Highway Trust Fund Transparency and Accountability Reports

Annual Project-Level Report

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE

AS OF SEPTEMBER 30, 2022
RECIPIENT PROJECT NUMBER PROJECT TITLE TOTAL OBLIGATIONS ESTIMATED TOTAL COST
Alabama 0002516 ADD LANES ON SR-2 (US-72/FLORENCE BLVD) FROM CR-30 (INDIAN SPRINGS DR) TO SKY PARK ROAD $23,454,630.38 $45,389,987.65
Alabama 0005512 SR-5 (US-78) ADD LANES FROM I-59 TO FINLEY BLVD. (PHASE 1) $25,702,401.30 $32,170,377.44
Alabama 0006521 SR-6 (US-82) ADD LANES FROM EAST END OF LUBBUB CK BRIDGE E OF REFORM TO 4-LANE WEST OF GORDO $42,527,042.47 $53,958,088.41
Alabama 0006562 SR-6 (US-82) FROM WEST OF GORDO TO CR-33 $50,725,647.97 $62,744,695.47
Alabama 0007549 ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5 ALONG THE NORFOLK SOUTHERN RAILROAD $74,248,992.40 $91,546,686.26
Alabama 0012507 ADD LANES SR-12 (US-84) EAST OF SR-87 TO EAST OF CR-507 GRADE AND DRAIN. $23,402,976.10 $29,253,720.13
Alabama 0013568 SR-13 (US-43) RESURFACING AND PAVEMENT REHABILITATION FROM THE NORTH END OF THE I-359 BRIDGE TO THE HUGH THOMAS BRIDGE $16,996,909.76 $26,971,123.50
Alabama 0014509 SR-14 INTERSECTION IMPROVEMENT AT SR-143 IN ELMORE (CSX RR) INCLUDES BRIDGES $24,733,077.60 $30,916,347.01
Alabama 0025556 RELOCATION OF SR-25 (US-411) FROM TURKEYTOWN TO 0.65 MILES NORTH OF CHEROKEE CR-20 $40,331,860.25 $50,414,825.31
Alabama 0035504 BRIDGE REMOVAL SR35 @ Texas RIVER $21,160,363.67 $26,450,454.59
Alabama 0035521 SR108 (MGM Outer Loop) at I-85 Interchange Ramp Bridges 1, 2, 3, & 4 Superstructure - Phase 4A $29,170,293.99 $36,462,867.49
Alabama 0042501 Grade, Drain & Bridge SR42/US98 from Mississippi State Line to .5 Mile E of CR576/Glennwood Road $66,970,770.42 $83,713,463.04
Alabama 0042509 SR-42 (US-98) FR MISS LINE TO 0.5 MI EAST OF CR-576 (GLENNWOOD RD) $27,475,252.29 $34,344,065.37
Alabama 0192901 Anniston E Bypass - S of Lake Yahou to SR1/US431, Grade & Drain $50,299,529.98 $53,674,711.55
Alabama 0210509 ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM SOUTH OF MEADOWBROOK DRIVE SOUTH TO NORTH CHEROKEE AVENUE AND ON SR-53 (US-231) FROM GIRARD AVENUE TO $44,400,505.74 $55,500,632.18
Alabama 0220253 WATERWAY VILLAGE MULTIMODAL ACCESS PROJECT BUILD GRANT - PHASE 1 AND 2 MEDICAL VILLAGE ACCESS IMPROVEMENTS $14,404,831.00 $25,060,134.88
Alabama 0355503 Base & Pave Corridor V from Mississippi State Line to SR247 $25,710,825.71 $31,073,170.32
Alabama 0471500 CORRIDOR X FM E OF I-65 TO US31, GRADE, DRAIN, BASE, PAVE & BRIDGE $36,537,341.27 $45,247,234.60
Alabama 0471501 Grade, Drain, Base, Pave & Bridge Corridor X, I-65 NB from N of CR1107/41th Avenue to CR120/Walkers Chapel Road $145,548,221.33 $181,471,887.68
Alabama 1602551 SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM WEST OF SR-79 TO EAST OF SR-75; INCLUDES GRADE, DRAIN, BRIDGES (DUAL BRGS OVER SR-79, RAMP H OVER SR-79, DU $69,695,808.12 $73,092,161.19
Alabama 3716258 PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE $8,719,942.22 $44,070,851.32
Alabama 4517252 WIDENING FOR ADDITIONAL LANES ON CR-47 (BLAKE BOTTOM ROAD) FROM CR-19 (JEFF ROAD) TO SR-255 (RESEARCH PARK BOULEVARD) $11,647,693.66 $26,328,669.83
Alabama 7002600 CR-52 (MORGAN RD) ADDITIONAL LANES FROM I-459 TO CR-2 (SOUTH SHADES CREST RD) $27,922,211.20 $34,902,764.01
Alabama 7009600 BRIDGE REPLACEMENT AND RELOCATION ON SR-150 AT SHADES CREEK (BIN # 1502) AND THE CSX RAILROAD FROM MP 6.4 WEST OF SHADES CREEK TO MP 7.0 EAST OF SHADE $22,563,876.56 $28,230,654.13
Alabama 7503600 5-LANE SCHILLINGER RD FROM HOWELLS FERRY RD TO SR-42 (US-98) $31,363,290.38 $39,211,941.95
Alabama 9070900 RECONSTRUCTION OF SLIDE AREA ON SR-53 (US-231) FROM MP 301.300 TO MP 301.900 (FHWA DISASTER AL2020-01, ALDOT EVENT 042, SITE IS 042-02-52-1 $22,610,851.12 $28,263,563.90
Alabama ATRP001 ATRIP #1: Aug-7, Sep-10, Nov-13, Dec-14, Jan-12, Feb-19, Apr-30, May-13, Jun-6, July-5, Aug-1, Sept-2, Oct-3, Dec-2, Jan-2, Mar-2, $462,822,019.90 $597,441,951.43
Alabama ATRP002 ATRIP # 2: Feb-1, Apr-4, May-8, Jun-6, Jul-4, Aug-1, Sep-2, Jan-3, Mar-1, Apr-2, May-2, Jun-1, Jul-1, Aug-1, Sep-3, Jan-1, Feb-1, Mar-1, Apr-1,Jun-1,  $2,626,405.56 $64,497,366.34
Alabama ATRP003 ATRIP #3 - May-6, Jun-6, Jul-5, Aug-3, Sep-7, Oct-1, Dec-2, Jan-2, Mar-1, Apr-1, Jul-1, Aug-2, Sep-1, Dec-3, Feb-1, July-1, SEPT-1, May-3,Aug-1 $4,374,979.18 $75,476,249.96
Alabama ATRP004 ATRIP #4 $2,753,797.51 $45,715,882.91
Alabama ATRP005 ATRIP #5 $1,479,788.39 $50,200,399.43
Alabama ATRP006 ATRIP #6: Aug-5, Sep-2, Oct-2, Dec-1, Feb-1, Mar-2, Apr-1, Jun-1, Jul-3, Aug-4, Sep-1, Dec-1, Feb-1, Mar-2, Jun-1, July-1, SEPT-2, Nov-1, JAN-2, Apr-1 $505,735.99 $34,444,406.82
Alabama ATRP007 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM $11,140,764.08 $79,462,162.44
Alabama ATRP008 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM $2,560,334.85 $51,851,214.65
Alabama ATRP009 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM $3,290,443.68 $59,546,931.32
Alabama ATRP010 ATRIP #10   $63,645,187.21
Alabama ATRP011 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM $3,212,055.64 $43,304,068.97
Alabama ATRP012 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM $9,741,533.30 $74,647,739.11
Alabama ATRP013 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM $13,138,283.42 $57,500,454.83
Alabama ATRP016 ALABAMA TRANSPORTATION REHABILITATION IMPROVEMENT PROGRAM #16 $11,742,218.95 $48,490,941.70
Alabama ATRP017 ALABAMA TRANSPORTATION REHABILITATION AND IMPROVEMENT PROGRAM $4,854,271.16 $45,210,135.05
Alabama I020341 I-20 PAVEMENT REHAB AND ADDITIONAL LANES FROM CR-49 TO GEORGIA STATE LINE. (PRIORITY #7) $27,059,173.90 $31,574,298.60
Alabama I022309 RESURFACING ON I-22 FROM MP 6.00 JUST WEST OF REESE ROAD OVERPASS TO MP 16.95 AT EXIT 16 $22,511,419.07 $25,012,687.85
Alabama I059383 CBD BRIDGE INTERCHANGE MODIFICATIONS ON I-59/20 AT I-65 $58,619,484.57 $351,364,745.11
Alabama I059385 CBD I-20/59 BRIDGE REPLACEMENT AND APPROACHES FROM I-65 TO NORTH OF 31ST STREET NORTH AND INTERCHANGE MODIFICATIONS AT E. B. STEPHENS EXPRESSWAY. BIN $162,161,955.50 $587,329,820.11
Alabama I059387 ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR-6(MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD $103,233,383.50 $121,002,382.91
Alabama I059394 DRAINAGE IMPROVEMENTS AND STREETSCAPE FOR CBD I-20/59 BRIDGE REPLACEMENT ALONG BIRMINGHAM CENTRAL BUSINESS DISTRICT 9TH AVE N FROM 15TH ST N TO 23RD S $11,795,616.68 $28,421,933.25
Alabama I059407 RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60) $30,848,697.73 $34,276,330.81
Alabama I059409 RESURFACING AND TRAFFIC STRIPE ON I-59 FROM .39 MILES SOUTH OF CR-276 (STEPHENS GAP ROAD) TO THE DEKALB COUNTY LINE $52,390,851.34 $58,212,057.04
Alabama I059423 I-59 RECONSTRUCTION OF THE NORTHBOUND ROADWAY AND REHABILITATION OF THE SOUTHBOUND ROADWAY FROM NORTH OF SR-7 (MP 225.600) TO NORTH OF SR-117 (MP 233. $43,687,386.50 $55,705,950.97
Alabama I065354 I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2) $77,850,464.11 $96,338,080.14
Alabama I065416 BRG REPL ON I-65 OVER MURDER CREEK AND RELIEF. BIN #'S 006470, 006471, 006472 AND 006473 (SUFF = 48.7, STAT = 2) $23,200,449.04 $28,713,061.30
Alabama I065497 REPLACE BRIDGES I-65 OVER SEPULGA RIVER AND RELIEF,BIN 6808,6809,6810,6811,6812 AND 6813 $37,408,131.66 $41,564,590.73
Alabama I085362 I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL $40,459,824.71 $46,462,999.68
Alabama I085365 BRIDGE WIDENING ON I-85 NB AND SB OVER LINE CREEK (BIN # 007554 AND 007555) AND RELIEF BRIDGES (BIN # 007556, 007557, 007566 AND 007567) $23,119,121.78 $25,687,913.09
Alabama I459315 PAVEMENT REHABILITATION ON I-459 FROM SOUTH OF CR-52 AT MCCALLA TO NORTH OF SR-150 $22,640,373.00 $25,155,970.00
Alaska 0001578 SEWARD HWY: MP 75-90 INGRAM CR GIRDWOOD RD&BR REHAB (PH I) $89,160,075.23 $95,460,466.00
Alaska 0001579 SEWARD HWY: MP 75-90 INGRAM CR GIRDWOOD RD&BR REHAB (PH II) $101,467,458.57 $108,637,535.95
Alaska 0002432 KIVALINA EVAC & SCHL SITE ACCESS RD- KIVALINA LAGN TO K HILL $46,017,016.22 $50,584,826.00
Alaska 0002469 KOTZEBUE TO CAPE BLOSSOM ROAD - STAGE I $36,249,509.72 $43,750,099.00
Alaska 0003209 KTN REVILLA NEW FERRY BERTH & UPLAND IMPROVEMENTS $38,379,395.10 $42,361,879.66
Alaska 0211065 HSIP: STERLING HIGHWAY SHOULDER WIDENING, MP 97 TO MP 118 $36,039,738.98 $39,597,373.81
Alaska 0212015 STERLING HIGHWAY MILEPOST 44.5 TO 58 (MILEPOINT 7.6 TO 22), SUNRISE INN TO SKILAK LAKE ROAD, RECONSTRUCTION  $67,805,791.57 $128,131,932.00
Alaska 0311032 SEWARD HWY: MP 17-22.5 REHABILITATION $67,163,593.91 $93,047,655.67
Alaska 0441008 HSIP: PALMER-WASILLA HWY, CENTER LEFT TURN LANE WIDENING $23,117,855.38 $25,540,693.87
Alaska 0512005 AMATS:  O'MALLEY RD RECONST: NEW SEWARD HWY TO HILLSIDE DRIVE AK100 $40,286,913.96 $44,286,946.06
Alaska 0525019 KNIK-GOOSE BAY ROAD RECONSTRUCTION, PHASE 1 - FAIRVIEW LOOP TO CENTAUR AVENUE $10,920,642.05 $75,088,457.00
Alaska 0617013 UNIVERSITY AVENUE REHABILITATION & WIDENING SEGMENT 2A $45,589,708.28 $50,115,102.00
Alaska 0652017 DALTON HWY MP 18-37 RECONSTRUCTION $22,942,789.48 $63,596,925.00
Alaska 0656005 DALTON HWY MP 289-305 REHABILITATION  $2,456,190.00 $42,004,162.00
Alaska 0657003 DALTON HWY MP 362-414 RECONSTRUCTION (MP 362-414 CONST) $43,771,283.95 $48,022,866.88
Alaska 0670001 3RD STREET WIDENING $34,854,424.83 $45,069,919.00
Alaska 0713013 RICHARDSON HWY MP 159 - 167 RECONSTRUCTION $26,011,015.59 $41,017,511.00
Alaska 0955016 JNU:GLACIER HIGHWAY IMPROVMENTS (LEMON CREEK AREA) $22,225,774.29 $25,139,997.03
Alaska 0956036 HNS HWY RECONSTRUCTION MILEPOST 12.2-23.0 $49,302,751.06 $54,196,714.35
Alaska 0972016 SGY REPLACE CAPT. WILLIAM HENRY MOORE BRIDGE $25,704,647.91 $28,293,314.98
Alaska 0A11016 ALASKA HIGHWAY MP 1235-1252 REHABILITATION $12,735,800.00 $26,079,978.00
Alaska 0A13021 TOK CUTOFF MP 38-50 REHABILITATION $39,798,111.73 $42,610,398.00
Alaska 0A16035 Glenn Highway Gambell Street to Airport Heights Reconstruction Demo ID # AK169 $41,092,014.31 $44,416,380.85
Alaska 0A24019 RICHARDSON HWY MP 353-357 ACCESS IMPROVEMENTS $24,762,891.60 $26,519,391.24
Alaska 0A31056 SEWARD HWY: MP 98-104 (Milepost 100-105) BIRD AND INDIAN IMPROVEMENTS STAGE 2 $32,946,974.45 $44,475,133.25
Alaska 0A31057 SEWARD HWY: DIMOND TO DOWLING RECONSTRUCTION , PHASE 1 $73,060,659.41 $78,223,045.41
Alaska 0A31065 DOWLING RD / SEWARD HWY INTERCHANGE RECONSTRUCTION $10,262,596.83 $42,776,381.00
Alaska 0A33014 STERLING:MP 58-79-SKILAK LK RD-STERLING REHAB & PASSING LN $75,980,298.84 $81,433,149.68
Alaska 0A33032 STERLING HWY MP 8-25 SUNRISE INN TO SKILAK LAKE RD STG 3&4 $41,684,521.41 $128,127,069.70
Alaska 0A41025 PARKS HWY RECONST, MP 43.5 TO 44.5  LUCUS ROAD TO CHURCH $27,691,284.55 $29,725,136.83
Alaska 0A41026 PARKS HWY RECONST, MP 44.5 TO 48.8 CHURCH TO PITTMAN  $69,154,091.04 $76,106,370.59
Alaska 0A41029 PARKS HWY: MP 48.8 TO 52.3, PITTMAN TO BIG LAKE RECONST $100,967,116.17 $108,753,194.54
Alaska 0A41034 PARKS HIGHWAY BRIDGE REPLACEMENT, MONTANA CR AND SHEEP CR $19,344,484.76 $32,555,784.69
Alaska 0A44020 PARKS HWY MP 231 ENHANCEMENTS $26,332,206.90 $28,393,941.00
Arizona 008A237 I-8; W OF AZTEC RD - E OF COUNTY LINE, YUMA $29,505,365.00 $31,275,562.00
Arizona 008B213 I-8, SW OF MARICOPA, MP 147.6 TO MP 158.5, SW OF STANFIELD $9,525,041.74 $35,108,957.45
Arizona 010A232 I-10; SR 85 TO VERRADO WAY, IN MARICOPA COUNTY $92,017,641.00 $105,416,181.00
Arizona 010A235 I-10; 443RD AVE - E OF WINTERSBURG RD $24,955,472.00 $26,452,695.00
Arizona 010B201 I-10, Sarival Ave to SR 101L in GOODYEAR & AVONDALE $95,091,910.51 $103,869,237.16
Arizona 010B202 I-10; Sarival Ave to Dysart Rd in GOODYEAR and AVONDALE (Reconstruct and Widen Freeway) $34,152,594.31 $36,201,631.72
Arizona 010C206 I-10; EARLY RD to I-8, E OF CASA GRANDE  $47,767,062.12 $57,808,829.17
Arizona 010C220 I-17 SPLIT- I-10 SR 202L SANTAN $409,444,599.56 $776,193,694.00
Arizona 010D013 I-10, Rurthrauff Rd to Prince Rd in TUCSON $99,336,163.22 $143,927,100.29
Arizona 010D201 I-10 @ Twin Peaks Interchange in MARANA (Construct New Interchange) $41,713,033.92 $59,829,874.52
Arizona 010D205 I-10, SR-87 TI to Town of Picacho $71,124,102.00 $132,860,261.50
Arizona 010D211 I-10; INA ROAD TI TO RUTHRAUFF RD TI, TUCSON $101,445,604.35 $187,466,534.00
Arizona 010D213 I-10; Ruthrauff Rd (MP 252 - 253), Tucson $124,637,580.84 $148,048,004.52
Arizona 010D216 I-10;INA RD TI (MP 247.48 - 249.51), NORTH OF TUCSON $120,256,264.30 $176,143,076.84
Arizona 010E200 I-10 @ SR-90 west of BENSON $35,041,715.83 $37,148,423.98
Arizona 010E221 I-10; Houghton Road TI, SE Of Tucson $34,969,602.00 $37,067,631.91
Arizona 015A216 I-15; VIRGIN RIVER BRIDGE NUMBER 1, NE OF LITTLEFIELD $78,172,005.00 $79,236,401.00
Arizona 017A228 I-17; ANTHEM WAY TI (MP 229.00) - SR 69 (MP 262.00),  N.OF PHOENIX $104,151,000.00 $461,120,000.00
Arizona 017A248 I-17; Pinnacle Peak Rd TI and Happy Valley Rd TI (MP 216.7 - 218.4), in Phoenix $40,180,689.00 $66,983,781.00
Arizona 017B232 I-17; Coconino County line (MP 311.60) - I-40 (MP 339.81) S of Flagstaff $33,591,475.00 $33,833,778.00
Arizona 017B233 I-17; NB MP 311.27-MP340.34 TO SB MP 322.79-MP 323.11 & SB MP 401.95-MP 402.05 (SR89A), S of Flagstaff $38,483,996.00 $45,918,579.00
Arizona 019A220 I-19 @ SR-86 (Ajo Way) in TUCSON $36,678,993.19 $70,748,668.11
Arizona 019A239 I-19; SR86, AJO WAY TI (MP 60.86-MP 62.25), TUCSON $31,599,106.07 $42,625,627.50
Arizona 024A200 SR 24;  Ellsworth Rd to Ironwood Rd, Mesa $120,637,977.00 $147,168,696.00
Arizona 040B226 I-40; Markham Wash (MP 108) - East 40B (WB) (MP 123) W of Seligman $5,697,522.83 $39,932,033.50
Arizona 040C213 I-40; CATARACT LAKE RD (MP162.39) - PARKS TI (MP179.00), E OF WILLIAMS $32,041,894.96 $78,679,045.00
Arizona 040C225 I-40; DEVIL DOG (MP 156.500) TO WILLIAMS (MP 161.400) EB/WB $26,067,499.34 $77,086,957.34
Arizona 040D236 I-40; Jackrabbit Rd. (MP 268) to Joseph City (MP 278) E of Winslow $6,495,402.98 $26,316,904.98
Arizona 0532043 SR-260; Doubtful Canyon Section east of PAYSON $34,956,601.05 $55,204,681.48
Arizona 060B006 US-60, GRAND AVE-43RD & 51ST AVE INTERSECTIONS PHX&GLNDL Intersection Imps Bridge Construction Signals $26,508,689.36 $31,602,686.36
Arizona 060D207 US 60; Pinto Creek (Bridge #351) E OF SUPERIOR $22,432,837.41 $51,350,657.56
Arizona 060D208 US-60, Queen Creek (MP 222.25) to SR-177 in SUPERIOR (MP 226.85) $40,384,497.00 $59,831,947.49
Arizona 077A204 SR-77; Tangerine Rd to Pima/Pinal County Line (MP 81.91 to MP 88.10) north of ORO VALLEY $38,653,878.00 $53,685,461.00
Arizona 077A215 SR 77; River Rd to Calle Concordia, Tucson $34,036,456.00 $38,124,863.00
Arizona 079A210 SR 79: Gila River Bridge (Structure #501) MP 135.50, N of Florence $31,306,864.00 $31,785,479.00
Arizona 086A210 SR 86; VALENCIA RD (MP 159.1) to KINNEY RD (MP 166.6) west of TUCSON $59,132,744.89 $80,023,726.46
Arizona 089D201 US-89; SR-64 to LITTLE COLORADO RIVER thru CAMERON $36,196,964.33 $51,677,052.99
Arizona 093A205 US 93, White Hills Rd (MP 28.09)- 11th ST. (MP 38.00), N of Kingman $5,861,113.15 $28,616,387.89
Arizona 093B205 US-93; MP 115.75 to 119.65 N of WIKIEUP (Carrow to Stephens Section) $45,607,661.66 $48,364,433.27
Arizona 093B215 US 93, TEGNER RD TO SR 89, N OF WICKENBURG $42,694,358.00 $72,750,032.00
Arizona 095B214 US 95; RIFLE RANGE RD - WELLTON-MOHAWK, YUMA $16,075,322.00 $33,266,000.00
Arizona 101B209 SR 101L (PRICE FREEWAY) BASELINE RD - SR 202L (SANTAN), MP 55.10 - MP 61.50, IN MARICOPA CO. $29,980,000.00 $75,779,258.00
Arizona 101B213 SR101L; PIMA RD (MP 36.30) TO I-17 (MP 23.30) $137,379,109.00 $225,240,094.00
Arizona 189A201 SR-189; International Border (MP 0) to Grand Ave (MP 3.75), Nogales $113,997,083.42 $144,107,548.43
Arizona 202A205 SR202L, SR101 to Broadway Road--DESIGN BUILD. HOV Lane and General Purpose Lane--Design Build Project $132,773,182.94 $140,798,793.22
Arizona 202C001 SR 202L, ARIZONA AVE-GILBERT RD Construct Roadway $53,616,970.53 $66,416,136.70
Arizona 202C002 SR-202L, SANTAN DOBSON RD-ARIZONA AVE Construct Divided Freeway $29,933,280.39 $36,469,034.39
Arizona 202C003 SR-202L; SANTAN FRYE RD - POWER RD Construct Divided Fwy $60,424,775.86 $78,388,104.76
Arizona 202C005 SR-202L; SANTAN FWY ELLIOTT RD-BASELINE RD Construct Divided Freeway $27,532,430.15 $28,859,055.60
Arizona 202C009 SR-202L; SANTAN GILBERT RD-FRYE RD Const Divided Fwy $49,363,956.99 $60,888,032.95
Arizona 202C207 SR 202; LINDSAY RD TRAFFIC INTERCHANGE, GILBERT $24,827,319.00 $27,278,524.00
Arizona 202D200 202 (SOUTH MOUNTAIN); I-10 MARICOPA (MP 54) TO I-10 PAPAGO (MP76) $727,869,000.00 $1,677,231,318.62
Arizona 260A208 SR 260; Thousand Trails (MP 214.79) to I-17 (MP 218.07) S of Cottonwood $73,859,729.94 $75,996,399.08
Arizona 260B213 SR-260; Rim Rd (MP 282.52) to Gibson Rd (MP 303.74)  $32,443,417.04 $34,404,471.00
Arizona 264A211 SR-264; Burnside-Fish Wash ( MP 441.02) to Window Rock (MP 450) $15,857,179.64 $27,176,870.45
Arizona 303A201 SR303L, THOMAS ROAD TO CAMELBACK RD $32,946,276.00 $36,480,816.41
Arizona 303A202 SR303L; Camelback Road to Glendale Avenue $40,212,203.72 $53,101,826.54
Arizona 303A203 SR 303: Glendale Avenue - Peoria Avenue Within Cites of Surprise and Glendale $71,645,076.00 $76,644,989.74
Arizona 303A204 SR 303L (Estrella Frwy); Peoria Ave to Mountain View Blvd in Surprise $135,454,559.00 $144,386,970.90
Arizona 303A206 I-10 AND SR 303L Traffic Interchange - Phase 1 $213,346,938.74 $229,816,219.12
Arizona 303A210 US60 (GRAND AVENUE) @SR303L TI--INTERIM TRAFFIC INTERCHANGE $51,209,641.00 $54,568,606.91
Arizona 303A216 I-10@303L TI; Phase II, MP 103.170-105.090 $64,428,517.00 $98,561,837.00
Arizona 303A227 SR 303L; HAPPY VALLEY PARKWAY TO LAKE PLEASANT PARKWAY, PEORIA $23,956,713.00 $25,834,338.00
Arizona 347A204 SR-347 @ Union Pacific RR in Maricopa $44,990,849.00 $63,839,786.00
Arizona GGI0204 TONTO CREEK BRIDGE @ PUNKIN CENTER, GILA COUNTY  $24,009,138.24 $28,118,067.26
Arizona MMA0239 Northern Parkway: Dysart Road to 111th Avenue $54,717,836.00 $63,480,310.00
Arizona MMA0249 NORTHERN PARKWAY: DYSART AND EL MIRAGE ROAD  $19,630,513.00 $33,146,462.00
Arizona MRN0014 INA RD; SILVERBELL RD TO STARCOMMERCE WAY, IN MARANA $16,490,276.00 $25,740,729.00
Arizona PPM0268 SUNSET RD: SANTA CRUZ RIVER TO RIVER RD, IN TUCSON, AZ $10,732,000.00 $33,101,000.00
Arkansas 0002031 Co. Rd. 411-Hwy. 425 (East of Crossett) (Hwy. 82) Widening $25,215,409.00 $34,499,262.00
Arkansas 0002032 Louisiana State Line - Hwy. 82 (Widening) (S) $4,826,064.80 $64,015,494.49
Arkansas 0004031 Avoca-North Garfield  $24,742,710.00 $30,928,387.50
Arkansas 0004045 Hwy. 264 - Pleasant Grove Rd. (S) $20,439,985.77 $25,549,982.21
Arkansas 0004072 Hwy. 72 North - Co. Rd. 34 (Add'l Lns.) (B.V. Bypass) $24,313,711.00 $30,256,083.06
Arkansas 0007024 Hwy. 274 - North (Widening) (S) $1,737,849.00 $32,707,813.00
Arkansas 0007025 Hwy. 79 - South (Widening) (S) $1,676,873.60 $34,444,378.63
Arkansas 0014028 Co. Rd. 27 - Hyw. 79 (Widening) (S) $2,053,323.00 $43,730,054.70
Arkansas 0023044 UPRR Overpass & Realign. (Mayflower) (Hwy. 89) (S) $29,066,696.83 $38,329,820.76
Arkansas 0025014 Hwy. 9 - South of Hwy. 342 (Mammoth Spring) $20,033,599.00 $25,041,998.75
Arkansas 0038045 Black River Str. & Apprs. (Black Rock) $33,498,280.00 $41,872,850.00
Arkansas 0043028 Hwy. 67 Interchange (N. of Cabot)  $22,604,337.23 $28,255,421.54
Arkansas 0044005 Hindsville-Huntsville Bypass (Hwy. 412) $26,173,683.00 $32,717,103.75
Arkansas 0047051 Manila - East (Widening) $15,000,000.00 $45,381,582.60
Arkansas 0047081 Hwys. 77, 140, 158, & 181 Strs. & Apprs. (Mississippi Co.) (S) $40,968,534.83 $56,416,208.54
Arkansas 0070033 El Dorado-Hwy. 335 (Hwy. 167) Widening to 5-lanes with shoulders, includes 2 bridges $21,857,008.00 $26,980,418.25
Arkansas 0070036 Airport Dr. - Hwy. 82B (Widening) $2,000,000.00 $38,490,854.25
Arkansas 0071030 Bee Branch-North (Hwy. 65)  $30,860,916.00 $38,576,145.00
Arkansas 0071031 Hwy. 110 - Clinton (Widening) (S) $2,080,000.00 $45,449,749.00
Arkansas 0073080 Lonoke Co. Line - Judsonia (S) $21,830,903.60 $27,288,629.50
Arkansas 0076244 Sevier St. - Geyer Springs Rd. (Conc. Pvmnt. Pres.) (S) $39,923,813.36 $44,459,792.63
Arkansas 0301152 Hwy. 67-Sheppard (I-30)  $28,770,073.00 $31,929,737.00
Arkansas 0302251 Sevier St.-West of Alcoa Rd. (I-30) Gr., Dr., Paving, Widening $36,223,652.00 $41,436,888.00
Arkansas 0302254 I-430 - Geyer Springs Rd. (I-30) Gr., Dr., Surf, Widening $59,816,057.00 $68,888,106.00
Arkansas 0302256 West of Pulaski Co. Line - I-430 (I-30) Gr., Dr., Surf., Widening, Bridges $33,547,148.00 $38,709,417.00
Arkansas 0302267 Hwy. 70 - Sevier St. (Widening) (F) $54,353,355.09 $214,319,635.10
Arkansas 0302268 I-530 - Hwy. 67 (Widening & Reconst.) (I-30 & I-40)(F) $195,490,943.00 $662,233,778.00
Arkansas 0401094 Oklahoma State Line - East (I-40 & I-540) (Sel. Secs.) (S) $53,756,078.00 $60,002,723.00
Arkansas 0401266 Alma - Hwy. 164 (S) $44,796,981.61 $49,774,424.01
Arkansas 0402076 Lamar - Pope Co. Line (I-40) Base, surface, bridges $22,461,507.00 $25,693,997.00
Arkansas 0403117 I-430 - I-30 (I-40) Earthwork, base, surfacing, MDS, bridges, safety $55,321,666.00 $65,438,051.00
Arkansas 0403138 Atkins - Plumerville (S) $30,274,174.04 $33,637,971.16
Arkansas 0404077 Cache River - West (I-40) Replace White River Relief brs. at 2 locations, raise 2 overpasses and rehab lanes & shoulders $50,065,261.00 $55,628,069.00
Arkansas 0404081 White River Str. & Apprs. (I-40) $109,233,753.67 $123,865,281.84
Arkansas 0404087 Hwy. 31 - East (S) $900,000.00 $32,500,000.00
Arkansas 0405143 I-55 East Intchng-Hwy. 131 (I-40) Overpass replacement $25,225,994.00 $28,028,882.00
Arkansas 0405153 Forrest City-East (I-40) Rehabilitation $43,517,632.29 $48,917,044.07
Arkansas 0405158 Shearerville - West (Pvmt. Impvts.) $29,331,459.52 $32,508,889.47
Arkansas 0491017 Hwy. 264 - New Hope Rd. (Widening) $1,373,317.39 $41,385,811.32
Arkansas 0551148 Hwy. 148 - So. of Hwy. 61 (S) $38,011,687.03 $42,413,843.72
Arkansas 1320001 Saline River-South (Hwy. 167) $26,816,252.10 $33,520,315.13
Arkansas 2221002 Hwy. 278 - Hwy. 293 (S) $50,493,693.00 $65,532,118.75
Arkansas 2373002 Vilonia Bypass-East (Hwy. 64) $20,340,539.76 $25,425,674.69
Arkansas 2662007 Hot Springs - I-30 (Widening) (S) $43,445,151.00 $88,008,951.57
Arkansas 4302265 I-430/Hwy. 10 Interchange Impvt. (L.R.) $26,214,940.07 $29,257,145.23
Arkansas 4302267 Hwy. 365-I-430(Widening) & I-430 Intchng. Mod. $34,460,136.00 $43,066,887.92
Arkansas 4302269 Hwy. 10 - Hwy. 100 (System Preservation & ITS Impvts.) (S) $33,490,738.40 $37,211,931.55
Arkansas 4401007 Bankhead Dr.-Ark. River Bridge (I-440)  $32,462,781.00 $36,069,756.00
Arkansas 4928001 Hwy. 16/112 Spur Intchng. Impvts. (F) $35,528,859.90 $40,846,132.00
Arkansas 5305004 Hwy. 65B-Hwy. 65 $70,516,006.24 $78,668,134.84
Arkansas 5401078 Hwy. 71B Intchng. Impvts. (I-49) $29,490,930.00 $38,600,662.50
Arkansas 5401262 Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (I-49)  $99,199,753.66 $110,221,922.39
Arkansas 5553001 Hwy. 63B - Hwy. 18 (S) $33,971,017.90 $37,745,575.66
Arkansas 6043002 Vandenberg Blvd. - Hwy. 5 (Widening) $6,011,634.00 $102,381,622.50
Arkansas 6301001 Baptist Hospital - Univeristy Ave. (Widening) (F) $24,363,095.63 $99,427,198.59
Arkansas 7007001 Ouachita River Str. & Apprs. (Hwy. 167)  $48,117,842.68 $60,147,303.35
Arkansas 9013010 Hwy. 67 - Hwy. 51 (Arkadelphia Bypass) (S) $17,670,688.85 $74,851,579.78
Arkansas 9036020 Hwy. 62/Hwy. 102 Intchng. Impvts. & 8th Street Widening (Bentonville) $19,937,191.00 $27,198,652.00
Arkansas 9061006 Alcoa Rd. - Hwy. 183 (S) $28,370,571.60 $35,463,214.50
Arkansas 9065024 Hwy 367 - Hwy. 89 (Cabot) (S) $22,564,011.80 $32,604,685.75
Arkansas 9210035 Hwy. 7S - Hwy. 5 (S) $19,634,398.90 $28,442,998.62
Arkansas 9210038 Hwy. 70 East - Hwy. 7 North (F) $53,821,698.25 $98,377,122.81
Arkansas 9222010 Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (Hwy. 67) $42,465,045.13 $53,081,306.41
Arkansas 9222014 Main St. - Vandenberg Blvd. (Widening) (Jacksonville) (F) $84,931,000.00 $157,553,494.00
Arkansas 9227074 I-555 - Hwy. 49 (Dr. Martin Luther King Jr. Dr. Extension) (Jonesboro) (S) $3,612,715.16 $93,904,945.95
Arkansas 9227080 BNSF Railroad Overpass (Hwy. 18) (Jonesboro) (S) $22,068,822.00 $27,071,606.00
Arkansas 9227086 Hwy. 49 - Hwy. 91 (Jonesboro) (S) $1,895,048.46 $40,239,559.75
Arkansas 9253063 Arkansas River Str. & Apprs. (Broadway)(LR/NLR) (Hwy. 70) $80,391,602.00 $120,489,503.00
Arkansas 9253087 Pleasant Ridge Rd. - Pleasant Valley Dr. (L.R.) (F) $94,814,608.84 $125,950,488.65
Arkansas 9271010 Hwy. 79 No.-Co. Rd. 525 (Magnolia) (S) $20,069,608.00 $25,087,009.50
Arkansas 9293009 Hwy. 83 Spur - Hwy. 278 Connector (Monticello) (F) $4,228,000.00 $29,469,500.00
Arkansas 9309002 White River Str. & Apprs. (Newport) (Hwy. 367) Replacement of one bridge $28,680,524.00 $35,850,655.00
Arkansas 9332011 Hwy. 49 - Hwy. 412 East (Gr. & Strs.)(Hwy. 412 - New Location) New Location - 2 lanes of ultimate 4 $24,608,472.00 $30,760,590.00
Arkansas B300001 I-30 INTERSTATE REHABILITATION -BOND PROCEEDS, GR., MDS, BASE, SURFACE $135,175,300.23 $150,194,777.04
Arkansas B300203 Red River-East & West Rehabilitation (I-30) $1,210,908.80 $49,746,898.13
Arkansas B300216 Hwy. 299 - Gurdon Rest Area (S)   $57,349,254.94
Arkansas B400001 I-40 INTERSTATE REHABILITATION-BOND PROCEEDS , GR., MDS. BASE, SURFACE $461,264,561.39 $512,510,184.57
Arkansas B400201 Cache River-Bayou DeView (I-40)  $34,810,223.00 $38,678,024.00
Arkansas B400207 Shearerville-Hwy. 77 (I-40) $5,072,885.00 $56,018,499.00
Arkansas B400223 Mill Creek - Hwy. 331 (I-40)  $341,608.00 $45,623,958.22
Arkansas B400229 Fishing Lake Str. & Apprs. (I-40)  $32,811,368.68 $36,457,076.09
Arkansas B400230 Shell Lake Str. & Apprs. (I-40) $1,281,361.40 $44,418,558.22
Arkansas B400231 Blackfish Lake Str. & Apprs. (I-40)  $594,420.41 $36,714,969.34
Arkansas B440202 Ark. River Bridge - I-40  $2,180,946.00 $58,687,538.47
Arkansas B530201 Jefferson-Hwy. 104 (I-530)  $29,600,669.00 $32,889,633.00
Arkansas B530202 Hwy 104- Hwy 65B (I-530) $33,819,559.54 $37,577,288.38
Arkansas B530203 I-30-Bingham Rd. (I-530) $70,058,197.00 $81,224,680.00
Arkansas B540230 Hwy. 22-I-40 (I-540) $82,973,062.39 $92,192,291.54
Arkansas B550001 I-40 JERICHO (I-55), COLD MILLING, BINDER, PAVING BARDSTOWN REST AREA - HILTON REST ARE (I-55) - CONST SERVICES & UTILITY ADJUST. $90,386,577.00 $114,960,280.56
Arkansas B550206 Hwy. 181-Hwy. 158 (I-55) Rehabilitation $34,801,569.00 $38,668,410.00
Arkansas B550209 No. of Hwy. 18-Missouri St. Line (I-55) (S) $30,984,763.00 $34,357,785.00
California 0001002 IN LONG BEACH, ON STATE RTE 47 AT OCEAN BLVD, CONSTRUCT INTERCHANGE $26,345,883.16 $44,546,187.98
California 0004001 ALAMEDA ST: DEL AMO BLVD TO RTE 91, WIDEN FROM 4 TO 6 LANES, CONST $24,751,440.00 $42,823,402.00
California 000C355 SR60/SR91/I-215 TO ORANGE SHOW ROAD I/C NORTH OF THE I-215/I-10, CONSTRUCT HOV LANES IN EACH DIRECTION (TC) $14,005,463.00 $173,933,571.00
California 000C438 ON I-205 AND I-580 FROM SAN JOAQUIN COUNTY LINE TO GREENVILLE ROAD OVERHEAD. RESURFACE AND RESTORE PAVEMENT ON THE MAINLINE AND RAMPS. (TC) $73,740,300.00 $79,491,200.00
California 000C466 TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER R $24,991,900.00 $25,323,700.00
California 000C469 IN AND NEAR SAN DIEGO AT ROUTE 905/125/11 SEPARATION (SEGMENT 4) AND ON ROUTE 11 FROM 0.1 MILE WEST OF ENRICO FERMI DRIVE TO 1.2 MILE EAST OF ENRICO $52,630,000.00 $126,507,700.00
California 000C470 ALAMEDA, CONTRA COSTA, AND SOLANO COUNTIES AT VARIOUS LOCATIONS INSTALL TRAFFIC OPERATION SYSTEM (TC)   $40,973,000.00
California 000C494 IN THE CITY OF SACRAMENTO, AT SACRAMENTO RIVER BRIDGE NO. 24-0053 AND NORTH SACRAMENTO UNDERCROSSING NO. 24-0111L; ALSO IN SAN JOAQUIN COUNTY, AT MOK $30,527,115.00 $35,275,000.00
California 000C526 IN SAN DIEGO COUNTY AND IMPERIAL COUNTY ON VARIOUS ROUTES AT VARIOUS LOCATIONS INSTALL FIBER OPTIC CABLE ALONG THE I-5, I-805, AND SR-905, CONNECT AL $16,532,800.00 $27,445,100.00
California 0051625 IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO REPLACE BRIDGE, RAMP, IC, BUTTRESS, BIKE TRL $11,519,460.00 $77,584,859.00
California 0051636 IN SAN DIEGO COUNTY ON INTERSTATE 5 AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF SAN ELIJO LAGOON BRIDGE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD OVE $59,240,700.00 $301,625,107.00
California 0051639 I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE $97,602,100.00 $300,466,000.00
California 0051993 CONSTRUCT HOV LANES, AUXILARY LANES, AND ITS (CMGC) IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILES NOR $52,989,300.00 $75,755,000.00
California 0052019 IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVE $65,748,450.00 $71,816,600.00
California 0052949 ON ROUTE 5 FROM ALONDRA BLVD(KP 2.9/PM 1.8) TO SHOEMAKER AVE(KP 4.0/PM 3.1) INTERSECTION IMPROVEMENTS $45,958,183.00 $125,171,506.00
California 0052969 IN LA CTY IN LAMIRADA, SANTA FE SPRINGS, NORWALK & DOWNEY FROM OC TO LA CTY, WIDEN FREEWAY, RECONSTRUCT OH (TC) $7,379,087.00 $112,841,043.00
California 0052981 IN LOS ANGELES COUNTY IN LAMIRADA FROM ARTESIA BLVD TO NORTH FORK COYOTE CREEK OVERCROSSING WIDEN AND REALIEGN FREEWAY TO ADD ONE MIXED FLOW LANE AND $45,903,500.00 $60,256,800.00
California 0053029 LA CO RTE 5 FROM N. OF BUENA VISTA TO RTE 170, HOV AND ROADWAY REHAB $47,406,661.21 $65,864,877.21
California 0053074 NEAR CASTAIC, FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY. REPLACE APPROACH SLABS, UPGRADE DRAINAGE SYSTEMS, UPGRADING $32,231,900.00 $35,454,200.00
California 0053078 IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES & MODIFICATION  AND ROADWAY REHABILITATION BASED ON THE CHA $103,745,612.00 $324,615,854.00
California 0053129 IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN $179,000,000.00 $533,596,550.00
California 0054204 IN KERN COUNTY NEAR KETTLEMEN CITY FROM 0.6 MILE SOUTH OF TWISSLEMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE. REHABILITATE AND $37,469,460.97 $48,424,800.00
California 0055156 MERCED COUNTY 0.4 MILE NORTH OF THE FRESNO COUNTY LINE AT THE JOHN "CHUCK" ERRECA SAFETY ROADSIDE REST AREA REPLACE SAFETY ROADSIDE REST AREA (SRRA) $32,520,700.00 $32,568,000.00
California 0055157 FRESNO COUNTY FROM 1.2 MILES SOUTH OF KAMM AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF PANOCHE ROAD OVERCROSSING PAVEMENT REHABILITATION, REPAIR CULVERT   $35,581,000.00
California 0056349 IN SACRAMENTO, FROM 1.1 MILES SOUTH OF ELK GROVE BLVD OC TO  AMERICAN RIVER BRIDGE CORRIDOR ENHANCEMENT - CONSTRUCT HOV LANE, ROADWAY REHABILITATION, $87,782,291.57 $352,355,700.00
California 0056360 IN SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILE SOUTH OF ARENA BLVD OVERCROSSING TO 0.4 MILE SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILE NO   $35,098,800.00
California 0058337 IN SHA CO NR LAKEHEAD AT SACTO RVR,BR#06-0089 (TC) REPLACE BRIDGE (TC) $186,149,723.43 $186,149,723.43
California 0058355 IN SHA CO ABOUT 8 MI N OF SHA LAKE CITY & NEAR LAKEHEAD FRM TURNTABLE BAY OC TO BRIDGE REPLACEMENT AND SEISMIC RETROFIT (TC) $30,460,600.00 $44,026,000.00
California 0058359 IN SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING. WIDENING TO 6 LANES, BRIDGE REP $112,782,153.00 $150,659,000.00
