | 22A0045 | I-196 FROM BYRON ROAD EAST TO 32ND AVENUE | $70,832,859.72 | |
Michigan | 22A0061 | I-94 Jackson/Calhoun County Line to Michigan Avenue | $38,291,330.07 | $42,545,922.32 |
Michigan | 22A0092 | US-31 FROM I-196 NORTH TO CENTRAL AVENUE | $117,949.00 | $25,287,153.86 |
Michigan | 22A0111 | I-94 Michigan Avenue interchange to M-60 interchange | $129,474,820.14 | |
Michigan | 22A0159 | STATEWIDE STATEWIDE | $29,370,334.16 | $29,370,334.16 |
Michigan | 22A0208 | I-75 N 5 bridges on I-75 in Monroe County | $34,320,585.43 | $38,133,983.82 |
Michigan | 22A0358 | US-23 north of Spencer Road to M-59; North of Crouse Road to Sout | $23,656,282.35 | $28,901,994.32 |
Michigan | 22A0453 | I-75 FROM LEVERING ROAD TO US-31 | $45,478,328.34 | $55,563,015.69 |
Michigan | 22A0562 | I-94 E West of Helmer Road to M-311 in Calhoun County | $118,713,766.74 | |
Michigan | 22A0637 | M-102 E M-39 to M-53 (Van Dyke Avenue) | $68,280,588.77 | |
Michigan | 22A0786 | US-23 Stony Creek to Ellsworth | $35,903,314.56 | |
Michigan | 22A0815 | I-196 I-196 over the Grand River and Market Avenue | $110,492,873.12 | |
Michigan | 22A0913 | US-24 Grand River to N. of 8 Mile Road | $46,679,373.59 | |
Michigan | 22A0973 | I-69 WB M-19 to Taylor Road | $26,758,567.20 | |
Michigan | 22A0989 | I-94 23 Mile Road to County Line Road | $30,266,789.74 | |
Michigan | FMIK001 | FMI NITC In-Kind Match Credit-A new border crossing between Detroit and Windsor, bridge, inspection area, and interchange | $137,688,046.03 | |
Minnesota | 0005006 | MN 5: FROM I-494 IN BLOOMINGTON TO SOUTH END OF THE MISSISSIPPI RIVER BR #9300- CONCRETE PAVEMENT REHAB & RESURFACE, LIGHTING, TMS & REHAB 12 BRIDGES | $20,779,466.36 | $25,974,332.95 |
Minnesota | 0010338 | US 10: FROM ANOKA/RAMSEY CITY LIMITS (0.48 MI E OF CSAH 57) TO W OF GREEN HAVEN RD (0.28 MI W OF MN 47)- R/W ACQUISITION FOR CONST OF NEW INTERCHANGE | $25,490,711.96 | $55,256,523.13 |
Minnesota | 0012300 | TH 12: CR 6 to Wayzata Blvd; Reconstruction, New Bridges, Replace Br 90650 w/Br27274, Signals, and Signs | $45,822,305.53 | $58,197,503.65 |
Minnesota | 0014336 | TH 14: BROADWAY ST TO 0.6 MI E OF TH 14/TH 15/CR 21 INT & TH 15: TH 14/TH15/CR 21 INT TO 0.1 MI N OF 428TH LN, RECONST, REPL BRS 9200 & 9294 (cont) | $24,898,696.56 | $31,452,543.59 |
Minnesota | 0014344 | US 14: FROM 1.25 MI NW OF CSAH 37 TO 0.5 MI E OF 481ST AVE IN NICOLLET CO- RECONSTRUCT FROM 2 LN TO 4 LN DIVIDED, CONCRETE & BIT SURFACING, ADA (CONT) | $22,250,696.08 | $83,539,141.56 |
Minnesota | 0023324 | MN 23: 0.1 MI N OF CSAH 24 TO US 212 IN GRANITE FALLS- BIT MILL, CONC & BIT PAVING, RWIS, SIGNAL, LIGHTING, TURN LN'S, TENSION CABLE GUARDRAIL, (CONT) | $29,806,735.71 | $37,173,294.34 |
Minnesota | 0036314 | TH36: OVER ST CROIX RIVER, CONST NEW BR #82045 INCL WB/EB RAMPS #82047 & 82048 ON/OFF TH95 & XCEL BARGE UNLOADER FACILITY REMOVAL | $151,648,640.85 | $333,685,951.65 |
Minnesota | 0052315 | TH 52: Oronoco ''Design Build' - New Interchange at CR 112 & New Overpass at CSAH 12, Repl brs 9234 & 9235 | $25,028,944.00 | $40,294,392.00 |
Minnesota | 0052347 | US 52: 0.4 MI S OF CSAH 86 IN HAMPTON TO 0.2 MI N OF 140TH ST IN ROSEMOUNT- CONCRETE SURFACING, UNBONDED CONC OVERLAY, BIT MILL & OVERLAY, TMS (CONT) | $57,760,000.00 | |
Minnesota | 0055316 | MN 55/MN 62: BLOOMINGTON RD IN MPLS TO US 52 IN INVER GROVE HEIGHTS- REHAB BRIDGES 4190, 19819 & 19827, BIT MILL & OVERLAY, CONCRETE PVMT REHAB (CONT) | $23,614,933.85 | $29,282,271.47 |
Minnesota | 0060319 | TH 60: 1.4 MI W OF W JCT TH 4 TO W JCT TH 15, CONC SURF, ADA, REHAB BR #91543 & TH 4: REHAB BR #83026 & CSAH 12: REHAB BR #83027 & TH 15: REMOVE(cont) | $24,248,889.58 | $30,495,245.67 |
Minnesota | 0063306 | TH 63: AT TH 61 IN REDWING TO 0.2 MI N OF 825TH ST IN WI & ON TH 61, FROM 0.47 MI E OF TH 58 TO 0.09 MI E OF TH 58- BIT & CONC PVMT, ADA, (CONT BELOW) | $28,112,178.88 | $63,436,184.27 |
Minnesota | 0122152 | MN 210: 0.19 MI E OF CSAH 1 (RIPPLE RVR) TO N JCT US 169 & US 169, FROM N JCT OF MN 210 TO 0.28 MI S OF CSAH 21 (MISSISSIPPI RVR) IN AITKIN CO. (CONT) | $4,100,000.00 | $36,214,110.00 |
Minnesota | 0169348 | TH 169:0.3 MI N OF TH 19 TO 0.5 MI S OF TH 25, CONC OVLY, CONC PVMT REHAB, BIT MILL & OVLY, DRAINAGE REPAIRS & TH 169:0.6 MI E OF TH 25 TO 0.1 (cont.) | $21,452,541.71 | $26,981,534.84 |
Minnesota | 0212308 | TH 212: CARVER CR 147 IN CHASKA TO CSAH 4 IN EDEN PRAIRIE, DESIGN BUILD, GR, SURF, BRS. | $124,041,073.12 | $253,585,892.17 |
Minnesota | 0212326 | US 212: FROM 0.30 MI E OF CSAH 36 TO CSAH 11 IN DAHLGREN TWP- RECONSTRUCT & EXPAND FROM A 2-LANE TO A 4-LANE DIVIDED HWY, REDUCED CONFLICT INT. (CONT) | $20,381,226.44 | $27,868,911.60 |
Minnesota | 0222054 | US 10 RUM RIVER BRIDGE REPLACEMENT & INTERSECTION IMPROVEMENTS | $15,000,000.00 | $44,883,760.20 |
Minnesota | 0353287 | I-35W/TH 62 (CROSSTOWN) : 66TH ST TO 42 ND ST & FROM PENN TO PORTLAND, GR, SURF, BRS. | $262,140,148.88 | $313,332,200.58 |
Minnesota | 0610309 | TH 610:CR 81 TO I-94 & CONST OF 105TH AV FR MAPLE GROVE PKWY TO 0.5 MI W OF I-94, 4 LN FREEWAY CONST, 9 NEW BRIDGES | $4,346,171.64 | $81,001,000.00 |
Minnesota | 1912258 | STH13: CONST INTERCHANGE (NEW BR #19036), ACCESS CLOSURES, FRONTAGE ROADS AT TH13 AND CSAH 5 IN THE CITY OF BURNSVILLE | $10,836,692.19 | $29,436,370.61 |
Minnesota | 1920071 | CSAH 70: FROM KENRICK AVE/KENSINGTON BLVD TO CSAH 23 IN LAKEVILLE- RECONSTRUCT FROM A 2-LN UNDIVIDED TO A 4 -LN DIVIDED HWY, PED/BIKE TRAIL & SIGNALS | $14,018,000.00 | $28,168,224.61 |
Minnesota | 2714124 | CSAH5 (FRANKLIN AV): IN MPLS, OVER W. RIVER RD & MISSISSIPPI RIVER, RECONDITION BR# 2441 | $8,320,000.00 | $43,097,946.99 |
Minnesota | 2716123 | CSAH 53: XERXES AV S TO RICHFIELD PKWY, CONST ROUNDABOUT, TURN LANES, & BIKE/PED FACILITY | $9,677,392.20 | $36,731,877.55 |
Minnesota | 2720177 | MN 65 (3RD AVE S): FROM 1ST ST S TO 180' S OF 2ND ST SE IN MINNEAPOLIS- REHAB BRIDGE 2440 OVER THE MISSISSIPPI RIVER *CMGC* | $88,072,363.93 | $129,347,958.55 |
Minnesota | 4944254 | I-494: TH5 TO 0.1 MI S OF TH55 - RECONST, GR, SURF, REPL BRS, & ADD 3RD LN EACH DIRECTION | $80,156,404.35 | $143,797,249.42 |
Minnesota | 6213094 | I- 35E: TO N OF MARYLAND AV & I-94: SB I-35E TO SB TH 52, RECONST INTCHG WITH CAYUGA ST, FRNTG RDS, ADD, REPL, REMOVE BRS. | $95,420,064.09 | $136,511,885.74 |
Minnesota | 6218067 | TH 149: TH 5 (W 7TH ST) TO GEORGE ST, OVER MISSISSIPPI RIVER IN ST. PAUL, REHAB BR #62090, APPROACH WORK, ADA | $34,280,538.40 | $44,375,535.44 |
Minnesota | 6222230 | MSAS 158 (KELLOGG BLVD): W 7TH ST TO MARKET ST IN ST. PAUL- REPLACE BR 90378 W/BR'S 62671 & 62672, RETAINING WALLS, SIGNALS, ADA, LIGHTING (CONT) | $36,216,438.00 | |
Minnesota | 6920250 | MNDOT D1/ST. LOUIS COUNTY: BRIDGE BUNDLE PARTNERSHIP TO REPLACE BRIDGES & BOX CULVERTS, INCLUDES PE & MNDOT BR'S 6290, 6292, 6293 & 6294 ALONG MN210 | $10,252,000.00 | $25,396,593.69 |
Minnesota | 7018262 | US 169: 0.6 MI N OF MN41/CSAH 78 TO 0.5 MI S OF CSAH 14- RECONSTRUCTION, INCLS INTERCHANGES AT CSAH 14 & MN41/CSAH 78 & CONST NEW FRONTAGE RD'S(CONT) | $37,438,933.00 | $44,619,364.23 |
Minnesota | 7022096 | MN 13: 800' W OF LOUISANA AVE TO QUENTIN AVE IN SAVAGE-CONSTRUCT INTERCHANGE & FRONTAGE ROADS, CONSTRUCT NEW BRIDGE 70053 & REMOVE BRIDGE 5831 | $20,126,557.76 | $30,894,467.55 |
Minnesota | 8606002 | TH 101:PRELIM ENG & 147 TH AV TO MISSIPPI RIVER, GR, SURF, WALLS, LIGHTS, SIG, BRS. - "BAP" PROJECT | $36,733,284.00 | $63,262,521.00 |
Minnesota | I350120 | I-35E:"ELLA", 0.6 MI N OF 80TH ST E TO JCT OF I-35/I-35W/I-35E & I-35W:2.3 MI N OF MAIN ST TO JCT I-35/I-35W/I-35E & I-35:JCT I-35/I-35W/I-35E(cont) | $53,468,478.52 | $63,989,564.66 |
Minnesota | I350122 | I-35: FROM CHISAGO CO LN TO 0.94 MI S OF CSAH 11- UNBONDED CONC OVLY, REPLC BR'S 58801 W/58825, BR 58802 W/58826, BR 58803 W/58823 & BR 58804 W/58824 | $26,030,843.52 | $30,387,467.22 |
Minnesota | I350129 | DULUTH TWIN PORTS INTERCHANGE ON I-35, I-535 & US 53 (CMGC WORK PACKAGES 1 & 2) | $163,478,106.83 | $275,839,504.55 |
Minnesota | I35W005 | I-35W:72' S OF E 43RD ST TO 520' E OF CHICAGO AV S & I-94:NICOLLET AV S TO 70' E OF PARK AV S & TH 65:168' N OF 24TH ST TO 550' S OF E 15TH ST, (cont) | $80,313,693.61 | $239,129,843.40 |
Minnesota | I35W010 | I-35W: CLIFF RD IN BURNSVILLE THROUGH THE 106TH ST INTCHG IN BLOOMINGTON, PVMT RECONST, AUX LNS, REPL BR #5983 W BRS 27W38 27W39, REPL BRS 9043 (cont) | $116,987,940.79 | $130,190,886.45 |
Minnesota | I35W012 | I-35W:CR B2 IN ROSEVILLE TO 0.1 MI N OF SUNSET AV (CR 53) IN LINO LAKES,CONST MnPASS LN FROM CR C TO LEXINGTON AV (CSAH 17),CONC OVLY FR CR C (cont.) | $184,419,585.66 | $207,674,620.00 |
Minnesota | I35W014 | I-35W (NB): FROM E 42ND ST TO E 40TH ST IN MINNEAPOLIS- CONSTRUCT STORMWATER HOLDING CAVERN SYSTEM, INCLUDES LIGHTING, NOISE & RETAINING WALLS | $54,889,933.59 | $64,488,815.10 |
Minnesota | I494006 | I-494: (ELLA) FROM 3RD AVE S IN S ST PAUL TO E END OF MN RIVER BR IN EAGAN- M&O, DRAINAGE, REHAB 7 BR'S, GUARDRAIL, TMS, TURN LNS, SIGNALS, ADA (CONT) | $29,394,339.89 | $32,855,066.79 |
Minnesota | I494008 | I-494: PILOT KNOB RD IN EAGAN TO 24TH AVE IN BLOOMINGTON- REHAB BR'S 19825, 27765, 27767, 9217E & 9217W, CONCRETE PVMT REHAB, BIT MILL & OVLY (CONT) | $33,735,584.36 | $62,000,000.00 |
Minnesota | I494009 | I-494 (EB & WB): 1000’ W OF EAST BUSH LAKE RD (CSAH 28) TO 1000’ E OF 12TH AVE S IN HENNEPIN CO- CONST EB/WB EZPASS LANES FROM CSAH 28 TO I-35W (CONT) | $314,721,349.16 | |
Minnesota | I535004 | TWIN PORTS INTERCHANGE (TPI) IN DULUTH - CMGC WORK PACKAGES #3 & #4 | $141,908,901.36 | $158,787,768.54 |
Minnesota | I694005 | I-694:IN OAKDALE, 10TH ST (CSAH 10) TO JCT I-694/494/94 & I-494:0.1 MI S OF TAMARACK RD TO JCT I-694/494/94, CONC OVLY, AUX LN SB FROM 10TH ST (cont.) | $27,013,493.53 | $30,411,706.05 |
Minnesota | I900140 | I-90: 2 MI W OF US 169 TO MN 22 IN FARIBAULT CO- UNBONDED CONC OVLY, RAMPS, LIGHTING, ADA, REHAB BR'S 22803, 22804, 22815, 22816, 22825 & 22826 AND PE | $71,689,122.00 | $75,462,234.00 |
Minnesota | I940022 | TH 94: 0.1 MI E OF NICOLLET AVE IN MPLS TO 0.3 MI W OF SHINGLE CREEK PKWY IN BROOKLYN CENTER- BIT OVLY, CPR, REHAB 50 BR'S, ADA RAMPS, C&G (CONT) | $45,838,377.59 | $50,931,530.66 |
Minnesota | I940034 | I-94: 0.4 MI W OF CSAH 19 IN ALBERTVILLE TO 0.3 MI E OF MN 241 IN ST MICHAEL- RECONST, INCLS ADDITION OF EB THIRD LN FROM CSAH 19 TO MN 241 (CONT.) | $7,384,072.50 | $70,995,000.00 |
Minnesota | I940037 | I-94: FROM MN 24 IN CLEARWATER TO 0.3 MI E OF BR #86802 (CSAH 39) NEAR MONTICELLO (EBL & WBL)- RECONSTRUCTION, REHAB 5 BR'S & REPLC 1 BR W/NEW CULVERT | $81,401,519.20 | $103,918,000.00 |
Minnesota | M265001 | I-494/169: DESIGN BUILD, RECONT INTERCHANGE, WIDEN BRS, NEW BRS. | $78,821,368.13 | $145,513,079.35 |
Mississippi | 0008005 | US 49 from the Stone County Line to South Gate Road - PE, UTIL & CON - Forrest County. | $46,294,453.33 | $51,498,874.00 |
Mississippi | 0029103 | ON SR 304 FROM US 61 TO I-55 WITH SPUR. GRADE, DRAIN, PAVE FOR NEW CONST. VISION 21. TUNICA CO. | $61,832,114.00 | $87,739,053.00 |
Mississippi | 0064020 | SR 149 between SR 13 & US 49 [Bridge #s 128.2, 128.6, 131.7 & 131.4] - Bridge Replacement - UTIL & CON - Simpson County | $16,835,813.00 | $34,794,766.00 |
Mississippi | 0083029 | US 49 from Florence to Scale Area in Richland - Reconstruction Widen to 6 Lanes - ROW and CON - Rankin County. | $264,598,187.45 | $347,073,910.45 |
Mississippi | 0111056 | US 82 Greenville Bypass Freight Corridor Improvement Project from MSi River Bridge to Leland - New Construction - PE & CON - Washington Co (INFRA) | $52,120,000.00 | $165,774,444.00 |
Mississippi | 0201216 | I-20 Bridge Replacement #44.9B & Rail Replacements on Bridges # 45.2B&C - I-20, US 49 & I-55 Install Fiber Optic Cables - PE & CON - Hinds & Rankin Co | $29,834,001.32 | $53,593,711.00 |
Mississippi | 0201234 | I-20 at Norrell Road - Interchange Improvements and Frontage Road Widening - Hinds County | $9,677,912.00 | $40,349,260.00 |
Mississippi | 0224063 | SR 15 APD SR 76 to the Union County Line - Paving - Pontotoc County | $20,683,120.00 | $25,853,900.00 |
Mississippi | 0250047 | City of Jackson - Greening the Gateways - PE & Construction - Hinds County | $26,031,913.00 | $42,494,629.00 |
Mississippi | 0261080 | Improvements to SR 19 to SR 492 to Philadelphia in Neshoba County, Mississippi (BUILD Grant) | $35,810,546.00 | $56,175,820.00 |
Mississippi | 0290100 | Bond Project for I-269/MS304 from I-55 to Texas State Line in Desoto and Marshall Counties per MOU | $309,476,754.00 | $843,557,849.45 |
Mississippi | 0401021 | SR 25 from SR 8 to US 278. Full ROW and Construction for 4 Lanes. Monroe County | $23,354,454.00 | $29,193,069.00 |
Mississippi | 0501034 | SR 9 Replace 4 Bridges [Bridge #s 35.5, 40.7, 40.9 & 41.2] - Bridge Replacement - ROW, UTIL & CON - Calhoun County | $23,633,812.00 | $29,542,266.00 |
Mississippi | 0552202 | Madison County Bond Project (I-55, SR 463 and connector roads) per MOU. | $154,867,243.00 | $238,557,847.00 |
Mississippi | 0552257 | I-55 from 0.5 Miles North of SR 17 to the Carroll County Line - Mill & Overlay - CON - Holmes County | $42,119,775.00 | $46,799,752.00 |
Mississippi | 0553094 | I-55 from the Carroll County Line to 2.5 Miles South of Carroll County - Mill & Overlay - CON - Montgomery County | $22,570,861.00 | $25,080,992.00 |
Mississippi | 0554102 | I-55 Replace Twin Bridges over Hickahala Creek and Relief Bridges - PE & CON - Tate County | $51,425,370.00 | $64,281,715.00 |
Mississippi | 0591075 | I-59 at SR 42 - Interchange - PE [survey, plans & phase B], ROW & Construction - Forrest County | $40,941,003.00 | $48,716,256.00 |
Mississippi | 0591121 | I-59 from the Lamar County Line to the Jones County Line - Pavement Restoration - CON - Forrest County | $23,816,694.00 | $42,282,185.00 |
Mississippi | 0592091 | I-59 BETWEEN 16TH AVE. AND 4TH AVE. IN LAUREL (S CURVE) RECONSTRUCTION JONES CO. | $38,825,424.00 | $53,508,188.00 |
Mississippi | 0592110 | I-59 from the Forrest County Line to 0.3 Miles South of Moselle - Pavement Restoration - CON - Jones County | $33,946,751.00 | $37,820,101.00 |
Mississippi | 0593099 | Improvements to I-59 / I-20 - Bridge Improvements - PE & CON - Lauderdale County [Design-Build] | $26,662,934.00 | $29,625,483.00 |
Mississippi | 0661008 | SR 57 from I-10 to Vancleave - Grade, Bridge, Pave 2 Lanes Parallel - CON - Jackson County | $222,805,903.00 | |
Mississippi | 0702015 | SR 6 through Marks - (Bridge #'s 31.3, 32.1, 33.2 & 33.5) - Bridge Replacement - ROW, UTIL & CON - Quitman County | $30,264,476.00 | $36,683,527.00 |
Mississippi | 0725011 | SR 3 from the Panola County Line to Just West of the Tunica County Line - Bridge #'s 183.8 & 184.2 - ROW, UTIL & CON - Tate and Tunica County | $25,265,047.00 | $31,783,941.00 |
Mississippi | 0781011 | APD COR "V" from Fairview to SR 23 - Grade Bridge Pave 4 Lanes - PE and CON - Itawamba County. | $73,431,526.00 | $98,147,591.00 |
Mississippi | 1920007 | Desoto County Board of Supervisors - Holly Springs Road - Reconstruction of 2.6 miles along Holly Springs Road including 5 Bridges -CON- Desoto County | $15,118,165.00 | $35,525,412.00 |
Mississippi | 2170022 | US 11 from Hobolochitto Creek to Hide-A-Way Lake Road - Construct 5 Lanes - ROW, UTIL & CON - Pearl River County. | $20,583,940.00 | $25,729,926.00 |
Mississippi | 9159001 | City of Gulfport - Interconnecting Gulfport (BUILD) - New Construction - PE & CON - Harrison County | $20,460,000.00 | $49,393,004.00 |
Mississippi | 9371101 | SR 605 over Industrial Waterway - Bridge Rehabilitation {BR #3.5} - PE and CON - Harrison County | $22,896,652.00 | $28,295,816.00 |
Mississippi | FY03001 | VARIOUS CITIES AND RURAL AREAS STATEWIDE. PE , ROW, & CONSTRUCTION. STATEWIDE. | $53,589,079.00 | $66,713,211.00 |
Mississippi | FY05001 | Annual Program STP projects for various urban and rural areas, PE, ROW, CONST. Statewide. | $43,954,317.00 | $54,776,953.00 |
Missouri | 0351291 | CLAY CO, CST 19TH ST, NEW INTERCHANGE SOUTH OF RT 92 AT 19TH ST IN KEARNEY | $9,927,800.59 | $25,519,387.64 |
Missouri | 0441102 | NEWTON CO, IS 44, BRIDGE IMPROVEMENTS AT VARIOUS LOCATIONS FROM .9 MI E OF LOOP 49 (RANGE LINE RD) IN JOPLIN TO RT Z IN HALLTOWN | $34,291,450.00 | $36,191,000.00 |
Missouri | 0441106 | WEBSTER CO, IS 44, DB BRIDGE IMPROVE TO BRIDGES IN JASPER, LAWRENCE, GREENE, & WEBSTER COUNTIES & POTENTIAL IMPROVE IN DALLAS COUNTY. | $40,913,700.00 | $43,174,000.00 |
Missouri | 0442332 | PHELPS CO, IS 44, PAVEMENT REBUILD ON THE EB LANES FROM E OF RT 63 TO WEST OF RT 68. | $30,560,192.08 | $33,820,133.32 |
Missouri | 0444188 | IS44 ST LOUIS CO; BRIDGE REPLACEMENT & ADD PED BRIDGE FROM I-270 TO WEST OF MERAMEC RIVER | $51,657,592.76 | $57,192,327.74 |
Missouri | 0471072 | TIGER PROJECT-ROUTE 47, FRANKLIN COUNTY; PROJECT TO REPLACE BRIDGE OVER THE MISSOURI RIVER FROM RTE. 94 TO 5TH STREET IN WASHINGTON, 3.502 MILES | $59,074,351.40 | $73,842,939.25 |
Missouri | 0512043 | DB, PERRY CO, MO 51, BRIDGE REPLACEMENT OVER THE MISSISSIPPI RIVER "CHESTER BRIDGE" AND HORSE ISLAND CHUTE, NEW TWO-LANE ROADWAY ON MISSOURI APPROACH | $120,468,453.33 | $145,042,000.00 |
Missouri | 0553097 | IS 55, ST LOUIS CITY CO, BRIDGE REHAB FROM VIRGINIA AVE TO BROADWAY STREET | $24,891,600.16 | $26,236,891.17 |
Missouri | 0553101 | ST LOUIS CO, IS 55 N, BRIDGE REHABILITATION FROM N OF LINDBERGH BLVD TO LOUGHBOROUGH AVE AND REMOVE PED BRIDGE AT DAYCARE OVERPASS. | $43,242,513.01 | $45,560,080.47 |
Missouri | 0641061 | IS 64 ST LOUIS CITY CO; MODIFY INTERCHANGE CONFIGURATION BETWEEN 18TH ST AND GARRISON AVE | $20,156,307.02 | $33,327,887.12 |
Missouri | 0701202 | IS 70, JACKSON CO. INTERCHANGE IMPROVEMENTS AT I-435. 1.657 MI | $47,773,349.96 | $52,242,819.29 |
Missouri | 0703275 | INFRA DB, IS 70, COOPER CO; BRIDGE REPLACEMENT OVER THE MISSOURI RIVER NEAR ROCHEPORT | $78,400,000.00 | $241,992,015.14 |
Missouri | 0704204 | ST CHARLES CO, MO 364, BRIDGE REHABILITATION ON BLANCHETTE BRIDGE OVER THE MO RIVER. | $32,886,587.35 | $36,473,517.50 |
Missouri | 0711063 | BUILD - IS 49, MCDONALD CO, CONSTRUCT NEW INTERSTATE ROADWAY TO COMPLETE I-49 FROM PINEVILLE TO THE ARKANSAS STATE LINE (BELLA VISTA) | $56,990,552.35 | $64,988,190.44 |
Missouri | 1001070 | MO 100, ST LOUIS CO; UPGRADE PED FACILITY TO COMPLY WITH ADA PLAN & PVMT RESURFACING FROM RT 61 TO BID BEND BLVD, BRIDGE REPLACEMENT OVER BLACK CREEK, | $25,165,574.97 | $31,178,003.87 |
Missouri | 1411029 | ARRA ROUTE 141, ST LOUIS COUNTY, RELOCATE/CONSTRUCT RTE 141 FROM RTE 40 TO RTE 340. 2.707 MI | $80,135,256.80 | $87,357,366.09 |
Missouri | 1691117 | BUILD, JACKSON CO, US 169 N, DESIGN BUILD, BRIDGE REPLACEMENT OF BUCK O'NEIL BRIDGE OVER MO RIVER & BRIDGE/RD IMPROVEMENTS RICHARDS RD TO 12 ST IN KC | $174,604,800.00 | $257,879,000.00 |
Missouri | 2553052 | IS 255, ST LOUIS CO; BRIDGE REHABILITATION AT THE MISSISSIPPI RIVER (JEFFERSON BARRACKS BR) | $27,622,989.40 | $29,108,677.14 |
Missouri | 2705352 | DESIGN-BUILD, IS 270, ST LOUIS CO, PAVE & BRIDGE IMPROVE ON THE I-270 NORTH CORRIDOR ON DISCONNECTED SECTIONS IN NORTH CO. | $255,864,751.87 | $280,604,846.28 |
Missouri | 2705359 | ST LOUIS CO, IS 270, MODIFY INTERCHANGE CONFIGURATION AT RIVERVIEW BLVD IN ST LOUIS CITY | $39,289,254.72 | $41,380,006.07 |
Missouri | 2705360 | IS 270, ST LOUIS CO; BRIDGE REPLACEMENT, REHAB AND PVMT REPAIR OVR CONWAY RD & NEW BALLAS RD & BR REHAB FOR I-270 MAINLINE & RAMP & RT AB (LADUE RD) | $56,063.12 | $32,546,636.80 |
Missouri | 2705372 | IS 270, ST LOUIS CITY; PAYMENT TO IDOT FOR BRIDGE REPLACEMENT OF CHAIN OF ROCKS BRIDGE OVER MISSISSIPPI RIVER | $190,000,000.00 | |
Missouri | 4351316 | RT 435, JACKSON CO, DESIGN-BUILD PROJECT - BRIDGE, PAVEMENT AND CORRIDOR IMPROVEMENTS FROM THE KS STATE LINE TO 1-49 | $68,338,139.86 | $72,018,766.51 |
Missouri | 4351323 | IS 435, CLAY CO, BRIDGE DECK REPLACEMENT AT THE MISSOURI RIVER. | $32,855,524.66 | $36,484,397.54 |
Missouri | 5617602 | BUILD PROJECT, ST LOUIS CITY - REPLACE TRAFFIC SIGNALS - SIGNAL INTERCONNECTION ON JEFFERSON AVE FROM MARKET ST TO NATURAL BRIDGE AVE | $17,651,000.00 | $25,939,132.00 |
Missouri | 5901816 | DB, BUILD GRANT, GREENE CO, CITY OF SPRINGFIELD, RECONSTRUCT MULTI-USE PATH ALONG GRANT AVE. PARKWAY FROM DOWNTOWN TO SUNSHINE ST. | $20,960,822.00 | $31,525,000.00 |
Missouri | 5909802 | GREENE CO; PUBLIC IMPROVEMENTS FOR THE EXTENSION OF KANSAS EXPRESSWAY FROM REPUBLIC RD TO THE FUTURE EAST/WEST ARTERIAL. | $20,149,753.68 | $25,187,192.08 |
Missouri | S102026 | CHBP, VARIOUS, VARIOUS, BRIDGE REPLACEMENTS AT VARIOUS LOCATIONS IN THE NORTHEAST AND NORTHWEST DISTRICT | $20,794,000.00 | $25,992,500.00 |
Missouri | S201001 | TIGER PROJECT-US 54, PIKE CO, REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA. | $32,701,933.81 | $36,846,104.77 |
Missouri | S502015 | DB OR 70,ST CHARLES;CORRIDOR IMPROVEMENTS FROM CAVE SPRINGS BLVD TO FAIRGROUNDS RD;BRIDGE REHAB OVER I-70 @ZUBEHL & CAVE SPRINGS & MODIFY INTERCHANGE | $51,389,851.34 | $62,782,249.75 |
Missouri | S602025 | MO 86, TANEY CO, BRIDGE REPLACEMENT OVER TABLE ROCK LAKE | $65,490,925.61 | $77,283,463.41 |
Missouri | S703077 | DESIGN-BUILD,BOLLINGER CO, MO 51, BRIDGE REPLACEMENT OVER DRAINAGE DITCH #65 & CASTOR RIVER OVERFLOW AND BRIDGE IMPRVMTS OVER VARIOUS DRAINAGE DITCHES | $21,694,550.00 | $25,523,000.00 |
Montana | 0002923 | US 93 2008 ISSUANCE (OT) Missoula District, Financing of the US 93 Corridor reconstruction | $60,252,587.57 | $65,802,428.53 |
Montana | 0017044 | LOHMAN-E & W (CN & CE) National Highway 1, Blaine County, Reconstruct the roadway and structure work from reference point 393.1 to 403.5 | $30,790,288.47 | $33,621,192.96 |
Montana | 0041061 | ROCKVALE-LAUREL 2 LANES (CN & CE) National Highway 4, Multiple counties, Reconstruct the roadway from reference point 42.5 to 52.5 | $28,076,592.24 | $29,964,016.00 |
Montana | 0056089 | BBP-YELLOWSTONE RIVER (IC, CN & CE) Yellowstone County, Construction of a new roadway and structure | $36,383,802.15 | $40,054,993.07 |
Montana | 0084066 | TOSTON STRUCTURES US-287 (CN & CE) National Highway 8, Broadwater County, Reconstruction from reference point 85.7 to 89.5 | $35,160,817.04 | $37,488,538.44 |
Montana | 0154138 | WOLF CREEK-N & S (CN & CE) Multiple routes, Lewis & Clark County, Rehabilitate the existing roadway at various locations | $43,357,935.10 | $47,368,695.41 |
Montana | 0575047 | JCT SEC 462-EAST & WEST (CN & CE) National Highway 57, Garfield County, Reconstruct the roadway from reference point 230.1 to 239.7 | $28,008,444.69 | $32,349,786.00 |
Montana | 0908177 | I-90 YELLOWSTONE R-BILLINGS (CN & CE) Multiple routes, Yellowstone County, Reconstruct the roadway and replace structures at various locations | $73,855,551.26 | $85,067,284.56 |
Montana | STWD790 | TIMBER BRIDGES-GLASGOW AREA (IC, CN & CE) Multiple routes/counties, Replace structures at various locations | $24,571,888.92 | $40,897,793.00 |
Nebraska | 0026120 | Lincoln South Beltway | $38,706,171.39 | $428,045,808.14 |
Nebraska | 0125122 | Niobrara West Bridges | $38,908,631.63 | $44,933,750.44 |
Nebraska | 0305134 | 23rd St, Columbus | $27,238,352.00 | $42,770,428.00 |
Nebraska | 0752128 | Murray - Plattsmouth | $20,000,000.00 | $54,952,152.00 |
Nebraska | 0801181 | Sidney West - Conc pvmt, bridge repair | $31,992,865.00 | $37,711,627.78 |
Nebraska | 0801186 | Wyoming Line - Bushnell | $36,662,750.00 | $43,798,849.66 |
Nebraska | 0801192 | Brownson East | $15,000,000.00 | $45,010,487.00 |
Nebraska | 0801196 | Bushnell - West Kimball | $46,805,539.00 | |
Nebraska | 0802100 | Big Springs West | $43,153,246.00 | $49,856,367.00 |
Nebraska | 0802103 | Chappell - N-27 | $46,985,241.00 | $54,044,715.47 |
Nebraska | 0803152 | Brule - Ogallala | $44,840,330.00 | $52,511,759.00 |
Nebraska | 0805075 | Lexington - Overton | $45,677,947.00 | |
Nebraska | 0D30107 | Norfolk NE Bridges | $18,814,864.00 | $25,408,205.00 |
Nebraska | 2814130 | Niobrara River at Holt/Boyd Co Line | $25,000,886.67 | $28,690,006.31 |
Nebraska | 3811001 | 168th St., West Center - "Q" St., Omaha | $18,122,915.14 | $43,584,281.43 |
Nebraska | 3853119 | L-62A North | $18,263,743.00 | $36,249,906.00 |
Nebraska | 4809003 | Douglas County, 20th St - Missouri River, Omaha, I-480 bridges including ramps from 20th St to the Missouri River in Omaha, Bridge Repair and Overlay | $26,005,860.00 | $43,906,340.00 |
Nebraska | 5127001 | 156th St., Pepperwood - Corby, Omaha | $20,152,108.72 | $28,224,783.15 |
Nebraska | 5147001 | 180th St., West Dodge - West Maple, Omaha | $33,802,833.46 | $42,792,844.92 |
Nevada | 0003139 | I15 / CC215 BELTWAY INTERCHANGE: PE/ROW | $116,584,912.60 | $136,768,336.00 |
Nevada | 0003231 | LAUGHLIN TO BULLHEAD CITY BRIDGE, CLARK CO., FROM MOHAVE VALLEY HWY TO NEEDLES HWY. OFF SYSTEM | $18,190,998.67 | $51,787,335.00 |
Nevada | 0003260 | LAS VEGAS, GRAND TETON DRIVE BETWEEN TEE PEE LANE AND EL CAPITAN WAY (OFF SYSTEM) | $20,413,317.00 | $26,500,000.00 |