California 0081329 IN SAN DIEGO COUNTY NEAR ALPINE ON INTERSTATE 8 FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE. PLACE CRCP, HMA, RSC, MGS, AND WATER POLLUITION $47,769,700.00 $52,554,000.00
California 0082109 IN IMPERIAL COUNTY NEAR EL CENTRO FROM 0.5 MILE WEST OF ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF ANDERHOLT ROAD OVERCROSSING AND FROM 0.5 MILE EAST $97,315,800.00 $98,089,600.00
California 0082112 IN IMPERIAL COUNTY IN EL CENTRO FROM 0.4 MILE WEST OF IMPERIAL AVENUE OVERCROSSING TO 0.1 MILE EAST OF 8TH STREET OVERCROSSING RECONSTRUCT INTERCHANG $29,696,160.26 $32,828,160.26
California 0101820 IN LA COUNTY IN CITY OF BALDWIN PARK AND WEST COVINA FR PUENTE AVE TO CITRUS ST CONSTRUCT HOV LANES AND SOUNDWALLS (TC) $40,140,000.00 $157,866,051.00
California 0101829 ROUTE 10 HOV LANES FROM CITRUS ST T ROUTE 57 IN LA COUNTY/CITRUS ST TO RTE 57 HOV, WIDENING, AND REALIGN (TC) $78,553,900.00 $233,907,500.00
California 0101840 LA, 10, PM: 14-19 IN THE CITY OF LOS ANGELES AT SANTA MONICA VIADUCT (BR. NO. 53-1301). PAINT AND REHABILITATE BRIDGE. THE PURPOSE OF THIS PROJECT IS $40,909,500.00 $41,354,700.00
California 0101844 IN THE CITIES OF SANTA MONICA AND LOS ANGELES, FROM ROUTE 1 TO ROUTE 5/101 INTERCHANGE; ALSO ON ROUTE 1 FROM MCCLURE TUNNEL TO LINCOLN BOULEVARD. REP $34,651,200.00 $38,106,060.00
California 0101855 LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALON $56,227,400.00 $62,034,000.00
California 0102266 IN SAN BERNARDINO COUNTY IN YUCAIPA FROM 0.2 MILE WEST OF LIVE OAK CANYON ROAD TO COUNTY
 LINE ROAD UNDERCROSSING PAVEMENT REHABILITATION AND CONTINO
$18,144,700.00 $36,589,100.00
California 0102268 IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR $139,502,033.00 $168,718,000.00
California 0102269 IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR $62,041,969.00 $117,755,000.00
California 0103110 RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS   $215,583,800.00
California 0103112 IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS $135,823,352.00 $326,730,500.00
California 0104064 ON I-10 IN INDIO BETWEEN WASHINGTON ST & MONROE ST AT JEFFERSON ST INTERCHANGE RECONSTRUCT/REALIGN EXISTING INTERCHANGE $33,310,000.00 $56,760,364.00
California 0104065 RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. RE $100,000,000.00 $215,896,600.00
California 0105052 IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS   $281,738,899.00
California 0151237 ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY IN AND NEAR VICTORVILLE *** ROADWAY RECONSTRUCTION (TC) $98,451,300.00 $102,718,300.00
California 0151250 IN SAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF CLEGHORN RD. UNDERCROSSING TO 0.5 MILE SOUTH OF ROUTE 138 AND FROM 0.5 MILE SOUTH OF TRUCK SAFETY CHE   $26,064,000.00
California 0153045 ON INTERSTATE ROUTE 15 IN SAN BERNARDINO COUNTY *** I 15 JOINT POINT OF ENTRY (SCALE - CVEF) (TC) $12,573,994.00 $52,150,417.00
California 0154208 IN SAN DIEGO AND RIVERSIDE COUNTY IN AND NEAR TEMECULA FROM 0.1 MILE SOUTH OF SAN DIEGO COUNTY LINE TO 0.1 MILE NORTH OF TEMECULA RIVER BRIDGE REPLAC $34,015,553.51 $37,620,800.00
California 0154210 IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATIONTO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERC $57,403,900.00 $63,222,100.00
California 0155165 IN SAN BERNARDINO COUNTY IN FONTANA AND NEAR DEVORE FROM 0.3 MILE SOUTH OF SIERRA AVENUE UNDERCROSSING TO GLEN HELEN PARKWAY UNDERCROSSING. REPLACE P $26,479,014.50 $29,213,800.00
California 0155166 IN RIVERSIDE COUNTY IN CORONA AND EASTVALE, FROM 0.5 MILE SOUTH OF ONTARIO AVENUE UNDERCROSSING  TO ROUTE 60/15 SEPARATION CONCRETE PAVEMENT SLAB REP $27,129,400.00 $30,088,200.00
California 0155167 IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT $34,093,500.00 $149,303,000.00
California 0401084 IN SAN BERNARDINO COUNTYNEAR LUDLOW FROM 0.3 MILE EAST OF CRUCERO ROAD TO 0.4 MI W/O BADGER WASH REGRADE MEDIAN CROSS SLOPE (TC) $41,220,800.00 $41,550,100.00
California 0401091 IN SAN BERNARDINO COUNTY AT NEWBERRY SPRINGS AND LUDLOW FROM 1.6 MILES EAST OF FORT CADY ROAD OVERCROSSING TO CRUCERO ROAD UNDERCROSSING REGRADE MEDI   $29,143,994.00
California 0801119 IN ALAMEDA COUNTY IN BERKELEY FROM 0.6 MILE NORTH OF UNIVERISTY AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF GILMAN STREET UNDERCROSSING CONSTRUCTION PED $17,156,901.41 $25,127,200.00
California 0801120 THE CITY AND COUNTY OF SAN FRANCISCO FROM 16TH STREET TO 4TH STREET. PAINT STEEL STRUCTURE $28,697,100.00 $31,725,500.00
California 0801121 ALAMEDA COUNTY IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD E $21,662,500.00 $30,787,200.00
California 0801998 ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CON   $84,940,900.00
California 0802375 SOLANO COUNTY IN FAIRFIELD AND VACAVILLE FROM 1.0 MILE WEST OF RED TOP ROAD UNDER CROSSING TO 0.4 MILE EAST OF LEISURE TOWN ROAD CROSSING HIGHWAY WID $6,859,000.00 $26,800,000.00
California 0803235 PLA CO;ROCKLIN;I-80 @ SIERRA COLLEGE BLVD OC, INTERCHANGE RECONSTRUCTION - (TC) $18,432,000.00 $25,545,565.00
California 0803237 IN SACRAMENTO AND WEST SACRAMENTO FROM 80/84 SEPARATION TO WATT AVENUE OVERCROSS CONST. HOV LANES & REHAB. ROADWAY - (TC) $73,653,185.91 $127,190,346.57
California 0803250 IN YOLO AND SACRAMENTO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF REED AVENUE UNDERCROSSING TO 0.1 MILE EAST OF SACRAMENTO RIVE $23,617,000.00 $26,080,200.00
California 0803252 PLACER COUNTY IN AND NEAR ROSEVILLE AND ROCKLIN FROM 0.1 MILE WEST OF RIVERSIDE AVENUE OVERCROSSING TO ROCKLIN ROAD UNDERCROSSING. ROADWAY EXCAVATION   $37,478,000.00
California 0804194 NEAR COLFAX ON RTE 80FROM LONG RAVINE RD TO EAST OF MAGRA RD OC TRUCK CLIMBING LANE (TC) $53,602,900.00 $53,812,700.00
California 0804207 N PLACER COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL SPRINGS ROAD OVERCROSSING TO CISCO OVERCROSSING. REPLACE BRIDGES AT FOUR LOCATIONS (#19-0112, #19-0 $34,766,500.00 $38,244,500.00
California 0804213 NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSINGTO ROUTE 89/267 SEPARATION ROADWAY EXCAVATION, JPCP AND FURNISH POLYE $23,893,800.00 $26,427,000.00
California 1101841 LA-110 - IN AND NEAR THE CITIES OF LOS ANGELES AND CARSON, FROM GAFFEY STREET TO COLLEGE STREET, EXTEND SERVICE LIFE OF EXISTING PAVEMENT AND INSTALL $39,412,800.00 $39,631,200.00
California 1187011 SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD CONSTRUCT TUNNELS, APPROACH RO $498,589,217.34 $502,809,766.87
California 19FF004 IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.4 TO 1.7 MILES EAST OF RODEO CREEK BR #10-237 STABILIZE ROADWAY   $26,337,100.00
California 2012001 AT RTE 76/15 SEP & ON RTE 76 FR SOUTH MISSION RD TO 76/15 SEP, CONSTRUCT 4 LANE HIGHWAY $300,000.00 $100,146,000.00
California 2056356 SAN JOAQUIN COUNTY IN AND NEAR TRACY FROM JANNEY OVERHEAD TO 1.3 MILES EAST OF MACARTHUR DRIVE OVERCROSSING WIDENING BRIDGES, RAMPS AND ROADWAY   $27,002,000.00
California 27E8004 IN VENTURA COUNTY, SOUTH OF POINT MUGU STATE PARK (PM 4.0) AND SYCAMORE CANYON ROAD (PM 4.2). CONSTRUCT SECANT WALLS AT TWO LOCATIONS AS A PERMANENT $49,537,700.00 $56,254,100.00
California 2801150 SANTA CLARA AND SAN MATEO COUNTIES IN LOS ALTOS HILLS AND MENLO PARK FROM FOOTHILL EXPRESSWAY UNDERCROSSING TO 0.5 MILE NORTH OF SAND HILL ROAD ROADW $53,402,900.00 $58,733,100.00
California 29R4006 IN MENDOCINO CO. NEAR WESTPORT, FROM 0.6 TO 1.4 MI NORTH OF BLUE SLIDE GULCH BRIDGE. EMERGENCY RELIEF - RECONSTRUCT ROADWAY $23,118,014.96 $38,650,000.00
California 31D0001 IN TRINITY CO., NEAR DEL LOMA AT BIG FRENCH CREEK ROAD EMERGENCY RELIEF - EMERGENCY OPENING STORM DAMAGE REPAIRS. $43,231,326.00 $43,853,000.00
California 31PZ004 BUTTE COUNTY NEAR PARADISE FROM 0.8 MILE WEST OF SHADY REST AREA TO 0.2 MILE EAST OFSHADY REST AREA. RAISE ALIGNMENT. PLACE HMA, STRUCTURAL CONCRETE   $35,259,500.00
California 31R0001 MONTEREY COUNTY, NEAR POSTS, AT PFEIFFER CANYON BRIDGE, NO. 44-0060 EMERGENCY PROJECT - EMERGENCY OPENING
 REMOVE AND REPLACE DAMAGED BRIDGE, RESTORE
$23,899,700.00 $26,996,626.00
California 31RH001 MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REM $84,480,300.00 $94,217,533.34
California 31TC001 IN SANTA CLARA COUNTY, NEAR LOS GATOS, AT 1.2 MILES NORTH OF LAS CUMBRES ROAD CONSTRUCT SOLDIER PILE WALLS. $11,958,000.00 $34,558,500.00
California 31TN001 IN MARIN COUNTY, NEAR STINSON BEACH AT 0.6 MILE SOUTH OF PANORAMIC HIGHWAY NORTH JUNCTION CONSTRUCT SOLDIER PILE WALL $22,060,700.00 $31,650,000.00
California 37B3004 MEN CO;NR LEGGETT;S/O TO N/O RED MTN CK NEW FWY;2 BRIDGES;RET WALLS;PA $65,894,389.11 $89,545,023.43
California 37Y0001 ON STATE ROUTE 70 IN YUBA COUNTY AND STATE ROUTE 99 IN SUTTER COUNTY AT VARIOUS LOCATIONS. PAVEMENT DAMAGED AT VARIOUS LOCATIONS DUE TO FEMA DEBRIS R $22,244,925.00 $29,612,500.00
California 37Y7001 IN BUTTE COUNTY ON ROUTE 32, 70, 99, 149, AND 191 AT VARIES POSTMILE REMOVING/DISPOSING/CHIPPING HAZARD TREE AND DEBRIS; INSTALL EROSION CONTROL ON S   $26,250,000.00
California 38Y0012 TOWN OF PARADISE - APPROXIMATELY 57 LOCATIONS DUE TO BURNT OUT CARS.  PAVEMENT IMPROVEMENT OF 32 MILES OF ROADWAY. REPARING DAMAGED SECTIONS OF ROADW $2,636,760.00 $55,439,200.00
California 4052003 ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI   $189,900,000.00
California 4052986 IN ORANGE COUNTY ON ROUTE 405 FROM STATE ROUTE 73 TO I-605 ADD ONE MIXED FLOW AND TOLL EXPRESS LANE IN EACH DIRECTION WITH OTHER OPERATIONAL IMPROVEM $74,191,000.00 $1,900,000,000.00
California 4052999 I-405 AT CRENSHAW BLVD. RAMP IMPROVEMENT; IN LOS ANGELES COUNTY, IN THE CITY OF TORRANCE BETWEEN WESTERN AVENUE AND WEST 182ND STREET / CRENSHAW BLVD. $10,989,400.00 $66,756,000.00
California 4053015 FROM PM 0.43 S/O LA-10 TO VENTURA BL. WIDEN FOR HOV LANE $222,428,625.26 $827,217,719.00
California 4127001 LA CO NON-INTERSTATE RTES VAR LOCATIONS, ER RELIEF STORM DAMAGE REPAIR $26,537,637.51 $29,114,534.00
California 5004049 W MISSION BAY DRIVE/SAN DIEGO RIVER BRIDGE REPLACEMENT (57C-0023) $61,887,016.00 $146,919,728.00
California 5006181 HYPERION VIADUCT OVER LA RIVER BRIDGE # 53C-1881 BRIDGE REHABILITATION AND SEISMIC RETROFIT $5,148,407.00 $77,336,126.00
California 5006219 N. SPRING ST. BRDG OVR L.A. RVR, BRIDGE # 53C0859 BRIDGE REHABILITATION/WIDENING $36,048,438.00 $45,996,471.46
California 5006221 RIVERSIDE DR. OVER L.A. RIVER, BRDG  #53C0160 BRIDGE REPLACEMENT /WIDENING $49,654,086.98 $60,868,544.00
California 5006336 FIRST ST. OVER L.A. RIVER BRIDGE # 53C-1166 BRIDGE REHABILITATION $58,331,222.66 $66,314,332.22
California 5006664 SIXTH STREET VIADUCT OVER LA RIVER AND EAST SANTA ANNA FREEWAY, 53C1880 REPLACE STRUCT DEFICIENT VIADUCT WITH NEW (TC) $125,530,142.05 $148,909,901.00
California 5006811 SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 CMGC PA $28,978,113.00 $33,088,934.00
California 5006831 SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE
 # 53C-1880 AND STATE BRIDGE # 53-0595 THIS I
$26,125,154.00 $29,509,945.00
California 5006839 SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595THIS PRO $123,862,444.00 $230,364,054.00
California 5006882 IN THE PORT OF LOS ANGELES, TERMINAL ISLAND TERMINAL ISLAND RAILYARD ENHANCEMENT PROJECT: THIS PROJECT ENTAILS THE ADDITION OF 5 STAGING/STORAGE TRAC $21,645,000.00 $55,650,000.00
California 5012037 LAKE MERRITT CHANNEL BRIDGE (BR.NO.33C-0030) REPLACE BRIDGE (PER SEISMIC STRATEGY) $27,595,632.00 $31,446,836.00
California 5012085 12TH & 14TH ST BRIDGES 33C0181 & 33C0182 BRIDGE REPLACEMENT (SEISMIC) $11,060,488.42 $55,410,000.00
California 5059230 STATE ROUTE 132 FROM NORTH DAKOTA AVE TO THE NEEDHAM STREET OVERCROSSING INCLUDING THE 132 / 99 INTERCHANGE. CONSTRUCT TWO-LANE EXPRESSWAY / HIGHWAY $22,101,971.00 $33,360,766.00
California 5060384 VETERANS BLVD./SH99/GOLDEN STATE BLVD.  (PHASE 3) VETERANS BLVD./SH99 INTERCHANGE; NORTHERLY JUG HANDLE; VETERANS BLVD. OVERCROSSING OF GOLDEN STATE $10,540,582.00 $59,151,158.00
California 5068001 CYPRESS AVE. @ SAC RIVER, BR #. 06C0108 L&R (NEW BRIDGE # 06C0377) REPLACE BRIDGES $79,976,316.00 $92,138,624.00
California 5104033 AUTO CENTER DRIVE AT BNSF RAILROAD SOUTH OF RAILROAD STREET, NEW OVERHEAD $8,061,892.00 $32,238,599.00
California 5108137 GERALD DESMOND BRIDGE BR# 53C0065 BRIDGE REPLACEMENT $173,115,000.00 $888,400,000.00
California 5108189 PORT OF LONG BEACH-PIER G TO J DOUBLE TRACK ACCESS FRO PIER G TO J, CREATING 9,000 FOOT DEPARTURE TRACK FOR TRAIN SERVING FOUR MARINE TERMINALS ALONG $14,000,000.00 $26,700,780.00
California 5109106 SR58: FROM 0.60 MILE E/O COFFEE RD OVERCROSSING TO TRUXTUN AVE UNDERCROSSING, ELEMENT OF THE CITY OF BAKERSFIELD CENTENNIAL CORRIDOR PROJECT. CONSTRU $113,362,209.00 $127,729,712.00
California 5109200 24TH/23RD STREETS (SR178) FROM 0.1 MI WEST OF SR99 (W/O KERN RIVER BR.) TO 0.2 MI EAST OF "M" STREET ROADWAY WIDENING AND INTERSECTION IMPROVEMENTS $23,540,432.70 $44,294,976.43
California 5109242 KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 99 FROM 0.3 MI SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 FROM $4,280,000.00 $36,549,100.00
California 5109245 SR99/ SR58 CONNECTOR, SR99 FROM BELLE TERRACE TO MING AVE. IMPROVEMENTS ON SR99/ SR58 CONNECTOR INCLUDING THE CONSTRUCTION OF A COLLECTOR-DISTRIBUTOR $11,122,638.65 $58,633,355.00
California 5109251 CENTENNIAL CORRIDOR CONNECTOR: WESTSIDE PARKWAY(WSP) AT KERN RIVER BR. TO SR58  SR99 NEW ROAD: CONSTRUCT NEW CENTENNIAL CORRIDOR MAINLINE AND INTERCH $97,719,464.10 $156,024,110.25
California 5163027 5TH STREET AT 2ND STREET AND 5TH STREET OVER FEATHER RIVER BRIDGE REPLACEMENT (TC) $76,942,547.91 $79,048,216.00
California 5166015 BON AIR BRIDGE (BON AIR RD OVER CORTE MADERA CREEK). BR.# 27C0028 BRIDGE REPLACEMENT $34,075,884.01 $39,867,829.13
California 5213039 FAIR OAKS AVE OVER CALTRAIN & UPRR, BRIDGE # 37C0765
 THIS REQUEST IS TO CONVERT AC FUNDS UNDER CONSTRUCTION AND R/W TO REGULAR FEDERAL FUNDS. BRIDGE
$25,971,994.00 $29,831,941.00
California 5282017 INDIAN CANYON DRIVE OVERHEAD AT THE UNION PACIFIC RAILROAD SOUTH OF GARNET AVENUE, BR. NO. 56C-0025 BRIDGE WIDENING TO SIX LANES $1,635,943.00 $26,425,723.00
California 5288046 IN FOLSOM ON WHITE ROCK RD FROM PRAIRIE CITY RD TO EAST BIDWELL ST. CONSTRUCT 4 LANE ROAD WITH 8 FOOT SHOULDERS.  (CLASS 1 TRAIL TO BE BUILT IN LATER $15,000,000.00 $31,201,500.00
California 5380028 GREEN TREE BOULEVARD FROM HESPERIA ROAD TO RIDGECREST BOULEVARD EXTENSION OF 4-LANE ROAD WITH NEW OVERHEAD $25,696,701.07 $46,469,279.91
California 5381033 VIA VERA CRUZ, BRDG NO. 57C0780 REPLACE 2-LANE BRIDGE WITH 4-LANE BRIDGE $20,538,960.00 $32,885,590.00
California 5459025 I-15/SR 79 INTERCHANGE FROM 0.4 MILES SOUTH OF SR 79 TO 0.6 MILES NORTH OF THE I-15/SR 79 SEPARATION IN THE CITY OF TEMECULA WIDEN INTERCHANGE RAMPS $14,415,839.50 $27,271,373.50
California 5459031 I-15 FROM WINCHESTER RD IC LOOP ENTRY RAMPS TO JEFFERSON AVE. WINCHESTER RD IC NB ENTRY RAMP POST MILES: BEGIN 6.40 END 9.70 FRENCH VALLEY PKWY IC/AR $51,439,839.50 $108,280,138.00
California 5464029 I-215 / CLINTON-KEITH ROAD INTERCHANGE  , RECONSTRUCT INTERCHANGE $9,999,452.00 $26,437,922.00
California 5801051 ON I-580 IN ALAMEDA COUNTY NEAR LIVERMORE 1 MILE EAST OF NORTH FLYNN ROAD CONSTRUCT RETAINING WALL AND CLIMBING LANE (TC) $53,480,532.41 $54,003,380.41
California 5801054 ISABEL AVEN (LIVERMORE) TO FOOTHILL (DUBLIN) CONSTRUCT A WESTBOUND HOV LANE $9,609,605.39 $51,907,082.00
California 5801055 GREENVILLE ROAD TO ISABEL AVENUE (LIVERMORE) CONSTRUCT A WESTBOUND HOV LANE $12,404,356.26 $68,826,847.67
California 5801076 ALAMEDA COUNTY FROM ROUTE 580/ROUTE 238 SEPERATION TO FRUITEVALE AVENUE UNDERCROSSING TO REPLACE SLAPBS, RESURFACE SHLDS & RAMPS, & CONSTRUCT MGS, & $39,410,700.00 $43,446,500.00
California 5908031 JELLYS FERRY RD OVER SACRAMENTO RIVER BRIDGE (BR. #08C0043) BRIDGE REPLACEMENT ON NEW ALIGNMENT $46,452,532.00 $53,014,641.00
California 5912085 MIDWAY RD @ BUTTE CREEK 3.9 MILES SOUTH OF NELSON RD. BRIDGE NO. 12C0052 & 12C0053 BRIDGE REPLACEMENT $24,076,840.00 $27,196,250.00
California 5925098 MOSQUITO RD OVER SOUTH FORK AMERICAN RIVER 5.7 MILES NORTH OF US 50 BR#25C0061 BRIDGE REPLACEMENT (TC) $25,114,000.00 $79,314,000.00
California 5929166 MCHENRY AVENUE OVER STANISLAUS RIVER (BRIDGE 38C0032) BRIDGE REPLACEMENT $22,651,344.00 $25,943,318.00
California 5934171 2ND STREET FROM MARKET TO KING BICYCLE & PED IMPROVEMENTS, REPAVE $11,116,386.00 $25,883,895.00
California 5934177 IN SAN FRANCISCO, ON 3RD STREET, CROSSING OVER THE MISSION CREEK CHANNEL BETWEEN BERRY STREET AND TERRY A FRANCOIS BOULEVARD; BR. # 34C0025 BRIDGE RE $32,060,268.00 $36,214,015.00
California 5934185 MARKET STREET, 5TH STREET TO 8TH STREET. WORK MAY EXTEND OFF MARKET STREET, UP TO 50 FEET AT INTERSECTIONS. ROADWAY IMPROVEMENTS, INCLUDING ROADWAY R $18,366,000.00 $191,108,886.00
California 5938076 CROWS LANDING ROAD OVER SAN JOAQUIN RIVER (BRIDGE 38C0010) REPLACE BRIDGE (SEISMIC) $12,216,407.00 $25,617,720.09
California 5943043 UNION RD @ SAN BENITO RIVER (BR# 43C0002) BRIDGE REPLACEMENT $4,427,301.00 $48,240,893.00
California 5956221 66TH AVENUE FROM EAST OF STATE ROUTE 86 TO DALE KILER ROAD IN THE COMMUNITY OF MECCA NEW OVERHEAD $24,479,641.00 $47,974,058.00
California 5956230 HAMNER AVENUE OVER SANTA ANA RIVER, BR. NO. 56C-0446 REPLACE 2-LANE BRIDGE WITH 6-LANE BRIDGE $41,311,467.00 $69,888,540.00
California 6003010 GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE II $176,753,580.79 $176,753,580.79
California 6003028 GOLDEN GATE BRIDGE                          . SEISMIC RETROFIT PHASE 3A $108,688,703.94 $108,688,704.94
California 6003051 GOLDEN GATE BRIDGE. BR. # 27 0052 SUICIDE DETERRENT SYSTEM $133,050,000.00 $204,092,868.00
California 6053122 US 395 FROM PALMDALE ROAD (SR 18) IN PALMDALE TO CHAMBERLAINE WAY IN ADELANTO, PHASE 1 WIDEN HIGHWAY FROM TWO TO FOUR LANES (TC) $8,027,804.64 $40,003,413.00
California 6053130 I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN $207,167,533.00 $287,061,533.00
California 6054066 STATE ROUTE 71/91 INTERCHANGE REPLACE CONNECTOR & RECONSTRUCT RAMP (TC) $34,362,820.55 $174,729,970.32
California 6054081 I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 60 IN THE CITIES OF EASTVALE AND JURUPA VALLEY CONSTRUCT TOLL EXPRESS LANES IN EACH DIREC $98,418,952.00 $329,521,881.00
California 6054090 STATE ROUTE 60 FROM GILMAN SPRINGS ROAD TO 1.37 MILES WEST OF JACK RABBIT TRAIL CONSTRUCT EASTBOUND AND WESTBOUND TRUCK LANES $45,401,000.00 $109,133,000.00
California 6065198 I-405 NB HOV LANE, WIDENING: I-10 TO I-101 ROAD WIDENING  FOR HOV LANE $92,600,000.00 $104,597,312.00
California 6065240 NORTHERN LOS ANGELES COUNTY FROM I-5/SR14 JCT. TO PARKER ROAD. THE INTERSTATE 5 (I-5) GOLDEN STATE CHOKEPOINT RELIEF PROJECT (THE PROJECT) OFFERS A C $47,000,000.00 $533,596,550.00
California 6065251 I-210 FREEWAY FROM 0.2 MILES WEST OF MARENGO AVE TO W ILSON AVE IN THE CITY OF PASADENA AND APPROXIMATELY 1.5 MILES OF SOUNDWALLS FROM BALDWIN AVE TO $48,649,000.00 $48,649,000.00
California 6066104 NCTD RAIL R/W FOR SPRINTER COMMUTER TRAIN IN CITIES OF VISTA, SAN MARCOS, OCEANSIDE AND THE COUNTY OF SAN DIEGO BUILD 7.1 MILES OF CLASS I BICYCLE TR $17,827,622.64 $28,374,000.00
California 6071122 INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION $1,000.00 $1,900,000,000.00
California 6071129 STATE ROUTE 55 FROM INTERSTATE 405 TO INTERSTATE 5 ADD ONE MIXED-FLOW AND HIGH-OCCUPANCY LANE IN EACH DIRECTION AND REPAIR CHOKEPOINTS (TC) $155,345,407.00 $231,469,718.00
California 6164023 ALONG THE WHITEWATER RIVER STORM CHANNEL FROM THE CITY OF PALM SPRINGS TO THE CITY OF COACHELLA, PHASE 1, SEGMENT 1 CONSTRUCT 13.47 MILES OF NEW BIKE $18,655,000.00 $33,009,000.00
California 6164024 EASTERN RIVERSIDE COUNTY (18 CORRIDORS): MONTEREY, COOK, PALM DR, BOB HOPE, FRED WARING, DINAH SHORE, GENE AUTRY, DATE PALM, INDIO BLVD, JEFFERSON, P $35,148,603.00 $62,573,714.00
California 6202007 HWY 299 BETWEEN TRINITY & SHASTA COUNTIES; APPROX 20 MILES WEST OF REDDING, HWY REALIGNMENT (TC) $839,440.00 $30,298,000.00
California 6203055 SR-99 FROM ASH ST TO RAMSDELL DR STREETSCAPE IMPROVEMENTS (TC) $10,810,000.00 $39,563,000.00
California 6203058 RECONFIGURE I-80/SR-65 I/C & WIDEN NB SR-65 FROM I-80 WB RAMP TO PLEASANT GROVE BL RECONFIGURE I-80/SR-65 INTERCHANGE AND WIDEN SR-65 $6,830,000.00 $43,180,600.00
California 6203059 SR-49 FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK REHABILITATE PAVEMENT (TC) $2,338,000.00 $36,052,100.00
California 6203060 NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. PM23.50 CONSTRUCT AN UNDERCROSSING AND A $6,091,900.00 $30,688,902.12
California 6203067 IN ROCKLIN: BETWEEN SR-65 (PM 4.1) AND ROCKLIN RD. (PM 6.0); CONSTRUCT I-80 EASTBOUND AUXILIARY LANE, INCLUDING TWO-LANE OFF-RAMP. IN ROSEVILLE:  BET $4,632,588.00 $37,478,000.00
California 6204105 I-580 LIVERMORE; GREENVILLE RD TO ISABEL AVE, CONSTRUCT W/B HOV LANE $6,187,759.00 $73,055,000.00
California 6204113 US 101 BROADWAY INTERCHANGE IN BURLINGAME RECONSTRUCT INTERCHANGE INCLUDE BIKE/PED FACILITY $3,559,977.49 $50,043,250.63
California 6204117 WB I-80 TO SR12 CONNECTOR, INTERCHANGE RECONSTRUCTION (TC) $999,962.00 $52,215,503.00
California 6204120 US 101 MARIN SONOMA NARROWS; NEAR PENTALUMA .8MIL S. TO 2MIL N. OF MARIN-SON LNS REALIGN US101 & CONSTRUCT WIDENING FOR HOV  (TC) $127,845.25 $55,486,000.00
California 6204123 IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PH II CONCESSIONARE PMTS P3 (TC) $34,000,000.00 $34,000,000.00
California 6204127 US 101 MARIN & SONOMA CO. BETWEEN KASTANIA RD. & SOUTH OF MARIN/SONOMA COUNTY LINE CONSTRUCT HOV LANES (TC) $32,200,000.00 $38,368,000.00
California 6204131 ON I-80 THROUGH THE  CITIES OF  FAIRFIELD AND VACAVILLE IN SOLANO COUNTY,  FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVER $63,464,510.00 $178,700,000.00
California 6204132 ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE  TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. $75,651,097.00 $103,646,000.00
California 6205010 STATE HWY 46 CORRIDOR SAN LUIS OBISPO COUNTY ROAD WIDENING $14,510,070.80 $25,734,967.65
California 6205015 ROUTE 46 CORRIDOR, ROAD WIDENING $2,477,410.47 $63,244,534.42
California 6205026 IN SANTA BARBARA COUNTY, IN AND NEAR SUMMERLAND FROM 0.2 MI NORTH OF PADARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. RECONSTRUCT PAVEMENT WITH C $3,098,688.99 $127,191,000.00
California 6205028 NEAR THE CITY OF SANTA CRUZ AND CAPITOLA ON HIGHWAY 1, FROM 41ST AVENUE TO SOQUEL AVENUE CONSTRUCT AUXILIARY LANES AND CONSTRUCT BICYCLE/PEDESTRIAN O $1,640,000.00 $28,110,000.00
California 6205029 ON SR156 IN SAN JUAN BAUTISTA, FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH ST. ROADWAY WIDENING $404,017.00 $58,711,000.00
California 6206010 ROUTE 99 FROM GOSHEN TO KINGSBURG WIDEN FROM 4-LANE TO 6-LANE $6,987,904.14 $99,254,688.29
California 6206011 ROUTE 99 FROM GOSHEN TO KINGSBURG WIDEN FROM 4-LANE TO 6-LANE $5,822,225.77 $99,383,881.20
California 6206021 SR 46 FROM THE INTERSECTION OF LOST HILLS ROAD TO 0.9 MI. E OF I5 WIDENING FROM 2 TO 4 LANES $17,701,000.00 $49,972,000.00
California 6206025 KINGS CANYON EXPRESSWAY SEGMENT 3, ON SR 180 FROM WEST OF SMITH AVENUE TO EAST OF FRANKWOOD AVENUE, PM R74.1/R78.6 CONSTRUCT 4 LANE EXPRESSWAY $2,666,318.70 $53,598,170.00
California 6206033 ON SR-99 AT COMMERCIAL AVE:  BETWEEN 0.9 MI N/O AVE 200 OC AND PAIGE AVE OC CONSTRUCT NEW INTERCHANGE AND CONSTRUCT NORTH AND SOUTHBOUND AUXILLARY LA $16,000,000.00 $57,398,000.00
California 6207028 ON SR 14:PEARBLOSSOM TO AVE P-8        , CONSTRUCT HOV LANES $32,127,808.86 $36,812,808.86
California 6207042 IN NORWALK AND SANTA FE SPRING(CARMENITA INT), INTERCHANGE RECONSTRUTION $98,527,001.00 $179,624,855.00
California 6207046 I-5/SR-14 SEPARATION NR CITY OF SANTA CLARITA CONSTR. 2 LANE ELEV. HOV CONNE $116,062,579.72 $164,015,944.00
California 6207055 I-5 : FROM RTE 134 TO MAGNOLIA BLVD HOV LANES $72,706,000.00 $113,213,945.00
California 6207059 ROUTE 10: PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES AND SOUNDWALLS (TC) $116,546,051.00 $157,866,051.00
California 6207063 SR-138, SEGMENT 6, (IN LITTLEROCK FROM 87TH ST E TO 96 ST. E) WIDENING OF SR-138 FROM 2 LANES TO 4 LANES (TC) $25,130,000.00 $25,130,000.00
California 6207067 LA COUNTY LINE TO MOORPARK RD. IN THOUSAND OAKS ADD ONE LANE IN EACH DIRECTION, WIDEN RAMPS ETC. $15,417,915.00 $40,083,904.38
California 6207068 ROUTE 005: (SEG. 5) ARTESIA BLVD. TO 0.4 MILE  NORTH OF SAN GABRIEL RIVER BRIDGE WIDEN I-5 WITH HOV MIXED FLOW LANES ETC. (TC) $96,114,000.00 $124,714,000.00
California 6207070 RT. 10 : FROM CITRUS AVE. TO RT. 57 CONSTRUCT HOV LANE IN BOTH DIRECTIONS. (TC) $162,885,020.00 $237,395,520.00
California 6207072 IN LOS ANGELES COUNTY FROM MAGNOLIA BLVD. TO JUST NORTH OF BUENA VISTA CONSTRUCT HOV LANES AND IC MODIFICATIONS $31,568,000.00 $325,040,000.00
California 6207078 I-5 CARPOOL LANE-ORANGE COUNTY LINE TO I-605 (SEGMENT 2) IN LA MIRADA WIDEN HOV
 
 
 LOCATION DETAILS SEGMENT 2.: IN LA MIRADA FROM ARTESIA BL TO NOR
$100,079,000.00 $199,898,000.00
California 6208009 STATE ROUTE 91 FROM ADAMS STREET TO THE 60/91/215 INTERCHANGE HOV LANES $57,796,950.00 $181,141,569.00
California 6208013 I-215: ORANGE SHOW RD. - RIALTO AVE. (SEG. 3) , CONSTRUCT HOV & MIXED-FLOW LANES $46,940,000.00 $87,997,100.00
California 6208016 I-15/I-215 INTERCHANGE S/O GLEN HELEN PARKWAY TO KENWOOD & I-215 S/O DEVORE ROAD, RECONSTRUCT INTERCHANGE, ADD MIXED-FLOW LANES TC $65,708,000.00 $258,659,000.00
California 6208018 SR 91 FROM SPRUCE ST. IN RIVERSIDE TO I-215 AT ORANGE SHOW RD. IN SAN BERNARDINO, HOV LANES, BRIDGE REPLACEMENT, ROAD REHABILITATI $44,871,000.00 $180,391,000.00
California 6208023 I-215 INTERCHANGE AT BARTON ROAD IN THE CITY OF GRAND TERRACE RECONSTRUCT OVERCROSSING AND RAMPS (TC) $18,756,086.83 $65,708,645.83
California 6208029 I-15 FROM 0.5 MILES N/O MOJAVE DRIVE TO 1.5 MILES N/O STODDARD WELLS ROAD, RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS (TC) $3,637,000.00 $84,990,000.00
California 6208032 I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 QUALIT $21,300,000.00 $84,926,325.00
California 6211114 I15-PM R46.2/R46.8 & SR76-PM R12.1/R17.7 INTERCHANGE SR76 EAST - ROADWAY WIDENING FROM 2 TO 4 LANES $86,750,801.30 $121,682,757.37
California 6211119 IN SAN DIEGO COUNTY IN SAN DIEGO ON I-5 FROM 0.4 MILES SOUTH OF GENESEE AVE OC TO THE SORRENTO VALLEY OVERHEAD REPLACE BRIDGE, RAMP, IC, BUTTRESS, BI $50,929,838.10 $70,925,715.00
California 6211121 I-805 SOUTH FROM PALOMAR STREET TO SR54 CONSTRUCT NOISE WALL (TC) $31,302,000.00 $32,092,210.06
California 6211126 IN IMPERIAL COUNTY IN THE CITY OF EL CENTRO AT I-8 AND IMPERIAL AVE INTERCHANGE RECONSTRUCTION OF INTERCHANGE (TC) $2,399,999.74 $31,342,999.74
California 6211131 IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS ALONG 1-5 FROM LOMAS SANTA FE DRIVE TO 0.5 MILE SOUTH OF PALOMAR AIRPORT ROAD REPLACE THE SAN ELIJO LAGOON B $186,740,594.00 $246,122,594.00
California 6211149 IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.6 MILE NORTH FROM DEL MAR HEIGHTS ROAD OVERCROSSING TO VILLA DE LA VALLE OVERCROSSING. RESTORE WETLANDS AT SA $37,284,000.00 $82,422,068.00
California 6212018 INTERSTATE 405 FROM STATE ROUTE 73 TO INTERSTATE 605 ADD TOLL EXPRESS (TEL) AND MIXED-FLOW LANES IN EACH DIRECTION $36,130,000.00 $256,189,516.00
California 6212021 INTERSTATE 5 FROM STATE ROUTE 73 TO OSO PARKWAY, SEGMENT 1 ADD MIXED-FLOW LANES IN EACH DIRECTION AND RECONSTRUCT THE I-5 INTERCHANGE INTERCHANGE (TC $19,848,000.00 $87,810,000.00
California 6212022 INTERSTATE 5 FROM OSO CREEK TO ALICIA PARKWAY CONSTRUCT ONE GENERAL PURPOSE LANE ON EACH DIRECTION, RECONSTRUCT LA PAZ ROAD INTERCHANGE AND ADD AUXIL $43,930,000.00 $158,080,000.00
California 6212024 INTERSTATE 5 FROM ALICIA PARKWAY TO EL TORO ROAD (SEGMENT 3) ADD GENERAL PURPOSE LANE, EXTEND 2ND HOV LANE IN BOTH DIRECTIONS, AND ADD AUXILIARY LANE $44,915,000.00 $149,817,000.00
California 6272023 YERBA BUENA ISLAND EASTSIDE WESTBOUND ON & OFF RAMPS RECONST EXISTING WB ON & OFF RAMPS ON EAST OF YBI $75,747,201.00 $85,581,736.00
California 6272047 ON YERBA BUENA ISLAND, SAN FRANCISCO - I-80 ON AND OFF RAMPS APPROACH ROADWAY REALIGNMENTS $9,769,288.00 $49,895,730.00
California 6303005 NOGALES ST. AT UPRR IN THE CITY OF INDUSTRY , GRADE SEPARATION ON NOGALES ST. $40,069,700.95 $50,129,010.95
California 6303030 RAMONA ST, MISSION RD, DEL MAR AVE, SAN GABRIEL BL UPTO WALNUT GROVE AVE W/UPRR, CONST. 2.6M LONG RAILROAD TRENCH $12,404,576.45 $399,597,000.00
California 6303039 DURFEE AVENUE AT UPRR (LA SUBDIVISION) IN CITY OF PICO RIVERA CONSTRUCTION OF RAIL ROAD GRADE SEPARATION $19,737,808.21 $78,030,062.20
California 6480017 IN THE CITY OF OAKLAND, WITHIN THE PORT OF OAKLAND'S SEAPORT FACILITIES AND ADJACENT AREA IN THE CITY OF OAKLAND ALONG WEST GRAND  AVE., MARITIME HAR $9,741,364.11 $28,562,849.11
California 6507003 MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT $92,790,871.00 $229,198,602.00
California 6507011 I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 DESIGN $21,992,329.00 $32,860,264.00
California 6507027 N 1ST AVENUE OVER BNSF RY, UP RR, AMTRAK, 0.2 MI N MAIN ST IN BARSTOW, BR. NO. 54C-0088 REPLACE EXISTING 2 LANE BRIDGE WITH 2 LANE BRIDGE, EXISTING B   $61,790,667.00
California 6801079 IN FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING. ROADWAY REHABILITATION, BRIDGE REPLACEMENT, RETAINING WALLS, $32,796,100.00 $145,178,000.00
California 6801081 IN FREMONT FROM SOUTH OF SCOTT CREEK ROAD TO AUTO MALL PARKWAY. RAMP METERING (TC) $27,415,200.00 $27,916,900.00
California 6801082 CONTRA COSTA COUNTY ON I-680 FROM NORTH MAIN STREET TO LIVORNA IN THE SOUTHBOUND DIRECTION. CONSTRUCT AN HOV LANE $14,759,200.00 $76,295,900.00
California 6801946 ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA $74,992,200.00 $82,130,000.00
California 6801990 ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON FROM KOOPMANN ROADUNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING PRECA   $226,773,000.00
California 7101807 IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE BRIDGE REPLACEMENT $394,303,000.00 $836,532,728.00
California 7101839 IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . $112,901,800.00 $113,434,400.00
California 8051640 IN SAN DIEGO COUNTY IN CHULA VISTA AND NATIONAL CITY FROM 0.2 MILE SOUTH OF SWEETWATER RIVER BRIDGE TO ROUTE 805/54 SEPARATION. UPGRADE BRIDGE RAILS,   $25,209,100.00
California 8801053 I-880 AT COLEMAN AVENUE INTERCHANGE   , RECON 880/COLEMAN____(2004A GARVEE)   $71,460,660.00
California 8801070 IN OAKLAND FROM SOUTH OF 29TH AVENUE TO NORTH OF 23RD AVENUE IMPROVE ON AND OFF RAMPS (TC) $78,497,887.00 $79,331,752.00
California 8801081 IN AND NEAR FREMONT, UNION CITY, HAYWARD, SAN LEANDRO, AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET SEPARATION AN $61,935,300.00 $64,663,400.00
California E2CA018 WALERGA  RD AT DRY CREEK BR #19C-159 BRIDGE REPLACEMENT $31,231,307.00 $36,721,268.00
California ERI8005 IN MARIPOSA COUNTY ABOUT 8 MILES WEST OF EL PORTAL FROM 1.2 MILES WEST OF SOUTH FORK MERCED RIVER BRIDGE TO 0.5 MILE WEST OF SOUTH FORK MERCED RIVER $26,862,300.00 $30,717,000.00