Nevada | 0017003 | LV SO BELTWAY (I-215) FM STEPHANIE TO I-515, PE, ROWA utilities/acquisition, construction. Construct system interchange & roadway. | $90,686,811.67 | $131,470,387.37 |
Nevada | 0151134 | I15 NORTH OF US95/I515 TO CRAIG ROAD WIDEN FM 6 TO 10 LANES FROM US 95/I515 TO LAKE MEAD BLVD: WIDEN 8 TO 10 FM LAKE MEAD TO CRAIG | $77,981,027.00 | $259,704,838.00 |
Nevada | 0151146 | I 15 CACTUS AVE IN LAS VEGAS NEVADA. CONSTRUCT NEW INTERCHANGE. PE/ROW/CONSTRUCTION | $59,402,861.98 | $63,081,090.29 |
Nevada | 0151150 | I 15 AT STARR AVENUE / PE AND RW FOR NEW INTERCHANGE. | $12,755,741.45 | $60,043,179.31 |
Nevada | 0151155 | I 15/ US 95 NEON DESIGN BUILD, SAHARA AVE. TO US 95 INTERCHANGE | $109,892,279.42 | $667,221,824.00 |
Nevada | 0151158 | I 15, CLARK COUNTY, GARNET INTERCHANGE @ US 93 MP CL 64.29 US 93 FROM MP CL 52.00 TO MP CL 57.00 | $70,255,946.00 | $80,634,198.00 |
Nevada | 0151161 | I 15, LAS VEGAS, AT TROPICANA AVE INTERCHANGE; I 15 AT HARMON AVE OVERPASS; WARM SPRINGS RD TO HARMON AVE | $127,818,026.00 | $358,808,500.00 |
Nevada | 0151162 | I 15 NORTH, CLARK COUNTY, FROM SPEEDWAY TO APEX (PHASE 3) MP CL 53.61 TO MP CL 58.38 | $39,386,961.00 | $41,459,957.00 |
Nevada | 0151163 | I 15 NORTH, CLARK COUNTY, FROM APEX TO GARNET (PHASE 3) MP CL 58.38 TO MP CL 64.28 | $41,083,512.00 | $43,245,800.00 |
Nevada | 0152047 | I 15, CLARK COUNTY, IN MESQUITE FROM 1.677 MI NORTH OF THE LOGANDALE/OVERTON INTERCHANGE TO 0.370 MI NORTH OF LOWER FLAT TOP DR; SB MP CL 95.559 TO MP | $37,706,635.00 | $39,691,193.00 |
Nevada | 0159014 | SR 159, CHARLESTON BLVD FROM HONOLULU ST TO SACRAMENTO DR, MP CL 29.45 TO MP CL 29.80; I 515, FROM WYOMING AVE TO EASTERN AVE, MP CL 71.19 TO MP 73.37 | $44,386,918.17 | $82,078,719.00 |
Nevada | 0376002 | SR 376, NYE COUNTY, FROM 0.275 MILES NORTH OF CARVER'S ROADSIDE REST PARK TO US 50; MP NY 53.943 TO MP LA 18.065 | $29,013,609.00 | $31,440,836.00 |
Nevada | 0445011 | SR 445 PYRAMID HIGHWAY FROM TYLER TO 0.23MN OF QUEEN WAY. PE/ROW/CONSTRUCTION | $54,210,785.20 | $60,938,175.00 |
Nevada | 0445013 | SR 445, PYRAMID HIGHWAY, FROM QUEEN WAY TO GOLDEN VIEW DRIVE; MP WA 2.00 TO MP WA 4.50 | $35,000,000.00 | $54,100,000.00 |
Nevada | 0502016 | US 50, LYON COUNTY, FROM ROY'S ROAD TO THE JUNCTION WITH US 95A. MP LY 19.90 TO LY 29.44 | $57,595,639.46 | $60,917,455.00 |
Nevada | 0802057 | I 80, PERSHING COUNTY, FROM 2.28 MILES EAST OF COAL CANYON INTERCHANGE TO 1.69 MILES EAST OF HUMBOLDT INTERCHANGE. MP PE 26.15 TO MP PE 51.30 | $26,925,231.00 | $28,342,349.00 |
Nevada | 0803067 | I 80, LA CO, BEGIN OF ASPHALT 0.424 W OF ROSNY CK GRD SEP TO EU CO BEGIN OF PCCP 2.877 E OF LA/EU CO LINE; MP LA 15.889 TO 26.970; MP EU 0 TO 2.877 | $29,067,101.00 | $30,596,947.00 |
Nevada | 0804097 | I 80, EUREKA COUNTY, AT EMIGRANT PASS | $24,332,245.00 | $28,343,063.00 |
Nevada | 0804101 | I 80, ELKO COUNTY, FROM 0.932 MILES WEST OF OSINO INTERCHANGE TO 0.611 MILES EAST OF GRAYS CREEK; MP EL 31.980 TO MP EL 61.966 | $27,590,461.00 | $29,042,590.00 |
Nevada | 0805041 | I80 1.04 MI E OF MOOR INTRCHG TO 1.87 MI E OF OASIS INTRCHG. PE/ROW | $37,297,334.88 | $39,293,353.00 |
Nevada | 0931008 | US93 From the Hoover Dam Interchange Bridge to 1 MS of the Junction of US95/ US93. Hoover Dam Bypass - Boulder Extension. | $253,024,309.52 | $292,945,128.15 |
Nevada | 0931013 | US 93 BOULDER CITY BYPASS PART 1, PACKAGE 3 FROM SILVERLINE TO FOOTHILL ROAD. CL 16.35 TO CL 14.72 | $82,745,184.00 | $128,678,039.00 |
Nevada | 0952037 | US95 AT RAINBOW CURVE (PHASES 2C & 2D). CONSTRUCTION | $44,561,874.41 | $47,835,106.00 |
Nevada | 0952039 | US 95 FM MARTIN LUTHER KING TO VALLEY VIEW BLVD. CONSTRUCTION | $64,943,610.66 | $68,551,694.71 |
Nevada | 0952043 | US 95 from East of Valley View to Rainbow Interchange (Phase 4B/5). Construction | $95,112,193.73 | $106,034,709.00 |
Nevada | 0952062 | US 95, LAS VEGAS, FROM ANN ROAD TO KYLE CANYON ROAD MP CL 86.75 TO MP CL 92.70 PACKAGE 2B/5 | $42,356,460.00 | $77,979,339.00 |
Nevada | 0952064 | US 95 NW CORRIDOR PHASE 3C AT MP 88 AND CC 215 FROM GRAND MONTECITO TO TENAYA WAY. MP 88 AND CC 215 37-39. | $18,391,964.00 | $80,030,703.00 |
Nevada | 0952065 | US 95 NW PHASE 3D, MP 88 AND CC215 FROM GRAND MONTECITO TO TENAYA, MP CL 37-39 AND US 95 AT LONE MOUNTAIN MP CL 85.6 | $88,634,108.00 | $155,193,795.00 |
Nevada | 0952066 | US 95, NYE COUNTY, 1.301 MILES SOUTH OF AMARGOSA VALLEY JUNCTION TO 1.742 MILES SOUTH OF THE AMARGOSA RIVER, MP NY 28.817 TO MP NY 56.234 | $23,828,488.00 | $25,082,618.00 |
Nevada | 0953013 | US 95 FROM 12.16 MILES NORTH OF BEATTY TO 3.67 MILES SOUTH OF THE NY/ES COUNTY LINE. NY 72.036 TO NY 103.552 | $16,890,072.18 | $36,721,092.00 |
Nevada | 1601028 | SR 160, BLUE DIAMOND ROAD, CLARK CO. FROM THE WEST EDGE OF MOUNTAIN SPRINGS COMMUNITY TO THE BEGINNING OF MOUNTAINOUS AREA MP CL 16.51 TO MP CL 22.20 | $39,197,146.00 | $46,971,122.00 |
Nevada | 1601029 | SR 160 BLUE DIAMOND RD, CLARK COUNTY, FROM 1.03 MILES NORTH OF MOUNTAIN SPRINGS SUMMIT TO CL/NY CO. LINE (EASTBOUND ONLY) MP CL 21.960 TO MP NY 0.950 | $21,317,123.00 | $25,262,492.00 |
Nevada | 3951015 | US 395 FM US 50 EAST TO LAKEVIEW INTERCHANGE PHASE 1B Construct a 4 lane controlled access freeway. Construction. | $86,183,570.00 | $103,271,106.00 |
Nevada | 3951018 | US 395, CARSON FREEWAY PHASE 2A: CONSTRUCTION. | $54,758,708.87 | $58,317,204.81 |
Nevada | 3951027 | US395 Carson City Fwy fm So Carson St to Fairview Dr. Pkg 2B-3. Construction. | $52,974,150.00 | $55,881,653.00 |
Nevada | 5151040 | I 515/US 95, LAS VEGAS, FROM EASTERN AVENUE TO LAS VEGAS SPAGHETTI BOWL, MP CL 73.35 TO MP CL 75.66 | $32,556,338.00 | $34,269,830.00 |
Nevada | 5151046 | I 515, CLARK COUNTY, FROM SUNSET RD. INTERCHANGE TO WYOMING AVE; MP CL 63.38 TO MP CL 71.18 | $42,639,394.00 | $44,883,571.00 |
Nevada | 5801023 | I580 FM WINTERS RANCH TO NR MOUNT ROSE HWY structures at Corey Canyon, Browns Creek, St.James Parkway and Galena Creek. | $63,573,324.63 | $75,881,582.00 |
Nevada | 5801025 | I-580 Freeway Near Winters Ranch to Near Mt. Rose Highway - Package B. Construction | $359,420,694.95 | $443,275,930.01 |
New Hampshire | A000124 | SALEM TO MANCHESTER,I93,MAINLINE,X1 TO STA 1130 & NH38 BR 077/063 & 073/063 (RED LIST) [PARTIAL GARVEE BONDED PROJECT] | $34,954,911.62 | $49,770,742.63 |
New Hampshire | A000125 | SALEM TO MANCHESTER I-93 I-93 Exit 2 Interchange reconstruction & Pelham Rd - debt service project for 13933E (Salem) | $45,946,857.01 | $46,246,464.60 |
New Hampshire | A000128 | SALEM TO MANCHESTER I-93 I-93 Exit 3 area -NB ML connections, NB Ramps & NH 111A relocation - debt service project for 13933H | $31,770,766.97 | $34,434,854.64 |
New Hampshire | A000129 | SALEM TO MANCHESTER I-93 I-93 Exit 3 area - Reconstruct SB ML, NH111 & SB on ramp (Windham) - debt service project for 13933I | $35,552,058.27 | $36,127,804.28 |
New Hampshire | A000143 | BEDFORD NH 101 Widen NH 101 to 5 lanes from NH 114 to Wallace Road | $26,580,438.63 | $26,821,291.95 |
New Hampshire | A000501 | SALEM-MANCHESTER,I93,X5 AREA,RECON INTERCHANGE,INCLUDE NB/SB MAINLINE,NB OFF-RAMP,BR#'S 96/163, 097/163, 099/160, 100/160.[GARVEE] | $33,804,409.44 | $55,947,210.02 |
New Hampshire | A000909 | PORTSMOUTH, NH - KITTERY, ME US 1 Bypass Bridge Replacement, US 1 Bypass over Piscataqua River (Sarah Mildred Long Bridge) (Red List) | $98,397,890.05 | $221,873,444.55 |
New Hampshire | A001154 | LEBANON, NH - HARTFORD, VT I-89 NB & SB Superstructure Replace & Widening, I-89 NB & SB over Connecticut River (Br No 044/103 & 044/104) | $31,133,417.45 | $52,165,394.22 |
New Hampshire | A004115 | SALEM TO MANCHESTER I-93 NB & SB Mainline, Weigh Station to Kendall Pond Rd (Windham & Derry) | $2,614,085.80 | $50,180,397.17 |
New Hampshire | A004152 | HINSDALE, NH - BRATTLEBORO, VT NH 119 Reconstruction of the new bridge over the Connecticut River | $49,743,110.45 | $81,567,721.25 |
New Hampshire | A004375 | SALEM TO MANCHESTER I-93 Exit 4 Interchange, NB & SB Mainline & NH 102 approach work | $8,229,449.46 | $67,214,304.46 |
New Hampshire | A004376 | SALEM TO MANCHESTER I-93 I-93 NB & SB mainline reconstruction, Exit 5 to I-293 split (Londonderry & Manchester) | $3,176,990.34 | $50,140,252.43 |
New Hampshire | A004377 | SALEM TO MANCHESTER I-93 NB & SB mainline between Exits 4 and 5 (Londonderry) | $1,754,048.03 | $28,146,735.00 |
New Hampshire | A005073 | DERRY-LONDONDERRY I-93 I-93 EXIT 4A, final design & construction of new interchange and connecting roadway | $50,476,640.60 | $67,740,148.50 |
New Jersey | 0001316 | Maintenance Bridge Fender Replacement Contract 2017-3, North, Various locations, Multi cities, Various Counties, Bridge Replacement, Construction | $31,032,560.47 | $31,052,961.47 |
New Jersey | 0003330 | Ridge Rd and Orient Way, Bridges over Rt 3, mp 5.27-6.30, bridge replacement, Borough of Rutherford, Bergen County-Construction | $37,219,655.88 | $39,509,039.69 |
New Jersey | 0003334 | Rt 3 Br. Over Northern Secondary Rail Line & Ramp A Bridge, MP10.62-10.84, North Bergen Twp, Hudson Co. PODI Project Oversight Br. Repl., Construction | $26,693,845.00 | $31,647,114.52 |
New Jersey | 0007107 | ROUTE 52 CAUSEWAY REPLACEMENT, CONTRACT A mp 0.26 to 1.5 construction | $171,473,216.77 | $171,473,216.77 |
New Jersey | 0007109 | ROUTE 52 CAUSEWAY CONTRACT B; BRIDGE REPLACEMENT, RECONSTRUCTION, RESURFACING- OCEAN CITY, CAPE MAY CO, MP. 0.26 TO 1.76 PODI-REVIEW - CONSTRUCTION | $109,928,050.77 | $317,492,977.15 |
New Jersey | 0009328 | Rt. 9, Indian Head Rd. to Central Ave/Hurley Ave., M.P. 95.01 to 101.89, Toms River & Lakewood Twps.,Ocean Co.,Hwy Reconstruction Project,Construction | $57,584,552.54 | $57,628,652.55 |
New Jersey | 0018309 | Rt 18 East Brunswick, MP 35.4-39.54, East Brunswick, Middlesex County, Drainage & Pavement Rehabilitation Project, Construction | $91,762,531.77 | $100,606,498.51 |
New Jersey | 0019120 | ROUTE 72 MANAHAWKIN BAY BRIDGE CONTRACT 2 Bridge Rehab and Replacement - Ocean County - MP 26.46-27.75 - PODI-REVIEW CONSTRUCTION | $105,052,702.23 | $106,890,411.45 |
New Jersey | 0019122 | Rt. 72 Manahawkin Bay Bridge Contract 4 MP 26.14-27.50 Stafford Twp., Ocean Co., Bridge Rehabilitation - PODI Review - Construction | $76,364,982.22 | $81,253,046.70 |
New Jersey | 0019129 | Rt. 72 Manahawkin Bay Brdgs-Contract 3 PODI, M.P. 27.59-28.16, Bridge Rehab, Twnp of Stafford, Ocean Cnty - Construction | $37,462,609.55 | $39,546,244.00 |
New Jersey | 0020301 | Rt 20, MP 0.0-3.97, City of Paterson & Clifton, Passaic County, Safety, Drainage & Resurfacing Project, Construction | $55,865,780.83 | $56,292,410.83 |
New Jersey | 0022108 | Rt. 37 EB Mathis Bridge o/Barnegat Bay MP 11.45-12.40 Toms River & Seaside Heights, Ocean County - Bridge Deck Replacement, PODI Finance-Construction | $71,103,657.57 | $72,095,246.28 |
New Jersey | 0022344 | Rt. 22 Chestnut St., MP 54.486 to 54.530 & MP 54.662 to 55.233, Union Twp., Union County, Bridge Replacement Project, Construction | $29,330,910.41 | $29,493,726.00 |
New Jersey | 0027302 | Rt. 27, Dehart Place to Rt. 21, MP 33.39 to 38.53, Various Towns, Various Counties, Roadway Resurfacing Project, Construction | $32,522,728.60 | $32,630,514.60 |
New Jersey | 0029329 | Route 29 Cass Street to Calhoun Street Drainage, MP 2.94-4.34, City of Trenton, Mercer County, Drainage Improvement Project, Construction | $36,959,012.80 | $37,018,636.16 |
New Jersey | 0030348 | Rt. 30, Elwood Rd./Weymouth Rd. (CR 623Z) to Haddon Ave., MP 36.40 -50.83,Various Towns, Atlantic County, Resurface Milling and Paving,Construction | $39,587,011.48 | $39,691,906.07 |
New Jersey | 0030358 | Rt. 30 Bridge Over Beach Thorofare, MP 56.68 to 57.03, Atlantic City, Atlantic County, Bridge Rehabilitation, Construction | $26,842,595.77 | $26,899,596.77 |
New Jersey | 0042304 | Rt 42 Bridges Over Blackwood Railroad Trail, MP 10.06 to 10.41, Gloucester Twp., Camden County, Bridge Replacement Project, Construction | $28,082,383.32 | $28,089,598.33 |
New Jersey | 0046336 | Rt. 46, Passaic Ave to Willowbrook Mall, MP 55.01-55.81, Fairfield/Wayne Twp, Passaic/Essex Co. Roadway widening/Bridge Replacement, Construction. | $50,885,468.16 | $51,027,449.96 |
New Jersey | 0046342 | Rt.3 & Rt.46 Valley & Notch Rifle Camp Rd.,Contract B,MP 58.76-60.58,Multi Towns, Passaic Co, Bridge Replacement, Construction. | $179,984,837.17 | $182,182,252.72 |
New Jersey | 0052302 | Signature Bridge Preventive Maintenance Contract 2019-1, Various cities, Multi counties, Bridge Maintenance, Construction | $29,669,379.30 | $30,382,524.30 |
New Jersey | 0054210 | Rt. 3/Rt. 46 Valley Rd. Contract A - M.P. 59.1 to 60.6 Intersection Improvements, Passaic Cnty - Construction - PODI | $67,907,350.91 | $74,268,962.84 |
New Jersey | 0055300 | Halls Mill Rd (MP 0-1.30) & Elton-Adelphi Rd (CR 524-MP 25.52), Freehold/Howell Twp. Monmouth Co. Roadway & Intersection Improvements, Construction. | $29,990,004.70 | $30,673,754.70 |
New Jersey | 0071300 | Route 71 Main Ave to Cedar Ave, M.P. 7.87 to 9.92, Pavement Rehabilitation, Monmouth County - Construction | $29,465,245.21 | $29,591,545.21 |
New Jersey | 0072307 | Rt. 72 Manahawkin Bay Bridges, Contract 1A & 1B, MP 25.38-28.76, Stafford Twp, Ship Bottom Boro, Ocean Cty, Paving & Drainage, PoDI Construction | $47,066,000.84 | $47,239,710.05 |
New Jersey | 0076203 | Rt 76,Bridge over Klemm Ave Conrail & South Branch Newton Creek-Contract 1,MP 0.76-1.89-Gloucester & Camden Cty, Bridge Replacement-Construction- PODI | $67,586,790.29 | $67,611,985.80 |
New Jersey | 0078324 | Route 78 Washington Valley Rd. MP 32.2-42.7 Multi Townships, Somerset Co. Pavement Preservation - Construction | $25,326,588.84 | $25,426,586.84 |
New Jersey | 0078326 | Rt. 78 Bridges over Rt.202/206 and Washington Valley Rd., MP 31.25-31.96, Multi Towns, Somerset Co., Bridge Deck Replacement, Construction. | $66,470,661.11 | $66,499,647.79 |
New Jersey | 0078328 | Rt. 78 Rockfall Mitigation, MP 10.10 to 10.30, Bethlehem Twp., Hunterdon County, Safety Management-Rockfall Mitigation, Construction | $37,210,258.73 | $37,336,607.04 |
New Jersey | 0080323 | Rt. 80 EB&WB Bridges over Rockaway River, MP 32.22-33.01, Jefferson Twp. Morris Co., Two Bridges Replacement-Construction | $25,767,484.55 | $25,937,880.52 |
New Jersey | 0130321 | Rt. 130 Charleston Rd/Cooper St. MP 43.01-51.59, Various Towns, Burlington County, Bridge Deck & Roadway Resurfacing, Construction. | $40,901,947.64 | $40,939,161.70 |
New Jersey | 0130328 | Rt 130 Bridge Over Big Timber Creek, MP 25.24-25.67 & CR 551 MP 29.38-29.46, Various Towns & Counties Bridge Replacement Project, Construction | $65,458,031.29 | $72,924,699.92 |
New Jersey | 0155107 | Rt130 Raccoon Creek Bridge Replacement&Pavement Rehabilitation from vicinity of High Hill Rd to N. of Baker Ave mp10.98-12.05 Gloucester-Construction | $69,296,305.43 | $70,115,213.42 |
New Jersey | 0206321 | Rt 206 Bypass Sections 14A & 15A Contract B, New Roadway Alignment, MP 63.3-67.07- Hillsborough, Montgomery Twp. Somerset County-PODI- Construction | $48,924,767.30 | $51,056,204.03 |
New Jersey | 0206328 | Route 206 Doctors Way to Valley Rd. MP 66.35 to 68.00, Hillsborough Twp., Somerset County, Dualization Project, Construction | $54,616,095.99 | $55,634,108.07 |
New Jersey | 0295320 | Rt. 295/42/I-76 Direct Connect-Contract 3 MP 26.28-27.63, Bellmawr Boro, Camden Cty-Ramp/bridge upgrades/geometry/reduction- Construction-PODI Review | $236,978,260.88 | $257,592,682.66 |
New Jersey | 0295330 | Rt.295/42 Missing Moves, MP 25.07-26.35, Multi Towns, Camden Co, PoDI Oversight, Bridge Replacement, Construction. | $210,673,721.23 | $211,057,590.23 |
New Jersey | 0520300 | Rumson Rd over Shrewsbury River S-32, MP 22.31-22.51, Rumson & Sea Bright Borough, Monmouth County, Bridge Replacement, Construction | $121,085,885.64 | $121,134,640.50 |
New Jersey | 2873095 | Rt 287/78, I-287/202/206 MP 20.5 to 22.3 Interchange Impr. Bedminster & Bridgewater Twp., Somerset Cnty.- Construction - PODI | $35,936,190.61 | $36,168,999.97 |
New Jersey | 2952137 | I-295 Direct Connect Contract #2, (PODI-REVIEW) MP 26.03-28.41, Camden County, Grading, Paving & Structures, Construction. | $183,338,239.37 | $195,271,432.77 |
New Jersey | 7892104 | LOCAL 14 STREET VIADUCT | $56,216,701.00 | $56,534,101.00 |
New Jersey | C00S319 | Local- West Brook Road Bridge over the Wanaque Reservoir - Con - NJTPA | $30,272,663.00 | $30,290,561.00 |
New Mexico | 0254078 | ALBUQUERQUE, I-40/I-25 SYSTEM INTERCH. CONS. | $130,145,714.51 | $331,851,900.68 |
New Mexico | 0261011 | NM 26 PAVEMENT AND BRIDGE REHAB | $6,255,198.72 | $30,182,607.97 |
New Mexico | 0401117 | INTERSTATE 40 WEST OF GALLUP SEG. 1 | $28,110,750.18 | $38,792,786.77 |
New Mexico | 0402073 | I-40, M.P. 117 TO M.P. 122.5 | $19,214,656.16 | $28,542,736.35 |
New Mexico | 0403144 | I-40 COORS INTERCHANGE | $120,026,391.58 | $170,954,166.23 |
New Mexico | 0403147 | I-40, MP 177.15 TO MP 181.66 | $25,411,572.48 | $35,115,659.53 |
New Mexico | 0403150 | I 4O TO NM 14 | $32,258,695.80 | $43,244,497.92 |
New Mexico | 0403155 | San Mateo I-40 Interchange, 160.73 MP TO 162.17 MP | $38,586,020.65 | $52,419,497.14 |
New Mexico | 0403157 | I-40 SAN MATEO TO PENNSYLVANIA STREET | $17,437,408.30 | $32,892,136.35 |
New Mexico | 0403165 | RECONSTRUCTION I-40, WEST CENTRAL TO 98TH ST. | $6,792,005.38 | $25,488,748.62 |
New Mexico | 0403187 | I-40, MP 173.73 TO MP 177.11 | $22,280,265.69 | $27,597,341.05 |
New Mexico | 0405072 | RECONSTRUCTION - NO ADDED CAPACITY I-40, MP 308 TO MP 313.87 | $11,751,123.90 | $31,985,715.40 |
New Mexico | 0541031 | 6.5 MI N ORO GRANDE - N., MAJOR WIDENING | $19,535,392.42 | $67,612,656.74 |
New Mexico | 0542027 | US 54, FROM MP 94.23 TO MP 107.1, TULAROSA TO VAUGHN, RECONSTRUCTION | $19,186,084.79 | $29,311,759.98 |
New Mexico | 0644027 | US 64, DULCE TO LUMBERTON | $20,208,820.95 | $30,091,321.33 |
New Mexico | 0702023 | US 70 INTERCHANGE, I-25 TO INT-E., CONS. DESIGN, R/W, RECONS.,CMGT | $7,915,269.48 | $32,837,179.61 |
New Mexico | 0702032 | T.4 MI E I-25 INTERCHANGE-E., RECONSTRUCTION | $14,465,640.31 | $37,082,422.36 |
New Mexico | 0704035 | US 70, Hondo Valley, Design Build Project | $40,081,166.35 | $125,355,737.79 |
New Mexico | 0846078 | ALAMO DRIVE TO OPERA/FLEA MARKET, RECONSTRUCTION | $33,948,692.71 | $59,421,708.09 |
New Mexico | 1100990 | EXIT 75 AT WILLIAMSBURG INTERCHANGE PROJECT | $14,583,697.00 | $43,185,092.05 |
New Mexico | 1101021 | I-25 ROADWAY RECONSTRUCTION | $25,522,508.95 | $29,880,380.53 |
New Mexico | 2101351 | Downtown Clovis Reconstruction Project | $14,296,520.55 | $41,058,819.05 |
New Mexico | 2101381 | Downtown Lovington Construction Phase I | $23,787,202.62 | $27,871,248.63 |
New Mexico | 2101771 | US-82-P, FROM MP 107.4 TO MP 139.1, NOT SPECIFIED, ROADWAY CONSTRUCTION | $40,039,974.61 | $71,654,376.76 |
New Mexico | 2102160 | US-285-P, FROM MP 0 TO MP 22, FROM TX STATE LINE TO LOVING, PHASE 1A/1B ALIGNMENT AND GEOTECHNICAL STUDY, PHASE 1C ENVIRONMENTAL, AND PHASE 1D PRELIMI | $6,401,802.98 | $55,388,334.33 |
New Mexico | 2102162 | US 285 Corridor Construction Phase III | $42,719.99 | $57,275,490.19 |
New Mexico | 2102163 | US 285 Corridor Construction Phase IV | $29,127,403.86 | $34,095,225.09 |
New Mexico | 4100401 | US-54-P, FROM MP 324.9 TO MP 326.3, 22.1 MILES NORTH OF JCT. LOOP 36 - EAST, BRIDGE REPLACEMENT | $22,713,536.45 | $27,314,087.25 |
New Mexico | 5100750 | NM 68, US 64 FROM LA POSTA RD. NORTH TO CAMINO DE LA PLACITAS (NORTH) IN THE TOWN OF TAOS -, ALIGNMENT STUDY | $21,038,569.93 | $33,930,607.00 |
New Mexico | 5101341 | I-25 La Bajada Slope Mitigation | $4,904,039.65 | $44,249,166.81 |
New Mexico | 5101441 | US 285 Tres Piedras | $27,113,687.30 | $31,738,678.19 |
New Mexico | 6100671 | NEAR CHURCH ROCK, NM. | $14,559,877.11 | $26,871,783.17 |
New Mexico | 6100780 | 41.846 MILES NORTH OF I-40 ON US491 BEGINNING IN GALLUP, NM | $10,910,628.65 | $27,999,763.78 |
New Mexico | 6100783 | US 491, FROM MP15.116 TO MP 36.984, 15 MILES NORTH OF I40, RECONSTRUCTION WITH ADDED CAPACITY | $11,681,416.32 | $93,319,498.44 |
New Mexico | 6101181 | I-40 Concrete Wall Barrier Project near Laguna | $10,746,089.23 | $29,085,501.41 |
New Mexico | A300160 | T/LPA-SUNPORT BLVD EXTENSION-FROM BROADWAY TO I-25 EXIT 221 AT SUNPORT BLVD.CONSTRUCT NEW 4 LANE DIVIDED FACILITY WITH BIKE LANES | $23,705,527.00 | $28,152,339.20 |
New Mexico | A300280 | I-25, MP 221.62 TO MP 222.02, RECONSTRUCT INTERCHANGE WITH POSSIBLE CHANGES IN CONFIGURATION | $50,566,726.25 | $64,791,085.58 |
New Mexico | A300381 | NM 528, FROM MP 8.32 TO MP 9.79, NM 528 RIO RANCHO BLVD IMPROVEMENTS (UPPER SECTION) - FROM RIDGECREST DR/LEON GRANDE AVE | $30,837,853.55 | $36,242,629.53 |
New Mexico | A301234 | US0550, FROM MP .6 TO MP 3, US 550 CONSTRUCTION & WIDENING PHASE 2 - FROM MP.6 TO MP 3.0, ROW PURCHASE, | $26,679,048.08 | $35,042,987.71 |
New Mexico | E100203 | NM 404 Widening Project | $32,249,053.97 | $62,633,228.34 |
New Mexico | LC00250 | I00025, FROM MP 1 TO MP 2, UNIVERSITY INTERCHANGE, BRIDGE REPLACEMENT, RAMP MODIFICATIONS/RECONSTRUCTION, ROADWAY RECONSTRUCTION, AND EXTENSION OF MUL | $37,182,085.61 | $44,795,634.49 |
New York | 0016273 | NY 112 RECONS BETWEEN I-495(LIE) AND GRANNY ROAD | $29,869,849.00 | $39,208,126.00 |
New York | 0054183 | SMITHTOWN:RECONSTRUCTION OF ROUTE 347 FROM TERRY ROAD TO GIBBS POND ROAD. | $30,497,801.00 | $37,508,188.00 |
New York | 0054203 | SMITHTOWN:RECONSTRUCT ROUTE 347 FROM ROUTE 111 TO MOUNT PLEASANT ROAD. | $18,837,225.00 | $32,046,532.00 |
New York | 0054213 | BROOKHAVEN:ROUTE 347 & ROUTE 112 INTERSECTION RECONSTRUCTION. | $22,124,679.00 | $38,399,446.00 |
New York | 0054233 | RECONSTRUCT NY 347 FROM GIBBS POND ROAD TO HALLOCK ROAD | $44,666,644.00 | $79,953,947.00 |
New York | 0072143 | NY878 OPERATIONAL IMPROVEMENTS | $73,458,400.00 | $96,623,000.00 |
New York | 0229483 | I495/CROOKED HILL RD INTRCHNG CONST | $19,311,883.00 | $37,054,138.00 |
New York | 0229563 | I495 PAVEMENT REHAB NASS LINE TO EXIT 55 | $18,689,083.57 | $39,585,386.00 |
New York | 0229573 | I495 Pavement Resurfacing Exit 55 to Exit 64 | $43,400,357.00 | $48,222,620.00 |
New York | 0327903 | NORTH HEMPSTEAD AND ROSLYN:THE ROSLYN VIADUCT ON STATE ROUTE 25A OVER HEMPSTEAD HARBOR FOR BRIDGE REPLACEMENT. | $63,425,107.00 | $79,656,384.00 |
New York | 0534803 | SSP Pavement Resurfacing Exit 20 to Exit 32 | $21,679,024.00 | $27,098,781.00 |
New York | 0760653 | NASSAU COUNTY BRIDGE REHAB | $3,832,257.00 | $29,700,001.00 |
New York | 0760783 | HOSP RD/NY27 BRID WIDEN & INTERSECT IMPROV - CONST | $17,987,091.00 | $26,312,338.00 |
New York | 0761353 | WALT WHITMAN RD OVER I495 BRIDGE WIDENING | $25,497,714.00 | $31,872,144.00 |
New York | 0809253 | HEMPSTEAD:REPAIRS ON TWO DRAW BRIDGES, MEADOWBROOK STATE PARKWAY OVER SLOOP CHANNEL AND LOOP PARKWAY OVER LONG CREEK. | $20,473,758.00 | $27,605,074.00 |
New York | 1051573 | ALBANY:INTERSTATE 787 & ROUTE 912S FROM ROUTE 9W TO ROUTE 5 FOR BRIDGE REHABILITATION AND HIGHWAY RESURFACING. | $32,552,129.00 | $37,672,499.00 |
New York | 1306813 | RT. 7 OVER THE HUDSON RIVER, BRIDGE REPAIR | $25,732,635.00 | $32,315,797.00 |
New York | 1721513 | COLONIE:INTERSTATE 87 EXIT 4 ACCESS IMPROVEMENTS (PHASE 1) I-87 OVER ALBANY SHAKER RD-PAVEMENT RECONSTRUCTION & BRIDGE REPLACEMENT | $22,580,577.00 | $25,389,497.00 |
New York | 1721903 | I-87: EXIT 4, AIRPORT CONNECTOR, PART2 | $32,190,343.00 | $38,317,048.00 |
New York | 2134413 | UTICA:ROUTES 5, 8, & 12/NORTH SOUTH ARTERIAL & VIADUCT FROM BURRSTONE ROAD TO ORISKANY CIRCLE FOR RECONSTRUCTION. | $54,772,250.00 | $68,465,313.00 |
New York | 3501903 | I-81 VIADUCT - I-481 CONVERSION TO I-81 NORTH OF KIRKVILLE RD | $227,350,000.00 | |
New York | 3506413 | SYRACUSE:INTERSTATE 690 OVER TEALL AVENUE AND BEECH STREET-BRIDGE REPLACEMENT PROJECT. | $67,257,000.00 | $74,730,000.00 |
New York | 4390303 | I390/490 NORTHBOUND RAMPS REALIGNMENT | $53,678,092.00 | $61,012,624.00 |
New York | 4390543 | I-390 INTERCHANGE IMPROVEMENTS @ I-490 (STAGES 3 & 4) [SEE COMPANION PROJECT 4390544 FOR NON-INTERSTATE 4390.54.322] | $40,140,949.00 | $68,429,791.00 |
New York | 494X053 | RT 19 AND RT 98 OVER ERIE CANAL LIFT BRIDGE REHAB | $6,427,455.00 | $29,557,974.00 |
New York | 5760803 | BUFFALO:NY GATEWAY CONNECTIONS IMPROVEMENT TO THE US PEACE BRIDGE PLAZA. | $46,087,513.00 | $66,198,804.00 |
New York | 6008223 | LINDLEY:ROUTE 15 FROM WATSONS CREEK TO PRESHO (PHASE 2) - CONSTRUCT 7 BRIDGES TO COMPLETE THE EXPRESSWAY. | $27,626,352.00 | $34,532,940.00 |
New York | 7111213 | BRIDGE REPLACEMENT, NY Route 12E over Chaumont River | $27,763,102.00 | $28,123,102.00 |
New York | 8006723 | WARWICK:ROUTE 17 EXIT 122 INTERCHANGE RECONSTRUCTION. | $39,617,125.00 | $81,971,616.00 |
New York | 8006843 | ROUTE 17 @ ROUTE 32 (EXIT 131) INTERCHANGE RECONSTRUCTION TOWNS OF MONROE AND WOODBURY ORANGE COUNTY. NY DEMO #583 | $113,157,814.00 | $142,642,639.00 |
New York | 8018463 | 801846 - ROUTE 28 / ESOPUS CREEK-BRIDGE REPLACEMENT - BIN 1091290, CIN C870151 | $20,837,454.00 | $26,054,894.00 |
New York | 8062093 | DEERPARK:INTERSTATE 84 OVER THE DELAWARE RIVER BETWEEN NEW YORK AND PENNSYLVANIA AND COUNTY ROUTE 16 FOR BRIDGE REHABILITATION. | $29,316,541.00 | $47,201,137.00 |
New York | 8101463 | WESTCHESTER COUNTY BRIDGES: HRP, SMRP, ROUTE 1 | $92,932,000.00 | $119,452,241.00 |
New York | 8127263 | TACONIC STATE PARKWAY @ PUDDING STREET INTERCHANGE, NEW GRADE SEPARATED INTERCHANGE, TOWN OF PUTNAM VALLEY PUTNAM COUNTY | $25,271,363.00 | $32,453,463.00 |
New York | 8239453 | ROUTE 9W: SEVEN BRIDGE REPLACEMENTS AND REHABILITATIONS IN THE TOWNS OF HIGHLANDS, CORNWALL, AND NEW WINDSOR, ORANGE COUNTY | $23,580,000.00 | $29,475,000.00 |
New York | 8729723 | I-287 BRIDGE DECK REPLACEMENTS OVER MIDLAND AVE AND METRO-NORTH RAILROAD, CITY OF RYE, WESTCHESTER CO. | $11,534,353.00 | $30,381,515.00 |
New York | 8808623 | WURTS STREET / DOCK STREET & RONDOUT CREEK | $51,540,670.00 | $51,540,670.00 |
New York | 8813683 | BRIDGE REHABILITATION/REPLACE: WESTCHESTER COUNTY | $19,943,281.00 | $33,844,144.00 |
New York | 8814073 | I-684 PMI PAVING: HUTCHINSON RIVER PARKWAY TO ROUTE 172 OVERPASS, TOWN OF BEDFORD, WESTCHESTER COUNTY | $26,384,140.00 | $29,319,932.00 |
New York | 8LHT113 | Lower Hudson Transit Link (8823.50 & 8823.51) | $70,987,368.00 | $119,616,998.00 |
New York | 8TZ1003 | ROCKLAND AND WESTCHESTER COUNTIES:TAPPEN ZEE BRIDGE OVER THE HUDSON RIVER FOR BRIDGE REPLACEMENT (DESIGN/BUILD CONTRACT). | $3,216,685,500.00 | |
New York | 9013393 | RT 17 INTERCHANGE 105 RECONSTRUCTION AND RT 42 IMPROVEMENTS | $1,171,500.00 | $30,255,620.00 |
New York | 9066743 | LIBERTY:ROUTE 17 @ PARKSVILLE BETWEEN MORRSTON EB ENT RAMP & FOX MOUNTAIN RD END 2 KM E OF COOLEY RD FOR RECONSTRUCT & NEW CONST. | $59,444,048.00 | $96,596,293.00 |
New York | 9067173 | THOMPSON:UPGRADE ROUTE 17 TO INTERSTATE STANDARDS BETWEEN EXITS 107 & 108 INCL REPL OF BRIDGE OVER THE NEVERSINK RIVER. | $26,288,633.00 | $30,625,889.00 |
New York | 9358223 | I-88 PAVEMENT & BRIDGE PROJECT, OTSEGO AND SCHOHARIE COUNTIES | $45,484,413.00 | $50,538,239.00 |
New York | 9358433 | I-88 EXIT 17 TO 18, CRACK & SEAT | $31,827,708.00 | $37,014,123.00 |
New York | 9500804 | BINGHAMTON:INTERSTATE 81/ROUTE 17 INTERCHANGE RECONSTRUCTION (PROSPECT MOUNTAIN PHASE 2) RECONST INTERCHANGE 4, INCL NEW BRIDGES, | $23,444,954.00 | $167,243,863.00 |
New York | NYCD001 | NEW YORK CITY:VARIOUS HIGHWAYS IN THE VICINITY OF THE WORLD TRADE CENTER FOR AN ER PROJECT (9/11/2001 ATTACK). | $97,604,976.00 | $97,604,976.00 |
New York | X021523 | NEW YORK CITY (BROOKLYN):REPLACEMENT OF THE BELT PARKWAY BRIDGE OVER MILL BASIN IN BROOKLYN, NY TO BRING TO A STATE OF GOOD REPAIR | $174,589,918.00 | $296,237,398.00 |
New York | X021543 | NEW YORK CITY:REHABILITATION OF THE BELT PARKWAY BRIDGE OVER GERRITSON INLET. | $84,883,281.00 | $106,104,105.00 |
New York | X027083 | BRONX RIVER GREENWAY SEGMENT PHASE 2 | $28,007,063.00 | $37,344,830.00 |
New York | X051603 | KGI INFRASTRUCTURE & OPERATIONAL IMPROVEMENT IN QUEENS CO. | $3,576,101.00 | $365,706,001.00 |
New York | X071483 | NEW YORK CITY:RECONSTRUCT THE HARLEM RIVER DRIVE VIADUCT BETWEEN E 125th & E 132nd ST INCLUDE CONST OF ENTRANCE RAMP FROM 3rd AVE ONTO SOUTHBOUND HRD. | $72,857,883.00 | $108,306,433.00 |
New York | X110263 | REPLACEMENT OF BRONX RIVER PARKWAY BRIDGES OVER MNRR, BRONX CO. (BINS 1075049 & 1075059) | $62,932,000.00 | $78,665,001.00 |
New York | X228693 | MOBILITY IMPROVEMENT ON LIE EB B/T CLEARVIEW EXPWY & SPRINGFIELD BLVD, REPLACEMENT OF OCEANIA ST BRIDGE OVER LIE IN QUEENS COUNTY, NYC (BIN: 1055300) | $60,504,272.00 | $88,327,756.00 |
New York | X720313 | REPLACEMENT OF EAST 138TH STREET BRIDGE OVER MAJOR DEEGAN EXPRESSWAY | $27,131,410.00 | $52,860,002.00 |
New York | X720393 | Rehab of Major Deegan Expy Between W.161st St & Highbridge Interchange (BINS 1067451, 1066840) & Depot Pl Bridge Rehab over MDE (BIN 1067452) in Bronx | $112,881,833.00 | $128,945,051.00 |
New York | X726993 | NEW YORK CITY:REHAB 3 BRIDGES ALONG THE CROSS BRONX EXPRESSWAY HIGH-BRIDGE INTERCHANGE. | $45,350,697.00 | $84,509,372.00 |
New York | X727163 | REPLACEMENT OF RAMP OCH, SHERIDAN BLVD. NORTH TO CBE WEST | $39,315,929.00 | $49,144,912.00 |
New York | X729773 | NEW YORK CITY:KOSCIUSZKO BRIDGE REPLACEMENT - Phase II. | $349,186,006.00 | $357,780,360.00 |
New York | X731273 | BRUCKNER EXPWY-HUTCHINSON PKWY MOBILITY IMPROVEMENT PROJECT, BRONX CO., NYC | $19,633,360.00 | $38,841,023.00 |
New York | X731453 | REHABILITATION OF BRUCKNER BLVD VIADUCT (278I). BRONX, NYC | $32,752,000.00 | $209,100,000.00 |
New York | X731473 | DECK REPLACEMENT OF FIVE BRIDGES ON I-278, KINGS & RICHMOND | $51,848,443.00 | $80,341,790.00 |
New York | X731493 | ARTHUR SHERIDAN ENHANCEMENT (I-895) | $41,216,935.34 | $51,521,170.34 |
New York | X731613 | GOWANUS EXPRESSWAY STEEL REPAIRS & RAMP D DECK REPLACEMENT, KINGS COUNTY | $28,725,858.00 | $31,917,622.00 |
New York | X731633 | HUNTS POINT TRUCK ACCESS IMPROVEMENT PROJECT PHASE 1, BRONX CO. NYC | $331,874,646.00 | $571,215,162.00 |
New York | X731653 | HUNTS POINT INTERSTATE ACCESS IMPROVEMENT PROJECT, CONTRACT 3, BRONX COUNTY | $481,486,514.00 | |
New York | X731683 | REHABILITATION OF THE WOOLLEY AVE AND BRADLEY AVE BRIDGES OVER STATEN ISLAND EXPRESSWAY IN RICHMOND COUNTY, NY | $10,768,846.00 | $32,790,856.00 |
New York | X731733 | Gowanus Expressway Viaduct Painting and Steel Repairs, Kings County, NYC | $69,004,032.00 | $176,738,040.00 |
New York | X735753 | NEW YORK CITY:REPLACEMENT OF VAN WYCK EXPRESSWAY. | $106,913,765.70 | $106,913,765.70 |
New York | X735773 | NYC:REPL OF VAN WYCK EXPWY VIADUCTS AT THE KGI, NB VAN WYCK EXPWY/ GRAND CENTRAL PKWY, UNION TPKE & JACKIE ROBINSON PKWY. | $109,009,471.00 | $138,658,347.00 |
New York | X735803 | VAN WYCK EXPRESSWAY VIADUCT REHABILITATION, QUEENS COUNTY | $85,043,318.00 | $133,064,009.00 |
New York | X735843 | X73584 - (DB CONTRACT 3) VAN WYCK EXPRESSWAY CAPACITY IMPROVEMENTS | $611,584,776.00 | $937,603,543.00 |
New York | X757003 | NEW YORK CITY:WILLIS AVENUE OVER THE HARLEM RIVER FOR BRIDGE REPLACEMENT. | $217,541,858.00 | $537,970,865.00 |
New York | X757533 | BROADWAY BRIDGE REHABILITATION (2240137) | $88,720,000.00 | $110,900,000.00 |
New York | X758863 | MADISON AVE. BRIDGE REHAB (BIN 2240079) | $21,400,000.00 | $30,353,000.00 |
New York | X758923 | NEW YORK CITY (QUEENS):ROOSEVELT AVENUE OVER THE VAN WYCK EXPRESSWAY/INTERSTATE 678 FOR BRIDGE REHABILITATION. | $53,333,335.00 | $70,266,669.00 |
New York | X759193 | NYC, ER EVENT 01-02, SEPTEMBERR 11, 2001, RECONSTRUCTION OF WORTH ST, HUDSON ST. TO EAST BROADWAY | $12,000,000.00 | $95,000,000.00 |
New York | X759213 | ER EVENT NY2001-02, 9/11, NYC, MANHATTAN RECONSTRUCTION OF WARREN AND JOHN STREETS. | $11,300,000.00 | $30,700,000.00 |
New York | X759843 | NEW YORK CITY:ROUTE 9A WEST STREET PROMENADE - SITE PROJECT FOR RECONSTRUCTION. | $105,415,792.00 | $119,050,170.00 |
New York | X759846 | NEW YORK CITY:ROUTE 9A NORTH AND WEST PROMENADE PROJECT EXTRA TASKS FOR CONSTRUCTION INSPECTION AND CONSTRUCTION SUPPORT SERVICES. | $38,781,817.00 | $38,781,817.00 |
New York | X761243 | IMPLEMENT PHASE FOUR OF GRAND CONCOURSE SAFETY IMPROVEMENTS | $18,456,401.00 | $60,566,864.00 |
New York | X761263 | REHAB BROOKLYN BRIDGE, MANHATTAN APPROACHES (CONTRACT 7) | $53,826,074.00 | $159,040,843.00 |
New York | X761264 | REHABILITATE THE MANHATTAN APPROACHES TO THE BROOKLYN BRIDGE IN NY COUNTY | $39,200,000.00 | $41,263,158.00 |
New York | X762074 | TMC OPERATIONAL SUPPORT FOR FFY 19 | $36,250,000.00 | $62,556,415.00 |
New York | X764203 | PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES | $16,038,203.30 | $25,444,626.00 |
New York | X764263 | WILLIAMSBURG BRIDGE REHABILITATION CONTRACT # 9 (BIN2240039), NEW YORK COUNTY | $153,495,936.00 | |
New York | X770183 | NEW YORK CITY:GRAND CONCOURSE IMPROVEMENTS FROM EAST 166th STREET TO EAST 171st STREET. | $19,894,600.00 | $26,176,750.00 |
New York | X770783 | NYC:REPLACEMENT OF CITY ISLAND ROAD BRIDGE OVER EASTCHESTER BAY WITH A SINGLE SPAN CABLE-STAYED STRUCTURE. | $99,612,848.00 | $124,516,060.00 |
New York | X772433 | NEW YORK CITY:UNIONPORT BRIDGE REPLACEMENT | $148,897,916.00 | $219,825,398.00 |
New York | X772483 | NEW YORK CITY:REHABILITATION OF ATLANTIC AVENUE BRIDGE | $31,487,749.00 | $77,785,932.00 |
New York | X772513 | REHABILITATE RIVERSIDE DRIVE BRIDGE/W 158TH STREET (2246720) | $53,333,600.00 | $82,758,144.00 |
New York | X772563 | NEW YORK CITY:REHABILITATE THE WESTCHESTER AVENUE BRIDGE OVER THE HUTCHINSON RIVER PARKWAY. | $34,859,000.00 | $45,408,750.00 |
New York | X772843 | REHABILITATION MANHATTAN BRIDGE STRUCTURAL COMPONENTS (2240028) | $37,336,000.00 | $73,019,628.00 |
New York | X772863 | NEW YORK CITY:THE MACOMBS DAM BRIDGE OVER THE HARLEM RIVER FOR BRIDGE REHABILITATION. | $32,109,825.00 | $49,652,282.00 |
New York | X773093 | BROOKLYN WATERFRONT GREENWAY GOWANUS CONNECTOR | $30,948,284.00 | |
New York | X773113 | SAFETY IMPROVEMENTS ON 4TH AVENUE IN BROOKLYN (REPURPOSED EARMARK NY650 - PROGRAM CODE RPS9) | $6,907,375.00 | $50,677,414.00 |
New York | X773363 | RECONSTRUCTION OF TILLARY STREET (PHASE 2) (BROOKLYN), NEW YORK CITY. | $14,667,000.00 | $41,600,000.00 |
New York | X774073 | RECONSTRUCTION OF 5TH AVENUE BRIDGE OVER LIRR & SEA BEACH (Bridge NY), KINGS COUNTY | $50,802,516.00 | |
New York | X777013 | EMERGENCY RELIEF NY2013-01, HURRICANE SANDY, NYCDOT (QUEENS COUNTY) PERMANENT FLOOD REPAIRS TO METROPOLITAN AVE BRIDGE BY CONTRACT | $22,600,000.00 | $28,250,000.00 |
New York | X777044 | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO MOVEABLE BRIDGES BY CONTRACT FORCES. | $41,673,232.00 | $52,091,540.00 |
New York | X777114 | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO BATTERY PARK AND WEST STREET UNDERPASSES BY CONTRACT FORCES. | $53,418,887.00 | $66,773,609.00 |
New York | X777811 | ER EVENT NY13-01, HURRICANE SANDY, QUEENS CO., PERMANENT REPAIRS TO PAVEMENT FROM STORM SURGE, ROCKAWAY BEACH BLVD FR 73 TO 88 ST | $16,332,765.00 | $30,534,013.00 |
New York | XM12533 | NEW YORK CITY:BRIDGE CORRECTIVE MAINTENANCE AT VARIOUS LOCATIONS. | $26,323,738.00 | $71,485,914.00 |
New York | XM16563 | BRIDGE EXPANSION JOINTS REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN NYC | $23,289,640.00 | $31,963,325.00 |
New York | XM17033 | FDR Drive Cleaning and Painting - South Street, NY, NY | $4,122,656.00 | $38,123,007.00 |
New York | XM22043 | BRIDGE PAINTING AT VARIOUS LOCATIONS IN BRONX, KINGS, QUEENS, AND RICHMOND COUNTIES, NYC | $8,982,131.00 | $41,729,045.00 |
North Carolina | 000S425 | Enhancement Beautification Program | $29,607,706.00 | $37,587,908.00 |
North Carolina | 000S781 | Carolinian/Piedmont between Charlotte & Raleigh | $37,299,089.00 | $54,264,000.00 |
North Carolina | 0012056 | Bridge Rehab (Design-Build) - Dare County | $117,655,985.00 | $154,742,448.00 |
North Carolina | 0012063 | Bridge #11 over the Oregon Inlet on NC 12 | $239,506,867.00 | $311,852,159.00 |
North Carolina | 0016052 | NC 16 North of SR 1814(Caldwell Rd) SR 1895(Tower Rd) | $35,258,252.00 | $66,661,959.00 |
North Carolina | 0017054 | US 17 from South of SR 1149 (Price Rd) to South of SR 1536 (Hamilton Beach Rd) | $188,595,939.00 | $237,645,573.00 |
North Carolina | 0017093 | US17 (New Bern Bypass) from US17 S. of New Bern to US70 | $37,720,592.00 | $46,609,701.00 |
North Carolina | 0017096 | US 17/Wilmington Bypass -NC 87 South of Bishop -US 74-76 East of Malmo | $59,050,909.00 | $76,511,079.00 |
North Carolina | 0017124 | US 17 (Wilmington Bypass) from US 74/76 east of Malmo in Brunswick County to SR 1430(Cedar Hill Rd) | $45,508,889.00 | $115,660,139.00 |
North Carolina | 0017131 | US 17(Wilmington Bypass) from SR 1430(Cedar Hill Road) US421 North of Wilmington | $53,889,361.00 | $170,811,184.00 |
North Carolina | 0024024 | Bridge # 116 over CSX railroad, North South railroad land Hillsboro Street on NC 24-87-02 | $30,988,936.00 | $39,067,853.00 |
North Carolina | 0026015 | Major Widening - Henderson County | $34,312,353.00 | $127,517,850.00 |
North Carolina | 0040033 | Pavement Rehabilitation 1 m E I-40 E of SR1143 to .7m E of US 601 | $54,043,811.00 | $67,564,198.00 |
North Carolina | 0040063 | I-40 Pavement Rehab - Buncombe County | $7,079,543.00 | $39,791,093.00 |
North Carolina | 0040068 | Pavement Rehab - Burke County | $36,708,865.00 | $45,890,750.00 |
North Carolina | 0040074 | Rehab & Restoration - Catawba County | $27,864,654.00 | $39,629,473.00 |
North Carolina | 0040075 | Pavement & Bridge Rehabilitation - Duplin County | $9,853,146.00 | $33,333,000.00 |
North Carolina | 0040097 | Pavement Rehabilitation - Buncombe County | $15,983,239.00 | $27,046,924.00 |
North Carolina | 0040114 | New Route - Forsyth County | $1,378,595.00 | $307,240,802.00 |
North Carolina | 0052057 | New Route - Forsyth County | $46,221,563.00 | $170,594,167.00 |
North Carolina | 0054031 | Major Widening - Wake County | $35,646,223.00 | $72,095,831.00 |
North Carolina | 0055020 | DURHAM-NC55 (ALSTON AVE) FROM NC 147 (BUCK DEAN FREEWAY) TO US 70 BUSINESS/NC 98 (HOLLWAY ST) MILES: 1.000/KILOMETERS: 1.609 | $65,055,998.00 | $92,049,383.00 |
North Carolina | 0059005 | Br #22 over I95B / US 301 on NC 59 | $26,104,631.00 | $32,548,883.00 |
North Carolina | 0063001 | NC63 FM SR1615 TO W SR1004 NW ASHVILLE, PE | $43,642,052.00 | $65,761,531.00 |
North Carolina | 0064216 | Replace Bridge# 9 - Dare County | $36,000,000.00 | $45,000,000.00 |
North Carolina | 0069007 | NC 69/US 64 fr Georgia state line to US 64 (Hayesville Byp) | $68,791,812.00 | $68,941,937.00 |
North Carolina | 0070049 | US70 HAVELOCKBYP/N PINEGROVE/N CARTERET CO LI, PE | $40,661,691.00 | $140,906,133.00 |
North Carolina | 0070106 | US 70 (Goldsboro Bypass) E SR 1300 (Salem church Rd) E SR 1556 (Wayne Memorial Dr) | $84,752,010.00 | $84,942,512.00 |
North Carolina | 0070119 | Br # 1830227 over Peace Street on US 70 | $57,740,590.00 | $83,411,362.00 |
North Carolina | 0070154 | US 70 Slocum Road at the Cherry Point Military Base (Planning/Environmental Studies only) | $34,635,596.00 | $43,551,453.00 |
North Carolina | 0070163 | US 70 west SR 2565(Sadisco Rd) west of SR 1915 (Turnage Rd) | $46,665,585.00 | $93,090,304.00 |
North Carolina | 0070241 | US 70 Havelock Byp/ N Pinegrove / N Carteret CO LI | $7,381,191.00 | $101,847,850.00 |
North Carolina | 0073025 | I-73 from NC 68 to the Greensboro Western Loop; Freeway on new location | $72,234,046.00 | $116,273,455.00 |
North Carolina | 0074137 | Charlotte-US 74 (Independence Blvd) from NC 24/27 (Albemarle Rd) to Idlewild Road | $6,711,803.00 | $58,830,321.00 |
North Carolina | 0074213 | Eastern section of nothern beltway in Winston-Salem - Forsyth County | $63,497,106.00 | $191,038,017.00 |
North Carolina | 0074226 | Winston Salem Northern Beltway Eastern Section (Future I-74) US311- I-40 | $95,100,000.00 | |
North Carolina | 0077016 | Rehabilitation & Restoration - Surry County | $50,763,840.00 | $65,329,802.00 |
North Carolina | 0085003 | I-85 fr SR 1113 (Kivett Dr) to .4 mi N of I-85 Bus in High Point - Guilford County | $20,178,801.00 | $25,286,753.00 |
North Carolina | 0085019 | Pavement Rehabilitation | $10,713,313.00 | $25,505,073.00 |
North Carolina | 0095031 | I-95 fr .4 mi N of US 70 Byp to .2 mi N of NC 222 | $67,778,950.00 | $96,301,561.00 |
North Carolina | 0095057 | Major Widening - Cumberland County - INFRA Grant | $119,264,000.00 | $418,500,000.00 |
North Carolina | 0095071 | Design-Build - Cumberland, Halifax, Harnett, Johnston, Nash, Northampton, Robeson, & Wilson Counties | $16,600,000.00 | $27,666,667.00 |
North Carolina | 0095078 | Rehab & Restoration - Robeson County | $22,500,000.00 | $190,662,500.00 |
North Carolina | 0095079 | Rehab & Restoration - Robeson County | $8,150,956.00 | $123,640,000.00 |
North Carolina | 0100024 | Fayetteville - Outer Loop fr S of SR 1003 (Camden Rd) to S of SR 1104 (Strickland Bridge Rd) | $45,328,217.00 | $220,627,122.00 |
North Carolina | 0107010 | NC 107 from SR 1002 (Roger Rd) to NC 281 | $26,293,252.00 | $54,065,319.00 |
North Carolina | 0129007 | New Route - Graham County | $27,200,000.00 | $27,200,000.00 |
North Carolina | 0129008 | New Route - Graham County | $60,000,000.00 | $60,000,000.00 |
North Carolina | 0143011 | New Construction - Graham County | $78,000,000.00 | $78,600,000.00 |
North Carolina | 0209006 | NC 209/US 19-23-74 (Great Smoky Mtn expressway)SR1523 (Old Clyde Rd)Lake Junaluska (includes: R-2210B) | $31,161,199.00 | $38,960,538.00 |
North Carolina | 0211021 | NC 211 from SR 1500 (Midway Rd) to NC 87 | $83,801,628.00 | $340,064,170.00 |
North Carolina | 0220025 | Greensboro-combined with R-2413C see state remarks for more details | $40,569,151.00 | $51,048,709.00 |
North Carolina | 0220065 | I-73/74 from .2 mile southwest of SR 1304(Harrington Rd) to I-73/74 interchange south of Ellerbe | $45,326,444.00 | $56,818,233.00 |
North Carolina | 0221041 | US 221 North of South Fork River to South of NC 194 | $57,255,348.00 | $91,030,188.00 |
North Carolina | 0261191 | I-26 at the NC 191 Interchange | $64,272,954.00 | $89,406,956.00 |
North Carolina | 0261199 | I-26 fr NC 146 (Long Shoals Rd) @ exit 37 to I-40 | $84,288,485.00 | $319,679,424.00 |
North Carolina | 0261200 | I-26 fr US 25 Bus (exit 44) to NC 280 (exit 40) | $43,749,125.00 | $164,332,625.00 |
North Carolina | 0261202 | Major Widening - Henderson County | $9,769,808.00 | $31,367,238.00 |
North Carolina | 0264067 | Rehabilitation & Restoration - Pitt County | $4,933,769.00 | $26,577,918.00 |
North Carolina | 0273001 | Mount Holly-NC 273 (South Main ST) fm. south of CAtawba Drive to Highland Street at Rankin Avenue | $21,404,947.00 | $29,924,717.00 |
North Carolina | 0277019 | Bridge Rehab - Mecklenburg County | $21,500,000.00 | $29,882,750.00 |
North Carolina | 0277020 | Bridge Rehabilitation - Mecklenburg County | $18,544,043.00 | $32,403,454.00 |
North Carolina | 0301028 | Rocky Mount-US 301 Bypass from NC 43-48 (Benvenue rd) to SR 1836 (May Drive) | $31,980,041.00 | $44,969,303.00 |
North Carolina | 0311023 | US 311 N of SR 1929 (Spencer RD) to US 220 / Future I-73 | $99,335,547.00 | $125,860,553.00 |
North Carolina | 0311032 | High Point-US 311 and NC 68 (Eastchester Drive) interchange | $17,372,269.00 | $38,833,693.00 |
North Carolina | 0401155 | I-40 from West of Sr 1224 (Monte Vista Rd) to I-240 in Asheville | $38,809,175.00 | $49,706,154.00 |
North Carolina | 0401230 | Fayetteville-US 401(Raeford Rd) east of US 401 Bypass (Skibo Rd) SR 1007(All-American Freeway) | $65,642,570.00 | $88,896,185.00 |
North Carolina | 0401249 | US 401 fr nc 96 to sr 1103 | $30,044,442.00 | $66,074,894.00 |
North Carolina | 0401259 | I-40 & SR 3015 (Airport Blvd) interchange | $22,944,418.00 | $55,477,705.00 |
North Carolina | 0401300 | Major Widening - Cumberland County | $5,789,402.00 | $35,903,488.00 |
North Carolina | 0402134 | I-40 near mp119 in Burke County/near mp 146 Iredell County | $28,008,668.00 | $31,405,704.00 |
North Carolina | 0402141 | Statesville-I-40/I-77 W. of SR 2003 (Radio Rd) SR 2158 (Old Mocksville Rd) I-77 S. SR 2321 (E. Broad St) SR 2171 (Jane Sower Rd) | $27,542,766.00 | $31,255,243.00 |
North Carolina | 0402145 | I-40 / I-77 Interchange *see state remarks for more detail* | $101,835,571.00 | $122,660,167.00 |
North Carolina | 0403112 | I-40 .3 mile W. of NC 801 Davie County to .3 mile W. ofSR 1122(Summerset Dr) Forsyth County | $45,994,174.00 | $88,936,560.00 |
North Carolina | 0404139 | I-40 from I-440 / US 64 (exit 301) to the US 70 Construction | $314,390,520.00 | $502,101,512.00 |
North Carolina | 0404140 | I-40 West ofSR 1728(Wade Ave,mp 289) East of SR 1319(Jones Franklin Rd,mp 294) | $48,706,842.00 | $61,993,437.00 |
North Carolina | 0404148 | I-40/I-85 to the Durham County Line | $16,328,584.00 | $308,696,331.00 |
North Carolina | 0404161 | I-40/I-85, SR 1107 (Mebane-Oaks Rd) in Mebane | $3,828,675.00 | $26,126,759.00 |
North Carolina | 0421087 | Bridge Replacement - Forsyth | $125,810,399.00 | $157,269,302.00 |
North Carolina | 0421088 | Design Build - Forsyth County | $66,699,329.00 | $84,827,761.00 |
North Carolina | 0431024 | Rocky Mount Northern Connector from SR 1604 (Hunter Hill Rd) to US 301 | $31,444,430.00 | $39,442,959.00 |
North Carolina | 0440010 | Raleigh-I-440 (Cliff Benson Beltline) Sr 1313 (Walnut St) SR 1728 (Wade Ave) | $89,739,967.00 | $509,047,891.00 |
North Carolina | 0440013 | I-440 /US 64 from the I-40(exit 301) North of US 64/264 (Knightdale Bypass) | $186,304,407.00 | $207,108,285.00 |
North Carolina | 0440024 | Rehab & Restoration - Wake County | $30,345,335.00 | |
North Carolina | 0485026 | I-485 (Charlotte Eastern Outer Loop) / I-85 | $97,522,129.00 | $108,340,707.00 |
North Carolina | 0485027 | I 485 (Charlotte Outer Loop) East of NC 115 to I-85 North | $123,687,202.00 | $159,664,006.00 |
North Carolina | 0507003 | Fuquay-Varina-North Judd Parkway northwest from NC 55 to NC 42 | $8,650,000.00 | $25,283,334.00 |
North Carolina | 0540041 | New Route - Wake County | $139,498,000.00 | |
North Carolina | 0540042 | New Route - Wake County | $145,053,000.00 | |
North Carolina | 0540045 | New Route - Wake County | $287,132,000.00 | |
North Carolina | 0540046 | Rehab & Restoration - Wake County | $33,400,000.00 | |
North Carolina | 0620031 | Fayetteville - Outer Loop fr S of US 401 to S of SR 1400 (Cliffdale Rd) - Cumberland County | $127,310,056.00 | $169,804,645.00 |
North Carolina | 0708053 | Greensboro Western Loop from US 220 (Battleground Ave) SR 2303(Lawndale Dr) | $81,197,985.00 | $101,535,896.00 |
North Carolina | 0708067 | Greensboro-Western Loop from south of SR 2137(Old Oak Ridge Rd) to north of US 220(Battleground Ave) | $62,069,512.00 | $193,774,939.00 |
North Carolina | 0771171 | I-77 from South of SR 1125 (Ashbury Church Rd/mp 71) to US 21 | $60,406,762.00 | $77,645,712.00 |
North Carolina | 0771219 | I-77 and SR 2136 (Gilead Rd) interchange | $17,022,858.00 | $25,078,573.00 |
North Carolina | 0771229 | New Construction I-77 from I-277 (Brookshire Freeway)to west Catawba Avenue(exit 28) | $105,862,973.00 | $136,107,880.00 |
North Carolina | 0771230 | New Route - Mecklenburg County | $29,600,000.00 | $37,002,285.00 |
North Carolina | 0771231 | New Route - Mecklenburg County | $27,200,000.00 | $34,046,870.00 |
North Carolina | 0851113 | I-85 / US 321, Geometric Safety Improvements to Interchange | $23,386,749.00 | $34,228,445.00 |
North Carolina | 0852062 | I-85 south of SR 2894 (Speedway-Concord Mills Blvd)Mecklenburg Co./ NC 73 Cabarrus County | $143,561,315.00 | $171,121,425.00 |
North Carolina | 0852077 | I-85 fr NC 73 in Cabarrus County (Exit 55) to Lane St (Exit 63) | $254,294,413.00 | $328,408,557.00 |
North Carolina | 0852078 | I-85 | $154,288,272.00 | $199,691,445.00 |
North Carolina | 0853197 | I-85 from North of SR 2120(Long Ferry Rd,exit 81) Rowan County-North of NC 150 Davidson County | $140,526,675.00 | $179,139,531.00 |
North Carolina | 0854104 | I-85 from Granville County to US 158 | $29,821,982.00 | $35,428,248.00 |
North Carolina | 0854116 | I-85 South of US158-Vance County/SR 1237(Manson Rd) Warren County | $87,007,526.00 | $110,392,138.00 |
North Carolina | 0854117 | I-85 from North of SR 1237(Manson RD) Virginia State Line | $58,286,701.00 | $73,050,299.00 |
North Carolina | 0918016 | Design Build-Winston-Salem-Salem Creek /SR4326(Rams Dr,formerly Stadium Dr) SR 4325(Martin Luther King Jr Dr) | $81,267,230.00 | $117,794,967.00 |
North Carolina | 0918062 | New Route - Forsyth County | $24,999,292.00 | $41,961,057.00 |
North Carolina | 0918093 | Winston-Salem Northern Beltway (Eastern Section ,Future I-74)from US 150 to I-40 Bus/NC421 | $101,004,789.00 | $187,650,242.00 |
North Carolina | 1118011 | New Route - Cumberland County | $81,519,123.00 | $245,200,734.00 |
North Carolina | 1118012 | New Route - Cumberland County | $5,520,681.00 | $62,722,941.00 |
North Carolina | 1121009 | Fayetteville-SR 1121(Ray Rd) fm. NC 210 to SR 1120 (Overhills Rd) | $31,643,103.00 | $40,624,454.00 |
North Carolina | 1132007 | Fayetteville-SR 1132 (Legion Rd) Sr 1363(Elk Rd) SR 1154 (West Mountain Drive) | $20,113,864.00 | $30,050,522.00 |
North Carolina | 1142011 | SR 1142 (Prison Camp Rd) fr NC 903 to SR 1182 (E College Rd) | $18,513,342.00 | $59,886,895.00 |
North Carolina | 1217006 | Kill Devil Hills-SR 1217 (Collington Rd) from US 158 to the Dead End | $19,848,131.00 | $33,387,970.00 |
North Carolina | 1335004 | Replace Bridge Numbers 73 & 96 - Carteret County | $10,893,916.00 | $54,100,000.00 |
North Carolina | 1820005 | High Point-Sr 1820(Skeet Club Rd) fm. East of Sr 1818 (Johnson St) to West of NC 68 (East Chester Dr) | $57,275,152.00 | $80,610,051.00 |
North Carolina | 1922001 | MORGANTON-SR1922-SR1924 FROM I-40 TO NC 18, PE | $28,773,272.00 | $36,502,981.00 |