California NBIS017 STATEWIDE BRIDGE INSPECTION & MANAGEMENT (TC) $33,000,000.00 $33,000,000.00
California NBIS018 STATEWIDE BRIDGE INSPECTION & MANAGEMENT $34,664,063.22 $39,155,240.00
California P001529 MEN CO;NR FORT BRAGG;N & S OF TEN MILE RV BR , REPLACE BRIDGE, REALIGN ROADWAY $18,939,549.00 $54,949,796.00
California P001590 SLO CO ABOUT 9 MI N OF SAN SIMEON FR PIEDRAS BLANCAS LIGHTHOUSE RD TO ARROYO... CONSTRUCT 3 BRIDGES & REALIGN 2 LANE HIGHWAY (TC) $30,723,700.00 $30,908,500.00
California P001649 SANTA CRUZ COUNTY IN AND NEAR SANTA CRUZ FROM NORTH APTOS UP TO JUNCTION ROUTE 9. COLD PLANE AND RESURFACE PAVEMENT, UPGRADE RAILING AND BARRIERS. $24,074,787.03 $30,114,900.04
California P001662 MONTEREY COUNTY FROM TORRE CANYON BRIDGE NEAR BIG SUR TO SAN LUIS AVENUE IN CARMEL. RHMA OVERLAY ON EXISTING ROADWAY AND UPGRADE GUARDRAIL. $24,668,600.00 $28,328,000.00
California P001675 SANTA CRUZ COUNTY IN AND NEAR CITY OF CAPITOLA FROM 0.2 MILE SOUTH OF 41ST AVENUE OVERCROSSING TO 0.2 MILE NORTH OF SOQUEL DRIVE OVERCROSSING. CONSTR   $31,870,000.00
California P001682 ORANGE COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL HEIGHTS DRIVE TO LOS ANGELES/ORANGE COUNTY LINE COLD PLANE, PLACE RHMA AND MODIFY CURB RAMPS AND ELEC   $33,876,000.00
California P011009 IN SAN DIEGO COUNTY NEAR SAN DIEGO AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING. OTAY MESA EAST PORT OF ENTRY SITE PREPARATION, DRAINAGE, AND UTIL $22,079,699.45 $35,706,100.00
California P012106 IN NAPA COUNTY FROM STATE ROUTE 29 TO 0.1 MILE WEST OF SOLANO COUNTY LINE WIDEN HWY TO 4 LANES AND CONSTR RET WALLS $15,382,680.87 $33,906,364.87
California P012107 IN NAPA AND SOLANO COUNTIES FROM 0.5 MILE WEST OF NAPA CO LINE TO RED TOP ROAD. WIDEN RTE 12 FROM 2 TO 4 LANE CONV HWY $7,172,513.69 $53,837,664.39
California P012112 IN SJ COUNTY NEAR TERMINOUS FROM MOKELUMNE RIVER BRIDGE TO POTATO SLOUGH BRIDGE PAVEMENT REHABILITATION AND WIDENING (TC) $53,429,122.00 $53,700,760.00
California P014081 IN KERN COUNTY AT AND NEAR ROSAMOND AND MOJAVE FROM 1.4 MILES SOUTH OF DAWN ROAD OVERCROSSING TO 0.5 MILE NORTH OF SILVER QUEEN ROAD OVERCROSSING. CO $44,616,500.00 $50,941,700.00
California P014106 LOS ANGELES COUNTY, ROUTE 14, POSTMILE R60.7/R77.0. IN AND NEAR PALMDALE AND LANDCASTER, FROM AVENUE P-8 TO THE KERN COUNTY LINE. REPLACE DISTRESSED   $314,833,800.00
California P017117 SANTA CLARA COUNTY IN AND NEAR LOS GATOS AND SAN JOSE FROM HEBARD ROAD TO ROUTE 17/280 SEPERATION COLD PLAN AND PAVE AC, REMOVE AND INSTALL CULVERTS, $51,614,800.00 $58,733,500.00
California P020184 NEAR YUBA CITY, FROM EAST END OF SUTTER BYPASS TO LYTLE ROAD. REHABILITATE ROADWAY, WIDEN SHOULDERS, AND REPLACE WADSWORTH CANAL BRIDGE NO.I8-0003. T $23,097,900.00 $26,246,200.00
California P020189 NEAR SMARTSVILLE, FROM THE YUBA RIVER BRIDGE TO EAST OF SMARTSVILLE ROAD. REALIGN AND WIDEN ROADWAY. THE NEED FOR THE FOLLOWING IMPROVEMENTS ARE ANAL $39,900,700.00 $44,855,100.00
California P020191 NEAR MARYSVILLE, FROM MARYSVILLE ROAD TO YUBA RIVER (PARKS BAR) BRIDGE. REHABILITATE ROADWAY. EXTEND SERVICE LIFE OF PAVEMENT, BRING HIGHWAY GEOMETRI $43,232,870.00 $49,400,100.00
California P020196 NEVADA COUNTY NEAR OMEGA AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CONSERVATION ROAD (WASHINGTON RIDGE ROAD) TO 1.2 MILES WEST OF ZIEBRIGHT ROAD. RO $36,674,500.00 $41,096,100.00
California P020198 IN MENDOCINO COUNTY NEAR UKIAH FROM 0.3 MILE WEST OF RUSSIAN RIVER BRIDGE AND OVERHEAD TO 0.4 MILE EAST OF COUNTY ROAD 144 REPLACE TWO BRIDGES $32,273,900.00 $36,949,000.00
California P023041 IN VENTURA COUNTY, ON STATE ROUTE 23, PM R3.3/R11.5. IN AND NEAR CITIES OF THOUSAND OAKS AND MOORPARK, FROM ROUTE 101 TO ROUTE 118. REHABILITATE PAVE   $91,342,600.00
California P024029 RT 24 FROM CALDECOTT TUNNEL TO EL CURTOLA O/C, ROADWAY REHABILITATION $41,284,906.00 $46,634,305.00
California P029148 IN LAKE COUNTY NEAR KELSEYVILLE ON RTE 29 FROM 0.6 MI TO 3.7 MILES NORTH OF RTE 281 AND ON RTE 175 FROM SOUTH JCT RTE 29 TO 0.3 MI EAST OF SO JCT RTE $60,679,000.00 $68,278,700.00
California P046062 IN SAN LUIS OBISPO COUNTY NEAR SHANDON FROM 0.2 MILE EAST OF SHANDON SAFETY ROADSIDEREST AREA TO 0.1 MILE WEST OF DAVIS ROAD CONVERT TO A FOUR LANE E $119,580,400.00 $135,441,000.00
California P047010 LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) $368,659,356.00 $368,785,856.00
California P049177 IN AUBURN, FROM 0.1 MILE SOUTH OF ROUTES 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK ROAD. REHABILITATE PAVEMENT $33,926,043.29 $38,894,100.89
California P050139 IN SOUTH LAKE TAHOE, NORTH OF ROUTE 89 TO TROUT CREEK BRIDGE. WATER QUALITY IMPROVEMENTS - (TC) $41,368,400.00 $42,093,600.00
California P050152 (03-4E620) NEAR PLACERVILLE AND CAMINO, FROM 0.2 MILE WEST OF STILL MEADOWS ROAD TO 0.4 MILE EAST OF UPPER CARSON ROAD. INSTALL MEDIAN BARRIER, WIDEN $27,348,100.00 $36,018,900.00
California P050154 IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB. $54,496,300.00 $434,546,200.00
California P051037 SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD. DREDGE, CONSTRUCT IN-WATER FOUNDATI $53,284,500.00 $60,427,100.00
California P052021 IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILE WEST OF CONVOY STREET OVERCROSSING TO 0.3 MILE EAST OF SANTO ROAD OVERCROSSING ROADWAY REHABILITATION   $55,394,000.00
California P057067 IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT $63,147,650.00 $71,876,400.00
California P057069 LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANG $33,118,900.00 $80,120,300.00
California P057073 IN LOS ANGELES COUNTY. ROUTE 57/60 CONFLUENCE CHOKEPOINT RELIEF PROGRAM. RECONSTRUCT GRAND AVENUE OVERCROSSING. RECONSTRUCT NORTHBOUND SR-57 CONNECTO $74,000,000.00 $338,900,000.00
California P058119 ON STATE ROUTE 58 IN SAN BERNARDINO COUNTY A HENKLEY *** RECONSTRUCTION (2 LANE TO 4 LANE EXPRESSWAY) (TC) $139,313,220.00 $139,827,720.00
California P058126 NEAR BAKERSFIELD FROM COTTONWOOD ROAD UNDERCROSSING TO 0.3 MILE EAST OF ROUTE 58/184 SEPARATION. CONSTRUCT CRCP, HMA PAVEMENT, MGS, AND MODIFYING ELE $39,401,100.00 $39,628,100.00
California P058127 IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O $207,775,600.00 $208,375,000.00
California P058128 KERN COUNTY IN BAKERSFIELD FROM RTE 58/99 SEPARATION TO COTTONWOOD ROAD UNDERCROSSING REPLACE LANES AND SHOULDERS WITH CONTINUOUSLY REINFORCED CONCRE $28,516,300.00 $29,022,400.00
California P060153 IN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM 0.1 MI WEST OF
 PIPELINE AVE OC TO 0.1 MI EAST OF BENSON AVE OC REMOVE AND REPLA
  $26,041,300.00
California P060154 IN RIVERSIDE COUNTY NEAR BEAUMONT ON SR 60 FROM GILMAN SPRINGS ROAD OVERCROSSING TO 1.4 MILES WEST OF JACK RABBIT TRAIL. CONSTRUCT A TRUCK CLIMBING L $62,120,400.00 $121,915,500.00
California P060155 IN SAN BERNARDINO AND RIVERSIDE COUNTIES IN ONTARIO, JURUPA VALLEY AND RIVERSIDE, FROM EUCLID AVENUE UNDERCROSSING TO ROUTE 60/91/215 SEPARATION. REP   $162,158,000.00
California P060159 IN SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE ADD WEST BOUND AUXILIARY LANE, ADD EAST-BOUND DEC $28,650,500.00 $32,806,300.00
California P062046 IN RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR YUCCA VALLEY AND IN TWENTYNINE PALMS FROM 0.2 MILE NORTH OF INDIAN CANYON DRIVE TO 0.6 MILE WEST $30,577,900.00 $32,746,700.00
California P065108 IN AND NEAR ROSEVILLE AND ROCKLIN, FROM ROUTE 80 TO 0.5 MILES SOUTH OF PLEASANT GROVE OVERCROSSING INCLUDING WIDENING OF THE GALLERIA BLVD/STANFORD R $24,480,600.00 $43,180,600.00
California P070137 NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE NO. I 6-00 I 9. REPL $45,899,180.00 $52,445,800.00
California P070143 IN YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD WIDEN ROADW $43,145,400.00 $48,518,000.00
California P070144 YUBA COUNTY NEAR MARYSVILLE FROM 0.2 MILE NORTH OF LAURELLEN ROAD TO SOUTH HONCUT CREEK BRIDGE WIDEN SHOULDERS AND IMPROVE CLEAR RECOVERY ZONE. $64,896,000.00 $72,938,200.00
California P074067 IN RIVERSIDE COUNTY ON ROUTE 74 FROM 0.6 MILES EAST OF ROUTE 215 TO 0.8 MILES WEST OF ACACIA AVENUE IN THE CITY OF HEMET CONSTRUCT RAISED CURB MEDIAN $25,824,020.00 $29,030,900.00
California P074071 ORANGE COUNTY NEAR SAN JUAN CAPISTRANO FROM 1.0 MILE WEST OF SAN JUAN HOT SPRINGS ROAD TO ORANGE COUNTY LINE APPLY HFST, OVERLAY OGAC AND INSTALL MGS $25,766,000.00 $29,137,100.00
California P074072 IN RIVERSIDE COUNTY IN AND NEAR HEMET FROM WINCHESTER ROAD TO FAIRVIEW AVENUE REHAB PAVEMENT, INSTALL FO/ VDS/ UPGRADE ADA RAMPS   $37,016,678.00
California P084042 IN/NEAR LIVERMORE & PLEASANTON FROM S/O RUBY HILL DRIVE TO N/O CONCANNON BLVD WIDEN AND UPGRADE 2.8 MILES OF SR 84 (TC) $46,709,000.00 $53,248,900.00
California P084054 ALAMEDA COUNTY NEAR FREMONT AT ALAMEDA CREEK BRIDGE REPLACE BR PAVING, SOIL NAIL WALL, DRAINAGE & CHANNEL RESTORATION $21,851,100.00 $25,221,800.00
California P091151 IN THE CITY OF CORONA AT THE JUNCTION OF SR-91 AND SR-71 NEAR THE ORANGE COUNTY LINE. REPLACE THE EB 91 TO NB 71 CONNECTOR WITH A DIRECT CONNECTOR AN   $151,327,818.00
California P099629 STANISLAUS COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF MERCED STANISLAUS COUNTY LINE TO 0.2 MILE SOUTH OF STANISLAUS SAN JOAQUIN COUNTY LINE C $13,985,600.00 $28,348,000.00
California P099635 MADERA COUNTY IN AND NEAR MADERA FROM AVENUE 12 OVERCROSSING TO 0.9 MILE NORTH OF AVENUE 17 OVERCROSSING REHABILITATE PAVEMENT AND CONSTRUCT NEW LANE $58,293,200.00 $65,925,900.00
California P099636 KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LAN $58,859,700.00 $71,341,800.00
California P099637 IN GALT, FROM THE SAN JOAQUIN COUNTY LINE TO SIMMERHOM ROAD; ALSO, IN THE CITIES OF ELK GROVE AND SACRAMENTO, FROM 0.7 MILE SOUTH OF ELK GROVE BOULEV $35,473,568.00 $40,312,800.00
California P099639 MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUE OVERCROSSING TO STANISLAUS COUNTY LINE NORTHBOUND LANE WIDENING FROM 2 TO $29,679,574.00 $42,383,800.00
California P099644 FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILES SOUTH OF SECOND STREET UNDERCROSSING. REPLACE CONCRETE AND AS $35,418,100.00 $40,420,100.00
California P099646 MERCED COUNTY IN AND NEAR ATWATER FROM 0.4 MILE SOUTH OF BUHACH OVERCROSSING TO 0.8 MILE NORTH OF WEST ATWATER OVERHEAD REPLACE CONCRETE AND ASPHALT $1,396,600.00 $72,340,200.00
California P099654 IN SUTTER COUNTY, IN AND NEAR LIVE OAK, FROM SOUTH OF COLEMAN AVENUE TO NEVADA STREET (NORTH INTERSECTION). REHABILITATE PAVEMENT, IMPROVE PEDESTRIAN $25,129,741.37 $36,746,000.00
California P099660 KERN COUNTY, IN AND NEAR BAKERSFIELD,  FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRE $54,176,800.00 $61,831,100.00
California P099662 MERCED COUNTY IN MERCED FROM 0.2 MILE SOUTH OF CHILDS AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF FRANKLIN ROAD OVERCROSSING RECONSTRUCT PAVEMENT $54,775,200.00 $65,929,100.00
California P099663 IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE   $73,158,900.00
California P099665 TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES $59,190,000.00 $67,376,000.00
California P099666 FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PA $71,509,800.00 $81,481,800.00
California P099669 SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD
 OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD BRIDGE REPLACEMENT AND
$50,329,800.00 $57,173,100.00
California P099671 IN MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING. REPLACE BRIDGES AND CONSTRUC $26,510,300.00 $30,461,200.00
California P099672 MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUEOVERCROSSING TO STANISLAUS COUNTY LINE WIDEN CONCRETE PAVEMENT LANES AND BR $29,454,200.00 $34,102,100.00
California P125021 IN SAN DIEGO COUNTY IN AN NEAR LEMON GROVE FROM 0.3 MILE SOUTH OF ELKELTON PLACE UNDERCROSSING TO 0.2 MILE SOUTH OF ROUTE 125/94 SEPARATION PAVEMENT   $42,799,997.00
California P134040 IN LOS ANGELES COUNTY IN CITIES OF LOS ANGELES, BURBANK, GLENDALE AND PASADENA FROM 0.0 MILE EAST OF ROUTE 101/134 SEPARATION TO JUNCTION OF ROUTE 21 $22,077,100.00 $47,748,300.00
California P138049 IN SAN BERNARDINO COUNTY ON STATE ROUTE 138 NEAR PHELAN *** ROADWAY RECONSTRUCTION (ADDED CAPACITY) (TC) $63,153,528.00 $63,678,528.00
California P138055 NEAR HESPERIA FROM 1.9 MI E/O RTE 15 TO 0.1 MI W/O SUMMIT POST OFFICE ROAD REALIGN AND CONSTRUCT 2-LANE PAVED SECTION WITH OUTSIDE SHOULDERS, 3 WILDL $22,578,900.00 $32,975,900.00
California P140040 MARIPOSA COUNTY FROM WHITLOCK ROAD NEAR MIDPINES TO YOSEMITE NATIONAL PARK COLD PLANE EXISTING PAVEMENT AND RESURFACE WITH HMA. $676.56 $27,117,000.00
California P156024 SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE   $69,711,000.00
California P162041 GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY $79,228,200.00 $90,972,100.00
California P210016 IN SAN BERNARDINO COUNTY IN SAN BERNARDINO, HIGHLAND, AND REDLANDS FROM 0.1 MILE WEST OF DEL ROSA AVENUE TO LUGONIA AVENUE BASELINE INTERCHANGE IMPRO $47,764,600.00 $149,679,901.00
California P217003 IN SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE REPLACE BRIDGE   $34,506,600.00
California P299185 IN SHASTA COUNTY ABOUT 20 MILES WEST OF REDDING FROM 0.3 MILE EAST OF TRINITY COUNTY LINE TO 0.9 MILES WEST OF CRYSTAL CREEK ROAD. HIGHWAY REALIGNMEN $44,998,502.00 $45,932,442.00
California P299214 NEAR WILLOW CREEK, FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 0.2 MILE EAST OF EAST FORK WILLOW CREEK BRIDGE. WIDEN SHOULDERS AND IMPROVE CURVES AT TH   $31,632,300.00
California P395236 IN SBD COUNTY FR 7.9 MI N/O SR-18 TO 10.4 MI S/O KRAMER JCT (RTE)58 WIDEN MEDIAN & SHOULDERS, CONSTRUCT TURNOUTS (TC) $31,415,318.00 $32,032,678.00
California P395276 IN SAN BERNARDINO COUNTY IN ADELANTO AND IN VICTORVILLE ON ROUTE 395 FROM ROUTE 18-PALMDALE ROAD TO CHAMBERLAINE WAY WIDEN HIGHWAY FROM TWO TO FOUR L $9,547,000.00 $31,613,553.00
California P395348 IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE E $76,343,500.00 $86,360,100.00
California Q101153 SF ON RTE 101 FROM PM 8.8-9.2, DOYLE DR REPL REPLACE/REHABILITATE ROADWAY $122,574,329.58 $160,696,807.58
California Q101237 IN SAN MATEO COUNTY ON US 101 IN THE CITY OF BURLINGAME RECONFIGURE THE BROADWAY INTERCHANGE (TC) $19,850,958.37 $60,085,142.37
California Q101247 IN AND NEAR THE CITIES OF LOS ANGELES, CALABASAS AND AGOURA HILLS FROM SR170 TO REHABILITATION PAVEMENT CONDITIONS (TC) $63,199,100.39 $63,408,100.39
California Q101261 MRN & SON COUNTIES ON US 101 SAN ANTONIO CURVE CORRECTION (TC) $75,275,041.00 $75,791,241.00
California Q101290 SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE RECONSTRUCT 3 BRIDGES, CONSTRUCT 1 BRIDG $54,846,100.00 $80,591,000.00
California Q101306 SAN LUIS OBISPO AND MONTEREY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING. $69,860,400.00 $70,452,900.00
California Q101338 MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE P $81,681,100.00 $105,748,900.00
California Q101342 MONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD RECONSTRUCT, CRACK AND SEAT PAVEMENT AND RECONSTR $42,102,080.00 $48,037,600.00
California Q101348 MONTEREY COUNTY NEAR SAN LUCAS FROM 0.1 MILE SOUTH OF PARIS VALLEY ROAD OVERCROSSING TO RANCHO UNDERCROSSING CONSTRUCT CONTINUOUSLY REINFORCED CONCRE $27,497,400.00 $31,230,600.00
California Q101350 MONTEREY COUNTY NEAR CHUALAR FROM 0.5 MILE NORTH OF NORTH GONZALES OVERCROSSING TO EAST MARKET STREET UNDERCROSSING REPLACE CONCRETE PANEL AND RESURF $26,578,449.00 $30,164,400.00
California Q101353 SONOMA COUNTY IN PETALUMA FROM ROUTE 101/116 SEPERATION TO 0.4 MILE NORTH OF CORONA ROAD OVERCROSSING ROADWAY, BRIDGES, RETAINING WALLS, SOUND WALL A   $104,750,100.00
California Q101363 THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING; UPGRADE MEDIAN CONCRETE BARRIER TO MEET THE $43,822,300.00 $44,130,700.00
California Q101365 SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION. CRACK, SEAT AND OVERLAY, AND REHABILITATE AND REPLACE   $87,903,000.00
California Q101366 THE CITY AND COUNTY OF SAN FRANCISCO AT ALEMANY CIRCLE UNDERCROSSING REPLACE BRIDGE DECK $12,265,254.00 $43,170,200.00
California Q101373 SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE. CONSTRUCT HOV LANES AN $48,147,600.35 $108,459,352.52
California Q101379 CITY AND COUNTY OF SAN FRANCISCO FROM THE SAN MATEO COUNTY LINE TO THE BAYSHORE VIADUCT COLD PLANE AND OVERLAY WITH RHMA.  REPLACE EXISTING PCC SLAB. $22,612,400.00 $25,361,400.00
California Q101381 SANTA BARBARA COUNTY IN AND NEAR SUMMERLAND FROM 0.2 MILE NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE. CONSTRUCT NEW HOV LANES AND $39,857,600.00 $127,191,000.00
California Q101385 VEN-101- IN VENTURA COUNTY, ON STATE ROUTE 101, PM R36.3/R40.6. NEAR SEA CLIFF, FROM 0.4 MILE SOUTH OF PADRE JUAN CANYON ROAD OVERCROSSING TO 0.3 MIL $38,098,900.00 $43,287,200.00
California Q101389 THE CITY AND COUNTY OF SAN FRANCISCO FROM 17TH STREET TO SOUTH VAN NESS AVENUE CLEAN AND PAINT STEEL STRUCTURE $33,735,800.00 $38,493,100.00
California Q101394 IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY   $63,701,000.00
California Q101395 SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE $99,251,600.00 $193,632,000.00
California Q101398 IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE   $78,032,000.00
California Q101399 IN HUMBOLDT COUNTY IN AND NEAR TRINIDAD FROM 1.3 MILES SOUTH OF SCHOOL ROAD OC TO 0.4 MILE NORTH OF BIG LAGOON BRIDGE CAPITAL PREVENTATIVE MAINTENANC $29,786,600.00 $33,880,100.00
California Q101403 MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEADTO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE CIP BRIDGES, CONSTRUCT R   $103,646,000.00
California Q101409 SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARKTO OLD COAST HIGHWAY REHABILITATE PAVEMENT   $60,954,000.00
California Q101410 SANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE. REPLACE BRIDGES.   $25,281,000.00
California Q101411 IN MONTEREY COUNTY AT AND NEAR PRUNEDALE AND SALINAS FROM 0.3 MILE NORTH OF BORONDA ROAD OVERCROSSING TO 0.4 MILE NORTHOF CRAZY HORSE CANYON ROAD OVE   $46,210,000.00
California S036115 IN LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD. REHABILITATE ROADWAY AND REPLACE $35,264,888.10 $40,079,808.00
California S074071 IN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE/RIVERSIDE COUNTY LINE TO MONTE VISTA STREET WIDEN EXISTING LANES TO PROVIDE 12' LANES, 4' SHOULDER $46,115,460.00 $51,869,500.00
California S087026 IN SAN JOSE RT 87 FROM JULIAN ST TO 280 U/C , WIDEN FWY (4 TO 6)___(2004A GARVEE)   $27,948,674.00
California S180059 IN FRESNO COUNTY ABOUT 8.4 MILES EAST OF FRESNO FROM 0.7 MILE WEST OF SMITH AVENUE TO 0.7 MILE EAST OF FRANKWOOD AVENUE. CONSTRUCT 4 LANE EXPRESSWAY $39,274,300.00 $65,206,600.00
California X023033 HUM CO;NR MCKIN'LYVL;SR-101;FR 0.2 KM S/O * REPLACE BRIDGES $46,858,060.00 $52,929,020.00
California X029126 KERN COUNTY NEAR INDIAN WELLS ON ROUTE 14 FROM 2.4 MILES SOUTH OF JUNCTION ROUTE 178 TO 1.7 MILES NORTH OF JUNCTION ROUTE 178 AND ON ROUTE 178 FROM R $27,853,200.00 $28,251,600.00
California X029141 KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF BELLE TERRACE OVERCROSSING TO 0.1 MILE NORTH OF ROUTE 58; ALSO ON ROUTE 58 $34,259,394.00 $40,522,000.00
California X029143 KERN COUNTY IN BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUE
 OVERCROSSING TO BEARSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEP
$41,404,800.00 $83,744,700.00
California X029144 KERN COUNTY IN THE CITY OF BAKERSFIELD ON RTE 58 AND RTE 99 FROM 0.1 MILE WEST OF RTE 99 TO 0.2 MILE EAST OF RTE 99 AND FROM 0.3 MILE SOUTH OF MING A $25,000,000.00 $58,633,355.00
California X029147 KERN COUNTY IN THE CITY OF BAKERSFIELD ON ROUTE 58 FROM 0.1 MILE WEST OF MOHAWK STREET TO COTTONWOOD ROAD AND ROUTE 99 FROM 0.8 MILE SOUTH OF ROUTE 5   $186,679,411.00
California X037165 NEAR THOUSAND OAKS, FROM VENTURA CNTY LINE TO RTE 101/23 INTERCHANGE , INTERCHANGE IMPROVEMENT $16,646,289.49 $38,055,456.00
California X037199 IN LOS ANGELES COUNTY IN AND NEAR CARSON ON ROUTE 110 FROM 0.2 MILE NORTH OF TORRANCE BLVD UC TO 190TH STREET UC AND ON ROUTE 405 FROM MAIN STREET UC $25,656,200.00 $25,930,700.00
California X037204 IN LOS ANGELES COUNTY ON ROUTES 2, 5, 10, 47, 90, 91, 105, 110, 405, 605 AND 710   REPAIR AND REPLACE THE PROJECT WILL IS MAXIMIZE THE USE OF THE EXI $29,044,200.00 $29,044,200.00
California X037211 IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON  ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 $154,604,749.00 $175,051,477.00
California X037218 IN LOS ANGELES COUNTY, AT VARIOUS LOCATIONS UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATION SYSTEM UPGRADE EXISTING TRAFFIC MANAGEMENT COMMUNICATIO $33,916,000.00 $38,613,000.00
California X037232 IN VARIOUS CITIES, FROM ORANGE COUNTY LINE TO 0.1 MILE NORTH OF TELEGRAPH ROAD; ALSO ON ROUTE 91 FROM 0.2 MILE WEST OF ROUTE 605TO ROUTE 605 (PM R16.   $72,804,000.00
California X055060 NAPA COUNTY NEAR NAPA ON ROUTE 29 FROM 0.7 MILES SOUTH TO 0.5 MILES NORTH OF ROUTE 221 AND ON ROUTE 221 FROM 0.2 MILES NORTH OF ROUTE 29 TO ROUTE 29 $18,797,500.00 $42,523,300.00
California X059083 IN ORANGE COUNTY AT VARIOUS LOCATIONS UPGRADE AND INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) ELEMENTS. $21,837,800.00 $25,171,300.00
California X059084 CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERC $196,429,800.00 $255,018,400.00
California X059087 ORANGE COUNTY AT VARIOUS LOCATIONS REHABILITATE PVMT BY REPAIR BROKE CONC SLABS & REPLACE AC W/ RHMA-G   $32,530,000.00
California X071063 IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTES 15 AND 215 *, 1-15/1-215 DEVORE INTERCHANGE IMPROVEMENT ** $134,351,000.00 $266,213,136.00
California X071071 IN SAN BERNARDINO COUNTY ON ROUTE 62 FROM 3.8 MILES WEST OF ROUTE 95 TO ARIZONA STATE LIN AND ON ROUTE 95 FROM ROUTE 62 TO 2.0 MILES SOUTH OF TURTLE $24,047,800.00 $27,490,700.00
California X073151 IN SAN DIEGO COUNTY ON ROUTE 94 FROM E94 / N125 SEPARATION IN LEMON GROVE TO 0.1 MILE EAST OF SPRING STREET UNDERCROSSING IN LA MESA AND ON ROUTE 125   $36,216,100.00
California X075027 SF 101/1 SEPARATION TO GOLDEN GATE TOLL PLAZA REPLACE/REHABILITATE ROADWAY $82,124,382.00 $104,451,807.00
California X075041 IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PRESIDIO PKWY-PHASE II CONCESSIONAIRE PMTS P3 (TC) $204,172,033.16 $731,328,837.00
California X075046 IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PARK PRESIDIO P3, DEPT DIRECTED CHANGES& SUPPT(TC) $156,252,688.00 $169,572,970.00
California X077014 SJ CO RTE205 IN TRACY 0.6KM W/11TH ST OC RTE5 WIDEN 4 LANE TO 6 LANE FREEWAY $72,879,005.00 $90,778,579.00
California X077028 SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 FROM 0.2 MILE EAST OF FRESNO AVENUE TO EL DORADO STREET AND ON ROUTE  5 FROM TAYLOR STREET OVERHEAD TO STOC $14,499,000.00 $37,712,800.00
California X093010 IN SISKIYOU COUNTY IN YREKA ON ROUTE 3 FROM 0.4 MILE NORTH OF LAURA LANE TO JUNIPER DRIVE AND ON ROUTE 263 FROM ROUTE 3 TO 1.0 MILE SOUTH OF LONG GUL $24,311,937.39 $81,293,400.00
California X095025 IN FAIRFIELD AT I-80 AND SR 12 CONSTRUCT A TWO-LANE WB I-80/WB SR 12 (TC) $19,569,973.18 $61,959,006.00
California X099645 IN AND NEAR THE CITY OF MODESTO ON SR 132 NEAR NORTH DAKOTA AVE TO NEAR 6TH ST AND ON SR 99 FROM 0.5 M SOUTH OF TUOLUMNE RIVER BRIDGE TO 0.1 M NORTH $38,923,100.00 $103,335,641.00
California X111079 ON ROUTE 101, BETWEEN LOS ANGELES / VENTURA COUNTY LINE AND OLD PACIFIC COAST HIGHWAY (POSTMILE 0.2 / 40.8 AND ON ROUTE 23, BETWEEN ROUTE 23 AND 101   $28,712,000.00
California X113036 YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE   $266,596,700.00
Colorado 007A034 PR SH7 Flood Repairs CP1 $41,663,135.00 $42,543,792.00
Colorado 0131057 SH13 GarCo RioBlanco Hill $1,781,267.00 $36,777,118.00
Colorado 0212011 CO21 RESEARCH INTERCHANGE CONSTRUCTION $24,147,273.00 $38,574,619.00
Colorado 0252457 I-25:ALAMEDA RIVER PH 2.0 $24,502,000.00 $33,640,000.00
Colorado 0252475 I-25 SOUTH GAP PACKAGE 1 $1.00 $72,956,566.00
Colorado 0252476 I-25 SOUTH GAP PACKAGE 2 $75,500,000.00 $149,797,342.00
Colorado 0252477 I-25 SOUTH GAP PACKAGE 3 $5,866,651.00 $186,002,724.00
Colorado 0253234 I-25: 120th Avenue (SH 128) to SH 7 $55,001,113.00 $76,130,685.00
Colorado 0253255 I-25 North: SH 402 to SH 14 $164,234,146.00 $557,017,748.36
Colorado 0253268 I-25 SEG3A RE-PKG 120TH TO E470 $19,211,230.00 $26,792,799.00
Colorado 025A019 I25A PUEBLO ILEX DB - BE $693,322.00 $59,912,091.58
Colorado 025A024 I25A PUEBLO ILEX DB - NON-BE $28,425,994.00 $41,023,356.00
Colorado 050A034 US50A Pueblo West Purcell Interchange wi $7,189,862.00 $49,300,465.00
Colorado 0702383 I-70 EB Aux Frisco to Silverthorne $9,670,582.00 $35,094,932.00
Colorado 0702413 Vail Pass Aux Phase 1 CAP 2   $30,060,934.00
Colorado 0703445 I-70 WESTBOUND PEAK PERIOD SHOULDER LANE $28,292,877.00 $85,988,632.05
Colorado 0704241 CENTRAL 70 $50,000,000.00 $933,536,830.74
Colorado 0704251 I70 AND PICADILLY INTERCHANGE $25,000,000.00 $92,000,002.00
Colorado 0852106 US-85 Louviers To MP 191.75 $22,299,664.00 $28,079,679.00
Colorado 0852118 US-85 HIGHLANDS RANCH PKWY TO DAD CLARK $3,652,877.00 $92,771,688.50
Colorado 0853107 Peckham Grade Separated Intersection $17,077,848.81 $44,169,056.00
Colorado 1151038 SH115 PAVEMENT RECONSTRUCTION MP 27 to M   $53,083,710.00
Colorado 119A065 PR SH 119A Boulder Canyon $25,715,079.00 $26,127,817.00
Colorado 1211086 WADS BLVD WIDENING:35TH AVE TO 48TH AVE $29,920,000.00 $64,970,964.00
Colorado 1601083 US 160 FOUR CORNERS TO AZTEC CR  MP 0-8 $6,583,572.00 $29,350,898.00
Colorado 2873172 FEDERAL BLVD:6TH TO HOWARD RECONSTRUCT - $23,360,000.00 $27,828,091.00
Colorado 4701124 C-470 TOLLED EXPRESS LANES SEGMENT 1 $21,974,944.00 $306,792,044.00
Colorado 5501029 US 550/160 CONNECTION SOUTH DESIGN-BUILD $34,190,498.50 $106,905,715.50
Colorado C100038 ILIFF AVE OP IMP:PARKER RD-QUEBEC ST- Ar $14,077,250.00 $27,668,212.10
Colorado GBLD001 BUILD Vehicle Tech, Safety & Mobility $20,009,700.00 $38,722,660.00
Colorado GBLD002 BUILD: North Interstate 25 Phase 2 $30,756,963.00 $294,921,972.00
Colorado GBLD003 BUILD MAMS Improvement Project $56,185,480.00 $136,560,952.49
Colorado R200266 R2B2 (REGION 2 BRIDGE BUNDLE) (GRANT) $12,475,000.00 $55,216,173.00
Colorado SW01498 HPTE US 36 Phase II to Foothills Blvd $14,403,946.00 $137,152,364.64
Connecticut 0003109 GLASTONBURY; RTE 3 BRIDGE REHABILITATION - NO ADDED CAPACITY (PUTNAM BR. #417) OVER THE CONNECTICUT RIVER. (CN) $22,511,556.40 $44,957,727.00
Connecticut 0006113 BRISTOL; PROVIDE A SECOND EASTBOUND THROUGH LANE  FROM CAROL DRIVE TO PEGGY LANE, A ONE MILE SEGMENT OF THE ROUTE 6 CORRIDOR. (CN) $20,186,524.85 $27,168,595.02
Connecticut 0008126 BPORT, RTE 8, REPL OF BRIDGE #S 03761, 03762, 03764, 03765 O/LINDLEY ST & CAPITOL AVE (NO ADDED CAP) DESIGN BLD PILOT PROJECT CN. $34,716,620.83 $40,884,409.33
Connecticut 0008130 SHELTON/DERBY; REHABILITATION OF BRIDGE #00571A, (COMMODORE HULL) ROUTE 8 OVER THE HOUSATONIC RIVER, ROUTE 110 & LOCAL ROADS. (CN) $28,521,949.60 $35,652,437.00
Connecticut 0008134 WATERBURY; REHABILITATION OF BRIDGES (NO ADDED CAPACITY) IN THE ROUTE 8/I-84 INTERCHANGE AREA (CN). $123,871,585.60 $160,013,036.01
Connecticut 0008141 D-B RBC PROJECT - RESURFACING, BRIDGE REHABILITATION, & SAFETY IMPROVEMENTS ON APPROX. 6.43 MILES OF MAINLINE (CN). $72,421,739.20 $98,258,407.03
Connecticut 000T285 Middletown; Reconfiguration of Route 17 On-Ramp onto Route 9 North. $39,862,544.00 $53,944,840.00
Connecticut 000T323 Bridge Painting/Metalizing along the I-395 Corridor in District 2. $29,767,424.00 $37,209,280.00
Connecticut 000T328 DISTRICT 1; Address Steel Beam end deterioration on various Bridges using Ultra High Performance Concrete (UHPC). $26,818,544.00 $33,523,180.00
Connecticut 0015105 NEW CANAAN/NORWALK - MERRITT PARKWAY (RTE 15) IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS (CN).   $70,928,725.00
Connecticut 0015134 WESTPORT - SAFETY IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS ON THE MERRITT PKWY (CT15) IN THE TOWNS OF WESTPORT & FAIRFIELD (CN). $66,014,459.41 $82,522,757.02
Connecticut 0015145 NORWALK - MERRITT PARKWAY (ROUTE 15) RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS (CN) $34,963,744.80 $43,708,449.01
Connecticut 0032203 EAST HARTFORD - RESURFACING, BRIDGE & SAFETY IMPROVEMENTS ON RTE 2 FROM THE CHARTER OAK BRIDGE AREA (CN) $68,814,621.60 $86,018,277.00
Connecticut 0034122 NEWTOWN - MAJOR INTERSECTION IMPROVEMENTS, CT 34 at I-84 (CN). $24,163,793.19 $33,429,952.13
Connecticut 0044139 HARTFORD - SAFETY IMPROVEMENTS, HOMESTEAD AVE TO GARDEN STREET, RT44 (CN). $23,510,222.40 $31,073,020.25
Connecticut 0066121 MIDDLETOWN, REHABILITATION OF BRIDGE #00524 (ARRIGONI) WHICH CARRIES ROUTE 66 OVER THE CONNECTICUT RIVER (CN). $31,345,909.60 $57,508,431.00
Connecticut 0082141 EAST HADDAM - REHABILITATION OF BRIDGE #01138, ROUTE 82 OVER CONNECTICUT RIVER (CN) $54,081,084.80 $78,440,121.00
Connecticut 0841095 DANBURY; IMPROVEMENTS TO I-84 INTERCHANGE 5, 6 & ROUTE 37 TO ADDRESS SAFETY & TRAFFIC OPERATIONS-ADDED CAPACITY. (CN) $23,885,980.20 $26,956,221.00
Connecticut 0842195 WATERBURY, I-84 RECONSTRUCT EXPRESSWAY (ADDED CAP) & OPERATIONAL IMPROVEMENTS INCLUDING INTERCHANGES - PHASE 3 (CN). $256,807,457.22 $335,107,487.04
Connecticut 0842306 WATERBURY; REHABILITATION OF BR. 03191B CARRYING I-84 WB OVER RTE. 8 AND THE NAUGATUCK RIVER. (CN) $44,352,312.30 $50,844,997.02
Connecticut 0842307 WATERBURY; REHABILITATION OF BR. 03191A CARRYING I-84 EB OVER I-84 WB, RTE. 8, AND THE NAUGATUCK RIVER. (CN) $52,640,191.80 $61,307,321.00
Connecticut 0842310 NEWTOWN; RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS ON I-84. $38,486,323.80 $42,762,582.04
Connecticut 0843236 HARTFORD; REHABILITATION OF BR #03160A-D, BR #03301, AND BR #03303 (I - 84 HARTFORD VIADUCT). (CN) $55,622,232.26 $61,961,168.46
Connecticut 0912136 WETHERSFIELD/HARTFORD; I-91 IMPROVEMENTS AND UPGRADES. $58,866,211.50 $65,325,235.06
Connecticut 0913182 Windsor Locks; Rehabilitation of Bridge #00454, I-91 over CT River, Amtrak and Rte. 159 (Dexter Coffin Bridge). $22,739,814.00 $25,266,460.02
Connecticut 0951181 NEW HAVEN; I-95/Q BR.RPL(NO ADDED CAPACITY) & DEMOLITION (CONTRACT B) FR. VIC EAST ST TO VIC. WOODWARD AVE, E. SHORE (CN). $427,528,518.33 $492,192,934.00
Connecticut 0951189 NEW HAVEN; I-95, OVER WEST RIVER & SR745 BRIDGE REPLACEMENT (ADDED CAPACITY) BRIDGE #00163A (CN). $155,197,500.30 $174,630,678.00
Connecticut 0951191 NORWALK/WESTPORT; I-95 RECONSTRUCT THE MEDIAN AND INSTALL 45" CONCRETE BARRIER CURB IN NORWALK & WESTPORT $73,166,838.30 $130,677,425.05
Connecticut 0951204 NEW HAVEN; ADVANCE SOIL PRELOAD CONTRACT FOR S. P. #92-531 - I-91/I-95/CT RTE. 34 INTERCHANGE (CONTRACT E1)(CN) $25,882,832.80 $32,400,274.00
Connecticut 0951222 NEW HAVEN; I-95 - NB APPROACH AND RIVER PIERS FOR NEW PEARL HARBOR MEMORIAL BR., CONTRACT B1 (CN) $135,771,245.61 $156,113,746.00
Connecticut 0951243 NEW HAVEN; BREAKOUT OF PROJ 92-531. RECONST OF I-95 / I-91 / ROUTE 34 INTERCHANGE ASSOC WITH Q BR. REPL. CONTRACT E-2 (CN) $98,935,740.54 $113,777,781.00
Connecticut 0951372 NORWALK; REHAB OF BRIDGE #00059 (YANKEE DOODLE BRIDGE), I-95 OVER NORWALK RIVER AND HENDRICKS RD. (CN) $36,260,541.90 $40,945,421.01
Connecticut 0951377 STRATFORD; PROVIDE A FULL INTERCHANGE ON I-95 AT INTERCHANGE 33 BY CONSTRUCTING A NEW SB OFF-RAMP AND A NEW NB ON-RAMP.  $35,645,277.60 $39,605,864.02
Connecticut 0951378 STAMFORD; REHABILITATION OF BRIDGE NO. 00032 CARRYING I-95 AND I-95 RAMPS OVER MNRR AND LOCAL ROADS. (CN) $24,054,682.50 $26,727,425.03
Connecticut 0951384 West Haven;  Replace Bridge Nos. 161 & 162 carrying I-95 over SR 745 & Metro North RR, respectively. $61,468,363.59 $113,320,580.01
Connecticut 0951386 I-95 Pavement Preservation from NY State Line to Exit 6 in Stamford (CN). $20,000,000.00 $45,778,100.02
Connecticut 0953073 NEW LONDON/GROTON; PHASE 1A OF REHAB FOR BR #03819 NB (GOLD STAR MEMORIAL BRIDGE) CARRYING I-95 OVER THAMES RIVER & LOCAL ROADS.   $69,743,408.00
Connecticut 0953078 East Lyme - Improvement of I-95 Interchange 74 at Rte 161 & Replacement of Bridge #00250 $49,400,000.00 $180,475,780.00
Connecticut 0954118 Safety Improvements and Pavement Rehabilitation on I-95 NB in Groton, Stonington & North Stonington $41,311,332.00 $49,849,440.00
Connecticut 1063143 HARTFORD; INTERCHANGE 29 @ I-91N & RTE 15N IMPROVEMENTS   $236,795,793.00
Connecticut 1092144 NEW HAVEN; MAJOR REHABILITATION OF BRIDGE #03810 OVER QUINNIPIAC RIVER. $4,916,605.11 $27,929,200.00
Connecticut 1096111 NEWTOWN; REHABILITATION OF BRIDGES 01218 & 04180, I-84 EB & WB O/ HOUSATONIC RIVER.  SUPERSTRUCTURE REPLACEMENTS. $54,860,356.80 $66,243,253.34
Connecticut H017003 NEW HAVEN; RECONST. OF I-95/I-91/RTE 34 INTERCH. ASSOC WITH Q BRIDGE REPLACEMENT (CONTRACT E) (CN). $293,831,426.19 $328,260,102.88
Connecticut H100002 DERBY; RECONSTRUCTION OF APPROXIMATELY 2,400 FEET OF ROUTE 34. $18,188,643.20 $29,863,804.03
Connecticut H121002 STAMFORD; REPLACEMENT OF DEFICIENT MNRR BRIDGE  #08012R OVER ATLANTIC ST (CN). $4,214,710.77 $69,702,343.76
Delaware 2015019 SR299, SR 1 to Catherine Street $31,458,112.00 $37,323,035.64
Delaware K008006 SR 1, Little Heaven Grade Separated Intersection $67,870,726.49 $79,474,811.16
Delaware K008011 SR 1, South Frederica Grade Separated Intersection $21,032,574.48 $27,035,329.87
Delaware N011031 Elkton Road, MD Line to Casho Mill Road $40,047,194.31 $44,806,905.44
Delaware N029003 Christina River Bridge Approaches $43,306,693.65 $61,071,148.29
Delaware N029005 Christina River Bridge $28,980,311.07 $35,784,407.81
Delaware N032013 US 40 / SR 72 Intersection Improvements $20,548,082.12 $25,214,249.93
Delaware N056041 SR141 Improvements, I-95 Interchange to Jay Drive $72,651,652.50 $94,491,697.90
Delaware N060044 I-95 and SR896 Interchange $14,949,411.46 $243,677,492.98
Delaware N356007 SR 72, McCoy Road to SR 71 $15,408,270.29 $29,866,691.77
Delaware S014014 HEP Sussex County, SR 1 and SR 16 Grade Separated Intersection $15,808,864.90 $43,819,395.41
Delaware S318005 Park Avenue Relocation, Phase 1 $12,863,200.00 $25,507,174.39
District Of Columbia 1104013 Key Bridge NW over Potomac River $24,544,125.90 $31,005,077.12
District Of Columbia 1116033 H Street Bridge over Railroad $20,827,012.23 $33,760,656.32
District Of Columbia 1501042 South Capitol Street Corridor Phase 2 $88,982,790.96 $111,287,988.70
District Of Columbia 2016006 Minnesota Avenue from Dix St. to Sheriff Road NE $21,912,159.12 $26,852,014.80
District Of Columbia 2016010 Traffic Signal Construction  $21,837,313.95 $26,182,708.92
District Of Columbia 2016016 South Capitol Street Corridor $43,791,506.92 $537,899,739.93
District Of Columbia 2016049 Multi-modal Traffic & Safety Construction $20,335,801.99 $60,265,256.05
District Of Columbia 2016051 Tunnel Preservation $47,666,084.75 $57,430,902.63
District Of Columbia 2018005 Interstate 295/Malcolm X Avenue Interchange Improvement Project $137,011,947.07 $138,463,628.07
District Of Columbia 2018006 Arlington Memorial Bridge Rehabilitation $90,000,000.00 $90,000,000.00
District Of Columbia 2018017 PAVEMENT RESTORATION - STBG STREETS $46,160,738.58 $64,737,519.33
District Of Columbia 2018022 Oregon Avenue NW, Military Rd to Western Ave. $21,729,506.57 $32,858,491.52
District Of Columbia 2018023 MARYLAND AVENUE NE ROAD DIET $12,285,399.88 $26,076,177.26
District Of Columbia 2018031 Highway Structures Preventive Maintenance and Repairs $31,261,995.56 $37,610,128.30
District Of Columbia 2018045 Traffic Signal Maintenance $24,109,694.75 $28,995,423.62
District Of Columbia 2019026 Massachusetts Ave from 20th Street to Waterside Drive NW $25,953,835.12 $31,257,319.83
District Of Columbia 2020037 Pavement Restoration - NHPP Streets $34,119,893.46 $42,649,868.39
District Of Columbia 2021023 Florida Avenue 2nd to H St NE $12,892,230.83 $34,050,905.09
District Of Columbia 2022022 Florida Ave and New York Ave NE Intersection $2,400,000.00 $26,414,101.47
District Of Columbia 2952185 GARVEE Bond Debt Service - 11th Street Bridge SE Replacement $288,653,875.19 $437,997,916.89
District Of Columbia 8888412 Urban Forestry Program $5,559,684.80 $26,340,305.15
District Of Columbia 8888452 HIGHWAY STRUCTURES PREVENTIVE MAINTENANCE AND REPAIRS $19,816,994.82 $25,250,821.51
District Of Columbia 8888468 PAVEMENT RESTORATION-NHPP STREETS $74,357,043.94 $93,511,627.58
District Of Columbia 8888483 STREETLIGHT ASSET MANAGEMENT $26,147,855.20 $50,831,488.60
Florida 0041228 I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING; DB $857,919,759.00 $4,539,283,593.00
Florida 0105152 I-10 (SR 8) / SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVEMENTS;INTERCHANGE IMPROVEMENT;CONSTRUCTION $96,410,670.00 $150,743,635.00
Florida 0751184 I-75 FROM HERNANDO CO LINE TO SR 470;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $78,842,976.00 $85,137,965.00
Florida 0751185 I-75 FROM SR 470 TO SR91(FLORIDA TURNPIKE);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $14,603,840.00 $51,940,645.00
Florida 0751191 I-75 (SR 93) FROM N OF SR 50 TO HERNANDO/SUMTER CO/L;ADD LANES & REHABILITATE PVMNT;PRELIMINARY ENGINEER;DB $30,912,760.00 $35,068,767.00
Florida 0754177 SR-93/I-75 ML SYSTEM FR S OF SHERIDAN ST INTRG TO N OF GRIFFIN ROAD;ADD SPECIAL USE LANE;CONSTRUCTION;DB $3,121,777.00 $100,427,741.00
Florida 0754180 SR 93/I-75 ML SYSTEM FROM NW 170 STREET TO S OF HEFT INTERCHANGE;ADD SPECIAL USE LANE;CONSTRUCTION;DB $6,724,472.00 $39,480,256.00
Florida 0755096 I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE;INTERCHANGE IMPROVEMENT;PRELIMINARY ENGINEER $39,454,706.00 $61,517,724.00
Florida 0757443 I-75 AT SR 64; INTERCHANGE IMPROVEMENT;CONSTRUCTION $44,967,112.00 $51,708,749.00
Florida 0951641 SR-9/I-95 (SPANISH RIVER) FROM NORTH OF GLADES ROAD TO SOUTH OF CONGRESS AVE;INTERCHANGE (NEW);CONSTRUCTION $69,102,417.00 $86,900,865.00
Florida 0951671 SR-9/I-95 FR S. OF SR-842/BROWARD BLVD TO N. OF SR-870/COMMERCIAL BLVD; ADD SPECIAL USE LANE;CONSTRUCTION;DB $75,335,922.00 $198,662,559.00
Florida 0951685 SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER;DB $35,345,470.00 $40,922,511.00
Florida 0951689 SR 9A/I-95 FROM NW 29 STREET TO NW 79 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER AND CONSTRUCTION;DB $64,970,638.00 $204,580,476.00
Florida 0951691 SR-9/I-95 FROM SW 10TH STREET TO BROWARD/PALM BEACH COUNTY LINE;ADD SPECIAL USE LANE;CONSTRUCTION;DB $32,718,464.00 $119,425,719.00
Florida 0951694 SR-9/I-95 FROM BROW/PALM BCH CO LINE TO SOUTH OF GLADES RD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB $50,266,785.00 $58,031,379.00
Florida 0951695 SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB $30,937,972.00 $50,406,075.00
Florida 0953112 I-95 FROM SR 406 TO 0.5 MILE N OF SR 44;ADD LANES & REHABILITATE PVMN;CONSTRUCTION $122,876,465.00 $136,937,342.00
Florida 0953133 I-95 INT @ ELLIS RD /ST JOHNS HERITAGE PKWY;INTERCHANGE (NEW);CONSTRUCTION $46,184,911.00 $52,452,099.00
Florida 0955313 I-95 (SR 9) AT NORTH I-295 INTERCHANGE  ;INTERCHANGE RAMP (NEW);CONSTRUCTION;DB $86,073,163.00 $236,430,104.00
Florida 0955314 I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $3,235,689.00 $149,366,236.00
Florida 1001069 SR 80 FROM DALTON LANE TO INDIAN HILLS DRIVE ;ADD LANES & RECONSTRUCT;CONSTRUCTION $31,003,147.00 $41,058,163.00
Florida 1002062 SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION $47,236,462.00 $118,964,473.00
Florida 1171052 SR 77 FROM NORTH OF CR 279 TO N SUNNY HILLS ENTRANCE;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $56,079,437.00 $90,348,591.00
Florida 1190014 SR 83 (US 331) FROM NORTH OF SR 20 TO SR 8 (I-10);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $53,169,675.00 $61,802,483.00
Florida 1316003 GATEWAY EXPRESSWAY FM SR690 @ US19 & SR686 EXT @ CR611 TO W OF I-275;NEW ROAD CONSTRUCTION;PRELIMINARY ENGINEER;DB $256,147,065.00 $2,593,207,101.00
Florida 1356011 SR 694 (GANDY BLVD) FROM W OF 9TH ST NORTH E OF 4TH ST NORTH;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $85,308,415.00 $108,977,456.00
Florida 1600003 SR 95 (US 29) FROM SR 8 (I-10) TO N OF SR 10 (US 90A) 9 MILE ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION $59,369,458.00 $67,675,713.00
Florida 1852019 US 19 (SR 55) FROM W JUMP COURT TO W FORT ISLAND TRAIL;ADD LANES & RECONSTRUCT;CONSTRUCTION $23,353,151.00 $136,277,409.00
Florida 2757410 I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB $138,331,419.00 $233,126,149.00
Florida 2955310 I-295 (SR 9A) FROM BUCKMAN BRIDGE TO I-95 AUX-LANES;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB-E2S01 $91,742,836.00 $94,732,580.00
Florida 2955314 I-295 (SR 9A) FROM SR202 JTB BLVD TO SR 9B  (MANAGED LANES);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $151,453,824.00 $228,788,707.00
Florida 3115028 SR201 FROM S OF BALDWIN TO N OF BALDWIN (BYPASS);NEW ROAD CONSTRUCTION;CONSTRUCTION $69,659,932.00 $77,052,248.00
Florida 3141036 SR429/46(WEKIVA PKW) FROM W OF OLD MCDONALD RD TO E OF WEKIVA RIVER RD;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB $29,094,914.00 $295,389,024.00
Florida 3141042 SR429/46(WEKIVA PKWY)FROM E OF WEKIVA RIVER RD TO ORANGE BOULEVARD;NEW ROAD CONSTRUCTION;CONSTRUCTION $57,891,755.00 $245,617,965.00
Florida 3951501 SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE;BRIDGE-REPLACE AND ADD LANES;CONSTRUCTION;DB $181,072,527.00 $728,076,726.00
Florida 4002027 SR20 FROM SW 56TH AVENUE TO CR315 IN INTERLACHEN;ADD LANES & RECONSTRUCT; UTILITY WORK IN PREP FOR CONSTRUCTION. $30,594,904.00 $36,875,894.00
Florida 4031035 SR 997/KROME AVENUE FROM SW 232 STREET TO S OF SW 184TH ST/EUREKA DR.;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT $25,360,595.00 $41,569,754.00
Florida 4047203 CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD;ADD LANES & RECONSTRUCT;CONSTRUCTION $22,110,822.00 $31,956,263.00
Florida 4221091 SR 30 (US 98) PENSACOLA BAY BRIDGE NO. 480035;BRIDGE REPLACEMENT;CONSTRUCTION;DB $18,344,966.00 $479,301,796.00
Florida 4221093 SR 30 (US 98) FROM CR 30F AIRPORT ROAD TO WALTON COUNTY LINE;ADD LANES & RECONSTRUCT;CONSTRUCTION $44,805,607.00 $62,416,234.00
Florida 4222077 SR 30 (US 98) @ SR 368 23RD STREET INTERSECTION PHASE I;ADD LANES & RECONSTRUCT;CONSTRUCTION $78,896,731.00 $97,613,456.00
Florida 4222081 SR 30 (US 98) FROM EMERALD BAY DRIVE TO TANG-O-MAR DRIVE;ADD LANES & RECONSTRUCT;CONSTRUCTION $48,206,351.00 $59,112,783.00
Florida 4751163 SR-7/US-441 FROM N. OF FILLMORE TO S OF STIRLING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $3,901,446.00 $45,203,759.00
Florida 4881064 SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTION $58,984,735.00 $81,465,943.00
Florida 4881072 SR200(A1A) FROM I-95 TO W OF STILL QUARTERS RD/INCLUDES I95 LIGHTING;ADD LANES & RECONSTRUCT;CONSTRUCTION $45,619,740.00 $59,674,296.00
Florida 4913014 SRA1A(3RD ST) FROM SEAGATE AVE TO BEACH BLVD ;DRAINAGE IMPROVEMENTS;CONSTRUCTION $28,655,682.00 $32,532,198.00
Florida 5951553 I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION $665,714,135.00 $3,093,214,708.00
Florida 5951556 I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING   $80,952,434.00
Florida 5951557 I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING   $124,950,849.00
Florida 5951560 I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB - AVAILABILITY PAYMENTS & OPERATIONS UNDER CRRSSA $160,390,282.00 $160,390,282.00
Florida 6107003 SR 847/NW 47 AVENUE FROM SR 860/NW 183 STREET TO N. OF NW 199 STREET;ADD LANES & RECONSTRUCT;CONSTRUCTION $20,730,369.00 $29,539,605.00
Florida 6268021 SR 826 FROM FLAGLER ST TO NW 154 ST. & I-75 FROM SR 826 TO NW 170 ST.;ADD SPECIAL USE LANE;CONSTRUCTION;DB $219,608,452.00 $319,224,304.00
Florida 7079006 SR-713/KINGS HWY FR 800' S OF SR-70 TO N OF PICOS ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION $11,268,652.00 $35,354,354.00
Florida 7810035 SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $28,295,602.00 $52,270,655.00
Florida 8886496 CR 4050 ORANGE AVE BR#794003 VETERANS MEMORIAL BRIDGE;BRIDGE REPLACEMENT;CONSTRUCTION;LAP $43,069,676.00 $50,241,167.00
Florida 8886535 CROSSTOWN PARKWAY FROM MANTH LANE TO SR-5/US-1;NEW BRIDGE CONSTRUCTION;CONSTRUCTION;LAP $46,175,530.00 $107,650,063.00
Florida 8886777 W. MIDWAY RD/CR-712 FROM S. 25TH STREET/SR-615 TO SR-5/US-1;ADD LANES & RECONSTRUCT;CONSTRUCTION $31,834,499.00 $40,939,291.00
Florida 8886919 SR 46 / US 441 FROM W OF US 441 TO E OF VISTA VIEW LANE;ADD LANES & RECONSTRUCT;CONSTRUCTION; WEKIVA SECTIONS 3A AND 3B $8,051,024.00 $65,946,899.00
Florida ARR1134 SR 826/SR 836 FROM N OF SW 8 ST TO S OF NW 25 ST & FM NW 87 TO 57 AVE';INTERCHANGE (MODIFY);CONSTRUCTION;DB $309,200,121.00 $567,489,632.00
Florida ARR1279 I-4/SELMON EXPRESSWY FROM S OF SELMON EXPRSSW TO I-4;INTERCHANGE (NEW);CONSTRUCTION $220,736,422.00 $226,120,955.00
Florida D117027 I-75 FROM S OF N JONES LOOP TO N OF US 17    ;ADD LANES & RECONSTRUCT;CONSTRUCTION $29,988,881.00 $36,279,243.00
Florida D117115 I-75 AT SR 70 INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION $90,316,085.00 $121,214,487.00
Florida D118021 US 41 - VENICE BYPASS FROM CENTER RD TO GULF COAST BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION $13,753,429.00 $26,751,246.00
Florida D118039 US 41 (SR 45) FROM WINKLER AVENUE TO SR 82   ;RESURFACING;CONSTRUCTION $6,475,366.00 $29,516,783.00
Florida D118043 I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB $81,212,836.00 $90,879,516.00
Florida D118127 I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $153,078,498.00 $171,267,894.00
Florida D119037 US 27 AT SR 60;INTERCHANGE - ADD LANES;CONSTRUCTION $36,592,357.00 $56,252,638.00
Florida D119075 SR 542 FROM BUCKEYE LOOP ROAD TO US 27;ADD LANES & RECONSTRUCT;CONSTRUCTION $42,921,635.00 $52,952,907.00
Florida D120030 I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION $54,954,114.00 $63,745,036.00
Florida D120059 I-4 (SR 400) AT CSX RAILROAD;BRIDGE REPLACEMENT;CONSTRUCTION $9,148,458.00 $32,736,647.00
Florida D121032 SR 70 FROM PEACE RIVER TO SE BAKER STREET;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION $4,595,914.00 $31,580,277.00
Florida D122041 SR 25 (US 27) FROM N OF SR 540 TO N OF KOKOMO RD;RESURFACING;CONSTRUCTION;DB $11,939,575.00 $25,064,677.00
Florida D122068 SR 70 FROM LORRAINE ROAD TO BOURNSIDE BLVD   ;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB   $50,750,975.00
Florida D217011 FCX SOUTH OF US17 TO NORTH OF SR16; NEW ROAD CONSTRUCTION;CONSTRUCTION $100,251,819.00 $910,874,555.00
Florida D217069 SR200(US301) FROM: BRADFORD C/L TO: NORTH OF CR218;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION; CONCRETE PROJECT WITH STATE MATERIALS $19,505,530.00 $26,300,250.00
Florida D217080 SR15(US17) FROM: W. OF DUNNS CREEK TO: HORSE LANDING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION $42,495,844.00 $52,034,347.00
Florida D217103 I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION $13,652,290.00 $26,165,437.00
Florida D217128 I-10 FROM I-295 TO I-95;ADD MANAGED LANES;PRELIMINARY ENGINEER;DB $167,915,467.00 $269,495,953.00
Florida D218017 SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD);NEW ROAD CONSTRUCTION;CONSTRUCTION $112,350,402.00 $278,649,798.00
Florida D218123 SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209     ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB   $681,123,882.00
Florida D219037 I-95(SR9) FROM: FLAGLER C/L TO: SR207;RESURFACING;CONSTRUCTION $24,608,583.00 $26,940,924.00
Florida D219120 URBAN CORE RIVERFRONT REVITALIZATION & COMPLETE STREETS;MISCELLANEOUS CONSTRUCTION;PRELIMINARY ENGINEER;LAP $12,571,580.00 $51,137,073.00
Florida D219130 I-95(SR9) FROM SR207 TO INTL GOLF PARKWAY;RESURFACING;CONSTRUCTION $11,011,250.00 $25,773,118.00
Florida D221010 SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE;RESURFACING;CONSTRUCTION $15,238,332.00 $36,200,358.00
Florida D221018 I-295(SR9A) @ US17 TO SOUTH OF WELLS ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION $24,413,299.00 $27,243,701.00
Florida D222030 I-95(SR9) @ SR115(US1)/ML KING/20TH STREET   ;INTERCHANGE - ADD LANES;CONSTRUCTION $50,538,346.00 $50,538,346.00
Florida D317016 SR 30 (US 98) ELEVATED ROADWAY E TO W OF TYNDALL AFB ENTRANCE;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $24,175,731.00 $36,981,239.00
Florida D317035 SR 388 WEST BAY PARKWAY FROM SR 79 TO E OF NWF BEACHES INTL AIRPORT;ADD LANES & RECONSTRUCT;CONSTRUCTION $57,663,832.00 $90,167,187.00
Florida D319003 SR 390 ST ANDREWS FROM SR 368 23RD ST TO E OF CR 2312 BALDWIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION $35,880,191.00 $52,970,277.00
Florida D319075 SR 77 FROM BAY COUNTY LINE TO NORTH OF CR 279;ADD LANES & RECONSTRUCT;CONSTRUCTION $7,107,422.00 $42,244,925.00
Florida D319079 SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB $68,516,903.00 $84,763,989.00
Florida D319080 SR 369 (US 319) FROM EAST IVAN ROAD TO NORTH OF SR 267;ADD LANES & RECONSTRUCT;CONSTRUCTION $9,955,555.00 $31,791,349.00
Florida D320013 SR 8 (I-10) INTERCHANGE WEST OF CRESTVIEW;INTERCHANGE (NEW);CONSTRUCTION SUPPORT;DB $546,487.00 $96,781,957.00
Florida D320016 SR 263 CAPITAL CIRCLE FROM CR 2203 SPRINGHILL RD TO SR 371 ORANGE AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION   $71,263,374.00
Florida D320021 SR 10 (US 90) OVER SIMPSON RIVER BRIDGE NO. 580056 & 580108;BRIDGE REPLACEMENT;CONSTRUCTION $8,451,501.00 $26,851,548.00
Florida D417080 SR-80 FROM W OF LION COUNTRY SAFARI RD TO FOREST HILL/CRESTWOOD BLVD.;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $33,542,326.00 $47,203,251.00
Florida D418011 SR-9/I-95 @ SR-808/GLADES ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $21,704,745.00 $29,674,592.00
Florida D419098 SR-9/I-95 @COPANS RD FR S OF NB EXIT RAMP TO N OF SB TO WB EXIT RAMP;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION $24,490,304.00 $28,452,535.00
Florida D420092 SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 ;BRIDGE REPLACEMENT;CONSTRUCTION $13,084,579.00 $130,724,213.00
Florida D421056 SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD;BRIDGE REPLACEMENT;CONSTRUCTION SUPPORT $3,828,159.00 $129,647,501.00
Florida D517015 SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400);NEW ROAD CONSTRUCTION;CONSTRUCTION;DB $133,298,723.00 $320,045,179.00
Florida D518022 SR 46 (WEKIVA PKWY) FROM ORANGE BLVD TO N. OREGON ST/WAYSIDE DR; ADD LANES & RECONSTRUCT; CONSTRUCTION $15,044,749.00 $26,079,015.00
Florida D519013 SR 500 (US 441) FROM LAKE ELLA RD TO AVENIDA CENTRAL; ADD LANES & RECONSTRUCT; CONSTRUCTION $42,796,342.00 $51,641,349.00
Florida D520035 I-4 (SR 400) AT DARYL CARTER PARKWAY INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION $15,288,332.00 $84,647,491.00
Florida D520075 SR 93 (I-75) FROM SUMTER COUNTY TO SR 200; RESURFACING; CONSTRUCTION $2,164,019.00 $31,573,246.00
Florida D521023 I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION $175,210,269.00 $227,872,595.00
Florida D521092 SPACE COMMERCE WAY;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $16,500,000.00 $29,722,571.00
Florida D617032 GOLDEN GLADES MULTI-MODAL TERMINAL (GGMMT);INTERMODAL HUB CAPACITY; PRELIMINARY ENGINEER; DB $30,449,740.00 $73,089,021.00
Florida D617044 SR 968/SW 1ST STREET AT MIAMI RIVER (BRIDGE #870660);BRIDGE REPLACEMENT;CONSTRUCTION $65,436,952.00 $89,233,891.00
Florida D620056 SR 25/OKEECHOBEE RD FROM E. OF NW 107 AVE TO E. OF NW 116 WAY(CNCRETE);ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $62,230,569.00 $123,088,197.00
Florida D621008 SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO WEST OF HEFT;ADD LANES & RECONSTRUCT;CONSTRUCTION $48,947,799.00 $52,095,406.00
Florida D717045 I-75 (SR 93A) FM WB SR60 ENTRANCE RAMP TO S OF CSX RR/CR 574;INTERCHANGE - ADD LANES;CONSTRUCTION $19,157,668.00 $59,109,093.00
Florida D717046 I-75 (SR93A)& SR 60 FM S OF SR60 @ SLIP RMP TO S OF CSX BRIDGE 100471;INTERCHANGE - ADD LANES;CONSTRUCTION $18,527,306.00 $33,212,406.00
Florida D717060 I-4/SR 400 FROM E OF 50TH ST TO E OF MCINTOSH;RESURFACING;CONSTRUCTION $27,240,383.00 $39,813,590.00
Florida D717065 I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I);INTERCHANGE - ADD LANES;CONSTRUCTION $37,488,730.00 $48,009,458.00
Florida D718036 SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45);ADD LANES & RECONSTRUCT;CONSTRUCTION $33,281,656.00 $56,764,991.00
Florida D718055 I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB $225,210,519.00 $383,892,268.00
Florida D718056 I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB $33,377,721.00 $51,682,122.00
Florida D718067 SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $35,720,989.00 $42,623,396.00
Florida D719008 SR 50 FROM US 98/MCKETHAN RD TO US 301;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $11,469,044.00 $25,470,918.00
Florida D720029 US 41/SR 45 FROM N OF 15TH AVE TO S OF BULLFROG CREEK;RESURFACING;CONSTRUCTION $9,699,292.00 $28,571,934.00
Florida D720031 I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $97,206,163.00 $105,013,733.00
Florida D721012 I-275 (SR 93) FROM N OF MLK TO N OF HILLSBOROUGH AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION $40,512,434.00 $43,358,909.00
Florida D721013 I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION $53,228,664.00 $55,622,422.00
Florida D721023 US 19 (SR 55) FROM N OF SR 580 (MAIN ST) TO NORTHSIDE DR;ADD LANES & RECONSTRUCT;CONSTRUCTION $29,129,294.00 $123,713,683.00
Florida D721027 I-4/SR 400 FROM DOWNTOWN TAMPA TO POLK COUNTY LINE;ITS COMMUNICATION SYSTEM;CONSTRUCTION $11,541,288.00 $27,780,963.00
Florida D721035 US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION $15,896,455.00 $144,623,747.00
Florida D722039 US 19/SR55/34TH ST FROM SR 682/54TH AVE S TO 22ND AVE N;RESURFACING;CONSTRUCTION $8,787,249.00 $26,421,302.00
Florida NASA002 NASA CAUSEWAY BRIDGE; BRIDGE REPLACEMENT; CONSTRUCTION $86,988,000.00 $94,490,626.00
Florida PMT1001 PORT OF MIAMI TUNNEL FROM PORT OF MIAMI TO SR 836/I-395;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB $214,270,573.00 $2,365,899,035.00
Florida SR20001 SR20 FROM ALACHUA C/L TO SW 56TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION $42,245,369.00 $70,551,393.00
Florida TAMI002 SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURE S-333 TO STRUCTURE S-334;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION;DB $60,069,034.00 $73,010,341.00
Florida TGER004 BIG BEND ROAD/CR 672 @ I-75/SR93A FROM W OF COVINGTON TO E OF SIMMONS;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $25,000,000.00 $104,015,237.00
Georgia 0000297 SR 3/US 19 FM CR 73/EAST-WEST COUNTY RD TO CR 8/ATWATER RD, CST $27,873,244.49 $34,841,555.61
Georgia 0000425 I-985 NEW INTERCHANGE N OF SR 13 CROSSOVER NEAR MARTIN RD, CST $38,755,516.02 $48,444,395.03
Georgia 0000544 SR 133 FM CR 10/PAULINE CH RD TO CR 1/OLD QUITMAN ADEL RD, CST $31,867,583.29 $39,834,479.12
Georgia 0000545 SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT, CST $39,350,328.65 $49,187,910.81
Georgia 0000546 SR 133 FROM CR 256/OLD BERLIN ROAD TO CR 388/HAWTHORNE DRIVE, CST $30,116,864.32 $37,646,080.40
Georgia 0000566 CR 717/SARDIS CHURCH RD EXT FM E OF SKIPPER RD OF TO SR 247, CST $60,787,156.32 $76,514,926.94
Georgia 0000762 I-75 FM NORTH OF SR 133 TO COOK COUNTY LINE - PHASE II, CST $60,861,481.22 $76,524,680.58
Georgia 0001757 SR 400 FM N SPRINGS MARTA STATION TO MCFARLAND RD-EXPRESS LN, CST $273,720,979.82 $3,828,612,218.76
Georgia 0001817 CR 1516 GRADE SEP @ NS RR; INCLUDING CONLEY RD & SR 3 RELOC - GRTA, CST $48,304,767.48 $61,525,959.35
Georgia 0002392 SR 20 FM CR 80/SAMPLES RD TO CR 450/JAMES BURGESS RD, CST $33,611,752.69 $42,278,103.79
Georgia 0002626 SR 3/US 41 AND SR 61/US 411 INTERCHANGE RECONSTRUCTION, CST $48,323,829.24 $60,404,786.55
Georgia 0003161 I-85 FROM N OF CR 417/FOREST ROAD TO N OF SR 34, CST $175,120,894.70 $218,901,118.38
Georgia 0004086 SR 316 FM W OF CR 104/COLLINS HILL RD TO CR 177/HI-HOPE RD, CST $105,394,185.13 $131,784,002.05
Georgia 0004166 SR 3/NORTHSIDE DRIVE AT CS 53/COLLIER RD; CS 364; 38; 6; 135, CST $15,968,301.41 $36,928,549.38
Georgia 0004428 CR 817/LEE RD FM I-20 TO SR 92/FAIRBURN RD - PHASE II - GRTA, CST $19,788,818.63 $31,074,679.48
Georgia 0004915 SR 140 FM SR 53/FLOYD TO OOTHKALOOGA CREEK/BARTOW, CST $68,618,911.06 $85,774,288.82
Georgia 0005071 I-95 FROM NORTH OF SR 303 TO CR 586, CST $76,703,446.25 $95,929,307.81
Georgia 0005088 I-95 @ TURTLE RIVER & GIBSON CREEK, CST $113,221,625.13 $141,527,031.43
Georgia 0005320 I-75 @ SR 215, CST $23,331,693.37 $29,164,616.72
Georgia 0006049 SR 360 FROM NEW MACLAND ROAD/COBB TO SR 120/PAULDING, CST $68,039,712.74 $90,993,918.95
Georgia 0006073 I-75 FM COOK COUNTY LINE TO CR 204/SOUTHWELL BLVD - PHASE 1, CST $77,746,102.44 $97,182,628.00
Georgia 0006857 SR 92 FROM OLD BURNT HICKORY ROAD TO PICKETTS MILL PLACE, CST $23,464,169.78 $29,330,212.22
Georgia 0006866 SR 92 FROM PICKETTS MILL PLACE TO SR 3/US 41, CST $24,974,555.02 $34,462,325.77
Georgia 0006900 SR 92 RELOC FM COOPER TO ELLIS RELOCS; INC UNDERPASS & RR - PHASE I, CST $44,750,081.94 $55,733,901.48
Georgia 0006901 SR 92 RELOC FROM PINE DRIVE TO COOPER STREET RELOC - PH II, CST $41,055,448.70 $53,800,310.88
Georgia 0007037 SR 135 @ ALTAMAHA RIVER- TIA, CST $2,798,369.00 $27,723,440.00
Georgia 0007128 CR 787/ISLANDS EXPRESSWAY @ WILMINGTON RIVER/BASCULE BRIDGE, CST $60,721,267.43 $75,939,176.28
Georgia 0007386 I-75 @ CR 274/LAKE PARK-BELLVILLE ROAD - PHASE II, CST $39,435,109.82 $49,331,882.52
Georgia 0007414 CR 90/COLERAIN ROAD FM W OF I-95 TO E OF KINGS BAY ROAD, CST $44,254,763.41 $56,040,907.50
Georgia 0007526 SR 400 @MCGINNIS FERRY ROAD, WIDENING & AUXILIARY LANES, CST $60,425,049.85 $79,861,312.31
Georgia 0007691 SR 92 FM CS 611/MALONE RD TO CS 519/NEBO RD-SEGMENT 1-PH IV,CST $69,499,761.49 $86,880,338.64
Georgia 0007885 CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25, CST $26,764,390.77 $30,444,137.50
Georgia 0008219 I-20 FROM SR 383/BELAIR ROAD TO E OF CR 601/WHEELER ROAD, CST $20,735,358.97 $25,919,198.72
Georgia 0008256 I-75/I-575 MANAGED LANES IN COBB & CHEROKEE, CST $253,769,746.20 $621,065,071.56
Georgia 0008406 SR 96 FM CS 1121/LAKE JOY ROAD TO CR 156/MOODY ROAD - PH II, CST $20,880,733.88 $45,609,359.27
Georgia 0008407 SR 96 FM E OF MOODY RD TO OLD HAWKINSVILLE RD-PHASE III, CST $35,424,350.45 $44,282,270.05
Georgia 0008430 SR 316/US 29 @ SR 11, CST $33,428,896.98 $43,164,637.17
Georgia 0009157 I-75 @ 1 LOC & I-675 @ 1 LOC - MANAGED LANES, CST $60,897,915.29 $76,122,394.11
Georgia 0009316 CR 455/BETHELVIEW ROAD FROM CR 8/CASTLEBERRY ROAD TO SR 20, CST $30,611,259.44 $41,684,664.30
Georgia 0009323 I-85 @ CR 103/POPLAR ROAD - NEW INTERCHANGE, CST $24,295,642.91 $31,003,169.63
Georgia 0009400 SR 13 FM CS 8/AFTON LANE TO CS 750/SHALLOWFORD TERRACE-PH II, CST $45,458,203.86 $50,509,115.40
Georgia 0010212 SR 53 WB @ CHATTAHOOCHEE RIVER , CST $20,333,762.99 $25,417,203.72
Georgia 0010297 I-75 @ SR 31 - PHASE II, CST $27,053,815.62 $53,262,269.53
Georgia 0012683 WEIGH-IN-MOTION SCALES, CST $25,162,175.14 $27,957,972.39
Georgia 0012698 I-85 @ SR 324, CST $21,557,980.06 $29,227,475.08
Georgia 0012700 I-75 NB FROM SR 19 TO I-16 - PHASE II, CST $56,015,107.33 $71,532,476.07
Georgia 0012701 I-16 WB FROM I-75 TO WALNUT CREEK - PHASE V, CST $71,521,156.30 $90,558,231.36
Georgia 0012757 I-16 FROM I-95 TO I-516, CST $173,100,593.00 $307,975,741.25
Georgia 0012956 TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - FY 2019, CST $38,216,000.00 $47,770,000.00
Georgia 0012957 TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - FY 2020, CST $27,200,000.00 $34,000,000.00
Georgia 0013239 S BARRETT PKWY FROM BARRETT LAKES BLVD TO SR 5 CONN - PH III, CST  $26,703,252.00 $45,022,637.02
Georgia 0013545 I-85 FROM N OF SR 53 TO N OF SR 11/US 129, CST  $87,608,072.75 $109,510,090.94
Georgia 0013546 I-285 @ SR 400; INC CD LANES & ABERNATHY ROAD INTERCHANGE, CST $500,182,324.17 $629,434,468.15
Georgia 0013727 I-16 @ SR 307, CST $32,482,065.79 $47,739,010.07
Georgia 0013741 SR 25 @ SAVANNAH RIVER IN PORT WENTWORTH, CST $55,707,495.98 $69,634,369.97
Georgia 0013915 I-285 @ I-20 - EAST SIDE INTERCHANGE RECONSTRUCTION, CST  $63,489,901.04 $955,949,415.38
Georgia 0015245 I-85 FROM SR 11 TO SR 15, CST $125,200,000.00 $157,010,000.00
Georgia 0017129 I-285 @ SR 12; @ REDWING CIRCLE & @ GLENWOOD RD, CST $29,282,148.80 $57,823,114.00
Georgia 0017130 I-285 WB AUX LANE EXT FM SR 9 TO RIVERSIDE DR; INC MT VERNON, CST $20,534,640.00 $42,678,111.00
Georgia 0026051 SR 11/US 129 FM SR 332 @TALMO/JACKSON CO TO SR 323/HALL CO, CST $43,652,450.52 $76,019,928.29
Georgia 0042031 SR 899/GRAY NORTH BYPASS FM SR 18 NE TO SR 22, CST $47,807,470.99 $59,775,227.23
Georgia 0084023 SR 38/US 84 FROM W OF WOODYARD CREEK TO W OF GREASY BRANCH, CST $66,701,897.52 $75,571,128.14
Georgia 0084026 SR 38/US 84 FM W OF GREASY BRANCH CK TO W OF CR 88/RUSKIN RD, CST $24,951,203.80 $29,210,003.61
Georgia 0084027 SR 38/US 84 FM W OF CR 88/RUSKIN RD TO E OF CR 294/WADLEY RD, CST $39,678,010.37 $44,866,708.33
Georgia 00MS007 SOUTH CALHOUN BYPASS FM SR 53 @ CR 13 EAST TO SR 53 @ CR 64, CST $51,733,318.33 $64,666,647.92
Georgia 0111053 SR 1/US 27 FM OLD MOON ROAD TO TURNBERRY LANE, CST $29,597,129.90 $38,101,698.99
Georgia 0121071 SR 20 FM I-75 TO SR 61 /US 411 PART RELOCATION, CST $29,623,896.17 $37,029,870.20
Georgia 0121080 SR 369 @ CHATTAHOOCHEE RIVER/LAKE LANIER, CST $5,349,613.22 $32,366,610.43
Georgia 0131063 SR 13 FROM CS 1120/SAWNEE AVE/GWINNETT TO SR 347/HALL, CST $28,525,222.32 $37,656,527.90
Georgia 0161092 I-16 FROM I-75 TO SR 87; INCL SR 87 INTERCHANGE - PHASE I, CST $93,752,407.80 $115,725,818.19
Georgia 0161104 I-75 SB FROM SR 19 TO I-16 INTERCHANGE - PHASE III, CST $85,475,823.81 $106,210,251.05
Georgia 0161131 I-16 EB FROM I-75 TO WALNUT CREEK - PHASE IV, CST $120,914,321.33 $151,367,045.64
Georgia 0181067 VILLA RICA BYPASS FROM SR 101 TO SR 61, CST $23,563,054.39 $29,468,779.64
Georgia 0201073 I-20 @ SR 92/FAIRBURN RD & APPROACHES IN DOUGLASVILLE, CST $50,204,060.02 $55,782,288.94
Georgia 0202117 I-20 @ SAVANNAH RIVER & AUGUSTA CANAL; INC WIDENING, CST $79,313,250.97 $90,086,145.69
Georgia 0202141 .I-20 @ SR 142/COVINGTON (INCL RELOC OF CR 72/FRONTAGE RD), CST $25,440,320.70 $31,790,741.43
Georgia 0202145 I-20 FROM E OF CR 842/WARREN RD TO W OF AUGUSTA CANAL, CST $55,784,021.45 $69,730,026.84
Georgia 0202167 I-20 FM ALCOVY ROAD INCL INTERCHANGE TO SR 142 IN COVINGTON, CST $44,747,420.50 $55,993,492.63