North Carolina | 2020001 | Bridge Replacement - Statewide | $23,000,000.00 | $30,000,000.00 |
North Carolina | 4121007 | Greensboro-High Point-SR 1486/SR 1421(Greensboro/High Point Rd) SR 4228 (Vickrey Chapel RD) to SR 1424(Hilltop Rd) | $22,534,172.00 | $38,292,724.00 |
North Carolina | 5238005 | Charlotte-SR 2467(Mallard Creek Rd) from SR 2480(Sugar Creek Rd) to SR 2665(Harris Blvd) | $32,536,054.00 | $42,475,709.00 |
North Carolina | ER19005 | Emergency Relief/Permanent Repair - Bladen County | $21,386,214.00 | $28,870,000.00 |
North Dakota | 1A94078 | BISMARCK-MANDAN MEMORIAL BRIDGE - Structure | $24,035,401.00 | $27,035,441.50 |
North Dakota | 4083111 | US 83, Minot Broadway Viaduct; Structural Replacement, Grading, Aggregate Base Course, Concrete Pavement, Curb and Gutter, Retaining Walls, Sidewalk | $20,019,448.33 | $25,527,975.99 |
North Dakota | 7085109 | US 85, Long X Bridge 2.2 mi S of CMC 2739; Grading, Aggregate Base, HMA, Structure Replacement (new NBI #), Wildlife Crossing Structure (new) & Inc. | $37,528,661.00 | |
North Dakota | 7804062 | ND 1804, Red Mike Area (W of CMC 5334) to .03 mi W of CMC 5333; Grading, Aggregate Base, Hot Mix Asphalt, Passing Lanes, Lighting, Signing | $3,336,428.27 | $44,730,547.90 |
North Dakota | 8029173 | I-29, N OF HUNTER SEPARATION TO S OF JCT ND 200 - SB; GRADING, PCC PAVEMENT, MILL & HMA OVERLAY, CULVERTS, FENCING, GUARDRAIL | $26,203,695.00 | $29,115,216.67 |
North Dakota | 8094092 | I-94, West Fargo Horace Interchange (I-94 & Sheyenne St); Grading, Aggregate Base, PCC Pavement, Storm Sewer, Signing, Marking & Lighting | $21,492,990.46 | $25,030,803.87 |
North Dakota | 9052056 | US 52, VARIOUS LOCATIONS FOR INFRA PROJECTS | $16,750,000.00 | $26,395,406.81 |
North Dakota | 9999500 | BUILD GRANT PROJECTS - STATEWIDE, VARIOUS LOCATIONS - FLOOD RESILIENCY PROJECTS | $27,115,015.11 | $55,875,631.60 |
North Dakota | SB97001 | STATE INFRASTRUCTURE BANK FY97, SIB - ACAP | $2,540,000.00 | $27,106,700.00 |
Ohio | E034667 | IR-77 from near Oakes Rd. to IR-480 in Cuyahoga County. GARVEE Bond Project. | $76,257,886.37 | $112,446,681.03 |
Ohio | E036192 | FRA IR 270 2.60 (Recon),Major reconstruction project with pavement replacement. Upgrade drainage, guardrail, GARVEE BOND PROJECT | $75,986,388.25 | $89,771,593.66 |
Ohio | E036466 | FRA IR 270 9.15 | $10,994,073.70 | $66,558,947.32 |
Ohio | E036702 | IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. | $77,215,749.91 | $105,096,581.75 |
Ohio | E040035 | SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. | $22,942,024.00 | $74,080,622.81 |
Ohio | E040187 | US-33 in the vicinity of Carroll in Fairfield County. New interchange. | $29,984,540.18 | $50,077,288.04 |
Ohio | E040268 | IR-75 from 3.4 miles north of Butler County to Montgomery County in Warren County. Reconstruction and added capacity. GARVEE BOND. | $57,980,743.61 | $139,035,087.49 |
Ohio | E040452 | SR-161 from Simpson's Run east to the city of Grandville in Licking County. GARVEE Bond Debt Service for St Proj # 77221. | $58,632,228.13 | $71,391,326.59 |
Ohio | E040537 | US-24 from US-127 to SR-424 in Paulding and Defiance Counties. GARVEE Bond project | $61,098,292.87 | $77,847,751.06 |
Ohio | E040542 | MOT IR 75 11.01, PROVIDE THREE CONTINUOUS LANES AT THE US35 INTERCHANGE. PHASE 1B. GARVEE BOND PROJECT.. | $63,480,862.64 | $75,490,275.83 |
Ohio | E040549 | LUC IR 75 3.99 intrchg Mod P2, Widen and upgrade existing facility and modify interchanges to provide better ingress & egress | $23,805,366.36 | $153,586,962.00 |
Ohio | E040555 | MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes | $12,320,264.69 | $105,750,588.36 |
Ohio | E040563 | SUM IR 0076 10.00. Reconstruct IR-76/77, & change the access points & geometry of Main/Broadway & Wolf Ledges/Grant Interchanges. | $107,141,099.22 | $122,589,773.61 |
Ohio | E040631 | IR-70/71 from Hague to James Rd, city of Columbus in Franklin Cty. Reconstruct I-70/71 Split in Downtown Columbus. Design/Build | $224,155,241.36 | $247,053,250.01 |
Ohio | E040793 | IR-75 from the Great Miami River to Leo St. in the city of Dayton in Montgomery County. Reconstruction. MPI-0042 - GARVEE bond | $111,982,256.48 | $140,620,721.68 |
Ohio | E040822 | IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. | $54,215,826.86 | $65,011,744.66 |
Ohio | E040889 | Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements | $17,676,916.19 | $90,260,927.77 |
Ohio | E041146 | HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, | $54,968,466.63 | $214,033,776.42 |
Ohio | E050670 | JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg | $31,735,233.60 | $138,678,494.76 |
Ohio | E060287 | LUC US 24 6.19 Part 3 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | $60,670,302.46 | $77,239,169.93 |
Ohio | E060288 | HEN/LUC US 24 15.85 Part 2 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | $55,622,690.13 | $70,612,514.21 |
Ohio | E060290 | LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports | $29,640,014.61 | $43,244,586.68 |
Ohio | E060308 | IR-70 at US-40 in Belmont County. | $18,799,826.37 | $26,759,263.67 |
Ohio | E070090 | FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. | $37,129,619.91 | $102,065,835.19 |
Ohio | E070348 | HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. | $48,316,469.60 | $68,705,207.90 |
Ohio | E070405 | HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system | $96,901,970.54 | $131,576,258.81 |
Ohio | E080604 | LAK IR 090 21.42, MAJOR REHAB FROM PAINE RD TO THE ASHTABULA COUNTY LINE SFY 2010. GARVEE Bond Project | $36,631,817.48 | $41,077,161.34 |
Ohio | E080951 | FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes | $12,815,534.58 | $56,128,682.02 |
Ohio | E081090 | FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures | $26,573,361.84 | $48,703,706.96 |
Ohio | E090644 | CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge | $33,972,708.35 | $50,802,929.20 |
Ohio | E100378 | LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St | $17,565,240.61 | $49,751,620.01 |
Ohio | E100386 | LOR SR 0057 19.42, Add Lanes in each direction from IR 80 to IR 90, Interchange modifications at I-90. | $7,424,241.60 | $25,325,753.26 |
Ohio | E100545 | LUC IR 75 6.70 widening.the widening and reconstruction of LUC-75 from Lagrange St to I-280; perform necessary related work | $7,644,726.32 | $72,199,526.00 |
Ohio | E100633 | DEL IR 71 11.500, Full depth pavement replacement and addition of 3rd median lane. Widen ML Bridge MRW-71-3.00. | $24,424,914.62 | $58,884,802.36 |
Ohio | E100634 | FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps | $21,720,135.53 | $91,927,124.83 |
Ohio | E100878 | Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. | $50,703,082.79 | $71,077,582.05 |
Ohio | E100995 | HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work | $21,969,425.59 | $32,114,177.30 |
Ohio | E101051 | CUY INNERBELT CCG2 EB Bridge, New structure to replace existng Innerbelt Bridge (1809393). CCG2. Design Build Finance.. | $31,940,928.27 | $311,215,128.01 |
Ohio | E110266 | R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville | $33,360,932.28 | $56,166,678.34 |
Ohio | E110547 | FRA Lazelle Road Ph B | $19,715,047.00 | $27,992,252.50 |
Ohio | E110820 | HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT | $62,964,880.43 | $154,122,201.53 |
Ohio | E110840 | CUY IR 271 00.00 Addlane, Add one (1) lane in each direction along I-271 | $127,973,451.17 | $147,423,143.78 |
Ohio | E111416 | CUY IR 480 18.42 L&R Deck | $91,769,188.93 | $244,456,419.71 |
Ohio | E120394 | MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. | $26,967,588.04 | $34,155,108.28 |
Ohio | E120441 | MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. | $16,085,602.06 | $32,952,705.70 |
Ohio | E120585 | LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges | $7,839,647.09 | $173,892,384.24 |
Ohio | E120602 | LUC IR 75 2.75 Pav Reconst, Bridge repl | $10,740,799.64 | $30,809,464.00 |
Ohio | E120609 | CLA IR 70 10.55/13.98, Ph. 2, Major rehabilitation of the existing lanes and the construction of an additional lane. | $55,149,534.67 | $56,101,782.39 |
Ohio | E120958 | WOO/LUC IR75 30.70/0.00 Major | $19,601,169.78 | $204,108,241.98 |
Ohio | E120960 | JEF SR 7 4.800. Bench exisitng hillside to eliminate rockfall and landslide hazards. OH11-01, DSR JEF-004 | $23,015,134.92 | $28,768,918.64 |
Ohio | E130382 | RIC US 0030 09.13 | $58,979,060.80 | $72,808,576.00 |
Ohio | E130407 | SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures | $40,375,314.13 | $98,675,027.74 |
Ohio | E130869 | STA IR 0077 08.40/VAR | $23,694,366.75 | $65,533,753.02 |
Ohio | E130952 | HAM IR 275 39.81 | $7,589,154.88 | $35,201,002.87 |
Ohio | E131180 | FRA-70-22.61 (FEF 1A), Interchange, Reconstruction | $21,824,687.99 | $90,596,514.44 |
Ohio | E131492 | CUY INNERBELT CCG6B Broadway, Remove and build a new longer bridge for Broadway (SR 14) over IR-77 | $29,195,085.47 | $33,950,849.53 |
Ohio | E131510 | WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange | $12,484,629.82 | $27,608,042.66 |
Ohio | E140008 | PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements | $5,894,956.00 | $35,573,730.00 |
Ohio | E140305 | CUY IR 077 14.35 CCG6A, Replace the mainline IR-77 bridge over IR-490. | $25,601,745.30 | $29,645,557.59 |
Ohio | E140310 | STW - Ohio Bridge Partnership Program Debt Service Authorization | $61,822,485.44 | $92,921,021.99 |
Ohio | E140985 | HAM IR 71 8.42 | $17,013,973.02 | $36,532,592.56 |
Ohio | E150336 | FRA CR 103 2.56 | $20,314,959.40 | $26,281,003.68 |
Ohio | E150345 | SUM IR 0076 05.62 | $13,237,774.11 | $30,120,387.35 |
Ohio | E150403 | LUC IR 475 1.85 @20A Interchnge, Build a new interchange | $15,040,920.00 | $117,964,212.48 |
Ohio | E150808 | GRE IR 675 0.00 - Pt. 1 | $23,104,917.00 | $25,947,620.00 |
Ohio | E150996 | PRE IR 70 0.00 | $17,399,864.70 | $33,576,000.33 |
Ohio | E161031 | FRA-70-14.56 (2G) Parts 1&2 | $39,609,396.06 | $46,740,518.43 |
Ohio | E170601 | SUM Main Street Corridor | $13,270,672.00 | $34,404,852.00 |
Ohio | E170641 | BUT SR 129 25.00 Liberty Way | $12,598,610.61 | $25,629,546.01 |
Ohio | E170713 | HAM IR 75 3.84 | $56,075,160.25 | $97,753,133.05 |
Ohio | E170961 | LAK VROOMAN ROAD | $15,759,166.34 | $25,062,005.37 |
Ohio | E170982 | FRA-71-9.62/9.71 Part 1 & 2 | $43,784,842.29 | $125,220,203.12 |
Ohio | E171059 | FRA IR 670 3.920 | $34,141,724.26 | $67,451,549.08 |
Ohio | E171457 | SUM IR 77/277/US 224 Interchange | $9,278,333.24 | $60,176,026.67 |
Ohio | E180134 | FRA IR 70 14.54 (Proj 2E) | $34,787,157.98 | $86,325,479.10 |
Ohio | E180347 | MAD IR 70 8.620 Major Rehab | $35,732,892.11 | $51,668,398.49 |
Ohio | E180372 | MOT IR 75 7.15 | $49,898,997.00 | $55,443,330.00 |
Ohio | E180428 | SUM IR 0076/0077 8.42/09.74 | $43,297,665.61 | $183,115,001.00 |
Ohio | E180439 | CLE 32-3.50 | $26,265,068.50 | $65,450,510.00 |
Ohio | E180746 | MUS IR 70 10.66 | $41,660,499.47 | $104,963,980.71 |
Ohio | E180796 | FRA IR 71 0.00 | $44,057,417.00 | $50,328,850.00 |
Ohio | E190121 | FRA IR 71 17.46 (Proj 3B) | $35,533,902.62 | $43,802,190.00 |
Ohio | E190122 | FRA-70/71-12.68/15.16 (Proj 4R) | $127,123,001.00 | $298,346,520.00 |
Ohio | E190184 | MOT IR 75 14.74 | $37,688,667.50 | $42,003,943.00 |
Ohio | E190328 | WAY SR 0083 10.81 | $25,939,021.80 | $32,634,630.00 |
Ohio | E190498 | MAH Youngstown Smart 2 Network | $20,265,085.08 | $27,042,240.63 |
Ohio | E200605 | UNI US 33 24.870 | $24,764,000.00 | $42,755,700.01 |
Ohio | E200851 | HAM-71-0.00 - Brent Spence Paint | $32,000,000.00 | |
Ohio | E210348 | LUC Toledo Build Grant - GCR | $23,668,160.00 | $57,062,891.86 |
Ohio | E220056 | CUY IR 077 00.42 Interchange | $24,649,233.72 | $37,100,000.00 |
Oklahoma | 019N175 | MCINTOSH CO. US-69:FROM SH-9 JCT, NORTH 4.5 MILES | $1,949,702.95 | $33,658,611.80 |
Oklahoma | 0352176 | I-35: 6 LANE FROM RIVER, NORTH 0.34 MI IN NORMAN (SH-9 INTERCHANGE)(DEL FR 09-14, ADD TO 11-14; PROJ STATUS CHANGE) | $36,529,245.54 | $40,578,226.00 |
Oklahoma | 0352304 | CLEVELAND CO. I-35: 6 LANE FR 0.34 MI NORTH OF RIVER, NORTH 0.78 MI IN NORMAN (LINDSEY ST INTERCHANGE) (DEL FR 09-14, ADD TO 11-14; PROJ STATUS | $37,215,312.57 | $38,420,367.57 |
Oklahoma | 0353125 | OKLAHOMA CO. I-35: OVER THE I-240 JCT. RECONSTR INTERCHANGE (PHASE IB) | $43,525,626.81 | $43,525,626.81 |
Oklahoma | 0404436 | I-40: FROM FROM MILE MARKER 136 TO MILE MARKER 139.83 | $46,534,290.24 | $46,580,993.00 |
Oklahoma | 0405382 | I-40: FR MILE MARKER 165 TO 167, LN ADDS & RECONSTRUCTION OF CHOCTAW RD INTERCHANGE | $36,993,921.00 | $41,104,358.00 |
Oklahoma | 0405394 | OKLAHOMA CO. I-40: W.B. AND E.B. BRIDGES OVER CRUTCHO CREEK & SE 15TH STREET 2.3 & 2.6 MILES EAST OF JCT. I-35 | $37,919,361.28 | $47,991,754.42 |
Oklahoma | 101A052 | US-59: FR 6.95 MILES NORTH OF WESTVILLE, NORTH 3.48 MILES THRU WATTS | $13,761,284.06 | $27,522,569.00 |
Oklahoma | 109B154 | CANADIAN CO. US-281: OVER THE SOUTH CANADIAN RV AT THE CADDO C/L | $22,810,909.37 | $35,705,909.37 |
Oklahoma | 207N085 | BRYAN CO. US-69 BEGIN AT SOUTH END OF CALERA AND EXTEND NORTH TO US-70 INTERCHANGE (FAST LANE) | $135,997,350.02 | $170,018,957.71 |
Oklahoma | 210C085 | CARTER CO. SH-53: FROM 14.8 MIS. E. OF SH 76, EXTEND E. 5.57 THRU I-35 INTERCHANGE | $26,308,890.20 | $26,308,890.20 |
Oklahoma | 2350004 | OKLAHOMA CO. I-235: NW 50TH AND BNSF BRIDGES AND APPROACHES (SEGMENT 4A) (DEL FROM 11/15 ADD TO 01/16) | $13,549,889.33 | $62,344,545.08 |
Oklahoma | 2350009 | OKLAHOMA CO. I-235: MAINLINE THRU I-44 INTERCHANGE(SEGMENT 8); I-235 NB TO WB & EB FLYOVER BRIDGES I-235/I-44 INTERCHANGE(SEGMENT 2B) | $95,714,176.15 | $119,738,378.02 |
Oklahoma | 2351092 | I-235: NW 36TH STREET INTERCHANGE (SEGMENT 6) | $35,486,221.95 | $36,007,237.77 |
Oklahoma | 242C079 | LOGAN CO. SH 51: OVER E. BEAVER CR. 0.3 MIS. W. OF THE US 77 JCT. | $20,663,675.50 | $25,829,594.38 |
Oklahoma | 244N052 | MCCLAIN CO. US-77 OVER SOUTH CANADIAN RIVER & RAILROAD, IN PURCELL (DEL FR 07-17, ADD TO 08-17; AS PER T. HURST) | $32,928,642.70 | $41,410,805.12 |
Oklahoma | 246N027 | MCINTOSH CO. US-69: FROM PITTSBURG C/L NORTH APPROX. 5.27 MILES TO JCT SH-9 | $23,144,128.28 | $28,930,162.11 |
Oklahoma | 248C036 | SH-99/US-377 OVER LAKE TEXOMA (WILLIS BRIDGE) (PENDING 50% FROM TXDOT) (DEL FR 05-18, ADD TO 07-18; ROW ISSUES) (80/20 SMC) | $22,619,863.00 | $45,830,952.00 |
Oklahoma | 251N117 | MUSKOGEE CO. US-62: OVER ARKANSAS RIVER, 2.4 MILES EAST OF SH-16 JCT. (EB & WB) | $74,530,958.09 | $74,530,958.09 |
Oklahoma | 257N085 | OSAGE CO. US-60: BEGIN JCT. US-60/SH-35 & EXTEND EAST 4.96 MILES | $25,507,629.28 | $31,884,536.60 |
Oklahoma | 261N084 | PITTSBURG CO. US-69 CONSTRUCTION INTERCHANGE @ KINKEAD ROAD IN MCALESTER | $27,291,210.34 | $34,114,012.93 |
Oklahoma | 266B081 | ROGERS CO. SH-20: FROM 4 MILES EAST OF TULSA COUNTY LINE EAST TO .65 MILE EAST OF VERDIGRIS RIVER | $1,749,122.65 | $46,914,657.72 |
Oklahoma | 267B093 | SEMINOLE CO. US-270: FROM 1.0 MILE SE OF SH-270A IN SEMINOLE, EAST TO Y AT US-270B WEST OF WEWOKA | $23,129,429.44 | $46,258,858.88 |
Oklahoma | 3500066 | OKLAHOMA CO. I-35: NB & SB OVER DEEP FORK CR. & SERVICE RD. 4.6 MI NORTH OF I-40 | $31,813,372.83 | $35,348,192.59 |
Oklahoma | 3500081 | LOVE CO. I-35: OVER US-77 AND BNSF RR 7.52 MIS. N. OF THE TEXAS STATE LINE N. APPROX. 0.53 MIS. | $24,785,952.04 | $34,187,520.06 |
Oklahoma | 3500132 | OKLAHOMA CO. I-35: NB & SB BRIDGES OVER 63RD STREET 5.0 MIS. N. OF I-40. | $31,977,857.84 | $63,955,715.67 |
Oklahoma | 3500134 | GARVIN CO. I-35: FROM 4.21 MI NORTH OF SH-7, NORTH 6.19 MI TO SH-29 (NORTHBOUND ONLY) | $26,501,188.02 | $33,126,485.03 |
Oklahoma | 4000047 | I-40: FROM MILE MARKER 167 EAST TO MILE MARKER 170 (RECONSTRUCT & ADD LANES) | $31,043,678.00 | $34,492,976.00 |
Oklahoma | 4000076 | I-40: FROM MM-292 TO MM-298 (EAST & WESTBOUND) | $29,569,635.55 | $32,855,150.63 |
Oklahoma | 4000095 | OKLAHOMA CO. I-40: E.B. AND W.B. BRIDGES OVER SOONER ROAD 3.1 MILES EAST OF I-35 | $21,895,472.49 | $31,273,282.95 |
Oklahoma | 4000126 | OKLAHOMA CO. I-40: AT DOUGLAS BLVD IN MWC, APPX 6 MILES EAST OF I-35 | $53,379,142.87 | $66,723,928.59 |
Oklahoma | 4000156 | OKLAHOMA CO. I-40: FROM DOUGLAS BLVD IN MWC, EXTEND EAST 5.0 MILES TO THE 240 JCT. | $52,099,456.65 | $65,124,320.81 |
Oklahoma | 4000248 | SEQUOYAH CO. I-40 INTERCHANGE @ US 64 IN SALLISAW (BR @ US-64 & LITTLE SALLISAW CR) (3-SD) (90/10 SMC) | $31,467,769.42 | $31,490,748.10 |
Oklahoma | 4400077 | TULSA CO. I-44/US-75 INTERCHANGE RECONSTRUCTION FROM UNION AVE TO THE ARKANSAS RIVER (WP 1) INFRA GRANT | $37,162,417.20 | $80,556,570.91 |
Oklahoma | 4440009 | TULSA CO. I-444 FROM SH 51 INTERCHANGE NORTH TO INDEPENDENCE (EAST LEG OF IDL) | $27,548,933.58 | $27,548,933.58 |
Oklahoma | XTWN048 | OKLAHOMA CO. I-40 CROSSTOWN: WP 4.5, GR, DR, BR & SURFACE THE BOULEVARD FROMBNSF EAST TO I-40 | $22,662,982.51 | $25,198,376.81 |
Oregon | 3410016 | US 26: CORNELIUS PASS RD - NW 185TH AVE SUNSET DESIGN FOR ADDING A TRAVEL LANE IN EACH DIRECTION WASHINGTON | $29,858,266.14 | $35,197,852.03 |
Oregon | 4700076 | Foothill Rd. Corridor/Foothill Rd: Delta Waters to Dry Creek | $17,289,265.64 | $72,312,762.68 |
Oregon | C019180 | Old Hwy 99N: Oakland Bridge and Melrose Rd: Conn Ford Bridge | $18,855,941.60 | $28,274,839.01 |
Oregon | C051099 | BURNSIDE ST: WILLAMETTE RIVER BR PAINT & REHAB LOCAL PAINT & REHAB BRIDGE # 00511 MULTNOMAH | $26,806,621.81 | $29,856,722.19 |
Oregon | C051112 | MORRISON STREET: WILLAMETTE RIVER (MORRISON) BR | $23,233,361.02 | $25,892,523.17 |
Oregon | S001475 | I-5: California state line - Ashland | $28,407,564.22 | $36,351,663.47 |
Oregon | S001478 | I-5: Roberts Creek Rd - South Umpqua River | $27,821,524.18 | $38,255,556.14 |
Oregon | S001497 | I-5: Aurora-Donald Interchange (Exit 278), Phase 1a and phase 2 | $8,860,643.12 | $30,527,470.85 |
Oregon | S001524 | I-5: Garden Valley Blvd - Roberts Creek | $5,878,659.06 | $25,897,291.89 |
Oregon | S002241 | I-84 (Eastbound): Tooth Rock Tunnel | $18,303,117.34 | $29,022,793.23 |
Oregon | S004219 | US97: OR58 - CALIFORNIA BORDER | $21,942,502.31 | $37,195,608.17 |
Oregon | S004221 | US197: The Dalles (Columbia River) Bridge | $20,265,717.87 | $43,018,595.92 |
Oregon | S004227 | US97 and US20 Bend North Corridor | $101,097,500.51 | $178,799,587.08 |
Oregon | S006158 | I-84: Ladd Canyon freight and culvert improvements | $37,673,517.76 | $40,854,287.00 |
Oregon | S006163 | I-84: Meacham-Kamela paving & Umatilla County signals | $1,261,126.93 | $48,045,288.22 |
Oregon | S009481 | US101: MCCULLOUGH BRIDGE(COOS BAY) BRIDGE PAINTING | $37,144,571.51 | $41,857,813.95 |
Oregon | S009494 | US101: YAQUINA BAY BRIDGE | $30,917,676.25 | $34,456,342.64 |
Oregon | S017016 | US20: Tumalo - Cooley Rd. (Bend) | $6,641,030.92 | $25,805,880.44 |
Oregon | S045054 | OR38: UMPQUA RIVER (SCOTTSBURG) BRIDGE REPLACEMENT | $2,645,829.86 | $55,804,926.46 |
Oregon | S064052 | I-205: JOHNSON CREEK TO GLEN JACKSON BRIDGE-PAVEMEMENT PRESERVATION. SINGLE LIFT INLAY | $34,928,066.00 | $38,253,628.16 |
Oregon | S064059 | I-205: JOHNSON CREEK - GLENN JACKSON BRIDGE PHASE 2 | $33,088,118.21 | |
Oregon | S064063 | I-205: I-5 to OR213, Phase 1A | $1,135,000.00 | $559,284,784.10 |
Oregon | S091090 | OR99W: I-5 - MC DONALD ST | $22,958,784.29 | $36,667,054.52 |
Oregon | S144026 | OR217: OR10 - OR99W | $57,032,874.22 | $174,680,347.62 |
Oregon | S171030 | FFO-OR212/224:SUNRISE CORRIDOR(I-205-SE 122ND AVE) VARIOUS HIGHWAYS CLACKAMAS COUNTY | $58,655,084.59 | $65,509,120.99 |
Oregon | S483000 | OR18 McMinnville Spur: South Yamhill River Bridge | $1,095,603.82 | $37,241,072.17 |
Oregon | SA00182 | Southern Oregon Seismic Bridge Retrofit | $2,776,443.37 | $25,607,940.80 |
Pennsylvania | 1034201 | SR 412 Improvement | $37,126,135.73 | $46,407,671.73 |
Pennsylvania | 1278120 | US 30: Walker Ave to Old U.S. 30 in Chambersburg Borough and Guilford Township | $21,776,657.40 | $29,101,379.40 |
Pennsylvania | 1729102 | Broad St. Betterment | $21,949,730.98 | $27,437,165.98 |
Pennsylvania | 1731101 | SR 12 TO US 222, SPRING & CUMRU TOWNSHIPS | CONSTRUCTION OF A 4-LANE DIVIDED HIGHWAY | $29,665,590.25 | $29,665,590.25 |
Pennsylvania | 2167201 | American Parkway Boulevard to Airport Road City of Allentown | $39,416,200.10 | $39,416,200.10 |
Pennsylvania | T012579 | I-90: MP 3.5 to 7 Reconstruct - #1 | $58,935,590.00 | $72,796,110.00 |
Pennsylvania | T032472 | SR 220: PA 287 to West Fourth Street | $38,210,393.00 | $38,210,393.00 |
Pennsylvania | T035176 | CSVT Southern Section Earthwork | $63,950,000.00 | $91,500,000.00 |
Pennsylvania | T042584 | I-84 ov LackRR/Roaring & 435 | $122,305,000.00 | $122,305,000.00 |
Pennsylvania | T042630 | I-81 Mill/Fill Dickson City to Susq County Line | $17,239,792.00 | $36,909,614.00 |
Pennsylvania | T044239 | I-84 E&W I-4R Wayne - E26 | $114,222,000.00 | $114,222,000.00 |
Pennsylvania | T044249 | I-84 E&W I-4R MP 40 - E46 | $45,000,000.00 | $94,913,000.00 |
Pennsylvania | T044253 | I-84 E&W I-4R E26 to E34 | $55,129,168.00 | $119,361,174.00 |
Pennsylvania | T051461 | Interstate 78 (12M) | $191,645,877.00 | $191,645,877.00 |
Pennsylvania | T051489 | I-78-Rt 61 Bridge Replace | $138,697,050.00 | $138,697,050.00 |
Pennsylvania | T052167 | I-80 Rehabilitation | $33,964,470.00 | $33,964,470.00 |
Pennsylvania | T054306 | I-80/Exit 308 Realignment | $86,175,977.00 | $104,042,739.00 |
Pennsylvania | T061158 | I-95, Pennsylvania Turnpike Interchange D10 | $99,995,111.00 | $99,995,111.00 |
Pennsylvania | T061166 | I-95, Section D20 | $86,800,000.00 | $86,800,000.00 |
Pennsylvania | T062182 | SR 202 over AMTRAK Rehabilitation | $35,473,862.18 | $35,473,862.18 |
Pennsylvania | T064209 | RTMC General Contract | $32,155,656.00 | $40,152,064.00 |
Pennsylvania | T064227 | US202:Johnson-Swede #4 | $36,881,211.00 | $54,239,000.00 |
Pennsylvania | T065169 | I-95N:Columbia-AnnSt N(C) | $253,270,478.00 | $253,270,478.00 |
Pennsylvania | T065185 | I-95 Betsy Ross Bridge and Aramingo Avenue Interchange | $157,168,662.78 | $157,168,662.78 |
Pennsylvania | T065188 | S.R. 0676, Vine Street Expressway Sections PAB and PAA | $72,526,199.00 | $72,526,199.00 |
Pennsylvania | T065203 | I-95 Betsy Ross Ramps and Adams Ave. Connector City of Philadelphia | $69,186,000.00 | $69,186,000.00 |
Pennsylvania | T065216 | I-95S: Columbia-Ann St N | $343,305,388.00 | $343,305,388.00 |
Pennsylvania | T065220 | I-76 Bridge Repair | $52,341,000.00 | $52,341,000.00 |
Pennsylvania | T065232 | I-95: Kennedy-Levick | $86,702,546.00 | $86,702,546.00 |
Pennsylvania | T065235 | I-95: Betsy Ross Rmps A&B | $103,000,000.00 | $103,000,000.00 |
Pennsylvania | T065253 | I-95: Allegheny & Castor Ave Intr Connection | $32,000,000.00 | $32,000,000.00 |
Pennsylvania | T065259 | I-95 Corridor ITS | $25,293,082.00 | $25,293,082.00 |
Pennsylvania | T065268 | I-95: Cottman On-Ramp | $47,856,995.00 | $55,924,440.00 |
Pennsylvania | T065273 | I-95: Margaret-Carver | $90,848,671.00 | $289,106,117.00 |
Pennsylvania | T065278 | Penn's Landing Project Development | $68,552,000.00 | $225,543,442.00 |
Pennsylvania | T082203 | Am Leg Mem Hwy Resurface | $28,975,806.00 | $28,975,806.00 |
Pennsylvania | T084200 | Mount Rose Avenue and I-83 Interchange (Exit 18) | $68,954,041.00 | $68,954,041.00 |
Pennsylvania | T084431 | I-83 Exit 4 | $33,348,184.78 | $33,348,184.78 |
Pennsylvania | T085167 | I83 East Shore Overpasses | $37,546,277.00 | $37,546,277.00 |
Pennsylvania | T085179 | I-83 East Shore Section 1 | $119,557,075.00 | $119,557,075.00 |
Pennsylvania | T089132 | US 22/322 Resurfacing | $25,876,924.00 | $25,876,924.00 |
Pennsylvania | T092078 | I-99 17th St-Grazierville | $37,110,360.50 | $37,110,360.50 |
Pennsylvania | T111143 | Neville Island Bridge | $48,676,092.00 | $48,676,092.00 |
Pennsylvania | T111155 | PA 28/Highland Park Br Interchange | $54,103,439.00 | $54,103,439.00 |
Pennsylvania | T111165 | I-79, Neville Island to I-279 | $30,176,641.00 | $30,176,641.00 |
Pennsylvania | T111172 | Boulevard of Allies Ramps | $40,257,102.00 | $40,257,102.00 |
Pennsylvania | T111181 | Forbes Avenue ov Fern Hollow | $25,000,000.00 | $25,000,000.00 |
Pennsylvania | T111189 | I-79, Moon Run - Neville Island | $20,921,734.00 | $41,780,970.00 |
Pennsylvania | T111976 | 279/Ft Duq to Camp Horne | $92,174,476.96 | $92,174,476.96 |
Pennsylvania | T111986 | Elizabeth Bridge | $38,871,488.00 | $38,871,488.00 |
Pennsylvania | T112280 | Koppel Bridge carrying PA 351 over the Beaver River | $33,023,075.93 | $33,360,524.00 |
Pennsylvania | T112311 | Freedom Rd Upgrade - Ph C | $25,584,113.00 | $25,584,113.00 |
Pennsylvania | T124258 | Bentleyville Interchange | $77,385,607.11 | $77,385,607.11 |
Pennsylvania | T124262 | Western section (MPMS 73514) - Interstate 70 from SR 136 (Beau Street) to I-79 South Junction Eastern section (MPMS 75950) - Interstate 70 from I-79 | $131,448,119.00 | $131,448,119.00 |