Georgia 0511023 SR 10 LOOP/ATHENS PERIMETER @ SR 10/US 78/LEXINGTON RD, CST $29,675,645.66 $37,748,791.37
Georgia 0545040 SR 10/SR 17/US 78 FROM SR 43 TO CR 6/SMITH MILL ROAD - TIA, CST $24,742,734.31 $36,591,810.44
Georgia 0545053 SR 10/SR 17 FM CR 6/SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA, CST $35,536,391.76 $52,414,621.00
Georgia 0561059 SR 400 FROM SR 140/HOLCOMB BRIDGE RD TO MCFARLAND RD GRTA, CST $59,230,445.92 $74,038,057.40
Georgia 0562029 SR 2/SR 515 FM YOUNG HARRIS ST/UNION TO TIMBERLINE DR/TOWNS,  CST $150,926,350.78 $160,559,555.78
Georgia 0630010 SR 144 EB FROM S OF CR 100 TO S OF CR 154, CST $30,948,878.27 $38,706,368.85
Georgia 0751156 I-75 FM SR 300 TO DOOLY COUNTY LINE, CST $176,372,262.26 $219,756,409.17
Georgia 0751192 I-75/I-475 INTERCHANGE @ CR 740/HARTLEY BRIDGE ROAD (P.I. #311465), CST FOR CONTRACT 2 PHASE OF PROJECT $126,618,642.43 $140,956,938.38
Georgia 0751205 I-75 FM SR 37 TO CR 246/KINARD BRIDGE RD - PHASE 1, CST $123,856,642.81 $154,820,803.53
Georgia 0751206 I-75 FM CR 246/KINARD BRIDGE RD TO TIFT COUNTY LINE - PHASE 1, CST $29,013,316.23 $36,266,645.30
Georgia 0751215 I-75 FM TIFT COUNTY LINE TO SR 32 - CONTRACT 1, CST $31,646,101.07 $39,557,626.32
Georgia 0751227 I-75 @ SR 27 - WIDEN BRIDGE & RAMPS, CST $25,652,558.22 $32,037,707.75
Georgia 0752213 I-75 @ CR 824/JODECO ROAD - INTERCHANGE IMPROVEMENT, CST $29,497,689.15 $37,037,991.88
Georgia 0791042 SR 135 FM SR 31/US 441 EAST TO SR 32 INCLUDING RR SEPARATION, CST $34,485,422.09 $43,106,777.64
Georgia 0852164 I 85 FM N OF OLD PEACHTREE TO HAMILTON MILL RD-MANAGED LANES, CST $155,251,312.80 $194,064,140.99
Georgia 0852165 I-85 FM N OF CR 134/HAMILTON MILL ROAD TO N OF SR 211, CST $42,142,857.20 $74,174,884.00
Georgia 0951117 I-95 FM N OF CSX RR TO N OF S ALTAMAHA RIVER; EXCL SR 99 INT, CST $112,472,735.77 $140,590,919.78
Georgia 0951118 I-95 FM US 17/SR 520 SOUTH OF BRUNSWICK TO NORTH OF SR 303, CST $32,723,459.68 $40,904,324.62
Georgia 0951120 I-95 FM JUST N OF ALTAMAHA RIVER BRIDGE TO SR 251, CST $48,617,323.54 $60,771,654.41
Georgia 0951121 I-95 FM 1 MILE NORTH OF SR 251 TO NORTH OF SR 57 - PHASE I, CST $65,651,944.13 $82,064,930.16
Georgia 0951150 I-95 @ CHAMPNEYS RIVER - BUTLER RIVER - DARIEN CREEK - CATHEAD CREEK, CST $42,239,748.84 $52,799,686.06
Georgia 1105004 CR 65/WINDSOR SPRINGS RD FM SR 88 TO CR 1515/WILLIS FOREMAN - TIA, CST $20,038,370.30 $26,564,476.31
Georgia 1551023 SR 96 FM 0.48 W OF SR 87 TO S OF I-16, CST $27,569,262.58 $80,422,864.09
Georgia 1801006 SR 151 FM S OF ROLLINS IND PARK/HOLCOMB RD TO SR 2/US 41, CST $45,197,416.73 $56,496,770.92
Georgia 1851317 I-185/COLUMBUS FM SR 520 TO ST MARYS ROAD, CST $50,164,128.18 $62,705,160.24
Georgia 1861011 SR 92 RELOC FM ELLIS ST RELOC TO N OF MALONE RD - PHASE III, CST $30,758,395.87 $38,206,269.43
Georgia 2851346 I-75 NB CD SYSTEM FROM SR 331 TO I-285, CST $71,770,861.97 $89,274,364.19
Georgia 2851347 I-285 @ SR 8/US 29/LAWRENCEVILLE HIGHWAY, CST $44,656,744.31 $51,316,430.02
Georgia 2851352 I 285 @ BOULDERCREST RD, CST $103,379,999.63 $129,695,999.53
Georgia 2851353 I-285 @ SR 10/MEMORIAL DR & RELOCATE GEORGE LUTHER DR, CST $88,561,116.45 $98,681,997.59
Georgia 2946001 OLD ALABAMA ROAD RELOC FROM SR 113 TO PAGA MINE ROAD, MCST $78,441,952.66 $98,052,440.84
Georgia 5201015 I-20 @ I-520 INTERCHANGE RECONSTRUCTION, CST $191,172,934.20 $247,196,712.22
Georgia 7007006 CR 65/WINDSOR SPRINGS RD FM WILLIS FORMAN RD TO TOBACCO RD-TIA, CST $29,242,061.31 $42,365,451.64
Georgia 7063001 OLD PETERSBURG RD/OLD EVANS FM BASTON RD TO WASHINGTON RD, CST $34,226,068.81 $65,776,069.04
Georgia 8060002 WHITTLESEY RD & VETERANS PKWY FM ROLLINS WAY TO GEPCA DR, CST $21,274,031.21 $26,594,670.81
Georgia 9004008 CR 4455/CANTON ROAD & RR BR OVER SR 3/US 41 N OF MARIETTA, CST $20,467,976.09 $25,584,970.14
Georgia 9108004 BATTLECREEK/MT ZION BLVD FM SOUTHLAKE PKWY TO SOMERTON DR, CST $21,454,628.00 $29,377,701.80
Georgia 9851322 I-985 SPLIT DIAMOND INTERCHANGE @ SR 13 & SR 53 & CD SYSTEM, CST $108,059,174.91 $135,073,968.64
Georgia M003308 I-20 FROM SR 1/US 27 TO SR 61, MCST $88,384,974.59 $98,205,527.32
Georgia M004417 I-285 FROM ASHFORD DUNWOODY ROAD TO HENDERSON MILL ROAD, MCST  $34,024,131.21 $37,804,590.24
Georgia M005713 I-75 FM CHATTAHOOCHEE RVR TO 0.45 MI N OF CS 3905/ALLGOOD RD, MCST $43,239,235.47 $48,043,594.97
Georgia M005874 I-75 FROM SR 42/MONROE TO SR 36/BUTTS, MCST $22,605,481.67 $25,117,201.86
Georgia M006050 I-75 FROM I-85 TO CHATTAHOOCHEE RIVER, MCST  $23,266,764.00 $25,851,960.00
Georgia M006105 I-85 FROM SR 140 TO 0.35 MI N OF CR 3761/OLD PEACHTREE ROAD, MCST  $38,144,281.62 $42,382,535.13
Guam 0003105 ROUTE 3 WIDENING FROM ROUTE 28 TO CHALAN KARETA $51,765,076.38 $51,765,076.38
Hawaii 0001041 HON CNTY - ALAPAI TRANSPORTATION MANAGEMENT CENTER (P, C) $40,604,813.60 $75,623,620.00
Hawaii 0011261 HON STATE - INTERSTATE ROUTE H-1, ADDITION AND MODIFICATION OF FREEWAY ACCESS (KAPOLEI INTERCHANGE COMPLEX), PHASE 2 $68,043,041.45 $73,132,579.29
Hawaii 0011271 Hon St - Interstate Route H-1, Addition and Modification of Freeway Access, Kapolei Interchange Complex, Phase 3 $9,497,358.60 $46,943,522.22
Hawaii 0011273 Hon St - INTERSTATE ROUTE H-1, AIRPORT VIADUCT IMPROVEMENTS VICINITY OF VALKENBURG STREET TO MIDDLE STREET, PHASE 3 (CON) $9,729,336.70 $43,876,295.04
Hawaii 0011274 HON STATE - INTERSTATE RTE H-1, SHOULDER WORK & PORTLAND CONCRETE PAVEMENT REHAB FROM THE VICINITY OF WAIMALU VIADUCT TO THE VICINITY OF HALAWA (P, C) $65,132,524.86 $81,791,050.00
Hawaii 0011275 HON STATE - INTERSTATE ROUTE H-1 REHABILITATION, SALT LAKE BOULEVARD TO AIRPORT VIADUCT (CON) $8,560,742.28 $30,396,584.92
Hawaii 0011276 HON STATE - INTERSTATE ROUTE H-1, AIRPORT VIADUCT IMPROVEMENTS VICINITY OF VALKENBURG STREET TO MIDDLE STREET, PHASE 2 (CON) $26,996,269.26 $30,456,930.44
Hawaii 0011279 HON STATE - INTERSTATE ROUTE H-1 RESURFACING, MILLER PEDESTRIAN OVERPASS TO KAPIOLANI INTERCHANGE (CON) $7,181,589.69 $36,037,059.10
Hawaii 0031075 HON STATE - INTERSTATE ROUTE H-3, H-3 FINISH (CON) $200,711,451.12 $228,480,547.79
Hawaii 0100077 HI STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, HAWAII (CON) $50,109,139.27 $62,636,424.12
Hawaii 0192061 HI STATE - HAWAII BELT ROAD, REHABILITATION OF UMAUMA BRIDGE (P, R, C) $37,151,930.84 $46,608,672.18
Hawaii 0300155 HON STATE - INSTALLATION OF ENHANCED PAVEMENT MARKING AND NEW MILLED RUMBLE STRIP AT VARIOUS LOCATIONS, OAHU (CON) $33,292,602.35 $35,461,923.76
Hawaii 0300158 HON STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, OAHU (CON) $30,870,595.86 $37,274,477.00
Hawaii 0300184 Hon State - Asphalt Pavement Preservation, Resurfacing and Reconstruction at Various Locations, Oahu (CON) $22,469,285.60 $60,634,829.09
Hawaii 0300189 Hon St -  Traffic Signal Controller Installation and Adapptive Signal Technology at Various Locations, Oahu (CON) $3,214,299.04 $37,289,127.47
Hawaii 0301035 MAUI STATE - HONOAPIILANI HWY REALIGNMENT, LAHAINA, MAUI, HI; PE PHASE 1A, FUTURE KEAWE ST EXTSN TO LAHAINALUNA RD-DESIGN BUILD $66,726,439.41 $83,905,997.67
Hawaii 0301038 MAUI STATE - HONOAPIILANI HIGHWAY REALIGNMENT, PHASE 1B-1, LAHAINALUNA ROAD TO HOKIOKIO PLACE (ROW & CON) $29,273,454.80 $38,116,164.14
Hawaii 0380010 MAUI STATE - KAHULUI AIRPORT ACCESS ROAD, PUUNENE AVENUE TO HANA HIGHWAY $20,851,716.60 $27,426,068.19
Hawaii 0501031 KAUAI STATE - KAUMUALII HIGHWAY WIDENING, VICINITY OF ANONUI STREET TO VICINITY OF LIHUE MILL BRIDGE (CON) $35,550,381.72 $48,680,560.14
Hawaii 0561051 KAUAI STATE - KUHIO HIGHWAY SHORT TERM IMPROVEMENTS, WAILUA CANE HAUL BRIDGE WIDENING (CON) $25,389,119.97 $33,537,553.49
Hawaii 0611035 HON STATE - PALI HWY RESURFACING, WAOKANAKA ST TO KAMEHAMEHA HWY AND PALI HWY LIGHTING REPLACEMENT, VINEYARD BLVD TO KAMEHAMEHA HWY (CON) $65,049,707.64 $81,407,542.70
Hawaii 0611036 HON STATE - PALI HIGHWAY RESURFACING, VINEYARD BOULEVARD TO WAOKANAKA STREET (C) $29,209,275.68 $50,299,308.97
Hawaii 0700082 KAUAI STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, ISLAND OF KAUAI $26,398,725.00 $39,248,406.25
Hawaii 0761009 HON STATE - FORT WEAVER ROAD WIDENING, VICINITY OF AAWA DRIVE TO GEIGER ROAD (DESIGN BUILD AND ROW) $51,637,101.64 $65,825,096.70
Hawaii 0831048 HON STATE - KAMEHAMEHA HIGHWAY, KAIPAPAU STREAM BRIDGE REPLACEMENT (ROW & CON) $8,789,306.28 $26,311,141.47
Hawaii 0900097 MAUI STATE - INSTALLATION OF PAVEMENT PRESERVATION STRATEGIES AND SURFACE TREATMENTS AT VARIOUS LOCATIONS, ISLAND OF MAUI, MOLOKAI AND LANAI $21,510,053.43 $26,887,566.81
Hawaii 0921027 HON STATE - NIMITZ HIGHWAY & ALA MOANA BOULEVARD, RESURFACING & HIGHWAY LIGHTING REPLACEMENT, FORT STREET TO KALAKAUA AVENUE (CON) $51,166,349.34 $67,788,029.14
Hawaii 0921029 HON STATE - ALA MOANA BOULEVARD ELEVATED PEDESTRIAN WALKWAY (CON) $19,976,642.72 $25,604,501.40
Hawaii 0931020 HON STATE - RTE 93, FARRINGTON HWY AT MAKAHA BR NO. 3 & MAKAHA BR NO. 3A; PE, ROW & CON FOR BRIDGE REPLACEMENT, NO ADDED CAPACITY $12,583,933.19 $28,665,310.63
Hawaii 0931021 HON STATE - FARRINGTON HIGHWAY AT MAIPALAOA BRIDGE; PE, ROW & CON FOR BRIDGE REPLACEMENT $23,603,937.68 $32,329,895.48
Hawaii 0931022 HON STATE - FARRINGTON HIGHWAY INTERSECTION IMPROVEMENTS AT NANAKULI AVENUE AND HALEAKALA AVENUE (C) $22,039,451.99 $28,655,107.42
Hawaii 0991031 HON STATE - KAMEHAMEHA HIGHWAY, KAMANANUI ROAD AND WILIKINA DRIVE REHABILITATION, VICINITY OF WEED CIRCLE TO H-2 $22,952,593.92 $28,731,828.63
Hawaii 2000004 HI CNTY - PUAINAKO ST EXTENSION, KOMOHANA ST TO COUNTRY CLUB RD, ROW & CON FOR NEW ROADWAY $26,886,000.00 $33,775,032.00
Hawaii 8930002 HON STATE - NORTH-SOUTH ROAD, PHASE 1B (KAPOLEI PARKWAY TO FARRINGTON HIGHWAY) (CON) $52,944,757.06 $82,937,614.65
Hawaii A191003 Waikoloa Road Rehabilitation, Mamalahoa Highway to Queen Kaahumanu Highway $3,510,553.43 $38,940,514.03
Hawaii A191038 HI STATE - QUEEN KAAHUMANU HIGHWAY WIDENING, PHASE 2, KEALAKEHE PARKWAY TO KEAHOLE AIRPORT ROAD (DESIGN-BUILD) $29,494,726.80 $37,084,561.52
Hawaii B191038 HI STATE - QUEEN KAAHUMANU HIGHWAY WIDENING, PHASE 2, KEALAKEHE PARKWAY TO KEAHOLE AIRPORT ROAD (DESIGN-BUILD) $29,133,274.66 $36,416,784.34
Hawaii C191038 HI STATE - QUEEN KAAHUMANU HIGHWAY WIDENING, PHASE 2, KEALAKEHE PARKWAY TO KEAHOLE AIRPORT ROAD (DESIGN-BUILD) $42,143,189.00 $65,785,224.63
Hawaii ER19002 KAUAI STATE - KUHIO HIGHWAY, EMERGENCY SLOPE STABILIZATION IN THE VICINITY OF WAINIHA (P, R, C) $33,316,505.35 $36,134,661.33
Hawaii ER19007 KAUAI STATE - KUHIO HIGHWAY, REPAIRS OF WAIOLI, WAIPA AND WAIKOKO BRIDGES $29,009,592.95 $36,261,991.16
Hawaii ER23001 KAUAI STATE - KUHIO HIGHWAY, EMERGENCY WAILUA RIVER BRIDGE DEBRIS REMOVAL AND SCOUR MITIGATION (P, C) $26,024,238.93 $69,061,137.15
Hawaii H201005 HON STATE - MOANALUA FREEWAY HIGHWAY LIGHTING IMPROVEMENTS, HALAWA HEIGHTS OFF-RAMP TO MIDDLE STREET OVERPASS (CON) $20,763,741.90 $30,888,213.05
Idaho 1568001 SH-55, SMITH'S FERRY TO ROUND VALLEY $51,784,451.09 $58,701,636.70
Idaho 4110156 US 95, THORN CREEK ROAD TO MOSCOW, PH 1 $56,753,928.50 $82,029,740.34
Idaho A013057 I 84, MERIDIAN IC TO FIVE MILE RD $28,031,695.99 $30,463,076.10
Idaho A018881 I 84, I 86 SALT LAKE SYSTEM INTERCHANGE $39,420,987.30 $42,768,515.46
Idaho A019261 US 95, CULDESAC CANYON PASSING LANE PHASE 2 $27,121,328.84 $38,492,968.91
Idaho A019682 SH 41, MULLAN AVE TO E. PRAIRIE AVE, POST FALLS $39,415,615.96 $48,694,187.62
Idaho A020083 I 15, FORT HALL IC# 80, BANNOCK CO $31,146,394.28 $33,755,710.74
Idaho A020098 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO $44,572,612.52 $49,229,737.97
Idaho A020139 I 84, COLD SPRINGS IC TO GLENNS FERRY IC $33,710,865.50 $36,535,022.79
Idaho A020442 I 90, SH-41 INTERCHANGE, KOOTENAI CO $12,253,613.96 $103,647,355.19
Idaho A020513 US 12, CLEARWATER RV MEMORIAL BR, NEZ PERCE COUNTY $37,833,290.60 $40,830,229.52
Idaho A020589 STATE, FY24 I-86/I-15 SYSTEM IC, POCATELLO $4,381,039.63 $40,613,620.01
Idaho A020798 INFRAFY18: I 84, NORTHSIDE BLVD TO FRANKLIN BLVD, NAMPA $44,387,534.00 $74,477,876.80
Idaho A020799 INFRAFY18: I 84, KARCHER IC TO NORTHSIDE BLVD $16,743,152.75 $28,059,890.77
Illinois 000S658 I-70 - Bridge replacement and new interchange on I-55/70 under IL 162 at Troy in Madison County. $26,155,295.30 $27,110,914.46
Illinois 000V127 0.72 miles reconstruction/widening of I-290 EB mainline pavmt. from Racine to Congress Parkway (i-9094) retain wall, lighting $29,610,659.43 $33,360,580.97
Illinois 0020074 CREATE - Construction on CREATE project EW1: Plan number EW1-BRC-TSX-001-Z-BD   $58,652,208.00
Illinois 0055410 FAI55/I55 OUTBND BDG, I-55 (OUTBOUND BRIDGES) @ I-94 (DAN RYAN EXPY)**. $69,043,433.23 $79,638,899.84
Illinois 0055455 Resurfacing, bridge repairs etc on I-55 through Will, DuPage and Cook Counties $29,478,421.41 $33,182,785.81
Illinois 0055475 1.0 miles of roadway reconstruction and the removal and replacement of the 3 inbound bridge structures of I-55 & US41, 3 new** $56,668,039.83 $63,087,543.96
Illinois 0057309 Bourbonnais road improvements, Bourbonnais. 1.42 miles of a new structure an interchange on I-57 at 6000N and improvements at** $46,105,899.29 $51,787,033.35
Illinois 0057312 9.28 mi of milling, rubblizing & 11.75" of HMA resurf, guardrail, striping etc on I-57 from Old IL 13 to Johnson Cty $26,438,888.53 $30,285,436.37
Illinois 0064403 0.711 mi of proposed bridge & additional lane on I-64 from MLK Bridge EB to I-55/64 WB $29,321,246.02 $32,620,141.26
Illinois 0070027 6.6 miles of resurfacing, bridge repairs etc. on I 70 in Bond and Madison Counties $24,288,210.63 $27,735,905.31
Illinois 0070047 9.05 miles of rebbilization/overlay of I-70 - starts at abandoned RR bridge in Altamont to Little Wabash River W of Effingham $53,561,297.13 $59,512,552.36
Illinois 0070405 Appr 9 mi of milling, patching, resurfacing, grdrl & bridge repair on I-70 from 2.5 mi east of I-55/70 int just west of Prairie Rd $28,064,642.27 $31,284,519.13
Illinois 0074324 0.5 miles added lanes & ramps, bridge replacement/rehab, lighting & drainage improvements on I-74 from Mississippi River to 7th Ave Moline $83,228,205.05 $94,651,112.00
Illinois 0074326 2 miles of reconstruction of I-74 starting (7th ave) south to (Avenue in Cities) - within the City of Moline $84,587,618.00 $96,169,621.00
Illinois 0075156 Construct 4 lane ext. of IL.Rte.29 from Rochester to Taylorville - new 4 lanes expressway around Edinburg incl. ** $34,925,049.85 $43,952,254.25
Illinois 0080408 Remove & repl stw structures over Green Rvr, two over BN&SF RR & two over Barstow Rd & resurf from .8 mi N of IL5/IL92 to Henry* $23,348,529.82 $26,008,312.21
Illinois 0090401 Removal & replacement of structure carrying EB I-90 over CTA BLue Line & EB I-90, retaining walls, recons of East River Rd bridge* $13,634,730.00 $25,266,246.00
Illinois 0090403 2.67 miles of a new lane on I-90 from Cumberland Ave to Harlem Ave in Chicago $22,695,886.00 $28,671,955.41
Illinois 0290201 0.49 miles of the construction of 2 new WB expressway lanes along I-290 from Peoria to Racine St inc 4 new retaining walls and** $27,346,416.25 $33,212,207.99
Illinois 0310139 5.5 miles of new 4-lane roadway; Seminary Road to US 67 in Godfrey including grading, paving, box culvert and signing. $23,502,425.43 $29,378,031.79
Illinois 0321015 TIGER PROJECT-US 54, PIKE CO. REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA $25,182,100.00 $29,626,000.00
Illinois 0322096 4.5 mi of grading, paving, new bridge and an additional lane to an existing bridge on US.51 from 1.4 mi S.of Assumption ** $22,203,584.77 $27,764,886.77
Illinois 0326088 4.47 mi of addition of 2 or more lanes on IL 47 from N of I-80 in Morris to just N of Sherrill Rd in Kendall Cty inc 32' median * $31,582,122.16 $40,090,294.93
Illinois 0326093 Const. of the US. I-80 to I-88 North-South Connector in Illinois - 7.023 mi of reconst. of IL.47 from 2-4 lanes inc. pvmnt, ** $37,588,133.34 $49,842,824.18
Illinois 0330070 Reconst./widening of 1.64 mi of US.12-45 (Manheim Rd) from IL.19 to I-94 inc. const. of Balmoral Underpass, retaining walls, ** $35,268,688.40 $44,468,015.70
Illinois 0330073 1.8 miles of reconstruction on US 45 from 143rd St. to 159th St., including signals, culverts, pavement marking, additional** $20,188,052.73 $29,964,765.33
Illinois 0330074 2.8 miles of additional lanes and roadway reconstruction inc signals, lighting, pavement marking, etc. on US 45 from 159th to** $24,374,900.08 $32,592,125.68
Illinois 0331068 10.828 of the addition of a new lane to IL 13, a new bridge over IL 13, new frontage rds, etc on IL 13 from 0.2 miles east on** $20,721,081.24 $25,921,525.93
Illinois 0332119 6.02 miles of the reconstruction of the existing 2-lanes and the addition of two more on US 45 beginning in Eldorado from just** $20,948,092.99 $26,195,055.45
Illinois 0338048 1.57 miles of roadway reconstruction, resurfacing, lighting, retaining walls, storm sewers, traffic signals, etc. on IL 59** $28,019,725.03 $37,895,544.43
Illinois 0341025 Lakefront Bike Trail: Navy Pier Flyover consisting of new pedestrian bridge, furnishing structural steel, lighting, concrete** $20,933,600.00 $28,952,200.00
Illinois 0345056 1.33 mi of interchange reconst. on US.20 inc lghtng, traff sgnls, structure work, retaining wall etc from Fleetwood Dr. to ** $30,568,574.44 $40,041,517.55
Illinois 0345062 1.4 miles of new interchange ramps, flyover bridge structures, retaining walls, noise wall, drainage improvements, lighting, etc** $29,318,875.29 $37,128,469.25
Illinois 0351027 5.15 mi of roadway reconst inc adding lanes, multi-use path, traffic signals lighting etc on IL 7 from Gougar Rd to Will-Cook* $49,078,337.36 $67,903,453.66
Illinois 0351028 2.5 mi of rdwy reconst, add lanes, add multi-use path, drainage improvements, signals, lighting, landscaping etc on US6/IL7* $46,548,707.62 $61,002,451.05
Illinois 0365012 Wide for add. lanes, reconst. & bridge repl, lndscpng, etc on IL.56 from W.of IL.59 (Joliet Rd.) toE.of Winfield Rd in Wrrnvlle $23,572,903.42 $29,936,368.31
Illinois 0373028 2.03 mi of bridge rehab, widening, ramp modification & lighting on IL 171 through Vil of McCook, Lyons & Summit $24,625,889.44 $27,402,112.79
Illinois 0556246 2.3 mi of relocate I-55 @ Arsenal Rd. interchange inc new Arsenal bridge, fly-over bridge, lighting, rem exist ** $34,252,726.00 $38,075,577.17
Illinois 0557203 STEVENSON EXPWY W DAMEN TO S FORK S.BRANCH, PAVEMENT RECONS & BR REHAB $31,051,347.32 $37,488,163.87
Illinois 0591028 Construction of Route 34 Interchange and improvements. 3.65 miles of reconstructing US 34 to 5 lanes inc storm sewers, curb &** $30,158,245.00 $38,193,683.00
Illinois 0595034 2.56 mi of pavement reconst. & widening to 6 lanes of IL.5 in Moline from 0.2 mi W.of 38th St. to 0.3 mi E.of 70th St. inc., ** $46,938,191.00 $58,759,353.00
Illinois 0698037 0.83 mile of the removal and replacement of the structure carrying IL 89 over the Illinois River located 1 mile south of US 6 in** $35,413,629.00 $44,396,158.00
Illinois 0734046 Reconstruction of IL 2 in Rockford $22,954,376.10 $34,514,297.23
Illinois 0745305 7.957 mi of repl of bridge carrying IL104 over IL Rvr in Meredosia, bridge rehab, earthwork, lighting, sidewalks, landscaping etc $62,241,919.60 $78,036,879.40
Illinois 1279114 5,110' of the removal and replacement of the structure carrying IL 178 over the Illinois River in Utica $22,899,350.00 $29,317,862.00
Illinois 1987002 New I-74 Mississippi River Bridges $185,112,599.41 $205,904,989.60
Illinois 2081100 Pre-construction and construction activities on US 45/La Grange Road from 131st Street to 179th Street. 1.8 miles of additional** $24,231,153.57 $32,886,784.24
Illinois 34FV643 Bridge replacement of four structures on I-57 in Kankakee County $22,574,795.00 $25,088,206.00
Illinois 3ELT222 CONSTRUCTION OF A GRADE SEPARATION STRUCTURE TO CARRY FAU 7448 (BRUSH COLLEGE RD.) OVER THE NORFOLK SOUTHERN RAILROAD & FAIRIES PKWY. IN DECATUR.   $45,625,824.00
Illinois 47CA169 Replace four structures within Lincoln Park near Montrose Harbor in the City of Chicago.   $31,425,000.00
Illinois 5181057 MCORE PROJECTS 1, 2 & 3.  $15,705,327.00 $26,176,116.00
Illinois 5JZQ983 CREATE Project P3: Stage II construction of a rail-to-rail flyover and for a rail grade separation CREATE Project GS19 at 71st street. $85,785,037.00 $297,717,362.00
Illinois 6000238 Undertake access improvements to US.Rte.41, Chicago $13,600,000.00 $30,150,000.00
Illinois 6000325 Wacker Dr.: Monroe St. to Van Buren St. $82,943,758.72 $120,850,462.09
Illinois 6000326 130th and Torrence Intersection Improvement, Chicago $76,606,782.66 $141,855,478.60
Illinois 6000418 The improvement of Bloomingdale Trail, Ridgeway Av. to the Kennedy Expressway $49,656,683.64 $62,070,854.69
Illinois 6000443 For the improvement of 35th St bicycle & pedestrian bridge over south Lake Shore Drive. $22,845,000.00 $28,556,250.00
Illinois 6000448 For the improvement of the Adams Street Viaduct over Union Station $18,155,400.00 $42,183,000.00
Illinois 622K195 Intersection and roadway reconstruction, bridge rehab, lighting and sidewalk on Wood Street, N of Little Calumet River to S of US 6 (159th St) $29,332,244.50 $45,844,819.01
Illinois 69NC103 Interchange reconstruction on I-55 from I-80 to US 52 $20,000,000.00 $54,155,000.00
Illinois 6BY3902 Roadway reconstruction and bridge preservation on I-74 from W of the Tazewell County line to e of the Carlock Interchange. $52,502,280.01 $58,555,217.23
Illinois 6FQN827 RECONSTRUCTION OF FAU 2755 (80TH AVE.) FROM GREENWAY BLVD. TO TIMBER DR. AND REPLACE THE BRIDGE CARRYING 80TH AVE. OVER I-80. $19,618,077.00 $49,723,996.00
Illinois 6FXA534 Pavement reconstruction, bridge replacement and widening and lighting on I-80 from Gardner St to Roswell Ave (Group A Structures WB) $36,492,111.00 $43,720,157.00
Illinois 8012014 Demo IL416: City of Springfield, IL for improvements to Cockrell Lane; Demo IL512: Improvements to Cockrell Lane in the City of** $20,830,431.40 $26,299,325.65
Illinois 9TJY262 NEW ROADWAY, INTERSECTION RECONSTRUCTION (LONGMEADOW PARKWAY CORRIDOR) $4,222,377.00 $27,777,277.00
Illinois APXQ831 Construction and widening the Kennedy mainline Expwy NB from Roosevelt Rd to Lake/Madison St in Chicago. $55,415,768.00 $61,641,767.00
Illinois C9B9786 Reconstruction, designed overlay, bridge deck overlay and repair on I-74 from US 150 W of Danville to Vermilion River in Danville $62,672,779.00 $69,636,424.00
Illinois CLGU392 Additional lane work with bridge replacement on I-57 over Middle Fork Big Muddy River N of West Frankfurt to 2.5 Mi S of IL 154 $42,253,518.25 $71,592,762.00
Illinois CRP1462 Single bridge replacement with dual bridges carrying I-270 over the Mississippi River $198,000,000.00 $220,000,000.00
Illinois F866342 Bridge rehabilitation on I-74 over the IC RR/TR 158 and over FAU 7169 (Market St.) in Champaign. $32,537,559.00 $36,152,848.00
Illinois FB4M631 Reconstruction, ramp modification and retaining walls on I-90/94/290. $43,996,278.00 $49,322,937.00
Illinois FF3X145 CREATE Project P3: Stage I construction of a rail-to-rail flyover at Forest Hill Junction and for a grade separation at 71st street. $15,000,000.00 $27,800,000.00
Illinois G3Q5348 Designed overlay with patching, pavement markings, drainage and ITS improvements on I-55 from S of I-80 to S of Weber Road (SB) $26,773,734.00 $27,087,166.00
Illinois GYUQ685 Resurfacing project with bridge improvements on I-39 from 1 Mi N of IL 116 to 2 MI S of IL 17 $25,709,179.00 $28,565,756.00
Illinois H8EV623 Rubblization and overlay on I-72 from 4.4 Mi W to 0.3 Mi W of Piatt County Line $27,451,603.00 $30,501,782.00
Illinois HB1K096 Pavement reconstruction, bridge replacement and widening and lighting improvements on I-80 from IL 53 (Chicago St) to Roswell Ave $42,357,942.00 $47,064,381.00
Illinois HJVN698 RECONSTRUCTION $22,747,966.79 $28,650,326.24
Illinois IH44562 Reconstruction with drainage improvements on US 20 from Gear Street to Main Street in Galena $36,229,402.16 $36,254,516.16
Illinois J7VU032 Reconstruction of the Adams St and Jackson Blvd bridges over I-90/94, includes ramps, retaining walls, and lighting, in Chicago. $44,058,083.00 $49,005,558.00
Illinois KC9D768 Pavement reconstruction and bridge repairs on I-57 from Jefferson County Line to 0.7 Mi N of IL 161 $59,134,655.78 $75,411,353.25
Illinois KENY416 Bridge replacement, Bridge rehabilitations, Retaining walls, and lighting on The MLK ramps in East St. Louis. $25,136,277.64 $30,519,201.75
Illinois KKGI625 Bridge rehabilitation on I-180 over the Illinois River. $23,949,112.50 $26,610,125.00
Illinois L3MU512 Rehab of Reversible Lane Access Control System on I-90/94 at Foster Avenue and Lawrence Avenue to Ohio Street $27,900,000.00 $31,000,000.00
Illinois LPYF801 Interchange reconstruction and bridge replacement on I-80 at US 30 in the Village of New Lenox. $48,712,788.00 $54,158,984.00
Illinois MAMH434 Resurfacing and Bridge rehabilitation on I-55 from 0.8 mile N of IL 16 to 0.6 mile N of IL 108. $33,822,128.00 $37,580,141.00
Illinois MID2911 Interchange rehabilitation and reconstruction at I-57 and I-74 $80,000,000.00 $130,299,740.00
Illinois N60V808 Roadway reconstruction and bridge repairs on I-55 from 1.7 miles S of IL 116 to 0.6 mile N of IL 23 in Pontiac. $39,452,582.65 $43,850,609.42
Illinois NI5S589 NEW CONSTRUCTION, RECONSTRUCTION, NEW BRIDGE $5,000,450.00 $49,068,150.00
Illinois NUW3186 43rd Street Pedestrian Bridge over Metra and South Lake Shore Drive $29,600,000.00 $37,000,000.00
Illinois NWQA467 Widening, resurfacing, lighting, and retaining walls on I-90 fron Cumberland Ave to Harlem Ave in Chicago. $39,424,153.00 $47,536,800.00
Illinois PW2V306 RECONSTRUCTION $23,248,831.00 $42,993,892.00
Illinois R0J4100 Concrete overlay, patching, deck replacement and expansion joints on I-55/I-64,  Poplar Street Collector-Distributor ramps $29,546,377.00 $32,829,306.00
Illinois RTYU738 Resurfacing and bridge repairss at various locations on I-55 from S of Bus 55 to N of IL 10, west of Lincoln.  $23,153,391.70 $25,895,986.00
Illinois SBVK122 Roadway reconstruction on IL 79 from 0.5 Mi E of IL 126 to W of Orchard Road W of Oswego   $37,000,000.00
Illinois TJQZ898 1.55 miles interchange reconstruction & additional lanes I-55 at Weber Road and 1.6 M recon Weber Road from Normantown Rd to Rodeo Dr. $39,536,657.00 $53,708,837.00
Illinois TRTJ747 Pump station reconstruction on I-290 at the DesPlaines River in the Village of Forrest Park. $53,877,414.00 $53,877,414.00
Illinois UI98917 Resurfacing and bridge rehabilitation on I-255 from IL 15 to collinsville Road in East St. Louis. $66,666,043.00 $74,073,382.00
Illinois V02M043 County Line Road, I-294 to North Avenue $23,921,870.00 $29,902,337.51
Illinois VDCD210 Interchange reconstruction and bridge replacement reconstruction on I-57 at I-74 Interchange $124,739,991.00 $138,599,992.00
Illinois VQ14255 Bridge replacement/rehabilitation, reconstruction, retaining walls at various locations on I-90/94 from SB taylor exit ramp to EB Taylo exit ramp. $71,552,443.45 $80,087,903.94
Illinois W166112 Designed overlay with pavement markings, drainage, ITS and landscaping improvements on I-55 from S of I-80 to S of Weber Road (NB) $26,555,512.00 $26,868,944.00
Illinois W46U596 Lakefront Bicycle Trail #3 over the Chicago River $29,820,000.00 $50,598,000.00
Illinois W793945 Roadway reconstruction and bridge replacement on US 20 from Simson Road to Rock River and S of Southrock Dr to S of US 20 in Rockford. $22,196,891.00 $27,819,048.00
Illinois X5LE481 NEW ROADWAY AND BRIDGE CONSTRUCTION  $32,000,000.00 $45,000,000.00
Illinois X8AF608 RECONSTRUCTION OF FAU 3533 (FRANKLIN AVENUE) FROM RUNGE ST. TO MANNHEIM RD. $22,511,723.00 $28,146,404.00
Illinois XBRG797 Rubblization and overlay with culvert removal and replacement and bridge deck replacement on I-70 from 1 Mi E of I-57 Intchg to Cumberland County Line $46,763,999.99 $51,960,000.00
Illinois XIL3358 Standard Overlay, Resurfacing, Rest Area Improvements, Weigh Station Repairs, and Bridge Deck Sealing on I-57  from Kankakee Co Rd to Steger Rd $41,843,831.40 $46,722,371.00
Illinois XPV5974 Resurfacing and bridge rehabilitation on I-70 from W of Sugar Loaf Rd to the BNSF railroad. $27,262,757.35 $30,303,352.17
Illinois Y4TH575 Bridge rehabilitation on I-74/IL 29 (Murray Baker Bridge) over the Illinois River in Peoria. $37,070,509.00 $45,965,496.00
Illinois YA23869 Patching, resurfacing and bridge repairs on I-24 from Johnson County Line to Ohio River  $23,263,749.00 $25,848,611.00
Illinois YJLB572 Removal and replacement of concrete bridge deck and resurfacing on I-280 from the Mississippi River Bridge to east of the IL 92 interchange $30,593,481.00 $52,818,817.00
Illinois YQT9213 Standard overlay resurfacing and various bridge repairs on I-70/ 270 from I-55 to 2.5 miles east of the I-55/70/270 interchange $24,970,789.19 $27,765,321.33
Illinois YRP3905 Bridge replacement on US 150 (McClugage Bridge) over the Illinois River in Peoria. $144,184,306.00 $181,823,828.00
Illinois ZDW0068 Standard overlay, Class A patching, drainage, ITS improvements and bridge deck sealing on I-57 from S of I-294 (Tri-State Tlwy) to IL 1 (Halstad St) $32,566,997.00 $36,195,552.00
Illinois ZEC3030 Widening, reconstruction, bridge replacement, and retaining walls on I-290/Congress Pkwy (Jane Byrne Intchg(EB ramp to I-90/94 (NB). $38,506,218.67 $43,080,093.71
Illinois ZZKI017 Lake Cook Road, Raupp Boulevard to Hasting Lane $22,087,000.00 $48,843,276.00
Indiana 0194014 US41, Bridge Replacement, Bridge over Cady March Ditch, 4.1 miles N of US 30 (Phase I), Lake County, R-25895 $21,594,123.04 $26,962,858.82
Indiana 0200699 I70, Added Travel Lanes, PCC, From 0.6 mi E of Post Road to 1.3 mi E of Mt Comfort Road, Marion County, IR-31104 $34,223,142.42 $34,589,503.25
Indiana 0200903 I65, Added Travel Lanes, From I-865 (formerly I-465 NW Connector) to 0.5 mile S of CR 100E  (Phase I), Boone County, IR-30704 $36,469,648.82 $42,908,530.94
Indiana 0201296 PR265, New Road Construction, East End ORB - New I-265 Bridge (Parsons & Milestone Funds), Clark County, PLC-30335 $270,999,078.17 $507,260,007.49
Indiana 0500430 PR69, New Road Construction, Martinsville Segment, from S of Indian Creek via SR 37 to 1 mi N of SR44, Morgan County, R-33493 $76,057,993.74 $189,055,739.33
Indiana 0500431 PR69, Road Reconstruction (3R/4R Standards), Morgan Co from 1 mi N of SR44 via SR 37 to 1 mi N of Henderson Ford Rd. S-line, Morgan County, R-33541 $28,215,286.84 $46,583,000.61
Indiana 0500432 PR69, New Road Construction, Johnson Co Segment, From 1 mi S of SR144 to 0.5 mi N of Wicker Rd Contract 4, Johnson County, R-41542 $21,012,292.66 $170,022,452.59
Indiana 0500440 I69, New Road Construction, 0.5 mi N of SR 64 to Patoka River, Pike County, IR-33038 $37,123,940.12 $37,452,422.58
Indiana 0500446 PR69, New Road Construction, US 231 near Crane Naval Center to 4.1 mi N of US 231 (Taylor Ridge Rd) (D/B), Greene County, IR-33734 $33,116,701.61 $38,223,276.60
Indiana 0500448 PR69, New Road Construction, SR 45 to SR 54, Greene County, IR-33737 $11,380,129.81 $75,136,885.42
Indiana 0500449 PR69, New Road Construction, Carmichael Rd to Greene/Monroe County Line, Greene County, IR-33739 $71,730,168.38 $77,465,280.51