Pennsylvania | T125320 | LVTIP: PA 819 to Norvelt (PA 981-Q20) | $57,836,955.00 | $57,836,955.00 |
Pennsylvania | T125337 | New Stanton Intrchng | $55,425,505.00 | $55,425,505.00 |
Pennsylvania | T125346 | I-70 @ PA 31 Interchange | $74,496,231.51 | $74,496,231.51 |
Pennsylvania | T125349 | Yukon & Madison Interchanges | $103,050,000.00 | $103,050,000.00 |
Pennsylvania | T125371 | US 119 Youngwood Recon | $26,094,000.00 | $26,094,000.00 |
Pennsylvania | T125374 | I-70 @ PA 51 Interchange | $65,000,000.00 | $137,930,192.27 |
Pennsylvania | U021001 | PA 26/I-80 Interchange | $35,110,410.00 | $58,517,350.00 |
Pennsylvania | U102102 | Freedom Rd (Beaver Co. to Haine School Rd) and Three Degree Road Intersection | $25,000,000.00 | $29,763,542.00 |
Pennsylvania | X012549 | I-90: MP 0 to 3.5 Reconstruct | $38,916,356.00 | $38,916,356.00 |
Pennsylvania | X012626 | Central Bayfront Parkway Multimodal | $22,157,833.00 | $27,697,292.00 |
Pennsylvania | X015276 | PA 8: Barkeyville to Franklin | $29,928,511.00 | $37,410,640.00 |
Pennsylvania | X035175 | CSVT Southern Section Earthwork | $35,000,000.00 | $35,000,000.00 |
Pennsylvania | X042499 | Harrison Avenue Bridge | $21,353,483.98 | $26,691,854.98 |
Pennsylvania | X042622 | SR 6 (Robert P. Casey Highway) to SR 6006 | $26,377,598.00 | $32,971,999.00 |
Pennsylvania | X043488 | Interchange on State Route 81 at Avoca (Exit 178) Avoca Borough Luzerne County | $27,368,288.42 | $30,409,210.42 |
Pennsylvania | X043547 | South Valley Parkway | $24,720,142.00 | $30,896,178.00 |
Pennsylvania | X044217 | Interstate 84 from Milford to New York State Line Pike County | $61,457,331.93 | $68,285,925.93 |
Pennsylvania | X044223 | Pike I-84 I4R E34 - MP 40 | $72,377,000.00 | $72,377,000.00 |
Pennsylvania | X051481 | SR 222_73 & Genesis Dr | $28,768,517.00 | $28,768,517.00 |
Pennsylvania | X053302 | Coplay-Northampton Bridge Chestnut Street over Norfolk Southern RR, Lehigh River and Ironton Trail Coplay Borough, Whitehall Township | $24,308,976.00 | $30,386,226.00 |
Pennsylvania | X053311 | Tilghman St o/Lehigh & RR | $23,819,760.00 | $29,774,700.00 |
Pennsylvania | X061253 | I-95 from Philadelphia to Scudder Falls | $26,972,158.00 | $33,715,199.00 |
Pennsylvania | X061258 | Route 1 Improvement-South | $80,132,211.00 | $100,165,267.00 |
Pennsylvania | X061264 | PA309:Sellersville Bypass(Parent) | $51,914,086.00 | $64,892,610.00 |
Pennsylvania | X061268 | Route 1 Improvement-North | $34,909,000.00 | $119,745,322.00 |
Pennsylvania | X062226 | State Route 422 Reconstruction | $66,103,829.31 | $82,629,788.31 |
Pennsylvania | X063232 | Market St Over AMTRAK(C) | $20,374,543.00 | $25,468,180.00 |
Pennsylvania | X063233 | US 322: from US Route 1 in Concord Township to east of Mattson Road/Featherbed Lane near Clayton Park and the Bethel Township line. Bridges include | $57,416,001.00 | $73,664,697.00 |
Pennsylvania | X063243 | I95 Delaware Line-Phila NB(Parent) | $43,866,187.00 | $48,740,209.00 |
Pennsylvania | X063244 | I-95 Delaware Line-Phila SB | $32,583,395.00 | $36,215,255.00 |
Pennsylvania | X064285 | STATE ROUTE 1058, SECTION HAT, IN MONTGOMERY COUNTY IN FRANCONIA, | THE CONSTRUCTION OF A TWO LANE ROADWAY (SR 1058) CONNECTING SU | $24,925,104.00 | $31,156,381.00 |
Pennsylvania | X064314 | US 422 Betzwood Bridge(C) | $87,495,026.00 | $109,368,798.00 |
Pennsylvania | X064324 | Markley St Improvement Project South | $22,014,659.00 | $27,518,325.00 |
Pennsylvania | X064346 | US202:Swede-Morris #2 | $40,033,186.00 | $50,041,484.00 |
Pennsylvania | X064362 | US202:Morris-Swedesfd #3 | $36,001,318.38 | $45,394,151.00 |
Pennsylvania | X064383 | 309 Cnntr: Allntwn Rd-Souderton Pk | $23,753,089.00 | $46,569,113.00 |
Pennsylvania | X065293 | Improvements to Cottman Avenue, Torresdale Avenue, Princeton Avenue, State Road and New State Road | $34,136,730.13 | $37,926,700.13 |
Pennsylvania | X065306 | Arch, Market, Little Market, Chestnut and 30th Streets over Amtra | $54,880,445.86 | $68,600,557.86 |
Pennsylvania | X065318 | I-95: Columbia - Ann(C) | $87,236,141.00 | $109,045,180.00 |
Pennsylvania | X065319 | SR 95 From: Levick Street To: Bleigh Avenue In: The city of Philadelphia | $240,193,911.00 | $266,882,127.00 |
Pennsylvania | X065355 | Passyunk Avenue Drawbridge over Schuylkill River | $31,308,419.66 | $39,135,531.66 |
Pennsylvania | X065373 | Chestnut St over Lower 30th Street, I-76 (Schuylkill Expressway), Schuylkill River, Schuylkill River Trail, CSX and 24th Street;; and Schuylkill Avenu | $91,159,065.00 | $113,653,184.00 |
Pennsylvania | X065400 | I-95: Allegheny AdvCntrc | $24,403,053.00 | $27,114,506.00 |
Pennsylvania | X065403 | Rsvlt Blvd o/Wayne Junc | $76,154,135.48 | $97,571,127.75 |
Pennsylvania | X065414 | I-95 Bridge Repairs | $44,146,329.00 | $49,051,477.00 |
Pennsylvania | X085250 | PA 283 Reconstruction 3 | $78,198,334.00 | $97,747,922.00 |
Pennsylvania | X087356 | State Rd Interchange-Amtrak | $20,791,634.00 | $25,989,545.00 |
Pennsylvania | X097072 | 219 Garrett Erthwk Ln Itm | $121,720,375.41 | $121,720,375.41 |
Pennsylvania | X097094 | US 219 Garrett Paving | $63,207,618.00 | $63,207,618.00 |
Pennsylvania | X111437 | 9th Street Bridge Rehab | $21,298,807.00 | $26,623,511.00 |
Pennsylvania | X111612 | 6th Street Bridge Rehab | $30,426,599.00 | $38,033,283.00 |
Pennsylvania | X111919 | S.10th St Br (MA11) Rehab | $20,716,916.32 | $25,896,146.32 |
Pennsylvania | X111947 | 7th St Br Rehab | $22,671,530.00 | $28,336,413.00 |
Pennsylvania | X124282 | I-79/I-70 Interchange, South Junction | $33,780,026.00 | $37,533,364.00 |
Pennsylvania | X125319 | US 119/PA 819 Interchange | $20,241,384.36 | $25,301,729.36 |
Pennsylvania | X125351 | US 119: Co Line - Crossover Rd | $33,620,063.00 | $42,025,083.00 |
Puerto Rico | 0002082 | PAVEMENT REHABILITATION AND RECONSTRUCTION OF PR-2 FROM KM 185.80 TO KM 195.00, SABANA GRANDE - GUANICA | $43,130,600.50 | $43,551,650.00 |
Puerto Rico | 0005012 | REHABILITATION OF CABLE STAYED BRIDGE NO. 3000 OVER LA PLATA RIVER, KM.18.75, Municipalities of Naranjito and Toa Alta | $29,847,882.00 | $29,865,132.00 |
Puerto Rico | 0009006 | Highway PR-9 From PR-132 to PR-123, Ponce | $56,143,258.60 | $56,917,100.93 |
Puerto Rico | 0009007 | Highway PR-9 From Ave Las Americas to PR-132, Ponce | $57,295,464.72 | $58,313,314.19 |
Puerto Rico | 0020008 | Safety Improvements Highway PR-20, Kilometers: 0.00 to 10.00, Guaynabo | $25,706,752.53 | $25,734,099.41 |
Puerto Rico | 0021006 | Improvements to Highways PR-21, PR-1, PR-176, PR-8838 and Cupey Station Surroundings, Municipality of San Juan | $33,307,729.29 | $45,076,118.57 |
Puerto Rico | 0034006 | Extension of Degetau Avenue, From Luis Munoz Marin Avenue to PR-788, Caguas | $24,528,614.80 | $25,683,303.62 |
Puerto Rico | 9999151 | Reconstruction and Pavement Rehabilitation Highways PR-2 and PR-861 | $21,032,368.42 | $26,592,247.54 |
Puerto Rico | 9999553 | Pavement Reconstruction PR-52 Southbound From Km. 0.00 to Km. 14.20, Municipalities of San Juan - Caguas | $19,740,707.32 | $28,958,158.63 |
Rhode Island | 0032018 | Bridge Group 32 - I-95 Cranston and Providence | $18,576,136.55 | $25,257,009.01 |
Rhode Island | 0037012 | Bridge Group 51A - Rt 37 C-2 | $19,763,073.59 | $35,931,572.56 |
Rhode Island | 0037014 | Design Build for Bridge Group 51B - Rte 37, Contract 3 - Cranston Canyon | $3,400,000.00 | $65,922,187.50 |
Rhode Island | 0138060 | Pell Bridge Ramps Phase 2, Newport | $11,005,650.24 | $28,989,567.17 |
Rhode Island | 0146030 | Design-Build for the Reconstruction of Rte 146, North Smithfield, North Providence & Providence, Bridge Group 96 | $12,097,840.00 | $115,697,446.00 |
Rhode Island | 0200005 | Reconstruction of the Washington Bridge #200, East Providence, Providence, GARVEE added Wash Ped Bridge (03/01/2012) Eng:Pavia | $84,641,104.47 | $86,259,950.01 |
Rhode Island | 0250010 | Replacement of the Sakonnet River Bridge No. 250 - GARVEE; Added Fed Hwy funds 09/21/2011 - GARVEE funds exhausted | $166,262,500.95 | $341,983,115.77 |
Rhode Island | 0403016 | Rel Rte 403 - B 1009 added 7/27/05, For Prev Auth. see FMIS W96A, See State Remarks Field for addtl projects - GARVEE PROJECT | $107,432,365.72 | $134,302,829.99 |
Rhode Island | 0550003 | Replacement of Pawtucket Bridge No. 550 (Engineer: Faraj) | $58,596,673.55 | $91,392,744.62 |
Rhode Island | 0578005 | Design Build Services for the Reconstruction of the I-95 Viaduct Northbound, Providence - GARVEE Funds | $16,256,149.84 | $148,575,150.00 |
Rhode Island | 0600005 | Bridge Group 49 - Henderson. South Angell Street to North Broadway Cities of Providence & East Providence | $28,600,000.00 | $68,330,415.81 |
Rhode Island | 0700006 | Design-Build for I-195 West Bound - Washington Bridge Phase 2 - Bridge Group 57TB-10; Providence & East Providence | $4,143,764.55 | $32,830,000.00 |
Rhode Island | 1954055 | IWAY C7 C9 C8 C6A C10,11 Adv. Sig 9/08, Lscp C-A 8/09, C13 7/10, Lscp B 11/11, Dmnd Grnd. 06/12, C14 11/12, C15 02/13 | $358,163,371.96 | $561,915,990.58 |
Rhode Island | 2950002 | Design-Build Services for I-295 Bridges - Contract 2, Cranston - GARVEE FUNDS | $7,383,517.55 | $45,979,548.76 |
Rhode Island | 610X001 | Design Build Services for the Reconstruction of the US Rte 6/Rte 10 Interchange, Providence - GARVEE Funds | $33,396,779.56 | $415,000,000.00 |
Rhode Island | 610X003 | Design Build Services for the Reconstruction of the US Rte 6/Rte 10 Interchange, Providence - FEDERAL HIGHWAY FUNDS | $20,000,000.00 | $101,520,584.89 |
Rhode Island | BG14001 | Adding the Construction Phase - 08/22/2022 - Right of Way for Bridge Group 14, Route 99, Cumberland, Lincoln & Woonsocket | $7,672,720.00 | $30,963,684.00 |
Rhode Island | BG39005 | Bridge Group 39 - Rte 146, Lincoln & Providence | $1,404,450.82 | $31,742,767.16 |
Rhode Island | BLDG001 | Pell Bridge Ramps Phase 2, Newport | $20,000,000.00 | $25,000,000.00 |
Rhode Island | BLDG002 | Bridge Group 57TB-10 - Design-Build of the Washington Bridge North - Phase 2 | $25,000,000.00 | $31,250,000.00 |
Rhode Island | BLDG003 | Design-Build for Bridge Group 51B - Rte 37, Contract 3, Cranston Canyon | $21,329,338.00 | $26,661,672.50 |
Rhode Island | FRIP001 | GARVEE, Freight Rail Improvement Project, added AMTRAK Force Account, 6/20/2005 | $36,183,744.05 | $45,122,744.15 |
Rhode Island | INFR001 | I-95 Viaduct Northbound - Providence | $60,355,000.00 | $75,443,750.00 |
Rhode Island | INFR002 | Design Build for the Reconstruction of Rte. 146; North Smithfield, Lincoln, North Providence & Providence | $65,000,000.00 | $81,250,000.00 |
Rhode Island | RESF440 | Interstate Resurfacing (I-95 and I-295), Statewide | $14,480,000.00 | $28,704,084.80 |
Rhode Island | TIGR003 | Bridge Group 51A - Rt 37 C-2 | $20,000,000.00 | $25,000,000.00 |
South Carolina | 0039390 | Clements Ferry Road | $18,536,000.00 | $33,555,002.70 |
South Carolina | 4084120 | Leesburg Road (SC 262); Intersection Improvements - SC 262 (Leesburg Road) at Patricia Drive | $29,587,373.08 | $52,841,958.14 |
South Carolina | 8888860 | I-85 (Near MM 77 to near MM 80) & I-85 (Gossett Rd (S-57) to NC State Line) - Gossett Rd (S-57) to SC 18 | $318,251,904.91 | $597,857,099.65 |
South Carolina | BR10025 | SC 174 Br Replacement over Store, Sand, and Russell Creeks north of Edisto - Charleston County | $21,942,752.62 | $27,428,440.78 |
South Carolina | BR40004 | REPLACE US 176 BRIDGE OVER BROAD RIVER BETWEEN S-114 AND S-213 Sufficiency Rating: 35.8 | $27,437,679.98 | $32,055,442.78 |
South Carolina | BR88044 | US 701 over Great Pee Dee River | $47,608,527.28 | $59,555,755.70 |
South Carolina | BR88056 | SC 9 over Broad River, Broad River Canal, S-46 and S-31 | $27,538,638.03 | $34,743,852.28 |
South Carolina | BR88076 | Design Build Package E | $48,032,817.69 | $57,318,626.76 |
South Carolina | CHMB010 | Phase III Berlin Myers Parkway | $38,268,921.76 | $151,154,932.68 |
South Carolina | EM05025 | Port Access Road | $8,000,000.00 | $388,184,242.27 |
South Carolina | EM13001 | Henry Brown Boulevard Extension - Phase I widening of S-136 from Liberty Hall Road( S-529) to Red Bank Road(S-29) | $5,039,440.00 | $27,956,140.23 |
South Carolina | FLMB006 | Widening S-29(South Cashua Dr) from SC 51 ( Second Loop Rd) to S-103(Knollwood Rd) as follows: South Cashua Dr. from SC 51 | $20,196,837.13 | $25,269,183.82 |
South Carolina | GPAT002 | Batesville Rd (S-164) (SC 14 to Roper Mountain Road) | $22,267,632.90 | $27,670,043.34 |
South Carolina | GRID010 | I385 FROM I85 TO US 276(STONE AVE), GR/DR/PAVE/WIDEN 6 LANES/BRIDGES | $87,783,660.16 | $118,119,611.51 |
South Carolina | GSLA003 | CAROLINA BAYS PKWY FR SC9 NR STEPHENS CROSS RDS TO US 501 NEW 6 LANES NEW LOCATION DESIGN BUILD, ROWA, CONSTRUCTION, & PE | $177,875,422.76 | $295,515,917.74 |
South Carolina | IM23009 | I-85 @ I-385 (Design Build) | $243,445,286.40 | $324,404,081.50 |
South Carolina | IM88030 | I-26 (near MM 60 to Near MM 75) | $23,191,447.43 | $25,768,274.92 |
South Carolina | LSCG005 | US 301 over North Edisto River & Swamp | $3,228,199.98 | $26,158,676.06 |
South Carolina | P026862 | US 21 over Harbor River | $61,390,365.44 | $77,287,956.80 |
South Carolina | P027002 | I-77 (I-20 to Killian Road (Exit 22) | $68,213,440.97 | $101,098,812.04 |
South Carolina | P027003 | I-20 Widening (US 378 to Longs Pond) - Design Build | $12,500,000.00 | $120,716,784.25 |
South Carolina | P027077 | I-26 from near Jedburg Road (Exit 194) to near Nexton Parkway (Exit 197) | $51,715,591.67 | $66,546,021.58 |
South Carolina | P027116 | I-85 - Widening from near SC 18 (Exit 96) to near NC State Line (Phase 3) | $187,946,637.76 | $236,646,604.55 |
South Carolina | P027413 | SC 85 over Southern R.R. and S-995 | $14,615,279.99 | $27,676,475.77 |
South Carolina | P027550 | I-95 RECONSTRUCTION (near MM 33 to near MM 64 Northbound/Southbound) | $3,614,004.70 | $82,750,934.04 |
South Carolina | P027551 | I-95 (Near MM 23 to near MM 33) (NB/SB) | $22,607,722.99 | $25,119,692.21 |
South Carolina | P029208 | I-26 widening from near SC 202 (Exit 85) to near US 176 (Exit 101) | $431,407,900.81 | $512,063,605.52 |
South Carolina | P029263 | I-26 from near SC 27 (Exit 187) to near Jedburg Road (Exit 194) | $11,789,094.40 | $196,114,391.21 |
South Carolina | P029450 | Design Build I-20 EB & WB over Wateree River and Wateree Swamp Overflow | $27,579,850.82 | $103,501,122.68 |
South Carolina | P029503 | Clements Ferry Road - Phase II | $16,000,000.00 | $48,887,327.82 |
South Carolina | P029525 | US 78 (US 178 to SC 27S) Widening Phase IIA & US 78 (SC 27 to S-22) Widening Phase IIB | $24,641,587.90 | $35,148,152.88 |
South Carolina | P029938 | I-26 (Near MM 149 to near MM 172) | $51,235,837.01 | $57,090,539.20 |
South Carolina | P030176 | Seamless City Revitalization Project | $17,666,966.50 | $39,935,597.69 |
South Carolina | P030462 | US 76 WB over Wateree River | $4,520,000.00 | $50,875,705.54 |
South Carolina | P030484 | Country Club Road Corridor Project | $14,120,431.38 | $36,336,549.55 |
South Carolina | P030487 | SC 277 NB over I-77 | $28,113,902.00 | $31,237,668.89 |
South Carolina | P030711 | US 1 over I-20 | $67,292,880.05 | $75,017,250.98 |
South Carolina | P038111 | I-85 over Rocky Creek Bridge Design Build | $33,054,525.82 | $36,817,250.91 |
South Carolina | P038652 | I-77 Panther's Interchange (MM81) Design Build | $34,597,743.00 | $65,500,000.00 |
South Carolina | P039718 | I-20/I-26/I-126 - Corridor Improvements - Phase 1 DB Construction | $179,190,000.00 | $222,546,127.00 |
South Carolina | P039719 | I-20/I-26/I-126 - Corridor Improvements - Phase 2 DB Construction | $106,259,873.02 | $133,958,780.00 |
South Carolina | RU27001 | US 17 Widening | $35,510,305.52 | $62,205,001.57 |
South Carolina | SB02002 | FROM US 1 TO I-20 (PHASE 2) - PALMETTO PARKWAY | $107,142,636.17 | $159,805,376.76 |
South Carolina | SB07001 | SC 170 - FROM ROAD S-20 TO SC ROUTE 280. | $69,552,973.64 | $95,027,499.84 |
South Carolina | SU39002 | SC 153 New Construction | $26,696,833.44 | $33,371,041.80 |
South Carolina | SU40013 | Hardscrabble Road (S-83) | $45,221,073.89 | $90,713,396.04 |
South Dakota | 0014194 | Pierre Area ; Replace Structure (Bridge), Intersection Improvements; On the following routes: 014, 014 E, 014 W | $39,618,065.98 | $54,460,392.51 |
South Dakota | 0046060 | County of Clay; Rural Reconstruction, Mill and Surfacing, Structure Replacement, On the following routes: 046 | $33,273,980.65 | $42,044,542.72 |
South Dakota | 0083074 | Winner Area; US83 Reconstruction - South of I-90 | $35,359,313.84 | $69,998,228.71 |
South Dakota | 0100104 | City of Sioux Falls; New roadway construction of Veterans Parkway Hwy 100 | $31,087,077.55 | $50,995,079.70 |
South Dakota | 0293106 | City of Sioux Falls; Modify Interchange, Bent Strengthening; On routes: 029 N, 029 N1, 029 N2, 029 N7, 029 N8, 029 S, 029 S1, 029 S2, 029 S7 | $20,738,109.34 | $25,247,346.16 |
South Dakota | 0901195 | Meade County; Grading, Interchange Recon. (Exit 37), PCC Surfacing, Replace Bridge, Railroad Crossing,Tilford Port of Entry; I90 EBL | $30,961,127.97 | $38,124,540.62 |
South Dakota | 0908095 | County of McCook; Remove and Replace PCC, Pipe Work, Replace Str and Approach Grading, Deck Overlay, Polymer Chip Seal; On the following route I90E | $34,745,475.07 | $39,150,881.37 |
South Dakota | 0908097 | County of McCook; Rural Interstate Reconstruction, Replace Bridge; Structure On the following routes 090W, 090E. | $74,683,664.33 | |
South Dakota | 6480004 | Pennington County; Reconstruction of Sheridan Lake Road | $12,223,760.59 | $25,115,440.87 |
Texas | 0001150 | SR-1, Near SR-281 in Cannon County to Centertown in Warren County - Construction New | $28,772,789.26 | $35,965,985.00 |
Texas | 0001298 | SR-1, From East of Kingston Avenue to SR-382 - Widen from 2 lanes to 5 lanes | $24,059,896.00 | $25,442,120.00 |
Texas | 0004008 | SR-4 (US-78), From the Mississippi State Line to South of Shelby Drive - Widen from 4-Lane to 6-Lane | $67,670,000.00 | $99,671,931.00 |
Texas | 0006083 | SR-6, From South of SR-441(Moores Lane) to SR-253 (Concord Road) in Brentwood - Reconstruction and Widen | $26,821,756.00 | $35,388,438.00 |
Texas | 0009066 | SR-9 (US-25W) - Bridge over Clinch River in Clinton LM 10.71 - Bridge Replacement | $27,482,824.26 | $34,396,279.57 |
Texas | 0010024 | SR-10, South of Goose Creek to SR-52 in Lafayette - Widen | $26,332,391.00 | $27,775,244.00 |
Texas | 0014062 | SR-14, East of Old Covington Pike to SR-385 (Paul Barrett Pkwy) - Widen to 5-Lanes | $34,658,327.00 | $43,199,917.00 |
Texas | 0014063 | SR-14 (Austin Peay Hwy), From SR-385 to East of Kerrville-Rosemark Road (IA) - Reconstruction - Widen from 2-ln to 4-ln divided typical section | $33,748,270.00 | $42,185,337.00 |
Texas | 0015106 | SR-15, From Mill Springs Branch to the Waynesboro Bypass - Widen | $39,072,031.32 | $49,677,307.63 |
Texas | 0015108 | SR-15, From Firetower Road to west of Bigbee Branch - Widen | $53,133,752.42 | $66,460,819.53 |
Texas | 0016054 | SR-16(Madison Street), From West of Jenkins Road to Near SR-276 (Thompson Creek Road) - Widen | $28,003,423.00 | $35,011,718.00 |
Texas | 0019053 | SR-19 (Brownsville Bypass), From East of SR-87 to West of Windrow Road (IA) - Widen from 2-lane to 4-lane divided | $24,949,506.58 | $31,878,284.00 |
Texas | 0026076 | SR-26 (Nashville Hwy), From near SR-53 to near SR-96 - Reconstruction | $27,145,732.00 | $33,962,637.00 |
Texas | 0028031 | SR-28(US 127), North of I-40 to Near Potato Farm Road | $17,846,478.88 | $86,960,881.10 |
Texas | 0028038 | SR-28, From near North Lowe Road to near Little Road, north of SR-62 | $8,598,658.11 | $99,683,454.64 |
Texas | 0029072 | SR-29, Olgiati Bridge over Texas River - Widen | $27,522,541.30 | $34,403,176.75 |
Texas | 0029084 | SR-29, From SR-61 in Harriman to South of Whetstone Road in Morgan County - Reconstruction | $58,791,103.00 | $73,668,871.00 |
Texas | 0029086 | SR-29, From South of Whetstone Road to North of SR-328 - Reconstruction and Widening | $31,139,148.00 | $38,938,341.00 |
Texas | 0033055 | SR-33, Knox County Line to South of SR-144 Left - Reconstruction | $41,056,024.90 | $71,297,645.00 |
Texas | 0035038 | SR-35(Newport Bypass), From SR-9 to Saint Tide Hollow Road - Construction - New | $64,103,459.00 | $80,251,910.00 |
Texas | 0035064 | SR-35 - Intersection of SR-92 / Dickey Road to Grapevine Hollow Road - Construction - New - Construct 5th Lane on 4-Lane Divided Road | $35,844,942.00 | $35,875,733.00 |
Texas | 0050027 | SR-50, SR-106(US-431, Franklin Pike) to SR-11(US-31A, Verona Avenue) in Lewisburg - Reconstruction | $46,798,094.67 | $48,360,229.00 |
Texas | 0052043 | SR-52(Corridor "J"), SR-53 to Existing SR-52 - New Construction | $29,392,645.00 | $36,740,807.00 |
Texas | 0054026 | SR-54, Near Rison Street to Near Smith Road - Construction - Widen from 2-Lane to 5-Lane | $37,512,612.00 | $47,102,176.00 |
Texas | 0056029 | SR-56, South of SR-288 Near Magness Road to East Bryant Street in Smithville - Widen 5 Lanes | $28,574,417.05 | $36,733,470.00 |
Texas | 0056039 | SR-56, South of Warren/Dekalb County Line to Near Magness Road - Reconstruction | $23,926,892.00 | $30,251,971.00 |
Texas | 0060013 | SR-60, From 4-Lane North of I-75 (Westlake Drive) to SR-306 - Reconstruction and Widening | $29,475,067.38 | $77,141,600.00 |
Texas | 0062034 | SR-62 (Western Avenue), From Texas Avenue to Major Avenue in Knoxville - Reconstruction - Widen 2 Lane to 5 Lane | $8,558,705.58 | $52,993,308.96 |
Texas | 0063006 | SR-63, From Campbell County Line to Hall Lane - Widen | $30,753,246.00 | $31,367,955.00 |
Texas | 0063055 | SR-63(General Carl W. Stiner Highway), From Near Frontier Road/Woodson Lane to Near Claiborne County Line - Widen from 2-Lane to 5-Lane | $25,430,272.00 | $25,854,928.00 |
Texas | 0065010 | SR-65 - From Old Hwy 431 to Walling Road - Reconstruction | $32,739,835.65 | $40,941,724.56 |
Texas | 0066044 | SR-66REL, North of I-81 at SR-341 in Jefferson County to SR-160 in Morristown - Construction - New | $59,845,961.05 | $75,012,752.31 |
Texas | 0069053 | I-69 PROP, From South of SR-3(US-51) to South of SR-5 - Construction - New | $48,375,748.00 | $60,827,145.00 |
Texas | 0069097 | I-69PROP - From West of SR-21 to SR-3(US-51) Near Mayberry Road (IA) - Construction - New 4-Lane Divided Limited Access Interstate Highway | $62,327,712.00 | $77,909,640.00 |
Texas | 0073050 | SR-73, From SR-2 (US-11) to East of Little Texas River (Ft Loudoun/Tellico Canal) - Reconstruction | $61,906,734.00 | $78,453,840.00 |
Texas | 0076065 | SR-76, From West of Cades-Atwood Road to East of SR-77 - Reconstruction | $30,816,347.00 | $38,520,433.75 |
Texas | 0092011 | SR-92, Bridge over French Broad River, LM 9.16 in Dandridge - Bridge Replacement | $29,827,603.00 | $37,487,532.00 |
Texas | 0099048 | SR-99 (New Salem Highway), From Cason Lane to I-24 in Murfreesboro - Widen | $25,003,241.00 | $32,344,770.00 |
Texas | 0101016 | SR-101, From Firetower Road to East of Lakeview Drive - Reconstruction - Widen from Two Lanes to Multi-Lane Facility | $34,396,083.00 | $43,387,182.00 |
Texas | 0101017 | SR-101(Peavine Road), From Lakeview Drive to East of Westchester Drive / Catoosa Boulevard in Fairfield Glade - Reconstruction | $32,546,689.00 | $41,166,774.00 |
Texas | 0109031 | SR-109, From North of SR-24(US-70) to South of Dry Fork Creek - Reconstruction | $30,815,434.00 | $38,794,690.00 |
Texas | 0109032 | SR-109, From South of Dry Fork Creek to South of Cumberland River - Reconstruction | $39,853,985.00 | $50,974,068.50 |
Texas | 0112006 | SR-112, From SR-12 (Ashland City Highway) to SR-155 (Briley Parkway) -Reconstruction, Widen, Curb and Gutter, Sidewalk, Signalization | $39,064,420.26 | $51,005,040.00 |
Texas | 0115027 | SR-115, South of Topside Road to North of Maloney Road - Widen | $63,031,188.00 | $78,877,045.00 |
Texas | 0115054 | SR-115, From North of Maloney Road to Woodson Drive - Widen from 4 to 6 Lanes | $71,945,900.00 | $94,316,818.00 |
Texas | 0115057 | SR-115 - (Relocated Alcoa Highway), From SR-35 (Hall Road), South of Airport Road to Proposed Interchange at Tyson Boulevard - Widen | $57,078,945.00 | $71,853,312.00 |
Texas | 0136008 | SR-136, SR-111 to I-40 - Widen | $48,052,510.27 | $63,660,523.00 |
Texas | 0149012 | SR-149, From River Road to SR-13; SR-13, SR-149 to Zinc Plant Road - Widen to 5 Lanes | $49,753,935.11 | $78,589,966.00 |
Texas | 0243090 | I-24, Interchanges at SR-2(Broad Street) and SR-58(Market Street) in Chattanooga - Interchange Modification | $36,840,728.00 | $41,759,295.00 |
Texas | 0243097 | I-24, Bridges over Germantown Road, LM 12.08 and Belvoir Avenue, 12.59 in East Ridge - Bridge Replacement | $36,112,144.89 | $40,124,608.44 |
Texas | 0247009 | SR-247(Duplex Road), SR-6 (US-31, Main Street) in Spring Hill to Near I-65 - Widen 2-3 lanes, Correct Vertical Allignment | $32,468,219.50 | $37,842,230.50 |
Texas | 0249079 | I-24, Interchange modification at Hickory Hollow Parkway - Modify Interchange | $31,626,364.02 | $37,740,840.90 |
Texas | 0266013 | SR-266 (Jefferson Pike), From SR-102 to East of I-840 - Widen | $14,678,704.00 | $74,112,669.00 |
Texas | 0269020 | I-269PROP(Paul Barret Parkway), From North of SR-57 in Fayette County to South of Raleigh-Lagrange Road - Stage Construction - New | $35,261,150.07 | $43,959,254.59 |
Texas | 0317014 | SR-317(Apison Pike), From Old Lee Highway to SR-321(Ooltewah-Ringold Road) - Widen | $30,760,772.00 | $41,494,338.00 |
Texas | 0317017 | SR-317, SR-321(Ooltewah-Ringgold Road) to Near Layton Lane - Reconstruction and Widen from 2 Lanes to 5 Lanes | $92,923,113.00 | $117,999,997.00 |
Texas | 0374010 | SR-374 (Warfield Blvd), South of Dunbar Cave Road to West of Stokes Road, in Clarksville - Widen | $23,171,685.80 | $31,262,551.00 |
Texas | 0396004 | SR-396(Saturn Parkway Extension), From SR-6 to SR-247; SR-247, From Cleburne Rd to Town Center Pkwy; and SR-6, Intersection at Stephen P Yokich Pkwy | $26,107,686.00 | $32,634,608.00 |
Texas | 0397010 | SR-397 (Mack Hatcher Parkway West) - From S of SR-96 W of Franklin to E of SR-106 N of Franklin - Construction - New | $48,821,165.56 | $64,766,993.00 |
Texas | 0401348 | I-40, From West of SR-186 (US-45 ByPass) to East of SR-5 (North Highland Avenue) - Widen | $62,761,320.65 | $78,451,650.81 |
Texas | 0401358 | I-40, From West of SR-20 (US-412, Hollywood Drive) to West of SR-186 (US-45 ByPass) (IA) - Widen | $33,775,792.00 | $42,219,740.00 |
Texas | 0402337 | I-40, From East of SR-5(US-45) to East of SR-1(US-70) in Jackson - Widen from 4-Lane to 6-Lane on existing alignment | $56,266,400.00 | $101,123,062.00 |
Texas | 0405140 | I-40, From West of SR-171 to East of SR-109 - Widen | $51,528,150.00 | $57,253,500.00 |
Texas | 0405142 | I-40, From East of SR-109 to East of I-840 - Widen, HOV Lanes, Shoulders, Bridge Widening | $35,167,816.31 | $43,959,771.00 |
Texas | 0405146 | I-40, Donelson Pike Interchange (includes Donelson Pike relocation from taxiway bridges over Donelson Pike to I-40) -Modify Interchange | $75,529,551.00 | $97,871,241.00 |
Texas | 0406130 | I-40, Interchange at Mine Lick Creek Road - Construct New Interchange | $28,109,437.00 | $32,192,533.00 |
Texas | 0406173 | I-40, Westbound near MM 342 to near MM 344 - Slope Stabilization and Resurfacing | $13,445,668.00 | $47,240,032.00 |
Texas | 0459010 | SR-459(Lexington Bypass), From SR-20(US-412) West of Lexington to Near SR-22 South of Lexington - New - Super 2-lane bypass on new alignment | $31,854,845.19 | $39,818,557.00 |
Texas | 0460010 | SR-460PROP (Somerville Beltway), From Near SR-15 (US-64) West of Somerville to Near SR-76 South of Somerville - Stage Construction - New | $26,152,624.00 | $32,690,780.00 |
Texas | 0551119 | I-55 at Crump Boulevard in Memphis - Modify Interchange | $108,082,917.19 | $120,104,081.00 |
Texas | 0652096 | I-65, Interchange at SR-99 (US-412) in Columbia - Modify Interchange | $4,564,156.43 | $35,795,855.92 |
Texas | 0652113 | I-65, Interchange at Buckner Road in Spring Hill (Design Build) - New Interchange | $31,928,097.00 | $57,800,000.00 |
Texas | 0653113 | I-65 (Prop Intch), Existing SR-109 to I-65 (Includes SR-41 Widening) - Widening, Construct New Interchange | $52,235,500.00 | $65,388,327.00 |
Texas | 0653128 | I-65, From near SR-25 (Main Street) to near SR-109 - Section 4 - Widen | $127,546,569.00 | $159,596,116.00 |
Texas | 0751131 | I-75, Interchange at I-24 - Modify Interchange | $136,876,258.00 | $152,084,732.00 |
Texas | 0751155 | I-75, Interchange at I-24, Phase 2 (IA) - Modify Interchange | $91,216,998.46 | $102,850,000.00 |
Texas | 0983030 | I-24 SMART Corridor (Phase II), From I-440 (Exit 53) to SR-10 (Exit 81 / US-231) in Murfreesboro and SR-1 from I-24 to SR-10 in Murfreesboro - ITS | $29,548,554.52 | $51,554,092.00 |
Texas | 1243081 | I-124, From the I-24 Interchange to South of the Texas River Bridge - Widen - Add Lanes | $131,563,917.00 | $164,459,234.00 |
Texas | 2401290 | I-240, From North of SR-385 (South of Poplar Avenue) to North of Walnut Grove Road - Widen | $43,962,243.00 | $55,086,536.00 |
Texas | 4404084 | I-440, From I-40 to I-24 - Reconstruction | $134,000,000.00 | $167,500,000.00 |
Texas | 6407161 | I-640, Interchange at North Broadway (Phase II) in Knoxville - Reconstruction and Relocation of Ramps | $5,497,200.00 | $30,185,230.00 |
Texas | 8300070 | Albert Gallatin Ave/Hatten Track Rd Ext, From SR-109 to SR-174 - New Construction | $28,435,790.00 | $37,352,392.00 |
Texas | 0095022-02 | VARIOUS LOCATIONS IN TARRANT COUNTY, CONGESTION MITIGATION & AIR QUALITY | $21,301,440.00 | $26,626,800.00 |
Texas | 0108184 | IH 10 FROM W OF ADAMS BAYOU, EAST TO W OF SABINE RIVER BRIDGE RECONSTRUCT MAIN LANES OF EXISTING 4 LANE FREEWAY | $15,079,960.37 | $55,519,614.93 |
Texas | 0303125 | CONSTRUCT ONE-WAY FRONTAGE ROADS, ENTRANCE AND EXIT RAMPS AND REPLACE BRIDGE AT FM 989 ON IH 30. | $55,333,461.40 | $68,545,021.19 |
Texas | 0354235 | IH 35 FROM FALLS COUNTY LINE TO WOODLAWN RD RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE CONGESTION AND ENHANCE SAFETY | $121,454,076.60 | $138,025,677.73 |
Texas | 0355152 | IH 35W FROM IH 820 TO IH 30. RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES | $220,313,023.61 | $294,794,414.93 |
Texas | 0356438 | IH 35E FROM SANDY LAKE RD/WHITLOCK LN TO LOOP 288. RECONST 6 LN TO 8 MAINLANES, 4 CONCURRENT MANAGED/HOV AND FR | $397,540,702.04 | $1,049,891,743.18 |
Texas | 0451346 | IH 45 FROM AT IH 610 S TO CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB | $22,644,369.15 | $28,472,662.26 |
Texas | 1102012 | ON US 290 FROM US 183 TO SH 130.CONSTRUCT 6-LANE TOLLWAY W/ FRT RDS | $103,120,000.00 | $240,301,000.00 |
Texas | 1102054 | US 190 FR. 0.20 MI E OF FM 3470 TO 0.30 MI W OF FM 2410 FR. 3470 TO ROY REYNOLDS . CONSTRUCT OVERPASS AND WIDEN FR 2 TO 4 LNS W/CO | $5,980,739.66 | $25,842,684.00 |
Texas | 1102319 | SH 242 FROM AT IH 45 TO . CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH 242 TO SB IH 45 & NB IH 45 TO WB SH 242 ( | $1,480,218.39 | $31,278,253.00 |
Texas | 1102493 | FROM IH 20 TO FM 700. CONSTRUCT NEW RELIEF ROUTE | $63,362,556.40 | $79,120,364.25 |
Texas | 1102558 | ON LP 1 FROM FM 734 (PARMER LANE) TO CESAR CHAVEZ STREET INTERCHANGE. PHASE 1: CONSTRUCT NB AND SB MANAGED LANES_(TOLL) | $160,595,203.40 | $200,744,004.75 |
Texas | 1402016 | RECONSTRUCT CLINTON DRIVE | $15,711,497.00 | $31,121,001.72 |
Texas | 1402081 | IH 69 FR W OF FM 762 TO 0.31 MI W OF FM 2759. WIDEN TO 8 ML, FRTG RDS, ITS, TMS, CONST 2-WAY HOV LNS & INT IMPRVS AT FM 762. | $130,353,034.39 | $183,422,238.85 |
Texas | 1402183 | IH 45 FROM SP 5 TO US 59. CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE EXISTING US 59 NB AND SB DIRECT CONNECTORS. | $31,042,363.63 | $38,802,954.54 |
Texas | 1502083 | 00US 75 FROM PGBT TO PARK BLVD. WIDEN D-C FR PGBT TO NB US75 & SB US75 TO PGBT; EXT DART RR BR & REPL PLANO PKWY O/PASS; AUX LN NB | $33,698,196.89 | $60,430,306.01 |
Texas | 1502464 | US 83 FROM 0.28 MI WEST OF SHOWERS RD TO 0.85 MI E OF FM 886(EL FARO RD). CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY | $21,812,000.00 | $67,039,536.19 |
Texas | 1502487 | IH 45 FROM FM 739 TO 15TH STREET IN CORSICANA CONSTRUCT PHASE 1 INTERCHANGE AT NEW LOCATION-SH 31 BYPASS | $30,416,428.27 | $32,690,661.65 |
Texas | 1502488 | ON SH 31 FR 3.2 MI W OF FM 2555 TO 3.7 MI E OF IH 45. CONSTR NEW LOC RELIEF RTE; ULTIMATE 4 LN DIV LIM ACC FAC W/IC @ IH45. | $14,109,278.72 | $88,622,316.45 |
Texas | 1502521 | IH35 FR N. STASSNEY LN TO S. WILLIAM CANNON DR ADD SHLDERS, AUX LNS, RAMP IMPRVMTS, PAV REHAB, BIKE & PED IMPRVM, FRT RD INTSE IMP | $31,332,261.92 | $77,852,159.34 |
Texas | 1502531 | ON IH 35E FR US 77 S OF WAXAHACHIE TO US 77 N OF WAXAHACHIE. RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES | $112,838,988.92 | $147,037,256.15 |
Texas | 1502613 | FM 1626 LANE RECONSTRUCTION | $3,461,126.10 | $25,689,139.16 |
Texas | 1602189 | REHAB EXISTING ROADWAY ON IH 40 | $11,475,826.98 | $28,689,649.86 |
Texas | 1602247 | IH 410 AT US 90. RECONSTRUCT INTERCHANGE AND OPERATIONAL IMPROVEMENTS | $73,498,308.65 | $81,664,787.39 |
Texas | 1602259 | SH 358 FROM NILE STREET TO AYERS STREET. RAMP REVERSAL PHASE II-A, SOUTH SIDE ONLY. | $40,996,406.49 | $51,245,508.11 |
Texas | 1602427 | CONSTRUCT 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND SIDEWALKS ON IH 20 | $12,625,395.26 | $70,512,006.15 |
Texas | 1602470 | WIDEN EXISTING FOUR LANE TO SIX LANE ON IH 10 | $42,969,591.46 | $53,711,989.33 |
Texas | 1602671 | SH 288 AT BW 8 INTERCHANGE. CONSTRUCT 8 DIRECT CONNECTORS | $1,802,655.00 | $100,253,318.00 |
Texas | 1702007 | IH 10 ADDITIONAL LANE CONSTRUCTION | $153,348,307.03 | $192,080,905.63 |
Texas | 1702354 | CONSTRUCT 0 TO 3/4 COLLECTOR DISTRIBUTOR, RECONSTRUCT 1/3 LANE SOUTHBOUND FRONTAGE ROADS AND RAMP MODIFICATIONS ON IH 35E | $67,866,111.88 | $84,872,575.32 |
Texas | 1702355 | CONSTRUCT 4 LANE BRIDGE AND RAMP MODIFICATIONS ON SH 114 | $26,585,626.44 | $46,732,033.06 |
Texas | 1702416 | FM 521 - WIDEN TO 4-LANE DIVIDED SECTION AND CONSTRUCT GRADE SEPARATION AT UNION PACIFIC RAIL ROAD | $20,458,196.69 | $25,684,230.42 |
Texas | 1702473 | SL 335- CONSTRUCT FRONTAGE ROADS. | $19,184,316.02 | $31,420,395.03 |
Texas | 1702501 | IH 10 INTERCHANGE IMPROVEMENTS | $14,441,495.74 | $32,825,598.60 |
Texas | 1702506 | IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES | $94,615,640.22 | $118,269,550.27 |
Texas | 1702559 | CONSTRUCT 4-LANE DIVIDED URBAN STREET FACILITY ON NEW LOCATION ON AIRPORT BOULEVARD | $28,171,736.97 | $35,230,786.81 |
Texas | 1702626 | RECONSTRUCTION OF DIRECT CONNECTOR ON IH 69 | $8,882,098.06 | $26,244,997.85 |
Texas | 1702631 | CONSTRUCT DIRECT CONNECTOR AND HOV ACCESS TO UPTOWN TRANSIT CENTER ON IH 610 | $56,915,556.97 | $68,253,926.76 |
Texas | 1702633 | IH 610 RECONSTRUCTION | $84,164,189.06 | $96,426,876.73 |
Texas | 1702650 | IH 35 OPERATIONAL IMPROVEMENTS | $116,499,570.90 | $138,383,967.68 |
Texas | 1702696 | WIDEN FREEWAY ON IH 45 | $104,378,702.00 | $130,473,377.51 |
Texas | 1702730 | FM 2181. WIDEN ROADWAY | $2,724,755.09 | $33,083,435.70 |
Texas | 1702792 | SL 1 GRADE SEPARATION OF MAIN LANES | $47,550,061.36 | $59,058,271.19 |
Texas | 1702818 | RECONSTRUCT ROADWAY AT BUFFALO SPEEDWAY | $9,796,640.00 | $27,975,271.62 |
Texas | 1702839 | CONSTRUCT 4 LANE TOLLWAY IN SECTIONS ON SH 249 | $154,400,000.00 | $309,757,180.00 |
Texas | 1702842 | CONVERT REVERSIBLE HOV TO REVERSIBLE EXPRESS LANES, RECONSTRUCT AND WIDEN MAINLANES AND FRONTAGE ROADS ON IH35 E AND US 67 | $317,248,899.00 | $624,975,805.00 |
Texas | 1802011 | WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED, INCLUDING INTERSECTION IMPROVEMENTS ON FM 664. | $24,946,752.10 | $32,296,841.69 |
Texas | 1802175 | IH 610 - RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS AT CAMBRIDGE STREET/ALMEDA ROAD/UNION PACIFIC RAILROAD | $65,000,000.00 | $84,171,015.81 |
Texas | 1802203 | REHABILITATE AND RAISE ROADWAY ON SH 87 | $17,531,249.14 | $26,443,393.32 |
Texas | 1802325 | ROADWAY WIDEN TO A MODIFIED SUPER 2 ON US 67. | $5,000,000.00 | $53,396,420.94 |
Texas | 1802387 | CONSTRUCT GRADE SEPARATION, RECONFIGURE RAMPS AND WIDEN FRONTAGE ROAD TO CONVERT TO ONE WAY ON IH 10 | $33,236,451.18 | $36,948,609.84 |
Texas | 1802390 | EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 | $50,100,000.00 | $200,648,881.31 |
Texas | 1802395 | US 82 - ADD TWO LANES WITH SHOULDERS AND WIDEN FROM 2 LANE TO 4 LANE | $64,985,054.86 | $81,326,475.57 |
Texas | 1802404 | CONSTRUCT MAIN LANES, OVERPASSES, FRONTAGE ROADS AND STRUCTURES ON US 77 | $32,383,849.12 | $40,479,811.40 |
Texas | 1802412 | US 69 - WIDEN FREEWAY FROM 4 TO 6 LANES | $27,865,125.15 | $34,831,406.44 |
Texas | 1802413 | IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES | $112,175,146.80 | $140,218,933.50 |
Texas | 1802439 | WIDEN ROAD - ADD LANES ON SH 97 | $59,295,842.78 | $70,119,828.47 |
Texas | 1802497 | WIDEN TO SIX MAIN LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING; INTELLIGENT TRANSPORTATION SYSTEM ON IH 10 | $125,000,000.00 | $373,870,824.61 |
Texas | 1802506 | US 83 CONSTRUCT OVERPASS, RELOCATE RAMPS, AND REGRADE CURVE. | $15,785,536.36 | $31,690,442.17 |
Texas | 1802535 | REPLACE BRIDGE AND APPROACHES ON IH 35. | $33,289,856.53 | $37,028,466.97 |
Texas | 1802544 | CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS ON IH 30 | $37,087,761.59 | $46,415,575.34 |
Texas | 1802546 | CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION ON US 377 | $35,668,539.46 | $56,399,568.86 |
Texas | 1802552 | WIDEN 2 TO 4 LANE DIVIDED ON FM 156. | $45,803,593.63 | $57,254,492.03 |
Texas | 1802558 | CONSTRUCT GRADE SEPARATION ON US 181 | $23,585,793.48 | $29,482,241.85 |
Texas | 1802575 | RAMPS RECONFIGURATION AND FRONTAGE ROAD EXTENSION ON SL 375 | $29,294,331.68 | $36,617,914.61 |
Texas | 1802735 | CONSTRUCT INTERCHANGES ON US 67. | $34,107,050.15 | $42,644,067.82 |
Texas | 1902002 | WIDEN ROAD - ADD LANES ON SH 36 | $7,000,000.00 | $98,644,061.78 |
Texas | 1902024 | REHABILITATION OF EXISTING ROAD ON OLD SAN ANTONIO ROAD. | $41,042,329.50 | $51,302,911.87 |
Texas | 1902056 | FM 2221. CONSTRUCT CONTROLLED ACCESS FACILITY. | $91,218,763.56 | $114,516,232.45 |
Texas | 1902057 | CONSTRUCT RAMPS ON IH 35. | $63,128,251.91 | $70,219,374.38 |
Texas | 1902060 | REHABILITATIONS AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 85. | $10,000,000.00 | $40,682,774.72 |
Texas | 1902063 | REHABILITATION OF EXISTING ROAD ON SH 123. | $21,394,897.17 | $26,752,645.11 |
Texas | 1902081 | CONSTRUCT 4 LANE DIRECT CONNECTION (FUTURE I-69) ON US 59. | $60,440,799.99 | $92,628,331.74 |
Texas | 1902105 | IH 45 WIDEN ROAD ADD LANES | $142,813,404.19 | $179,214,098.64 |
Texas | 1902107 | REHABILITATION OF EXISTING ROAD ON US 183 | $22,000,000.00 | $28,720,936.06 |
Texas | 1902148 | HAZARD ELIMINATION AND SAFETY ON IH 27 AND US 87. | $34,238,802.93 | $42,640,057.38 |
Texas | 1902182 | FM 2100 WIDEN TO 4 LANE DIVIDED | $24,481,834.67 | $30,684,149.84 |
Texas | 1902201 | INTERCHANGE IMPROVEMENT ON SL 12 AND SS 482. | $271,498,670.57 | $341,709,166.57 |
Texas | 1902215 | WIDEN ROAD AND ADD LANES ON IH 410 | $64,126,345.37 | $84,896,921.79 |
Texas | 1902268 | WIDEN FROM 2 LANE TO 4 LANE WITH A CONTINUOUS LEFT TURN LANE; REPLACE BRIDGE AT SAND CREEK | $22,179,337.43 | $35,502,514.54 |
Texas | 1902275 | HAZARD ELIMINATION AND SAFETY | $27,232,864.76 | $30,258,738.61 |
Texas | 1902299 | CONSTRUCT NEW ROADWAY LANES ON US 281 | $66,747,449.27 | $83,434,311.59 |
Texas | 1902314 | WIDEN FREEWAY - ADD LANES ON IH 10. | $80,492,432.23 | $100,790,599.37 |
Texas | 1902343 | SH 87 - FERRY OPERATION PROJECTS | $21,874,049.60 | $27,342,562.00 |
Texas | 1902389 | WIDEN FREEWAY ON IH 635. | $916,159,862.83 | $1,720,223,200.00 |
Texas | 1902417 | CONSTRUCT INTERCHANGE ON IH 2 AND IH 69C. | $152,480,000.00 | $300,051,164.00 |
Texas | 1996001 | STATEWIDE, STATE INFRASTRUCTURE BANK -ADV CAP | $71,726,747.00 | $192,462,886.00 |
Texas | 2002040 | IH 30 FROM EAST OF SYLVAN AVE TO IH 35E. WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV. | $36,234,552.00 | $112,449,552.20 |
Texas | 2002632 | US CUSTOMS PORT OF ENTRY EXIT TO US 281. CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF) | $33,146,456.76 | $36,270,895.40 |
Texas | 2005862 | US 82 FROM US 82 AT US 281 TO .. CONSTRUCT DIRECT CONNECT INTERCHANGE | $31,139,709.00 | |
Texas | 2005994 | IH 635 FROM WEBB CHAPEL TO WEST OF US 75 (MERIT DR). IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV/MANAGED LANES | $346,160,303.95 | $930,082,152.42 |
Texas | 2007405 | FM 1314 FROM 1.0 MI S OF SH 242 TO 2.6 MILE NW OF LOOP 494 WIDEN TO 4 LANE DIVIDED RURAL ROAD AND LENGTHEN OR REPLACE | $29,683,024.19 | $46,093,270.00 |
Texas | 2007688 | FM 1484 FROM FM 3083 TO FM 2432. WIDEN TO 4 LANE DIVIDED | $18,508,072.78 | $33,997,859.93 |
Texas | 2007717 | FM 1488 FROM EAST OF FM 149 AT MOSTYN TO FM 2978. WIDEN 2 LANES TO 4-LANE DIVIDED (PTF) | $26,026,471.13 | $36,148,371.04 |
Texas | 2007869 | SS 601 FROM US 54 (PATRIOT FREEWAY) TO LOOP 375 (PURPLE HEART FREEWAY). CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES | $244,634,419.55 | $359,350,000.00 |
Texas | 2007913 | FM 3407 FROM RM 12 TO RM 2439 CONSTRUCT 4-LN DIVIDED ROADWAY | $32,415,232.10 | $41,732,542.58 |
Texas | 2008345 | ON SH 199 AT BYPASS CHANNEL IN FTW TO NEAR CBD & TRINITY RIVER. CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL. | $36,982,949.80 | $48,967,209.40 |
Texas | 2008654 | US 79 FROM 79-B E OF TAYLOR TO E OF FM 1063. UPGRADE TO 4-LN DIVIDED RDWY | $19,865,925.86 | $28,636,441.29 |
Texas | 2008830 | IH 20 FROM SH 171; IN WEATHERFORD TO FM 2552; ON EAST AND WEST BOUND FRONTAGE ROADS. RECONSTRUCT AND EXTEND FRONTAGE ROAD. | $19,196,974.61 | $35,689,114.71 |
Texas | 2009235 | FM 646 FROM FM 517 TO FM 1764. WIDEN FROM 2 LANES TO 4-LANE DIVIDED (PTF) | $16,115,604.92 | $26,866,332.00 |
Texas | 2009513 | ENGINEERING, ROW, & CONSTRUCTION OF DFW CONNECTOR ON SH 114 AND SH 121. RECONSTRUCT FREEWAY, FRONTAGE ROADS AND RAMPS | $609,278,566.00 | $696,394,133.00 |
Texas | 2009656 | IH 10 @ LP 375. INTERCHANGE IMPROVEMENTS INCLUDING THE CONSTRUCTION OF DIRECT-CONNECTORS | $6,484,439.64 | $38,105,549.55 |
Texas | 2009753 | ENGINEERING, ROW AND CST OF DFW CONNECTOR ON SH 121 AND SH 114. RECONST FRWY 4 TO 6 W/AUX LNS,FR RDS & RAMPS & ADD COLLECTOR | $591,539,254.30 | $739,424,067.78 |
Texas | 2009919 | IH 820 FROM IH 35W TO SH 121/SH 183. RECONSTRUCT 4 TO 10 W/ HOV/MANAGED LANE, INTERCHANGE AND CONNECTORS | $421,105,616.27 | $526,087,354.64 |
Texas | 2011591 | US 271 FROM 0.3 MI. NORTH OF US 67 TO .7MI SOUTH OF FM 3417. CONSTRUCT FIRST PHASE OF ULTIMATE 4-LANE DIVIDED FREEWAY | $50,559,019.54 | $87,852,142.31 |
Texas | 2011998 | IH 610 FROM TC JESTER TO N OF IH 10 ON IH 610 AND TO 34TH ST ON US 290. RECONSTR US290/IH610 IC, CONSTR INTERCHANGE W/ DC'S W/ TWO | $36,665,773.00 | $171,036,404.00 |
Texas | 2012125 | LP 363 FROM IH 35 NORTH OF TEMPLE TO SH 53. CONSTRUCT NORTHBOUND FRONTAGE ROAD TO PROVIDE INTERIM 4-LANE | $28,040,000.00 | $39,597,527.26 |
Texas | 2012221 | SH 550 @ US 77/83 TO 0.53 MI E OF OLD ALICE RD. CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES | $2,300,000.00 | $34,495,766.00 |
Texas | 2012232 | US 290 FROM WEST OF RM 1826 TO SL 1; RECONSTRUCT 4-LANE TO 6-LANE CONTROLLED ACCESS HIGHWAY AND FRONTAGE ROADS | $21,468,853.91 | $146,578,873.54 |
Texas | 2012594 | US 59 - WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS | $84,105,000.00 | $120,120,653.85 |
Texas | 2012691 | IH 35 FROM S LP 363 IN TEMPLE TO NUGENT AVE. RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES. | $233,750,004.59 | $275,865,720.60 |
Texas | 2012805 | RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE ON MEDICAL DISTRICT DRIVE. | $19,376,490.00 | $27,202,300.29 |
Texas | 2013082 | AT VARIOUS LOCATIONS ON US290, WEST OF FM 529 AND LITTLE YORK.CONSTRUCT FRONTAGE RDS AND ADD AUXILIARY LANES & GRADE SEPARATIONS | $69,991,557.83 | $87,879,332.83 |
Texas | 2013136 | ON IH 610 FROM W OF W 34TH ST ON US 290 TO N AND S OF US 290 ON IH 610.RECONSTRUCT US 290/IH 610 INCLUDING IH10 TO US 290 OUTBOUND | $99,132,093.21 | $124,346,658.20 |
Texas | 2013163 | IH 45 FROM 0.9884 MILES SOUTH OF FM 2351 TO SOUTH OF MEDICAL CENTER DRIVE. WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3-LANE FR | $85,185,107.91 | $106,749,097.46 |
Texas | 2013218 | CONSTRUCT FOUR LANE FREEWAY AT DIBOLL (FUTURE I-69) | $14,237,000.00 | $171,923,286.00 |
Texas | 2013221 | HIGHWAY IMPROVEMENT ON US 59. | $813,685.77 | $101,174,791.48 |
Texas | 2013226 | IH 10 AT SH 87 AND T&NO RR. REPLACE BRIDGE AND APPROACHES | $24,578,123.17 | $30,722,653.80 |
Texas | 2013287 | US 77 FROM CR 16 TO FM 1898. CONSTRUCT MAIN LANES, PARTIAL FRONTAGE ROADS AND OVERPASSES. | $68,072,909.39 | $85,091,136.74 |
Texas | 2013292 | SH183 FROM FM157 TO I35E; LP12 FROM SH183 TO I35E; AND SH114 FROM SH97 TO SH183. RECONSTRUCT & ADD MANAGED LANES | $576,221,762.15 | $809,451,840.03 |
Texas | 2013307 | IH 30 EAST OF SYLVAN AVE TO IH 35E. MARGARET MCDERMOTT BRIDGES. | $27,240,122.00 | $34,050,152.40 |
Texas | 2013400 | US 82 FROM FM 1840 TO SH 98. RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES | $9,992,256.47 | $27,294,014.40 |
Texas | 2013420 | ON SH 365 FROM FM 396 TO US 281. CONSTRUCT 4-LANE CONTROLLED ACCESS TOLLED FACILITY | $33,756,881.00 | $155,435,862.00 |
Texas | 2013567 | CONSTRUCT 6-LANE DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY WITH AUTO PUMP STATION AND RAILROAD LINE WITH UNDERPASSES ON HEMPSTEAD ROAD | $32,852,164.82 | $61,662,913.46 |
Texas | 2013596 | REHABILITATION OF EXISTING ROADWAY AND INTERCHANGE IMPROVEMENTS ON US 175 AND SH 310. | $24,000,000.00 | $47,506,925.80 |
Texas | 2013734 | FM 359 AT US 90A AND UPRR. RAILROAD GRADE SEPARATION (ELEVATED T). | $28,028,742.88 | $35,075,317.23 |
Texas | 2013737 | US 290 FR W OF PINEMONT TO W OF 34TH ST. RECONSTRUCT & WIDEN TO 8 MN LNS WITH 3 REV MANAGED LNS, AUX LNS; 2-2 LN FRTG RDS. | $50,689,709.93 | $176,105,503.14 |
Texas | 2013740 | US 290 - RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES AND TWO 2-LANE FRONTAGE ROADS | $90,576,521.07 | $194,587,373.84 |
Texas | 2013741 | ON US 290 FR E OF W LITTLE YORK TO W OF PINEMONT. RECONSTRUCT & WIDEN TO 8 MN LNS, 3 REV MNG LNS, AUX LNS; 2 2-LN FRTG RDS, GRD SE | $102,778,084.87 | $189,407,321.74 |
Texas | 2013874 | REPLACE BRIDGE AND APPROACHES ON FM 1495. | $26,727,976.27 | $33,415,139.89 |
Texas | 2013875 | CONSTRUCT NEW ROAD ON LP 375. | $29,427,716.36 | $36,784,645.46 |
Texas | 2013983 | US 290 FROM E OF MUESCHKE RD TO E OF TELGE RD. RECON AN WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MAIN LANES, AUX LANES AND 2-LN FR | $37,362,073.98 | $98,369,741.82 |
Texas | 2013984 | CONSTRUCT DIRECT CONNECTOR ON IH 45 AT IH 610 E. | $55,043,017.24 | $57,720,972.39 |
Texas | 2013991 | IH 610 FROM W OF 34TH ST ON US 209 TO IH 610. RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS AND 3-LANE REVERSIBLE | $2,830,000.00 | $181,761,983.83 |
Texas | 2013996 | FM 1957 FROM SH 211 TO LOOP 1604. EXPAND FROM 2 LANES TO 4 LANE DIVIDED. | $4,448,000.00 | $37,501,000.00 |
Texas | 2014154 | SH 26 RECONSTRUCTION | $22,499,087.33 | $28,634,874.16 |
Texas | 2014211 | ON US 59 FROM SP 10 TO W OF FM 762. WIDEN TO 6-LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM W/ GRADE SEPARATION | $126,532,655.18 | $155,662,867.49 |
Texas | 2014326 | CONSTRUCT NEW ROAD ON MCHARD ROAD. | $23,966,629.04 | $29,959,286.30 |
Texas | 2014444 | WIDEN ROAD, ADD LANES, AND SHOULDERS ON US 69 | $33,829,736.79 | $42,287,170.98 |
Texas | 2014643 | SH 105 FROM AT THE BRAZOS RIVER TO . REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, STRUCTURES, BASE AND SURFACE | $28,167,790.30 | $35,209,737.90 |
Texas | 2014669 | AT WHITE SETTLEMENT RD IN FTW. CONST 4 LN BRIDGE AT NEW LOC OF PROPOSED BYPASS CHANNEL FOR TRINITY RIVER NEAR CBD OF FTW | $6,200,000.00 | $33,796,872.18 |
Texas | 2014953 | US 290 FR W OF MASON RD TO E OF MUESCHKE RD. RECONST & WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MANAGED LANES, AUX LANES, FRTG RDS. | $53,086,121.17 | $66,881,090.26 |
Texas | 2015062 | ON IH 30 AT FM 3549. RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS AND RAMPS CONSTRUCTION. | $16,709,036.80 | $26,585,311.57 |
Texas | 2016108 | ADD SHOULDERS, AUXILLARY LNS, RAMP IMPROVEMENTS, PAVEMENT REHAB, BIKE AND PED IMPROVEMENTS & FRONTAGE ROAD INTERSECTION IMPROVEMENTS ON IH 35 | $43,681,638.29 | $48,547,153.65 |
Texas | 2016183 | ON IH30 FR 1.0 MI W OF SH360 TO GREAT SOUTHWEST PKWY; AT SIX FLAGS DR. CONST DIR CONN INTCHG AT SH360 & TMS & RECONSTR BRIDGE. | $43,206,971.49 | $260,791,576.08 |
Texas | 2016326 | IH 2 FROM 0.209 MI W OF SP 115 TO 0.203 MI E OF SH 336. INTERCHANGE IMPROVEMENTS @ MAIN STREET & BICENTENNIAL. | $44,251,471.79 | $49,168,301.99 |
Texas | 2016367 | SL 49 CONTROLLED ACCESS TOLL ROAD CONSTRUCTION | $3,232,010.98 | $66,595,380.24 |
Texas | 2016739 | WIDEN 2-LANE UNDIVIDED HIGHWAY TO 4-LANE URBAN FREEWAY WITH GRADE SEPARATED INTERCHANGES AND 0 TO 4-LANE FRONTAGE ON US 287 | $56,172,445.12 | $71,175,163.79 |
Texas | 2016884 | US 175 & IH 45 WIDENING | $100,963,387.50 | $117,539,821.09 |
Texas | 2017241 | IH 45. WIDEN FREEWAY CONSISTING OF GRADING, STRUCTURES, FLEXIBLE BASE, HMA, CONCRETE PAVEMENT, SIGNS AND PAVEMENT MARKINGS | $114,881,928.26 | $143,602,410.32 |
Texas | 2017368 | IH 20. REALIGN EXISTING ROADWAY INCLUDING GRADING, PAVEMENT DRAINAGE, SIGNING, AND ILLUMINATION. | $80,121,825.43 | $89,828,148.68 |
Texas | 2017592 | EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 | $78,000,000.00 | $199,577,086.75 |
Texas | 2017887 | WIDEN FREEWAY FROM FOUR TO SIX LANES ON US 67 | $3,022,594.50 | $66,270,431.33 |
Texas | 2017906 | WIDEN ROADWAY INCLUDING FRONTAGE ROADS, STRIPING AND SIGNING ON IH 45 | $63,259,215.23 | $94,794,666.94 |