Indiana 0500450 PR69, New Road Construction, Harmony Rd to Branch of Clear Creek, Monroe County, IR-33741 $54,684,211.17 $72,257,057.17
Indiana 0500597 SR25, New Road Construction, From 0.1 mi E CR 750 E to 0.1 mi W of NS RR (Segment 1- Phase B), Montgomery County, SIR-30843 $28,582,107.11 $29,288,114.49
Indiana 0500599 SR25, New Road Construction, Fr 0.6 mi S of Main St to 0.21 mi E of relocated SR 218 (Segment 2 - Phase C), Carroll County, IR-30847 $8,054,065.57 $30,672,038.47
Indiana 0500620 SR25, New Road Construction, From 0.11 mi E of CR 100 W to 0.16 mi E of CR 500 S (Segment 3 -Phase B), Carroll County, IR-30850 $20,244,464.61 $26,629,356.93
Indiana 0501212 I65, Added Travel Lanes, From US 50 to SR 58, Bartholomew County, SR-28940 $132,966,766.05 $168,041,179.97
Indiana 0600438 US31, New Interchange Construction, Monon Trail to Greyhound Pass, Hamilton County, IR-30201 $28,801,520.78 $28,997,371.32
Indiana 0624012 SR45, Added Travel Lanes, HMA, From Kinser Pike to Pete Ellis Dr, Monroe County, IR-29982 $30,946,861.95 $33,270,286.93
Indiana 0710056 ST1037, New Road Construction, Reconstruction of 45th St. from 0.2 miles E of Calumet Avenue, Lake County, B-36229 $22,363,368.96 $28,943,443.52
Indiana 0715010 SR25, New Road Construction, From I-65 to 0.1 mi E of CR 750 E (Segment 1 - Phase A), Tippecanoe County, IR-30840 $39,903,016.94 $43,565,718.81
Indiana 0715016 SR25, New Road Construction, Fr 0.42 mi E of Tipp/Carroll CL to 0.15 mi E of US 421 (Segment 2 - Phase A ), Carroll County, IR-30845 $20,339,064.15 $25,397,580.20
Indiana 0715017 SR25, New Road Construction, From 0.61 mi E of CR 325 W  to 0.21 mi E of CR 115 W (Segment 4 - Phase A), Cass County, IR-30853 $25,596,771.04 $26,798,400.59
Indiana 0753025 I64, New Br, Comp.Cont.Pres.Conc.Bulb T-Beam, NW ramp over Branch of N Fork Little Pigeon Creek, Spencer County, R-28507 $27,822,132.40 $33,824,485.09
Indiana 0800272 I65, Rest Area Modernization, I-65 Northern Rest Area- Kankakee Rest Area Replacement, Jasper County, R-33588 $32,471,020.89 $37,397,451.36
Indiana 0819029 US231, New Road Construction, From SR 26 to US 52 around the W side of W Lafayette, Tippecanoe County, IR-29161 $13,734,205.99 $33,674,949.65
Indiana 0902199 I65, HMA Overlay Minor Structural, SR-250 to US-50 Interchange (Seymour), Jackson County, R-33091 $28,453,421.46 $31,656,362.72
Indiana 0902256 US421, Replace Superstructure, Madison, IN (Replace truss superstructure), Jefferson County, IB-33023 $57,659,783.12 $59,276,757.92
Indiana 0902297 I65, Interchange Modification, I-465 and I-65 S of Indianapolis, Marion County, IR-33066 $31,661,069.45 $35,386,591.90
Indiana 1006075 PR69, New Road Construction, Branch of Clear Creek to SR 37, Monroe County, IR-33742 $22,630,223.24 $28,149,922.26
Indiana 1172430 I65, Added Travel Lanes, I-65 ATL from US 231 to US 30, Lake County, R-37450 $8,132,512.42 $34,968,477.08
Indiana 1173374 US50, New Road Construction, Continuation of North Vernon Bypass from SR 3 to US 50 East of the town, Jennings County, IR-34408 $21,321,364.86 $27,996,871.95
Indiana 1296427 US31, Added Travel Lanes, 96th Street to 146th, Hamilton County, IR-35600 $91,066,893.08 $104,995,459.46
Indiana 1296429 I469, Pavement Replacement, From 0.85 mi E of US 27 to 2.73 miles S of US 30., Allen County, R-35099 $15,561,027.50 $26,429,801.44
Indiana 1297885 PR69, New Road Construction, From S of Bloomington via SR37 corridor to SR39, Monroe County, PLC-37991 $140,048,168.07 $209,507,337.32
Indiana 1298685 US31, Added Travel Lanes, 169th to 203rd Street, Hamilton County, IR-35602 $46,916,038.90 $54,748,734.95
Indiana 1382656 I65, HMA Overlay Minor Structural, From 4.59 mi S of SR 28 to 3.44 mi S of SR 38, Clinton County, RS-36714 $26,347,160.80 $29,589,044.38
Indiana 1383650 I69, PCCP on PCC Pavement, From SR 18 to 5.59 miles N. of SR 18., Grant County, R-37704 $29,215,120.14 $33,176,259.09
Indiana 1400034 I465, Br Repl, Comp. Cont. Conc. Construction, EB over W 96th Street, 1.22 miles W US 421, Marion County, B-42569 $28,569,885.36 $34,709,085.21
Indiana 1400597 I65, Added Travel Lanes, 1.02 mi N of SR 60 to 2.8 mi S of SR 160 (.75 mi N of Memphis Rd), Clark County, R-37383 $12,146,087.70 $78,162,813.87
Indiana 1592349 SR37, New Interchange Construction, Intersection Improvement at 146th Street and SR 37, Hamilton County, R-39504 $26,515,709.83 $26,516,904.83
Indiana 1592397 I74, Road Reconstruction (3R/4R Standards), From 6.41 miles W of SR 229 (New Point) to SR 101, Ripley County, R-39226 $55,284,477.34 $61,877,914.76
Indiana 1592426 I69, Added Travel Lanes, From 0.8 miles N of SR 38 to 0.5 miles N of SR 9/SR 109, Madison County, R-39093 $20,819,910.80 $64,616,269.67
Indiana 1592433 I70, Road Rehabilitation (3R/4R Standards), From 0.8 mi W of SR 39 to 0.5 mi E of Ronald Reagan Pkwy, 2.40 mi E of SR 267, Hendricks County, R-38773 $43,841,940.08 $50,129,890.26
Indiana 1592546 I70, HMA Overlay, Preventive Maintenance, From 0.5 mi W of SR 3 to 0.47 mi W of SR 1, Wayne County, RS-39784 $33,694,699.13 $37,867,180.84
Indiana 1600808 I65, Interchange Modification, Multi-Level, I-65/70 N Jct. bounded by Vermont St, Central Ave and Commerce St, Marion County, B-36910 $264,194,169.50 $404,729,862.44
Indiana 1700897 I70, HMA Overlay Minor Structural, From 5.03 miles E of SR 9 to 0.24 mi E of SR 109 (Montgomery Creek), Henry County, R-40616 $32,815,026.22 $36,635,706.67
Indiana 1702255 I64, Bridge Rehabilitation Or Repair, Sherman Minton Bridge over Ohio River 3.95 miles W of I-65, Painting, MOT, Inter, Floyd County, B-40719 $8,305,429.64 $159,547,125.51
Indiana 1801695 PR69, New Road Construction, Marion Co Segment, 0.5 miles N of Wicker Rd via SR 37 to I-465, Marion County, R-41536 $252,900,726.70 $726,517,526.80
Indiana 1801697 PR69, New Road Construction, Morgan Co Segment 2, from 1 mi N of Henderson Ford Rd to 1 mi S of SR144, Johnson County, R-41542 $26,592,503.01 $100,871,616.37
Indiana 1802075 I465, Road Reconstruction (3R/4R Standards), Reconfiguration from I-70 to Mann Rd. & from US-31 to I-65, Marion County, R-41536 $9,026,787.80 $66,878,576.93
Indiana 1901381 PR69, Road Reconstruction (3R/4R Standards), Johnson Co Segment, From 1 mi S of SR144 to 0.5 mi N of Wicker Rd Contract 5, Morgan County, R-41536 $41,829,351.51 $57,958,461.25
Indiana 1901383 PR69, New Road Construction, Morgan/Johnson Co, from 1 mi N of SR44 via SR 37 to SR 144, S-Lines only Contrac, Morgan County, R-41542 $16,388,024.48 $66,125,815.25
Indiana 1902139 I70, Patch And Rehab Pavement, State Route 1 to the Ohio State Line, Wayne County, R-42555 $23,708,319.14 $26,570,048.32
Indiana 2001172 I65, Added Travel Lanes, 1.33 mi N of SR 25 to 0.8 mi N of SR 43, Tippecanoe County, R-42909 $7,641,955.29 $52,530,904.60
Indiana 2652002 PR265, New Road Construction, Section 6 ORB - R/W Alignment to I-265 Bridge (B&N; BLN), Clark County, PLC-30335 $23,094,812.63 $26,392,262.84
Indiana 2911004 PR641, New Road Construction, From 0.25 mile N of existing Feree Rd to approx 3.50 mi N of Riley Rd, (Ph IIIA), Vigo County, IR-30089 $30,847,940.51 $38,518,349.25
Indiana 2911007 SR 641, NEW ROAD CONSTRUCTION, FROM WOODSMALL RD TO 0.25 MILE N OF EXISTING FEREE RD, (PHASE IIB), VIGO COUNTY, R-28177 $35,453,757.30 $44,287,133.59
Indiana 70BG020 I-70, Added Travel Lanes, 2020 BUILD Grant I-70 Rehabilitation and Modernization, Hancock County, R-41501 $94,080,688.51 $161,962,452.84
Indiana B282018 US40, New Sign Installation, From Franklin Rd to Grassy Creek 1.66 miles W of Marion/Hancock County Line, Marion County, IR-29133 $23,017,370.82 $28,514,105.99
Indiana CPIG121 I-465, Interchange Modification, 2021 INFRA Grant Clear Path I-465, Marion County, R-38526 $50,059,621.24 $177,151,627.31
Indiana I69S518 PR69, New Road Construction, From S of Bloomington via SR37 corridor to SR39, Monroe County, PLC-37991 $238,691,279.10 $303,385,057.66
Indiana N881008 SR152, Lighting Installation / Maintenance, SR 152 bridge over CSX and IHB Railroad, 3.48 km N of  I-80/94, Lake County, B-33357 $20,658,013.39 $25,628,589.85
Indiana NCBG018 I65, Added Travel Lanes, 2018 BUILD Grant I65 Added Travel Lanes Project in Boone County, R-41841 $51,595,642.00 $78,253,292.00
Indiana SCBG018 I65, Added Travel Lanes, 2018 BUILD Grant I65 Added Travel Lanes Project in Bartholomew County, R-41849 $25,775,251.16 $54,414,103.44
Indiana WTBG019 I65, Interchange Modification, 2019 BUILD Grant I65 Mobility and Access Project in Whitestown, Boone County, R-39231 $36,445,145.60 $67,452,009.68
Iowa 0209183 Dubuque County, from 0.2 miles east of Cottingham Road to 1.5 miles east of Swiss Valley Road - Pavement, Grade and New   $31,917,562.80 $40,260,211.50
Iowa 0293115 Pottawattamie Co, I 29/80 in Council Bluffs, I 29 NB from N of US 275 to Ramp F/Ramp D Berm I 80 WB to W of S Expsswy - PCC Pavement, Grade & Replace  $36,248,994.15 $42,472,378.99
Iowa 0293141 In Pottawattamie County & the city of Council Bluffs at The Nebraska Ave. Interchange  - Portland Cement Concrete (PCC) Pavement $26,297,329.61 $30,803,653.00
Iowa 0293171 Pottawattamie County, in Council Bluffs,  I-29 SB from Indian Creek Bridge to I-29 SB and I-80 EB - PCC Pavement, Grade and New   $36,984,931.73 $43,307,882.59
Iowa 0293190 I-29 in Council Bluffs from N of UPRR to 0.9 mi. N of Ave. G & I-480 from E of Missouri River to I-29 in Pottawattamie County  - PCC Pavement  $88,860,058.00 $89,679,453.00
Iowa 0295245 Harrison County, I 29, 0.4 mi N of UP RR to 0.5 mi N of IA 127 (SBL) - PCC Pavement, Grade and Replace   $28,674,498.60 $31,863,179.00
Iowa 0297049 In city of Sioux City, Downtown (NBL), Woodbury County - Portland Cement Concrete (PCC) Pavement - Grade and replace. $27,468,787.58 $33,004,143.43
Iowa 0297050 I 29, Woodbury County, in the city of Sioux City Downtown Median & SBL - Portland Cement Concrete (PCC) Pavement, Grade and new  $26,265,132.67 $31,054,350.93
Iowa 0306181 Along U.S. 30 from West of Co Rd V44(16th Ave.) to 1 mi W of U.S. 218 (EB/WB) in Benton County - Portland Cement Concrete(PCC) Pavement & Grading $30,722,619.20 $38,604,915.00
Iowa 0306191 Tama County, US 30, Tama Bypass to W of IA 21 - PCC pavement, new   $23,681,348.00 $29,816,927.00
Iowa 0353195 Along I-35 Northbound over  I-80/I-235 Ramps in Polk County NE of the city of Des Moines - Bridge New - Steel Girder $39,651,202.80 $44,056,892.00
Iowa 0694068 Along U.S. 69 from I-80 to S of SW Springfield Dr./SE 33rd St in Polk County & the city of Ankeny. - PCC Pavement -Grade and New $25,491,948.00 $34,500,722.00
Iowa 0741197 Scott County, I 74 Approaches to Arch Bridge over the Mississippi River- Bridge Replacement, Steel Girder  $67,932,489.49 $78,695,880.51
Iowa 0741198 Scott County Mississippi River Bridges between Bettendorf, IA and Moline, IL - Bridges replacement, other $104,953,148.60 $156,667,544.23
Iowa 0741200 EB I-74 and U.S. 67 Ramp C in Scott County & the city of Bettendorf. - Bridge Replacement $30,522,259.02 $34,575,525.00
Iowa 0741206 Scott County, I-74 from 12th Avenue in Moline to North of Lincoln Road in Bettendorf - Portland Cement Concrete (PCC) Pavement, Grade and Replace  $33,224,142.80 $37,984,758.50
Iowa 0801378 Pottawattamie County, Eastbound I-80 (Viaduct) over Northbound I-29, Railroads and Harry Langdon Blvd - Bridge New, Steel Girder $31,548,951.88 $36,986,666.61
Iowa 0801447 Madison Ave Interchange (EB) in Pottawattamie County and the city of Council Bluffs -  Portland Cement Concrete(PCC) Pavement - Grade and New   $38,874,173.00
Iowa 0803184 Polk County, I 80, Douglas Ave to E of 100th St, includes IA 141 interchange in Urbandale - PCC Pavement, grades and new    $19,882,924.40 $25,644,043.00
Iowa 0806355 Johnson County, EB I-80 to NB I-380 Ramp H over I-80, I-380 Ramps & EB I-80 to SB I-380 Ramp B over Ramp G - Bridge, Steel Girder   $25,634,154.40 $32,042,693.00
Iowa 0806371 Johnson County, I-80/380/US218 interchange near Iowa City - Portland Cement Concrete (PCC) Pavement, Grade and Replace   $31,639,034.40 $41,018,793.00
Iowa 0806372 Johnson County, I-80, I-80/380/US 218 Interchange near Iowa City - Portland Cement Concrete (PCC) Pavement - Grade and Replace $86,809,516.00 $108,511,895.00
Iowa 0806488 I-80/1st Ave Interchange in Johnson County and city of Coralville - PE/ROW/Portland Cement Concrete (PCC) Pavement - Grade and New/Bridge Replacement $20,525,359.00 $42,321,904.00
Iowa 0807174 Along I-80 Approx. 1.5 mi E of IA 1 to 0.5 mi E of Wapsi Ave (EB/WB) in Johnson County - Portland Cement Concrete (PCC) Pavement - Grade and Pave $16,667,363.00 $40,094,861.00
Iowa 0977650 TIGER IX: City of Burlington Downtown/Riverfront Revitalization Project in Des Moines County - PE/CE/PCC Pavement $17,000,000.00 $26,071,562.50
Iowa 3715652 Along Dubuque St. from Foster Rd. to Church St. & Along Park Rd. from Dubuque St. to Holt Ave. in Johnson County and Iowa City. - PCC Pavement $7,617,603.74 $42,985,293.00
Iowa C077227 In Polk County, on NE Broadway Avenue from IA Hwy 415 to US Hwy 6 - Hot-Mix Asphalt Pavement - Grade and Replace $25,000,000.00 $44,040,405.00
Iowa PA26001 In Polk County, Phase I Dam Modifications and User Access Project at Birdland Marina, Prospect Park, Harriet Access, and Scott Avenue sites - PCC Pave $25,550,000.00 $42,364,153.00
Kansas 0702047 I-70 Improvements in Gove County $40,445,896.33 $45,016,857.91
Kansas 0706125 Bridges for the Lewis & Clark Viaduct, Kansas City, KS $67,660,627.30 $75,575,195.52
Kansas 2351200 Roadway improvements in Sedgwick County $57,346,130.75 $69,954,845.10
Kansas A100502  US-166/US-400: Pittsburg Bypass, SE to the KS/MOSt Ln $53,367,712.42 $70,862,987.08
Kansas A100702 K-14 (K-96) Improvements in Reno County $42,410,840.01 $58,897,935.21
Kansas A100703 K-14(K-96): from RN/RC Co Ln, N to Jct K-96/RS-571 $40,511,774.74 $54,339,586.40
Kansas A126606 I-70 Polk/Quincy Viaduct: ROW/ Building Demolition $1,752,056.54 $25,012,046.37
Kansas A155302 Construct upgradable expressway in Bourbon County $21,355,261.56 $28,271,318.70
Kansas A155402 Construct upgradable expressway in Crawford County $24,677,245.47 $31,476,899.87
Kansas A155403 Road Improvements in Crawford County $22,455,280.29 $28,713,448.30
Kansas A158601 K-7 from K-7/US-160 Jct(Columbus), North to CK/CR Co Ln $34,478,220.95 $46,518,956.62
Kansas A236801 Grading and Surfacing on K-177 in Morris County   $33,746,372.01
Kansas A236901 Grading and Surfacing on K-177 in Geary County   $36,155,855.52
Kansas A237003 Grading and Surfacing on US-281 Russell County   $41,969,852.49
Kansas A237303 DELAYED: Highway improvements on K-68 in Miami County $17,255,806.41 $28,002,514.55
Kansas A238001 Roadway reconstruction in Anderson County $20,917,417.34 $27,470,844.61
Kansas A238201 Reconstruct 4-Lane on US-54 in Sedgwick County $63,107,486.92 $87,854,521.68
Kansas A238301 Roadway reconstruction in Gray County   $45,569,385.53
Kansas A238401 Construct 4-Lane expressway on US-50 in Ford County   $71,365,199.79
Kansas A238501 Construct 4-Lane on US-54 in Seward County   $34,429,247.03
Kansas A238503 Construct 4-Lane on US-54 in Seward County $29,227,381.69 $37,215,042.01
Kansas A307901 Bridges #104 & #105 on K-32 in Wyandotte County   $26,377,251.29
Kansas A323203 SB I-135 and WB I-235 Fly Over Brg Option #2-Wichita $48,909,100.23 $57,110,567.54
Kansas A323222 I-235, I-135, K-254 & K-96 Intchg-Gold Project-Wichita $38,100,000.00 $132,930,000.00
Kansas A325501 Roadway reconstruction and bridges in Neosho County $27,811,536.56 $36,620,122.16
Kentucky 0011038 Fulton,Hickman,Graves | I-69 Corridor Improvement $6,888,032.96 $33,539,500.00
Kentucky 0061061 Mountain Parkway widening/safety improvements from MP 73.4, 1.1 mi west of Licking River Bridge to MP 75.3 Burning Fork Bridge. $24,372,427.00 $26,953,431.00
Kentucky 0061066 Wolfe County - Mountain Pkwy (INFRA) $93,355,914.00 $148,288,354.00
Kentucky 0061072 WOLFE, MORGAN, MAGOFFIN - KY 9009-RECONSTRUCT TO WIDEN THE MOUNTAIN PARKWAY TO 4 LANES $98,306,579.90 $98,306,579.90
Kentucky 0061076 Magoffin Co. | Mountain Parkway Corridor  $69,307,938.40 $69,307,938.40
Kentucky 0151078 Perry County - KY 15 RECONSTRUCTION $58,037,800.00 $58,037,800.00
Kentucky 0151086 PERRY CO., KY 15 - IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUES  $48,205,200.00 $48,205,200.00
Kentucky 0241090 Reconstruct I-24/Purchase Parkway Interchange (I-69 Corridor Improvement). $42,648,486.00 $42,648,486.00
Kentucky 0242075 Lyon-Caldwell-Trigg | I-24 Resurfacing & Rehab $31,723,650.00 $31,723,650.00
Kentucky 0243057 Christian Co. | I-24 Pavement Rehab $25,684,000.00 $25,684,000.00
Kentucky 0302025 Owsley-Jackson | KY 30 Reconstruction $66,462,915.10 $66,462,915.10
Kentucky 0302026 Lee-Owsley Co. | KY 11 Reconstruction $21,164,000.00 $26,455,000.00
Kentucky 0311034 Jefferson- Dixie Highway TIGER project $24,690,000.00 $37,921,970.50
Kentucky 0411026 Christian & Hopkins Cos. | Remove & Replace concrete pavement on Pennyrile Pkwy $55,264,110.00 $55,264,110.00
Kentucky 0601196 Livingston Co. | US 60 over Cumberland River Bridge Replacement $56,342,464.00 $70,340,580.00
Kentucky 0643058 Franklin Co. | I-64 Bridges  $26,615,160.00 $33,268,950.00
Kentucky 0649009 Jefferson Co. | I-64 Sherman Minton Bridge Maintence $77,264,791.00 $85,285,441.00
Kentucky 0654041 Hardin Co. | I-65/KY222 Interchange at Glendale  $19,520,000.00 $46,934,160.00
Kentucky 0654048 Widen I-65 to 6 lanes from 0.6 mi north of Old Sonora Road to the Western Kentucky Parkway. $75,446,855.00 $75,446,855.00
Kentucky 0655120 Bullitt Co- Construct new I-65 interchange $27,707,722.20 $27,707,722.20
Kentucky 0659023 Louisville/Southern Indiana Ohio River Br "Downtown Crossing" general project mgmt/oversight including construction eng inspection $85,060,407.86 $85,060,407.86
Kentucky 0659024 Jefferson - Construct the Downtown Ohio River Crossing and associated roadway approaches in Louisville and Jeffersonville, Indiana"Design-Buil $72,863,423.14 $72,863,423.14
Kentucky 0659025 Jefferson - Construct the Downtown Ohio River Crossing & associated roadway approaches in Louisville & Jeffersonville, Indiana "Design-Build". $219,382,945.17 $309,155,689.10
Kentucky 0752059 Laurel Co. |  I-75 Widening $81,442,056.71 $82,255,095.15
Kentucky 0752095 ROCKCASTLE CO., I-75 - WIDEN I-75 TO 6 LANES  $45,475,091.09 $45,970,900.00
Kentucky 0752098 ROCKCASTLE CO., I-75 - WIDEN I-75 TO 6 LANES  $44,968,600.00 $44,968,600.00
Kentucky 0752100 Laurel Co; widen I-75 to 6 lanes $60,403,800.00 $60,403,800.00
Kentucky 0753092 Rockcastle County I-75 Widening  $36,577,240.14 $36,653,340.14
Kentucky 0754065 Fayette Co. | I-75 Improvements | Section 2 $14,000,000.00 $45,744,600.00
Kentucky 0757144 Boone Co. | I-71/75 INFRA Project $146,598,062.39 $193,585,628.00
Kentucky 0758107 Kenton Co. | Brent Spence Bridge Maintenance $31,550,024.00 $39,437,530.00
Kentucky 0801098 Trigg | Marshall - Construct a bridge and approaches on US 68/KY 80 over Kentucky Lake. $72,117,599.97 $192,397,360.20
Kentucky 0801101 Trigg - Construct a bridge and approaches on US 68/KY 80 over Lake Barkley. $89,080,443.83 $201,235,582.00
Kentucky 0801104 Trigg County - Aurora-Cadiz Road: Reconstruct (US 68)  $31,328,123.00 $31,328,123.00
Kentucky 0806044 Pike Co., US 460 - Construct twin bridges on relocated US 460 at Pond Creek. $29,624,550.00 $29,624,550.00
Kentucky 0806047 Pike County | US 460  $70,993,658.26 $78,687,600.00
Kentucky 0902008 Whitley Co. | US 25W BUILD Grant Project $15,050,000.00 $41,281,000.00
Kentucky 1271120 RUSSELL CO, US 127 - RELOCATE US 127 FROM THE NORTH BANK OF THE CUMBERLAND RIVER TO THE JAMESTOWN BYPASS. $38,749,477.80 $38,749,477.80
Kentucky 1271122 Russell-Clinton- Relocation of US 127 $34,568,612.00 $117,644,675.00
Kentucky 2653043 Jefferson & Oldham Cos. | I-MOVE KY Design-Build $113,829,084.68 $189,000,000.00
Kentucky 2681033 FAYETTE CO., KY 4 - WIDEN NEW CIRCLE ROAD  $46,019,590.00 $46,019,590.00
Kentucky 2759135 Boone Co. | I-275/Graves Rd XCHNG | Design-Build $74,760,935.00 $75,300,935.00
Kentucky 2759136 Kenton Co; address pavement condition on pcc pavement on I-275 $34,471,030.00 $34,471,030.00
Kentucky 3020007 Henderson - I-69 Bridge over Ohio River $63,420,000.00 $234,270,000.00
Kentucky 4601053 Bourbon Co. | US 460 Reconstruction (BUILD GRANT) $11,200,000.00 $25,017,175.00
Kentucky 4611009 Pulaski Co | KY 461 | BUILD Grant $57,928,400.00 $66,910,500.00
Kentucky 5053031 Henderson Co.- US 60 Bridge over Green River $36,687,527.40 $36,687,527.40
Kentucky 5211123 Boyd Co. | US 60 Improvements $10,000,000.00 $50,320,050.00
Kentucky 5225005 Boone Co. - KY 536-reconstruct to a 5-lane urban section $29,121,600.00 $29,216,400.00
Kentucky 5283007 Madison County - KY 52 $15,531,517.60 $35,657,700.00
Kentucky 6000167 Bridging KY Design-Build No.1 $67,189,515.71 $105,878,911.11
Kentucky 6000205 Jefferson-Oldham Co. | KY 3084 Extension   $27,600,665.00
Kentucky 6411039 Calloway Co. BUILD | Improvements along US 641  $29,300,000.00 $55,369,152.75
Kentucky 8200014 Boone: Reconstruct & widen KY237 from Rogers Ln to KY18 - Grade, drain & surface $24,928,420.00 $25,088,420.00
Kentucky 8200017 Boone Co; Reconstruct and widen KY 237 $26,085,420.00 $26,085,420.00
Louisiana 0021023 I-49, I-49 NORTH (LA 2 TO MIRA-MYRTIS ROAD), LOCATED ON RT. I-49 FROM ITS JCT. WITH RT. LA 2, ITS JCT. WITH MIRA-M (CONSTR.-DEMO) $21,103,197.84 $25,954,547.24
Louisiana 0806504 BOSSIER PARISH CONGESTION RELIEF NORTH/SOUTH CORRIDOR, SWAN LAKE ROAD $20,092,181.21 $26,267,706.27
Louisiana 0905504 I-49 NORTH; (Mira-Myrtis Road - LA 168), New Construction Roadway (STIMULUS) $33,480,197.85 $33,714,740.31
Louisiana 3621010 US 190, US 190 Widening (LA 22 to Little Bayou Castine), LOC On Route US 190 From ITS Intersection with Route LA 22, Bayou Castine $25,610,272.70 $32,093,340.90
Louisiana 3806500 REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE $79,495,534.86 $222,814,244.31
Louisiana 4507502 I-310 MISSISSIPPI RIVER BRIDGE (LULING) CABLE STAY REPLACEMENT, LOCATED ON RT. 1-310 OVER MISS. RIVER BRIDGE (CONSTR.-BR) $46,673,786.82 $58,342,233.53
Louisiana 5109501 US 90 INTERCHANGE US 90 @ LA 318 (US 90 @ LA 318) $18,456,617.51 $77,473,132.89
Louisiana H000343 US 190; BEG LOG MILE 0.000 END LOG MILE 1.110; MISSISSIPPI RIVER BRIDGE CLEAN, PAINT & REPAIR PHASE 1 $76,006,304.76 $117,405,259.54
Louisiana H000428 ROUTE LA 12 $25,155,095.91 $31,443,869.91
Louisiana H000665 MISSOURRI PACIFIC RAILROAD OVERPASS NEAR BONITA,  END. BEG LOG MI 9.061,END LOG MI 9.35 $4,780,104.28 $36,222,121.43
Louisiana H001120 ROUTE LA 8; EARTHWORK, GRADING ASPHALTIC CONCRETE DRAINAGE STRUCTURES $36,529,210.38 $45,661,512.99
Louisiana H001234 LA 1: PORT ALLEN CANAL BR REPL (PH1)(HBI) $55,702,106.32 $89,470,782.59
Louisiana H001263 LA 1 AT JCT LA 107 & JCT 1189;  BEG. LOG. MILE 7.290 END LOG MILE 10.480 $23,057,271.25 $28,821,589.24
Louisiana H001340 LA 21 WIDENING; BEG LOG MILE 5.00 END LOG MILE 6.000; LA 1085-11TH;  CONSTRUCT NEW 2 LANE BRIDGE $23,356,991.88 $29,146,262.78
Louisiana H001344 US 190: LA 437 - US 190 BUS (PH 1) $19,480,734.65 $42,685,014.78
Louisiana H001498 LA 24 DISTRICT 02 TERREBONNE PARISH BEG. LOG MILE 1.000 END LOG MILE 1.403 BRIDGE REPLACEMENT $32,897,151.78 $41,121,433.68
Louisiana H002370 LA 42: US 61 - LA 44; $30,208,153.39 $59,721,751.71
Louisiana H002375 AMITE R.BR. NEAR FRENCH SETTLEMENT; BEG: 700' BEFORE BRIDGE BEGIN; END: 700' AFTER BRIDGE END $21,290,578.34 $26,613,223.02
Louisiana H002424 LA 70: SUNSHINE BRIDGE - LA 22   $40,574,264.57
Louisiana H002622 ROUTE LA 616; ARKANSAS ROAD:  (CALDWELL ROAD - LA 143) $66,362,837.62 $83,033,587.02
Louisiana H002868 I-49 S:AMB CAFFERY/US90 INTERCHANGE $21,963,334.71 $177,780,739.75
Louisiana H002980 I-10; REPLACE BRIDGE BEG. LOG MILE 0.570 END LOG MILE 0.970 $18,356,328.45 $98,064,722.72
Louisiana H003003 I-10: E. JCT I-49 TO LA 328; BEG: E. JCT I-49; END: LA 328 $144,459,835.19 $187,810,332.15
Louisiana H003014  I-10: CSLM 5.50 TO ATCHAFALAYA FLDWY BR; BEG: ST MARTIN PARISH LINE; END: W. END OF ATCHAFALAYA FLOODWAY BRIDGE $69,589,657.87 $88,354,253.69
Louisiana H003047 PECUE LANE/I-10 INTERCHANGE $44,087,666.45 $67,387,325.55
Louisiana H003184 I-10: TEXAS STATE LINE-E. OF COONE GULLY $57,629,802.32 $195,226,781.70
Louisiana H003298 I-20; BEG LOG MILE 9.900 END LOG MILE 13.300; CONCRETE WORK RELATED TO BUILDING NEW INTERCHANGE $10,967,578.86 $30,245,447.05
Louisiana H003370 I-220/1-20 INTERCHANGE IMP & BAFB ACCESS $32,033,394.27 $113,713,613.56
Louisiana H003495 I-49 NORTH ( I-220 TO MARTIN LUTHER KING DRIVE) BEG. LOG MILE 0.000  END LOG MILE 1.024 $21,210,200.00 $62,623,421.89
Louisiana H003496 I-49 North: Martin Luther King, Jr. Drive (LA 3194) - LA 1; New Roadway Construction, New Interstate $740,360.85 $66,259,721.07
Louisiana H004100 I-10; LA 415 TO ESSEN ON I-10 AND I-12 $89,618,573.13 $151,827,703.81
Louisiana H004113 LA 3241: LA 435 TO LA 40/LA 41(BUSH) $17,251,187.69 $71,363,172.82
Louisiana H004435 LA 3241: LA 36 TO LA 435 $18,656,216.88 $98,025,922.15
Louisiana H005967 Nelson Road, Extension of Nelson Road to Contraband Bayou, New Bridge over bayou for access to Port of Lake Charles $18,678,081.15 $94,372,252.58
Louisiana H006196 WISNER BLVD BRIDGE REPLACEMENT; BEG: EXIST. STRUCTURE: 24'W X 1423'L $20,405,355.66 $25,563,088.19
Louisiana H008145 LA 1: LEEVILLE TO GOLDEN MEADOW (PHASE 2) $160,340,895.00 $580,213,957.08
Louisiana H009250 I-10; HIGHLAND ROAD TO LA 73; WIDEN I-10 FROM 4 TO 6 LANES TOWARDS THE MEDIAN SIDE $85,204,847.29 $98,140,121.15
Louisiana H009461 I-10 ATCHAFALAYA FLDWY CLEAN & PAINT; $25,727,590.45 $28,586,211.63
Louisiana H009479 ROUTE LA 1; BEG LOG MILE 2.780 END LOG MILE 3.780; STRUCTURAL REPAIRS CLEANING AND PAINTING OF VERTICAL LIFT BRIDGE $28,349,154.11 $35,436,442.65
Louisiana H009498 LA 121: CALCASIEU RIVER BRIDGE $10,220,238.83 $29,883,001.74
Louisiana H009620 I-10:WEST OF LA 108 TO 1-210 INTERCHANG $46,265,373.42 $55,664,324.69
Louisiana H010016 US 11: LAKE PONTCHARTRAIN BRIDGE REHAB $17,826,964.41 $30,639,996.61
Louisiana H010018 I-10: NO EAST DRAIN CANAL BRIDGE REPLACE $28,912,673.03 $36,140,841.29
Louisiana H010037 NEW FERRY BOAT /  CAMERON FERRY CROSSING   $53,643,844.31
Louisiana H010601 I-10: LA 328 to LA 347 $96,053,949.97 $115,455,732.66
Louisiana H010620 US 90: ALBERTSON'S PKWY TO AMB. CAFFERY; Scope: 6 lane facility from Albertson's Pkwy to Amb. Caff. and frontage road construction   $87,136,141.18
Louisiana H010673 US90Z : HARVEY CANAL TUNNEL REHABILITATION $36,596,426.25 $46,938,452.96
Louisiana H010916 PRIEN LAKE MAIN SPAN RE-DECKING (DDIR LA2020-01 I-210: C.S. 450-30: LM 1.02 - 4.00) $45,151,128.74 $53,931,489.33
Louisiana H010960 LA 30 ROUNDABOUTS @ TANGER MALL & I-10 $9,700,571.04 $32,641,935.50
Louisiana H011111 I-49 NORTH, SEGMENT K - PHASE 2; SCOPE: Construction of new roadway, including bridges for I-49 North, between I-220 and MLK Dr $62,322,149.21 $159,098,953.06
Louisiana H011152 I-12: US 190 TO LA 59; ROADWAY WIDENING AND OVERLAY $61,167,429.78 $74,033,563.09
Louisiana H011487 LA 182: BERWICK BAY BRIDGE REHAB (HBI) $32,563,671.53 $40,704,589.41
Louisiana H011670 I-10 / LOYOLA INTERCHANGE IMPROVEMENT $41,574,987.39 $213,649,660.08
Louisiana H011705 US 11: LAKE PONTCHARTRAIN BR. REHAB PH 2 $34,240,968.79 $42,863,074.44
Louisiana H011915 AIRPORT CONNECTOR ROAD AND BRIDGE $17,528,716.80 $31,022,192.07
Louisiana H011965 LA 47: IWGO BRIDGE REHABILITATION (HBI) $48,383,124.75 $60,544,781.01
Louisiana H012174 I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR) $54,869,418.84 $60,027,936.88
Louisiana H012588 I-10: ATCH BASIN BR - W BATON ROUGE P/L $22,871,209.33 $25,412,454.81
Louisiana H012739 I-20 MRB AT VICKSBURG OVERLAY AND REHAB $36,588,225.38 $40,808,548.27
Louisiana H012889 I-20 REHAB (W OF LA 3 TO AIRLINE DR) $2,822,763.45 $73,528,958.75
Louisiana H013245 MOTORIST ASSISTANCE PATROL (MAP) $22,518,245.86 $28,147,807.33
Louisiana H013265 US 90: LA 14 - LA 83 $24,419,663.03 $37,444,172.38
Louisiana H013842 CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1A $20,286,305.98 $72,034,194.58
Louisiana H013866 I-12: LA 21 TO US 190 $54,643,306.51 $68,304,133.12
Louisiana H013897 I-10 & I-12 COLLEGE DR FLYOVER RAMP $11,371,905.00 $70,898,611.98
Maine 1015200 Kittery, US 1, Memorial Bridge #2546, Bridge Replacement $29,634,207.97 $37,042,759.96
Maine 1671000 Kittery-Portsmouth, SML BR #3641 $37,500,410.37 $201,902,608.02
Maine 1673100 Falmouth - Portland, Route 1 Martin Point Br. # 2515, Bridge Replacement. Design-Build $20,792,363.04 $26,016,452.70
Maine 1728001 Western Maine Gateway BUILD Grant Bundle $11,027,500.00 $28,775,656.54
Maine 1891500 Brewer-Eddington, I-395/9 Connector & Brewer, Wilston Street/I-395 Bridge #1564 $33,899,051.94 $72,774,000.00
Maine 1919700 Bar Harbor, Route 3 $7,207,488.48 $25,534,824.47
Maine 1927000 Kittery- Portsmouth, I95, Piscataqua River Bridge #6330, I-95 $2,412,000.00 $42,227,372.75
Maine 2173600 Madawaska,Bridge Ave. International Br #2399 $45,302,647.86 $92,910,405.68
Maine 2189401 2020 INFRA FRAME Project Bundle    $35,947,089.17
Maine 2262600 BEALS-JONESPORT, Beals Island Bridge #5500 on the Beals/Jonesport town line, Bridge Replacement $15,691,451.77 $28,224,010.87
Maine 2262701 TIGER Penquis Bridge Replacement Bundle $15,990,795.00 $30,345,588.75
Maine 2309401 2020 BUILD Grant Bundle, Bridging the Economy of Rural Maine (BERM) $21,745,322.17 $38,849,144.02
Maine 2313800 Waterville, Ticonic Bridge (#2854) $26,308,000.00 $48,418,000.00
Maine 2392900 Woolwich, Station 46 Bridge #3039 & U.S. Route 1 Safety Improvements BUILD grant $25,000,000.00 $32,520,000.00
Maryland 0003801 Latex Modified Concrete Overlays on Ten (10) Bridges in the I-95/I-695 Interchange South of Baltimore $4,000,000.00 $29,621,902.59
Maryland 0701265 Dual Bridges No. 21118 on I-70 over MD 65 and Dual Bridges No. 21119 on I-70 over CSX Transportation $23,020,635.97 $28,184,837.79
Maryland 0811071 I-81 from South of US Rte. 11 in W. VA to North of MD Rte. 68/63 in MD $58,570,618.55 $103,986,850.56
Maryland 0832228 Replacement of Dual Bridges No. 0306201 and 0306202 on I-83 over Padonia Road and Extension of Box Culvert No. 03392X0 Carrying Branch of Beaver Run $21,848,389.35 $25,254,468.78
Maryland 0951514 Replacement of Dual Bridge Nos. 1616005 and 1616006 on I-95/I-495 (Capital Beltway) over Suitland Parkway  $35,645,374.67 $38,124,718.33
Maryland 0951517 I-95 Interchange at Belvidere Road $20,000,000.00 $64,414,000.00
Maryland 0952270 Replacement of Dual Bridge Nos. 1615305 and 1615306 on I-95/I-495 (Capital Beltway) over MD 214 $28,620,256.52 $30,567,590.27
Maryland 1111029 Replacement of Three Bridges over MD 295 - Waterview Avenue, Annapolis Road and Maisel Street Pedestrian Bridge $24,000,000.00 $40,680,173.14
Maryland 1181069 MD 32 from Linden Church Road to I-70  $80,815,701.03 $101,579,523.90
Maryland 1211032 MD 261: Replacement of Bridge No. 04011 on MD 261 (Bayside Rd.) over Fishing Creek - Constr. $17,668,542.43 $26,457,499.41
Maryland 1211033 MD 5 (Branch Ave.) Phase 2 from Auth Way to South of I-495/I-95 and Construct an Access Road to the Branch Ave. Metro Station. $31,589,417.80 $43,079,096.02
Maryland 1211035 MD 5 at Brandywine Road and MD 373 Interchange Phase 2 - Constr. $29,880,171.02 $46,674,749.28