Texas | 2017973 | REPLACE SWING BRIDGE ON FM 457 | $45,299,774.23 | $45,299,774.23 |
Texas | 2017990 | IH 10 EXPAND FROM 4 TO 8 LANE EXPRESSWAY | $67,089,546.54 | $83,861,933.17 |
Texas | 2018201 | CONSTRUCT RELIEF ROUTE AROUND DRISCOLL ON US 77. | $40,000,000.00 | $98,921,208.78 |
Texas | 2018321 | IH 820 AND SH 121. RECONSTRUCTION AND WIDENING. | $134,591,824.21 | $168,259,780.27 |
Texas | 2018359 | REPLACE EXISTING APPROACHES AND BRIDGES ON IH 40 | $38,088,137.11 | $42,320,152.34 |
Texas | 2018375 | DEDICATED BUS LANE ON IH 610 | $32,250,206.60 | $64,107,123.38 |
Texas | 2018416 | FM 762 AND FM 2759 - WIDEN TO 4 LANES DIVIDED | $27,554,687.76 | $34,539,569.58 |
Texas | 2018434 | US 377 AT LAKE TEXOMA. BRIDGE REPLACEMENT. | $5,000,000.00 | $35,234,013.62 |
Texas | 2018456 | SH 360 WIDEN AND RECONSTRUCT FROM 6 TO 8 LANES. | $50,933,368.17 | $64,243,032.73 |
Texas | 2018627 | CITY STREET FROM MARSALIS AVENUE TO EWING AVENUE. CONSTRUCT LOCAL ENHANCEMENTS. | $16,000,000.00 | $39,388,000.00 |
Texas | 2018774 | US 285. ROADWAY WIDENING TO A MODIFIED SUPER 2 | $34,325,994.90 | $43,366,955.49 |
Texas | 2018811 | WIDEN FROM 2 LANES TO 4 LANE ON US 69 | $52,977,757.81 | $66,222,197.26 |
Texas | 2018842 | UPGRADE FROM 4-LANE DIVIDED HWY TO 4-LANE FREEWAY WITH FRONTAGE ROAD BY CONSTRUCTING 4 MAINLANES, INTERCHANGES, AND FRONTAGE ROADS AT SH 44 | $26,238,131.10 | $32,797,663.88 |
Texas | 2018852 | WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES ON SH 146 | $81,128,000.00 | $253,240,692.19 |
Texas | 2018858 | SH 242 AT FM 1314. CONSTRUCT GRADE SEPARATION. | $21,168,947.40 | $26,532,973.00 |
Texas | 2018873 | REHAB AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16 | $17,100,000.00 | $43,749,069.95 |
Texas | 2018882 | ROADWAY WIDENING TO A MODIFIED SUPER 2 ON US 285 | $34,066,526.95 | $42,583,158.69 |
Texas | 2018907 | RECONSTRUCT INTERSECTION ON IH 35. | $23,445,433.99 | $26,050,482.21 |
Texas | 2018953 | CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE ON IH 10 | $27,763,717.15 | $34,704,646.44 |
Texas | 2018963 | RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS ON IH 45 | $200,501,389.55 | $251,138,652.59 |
Texas | 2018972 | SL 1604 - EXPAND FROM 2 LANES TO 4 LANE DIVIDED | $23,000,000.00 | $41,186,171.87 |
Texas | 2018973 | SL 1604 - EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY | $42,915,149.12 | $53,680,944.44 |
Texas | 2019045 | REHABILITATE ROADWAY ON UP 281 | $14,075,166.97 | $25,191,978.72 |
Texas | 2019047 | REHABILITATE EXISTING ROADWAY ON US 83. | $58,274,022.74 | $72,871,466.30 |
Texas | 2019048 | REHABILITATION OF EXISTING HIGHWAY ON US 83. | $9,000,000.00 | $65,135,678.13 |
Texas | 2019063 | BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONS AT INTERSECTIONS ON US 62. | $25,000,000.00 | $172,354,438.05 |
Texas | 2019106 | RECONSTRUCT EXISTING 4-LANE UNDIVIDED ROADWAY TO A 4-LANE DIVIDED ROADWAY ON US 290. | $31,604,453.80 | $36,332,955.39 |
Texas | 2019166 | US 54 FROM LOOP 375, INTERCHANGE IMPROVEMENTS. | $89,673,201.39 | $112,175,417.14 |
Texas | 2019168 | WIDEDN FROM 4 TO 6 LANES ON SL 375. | $95,362,990.82 | $116,103,738.53 |
Texas | 2019242 | CONSTRUCT 2 LANE STRUCTURE TO COMPLETE 4 LANE. FACILITY OPERATIONAL IMPROVEMENT TO ELIMINATE BOTTLENECK ON SH 334. | $37,851,101.41 | $47,313,876.76 |
Texas | 2019274 | REHABILITATION AND WIDEN ROADWAY TO PROVIDE PASSSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16. | $20,517,490.45 | $25,646,863.06 |
Texas | 2019312 | RECONSTRUCTION ON 1H 35 TO INCLUDE WIDENING FROM 6 TO 8 LANES. | $185,035,000.00 | $374,225,164.70 |
Texas | 2019409 | US 54, CONVERT TO SUPER 2 HIGHWAY | $19,000,000.00 | $38,238,067.66 |
Texas | 2019411 | CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY ON SL 335. | $41,103,841.85 | $51,379,802.32 |
Texas | 2019437 | CONSTRUCT FRONTAGE ROADS ON US 59. | $17,000,000.00 | $38,337,252.61 |
Texas | 2019442 | CONSTRUCT NEW INTERCHANGE ON SL 250. | $20,067,374.89 | $27,084,218.61 |
Texas | 2019507 | RAMP REVISIONS,INTERSECTION AND FRONTAGE ROAD OPERATIONAL IMPROVEMENTS ON IH 35. | $7,000,000.00 | $27,154,425.57 |
Texas | 2019599 | WIDEN NON-FREEWAY FROM 2 LANE TO 4 LANE ON US 190 | $36,488,767.18 | $86,376,750.15 |
Texas | 2019609 | RECONSTRUCT EXISTING 4 LANE UNDIVIDED ROADWAY TO A 4 LANE DIVIDED ROADWAY ON US 290. | $25,471,516.09 | $31,918,362.62 |
Texas | 2019611 | US 60 TO WEST OF BOVINA. REHAB OF EXISTING ROADWAY. | $11,000,000.00 | $28,667,631.21 |
Texas | 2019613 | CONSTRUCT TWO NEW COLORADO RIVER 2-LANE FRONTAGE ROAD BRIDGES ON SH 21. | $16,000,000.00 | $44,777,398.93 |
Texas | 2019626 | FM 2100 - WIDEN TO 4-LANE DIVIDED | $4,000,000.00 | $48,685,047.79 |
Texas | 2019651 | WIDEN ROAD AND ADD LANES ON US 190. | $23,765,020.86 | $29,706,276.07 |
Texas | 2019689 | REPLACE BRIDGES AND APPROACHES ON SH 8. | $26,204,446.57 | $38,992,035.00 |
Texas | 2019797 | SH 242 - WIDEN FROM 2 TO 4 LANES | $49,090,877.55 | $73,431,751.26 |
Texas | 2019822 | HIGHWAY IMPROVEMENT ON US 385. | $32,906,701.12 | $41,133,376.40 |
Texas | 2019834 | WIDEN FREEWAY ON IH 35E | $101,800,943.70 | $128,702,705.70 |
Texas | 2019859 | INTERCHANGE IMPROVEMENT ON IH 45. | $2,151,964.14 | $39,810,234.26 |
Texas | 2019900 | BASE REPAIR, SEAL COAT, OVERLAY, AND PAVEMENT MARKINGS ON MAINLANES ON IH 35 AND IH 37. | $24,673,647.89 | $27,450,088.16 |
Texas | 2019952 | SH 242 - WIDEN FROM 2 TO 4 LANES | $33,206,352.62 | $41,541,414.96 |
Texas | 2019978 | CONSTRUCT INTERCHANGE ON US 287. | $3,000,000.00 | $30,849,400.78 |
Texas | 2019988 | FM 3005 - INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL IMPROVEMENTS, APPROX 12 INCH OVERLY AND STRIPING. | $17,627,032.68 | $39,141,429.85 |
Texas | 2019990 | CONSTRUCT NEW SAFETY REST AREA ON IH 10 | $32,490,259.77 | $36,612,824.72 |
Texas | 2019996 | CONSTRUCT BRIDGE AT RM 620. | $23,128,441.18 | $28,958,721.48 |
Texas | 2020008 | US 75 AT US 82 SOUTH OF CENTER STREET WIDEN ROAD. | $14,000,000.00 | $169,147,954.04 |
Texas | 2020056 | WIDEN ROAD - ADD LANES ON SH 36 | $33,833,597.74 | $51,291,997.17 |
Texas | 2020057 | WIDEN ROAD - ADD LANES ON SH 36 | $64,840,000.00 | $91,254,896.60 |
Texas | 2020115 | WIDEN ROAD AND ADD LANES ON IH 10 | $20,000,000.00 | $164,781,261.91 |
Texas | 2020185 | RECONSTRUCT INTERCHANGE AND CONSTRUCT FRONTAGE ROAD ON IH 35. | $47,558,158.59 | $59,510,187.06 |
Texas | 2020303 | WIDEN ROAD - ADD LANES ON FM 2218 | $46,532,842.75 | $58,166,053.43 |
Texas | 2020314 | OSTOS ROAD WIDEN ROAD, ADD LANES, AND SHOULDERS. | $19,265,984.48 | $26,303,348.60 |
Texas | 2020432 | CONSTRUCT NEW ROAD ON PELLICANO DRIVE AT JOE BATTLE BOULEVARD TO DARRINGTON AT BERRYVILLE STREET. | $18,464,800.00 | $26,520,124.43 |
Texas | 2020451 | BRIDGE REPLACEMENT ON US 271 | $20,034,841.22 | $25,043,551.51 |
Texas | 2020455 | WIDEN ROAD ADD LANES AND SHOULDERS TO IH 30. | $76,946,054.15 | $97,568,095.52 |
Texas | 2020476 | REPLACE BRIDGE AND REHABILITATE FRONTAGE ROADS ON IH 20. | $6,000,000.00 | $33,420,426.78 |
Texas | 2020489 | WIDEN FREEWAY ON SH 199. | $95,997,373.38 | $120,008,399.33 |
Texas | 2020493 | WIDEN FREEWAY ON SH 170. | $86,961,277.60 | $108,701,597.00 |
Texas | 2020496 | CONVERT NON-FREEWAY ON US 59. | $30,000,000.00 | $182,251,470.46 |
Texas | 2020549 | HIGHWAY IMPROVEMENT ON IH 40. | $22,235,598.98 | $27,831,657.31 |
Texas | 2020571 | HIGHWAY IMPROVEMENT; ROADWAY RECONSTRUCTION ON US 385. | $43,945,315.66 | $54,931,644.57 |
Texas | 2020573 | REHABILITATION OF EXISTING ROAD ON SH 302 | $54,969,534.96 | $62,962,918.69 |
Texas | 2020649 | CONSTRUCT NEW INTERCHANGE AT NORTH SL 338 AT US 385 | $22,391,183.03 | $28,353,088.78 |
Texas | 2020652 | HIGHWAY IMPROVEMENT ON US 67 | $20,582,562.25 | $25,826,006.33 |
Texas | 2020751 | REHABILITATION OF EXISTING ROAD ON FM 2119 | $27,000,000.00 | $66,252,295.96 |
Texas | 2020863 | CONSTRUCT BRIDGE ON IH 20 | $30,674,839.02 | $40,343,548.78 |
Texas | 2020864 | CONSTRUCT BRIDGE ON SH 302. | $25,000,000.00 | $60,650,012.18 |
Texas | 2020871 | CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 | $50,681,059.16 | $63,385,134.88 |
Texas | 2020879 | WIDEN NON-FREEWAY FACILITY ON FM 2818 | $38,019,405.83 | $48,166,546.29 |
Texas | 2020944 | ADD PASSING LANES ON US 83. | $21,996,924.75 | $27,552,731.94 |
Texas | 2020950 | SURFACING AND ROADWAY RESTORATION ON SH 137 | $47,303,780.32 | $57,214,901.80 |
Texas | 2020966 | WIDEN ROAD - ADD LANES ON IH 10. | $46,028,828.08 | $57,536,035.10 |
Texas | 2021093 | WIDEN ROAD - ADD LANES ON SL 121 | $26,337,010.89 | $33,070,636.82 |
Texas | 2021189 | REHABILITATION OF EXISTING ROAD ON FM 2004 | $21,477,838.44 | $31,453,621.29 |
Texas | 2021213 | BRIDGE REPLACEMENT ON SH 198. | $12,000,000.00 | $33,163,967.62 |
Texas | 2021310 | WIDEN ROAD - ADD LANES ON SH 72. | $8,000,000.00 | $50,911,818.47 |
Texas | 2021327 | WIDEN ROAD AND ADD LANES ON IH 35. | $85,000,000.00 | $235,087,606.29 |
Texas | 2021339 | HIGHWAY IMPROVEMENT ON US 183 | $120,001,000.00 | |
Texas | 2021404 | CONSTRUCT DIRECT CONNECTORS ON IH 410 | $84,762,682.49 | $105,987,638.80 |
Texas | 2021440 | US 59. HIGHWAY IMPROVEMENT. | $57,844,043.02 | $72,330,053.77 |
Texas | 2021488 | WIDEN ROAD-ADD LANES ON SL 1604 | $5,000,000.00 | $163,323,331.38 |
Texas | 2021492 | WIDEN ROAD - ADD LANES ON FM 1463 | $48,009,780.66 | $60,122,177.87 |
Texas | 2021518 | HIGHWAY IMPROVEMENT ON IH 27. | $6,000,000.00 | $27,358,852.92 |
Texas | 2021536 | CONSTRUCT NEW ROADWAY LANES AND INSTALL ILLUMINATION ON US 380. | $122,194,673.77 | $153,203,526.72 |
Texas | 2021543 | CONSTRUCT AND WIDEN ROAD ON FM 60. | $8,000,000.00 | $39,536,156.51 |
Texas | 2021547 | RECONSTRUCT AND WIDEN ROADWAYS ON SH 242 | $19,897,876.80 | $35,019,355.32 |
Texas | 2021576 | CONVERT NON-FREEWAY ON FM 1585 | $7,856,000.00 | $170,958,500.84 |
Texas | 2021615 | HIGHWAY IMPROVEMENT ON SL 1604 AT FM 2696 | $8,125,762.13 | $40,359,224.86 |
Texas | 2021616 | WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. | $24,288,838.00 | $226,609,058.80 |
Texas | 2021704 | WIDEN ROAD AND ADD LANES ON US 82 | $43,727,125.65 | $54,658,907.06 |
Texas | 2021728 | WIDEN ROAD - ADD LANES ON SH 36. | $54,784,000.00 | $109,072,964.81 |
Texas | 2021745 | CONSTRUCT NEW ROAD AT KENNY FORT BOULEVARD. | $28,369,555.49 | |
Texas | 2021840 | RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES ON FM 2100. | $35,214,056.19 | $61,875,474.27 |
Texas | 2021858 | CONSTRUCT FRONTAGE ROADS ON SL 9. | $17,150,518.79 | $25,226,148.50 |
Texas | 2021859 | CONSTRUCT FRONTAGE ROADS ON SL 9. | $40,738,586.18 | $50,948,232.73 |
Texas | 2021864 | WIDEN ROAD - ADD SHOULDERS ON US 287 | $29,081,956.02 | $36,459,683.01 |
Texas | 2021943 | CONSTRUCT RAMPS ON SH 6. | $48,337,354.80 | $60,671,693.50 |
Texas | 2022006 | WIDEN ROAD AND ADD LANES ON FM 471. | $28,047,157.35 | |
Texas | 2022009 | WIDEN ROAD-ADD LANES ON IH 45. | $50,000,000.00 | $227,644,053.27 |
Texas | 2022013 | HIGHWAY IMPROVEMENT ON US 69. | $58,983,111.83 | $78,831,618.79 |
Texas | 2022027 | CONSTRUCT NEW ROADWAY LANES AND RECONSTRUCT EXISTING ROADWAY ON IH 35E | $623,356,560.75 | $668,302,241.00 |
Texas | 2022053 | WIDEN FREEWAY ON IH 10 | $166,260,971.09 | $237,039,820.10 |
Texas | 2022076 | EXPAND FROM 8 LANES TO 14 LANES ON IH 35. EXPRESSWAY-ADD 6 NEW EXPRESS LANES | $65,570,351.00 | $1,783,218,521.00 |
Texas | 2022153 | CONSTRUCT FRONTAGE RAODS ALONG IH 20. | $15,000,000.00 | $91,848,786.31 |
Texas | 2022160 | CONSTRUCT BRIDGE ON SL 360 | $43,713,793.38 | $68,642,241.73 |
Texas | 2022185 | WIDEN ROAD AND ADD LANES ON US 83. | $22,284,686.94 | $27,965,109.25 |
Texas | 2022340 | WIDEN ROAD - ADD LANES ON IH 35 | $225,728,405.77 | $578,235,425.65 |
Texas | 2022356 | INTERCHANGE IMPROVEMENT ON IH 20 | $60,596,223.58 | $78,885,163.03 |
Texas | 2022386 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE- SS 366. | $36,497,175.30 | $50,837,003.05 |
Texas | 2022402 | CONSTRUCT DIRECT CONECTORS ON IH 10 | $371,679,466.38 | $465,878,473.92 |
Texas | 2022437 | WIDEN FREEWAY ON IH 35 | $43,908,418.29 | $443,962,164.25 |
Texas | 2022446 | BRIDGE REPLACEMENT ON SH 21 | $25,053,360.94 | $31,316,701.18 |
Texas | 2022480 | BRIDGE REPLACEMENT ON SH 174 | $21,462,755.43 | $26,828,444.29 |
Texas | 2022496 | ROADWAY WIDENING TO A SUPER 2 HIGHWAY ON SH 302 | $32,788,970.36 | $41,101,212.96 |
Texas | 2022509 | WIDEN ROAD ADD LANES ON SH 36. | $6,480,000.00 | $57,166,355.42 |
Texas | 2022510 | WIDEN ROAD - ADD LANES ON FM 723. | $57,744,809.93 | $77,181,012.42 |
Texas | 2022512 | WIDEN ROAD - ADD LANES ON SH 36 | $34,505,471.39 | $43,131,839.25 |
Texas | 2022572 | CONSTRUCT INSPECTION STATION AT ANZALDUAS INTERNATIONAL BRIDGE PORT OF ENTRY. | $18,480,000.00 | $56,396,274.77 |
Texas | 2022575 | CONSTRUCT BRIDGE ON SH 288. | $35,900,416.00 | $44,875,520.00 |
Texas | 2022582 | SAFTETY IMPROVEMENT ON SH 115 AT FM 181. | $24,877,979.85 | $27,642,199.85 |
Texas | 2022583 | ROADWAY REHABILITATION ON SH 18. | $32,555,038.97 | |
Texas | 2022599 | ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY ON US 67. | $23,400,589.18 | $29,250,736.48 |
Texas | 2022615 | INTERCHANGE IMPROVEMENT ON US 75. | $40,557,316.64 | $50,710,215.40 |
Texas | 2022632 | BRIDGE REPLACEMENT ON SH 7 | $22,917,104.57 | $28,647,410.21 |
Texas | 2022653 | HIGHWAY IMPROVEMENT AND PREVENTATIVE MAINTENANCE ON SH 137. | $33,385,352.56 | |
Texas | 2022675 | WIDEN FREEWAY IN VARIOUS LOCATIONS IN THE FORT WORTH DISTRICT TO INCLUDE IH 820, IH 20, US 287 | $357,830,773.05 | $1,637,220,287.00 |
Texas | 2022793 | RECONSTRUCT EXISTING ROADWAY AND BRIDGE REPLACEMENT ON US 80. | $32,586,771.00 | $121,178,586.74 |
Texas | 2022811 | WIDEN ROAD - ADD LANES ON FM 16 | $16,788,271.47 | $42,314,209.28 |
Texas | 2022901 | WIDEN ROADS AND ADD LANES TO SH 46. | $64,037,567.08 | |
Texas | 2022926 | WIDEN ROAD - ADD LANES ON SH 105. | $23,498,452.00 | $390,491,813.95 |
Texas | 2022929 | CONSTRUCT BRIDGE ON SH 288. | $25,567,473.95 | |
Texas | 2023026 | WIDEN ROAD AND ADD LANES AND SHOULDERS ON SH 149. | $19,496,249.28 | $38,354,240.89 |
Texas | 2023121 | RESURFACE ROADWAY ON US 90 | $29,109,171.81 | $36,386,464.77 |
Texas | 2023166 | WIDEN FREEWAY ON IH 30 | $40,000,000.00 | $456,845,192.87 |
Texas | 2B20004 | CONSTRUCT SUPER 2, GRADING, BASE, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKING ON US 281. | $21,000,000.00 | $26,322,526.80 |
Texas | 2B20006 | WIDEN ROAD AND INSTALL SIGNS ON SH 114. | $25,977,982.83 | $35,472,478.54 |
Texas | 2B20010 | INFRASTRUCTURE IMPROVEMENTS ON SL 375 | $33,600,250.88 | $42,000,313.61 |
Texas | 2B20015 | CONSTRUCT NEW ROADWAY LANES ON IH 37. | $14,000,000.00 | $69,791,097.00 |
Texas | 2B20048 | WIDEN ROAD AND ADD LANES ON IH 45 | $78,971,131.75 | $98,859,273.45 |
Texas | 2B20200 | NEW LOCATION FREEWAY AND INTERSECTION IMPROVEMENTS ON AVONDALE-HASLET ROAD, HASLET PARKWAY AND FM 156. | $33,556,556.01 | $49,088,603.58 |
Texas | 2B20250 | HIGWAY IMPROVEMENT ON SH 302. | $9,000,000.00 | $47,343,520.93 |
Texas | 2B20255 | WIDEN ROAD (ADD LANES) ON FM 2478. | $23,494,713.75 | $29,368,392.19 |
Texas | 2B20260 | SH 121 - CONSTRUCT NEW ROADWAY LANES. | $52,019,160.00 | $101,958,550.50 |
Texas | 2B22018 | INTERCHANGE IMPROVEMENT ON IH 30. CONSTRUCT NEW ROAD ON IH30. BRIDGE REPLACEMENT ON IH30 | $25,278,006.81 | $139,578,689.56 |
Texas | NBIS019 | STATEWIDE INVENTORY AND INSPECTION OF ON AND OFF-SYSTEM BRIDGES FOR FISCAL YEARS 2019 AND 2020 | $52,800,000.00 | $66,000,000.00 |
Texas | NBIS022 | FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - ON SYSTEM | $25,600,000.00 | $32,000,000.00 |
Texas | NBIS023 | FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - OFF SYSTEM | $25,600,000.00 | $32,000,000.00 |
Texas | SB97001 | STATEWIDE, STATE INFRASTRUCTURE BANK-ADV CAP. | $99,562,057.00 | $285,168,019.00 |
Texas | X597001 | US 181; FROM N. OF THE CORPUS CHRISTI SHIP CHANNEL TO S. OF THE CORPUS CHRISTI SHIP CHANNEL. CONST NEW HARBOR BR OVER SHIP CHANNEL | $716,823,258.92 | $845,039,286.84 |
Utah | F003728 | SR-68; Bangerter Highway through Saratoga Springs; Roadway Widening - EARMARK PROJECT - DESIGN/BUILD | $8,563,700.54 | $103,362,549.94 |
Utah | F005290 | SR-92, Lehi to Highland; ROADWAY WIDENING | $7,912,919.60 | $161,068,765.68 |
Utah | F006557 | SR-114; GENEVA RD, ROADWAY WIDENING; ROADWAY WIDENING - Demo Project; Design/Build | $39,689,129.51 | $73,518,478.69 |
Utah | F010155 | SR-68; I-215 Interchange Reconstruct.; Choke Point | $36,356,545.63 | $39,400,000.00 |
Utah | F010782 | I-80 & SR-36 BRIDGE REPLACEMENT PROJECT; I-80; Structure Replacement (MP 101 and 99); Rehabilitation or Replacement | $32,778,260.31 | $41,697,060.23 |
Utah | F010853 | US-40; Strawberry Valley Passing Lane & Pvmt Rehab; Passing Lane | $31,587,618.97 | $33,867,849.00 |
Utah | F011271 | I-15; SR-232 to I-84; Widen Existing Facility | $52,515,922.24 | $163,758,322.83 |
Utah | F011826 | SR-172; 5600 W. Railroad Crossing; Widen Existing Facility | $56,439,906.21 | $82,625,531.26 |
Utah | F012228 | 4100 South; Bangerter Highway to 5460 West; Major Rehabilitation - Roadway | $11,227,683.00 | $26,118,478.41 |
Utah | F012676 | SR-68; Village Pkwy. to Grandview in Saratoga Spgs; Widen Existing Facility | $21,742,256.71 | $28,561,894.80 |
Utah | F012730 | US-191; North Moab to Colorado River Bridge; High Volume | $13,052,200.00 | $32,428,090.00 |
Utah | F013042 | SR-30; SR-23 to SR-252; Widen Existing Facility | $17,963,267.61 | $79,208,320.62 |
Utah | F013049 | I-80; 1300 E to 2300 E and I-215; 3300 S to 4500 S; High Volume | $115,450,066.88 | $142,320,573.84 |
Utah | F013093 | I-15; MP 135 to MP 142.5, Climbing Lanes; Passing Lane | $15,800,530.00 | $39,350,000.00 |
Vermont | 0102016 | READSBORO, VT100, BRIDGE NO. 25; SCOPING TO EVALUATE ALTERNATIVES, PENG, REPLACE BRIDGE. | $3,053,797.06 | $25,050,236.32 |
Vermont | 0134013 | WATERBURY, US 2, .14ME INT/VT 100 E.84M, PENG & RECONSTRUCT HIGHWAY | $28,292,897.66 | $31,747,928.20 |
Vermont | 0193496 | BRANDON, US7, BEGINNING AT MM 3.351 EXT. NORTH 1.149 MILES; PENG, ROWA, CONST., RECONSTRUCT EXISTING HIGHWAY. | $25,993,039.45 | $33,313,663.11 |
Vermont | 0281026 | NORTH HERO-GRAND ISLE, US2, BRIDGE NO. 8; PENG, CONST., REPLACE BRIDGE. | $74,607,315.59 | $97,087,136.28 |
Vermont | 0283026 | CABOT-DANVILLE, US 2, 3.93 MILES, PENG, ROWA, CONST., RECONSTRUCT HIGHWAY | $25,367,840.85 | $27,901,212.63 |
Vermont | 0893066 | MILTON, I-89, BRIDGE NO. 81 N&S; PENG, CONST., REPLACE DEFICIENT BRIDGES. | $25,038,055.99 | $29,461,995.00 |
Vermont | 0911065 | BRATTLEBORO, I-91, BRIDGE NOS. 8 N&S AND 9 N&S; PENG, CONST., REPLACE BRIDGES. | $60,263,999.99 | $66,959,999.99 |
Vermont | 0911066 | ROCKINGHAM, I-91, BRIDGE NO. 24 N&S; PENG, CONST., REHAB BRIDGES. | $46,259,424.22 | $52,193,887.02 |
Vermont | 2945001 | WATERBURY-STOWE, VT100, BEGINNING AT MM 0.000 IN WATERBURY EXT NORTHERLY 9.688 MILES; PENG, RESURFACING. | $20,782,967.44 | $27,369,635.75 |
Vermont | 2971001 | WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. | $15,317,429.48 | $28,306,283.85 |
Vermont | 5000001 | BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY | $49,269,771.19 | $72,837,104.48 |
Vermont | A004152 | BRATTLEBORO-HINSDALE, NH, BRIDGE ST.; PENG, REPLACE CONNECTICUT RIVER BRIDGE. | $8,460,000.00 | $26,320,258.73 |
Vermont | WCRS023 | MIDDLEBURY, VERMONT RAILWAY; PENG, ROWA, CONST., LOWER GRADE OF RAILS UNDER VT30/MERCHANTS ROW, TO 21-FT CLEARANCE. | $79,837,809.34 | $93,167,850.49 |
Virgin Islands | A034002 | GARVEE Project for Veterans Drive Improvements of Route 30, St Thomas, VI | $23,302,095.83 | $46,658,571.43 |
Virginia | 000S321 | Statewide | $9,374,253.13 | $36,634,890.96 |
Virginia | 000S328 | Statewide ATMS FY17-20; Sole Source | $195,916.00 | $29,845,582.00 |
Virginia | 000S338 | Statewide ITS maintenance | $49,085,645.00 | |
Virginia | 000S343 | Statewide Transportation Operations Center for Safety Services Patrol Program - Eastern, Central, Northern, Northwest and Southwest Regional Offices | $12,902,229.00 | $238,749,035.00 |
Virginia | 000S345 | Statewide - I-95 Express Lanes Extension Exit 160 to Exit 133 | $40,000,000.00 | $50,000,000.00 |
Virginia | 0015024 | Accomack Co, State Rte 175: Bridge over Black Narrows, Chincoteague, & Lewis Creek Channels -- Bridge Replacement (1 of 2 fed #) | $54,809,537.00 | $75,645,366.00 |
Virginia | 0131067 | BUCHANAN COUNTY | $147,776,624.10 | $178,879,832.00 |
Virginia | 0131069 | Buchanan Co; Rt 460 Connector Phase II FR: Rt. 460 Conn Phase I Approx 7 Mi to Rt 121/460 Connection; Design-Build to Rough Grade | $108,817,409.00 | $120,000,000.00 |
Virginia | 0131087 | Buchanan County; Route 460; Corridor Q - 460 Connector Phase II Finish Grade | $22,533,255.00 | $33,810,731.00 |
Virginia | 0131088 | CFX - Poplar Creek Phase B - VDOT Oversight and RW Acq. Cost | $13,349,796.00 | $25,099,684.00 |
Virginia | 0131089 | Buchanan County; Route 460 (Coalfield Expressway); Poplar Creek Phase B | $171,299,543.00 | |
Virginia | 0135015 | City of Chesapeake: rte 13 - 0.417 Mi W - 0.356 Mi E of Gilmerton Bridge Bridge Replacement | $133,825,981.00 | $166,271,747.00 |
Virginia | 0327032 | Culpeper District - Design Build for CONST INTERCHANGE U.S. RTE 15/17/29 AT U.S. RTE 15/17/29 BUS | $7,587,655.89 | $35,884,553.41 |
Virginia | 0642150 | Richmond DIstrictwwide.- Fr: 0.99 Mi. W. Rt. 623 to 0.38 Mi. W. Rt 292 in Short Pump. - Design Build for Widen from 4 to 6 Lanes | $35,403,075.59 | $36,923,792.19 |
Virginia | 0643479 | Hampton City, I-64: From: Rte 143 To: Rte 199; PE for capacity improvements from Newport News to Williamsburg; also design-build | $50,483,798.87 | $138,003,915.26 |
Virginia | 0643488 | Chesapeake City, I-64; From I-464 to I-664/I-264; Design-Build for Southside widening - including high rise bridge. | $33,120,793.00 | $558,139,606.00 |
Virginia | 0643498 | Hampton Roads Districtwide capacity improvements | $118,022,660.00 | $261,874,144.00 |
Virginia | 0643499 | Henrico County; I-64 | $26,707,242.50 | $74,343,307.07 |
Virginia | 0643511 | City of Newport News-Replace Denbigh Blvd Bridge i-64 and CSX Railroad. | $18,676,601.00 | $29,529,369.00 |
Virginia | 0643513 | Henrico County-RTE 64 replace bridges over RTE 156. | $6,917,053.70 | $31,637,013.00 |
Virginia | 0643533 | City of Hampton; I-64; Hampton Roads express lanes, segment 4C - Phase 1 PE; | $429,754,878.00 | |
Virginia | 0661318 | Capital Beltway HOT Lanes Project, Route 66 & 495 Access Improvement & Flyover & Pavement Rehab & Other CN | $103,860,943.00 | $1,792,214,461.00 |
Virginia | 0661341 | Prince William Co.- Fr: Rt1 15 To: I-66 DESIGN BUILD to reconstruct interchange at Rt 15 and I-66 | $33,460,055.77 | $74,588,754.52 |
Virginia | 0661356 | NORTHERN VIRGINIA | $34,540,258.23 | $153,145,784.64 |
Virginia | 0811342 | MONTGOMERY COUNTY | $42,765,075.94 | $53,886,676.00 |
Virginia | 0812302 | Roanoke County, I-81; NB auxilary lane | $6,432,338.07 | $40,091,778.87 |
Virginia | 0812318 | #SMART18 - I-81 SB Auxiliary Lane from Exit 143 to 141 | $1,652,450.00 | $47,892,990.00 |
Virginia | 0812330 | Roanoke County: I-81;Corridor Improvement Plan (CIP) ADD LANE IN EACH DIRECTION (ID #39) | $227,671,728.00 | |
Virginia | 0812992 | Montgomery Co. Fr I81 SB over Rte 8 PE for Rte 81 -SBL Bridge Over Route 8 | $31,045,852.00 | $34,014,401.00 |
Virginia | 0938026 | Warren Co;Rte 340; Fr: .105 Mi. S.Int. 18th St. To: .115 Mi. N. Int. Rte 55;Bridge replacement & approac over South Fork Shenandoah | $46,336,492.71 | $55,085,896.14 |
Virginia | 0951335 | TOWN OF EMPORIA | $22,699,970.29 | $27,123,793.00 |
Virginia | 0952523 | I-95 HOV/HOT Lanes - PPTA project, and VDOT oversight to manage design and construction of I-95 HOV/HOT Lanes project | $36,863,337.00 | $1,007,729,883.00 |
Virginia | 0952525 | Northern Virginia Region - I95 HOV/HOT Lanes; I95 HOV/HOT Lanes Debt Service | $74,504,930.63 | $110,089,071.24 |
Virginia | 0952537 | STAFFORD COUNTY | $54,685,093.90 | $232,090,029.33 |
Virginia | 0952545 | I-95 Rappahannock River Crossing - Northbound | $41,201,366.00 | $127,000,000.00 |
Virginia | 2646106 | I-264/Witchduck Road interchange and ramp | $23,707,384.00 | $126,028,464.00 |
Virginia | 3954190 | I-395 Design Build | $87,093,966.00 | $602,647,237.00 |
Virginia | 4601005 | Buchanan Co Rte 460 Connector Phase 1-KY State Line approx 1 mile to Rte 460 Connector Phase II=Design Build PE, RW, CN | $98,959,280.00 | $129,218,501.26 |
Virginia | 5104230 | DESIGN BUILD PROJECT FOR 29 SOLUTIONS PROJECTS | $90,746,013.55 | $185,572,992.00 |
Virginia | 5104296 | #SGR19LB - RT 20 - BRIDGE REPLACEMENT | $621,978.00 | $31,088,610.00 |
Virginia | 5111235 | City of Fredericksburg-I95 Southbound-Rappahannock River Crossing | $83,481,071.00 | $143,660,762.00 |
Virginia | 5118209 | Lynchburg - 1.6 Mi W, to: 0.6 Mi W Rte 501 - DB: extend OddFellows Rd to new intrchnge w/ Rte 29/460 & related options on Odd F.Rd | $22,155,960.88 | $57,124,063.54 |
Virginia | 5127932 | COMMERCE ROAD - WIDENING | $4,436,705.00 | $25,697,515.00 |