Maryland 1251066 US 40 (Pulaski Highway) Dual Steel Beam Br. Nos. 0303503 & 0303504 over Gunpowder Falls & Br. Nos. 0303403 & 0303404 over Little Gunpowder Falls $21,364,858.28 $27,172,933.22
Maryland 1553001 MD 331: Steel and Prestressed Concrete Girder Bridge# 2003400 on MD 331 (Dover Rd) over Choptank River. (Constr.) $47,592,217.54 $55,874,789.97
Maryland 2031003 US 219 from I 68 to Old Salisbury Road $60,210,141.59 $60,539,764.53
Maryland 2441026 Edmondson Avenue over Gwynns Falls and CSXT - Bridge Replacement - Construction $48,311,494.00 $48,311,494.00
Maryland 2471012 MD 355 Underpass (BRAC Project): South of Jones Bridge Road/Center Drive to North of South Wood Drive/South Drive - Construction $24,776,950.00 $93,374,722.70
Maryland 2511076 US 1 – College Avenue/Regents Drive to MD 193 (University Blvd.) $17,153,607.44 $37,552,661.98
Maryland 2511078 US 1 (Washington Boulevard) Bridge No. 0300800 over CSX Railroad $27,912,773.05 $31,227,778.58
Maryland 2591083 MD 4 (Pennsylvania Avenue) at Suitland Parkway $36,351,519.63 $89,943,542.23
Maryland 2631022 MD 210 (Indian Head Highway): Livingston Road/ Kerby Hill Road - Interchange Constr. Design-Build (Construction) $83,089,924.99 $105,871,668.33
Maryland 3001053 MD 404 (Shore Highway): From US 50 to East of Holly Road $102,146,855.16 $135,111,195.45
Maryland 3034016 Replacement of 3 bridges in the MD 151 (Sparrows Point Blvd) / MD 151B (Wharf Rd) Interchange $25,852,783.53 $25,870,285.59
Maryland 3049003 Dundalk Avenue Streetscape from Eastern Avenue to Baltimore City Line $15,279,424.28 $25,249,336.48
Maryland 3057004 Rehabilitation of Central Avenue and Storm Drain from Eastern Ave. to North of Madison Street $26,131,127.80 $33,746,316.51
Maryland 3057006 Central Avenue Streetscape and Harbor Point Connector Bridge (Design Build) - Construction $45,150,054.22 $55,852,126.25
Maryland 3071005 North Charles Street Reconstruction from 25th Street to University Parkway $18,878,650.24 $27,260,052.00
Maryland 3271037 US 113 (Worcester Hwy) from North of Massey Branch to Five Mile Branch Road - Dualization (Construction - Design Build) $37,219,782.24 $44,017,605.00
Maryland 3271039 US 113 (Worcester Highway): From North of MD 365 to North of Five Mile Branch Road $63,777,290.04 $63,777,290.04
Maryland 3617019 MD 175 (Annapolis Road): From West of Reece Road to East of Disney Road $21,256,601.07 $26,081,908.48
Maryland 3617020 MD 175 from National Business Parkway to McCarron Court $15,294,311.54 $48,393,462.35
Maryland 6956371 I-695 IL over Benson Ave/Leeds Ave/US 1/AMTRAK/Herbert Run - Replace Bridge Nos. 0311305 & 0311405/Realignment of Ramp 8 Br.(Con.) $41,961,288.42 $46,566,383.00
Maryland 6956376 I-695 OL (Baltimore Beltway): From South of US 40 to MD 144 - Multi-lane Reconstruct (Construction) $70,366,514.63 $99,360,361.07
Maryland 6956385 I-695 Baltimore Beltway from I-70 to MD 43 Transportation Systems Management and Operations $84,191,605.60 $167,755,099.70
Maryland 7816001 MD 85 (Buckeystown Pike): From South of District 7 Office to North of Spectrum Drive at I-270 (Phase 1) $60,424,575.77 $75,391,033.09
Maryland ICC1001 MD 200: from I 270 to US 1 Inter-County Connector ICC Construction. $953,612,187.90 $2,330,518,244.46
Massachusetts 001S977  BOSTON- BRIDGE REHABILITATION, B-16-029, ROUTE 99 (ALFORD STREET) OVER MYSTIC RIVER $48,952,697.40 $61,291,671.75
Massachusetts 002S318  SHREWSBURY- WORCESTER- BRIDGE REHABILITATION, S-14-001=W-44-018, STATE ROUTE 9 (BELMONT STREET) OVER LAKE QUINSIGAMOND (AKA - KENNETH F. BURNS BRIDGE $42,379,441.39 $116,121,177.17
Massachusetts 002S372  QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON STREET) OVER THE FORE RIVER $100,632,987.90 $290,959,615.99
Massachusetts 002S386  BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE)  (AKA - LONGFEL $114,476,399.47 $337,781,419.68
Massachusetts 002S421  AMESBURY- NEWBURYPORT- SALISBURY- BRIDGE REPLACEMENT ON ROUTE I-95, A-07-016=N-11-007, OVER MERRIMACK RIVER (WHITTIER BRIDGE) & A-07-017 OVER EVANS P $106,949,743.43 $345,599,248.01
Massachusetts 002S425  FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS $130,483,195.64 $278,751,904.97
Massachusetts 002S748  BEVERLY- RECONSTRUCTION & SIGNAL IMPROVEMENTS ON ROUTE 1A (RANTOUL STREET & CABOT STREET), FROM CABOT STREET (SOUTH) TO 440 FEET NORTH OF BLAINE AVEN $22,083,688.07 $28,530,310.45
Massachusetts 002S760  EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12-004=M-12-018 OVER THE MALDEN RIVER (WOODS MEMORIAL BRIDGE) & M-12-017 OV $22,763,137.34 $86,546,471.18
Massachusetts 002S797 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET. $57,269,890.66 $70,809,808.53
Massachusetts 002S937 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INC $69,198,829.98 $89,371,564.04
Massachusetts 002S969  BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) $33,776,618.42 $43,143,038.53
Massachusetts 002S991  HANOVER- NORWELL- BRIDGE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER HIGH STREET $32,757,346.89 $41,518,695.79
Massachusetts 0032020 HADLEY- RECONSTRUCTION ON ROUTE 9, FROM MIDDLE STREET TO MAPLE/SOUTH MAPLE STREET $10,205,568.98 $33,929,004.35
Massachusetts 0032022 WEST SPRINGFIELD- RECONSTRUCTION OF MEMORIAL AVENUE (ROUTE 147), FROM COLONY ROAD TO THE MEMORIAL AVENUE ROTARY (1.4 MILES) $2,148,892.59 $33,403,159.79
Massachusetts 0034007 EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET $23,626,416.58 $39,929,034.73
Massachusetts 0034012 WOBURN- BRIDGE REPLACEMENT, W-43-017, NEW BOSTON STREET OVER MBTA $23,285,066.48 $29,168,301.10
Massachusetts 0035003 WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER $20,504,631.49 $26,023,774.36
Massachusetts 0035043  BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD $23,214,527.43 $31,499,191.33
Massachusetts 0036009  NEEDHAM- NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO ROUTE 9 (NEWTON $28,632,126.92 $34,473,238.80
Massachusetts 0036012 BOSTON- SUPERSTRUCTURE REPLACEMENT, B-16-067 (3GV), MAFFA WAY & B-16-068=S-17-027 (3GW), MYSTIC AVENUE OVER ORANGE & MBTA/BMRR  $52,026,806.09 $65,930,108.61
Massachusetts 0036278  BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD  $25,410,209.78 $32,068,747.22
Massachusetts 003S054  BOSTON- BRIDGE REPLACEMENT, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR $154,511,304.04 $211,876,058.31
Massachusetts 003S070  AGAWAM- WEST SPRINGFIELD- BRIDGE REPLACEMENT, A-05-002=W-21-014, ROUTE 147 OVER THE WESTFIELD RIVER & INTERSECTION & SIGNAL IMPROVEMENTS @ 3 LOCATION $21,718,892.61 $28,384,361.14
Massachusetts 003S103  DANVERS- BRIDGE REPLACEMENT, D-03-018, ST 128 OVER WATERS RIVER $20,409,854.68 $25,852,223.18
Massachusetts 003S113  HAVERHILL- BRIDGE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER MERRIMACK RIVER $84,819,896.64 $107,311,915.85
Massachusetts 003S179 SOMERVILLE-BRIDGE PRESERVATION,S-17-031,I-93 NB AND SB FROM ROUTE 28 TO TEMPLE STREET $26,998,522.48 $40,539,523.10
Massachusetts 003S180  CHELSEA- ROUTE 1 VIADUCT REHABILITATION (SB/NB) ON C-09-007 & C-09-011 $167,153,833.83 $209,325,017.29
Massachusetts 003S191 FALL RIVER- CORRIDOR IMPROVEMENTS ON ROUTE 79/DAVOL STREET  $54,425,419.13 $134,536,940.70
Massachusetts 003S196 CHARLTON- OXFORD- RECONSTRUCTION ON ROUTE 20, FROM RICHARDSON'S CORNER EASTERLY TO ROUTE 12, INCLUDES REHAB OF C-06-023 & REPLACEMENT OF O-06-002 $41,422,972.34 $120,770,001.87
Massachusetts 003S201 NORTHFIELD- BIKE/PED BRIDGE CONSTRUCTION TO REPLACE N-22-002, SCHELL BRIDGE OVER THE CONNECTICUT RIVER $24,002,744.70 $30,108,430.88
Massachusetts 003S263  LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) $82,380,601.00 $103,929,811.25
Massachusetts 003S390 ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. $18,744,594.46 $25,114,574.27
Massachusetts 003S398 TAUNTON- INTERCHANGE IMPROVEMENTS AT ROUTES 24 & 140, INCLUDING REPLACING T-01-045 AND T-01-046 $91,306,365.37 $142,076,039.78
Massachusetts 003S468 BOSTON- ROADWAY, CEILING, ARCH & WALL RECONSTRUCTION AND OTHER CONTROL SYSTEMS IN SUMNER TUNNEL $119,681,186.92 $163,834,233.65
Massachusetts 00DB004 DUXBURY- LAKEVILLE- MANSFIELD- PLYMOUTH- WAREHAM- BRIDGE DECK REPLACEMENTS, D-14-008, L-01-011, L-01-015, M-03-018, P-13-031, P-13-035, W-06-038 (DB) $37,441,854.43 $49,335,000.00
Massachusetts 091S001 NORTHAMPTON– BRIDGE REPLACEMENT, N-19-059, I-91 OVER US ROUTE 5 AND B&MRR, BRIDGE REPLACEMENT, N-19-060, I-91 OVER HOCKANUM ROAD AND IMPROVEMENTS ... $40,939,927.45 $51,934,809.31
Massachusetts 0931524  MEDFORD- BRIDGE REPLACEMENT ON I-93 CORRIDOR  $44,723,236.24 $98,127,600.00
Massachusetts 0931528  METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRU $57,287,750.10 $71,901,206.00
Massachusetts 093S001 BOSTON- MILTON- QUINCY- SOUTHEAST EXPRESSWAY/INTERSTATE 93 REPLACEMENT OF BARRIERS FOR HIGH OCCUPANCY VEHICLE LANE (HOV)  $35,468,451.65 $35,934,981.65
Massachusetts 0951108  ATTLEBORO- BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE $22,035,711.95 $27,624,439.93
Massachusetts 0954001 DANVERS- TOPSFIELD- BOXFORD- ROWLEY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 $27,460,207.87 $31,138,837.08
Massachusetts 1906031  WORCESTER- WEST BOYLSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I-190 OVER ROUTE 12 & RAMP B  $20,732,236.89 $33,342,477.72
Massachusetts 495S301 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE $128,510,160.99 $476,642,155.70
Michigan 1482117 M-1 Chandler Street to Adams Avenue $40,796,426.48 $49,842,915.68
Michigan 1584216 Southfield Regionwide $27,219,139.41 $133,200,051.03
Michigan 1682303 I-75 I-75 over Rouge River $85,479,520.29 $94,977,244.77
Michigan 1682304 I-75 NB and SB over Goddard Rd and Sexton Kilfoil $53,188,022.54 $59,097,802.83
Michigan 1725028 I-69 Ballenger Highway to Fenton Road $26,718,969.06 $30,797,614.88
Michigan 1750008 M-59 E M-53 to E. of Romeo Plank Rd. $55,441,159.24 $67,735,075.42
Michigan 1782067 I-75 S. of Springwells (Fort St.)  to N. of Clark $36,356,356.25 $40,395,951.39
Michigan 1800104 M-20 over Tittabawassee River & CSX Rail Road (Abndn) $21,464,555.44 $26,224,258.30
Michigan 1800183 US-131 10 Mile Road north to 14 Mile Road $25,315,069.48 $30,928,612.68
Michigan 1800261 Dupont Street Dupont Road from University to Welch and Pasadena to Bishop $20,000,000.00 $25,000,000.00
Michigan 1800426 I-696 Dequindre Rd. to Neiman Rd. $88,378,666.63 $88,996,655.97
Michigan 1800433 I-75 from North of 13 Mile Rd to Coolidge Hwy $231,458,350.83 $266,109,227.57
Michigan 1800754 I-94 I-94 over Conrail and the Grand River $33,350,230.19 $33,350,230.19
Michigan 1800762 I-94 W M-60 to Sargent Road $79,012,042.39 $79,012,042.39
Michigan 1800869 I-475 Carpenter Rd to Clio Rd $41,059,015.65 $41,059,015.65
Michigan 1801017 I-94 Second Avenue over I-94, Wayne County $29,757,095.43 $34,361,221.01
Michigan 1801046 I-75 from 8 Mile Rd to North of 13 Mile Rd $36,658,600.00 $1,502,622,373.00
Michigan 1900184 I-196 I-196: Maryland Avenue east to I-96; I-96: Leonard Street e $21,777,496.42 $26,606,593.06
Michigan 1900325 I-75 N 9 bridges on I-75 in Monroe County $30,729,970.77 $34,144,411.97
Michigan 1900326 I-75 I-75 from Ohio State Line to Erie Road $71,797,702.18 $97,775,224.65
Michigan 1900759 US-31 North of Napier Avenue (Exit 24) to I-94 $20,000,000.00 $48,419,428.38
Michigan 1901016 I-75 Hess to South I-675 Interchange $39,182,155.00 $49,465,553.88
Michigan 1901055 Mound Road I-696 to M-59 $98,471,195.00 $253,318,030.89
Michigan 20A0293 M-24 S. of Goldengate to N. of Harriet $29,686,709.72 $36,454,446.56
Michigan 20A0461 I-94 E Britain Avenue to I-196 $30,572,204.00 $113,151,697.02
Michigan 20A0759 I-69 0.5 miles south of Calhoun/Eaton Co Line to Nye Hwy (Page D $10,621,601.00 $56,151,854.98
Michigan 20A0760 I-69 Nye Hwy (Page Drain) to Island Hwy   $73,996,510.23
Michigan 20A0903 I-94 at Elm Road $33,290,291.87 $36,989,213.18
Michigan 21A0133 M-3 11 Mile Road to 14 Mile Road $62,043,766.73 $75,801,791.95
Michigan 21A0134 I-75 Beaver Road to Cottage Grove $25,213,096.26 $28,014,551.41
Michigan 21A0236 I-69 NEWARK ROAD TO EAST LAPEER COUNTY LINE $30,864,431.41 $34,293,812.67
Michigan 21A0255 I-94 EAST OF LOVERS LANE TO EAST OF PORTAGE ROAD $52,254,992.91 $63,842,385.95
Michigan 21A0256 I-94 Portage Road to Sprinkle Road $28,031,107.62 $34,246,924.41
Michigan 21A0442 I-69 I-96 to Airport Road   $60,381,319.57
Michigan 21A0741 I-496 Lansing Road to the Grand River   $88,254,136.00
Michigan 21A1026 US-127 Ingham/Jackson County Line to M-36   $71,930,114.28
Michigan 22A0045 I-196 FROM BYRON ROAD EAST TO 32ND AVENUE   $70,832,859.72
Michigan 22A0061 I-94 Jackson/Calhoun County Line to Michigan Avenue $38,291,330.07 $42,545,922.32
Michigan 22A0092 US-31 FROM I-196 NORTH TO CENTRAL AVENUE $117,949.00 $25,287,153.86
Michigan 22A0111 I-94 Michigan Avenue interchange to M-60 interchange   $129,474,820.14
Michigan 22A0159 STATEWIDE STATEWIDE $29,370,334.16 $29,370,334.16
Michigan 22A0208 I-75 N 5 bridges on I-75 in Monroe County $34,320,585.43 $38,133,983.82
Michigan 22A0358 US-23 north of Spencer Road to M-59; North of Crouse Road to Sout $23,656,282.35 $28,901,994.32
Michigan 22A0453 I-75 FROM LEVERING ROAD TO US-31 $45,478,328.34 $55,563,015.69
Michigan 22A0562 I-94 E West of Helmer Road to M-311 in Calhoun County   $118,713,766.74
Michigan 22A0637 M-102 E M-39 to M-53 (Van Dyke Avenue)   $68,280,588.77
Michigan 22A0786 US-23 Stony Creek to Ellsworth   $35,903,314.56
Michigan 22A0815 I-196 I-196 over the Grand River and Market Avenue   $110,492,873.12
Michigan 22A0913 US-24 Grand River to N. of 8 Mile Road   $46,679,373.59
Michigan 22A0973 I-69 WB M-19 to Taylor Road   $26,758,567.20
Michigan 22A0989 I-94 23 Mile Road to County Line Road   $30,266,789.74
Michigan FMIK001 FMI NITC In-Kind Match Credit-A new border crossing between Detroit and Windsor, bridge, inspection area, and interchange   $137,688,046.03
Minnesota 0005006 MN 5: FROM I-494 IN BLOOMINGTON TO SOUTH END OF THE MISSISSIPPI RIVER BR #9300- CONCRETE PAVEMENT REHAB & RESURFACE, LIGHTING, TMS & REHAB 12 BRIDGES $20,779,466.36 $25,974,332.95
Minnesota 0010338 US 10: FROM ANOKA/RAMSEY CITY LIMITS (0.48 MI E OF CSAH 57) TO W OF GREEN HAVEN RD (0.28 MI W OF MN 47)- R/W ACQUISITION FOR CONST OF NEW INTERCHANGE $25,490,711.96 $55,256,523.13
Minnesota 0012300 TH 12: CR 6 to Wayzata Blvd; Reconstruction, New Bridges, Replace Br 90650 w/Br27274, Signals, and Signs $45,822,305.53 $58,197,503.65
Minnesota 0014336 TH 14: BROADWAY ST TO 0.6 MI E OF TH 14/TH 15/CR 21 INT & TH 15: TH 14/TH15/CR 21 INT TO 0.1 MI N OF 428TH LN, RECONST, REPL BRS 9200 & 9294 (cont) $24,898,696.56 $31,452,543.59
Minnesota 0014344 US 14: FROM 1.25 MI NW OF CSAH 37 TO 0.5 MI E OF 481ST AVE IN NICOLLET CO- RECONSTRUCT FROM 2 LN TO 4 LN DIVIDED, CONCRETE & BIT SURFACING, ADA (CONT) $22,250,696.08 $83,539,141.56
Minnesota 0023324 MN 23: 0.1 MI N OF CSAH 24 TO US 212 IN GRANITE FALLS- BIT MILL, CONC & BIT PAVING, RWIS, SIGNAL, LIGHTING, TURN LN'S, TENSION CABLE GUARDRAIL, (CONT) $29,806,735.71 $37,173,294.34
Minnesota 0036314 TH36: OVER ST CROIX RIVER, CONST NEW BR #82045 INCL WB/EB RAMPS #82047 & 82048 ON/OFF TH95 & XCEL BARGE UNLOADER FACILITY REMOVAL $151,648,640.85 $333,685,951.65
Minnesota 0052315 TH 52: Oronoco ''Design Build' - New Interchange at CR 112 & New Overpass at CSAH 12, Repl brs 9234 & 9235 $25,028,944.00 $40,294,392.00
Minnesota 0052347 US 52: 0.4 MI S OF CSAH 86 IN HAMPTON TO 0.2 MI N OF 140TH ST IN ROSEMOUNT- CONCRETE SURFACING, UNBONDED CONC OVERLAY, BIT MILL & OVERLAY, TMS (CONT)   $57,760,000.00
Minnesota 0055316 MN 55/MN 62: BLOOMINGTON RD IN MPLS TO US 52 IN INVER GROVE HEIGHTS- REHAB BRIDGES 4190, 19819 & 19827, BIT MILL & OVERLAY, CONCRETE PVMT REHAB (CONT) $23,614,933.85 $29,282,271.47
Minnesota 0060319 TH 60: 1.4 MI W OF W JCT TH 4 TO W JCT TH 15, CONC SURF, ADA, REHAB BR #91543 & TH 4: REHAB BR #83026 & CSAH 12: REHAB BR #83027 & TH 15: REMOVE(cont) $24,248,889.58 $30,495,245.67
Minnesota 0063306 TH 63: AT TH 61 IN REDWING TO 0.2 MI N OF 825TH ST IN WI & ON TH 61, FROM 0.47 MI E OF TH 58 TO 0.09 MI E OF TH 58- BIT & CONC PVMT, ADA, (CONT BELOW) $28,112,178.88 $63,436,184.27
Minnesota 0122152 MN 210: 0.19 MI E OF CSAH 1 (RIPPLE RVR) TO N JCT US 169 & US 169, FROM N JCT OF MN 210 TO 0.28 MI S OF CSAH 21 (MISSISSIPPI RVR) IN AITKIN CO. (CONT) $4,100,000.00 $36,214,110.00
Minnesota 0169348 TH 169:0.3 MI N OF TH 19 TO 0.5 MI S OF TH 25, CONC OVLY, CONC PVMT REHAB, BIT MILL & OVLY, DRAINAGE REPAIRS & TH 169:0.6 MI E OF TH 25 TO 0.1 (cont.) $21,452,541.71 $26,981,534.84
Minnesota 0212308 TH 212: CARVER CR 147 IN CHASKA TO CSAH 4 IN EDEN PRAIRIE, DESIGN BUILD, GR, SURF, BRS. $124,041,073.12 $253,585,892.17
Minnesota 0212326 US 212: FROM 0.30 MI E OF CSAH 36 TO CSAH 11 IN DAHLGREN TWP- RECONSTRUCT & EXPAND FROM A 2-LANE TO A 4-LANE DIVIDED HWY, REDUCED CONFLICT INT. (CONT) $20,381,226.44 $27,868,911.60
Minnesota 0222054 US 10 RUM RIVER BRIDGE REPLACEMENT & INTERSECTION IMPROVEMENTS $15,000,000.00 $44,883,760.20
Minnesota 0353287 I-35W/TH 62 (CROSSTOWN) : 66TH ST TO 42 ND ST & FROM PENN TO PORTLAND, GR, SURF, BRS. $262,140,148.88 $313,332,200.58
Minnesota 0610309 TH 610:CR 81 TO I-94 & CONST OF 105TH AV FR MAPLE GROVE PKWY TO 0.5 MI W OF I-94, 4 LN FREEWAY CONST, 9 NEW BRIDGES $4,346,171.64 $81,001,000.00
Minnesota 1912258 STH13: CONST INTERCHANGE (NEW BR #19036), ACCESS CLOSURES, FRONTAGE ROADS AT TH13 AND CSAH 5 IN THE CITY OF BURNSVILLE $10,836,692.19 $29,436,370.61
Minnesota 1920071 CSAH 70: FROM KENRICK AVE/KENSINGTON BLVD TO CSAH 23 IN LAKEVILLE- RECONSTRUCT FROM A 2-LN UNDIVIDED TO A 4 -LN DIVIDED HWY, PED/BIKE TRAIL & SIGNALS $14,018,000.00 $28,168,224.61
Minnesota 2714124 CSAH5 (FRANKLIN AV): IN MPLS, OVER W. RIVER RD & MISSISSIPPI RIVER, RECONDITION BR# 2441 $8,320,000.00 $43,097,946.99
Minnesota 2716123 CSAH 53: XERXES AV S TO RICHFIELD PKWY, CONST ROUNDABOUT, TURN LANES, & BIKE/PED FACILITY $9,677,392.20 $36,731,877.55
Minnesota 2720177 MN 65 (3RD AVE S): FROM 1ST ST S TO 180' S OF 2ND ST SE IN MINNEAPOLIS- REHAB BRIDGE 2440  OVER THE MISSISSIPPI RIVER *CMGC* $88,072,363.93 $129,347,958.55
Minnesota 4944254 I-494: TH5 TO 0.1 MI S OF TH55 - RECONST, GR, SURF, REPL BRS, & ADD 3RD LN EACH DIRECTION $80,156,404.35 $143,797,249.42
Minnesota 6213094 I- 35E: TO N OF MARYLAND AV & I-94: SB I-35E TO SB TH 52, RECONST INTCHG WITH CAYUGA ST, FRNTG RDS, ADD, REPL, REMOVE BRS. $95,420,064.09 $136,511,885.74
Minnesota 6218067 TH 149: TH 5 (W 7TH ST) TO GEORGE ST, OVER MISSISSIPPI RIVER IN ST. PAUL, REHAB BR #62090, APPROACH WORK, ADA $34,280,538.40 $44,375,535.44
Minnesota 6222230 MSAS 158 (KELLOGG BLVD): W 7TH ST TO MARKET ST IN ST. PAUL- REPLACE BR 90378 W/BR'S 62671 & 62672, RETAINING WALLS, SIGNALS, ADA, LIGHTING (CONT)   $36,216,438.00
Minnesota 6920250 MNDOT D1/ST. LOUIS COUNTY: BRIDGE BUNDLE PARTNERSHIP TO REPLACE BRIDGES & BOX CULVERTS, INCLUDES PE & MNDOT BR'S 6290, 6292, 6293 & 6294 ALONG MN210 $10,252,000.00 $25,396,593.69
Minnesota 7018262 US 169: 0.6 MI N OF MN41/CSAH 78 TO 0.5 MI S OF CSAH 14- RECONSTRUCTION, INCLS INTERCHANGES AT CSAH 14 &  MN41/CSAH 78 & CONST NEW FRONTAGE RD'S(CONT) $37,438,933.00 $44,619,364.23
Minnesota 7022096 MN 13: 800' W OF LOUISANA AVE TO QUENTIN AVE IN SAVAGE-CONSTRUCT INTERCHANGE & FRONTAGE ROADS, CONSTRUCT NEW BRIDGE 70053 & REMOVE BRIDGE 5831 $20,126,557.76 $30,894,467.55
Minnesota 8606002 TH 101:PRELIM ENG & 147 TH AV TO MISSIPPI RIVER, GR, SURF, WALLS, LIGHTS, SIG, BRS. - "BAP" PROJECT $36,733,284.00 $63,262,521.00
Minnesota I350120 I-35E:"ELLA", 0.6 MI N OF 80TH ST E TO JCT OF I-35/I-35W/I-35E & I-35W:2.3 MI N OF MAIN ST TO JCT I-35/I-35W/I-35E & I-35:JCT I-35/I-35W/I-35E(cont) $53,468,478.52 $63,989,564.66
Minnesota I350122 I-35: FROM CHISAGO CO LN TO 0.94 MI S OF CSAH 11- UNBONDED CONC OVLY, REPLC BR'S 58801 W/58825, BR 58802 W/58826, BR 58803 W/58823 & BR 58804 W/58824 $26,030,843.52 $30,387,467.22
Minnesota I350129 DULUTH TWIN PORTS INTERCHANGE ON I-35, I-535 & US 53 (CMGC WORK PACKAGES 1 & 2) $163,478,106.83 $275,839,504.55
Minnesota I35W005 I-35W:72' S OF E 43RD ST TO 520' E OF CHICAGO AV S & I-94:NICOLLET AV S TO 70' E OF PARK AV S & TH 65:168' N OF 24TH ST TO 550' S OF E 15TH ST, (cont) $80,313,693.61 $239,129,843.40
Minnesota I35W010 I-35W: CLIFF RD IN BURNSVILLE THROUGH THE 106TH ST INTCHG IN BLOOMINGTON, PVMT RECONST, AUX LNS, REPL BR #5983 W BRS 27W38 27W39, REPL BRS 9043 (cont) $116,987,940.79 $130,190,886.45
Minnesota I35W012 I-35W:CR B2 IN ROSEVILLE TO 0.1 MI N OF SUNSET AV (CR 53) IN LINO LAKES,CONST MnPASS LN FROM CR C TO LEXINGTON AV (CSAH 17),CONC OVLY FR CR C (cont.) $184,419,585.66 $207,674,620.00
Minnesota I35W014 I-35W (NB): FROM E 42ND ST TO E 40TH ST IN MINNEAPOLIS- CONSTRUCT STORMWATER HOLDING CAVERN SYSTEM, INCLUDES LIGHTING, NOISE & RETAINING WALLS $54,889,933.59 $64,488,815.10
Minnesota I494006 I-494: (ELLA) FROM 3RD AVE S IN S ST PAUL TO E END OF MN RIVER BR IN EAGAN- M&O, DRAINAGE, REHAB 7 BR'S, GUARDRAIL, TMS, TURN LNS, SIGNALS, ADA (CONT) $29,394,339.89 $32,855,066.79
Minnesota I494008 I-494: PILOT KNOB RD IN EAGAN TO 24TH AVE IN BLOOMINGTON- REHAB BR'S 19825, 27765, 27767, 9217E & 9217W, CONCRETE PVMT REHAB, BIT MILL & OVLY (CONT) $33,735,584.36 $62,000,000.00
Minnesota I494009 I-494 (EB & WB): 1000’ W OF EAST BUSH LAKE RD (CSAH 28) TO 1000’ E OF 12TH AVE S IN HENNEPIN CO- CONST EB/WB EZPASS LANES FROM CSAH 28 TO I-35W (CONT)   $314,721,349.16
Minnesota I535004 TWIN PORTS INTERCHANGE (TPI) IN DULUTH - CMGC WORK PACKAGES #3 & #4 $141,908,901.36 $158,787,768.54
Minnesota I694005 I-694:IN OAKDALE, 10TH ST (CSAH 10) TO JCT I-694/494/94 & I-494:0.1 MI S OF TAMARACK RD TO JCT I-694/494/94, CONC OVLY, AUX LN SB FROM 10TH ST (cont.) $27,013,493.53 $30,411,706.05
Minnesota I900140 I-90: 2 MI W OF US 169 TO MN 22 IN FARIBAULT CO- UNBONDED CONC OVLY, RAMPS, LIGHTING, ADA, REHAB BR'S 22803, 22804, 22815, 22816, 22825 & 22826 AND PE $71,689,122.00 $75,462,234.00
Minnesota I940022 TH 94: 0.1 MI E OF NICOLLET AVE IN MPLS TO 0.3 MI W OF SHINGLE CREEK PKWY IN BROOKLYN CENTER- BIT OVLY, CPR, REHAB 50 BR'S, ADA RAMPS, C&G (CONT) $45,838,377.59 $50,931,530.66
Minnesota I940034 I-94: 0.4 MI W OF CSAH 19 IN ALBERTVILLE TO 0.3 MI E OF MN 241 IN ST MICHAEL- RECONST, INCLS ADDITION OF EB THIRD LN FROM CSAH 19 TO MN 241 (CONT.) $7,384,072.50 $70,995,000.00
Minnesota I940037 I-94: FROM MN 24 IN CLEARWATER TO 0.3 MI E OF BR #86802 (CSAH 39) NEAR MONTICELLO (EBL & WBL)- RECONSTRUCTION, REHAB 5 BR'S & REPLC 1 BR W/NEW CULVERT $81,401,519.20 $103,918,000.00
Minnesota M265001 I-494/169: DESIGN BUILD, RECONT INTERCHANGE, WIDEN BRS, NEW BRS. $78,821,368.13 $145,513,079.35
Mississippi 0008005 US 49 from the Stone County Line to South Gate Road - PE, UTIL & CON - Forrest County. $46,294,453.33 $51,498,874.00
Mississippi 0029103 ON SR 304 FROM US 61 TO I-55 WITH SPUR. GRADE, DRAIN, PAVE FOR NEW CONST. VISION 21. TUNICA CO. $61,832,114.00 $87,739,053.00
Mississippi 0064020 SR 149 between SR 13 & US 49 [Bridge #s 128.2, 128.6, 131.7 & 131.4] - Bridge Replacement - UTIL & CON - Simpson County  $16,835,813.00 $34,794,766.00
Mississippi 0083029 US 49 from Florence to Scale Area in Richland - Reconstruction Widen to 6 Lanes - ROW and CON - Rankin County. $264,598,187.45 $347,073,910.45
Mississippi 0111056 US 82 Greenville Bypass Freight Corridor Improvement Project from MSi River Bridge to Leland - New Construction - PE & CON - Washington Co (INFRA) $52,120,000.00 $165,774,444.00
Mississippi 0201216 I-20 Bridge Replacement #44.9B & Rail Replacements on Bridges # 45.2B&C - I-20, US 49 & I-55 Install Fiber Optic Cables - PE & CON - Hinds & Rankin Co $29,834,001.32 $53,593,711.00
Mississippi 0201234 I-20 at Norrell Road -  Interchange Improvements and Frontage Road Widening - Hinds County $9,677,912.00 $40,349,260.00
Mississippi 0224063 SR 15 APD SR 76 to the Union County Line - Paving - Pontotoc County $20,683,120.00 $25,853,900.00
Mississippi 0250047 City of Jackson - Greening the Gateways - PE & Construction - Hinds County $26,031,913.00 $42,494,629.00
Mississippi 0261080 Improvements to SR 19 to SR 492 to Philadelphia in Neshoba County, Mississippi (BUILD Grant) $35,810,546.00 $56,175,820.00
Mississippi 0290100 Bond Project for I-269/MS304 from I-55 to Texas State Line in Desoto and Marshall Counties per MOU $309,476,754.00 $843,557,849.45
Mississippi 0401021 SR 25 from SR 8 to US 278. Full ROW and Construction for 4 Lanes. Monroe County $23,354,454.00 $29,193,069.00
Mississippi 0501034 SR 9 Replace 4 Bridges [Bridge #s 35.5, 40.7, 40.9 & 41.2] - Bridge Replacement - ROW, UTIL & CON - Calhoun County $23,633,812.00 $29,542,266.00
Mississippi 0552202 Madison County Bond Project (I-55, SR 463 and connector roads) per MOU. $154,867,243.00 $238,557,847.00
Mississippi 0552257 I-55 from 0.5 Miles North of SR 17 to the Carroll County Line - Mill & Overlay - CON - Holmes County  $42,119,775.00 $46,799,752.00
Mississippi 0553094 I-55 from the Carroll County Line to 2.5 Miles South of Carroll County - Mill & Overlay - CON - Montgomery County $22,570,861.00 $25,080,992.00
Mississippi 0554102 I-55 Replace Twin Bridges over Hickahala Creek and Relief Bridges - PE & CON - Tate County $51,425,370.00 $64,281,715.00
Mississippi 0591075 I-59 at SR 42 - Interchange - PE [survey, plans & phase B], ROW & Construction - Forrest County $40,941,003.00 $48,716,256.00
Mississippi 0591121 I-59 from the Lamar County Line to the Jones County Line - Pavement Restoration - CON - Forrest County $23,816,694.00 $42,282,185.00
Mississippi 0592091 I-59 BETWEEN 16TH AVE. AND 4TH AVE. IN LAUREL (S CURVE) RECONSTRUCTION JONES CO. $38,825,424.00 $53,508,188.00
Mississippi 0592110 I-59 from the Forrest County Line to 0.3 Miles South of Moselle - Pavement Restoration - CON - Jones County  $33,946,751.00 $37,820,101.00
Mississippi 0593099 Improvements to I-59 / I-20 -  Bridge Improvements - PE & CON - Lauderdale County [Design-Build] $26,662,934.00 $29,625,483.00
Mississippi 0661008 SR 57 from I-10 to Vancleave - Grade, Bridge, Pave 2 Lanes Parallel - CON - Jackson County   $222,805,903.00
Mississippi 0702015 SR 6 through Marks - (Bridge #'s 31.3, 32.1, 33.2 & 33.5) - Bridge Replacement - ROW, UTIL & CON - Quitman County $30,264,476.00 $36,683,527.00
Mississippi 0725011 SR 3 from the Panola County Line to Just West of the Tunica County Line - Bridge #'s 183.8 & 184.2 - ROW, UTIL & CON - Tate and Tunica County $25,265,047.00 $31,783,941.00
Mississippi 0781011 APD COR "V" from Fairview to SR 23 - Grade Bridge Pave 4 Lanes - PE and CON - Itawamba County. $73,431,526.00 $98,147,591.00
Mississippi 1920007 Desoto County Board of Supervisors - Holly Springs Road - Reconstruction of 2.6 miles along Holly Springs Road including 5 Bridges -CON- Desoto County $15,118,165.00 $35,525,412.00
Mississippi 2170022 US 11 from Hobolochitto Creek to Hide-A-Way Lake Road - Construct 5 Lanes - ROW, UTIL & CON - Pearl River County. $20,583,940.00 $25,729,926.00
Mississippi 9159001 City of Gulfport - Interconnecting Gulfport (BUILD) - New Construction - PE & CON - Harrison County $20,460,000.00 $49,393,004.00
Mississippi 9371101 SR 605 over Industrial Waterway - Bridge Rehabilitation {BR #3.5} - PE and CON - Harrison County $22,896,652.00 $28,295,816.00
Mississippi FY03001 VARIOUS CITIES AND RURAL AREAS STATEWIDE. PE , ROW, & CONSTRUCTION. STATEWIDE. $53,589,079.00 $66,713,211.00
Mississippi FY05001 Annual Program STP projects for various urban and rural areas, PE, ROW, CONST. Statewide. $43,954,317.00 $54,776,953.00
Missouri 0351291 CLAY CO, CST 19TH ST, NEW INTERCHANGE SOUTH OF RT 92 AT 19TH ST IN KEARNEY $9,927,800.59 $25,519,387.64
Missouri 0441102 NEWTON CO, IS 44, BRIDGE IMPROVEMENTS AT VARIOUS LOCATIONS FROM .9 MI E OF LOOP 49 (RANGE LINE RD) IN JOPLIN TO RT Z IN HALLTOWN $34,291,450.00 $36,191,000.00
Missouri 0441106 WEBSTER CO, IS 44, DB BRIDGE IMPROVE TO BRIDGES IN JASPER, LAWRENCE, GREENE, & WEBSTER COUNTIES & POTENTIAL IMPROVE IN DALLAS COUNTY. $40,913,700.00 $43,174,000.00
Missouri 0442332 PHELPS CO, IS 44, PAVEMENT REBUILD ON THE EB LANES FROM E OF RT 63 TO WEST OF RT 68. $30,560,192.08 $33,820,133.32
Missouri 0444188 IS44 ST LOUIS CO; BRIDGE REPLACEMENT & ADD PED BRIDGE FROM I-270 TO WEST OF MERAMEC RIVER $51,657,592.76 $57,192,327.74
Missouri 0471072 TIGER PROJECT-ROUTE 47, FRANKLIN COUNTY; PROJECT TO  REPLACE BRIDGE OVER THE MISSOURI RIVER FROM RTE. 94 TO 5TH STREET IN WASHINGTON, 3.502 MILES $59,074,351.40 $73,842,939.25
Missouri 0512043 DB, PERRY CO, MO 51, BRIDGE REPLACEMENT OVER THE MISSISSIPPI RIVER "CHESTER BRIDGE" AND HORSE ISLAND CHUTE, NEW TWO-LANE ROADWAY ON MISSOURI APPROACH  $120,468,453.33 $145,042,000.00
Missouri 0553097 IS 55, ST LOUIS CITY CO, BRIDGE REHAB FROM VIRGINIA AVE TO BROADWAY STREET $24,891,600.16 $26,236,891.17
Missouri 0553101 ST LOUIS CO, IS 55 N, BRIDGE REHABILITATION FROM N OF LINDBERGH BLVD TO LOUGHBOROUGH AVE AND REMOVE PED BRIDGE AT DAYCARE OVERPASS. $43,242,513.01 $45,560,080.47
Missouri 0641061 IS 64 ST LOUIS CITY CO; MODIFY INTERCHANGE CONFIGURATION BETWEEN 18TH ST AND GARRISON AVE $20,156,307.02 $33,327,887.12
Missouri 0701202 IS 70, JACKSON CO. INTERCHANGE IMPROVEMENTS AT I-435. 1.657 MI $47,773,349.96 $52,242,819.29
Missouri 0703275 INFRA DB, IS 70, COOPER CO; BRIDGE REPLACEMENT OVER THE MISSOURI RIVER NEAR ROCHEPORT $78,400,000.00 $241,992,015.14
Missouri 0704204 ST CHARLES CO, MO 364, BRIDGE REHABILITATION ON BLANCHETTE BRIDGE OVER THE MO RIVER. $32,886,587.35 $36,473,517.50
Missouri 0711063 BUILD - IS 49, MCDONALD CO, CONSTRUCT NEW INTERSTATE ROADWAY TO COMPLETE I-49 FROM PINEVILLE TO THE ARKANSAS STATE LINE (BELLA VISTA) $56,990,552.35 $64,988,190.44
Missouri 1001070 MO 100, ST LOUIS CO; UPGRADE PED FACILITY TO COMPLY WITH ADA PLAN & PVMT RESURFACING FROM RT 61 TO BID BEND BLVD, BRIDGE REPLACEMENT OVER BLACK CREEK, $25,165,574.97 $31,178,003.87
Missouri 1411029 ARRA ROUTE 141, ST LOUIS COUNTY, RELOCATE/CONSTRUCT RTE 141 FROM RTE 40 TO RTE 340. 2.707 MI $80,135,256.80 $87,357,366.09
Missouri 1691117 BUILD, JACKSON CO, US 169 N, DESIGN BUILD, BRIDGE REPLACEMENT OF BUCK O'NEIL BRIDGE OVER MO RIVER & BRIDGE/RD IMPROVEMENTS RICHARDS RD TO 12 ST IN KC $174,604,800.00 $257,879,000.00
Missouri 2553052 IS 255, ST LOUIS CO; BRIDGE REHABILITATION AT THE MISSISSIPPI RIVER (JEFFERSON BARRACKS BR) $27,622,989.40 $29,108,677.14
Missouri 2705352 DESIGN-BUILD, IS 270, ST LOUIS CO, PAVE & BRIDGE IMPROVE ON THE I-270 NORTH CORRIDOR ON DISCONNECTED SECTIONS IN NORTH CO. $255,864,751.87 $280,604,846.28
Missouri 2705359 ST LOUIS CO, IS 270, MODIFY INTERCHANGE CONFIGURATION AT RIVERVIEW BLVD IN ST LOUIS CITY $39,289,254.72 $41,380,006.07
Missouri 2705360 IS 270, ST LOUIS CO; BRIDGE REPLACEMENT, REHAB AND PVMT REPAIR OVR CONWAY RD & NEW BALLAS RD & BR REHAB FOR I-270 MAINLINE & RAMP & RT AB (LADUE RD) $56,063.12 $32,546,636.80
Missouri 2705372 IS 270, ST LOUIS CITY; PAYMENT TO IDOT FOR BRIDGE REPLACEMENT OF CHAIN OF ROCKS BRIDGE OVER MISSISSIPPI RIVER   $190,000,000.00
Missouri 4351316 RT 435, JACKSON CO, DESIGN-BUILD PROJECT - BRIDGE, PAVEMENT AND CORRIDOR IMPROVEMENTS FROM THE KS STATE LINE TO 1-49 $68,338,139.86 $72,018,766.51
Missouri 4351323 IS 435, CLAY CO, BRIDGE DECK REPLACEMENT AT THE MISSOURI RIVER. $32,855,524.66 $36,484,397.54