Virginia | 5128326 | Botetourt County – Fr South of Int. Rte 43 To Int. Rte 727; PE, RW, CN for Route 220 Reconstruction and Safety – Ph. 1, 2, & 3 | $78,025,833.03 | $80,450,448.00 |
Virginia | 5138172 | Frederick County - Route 277 - Widen to 5 lanes | $9,281,307.67 | $57,997,116.87 |
Virginia | 5150184 | Montgomery Co; Rte 460; Fr: .156 Mi. W. Int. Southgate Dr To: .799 Mi. E. Int. Southgate Dr.; CN: Interchange & Connector | $31,291,811.20 | $44,596,240.00 |
Virginia | 5401571 | NORTHERN VA DISTRICTWIDE: FR: ROUTE 28 TO: POLAND ROAD - CN for 6-LANE WIDENING- DESIGN BUILD | $38,228,546.00 | $94,912,504.00 |
Virginia | 5403989 | City of Norfolk: Rte 337- Fr. 0.005 KM N Rogers Ave - 0.011 KM S "B" Ave Reconstruction | $27,543,727.00 | $66,639,279.00 |
Virginia | 5A01165 | Loudoun Co. - From Old Ox Road, Rt. 621 to Rt. 267, All phases Rte 606,, Dulles Loop. Design Build | $23,263,136.00 | $118,470,918.00 |
Virginia | 5A01181 | Fredericksburg Dist.; D-B job on Fall Hill Ave., 0.12 mi W of Gordon Shel. Blvd. to Int. of Mary W.Blvd. & Rte.1, incl. I-95 BR | $17,964,198.92 | $52,841,781.78 |
Virginia | 5A01509 | Prince William County - Fr 0.198 S. of Infrantry Ln To Linton Hall Rd; CN for Rt 28 - Widen to Four Lanes & Rt 215 Realignment | $23,466,455.00 | $30,393,040.00 |
Virginia | 5A01553 | Loudun Co; CN For Rte 7; Fr:0.7 Mi. W. Of Rte 659 To:0.8 Mi. E. of Rte 659 | $16,248,900.82 | $62,737,749.00 |
Virginia | 5A01569 | Arlington Co;Rte 27;Fr: 0.50 Mi. N. of Columbia Pike To: 0.60 Mi. to the intersection w. Rte 12-Memorial Dr.;CN: Major bridge reh | $13,477,884.14 | $29,024,382.50 |
Virginia | 5A01583 | Loudoun Co; Rte 659; Fr: Hay Rd To: Gloucester Parkway; CN : Reconstruct to 4 lanes: Design Buildi | $1,831,436.00 | $51,449,852.72 |
Virginia | 5A01644 | Prince William County | $47,534,343.00 | $59,490,380.00 |
Virginia | 5A01704 | Town of Leesburg; Route 7 Interchange at Battlefield Parkway | $11,335,520.00 | $77,288,540.00 |
Virginia | 5A01717 | Fairfax County, Rte 8102 | $8,647,569.00 | $51,281,516.00 |
Virginia | 5A01745 | HB2 FY17 RTE 7 CORRIDOR IMPROVEMENTS - PHASE 1 and PHASE 2 | $58,300,035.95 | $224,560,741.67 |
Virginia | 5A01790 | Fairfax County - FY17 Route 7 Corridor Improvements - Phase 2 | $61,453,399.67 | $132,323,861.68 |
Virginia | 5A01907 | Potomac Town Center Garage | $17,127,010.00 | $66,332,355.90 |
Virginia | 5A01917 | Route 29 Widening - Phase II | $2,208,446.00 | $179,315,134.00 |
Virginia | 5A01992 | SPRINGFIELD CBC COMMUTER PARKING GARAGE | $40,132,000.00 | $54,140,000.00 |
Virginia | 5A03632 | CITY OF VIRGINIA BEACH-FROM E STRAFORD RD TO VISTA CIRCLE. CN FOR LESNER BRIDGE REPLACEMENT PROJECT. | $8,688,303.00 | $95,885,692.00 |
Virginia | 5A03662 | CITY OF VIRGINIA BEACH-FROM 0.207 MI NORTH OF DAM NECK RD TO 0.152 MI SOUTH OF NIMMO PWY. CN FOR HOLLAND RD-UPGRADE TO 4 LANES. | $30,722,001.00 | |
Virginia | 5A03755 | City of Norfolk; Military Highway; Design Build | $47,140,247.57 | $105,193,209.68 |
Virginia | 5A03761 | City of Suffolk Rte 58; From Rte 58/13/32 bypass to .7 Mi West of Manning Bridge Rd: RW for Holland Rd Corridor Improvements. | $1,202,164.52 | $132,927,677.26 |
Virginia | 5A03794 | CITY OF VIRGINIA BEACH | $700,008.00 | $26,927,288.00 |
Virginia | 5A03857 | City of Newport News - #HB2 Atkinson Boulevard - 4 lanes | $37,095,844.00 | $60,537,493.00 |
Virginia | 5A03950 | #SMART18 - Laskin Road Phase 1-A | $27,754,965.00 | $49,616,391.00 |
Virginia | 5A03956 | #HB2.FY17 RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY | $12,515,031.00 | $43,711,511.00 |
Virginia | 5A03972 | #SMART18 - SKIFFES CREEK CONNECTOR | $29,481,144.00 | $36,851,433.00 |
Virginia | 5A03992 | I-64 HRBT Expansion Project - Design-Build Contract | $164,913,763.99 | $3,935,409,912.00 |
Virginia | 5A27328 | Chesterfield Co, FR: 1.73 Miles W TO: 0.27 MIles E of Rte 618 (Old Bermuda Hundred Road), Rte 10 Major Widening | $25,892,882.32 | $69,631,465.57 |
Virginia | 5B01078 | Widen Route 28 from 4 to 6 Lanes Divided | $28,159,471.35 | $73,982,000.00 |
Virginia | 5B01104 | NORTHSTAR BLVD EXTENSION SHREVEPORT DR TO ROUTE 50 | $25,000,000.00 | $89,996,999.40 |
Virginia | 5B01135 | #HB2.FY17 WIDEN ROUTE 1 TO SIX LANES | $9,004,516.64 | $39,492,681.00 |
Virginia | 9611099 | City of Bristol; Various Locations I-81 | $13,199,225.76 | $38,971,863.16 |
Virginia | 9655057 | Hampton Rds PPTA: Midtown tunnel corridor & Martin Luther King Freeway Extension - PPTA Project development & management and ROW | $44,734,791.00 | $86,770,331.00 |
Virginia | 9655077 | Hampton Rds Districtwide - Rte 58 - Downtown & Midtown Tunnels; extension of MLK to I-264 - PE for DT/MT/MLK Primary Debt Service | $372,243,663.38 | $564,265,078.23 |
Virginia | 9655079 | Hampton Rds PPTA: Interstate/Primary Design/ROW/Upgrade and Construction of Downtown & Midtown Tunnels; extension of MLK to I-264 | $2,139,358,000.00 | |
Virginia | 9655086 | I-64 Districtwide;From:1.05 Mi West of Rte 199 to 0.54 Miles East of Rte 238;PE for I-64 Capacity Improvements (HRTAC Project) | $189,707,675.00 | |
Virginia | PM00216 | Statewide: Contract for Pavement data collection -- condition of roadway - Multi-year contract | $26,265,838.00 | $40,499,999.00 |
Virginia | PM01337 | Bristol Districtwide Paving | $10,530,759.13 | $57,192,918.50 |
Virginia | PM01339 | Bristol Districtwide Paving | $5,122,946.00 | $98,000,000.00 |
Virginia | PM01348 | Bristol Districtwide Paving | $4,495,958.00 | $95,000,000.00 |
Virginia | PM02458 | Salem Districtwide Paving; Interstate and Secondary | $41,720,746.00 | $52,220,829.00 |
Virginia | PM02459 | Salem Districtwide Paving; Primary | $47,683,100.00 | $49,460,600.52 |
Virginia | PM02461 | Salem Districtwide Paving - Plant mix | $7,285,670.92 | $98,000,000.00 |
Virginia | PM02477 | Salem Districtwide Paving | $1,602,122.00 | $95,000,000.00 |
Virginia | PM03369 | Lynchburg Districtwide Paving | $59,743,478.30 | $90,000,000.00 |
Virginia | PM03371 | Lynchburg Districtwide Paving | $2,576,347.00 | $56,000,000.00 |
Virginia | PM03380 | Lynchburg Districtwide Paving | $60,000,000.00 | |
Virginia | PM04473 | Richmond Districtwide Paving; Interstate and Secondary | $36,363,339.00 | $47,304,117.16 |
Virginia | PM04474 | Richmond Districtwide Paving; Primary | $62,980,300.00 | $90,148,885.85 |
Virginia | PM04498 | Richmond Districtwide Paving: Interstate and Primary | $5,222,957.00 | $84,000,000.00 |
Virginia | PM04499 | Richmond Districtwide Paving: Secondary | $40,000,000.00 | |
Virginia | PM04516 | Richmond Districtwide Paving | $1,925,540.00 | $95,000,000.00 |
Virginia | PM05443 | Hampton Roads Districtwide Paving | $426,660.00 | $90,000,000.00 |
Virginia | PM05462 | Hampton Roads Districtwide Paving | $1,339,223.15 | $98,000,000.00 |
Virginia | PM05521 | Hampton Roads Districtwide Paving | $2,116,283.00 | $90,000,000.00 |
Virginia | PM06398 | Fredericksburg Districtwide Paving | $6,451,529.73 | $39,880,371.73 |
Virginia | PM06399 | Fredericksburg Districtwide Paving | $5,554,397.00 | $98,000,000.00 |
Virginia | PM06403 | Fredericksburg Districtwide Paving | $90,000,000.00 | |
Virginia | PM07314 | Culpeper Districtwide Paving | $45,275,193.00 | $47,711,814.12 |
Virginia | PM07318 | Culpeper Districtwide Paving | $70,000,000.00 | |
Virginia | PM07325 | Culpeper Districtwide Paving | $60,000,000.00 | |
Virginia | PM08451 | Staunton Districtwide Paving | $72,955,400.00 | $90,000,000.00 |
Virginia | PM08452 | Staunton Districtwide Paving | $5,123,765.91 | $90,000,000.00 |
Virginia | PM08465 | Staunton Districtwide Paving | $2,400,000.00 | $95,000,000.00 |
Virginia | PM09356 | Northern Virginia Districtwide Paving; Interstate and Primary; NHS Routes | $23,629,711.00 | $52,604,908.17 |
Virginia | PM09357 | Northern Virginia Districtwide Paving; Secondary | $90,000,000.00 | |
Virginia | PM09360 | Northern Virginia Districtwide Paving: Interstate and Primary | $7,205,564.00 | $85,000,000.00 |
Virginia | PM09361 | Northern Virginia Districtwide Paving: Secondary | $90,000,000.00 | |
Virginia | PM09369 | Northern Virginia Districtwide Paving | $90,000,000.00 | |
Virginia | PM09370 | Northern Virginia Districtwide Paving | $90,000,000.00 | |
Virginia | TS00252 | Statewide- Multiple Districts- Various Locations- Project to support Statewide TOCs, SSP, and ITS | $268,734,142.33 | $286,253,236.00 |
Virginia | TS00263 | Statewide;Multiple Districts; Statewide TOC, SSP, & ITS Devices Contract-Statewide Task Order | $67,392,068.00 | |
Virginia | TS05271 | CITY OF HAMPTON-FROM HRBT SOUTH SHORE NORFOLK TO HRBT NORTH SHORE-HAMPTON. CN FOR HRBT SWITCHGEAR INSTALLATION. | $15,739,002.00 | $26,633,756.00 |
Virginia | TS05293 | Tunnels and Movable Bridge Staff Augmentation | $8,120,900.00 | $87,500,000.00 |
Virginia | TS05305 | CONTROL ROOM & FIELD OPS FOR MONITOR MERRIMAC BRIDGE TUNNEL | $35,816,875.00 | |
Virginia | TS05306 | CONTROL ROOM & FIELD OPS FOR HAMPTON RDS BRIDGE TUNNEL | $55,083,125.00 | |
Washington | 0003129 | SR 3/Chico Creek - Remove Fish Barrier | $2,244,794.06 | $56,437,659.50 |
Washington | 0053971 | I-5 / SB S 320TH ST TO DUWAMISH RIVER BRIDGE - CONCRETE PAVEMENT REHAB | $26,656,342.07 | $27,033,214.07 |
Washington | 0053974 | I-5/ NB MARTIN LUTHER KING JR WY TO NE RAVENNA BR - PAVEMENT REPAIR AND MORE | $37,281,734.83 | $53,938,167.83 |
Washington | 0053977 | I-5/S Bailey St Ramp to I-90 W-S Ramp - Deck Overlay & Expansion Joints | $25,023,469.16 | $25,625,787.74 |
Washington | 0053981 | I-5/SB Denny Way to NE 117th St - Pavement, Deck & Expansion Joint | $196,840,913.00 | $285,894,951.80 |
Washington | 0099097 | SR99 / ALASKAN WAY VIADUCT (HOLGATE ST. TO S. KING ST.- VIADUCT REPLACEMENT) STAGE 2 (AWV) | $165,412,375.91 | $269,605,331.00 |
Washington | 0099111 | SR99 / ALASKAN WAY TUNNEL ALTERNATIVE -TUNNEL DESIGN/BUILD (S. KING ST VIC TO ROY ST VIC) (AWV) | $467,065,190.10 | $1,604,833,271.76 |
Washington | 0099122 | SR 99/TUNNEL ALTERNATIVE, NORTH ACCESS CONNECTION SR 99 MP 32.55 TO MP 34.12 | $5,948,153.00 | $69,430,438.01 |
Washington | 0099137 | SR 99/Aurora Ave - George Washington Memorial Br 99/560 (Stage 2) | $22,498,333.13 | $35,892,280.92 |
Washington | 0101307 | SR101 / SHORE ROAD TO KITCHEN-DICK ROAD - WIDENING | $47,779,159.00 | $54,233,065.00 |
Washington | 0101361 | US 101/SIEBERT CREEK - REMOVE FISH BARRIER | $33,254,966.28 | $33,871,875.89 |
Washington | 0101378 | US 101/Elwha River Bridge - Bridge Replacement | $36,845,128.24 | $38,157,573.63 |
Washington | 0104025 | HOOD CANAL BRIDGE RETROFIT AND REPLACEMENT EAST | $310,956,527.17 | $435,435,346.17 |
Washington | 0104033 | HOOD CANAL BRIDGE RETROFIT AND REPLACEMENT EAST DEBT SERVICE PAYMENT | $71,447,045.75 | $101,273,802.00 |
Washington | 0167055 | SR 167/SR 410 to SR 18 - Congestion Management | $19,539,831.39 | $33,807,279.97 |
Washington | 0167057 | SR 167/I-5 to SR 509 - Corridor Construction | $14,679,770.00 | $476,196,441.82 |
Washington | 0290025 | SR 290 / Spokane River E Trent Br- Replace Bridge | $7,678,661.58 | $25,778,677.77 |
Washington | 0302013 | SR 302(SPUR)/SR 302 to N of 154th St NW - Paving | $22,742,395.70 | $34,730,487.49 |
Washington | 0509034 | SR 509/I-5 & SR 516 I/C to 28th/24th Ave S - Widening and Toll Lanes | $82,164,340.00 | $347,278,086.46 |
Washington | 0520047 | SR 520 / I-5 TO MEDINA - STGE 1 EVERGREEN POINT FLOATING BRIDGE AND LANDINGS | $139,007,369.80 | $824,557,570.80 |
Washington | 0520053 | SR 520/WEST APPROACH BRIDGE NORTH (WABN) | $53,146,501.19 | $258,739,830.23 |
Washington | 0524011 | 196th Street SW (SR 524) | $8,990,000.00 | $34,977,965.00 |
Washington | 0701063 | Index Galena Rd MP 6.4 to MP 6.9 | $21,571,681.00 | $27,622,618.00 |
Washington | 0901490 | I-90 / 468TH AVE SE TO W SUMMIT RD EB - REHAB CONCRETE | $34,384,270.69 | $51,387,993.89 |
Washington | 0901496 | I-90/468th Ave SE to W Summit Rd WB - Rehab Concrete | $28,278,170.55 | $28,907,437.11 |
Washington | 1402003 | SR 530/SKAGLUND HILL VIC TO C-POST VIC - ER ROADWAY RECONSTRUCTION | $27,836,112.28 | $27,967,980.76 |
Washington | 1499002 | East Marginal Way Heavy Haul Corridor | $2,900,000.00 | $63,325,890.00 |
Washington | 1613005 | Fairview Ave. Bridge Replacement | $10,000,000.00 | $34,016,606.00 |
Washington | 1615005 | Rainier Ave S Corridor Improvements - Phase 4 | $19,074,850.00 | $30,143,356.00 |
Washington | 2012028 | WSF SYSTEMWIDE VESSEL PRESERVATION & IMPROVEMENTS (MAP-21) | $28,259,161.02 | $28,259,161.02 |
Washington | 2015086 | SR 305 / BAINBRIDGE ISLAND FERRY TERMINAL - PEDESTRIAN LOADING BRIDGE REPLACEMENT | $9,010,000.00 | $25,805,493.00 |
Washington | 2016024 | WSF SYSTEMWIDE VESSEL PRESERVATION & IMPROVEMENTS (FFY 2016) | $42,400,241.48 | $43,309,210.48 |
Washington | 2411003 | West Sammamish River Bridge | $13,063,994.00 | $40,386,560.00 |
Washington | 3440001 | Duportail Street Bridge | $2,695,821.77 | $39,906,386.77 |
Washington | 4123005 | Barker Rd/BNSF Grade Separation | $15,740,070.00 | $26,913,000.00 |
Washington | 9917036 | West Seattle Corridor Bridges | $37,650,600.00 | $67,048,691.00 |
Washington | 9927056 | Port of Tacoma Interchange - Phase 1 | $14,726,500.00 | $38,792,740.00 |
Washington | 9932062 | Geiger Boulevard Infrastructure Improvements | $14,300,000.00 | $41,567,271.00 |
Washington | F045001 | West Cashmere Bridge Replacement | $18,350,000.00 | $26,389,954.00 |
West Virginia | 0002578 | WHEELING STREETSCAPE | $7,600,000.00 | $36,047,000.00 |
West Virginia | 0002608 | WV 2 PROCTOR-KENT | $9,400,000.00 | $108,367,000.00 |
West Virginia | 0002628 | PARKERSBURG-ST. MARYS RD | $3,206,072.91 | $32,060,729.17 |
West Virginia | 0010226 | LOGAN, WV 10, 0.70 MI S CO 14-1.36 MI N I/S RELOC WV 10., GR, DR $ RET WALLS. | $34,722,843.20 | $43,403,554.00 |
West Virginia | 0035202 | PUTNAM, US 35, WV 869-0.52 MILES SOUTH CO 40, UPGR 4 LN. | $173,743,322.67 | $217,179,153.34 |
West Virginia | 0051050 | INWOOD PHASE 2 | $854,855.62 | $25,712,020.00 |
West Virginia | 0052361 | MTN VIEW TO GILBERT | $5,475,358.70 | $54,753,587.02 |
West Virginia | 0064406 | CULLODEN INTERCHANGE | $3,655,098.00 | $36,550,980.00 |
West Virginia | 0119447 | ROCK CK I/C | $28,555,525.16 | $28,555,525.16 |
West Virginia | 0121016 | WYOMING, WV 121, MULLENS CON - .15 MILES EAST CO 12/1, WV 54 - WV 121 @ MP 14.65, GR DR. | $48,632,500.00 | $51,132,500.00 |
West Virginia | 0121132 | WELCH - WV 16 I/C | $15,875,027.41 | $158,750,274.17 |
West Virginia | 0223010 | WELLSBURG BR | $97,718,689.60 | $161,338,397.00 |
West Virginia | 0484241 | DAVIS, TUCKER, US 48, 0.7 MI E WV 32-6.2 MI W WV 32, CONST 4 LN. | $53,778,381.00 | $67,781,521.00 |
West Virginia | 0484246 | TUCKER US 48, GRANT WV 1, 6.2 MI W WV 42 - WV 93 CONN, CONST 4 LN. | $74,979,127.00 | $94,474,291.00 |
West Virginia | 0484316 | KERENS - US 219 CONNECTOR | $248,183,921.17 | $248,183,921.17 |
West Virginia | 0484326 | US 219 CONNECTOR -WV 72 | $20,000,000.00 | $33,866,661.77 |
West Virginia | 0484329 | CHEAT RIVER BRIDGE | $117,081,291.50 | $167,081,291.50 |
West Virginia | 0484331 | US 219 CONN-WV 72 I/C | $101,553,548.00 | $191,553,548.00 |
West Virginia | 0484334 | WV 72 I/C - PARSONS | $60,000,000.00 | $63,345,270.82 |
West Virginia | 0522045 | BERKELEY SPRINGS BYPASS | $20,000,000.00 | $67,599,646.20 |
West Virginia | 0522047 | NORTHERN CONN +1(FAIRVIE CONNECTOR) | $16,209,272.95 | $57,500,000.00 |
West Virginia | 0601010 | JEFFERSON ROAD | $43,277,839.91 | $53,174,429.70 |
West Virginia | 0641399 | US 35/I-64 I/C - NITRO I/C | $50,406,735.01 | $244,683,660.00 |
West Virginia | 0641400 | MERRITTS CREEK- BARBOUSVILLE | $62,513,680.00 | $78,142,100.00 |
West Virginia | 0642164 | CARTER BR-BROOKS ST I/C | $37,661,934.98 | $37,661,934.98 |
West Virginia | 0793240 | MORGANTOWN, MONONGALIA, I-79, 0.7 MILES NORTH US 19 - 0.4 MILES SOUTH CR 19/24, CONST NEW I/C. | $25,271,282.71 | $28,079,203.00 |
West Virginia | 0793305 | S. FAIRMONT-PLEASANT VALLEY | $72,551,016.28 | $72,551,016.28 |
West Virginia | 0793309 | I-79 BRIDGE REHAB | $66,961,042.80 | $72,178,936.44 |
West Virginia | 0793313 | I-79 BRIDGE REPLACEMENTS | $35,995,027.51 | $39,994,475.00 |
West Virginia | 0811124 | I-81 BR/POTOMAC RI & WIDENING TO US 11 | $34,197,340.80 | $42,746,676.00 |
West Virginia | 0H22001 | Statewide, Enhancement Program. | $32,822,975.47 | $32,985,615.47 |
West Virginia | 0Q22001 | STATEWIDE, ENHANCEMENT PROGRAM | $26,861,203.53 | $32,815,209.04 |
West Virginia | 2117061 | GARVEE 17 BOND PAYMENTS | $175,666,054.00 | $295,674,809.00 |
West Virginia | 2217048 | TOM WILLIAMS FAMILY+3( WESTMORELAND OP, CORA ST OP, DANNER RD OP) | $16,093,081.65 | $26,821,361.00 |
Wisconsin | 2014260 | MOUNT HOREB - MADISON VERONA ROAD TO SEMINOLE HIGHWAY CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING | $31,622,274.18 | $62,852,387.02 |
Wisconsin | 2014302 | USH 10 - USH 10/STH 441 COUNTY CB - ONEIDA STREET LLBDM BRIDGE B-70-403 LET - CONTRACT VIA BID LETTING | $34,452,016.39 | $43,933,110.70 |
Wisconsin | 2015473 | ZOO IC, ZOO INTERCHANGE PHASE 2 LINCOLN-BLUEMOUND, 121ST TO 70TH CONST/RECONSTRUCTION, EXPANSION LET - CONTRACT VIA BID LETTING | $83,999,093.48 | $337,692,497.52 |
Wisconsin | 2016337 | ILLINOIS STATE LINE - MADISON S.DANE CTY LINE TO E.CHURCH RD,NB CONST OPS/RECSTE PVMNT/STRCT/INTRCH LET - CONTRACT VIA BID LETTING | $24,228,503.66 | $32,383,971.22 |
Wisconsin | 2017186 | HUDSON - BALDWIN STH 35 NORTH TO USH 12 CONSTRUCTION/RECONSTRUCTION LET - CONTRACT VIA BID LETTING | $24,411,513.93 | $30,513,724.34 |
Wisconsin | 2017327 | ILLINOIS STATE LINE - MADISON CTH O TO USH 14 INTERCHANGE NORTH CONST OPS/RECSTE PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING | $30,054,242.00 | $40,845,407.45 |
Wisconsin | 2017338 | MOUNT HOREB - MADISON CTH PD TO RAYMOND RD/STG 2/PHASE 2 CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING | $5,895,183.38 | $29,475,916.74 |
Wisconsin | 2017398 | ILLINOIS STATE LINE - MADISON HART ROAD TO WOODMAN ROAD CONST OPS/RECSTE PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING | $26,526,297.26 | $33,517,728.01 |
Wisconsin | 2017452 | 108TH STREET (HALES CORNERS) COLLEGE AVE - LAYTON AVE CONST/RECONSTRUCTION LET - CONTRACT VIA BID LETTING | $13,567,034.36 | $27,313,283.05 |
Wisconsin | 2017512 | WAUKESHA BYPASS GENESEE RD TO FIDDLERS CREEK DR CONST/RECONSTRUCT, PAVING LET - CONTRACT VIA BID LETTING | $38,165,539.88 | $47,947,775.04 |
Wisconsin | 2017518 | HUDSON - MENOMONIE 250TH STR TO WILSON CREEK (EB & WB) CONSTRUCTION/PVRPLA/8 BRIDGES LET - CONTRACT VIA BID LETTING | $29,824,445.73 | $33,138,273.02 |
Wisconsin | 2018157 | USH 10 - USH 10/STH 441 COUNTY CB - ONEIDA STREET STH 441 SB MAINLINE MIDWAY RD-EPL LET - CONTRACT VIA BID LETTING | $32,688,775.23 | $40,863,679.91 |
Wisconsin | 2018329 | N-S FREEWAY, STH 20 TO CTH K MAINLINE (SOUTH) RECONST/RECONSTRUCT LET - CONTRACT VIA BID LETTING | $19,362,784.36 | $29,595,867.31 |
Wisconsin | 2018330 | N-S FREEWAY, CTH E INTERCHANGE MAINLINE & RAMPS CONST/RECONST LET - CONTRACT VIA BID LETTING | $18,725,000.00 | $25,914,629.38 |
Wisconsin | 2018333 | N-S FREEWAY, STH 11 INTERCHANGE MAINLINE & RAMPS CONST/RECNST LET - CONTRACT VIA BID LETTING | $38,129,418.37 | $47,682,121.08 |
Wisconsin | 2018383 | N-S FREEWAY, 7 MILE RD INTERCHANGE MAINLINE & RAMPS CONSTR/RECONSTRUCT LET - CONTRACT VIA BID LETTING | $20,870,109.02 | $26,087,636.27 |
Wisconsin | 2018433 | ILLINOIS STATE LINE - MADISON EAST CHURCH RD TO CHURCH ST-SB CONST OPS/RECSTE/PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING | $6,270,052.86 | $25,211,345.81 |
Wisconsin | 2018438 | MOUNT HOREB - MADISON CTH PD TO RAYMOND RD/STG 2/PHASE 3 CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING | $7,364,087.60 | $36,155,756.91 |
Wisconsin | 2019001 | ILLINOIS STATE LINE - MADISON USH 14 INT NORTH TO KENNEDY ROAD CONST OPS/RECSTE/PVMNT/STRCT/INTRCH LET - CONTRACT VIA BID LETTING | $90,651,982.70 | $121,823,470.11 |
Wisconsin | 2019015 | HUDSON - MENOMONIE STH 128 TO 250TH STREET (EB & WB) CONSTR/PAVEMENT REPLACEMNT/6 BRIDGS LET - CONTRACT VIA BID LETTING | $56,828,077.37 | $63,142,308.18 |
Wisconsin | 2019200 | ILLINOIS STATE LINE - MADISON KENNEDY ROAD TO KNUTSON ROAD CONST OPS/RECSTE PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING | $33,983,893.77 | $68,613,892.49 |
Wisconsin | 2019496 | ILLINOIS STATE LINE - MADISON IH 43 INTERCHANGE CORE CONST OPS/INTERCHANGE IMPROVEMENTS LET - CONTRACT VIA BID LETTING | $84,176,008.63 | $121,158,399.58 |
Wisconsin | 2019498 | ILLINOIS STATE LINE - MADISON CTH AB TO USH 12/18 INTCHG - RECSTE CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING | $18,096,908.26 | $26,007,782.80 |
Wisconsin | 2019634 | SHAWANO - GREEN BAY CTH VV INTERCHANGE DSGN/ BUILT GRANT FUNDING C/E - CONSULTANT DELIVERY (PRELIM OR CONST ENGINEERING) | $19,757,899.00 | $29,238,789.00 |
Wisconsin | 2019801 | IH 43 ROCK FREEWAY ROCK COUNTY LINE TO USH 12 CONST/DIAMOND GRIND-BRRHB LET - CONTRACT VIA BID LETTING | $23,547,689.35 | $29,434,611.67 |
Wisconsin | 2020384 | RACINE STREET BRIDGE, C OF MENASHA FOX RIVER BRIDGE AND APPROACHES CONST/BRIDGE REPLACE 84.10 BRIDGE LET - CONTRACT VIA BID LETTING | $23,362,374.00 | $36,329,456.09 |
Wisconsin | 2020466 | ZOO IC, USH 45 SWAN BLVD TO BURLEIGH STREET CONST/RECONSTRUCT W/ ADDL LANES LET - CONTRACT VIA BID LETTING | $81,824,589.01 | $177,684,354.56 |
Wisconsin | 2021019 | MADISON - CAMBRIDGE WHITNEY WAY TO IH 39/90 CONST/RESURFACE BOTH ROADWAYS LET - CONTRACT VIA BID LETTING | $34,000,000.00 | $48,270,820.41 |
Wisconsin | 2021031 | 75TH ST, C KENOSHA/V PLEASANT PRAIR IH 94 TO 74TH AVE CONST / RECONSTRUCT WITH EXPANSION LET - CONTRACT VIA BID LETTING | $51,960,325.62 | $66,889,353.23 |
Wisconsin | 2021032 | 75TH ST, C KENOSHA/V PLEASANT PRAIR 74TH AVE TO 43RD AVE CONST / RECONSTRUCT WITH EXPANSION LET - CONTRACT VIA BID LETTING | $26,472,154.66 | $33,466,494.26 |
Wisconsin | 2021226 | IH 43 NORTH SOUTH FREEWAY CAPITOL DR-2100 FT N OF HAMPTON AVE CONST / BRIDGE REPLACEMENT LET - CONTRACT VIA BID LETTING | $53,223,447.13 | $66,529,308.91 |
Wisconsin | 2021227 | FOND DU LAC - PLYMOUTH USH 151-SEVEN HILLS ROAD CONST/GRADE/BASE/PAVE R/W-YES LET - CONTRACT VIA BID LETTING | $22,000,000.00 | $38,158,450.77 |
Wisconsin | 2021264 | STH 76-NEW LONDON WI CENTRAL RR-CTH JJ CONST/RECSTE NEW BYPASS LET - CONTRACT VIA BID LETTING | $21,758,836.14 | $27,198,545.15 |
Wisconsin | 2022007 | I-43 NORTH SOUTH FREEWAY HIGHLAND ROAD TO STH 60 CONST/RECONSTRUCTION W/EXPANSION LET - CONTRACT VIA BID LETTING | $79,735,105.87 | $118,677,604.36 |
Wisconsin | 2022106 | I-43 NORTH SOUTH FREEWAY W COUNTY LINE RD INTERCHANGE CONST/RECONSTRUCT W/EXPANSION LET - CONTRACT VIA BID LETTING | $39,016,349.65 | $56,476,689.09 |
Wisconsin | 2022372 | HUDSON - BALDWIN IH 94 SWEF 61 HUDSON CONSTRUCTION/SWEF LET - CONTRACT VIA BID LETTING | $18,600,000.00 | $25,274,819.23 |
Wisconsin | 2022535 | STH 23 - LONE ROCK WISCONSIN RIVER/B-25-192,B-52-279 DES/BLD FINAL DES/CONST/RDWY/BRRPL LET - CONTRACT VIA BID LETTING | $40,137,137.00 | |
Wisconsin | 2023002 | I-43 NORTH SOUTH FREEWAY UNION PACIFIC RR BRIDGE B-40-921 CONST/PHASE 3 RECST W/ EXPANSION LET - CONTRACT VIA BID LETTING | $25,610,167.65 | |
Wisconsin | 2023003 | I-43 NORTH SOUTH FREEWAY BENDER ROAD TO BROWN DEER ROAD CONST/RECONSTRUCTION W/ EXPANSION LET - CONTRACT VIA BID LETTING | $150,266,934.09 | |
Wisconsin | 2023004 | MOUNT HOREB - MADISON TOWN HALL ROAD TO CTH PD CONST/RESURF EB-WB RDWYS/RSRF30 LET - CONTRACT VIA BID LETTING | $21,234,510.74 | $27,781,346.70 |
Wyoming | 0261020 | LARAMIE STREETS - CLARK/LEWIS STREETS VIADUCTS. | $34,364,144.00 | $37,975,628.00 |
Wyoming | 0901091 | NORTH SHERIDAN INTERCHANGE-I-90, GRADING, DRAINING, MILLING, PLANT MIX, REMOVAL AND REPLACEMENT OF STRUCTURES | $46,826,021.00 | $50,496,833.00 |
Wyoming | 2000058 | PE WY 22, JACKSON - WILSON TETON COUNTY | $3,996,157.00 | $33,962,286.00 |
Wyoming | HPP0418 | US 212 / BEARTOOTH HIGHWAY | $25,903,000.00 | $26,936,679.00 |
Wyoming | I254160 | CASPER MARGINAL | $31,662,851.37 | $43,209,167.19 |
Wyoming | I254168 | CASPER-KAYCEE / MIDWEST SECTION / I-25 | $12,675,000.00 | $28,803,596.00 |
Wyoming | I802204 | ROCK SPRINGS - RAWLINS / ROCK SPRINGS EAST | $25,413,431.15 | $27,396,971.24 |
Wyoming | I802208 | ROCK SPRINGS - RAWLINS / ROCK SPRINGS EAST | $23,330,226.15 | $25,171,150.49 |
Wyoming | I802209 | LYMAN-GREEN RIVER / LITTLE AMERICA / I-80 | $12,300,000.00 | $27,270,485.00 |
Wyoming | I804271 | I-80 WINTER FREIGHT IMPROVEMENT PROJECT | $27,750,285.00 | $34,709,551.00 |
Wyoming | I904143 | SUNDANCE MARGINAL / I-90 | $8,167,461.00 | $35,039,419.00 |
Wyoming | N103103 | THAYNE - ALPINE JCT. / ETNA NORTH. **WIDEN TO 5 LANES** | $33,823,009.00 | $37,377,622.00 |
Wyoming | N104066 | HOBACK JUNCTION - JACKSON ROAD / SNAKE RIVER SECTION **RECONSTRUCTION / TURNOUT** | $77,840,321.77 | $84,901,890.03 |
Wyoming | N104083 | HOBACK JUNCTION - JACKSON / SNAKE RIVER SECTION 2. | $36,407,124.58 | $39,632,184.02 |