Missouri 5617602 BUILD PROJECT, ST LOUIS CITY - REPLACE TRAFFIC SIGNALS - SIGNAL INTERCONNECTION ON JEFFERSON AVE FROM MARKET ST TO NATURAL BRIDGE AVE $17,651,000.00 $25,939,132.00
Missouri 5901816 DB, BUILD GRANT, GREENE CO, CITY OF SPRINGFIELD, RECONSTRUCT MULTI-USE PATH ALONG GRANT AVE. PARKWAY FROM DOWNTOWN TO SUNSHINE ST. $20,960,822.00 $31,525,000.00
Missouri 5909802 GREENE CO; PUBLIC IMPROVEMENTS FOR THE EXTENSION OF KANSAS EXPRESSWAY FROM REPUBLIC RD TO THE FUTURE EAST/WEST ARTERIAL. $20,149,753.68 $25,187,192.08
Missouri S102026 CHBP, VARIOUS, VARIOUS, BRIDGE REPLACEMENTS AT VARIOUS LOCATIONS IN THE NORTHEAST AND NORTHWEST DISTRICT $20,794,000.00 $25,992,500.00
Missouri S201001 TIGER PROJECT-US 54, PIKE CO, REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA. $32,701,933.81 $36,846,104.77
Missouri S502015 DB OR 70,ST CHARLES;CORRIDOR IMPROVEMENTS FROM  CAVE SPRINGS BLVD TO FAIRGROUNDS RD;BRIDGE REHAB OVER I-70 @ZUBEHL & CAVE SPRINGS & MODIFY INTERCHANGE $51,389,851.34 $62,782,249.75
Missouri S602025 MO 86, TANEY CO, BRIDGE REPLACEMENT OVER TABLE ROCK LAKE $65,490,925.61 $77,283,463.41
Missouri S703077 DESIGN-BUILD,BOLLINGER CO, MO 51, BRIDGE REPLACEMENT OVER DRAINAGE DITCH #65 & CASTOR RIVER OVERFLOW AND BRIDGE IMPRVMTS OVER VARIOUS DRAINAGE DITCHES $21,694,550.00 $25,523,000.00
Montana 0002923 US 93 2008 ISSUANCE (OT) Missoula District, Financing of the US 93 Corridor reconstruction $60,252,587.57 $65,802,428.53
Montana 0017044 LOHMAN-E & W (CN & CE) National Highway 1, Blaine County, Reconstruct the roadway and structure work from reference point 393.1 to 403.5 $30,790,288.47 $33,621,192.96
Montana 0041061 ROCKVALE-LAUREL 2 LANES (CN & CE) National Highway 4, Multiple counties, Reconstruct the roadway from reference point 42.5 to 52.5 $28,076,592.24 $29,964,016.00
Montana 0056089 BBP-YELLOWSTONE RIVER (IC, CN & CE) Yellowstone County, Construction of a new roadway and structure $36,383,802.15 $40,054,993.07
Montana 0084066 TOSTON STRUCTURES US-287 (CN & CE) National Highway 8, Broadwater County, Reconstruction from reference point 85.7 to 89.5 $35,160,817.04 $37,488,538.44
Montana 0154138 WOLF CREEK-N & S (CN & CE) Multiple routes, Lewis & Clark County, Rehabilitate the existing roadway at various locations $43,357,935.10 $47,368,695.41
Montana 0575047 JCT SEC 462-EAST & WEST (CN & CE) National Highway 57, Garfield County, Reconstruct the roadway from reference point 230.1 to 239.7 $28,008,444.69 $32,349,786.00
Montana 0908177 I-90 YELLOWSTONE R-BILLINGS (CN & CE) Multiple routes, Yellowstone County, Reconstruct the roadway and replace structures at various locations $73,855,551.26 $85,067,284.56
Montana STWD790 TIMBER BRIDGES-GLASGOW AREA (IC, CN & CE) Multiple routes/counties, Replace structures at various locations $24,571,888.92 $40,897,793.00
Nebraska 0026120 Lincoln South Beltway $38,706,171.39 $428,045,808.14
Nebraska 0125122 Niobrara West Bridges $38,908,631.63 $44,933,750.44
Nebraska 0305134 23rd St, Columbus $27,238,352.00 $42,770,428.00
Nebraska 0752128 Murray - Plattsmouth $20,000,000.00 $54,952,152.00
Nebraska 0801181 Sidney West - Conc pvmt, bridge repair $31,992,865.00 $37,711,627.78
Nebraska 0801186 Wyoming Line - Bushnell $36,662,750.00 $43,798,849.66
Nebraska 0801192 Brownson East $15,000,000.00 $45,010,487.00
Nebraska 0801196 Bushnell - West Kimball   $46,805,539.00
Nebraska 0802100 Big Springs West $43,153,246.00 $49,856,367.00
Nebraska 0802103 Chappell - N-27 $46,985,241.00 $54,044,715.47
Nebraska 0803152 Brule - Ogallala $44,840,330.00 $52,511,759.00
Nebraska 0805075 Lexington - Overton   $45,677,947.00
Nebraska 0D30107 Norfolk NE Bridges $18,814,864.00 $25,408,205.00
Nebraska 2814130 Niobrara River at Holt/Boyd Co Line $25,000,886.67 $28,690,006.31
Nebraska 3811001 168th St., West Center - "Q" St., Omaha $18,122,915.14 $43,584,281.43
Nebraska 3853119 L-62A North $18,263,743.00 $36,249,906.00
Nebraska 4809003 Douglas County, 20th St - Missouri River, Omaha, I-480 bridges including ramps from 20th St to the Missouri River in Omaha, Bridge Repair and Overlay $26,005,860.00 $43,906,340.00
Nebraska 5127001 156th St., Pepperwood - Corby, Omaha $20,152,108.72 $28,224,783.15
Nebraska 5147001 180th St., West Dodge - West Maple, Omaha $33,802,833.46 $42,792,844.92
Nevada 0003139 I15 / CC215 BELTWAY INTERCHANGE: PE/ROW $116,584,912.60 $136,768,336.00
Nevada 0003231 LAUGHLIN TO BULLHEAD CITY BRIDGE, CLARK CO., FROM MOHAVE VALLEY HWY TO NEEDLES HWY. OFF SYSTEM $18,190,998.67 $51,787,335.00
Nevada 0003260 LAS VEGAS, GRAND TETON DRIVE BETWEEN TEE PEE LANE AND EL CAPITAN WAY (OFF SYSTEM) $20,413,317.00 $26,500,000.00
Nevada 0017003 LV SO BELTWAY (I-215) FM STEPHANIE TO I-515, PE, ROWA utilities/acquisition, construction. Construct system interchange & roadway. $90,686,811.67 $131,470,387.37
Nevada 0151134 I15 NORTH OF US95/I515 TO CRAIG ROAD WIDEN FM 6 TO 10 LANES FROM US 95/I515 TO LAKE MEAD BLVD: WIDEN 8 TO 10 FM LAKE MEAD TO CRAIG $77,981,027.00 $259,704,838.00
Nevada 0151146 I 15 CACTUS AVE IN LAS VEGAS NEVADA. CONSTRUCT NEW INTERCHANGE. PE/ROW/CONSTRUCTION $59,402,861.98 $63,081,090.29
Nevada 0151150 I 15 AT STARR AVENUE / PE AND RW FOR NEW INTERCHANGE. $12,755,741.45 $60,043,179.31
Nevada 0151155 I 15/ US 95 NEON DESIGN BUILD, SAHARA AVE. TO US 95 INTERCHANGE $109,892,279.42 $667,221,824.00
Nevada 0151158 I 15, CLARK COUNTY, GARNET INTERCHANGE @ US 93 MP CL 64.29  US 93 FROM MP CL 52.00 TO MP CL 57.00 $70,255,946.00 $80,634,198.00
Nevada 0151161 I 15, LAS VEGAS, AT TROPICANA AVE INTERCHANGE; I 15 AT HARMON AVE OVERPASS; WARM SPRINGS RD TO HARMON AVE $127,818,026.00 $358,808,500.00
Nevada 0151162 I 15 NORTH, CLARK COUNTY, FROM SPEEDWAY TO APEX (PHASE 3) MP CL 53.61 TO MP CL 58.38 $39,386,961.00 $41,459,957.00
Nevada 0151163 I 15 NORTH, CLARK COUNTY, FROM APEX TO GARNET (PHASE 3) MP CL 58.38 TO MP CL 64.28 $41,083,512.00 $43,245,800.00
Nevada 0152047 I 15, CLARK COUNTY, IN MESQUITE FROM 1.677 MI NORTH OF THE LOGANDALE/OVERTON INTERCHANGE TO 0.370 MI NORTH OF LOWER FLAT TOP DR; SB MP CL 95.559 TO MP $37,706,635.00 $39,691,193.00
Nevada 0159014 SR 159, CHARLESTON BLVD FROM HONOLULU ST TO SACRAMENTO DR, MP CL 29.45 TO MP CL 29.80; I 515, FROM WYOMING AVE TO EASTERN AVE, MP CL 71.19 TO MP 73.37 $44,386,918.17 $82,078,719.00
Nevada 0376002 SR 376, NYE COUNTY, FROM 0.275 MILES NORTH OF CARVER'S ROADSIDE REST PARK TO US 50; MP NY 53.943 TO MP LA 18.065 $29,013,609.00 $31,440,836.00
Nevada 0445011 SR 445 PYRAMID HIGHWAY FROM TYLER TO 0.23MN OF QUEEN WAY. PE/ROW/CONSTRUCTION $54,210,785.20 $60,938,175.00
Nevada 0445013 SR 445, PYRAMID HIGHWAY, FROM QUEEN WAY TO GOLDEN VIEW DRIVE; MP WA 2.00 TO MP WA 4.50 $35,000,000.00 $54,100,000.00
Nevada 0502016 US 50, LYON COUNTY, FROM ROY'S ROAD TO THE JUNCTION WITH US 95A. MP LY 19.90 TO LY 29.44 $57,595,639.46 $60,917,455.00
Nevada 0802057 I 80, PERSHING COUNTY, FROM 2.28 MILES EAST OF COAL CANYON INTERCHANGE TO 1.69 MILES EAST OF HUMBOLDT INTERCHANGE. MP PE 26.15 TO MP PE 51.30 $26,925,231.00 $28,342,349.00
Nevada 0803067 I 80, LA CO, BEGIN OF ASPHALT 0.424 W OF ROSNY CK GRD SEP TO EU CO BEGIN OF PCCP 2.877 E OF LA/EU CO LINE; MP LA 15.889 TO 26.970; MP EU 0 TO 2.877 $29,067,101.00 $30,596,947.00
Nevada 0804097 I 80, EUREKA COUNTY, AT EMIGRANT PASS $24,332,245.00 $28,343,063.00
Nevada 0804101 I 80, ELKO COUNTY, FROM 0.932 MILES WEST OF OSINO INTERCHANGE TO 0.611 MILES EAST OF GRAYS CREEK; MP EL 31.980 TO MP EL 61.966 $27,590,461.00 $29,042,590.00
Nevada 0805041 I80 1.04 MI E OF MOOR INTRCHG TO 1.87 MI E OF OASIS INTRCHG. PE/ROW $37,297,334.88 $39,293,353.00
Nevada 0931008 US93 From the Hoover Dam Interchange Bridge to 1 MS of the Junction of US95/ US93. Hoover Dam Bypass - Boulder Extension. $253,024,309.52 $292,945,128.15
Nevada 0931013 US 93 BOULDER CITY BYPASS PART 1, PACKAGE 3 FROM SILVERLINE TO FOOTHILL ROAD. CL 16.35 TO CL 14.72 $82,745,184.00 $128,678,039.00
Nevada 0952037 US95 AT RAINBOW CURVE (PHASES 2C & 2D). CONSTRUCTION $44,561,874.41 $47,835,106.00
Nevada 0952039 US 95 FM MARTIN LUTHER KING TO VALLEY VIEW BLVD. CONSTRUCTION $64,943,610.66 $68,551,694.71
Nevada 0952043 US 95 from East of Valley View to Rainbow Interchange (Phase 4B/5). Construction $95,112,193.73 $106,034,709.00
Nevada 0952062 US 95, LAS VEGAS, FROM ANN ROAD TO KYLE CANYON ROAD MP CL 86.75 TO MP CL 92.70 PACKAGE 2B/5 $42,356,460.00 $77,979,339.00
Nevada 0952064 US 95 NW CORRIDOR PHASE 3C AT MP 88 AND CC 215 FROM GRAND MONTECITO TO TENAYA WAY.  MP 88 AND CC 215 37-39. $18,391,964.00 $80,030,703.00
Nevada 0952065 US 95 NW PHASE 3D, MP 88 AND CC215 FROM GRAND MONTECITO TO TENAYA, MP CL 37-39 AND US 95 AT LONE MOUNTAIN MP CL 85.6  $88,634,108.00 $155,193,795.00
Nevada 0952066 US 95, NYE COUNTY, 1.301 MILES SOUTH OF AMARGOSA VALLEY JUNCTION TO 1.742 MILES SOUTH OF THE AMARGOSA RIVER, MP NY 28.817 TO MP NY 56.234 $23,828,488.00 $25,082,618.00
Nevada 0953013 US 95 FROM 12.16 MILES NORTH OF BEATTY TO 3.67 MILES SOUTH OF THE NY/ES COUNTY LINE. NY 72.036 TO NY 103.552   $16,890,072.18 $36,721,092.00
Nevada 1601028 SR 160, BLUE DIAMOND ROAD, CLARK CO. FROM THE WEST EDGE OF MOUNTAIN SPRINGS COMMUNITY TO THE BEGINNING OF MOUNTAINOUS AREA MP CL 16.51 TO MP CL 22.20  $39,197,146.00 $46,971,122.00
Nevada 1601029 SR 160 BLUE DIAMOND RD, CLARK COUNTY, FROM 1.03 MILES NORTH OF MOUNTAIN SPRINGS SUMMIT TO CL/NY CO. LINE (EASTBOUND ONLY) MP CL 21.960 TO MP NY 0.950 $21,317,123.00 $25,262,492.00
Nevada 3951015 US 395 FM US 50 EAST TO LAKEVIEW INTERCHANGE PHASE 1B Construct a 4 lane controlled access freeway. Construction. $86,183,570.00 $103,271,106.00
Nevada 3951018 US 395, CARSON FREEWAY PHASE 2A: CONSTRUCTION. $54,758,708.87 $58,317,204.81
Nevada 3951027 US395 Carson City Fwy fm So Carson St to Fairview Dr. Pkg 2B-3. Construction. $52,974,150.00 $55,881,653.00
Nevada 5151040 I 515/US 95, LAS VEGAS, FROM EASTERN AVENUE TO LAS VEGAS SPAGHETTI BOWL, MP CL 73.35 TO MP CL 75.66 $32,556,338.00 $34,269,830.00
Nevada 5151046 I 515, CLARK COUNTY, FROM SUNSET RD. INTERCHANGE TO WYOMING AVE; MP CL 63.38 TO MP CL 71.18 $42,639,394.00 $44,883,571.00
Nevada 5801023 I580 FM WINTERS RANCH TO NR MOUNT ROSE HWY structures at Corey Canyon, Browns Creek, St.James Parkway and Galena Creek. $63,573,324.63 $75,881,582.00
Nevada 5801025 I-580 Freeway Near Winters Ranch to Near Mt. Rose Highway - Package B. Construction $359,420,694.95 $443,275,930.01
New Hampshire A000124 SALEM TO MANCHESTER,I93,MAINLINE,X1 TO STA 1130 & NH38 BR 077/063 & 073/063 (RED LIST) [PARTIAL GARVEE BONDED PROJECT] $34,954,911.62 $49,770,742.63
New Hampshire A000125 SALEM TO MANCHESTER I-93 I-93 Exit 2 Interchange reconstruction & Pelham Rd - debt service project for 13933E (Salem) $45,946,857.01 $46,246,464.60
New Hampshire A000128 SALEM TO MANCHESTER I-93 I-93 Exit 3 area -NB ML connections, NB Ramps & NH 111A relocation - debt service project for 13933H $31,770,766.97 $34,434,854.64
New Hampshire A000129 SALEM TO MANCHESTER I-93 I-93 Exit 3 area - Reconstruct SB ML, NH111 & SB on ramp (Windham) - debt service project for 13933I $35,552,058.27 $36,127,804.28
New Hampshire A000143 BEDFORD NH 101 Widen NH 101 to 5 lanes from NH 114 to Wallace Road $26,580,438.63 $26,821,291.95
New Hampshire A000501 SALEM-MANCHESTER,I93,X5 AREA,RECON INTERCHANGE,INCLUDE NB/SB MAINLINE,NB OFF-RAMP,BR#'S 96/163, 097/163, 099/160, 100/160.[GARVEE] $33,804,409.44 $55,947,210.02
New Hampshire A000909 PORTSMOUTH, NH - KITTERY, ME US 1 Bypass Bridge Replacement, US 1 Bypass over Piscataqua River (Sarah Mildred Long Bridge) (Red List) $98,397,890.05 $221,873,444.55
New Hampshire A001154 LEBANON, NH - HARTFORD, VT I-89 NB & SB Superstructure Replace & Widening, I-89 NB & SB over Connecticut River (Br No 044/103 & 044/104) $31,133,417.45 $52,165,394.22
New Hampshire A004115 SALEM TO MANCHESTER I-93 NB & SB Mainline, Weigh Station to Kendall Pond Rd (Windham & Derry) $2,614,085.80 $50,180,397.17
New Hampshire A004152 HINSDALE, NH - BRATTLEBORO, VT NH 119 Reconstruction of the new bridge over the Connecticut River $49,743,110.45 $81,567,721.25
New Hampshire A004375 SALEM TO MANCHESTER I-93 Exit 4 Interchange, NB & SB Mainline & NH 102 approach work $8,229,449.46 $67,214,304.46
New Hampshire A004376 SALEM TO MANCHESTER I-93 I-93 NB & SB mainline reconstruction, Exit 5 to I-293 split (Londonderry & Manchester) $3,176,990.34 $50,140,252.43
New Hampshire A004377 SALEM TO MANCHESTER I-93 NB & SB mainline between Exits 4 and 5 (Londonderry) $1,754,048.03 $28,146,735.00
New Hampshire A005073 DERRY-LONDONDERRY I-93 I-93 EXIT 4A, final design & construction of new interchange and connecting roadway $50,476,640.60 $67,740,148.50
New Jersey 0001316 Maintenance Bridge Fender Replacement Contract 2017-3, North, Various locations, Multi cities, Various Counties, Bridge Replacement, Construction $31,032,560.47 $31,052,961.47
New Jersey 0003330 Ridge Rd and Orient Way, Bridges over Rt 3, mp 5.27-6.30, bridge replacement, Borough of Rutherford, Bergen County-Construction $37,219,655.88 $39,509,039.69
New Jersey 0003334 Rt 3 Br. Over Northern Secondary Rail Line & Ramp A Bridge, MP10.62-10.84, North Bergen Twp, Hudson Co. PODI Project Oversight Br. Repl., Construction $26,693,845.00 $31,647,114.52
New Jersey 0007107 ROUTE 52 CAUSEWAY REPLACEMENT, CONTRACT A mp 0.26 to 1.5 construction $171,473,216.77 $171,473,216.77
New Jersey 0007109 ROUTE 52 CAUSEWAY CONTRACT B; BRIDGE REPLACEMENT, RECONSTRUCTION, RESURFACING- OCEAN CITY, CAPE MAY CO, MP. 0.26 TO 1.76 PODI-REVIEW - CONSTRUCTION  $109,928,050.77 $317,492,977.15
New Jersey 0009328 Rt. 9, Indian Head Rd. to Central Ave/Hurley Ave., M.P. 95.01 to 101.89, Toms River & Lakewood Twps.,Ocean Co.,Hwy Reconstruction Project,Construction $57,584,552.54 $57,628,652.55
New Jersey 0018309 Rt 18 East Brunswick, MP 35.4-39.54, East Brunswick, Middlesex County, Drainage & Pavement Rehabilitation Project, Construction $91,762,531.77 $100,606,498.51
New Jersey 0019120 ROUTE 72 MANAHAWKIN BAY BRIDGE CONTRACT 2 Bridge Rehab and Replacement - Ocean County - MP 26.46-27.75 - PODI-REVIEW CONSTRUCTION $105,052,702.23 $106,890,411.45
New Jersey 0019122 Rt. 72 Manahawkin Bay Bridge Contract 4 MP 26.14-27.50 Stafford Twp., Ocean Co., Bridge Rehabilitation - PODI Review - Construction $76,364,982.22 $81,253,046.70
New Jersey 0019129 Rt. 72 Manahawkin Bay Brdgs-Contract 3 PODI, M.P. 27.59-28.16, Bridge Rehab, Twnp of Stafford, Ocean Cnty - Construction $37,462,609.55 $39,546,244.00
New Jersey 0020301 Rt 20, MP 0.0-3.97, City of Paterson & Clifton, Passaic County, Safety, Drainage & Resurfacing Project, Construction $55,865,780.83 $56,292,410.83
New Jersey 0022108 Rt. 37 EB Mathis Bridge o/Barnegat Bay MP 11.45-12.40 Toms River & Seaside Heights, Ocean County - Bridge Deck Replacement, PODI Finance-Construction $71,103,657.57 $72,095,246.28
New Jersey 0022344 Rt. 22 Chestnut St., MP 54.486 to 54.530 & MP 54.662 to 55.233, Union Twp., Union County, Bridge Replacement Project, Construction $29,330,910.41 $29,493,726.00
New Jersey 0027302 Rt. 27, Dehart Place to Rt. 21, MP 33.39 to 38.53, Various Towns, Various Counties, Roadway Resurfacing Project, Construction $32,522,728.60 $32,630,514.60
New Jersey 0029329 Route 29 Cass Street to Calhoun Street Drainage, MP 2.94-4.34, City of Trenton, Mercer County, Drainage Improvement Project, Construction $36,959,012.80 $37,018,636.16
New Jersey 0030348 Rt. 30, Elwood Rd./Weymouth Rd. (CR 623Z) to Haddon Ave., MP 36.40 -50.83,Various Towns, Atlantic County, Resurface Milling and Paving,Construction $39,587,011.48 $39,691,906.07
New Jersey 0030358 Rt. 30 Bridge Over Beach Thorofare, MP 56.68 to 57.03, Atlantic City, Atlantic County, Bridge Rehabilitation, Construction $26,842,595.77 $26,899,596.77
New Jersey 0042304 Rt 42 Bridges Over Blackwood Railroad Trail, MP 10.06 to 10.41, Gloucester Twp., Camden County, Bridge Replacement Project, Construction $28,082,383.32 $28,089,598.33
New Jersey 0046336 Rt. 46, Passaic Ave to Willowbrook Mall, MP 55.01-55.81, Fairfield/Wayne Twp, Passaic/Essex Co. Roadway widening/Bridge Replacement, Construction. $50,885,468.16 $51,027,449.96
New Jersey 0046342 Rt.3 & Rt.46 Valley & Notch Rifle Camp Rd.,Contract B,MP 58.76-60.58,Multi Towns, Passaic Co, Bridge Replacement, Construction. $179,984,837.17 $182,182,252.72
New Jersey 0052302 Signature Bridge Preventive Maintenance Contract 2019-1, Various cities, Multi counties, Bridge Maintenance, Construction $29,669,379.30 $30,382,524.30
New Jersey 0054210 Rt. 3/Rt. 46 Valley Rd. Contract A - M.P. 59.1 to 60.6 Intersection Improvements, Passaic Cnty - Construction - PODI $67,907,350.91 $74,268,962.84
New Jersey 0055300 Halls Mill Rd (MP 0-1.30) & Elton-Adelphi Rd (CR 524-MP 25.52), Freehold/Howell Twp. Monmouth Co. Roadway & Intersection Improvements, Construction. $29,990,004.70 $30,673,754.70
New Jersey 0071300 Route 71 Main Ave to Cedar Ave, M.P. 7.87 to 9.92, Pavement Rehabilitation, Monmouth County - Construction $29,465,245.21 $29,591,545.21
New Jersey 0072307 Rt. 72 Manahawkin Bay Bridges, Contract 1A & 1B, MP 25.38-28.76, Stafford Twp, Ship Bottom Boro, Ocean Cty, Paving & Drainage, PoDI Construction $47,066,000.84 $47,239,710.05
New Jersey 0076203 Rt 76,Bridge over Klemm Ave Conrail & South Branch Newton Creek-Contract 1,MP 0.76-1.89-Gloucester & Camden Cty, Bridge Replacement-Construction- PODI $67,586,790.29 $67,611,985.80
New Jersey 0078324 Route 78 Washington Valley Rd. MP 32.2-42.7 Multi Townships, Somerset Co. Pavement Preservation - Construction $25,326,588.84 $25,426,586.84
New Jersey 0078326 Rt. 78 Bridges over Rt.202/206 and Washington Valley Rd., MP 31.25-31.96, Multi Towns, Somerset Co., Bridge Deck Replacement, Construction. $66,470,661.11 $66,499,647.79
New Jersey 0078328 Rt. 78 Rockfall Mitigation, MP 10.10 to 10.30, Bethlehem Twp., Hunterdon County, Safety Management-Rockfall Mitigation, Construction $37,210,258.73 $37,336,607.04
New Jersey 0080323 Rt. 80 EB&WB Bridges over Rockaway River, MP 32.22-33.01, Jefferson Twp. Morris Co., Two Bridges Replacement-Construction $25,767,484.55 $25,937,880.52
New Jersey 0130321 Rt. 130 Charleston Rd/Cooper St. MP 43.01-51.59, Various Towns, Burlington County, Bridge Deck & Roadway Resurfacing, Construction. $40,901,947.64 $40,939,161.70
New Jersey 0130328 Rt 130 Bridge Over Big Timber Creek, MP 25.24-25.67 & CR 551 MP 29.38-29.46, Various Towns & Counties Bridge Replacement Project, Construction $65,458,031.29 $72,924,699.92
New Jersey 0155107 Rt130 Raccoon Creek Bridge Replacement&Pavement Rehabilitation from vicinity of High Hill Rd to N. of Baker Ave mp10.98-12.05 Gloucester-Construction  $69,296,305.43 $70,115,213.42
New Jersey 0206321 Rt 206 Bypass Sections 14A & 15A Contract B, New Roadway Alignment, MP 63.3-67.07- Hillsborough, Montgomery Twp. Somerset County-PODI- Construction $48,924,767.30 $51,056,204.03
New Jersey 0206328 Route 206 Doctors Way to Valley Rd. MP 66.35 to 68.00, Hillsborough Twp., Somerset County, Dualization Project, Construction $54,616,095.99 $55,634,108.07
New Jersey 0295320 Rt. 295/42/I-76 Direct Connect-Contract 3 MP 26.28-27.63, Bellmawr Boro, Camden Cty-Ramp/bridge upgrades/geometry/reduction- Construction-PODI Review $236,978,260.88 $257,592,682.66
New Jersey 0295330 Rt.295/42 Missing Moves, MP 25.07-26.35, Multi Towns, Camden Co, PoDI Oversight, Bridge Replacement, Construction. $210,673,721.23 $211,057,590.23
New Jersey 0520300 Rumson Rd over Shrewsbury River S-32, MP 22.31-22.51, Rumson & Sea Bright Borough, Monmouth County, Bridge Replacement, Construction $121,085,885.64 $121,134,640.50
New Jersey 2873095 Rt 287/78, I-287/202/206 MP 20.5 to 22.3 Interchange Impr. Bedminster & Bridgewater Twp., Somerset Cnty.- Construction - PODI $35,936,190.61 $36,168,999.97
New Jersey 2952137 I-295 Direct Connect Contract #2, (PODI-REVIEW) MP 26.03-28.41, Camden County, Grading, Paving & Structures, Construction.  $183,338,239.37 $195,271,432.77
New Jersey 7892104 LOCAL 14 STREET VIADUCT $56,216,701.00 $56,534,101.00
New Jersey C00S319 Local- West Brook Road Bridge over the Wanaque Reservoir - Con - NJTPA  $30,272,663.00 $30,290,561.00
New Mexico 0254078 ALBUQUERQUE, I-40/I-25 SYSTEM INTERCH. CONS. $130,145,714.51 $331,851,900.68
New Mexico 0261011 NM 26 PAVEMENT AND BRIDGE REHAB $6,255,198.72 $30,182,607.97
New Mexico 0401117 INTERSTATE 40 WEST OF GALLUP SEG. 1 $28,110,750.18 $38,792,786.77
New Mexico 0402073 I-40, M.P. 117 TO M.P. 122.5 $19,214,656.16 $28,542,736.35
New Mexico 0403144 I-40 COORS INTERCHANGE $120,026,391.58 $170,954,166.23
New Mexico 0403147 I-40, MP 177.15 TO MP 181.66 $25,411,572.48 $35,115,659.53
New Mexico 0403150 I 4O TO NM 14 $32,258,695.80 $43,244,497.92
New Mexico 0403155 San Mateo I-40 Interchange, 160.73 MP TO 162.17 MP $38,586,020.65 $52,419,497.14
New Mexico 0403157 I-40 SAN MATEO TO PENNSYLVANIA STREET $17,437,408.30 $32,892,136.35
New Mexico 0403165 RECONSTRUCTION I-40, WEST CENTRAL TO 98TH ST. $6,792,005.38 $25,488,748.62
New Mexico 0403187 I-40, MP 173.73 TO MP 177.11 $22,280,265.69 $27,597,341.05
New Mexico 0405072 RECONSTRUCTION - NO ADDED CAPACITY I-40, MP 308 TO MP 313.87 $11,751,123.90 $31,985,715.40
New Mexico 0541031 6.5 MI N ORO GRANDE - N., MAJOR WIDENING $19,535,392.42 $67,612,656.74
New Mexico 0542027 US 54, FROM MP 94.23 TO MP 107.1, TULAROSA TO VAUGHN, RECONSTRUCTION $19,186,084.79 $29,311,759.98
New Mexico 0644027 US 64, DULCE TO LUMBERTON $20,208,820.95 $30,091,321.33
New Mexico 0702023 US 70 INTERCHANGE, I-25 TO INT-E., CONS. DESIGN, R/W, RECONS.,CMGT $7,915,269.48 $32,837,179.61
New Mexico 0702032 T.4 MI E I-25 INTERCHANGE-E., RECONSTRUCTION $14,465,640.31 $37,082,422.36
New Mexico 0704035 US 70, Hondo Valley, Design Build Project $40,081,166.35 $125,355,737.79
New Mexico 0846078 ALAMO DRIVE TO OPERA/FLEA MARKET, RECONSTRUCTION $33,948,692.71 $59,421,708.09
New Mexico 1100990 EXIT 75 AT WILLIAMSBURG INTERCHANGE PROJECT $14,583,697.00 $43,185,092.05
New Mexico 1101021 I-25 ROADWAY RECONSTRUCTION $25,522,508.95 $29,880,380.53
New Mexico 2101351 Downtown Clovis Reconstruction Project $14,296,520.55 $41,058,819.05
New Mexico 2101381 Downtown Lovington Construction Phase I $23,787,202.62 $27,871,248.63
New Mexico 2101771 US-82-P, FROM MP 107.4 TO MP 139.1, NOT SPECIFIED, ROADWAY CONSTRUCTION $40,039,974.61 $71,654,376.76
New Mexico 2102160 US-285-P, FROM MP 0 TO MP 22, FROM TX STATE LINE TO LOVING, PHASE 1A/1B ALIGNMENT AND GEOTECHNICAL STUDY, PHASE 1C ENVIRONMENTAL, AND PHASE 1D PRELIMI $6,401,802.98 $55,388,334.33
New Mexico 2102162 US 285 Corridor Construction Phase III $42,719.99 $57,275,490.19
New Mexico 2102163 US 285 Corridor Construction Phase IV $29,127,403.86 $34,095,225.09
New Mexico 4100401 US-54-P, FROM MP 324.9 TO MP 326.3, 22.1 MILES NORTH OF JCT. LOOP 36 - EAST, BRIDGE REPLACEMENT $22,713,536.45 $27,314,087.25
New Mexico 5100750 NM 68, US 64 FROM LA POSTA RD. NORTH TO CAMINO DE LA PLACITAS (NORTH) IN THE TOWN OF TAOS -, ALIGNMENT STUDY $21,038,569.93 $33,930,607.00
New Mexico 5101341 I-25 La Bajada Slope Mitigation $4,904,039.65 $44,249,166.81
New Mexico 5101441 US 285 Tres Piedras $27,113,687.30 $31,738,678.19
New Mexico 6100671 NEAR CHURCH ROCK, NM. $14,559,877.11 $26,871,783.17
New Mexico 6100780 41.846 MILES NORTH OF I-40 ON US491 BEGINNING IN GALLUP, NM $10,910,628.65 $27,999,763.78
New Mexico 6100783 US 491, FROM MP15.116 TO MP 36.984, 15 MILES NORTH OF I40, RECONSTRUCTION WITH ADDED CAPACITY $11,681,416.32 $93,319,498.44
New Mexico 6101181 I-40 Concrete Wall Barrier Project near Laguna $10,746,089.23 $29,085,501.41
New Mexico A300160 T/LPA-SUNPORT BLVD EXTENSION-FROM BROADWAY TO I-25 EXIT 221 AT SUNPORT BLVD.CONSTRUCT NEW 4 LANE DIVIDED FACILITY WITH BIKE LANES $23,705,527.00 $28,152,339.20
New Mexico A300280 I-25, MP 221.62 TO MP 222.02, RECONSTRUCT INTERCHANGE WITH POSSIBLE CHANGES IN CONFIGURATION $50,566,726.25 $64,791,085.58
New Mexico A300381 NM 528, FROM MP 8.32 TO MP 9.79, NM 528 RIO RANCHO BLVD IMPROVEMENTS (UPPER SECTION) - FROM RIDGECREST DR/LEON GRANDE AVE $30,837,853.55 $36,242,629.53
New Mexico A301234 US0550, FROM MP .6 TO MP 3, US 550 CONSTRUCTION & WIDENING PHASE 2 - FROM MP.6 TO  MP 3.0, ROW PURCHASE, $26,679,048.08 $35,042,987.71
New Mexico E100203 NM 404 Widening Project $32,249,053.97 $62,633,228.34
New Mexico LC00250 I00025, FROM MP 1 TO MP 2, UNIVERSITY INTERCHANGE, BRIDGE REPLACEMENT, RAMP MODIFICATIONS/RECONSTRUCTION, ROADWAY RECONSTRUCTION, AND EXTENSION OF MUL $37,182,085.61 $44,795,634.49
New York 0016273 NY 112 RECONS BETWEEN I-495(LIE) AND GRANNY ROAD $29,869,849.00 $39,208,126.00
New York 0054183 SMITHTOWN:RECONSTRUCTION OF ROUTE 347 FROM TERRY ROAD TO GIBBS POND ROAD. $30,497,801.00 $37,508,188.00
New York 0054203 SMITHTOWN:RECONSTRUCT ROUTE 347 FROM ROUTE 111 TO MOUNT PLEASANT ROAD. $18,837,225.00 $32,046,532.00
New York 0054213 BROOKHAVEN:ROUTE 347 & ROUTE 112 INTERSECTION RECONSTRUCTION. $22,124,679.00 $38,399,446.00
New York 0054233 RECONSTRUCT NY 347 FROM GIBBS POND ROAD TO HALLOCK ROAD $44,666,644.00 $79,953,947.00
New York 0072143 NY878 OPERATIONAL IMPROVEMENTS $73,458,400.00 $96,623,000.00
New York 0229483  I495/CROOKED HILL RD INTRCHNG CONST $19,311,883.00 $37,054,138.00
New York 0229563 I495 PAVEMENT REHAB NASS LINE TO EXIT 55 $18,689,083.57 $39,585,386.00
New York 0229573 I495 Pavement Resurfacing  Exit 55 to Exit 64 $43,400,357.00 $48,222,620.00
New York 0327903 NORTH HEMPSTEAD AND ROSLYN:THE ROSLYN VIADUCT ON STATE ROUTE 25A OVER HEMPSTEAD HARBOR FOR BRIDGE REPLACEMENT. $63,425,107.00 $79,656,384.00
New York 0534803 SSP Pavement Resurfacing Exit 20 to Exit 32 $21,679,024.00 $27,098,781.00
New York 0760653 NASSAU COUNTY BRIDGE REHAB $3,832,257.00 $29,700,001.00
New York 0760783  HOSP RD/NY27 BRID WIDEN & INTERSECT IMPROV - CONST $17,987,091.00 $26,312,338.00
New York 0761353 WALT WHITMAN RD OVER I495 BRIDGE WIDENING $25,497,714.00 $31,872,144.00
New York 0809253 HEMPSTEAD:REPAIRS ON TWO DRAW BRIDGES, MEADOWBROOK STATE PARKWAY OVER SLOOP CHANNEL AND LOOP PARKWAY OVER LONG CREEK. $20,473,758.00 $27,605,074.00
New York 1051573 ALBANY:INTERSTATE 787 & ROUTE 912S FROM ROUTE 9W TO ROUTE 5 FOR BRIDGE REHABILITATION AND HIGHWAY RESURFACING. $32,552,129.00 $37,672,499.00
New York 1306813 RT. 7 OVER THE HUDSON RIVER, BRIDGE REPAIR $25,732,635.00 $32,315,797.00
New York 1721513 COLONIE:INTERSTATE 87 EXIT 4 ACCESS IMPROVEMENTS (PHASE 1) I-87 OVER ALBANY SHAKER RD-PAVEMENT RECONSTRUCTION & BRIDGE REPLACEMENT $22,580,577.00 $25,389,497.00
New York 1721903 I-87: EXIT 4, AIRPORT CONNECTOR, PART2 $32,190,343.00 $38,317,048.00
New York 2134413 UTICA:ROUTES 5, 8, & 12/NORTH SOUTH ARTERIAL & VIADUCT FROM BURRSTONE ROAD TO ORISKANY CIRCLE FOR RECONSTRUCTION. $54,772,250.00 $68,465,313.00
New York 3501903 I-81 VIADUCT -  I-481 CONVERSION TO I-81 NORTH OF KIRKVILLE RD   $227,350,000.00
New York 3506413 SYRACUSE:INTERSTATE 690 OVER TEALL AVENUE AND BEECH STREET-BRIDGE REPLACEMENT PROJECT. $67,257,000.00 $74,730,000.00
New York 4390303 I390/490 NORTHBOUND RAMPS  REALIGNMENT $53,678,092.00 $61,012,624.00
New York 4390543 I-390 INTERCHANGE IMPROVEMENTS @ I-490 (STAGES 3 & 4) [SEE COMPANION PROJECT 4390544 FOR NON-INTERSTATE 4390.54.322] $40,140,949.00 $68,429,791.00
New York 494X053 RT 19 AND RT 98 OVER ERIE CANAL LIFT BRIDGE REHAB $6,427,455.00 $29,557,974.00
New York 5760803 BUFFALO:NY GATEWAY CONNECTIONS IMPROVEMENT TO THE US PEACE BRIDGE PLAZA. $46,087,513.00 $66,198,804.00
New York 6008223 LINDLEY:ROUTE 15 FROM WATSONS CREEK TO PRESHO (PHASE 2) - CONSTRUCT 7 BRIDGES TO COMPLETE THE EXPRESSWAY. $27,626,352.00 $34,532,940.00
New York 7111213 BRIDGE REPLACEMENT, NY Route 12E over Chaumont River $27,763,102.00 $28,123,102.00
New York 8006723 WARWICK:ROUTE 17 EXIT 122 INTERCHANGE RECONSTRUCTION. $39,617,125.00 $81,971,616.00
New York 8006843 ROUTE 17 @ ROUTE 32 (EXIT 131) INTERCHANGE RECONSTRUCTION TOWNS OF MONROE AND WOODBURY ORANGE COUNTY. NY DEMO #583 $113,157,814.00 $142,642,639.00
New York 8018463 801846 - ROUTE 28 / ESOPUS CREEK-BRIDGE REPLACEMENT - BIN 1091290, CIN C870151 $20,837,454.00 $26,054,894.00
New York 8062093 DEERPARK:INTERSTATE 84 OVER THE DELAWARE RIVER BETWEEN NEW YORK AND PENNSYLVANIA AND COUNTY ROUTE 16 FOR BRIDGE REHABILITATION. $29,316,541.00 $47,201,137.00
New York 8101463 WESTCHESTER COUNTY BRIDGES: HRP, SMRP, ROUTE 1 $92,932,000.00 $119,452,241.00
New York 8127263 TACONIC STATE PARKWAY @ PUDDING STREET INTERCHANGE, NEW GRADE SEPARATED INTERCHANGE, TOWN OF PUTNAM VALLEY PUTNAM COUNTY $25,271,363.00 $32,453,463.00
New York 8239453 ROUTE 9W: SEVEN BRIDGE REPLACEMENTS AND REHABILITATIONS IN THE TOWNS OF HIGHLANDS, CORNWALL, AND NEW WINDSOR, ORANGE COUNTY $23,580,000.00 $29,475,000.00
New York 8729723 I-287 BRIDGE DECK REPLACEMENTS OVER MIDLAND AVE AND METRO-NORTH RAILROAD, CITY OF RYE, WESTCHESTER CO. $11,534,353.00 $30,381,515.00
New York 8808623 WURTS STREET / DOCK STREET & RONDOUT CREEK $51,540,670.00 $51,540,670.00
New York 8813683 BRIDGE REHABILITATION/REPLACE: WESTCHESTER COUNTY $19,943,281.00 $33,844,144.00
New York 8814073 I-684 PMI PAVING: HUTCHINSON RIVER PARKWAY TO ROUTE 172 OVERPASS, TOWN OF BEDFORD, WESTCHESTER COUNTY $26,384,140.00 $29,319,932.00
New York 8LHT113 Lower Hudson Transit Link (8823.50 & 8823.51) $70,987,368.00 $119,616,998.00
New York 8TZ1003 ROCKLAND AND WESTCHESTER COUNTIES:TAPPEN ZEE BRIDGE OVER THE HUDSON RIVER FOR BRIDGE REPLACEMENT (DESIGN/BUILD CONTRACT).   $3,216,685,500.00
New York 9013393 RT 17 INTERCHANGE 105 RECONSTRUCTION AND RT 42 IMPROVEMENTS $1,171,500.00 $30,255,620.00
New York 9066743 LIBERTY:ROUTE 17 @ PARKSVILLE BETWEEN MORRSTON EB ENT RAMP & FOX MOUNTAIN RD END 2 KM E OF COOLEY RD FOR RECONSTRUCT & NEW CONST. $59,444,048.00 $96,596,293.00
New York 9067173 THOMPSON:UPGRADE ROUTE 17 TO INTERSTATE STANDARDS BETWEEN EXITS 107 & 108 INCL REPL OF BRIDGE OVER THE NEVERSINK RIVER. $26,288,633.00 $30,625,889.00
New York 9358223 I-88 PAVEMENT & BRIDGE PROJECT, OTSEGO AND SCHOHARIE COUNTIES $45,484,413.00 $50,538,239.00
New York 9358433 I-88 EXIT 17 TO 18, CRACK & SEAT $31,827,708.00 $37,014,123.00
New York 9500804 BINGHAMTON:INTERSTATE 81/ROUTE 17 INTERCHANGE RECONSTRUCTION (PROSPECT MOUNTAIN PHASE 2) RECONST INTERCHANGE 4, INCL NEW BRIDGES, $23,444,954.00 $167,243,863.00
New York NYCD001 NEW YORK CITY:VARIOUS HIGHWAYS IN THE VICINITY OF THE WORLD TRADE CENTER FOR AN ER PROJECT (9/11/2001 ATTACK). $97,604,976.00 $97,604,976.00
New York X021523 NEW YORK CITY (BROOKLYN):REPLACEMENT OF THE BELT PARKWAY BRIDGE OVER MILL BASIN IN BROOKLYN, NY TO BRING TO A STATE OF GOOD REPAIR $174,589,918.00 $296,237,398.00
New York X021543 NEW YORK CITY:REHABILITATION OF THE BELT PARKWAY BRIDGE OVER GERRITSON INLET. $84,883,281.00 $106,104,105.00
New York X027083 BRONX RIVER GREENWAY SEGMENT PHASE 2 $28,007,063.00 $37,344,830.00
New York X051603 KGI INFRASTRUCTURE & OPERATIONAL IMPROVEMENT IN QUEENS CO. $3,576,101.00 $365,706,001.00
New York X071483 NEW YORK CITY:RECONSTRUCT THE HARLEM RIVER DRIVE VIADUCT BETWEEN E 125th & E 132nd ST INCLUDE CONST OF ENTRANCE RAMP FROM 3rd AVE ONTO SOUTHBOUND HRD. $72,857,883.00 $108,306,433.00
New York X110263 REPLACEMENT OF BRONX RIVER PARKWAY BRIDGES OVER MNRR, BRONX CO. (BINS 1075049 & 1075059) $62,932,000.00 $78,665,001.00
New York X228693 MOBILITY IMPROVEMENT ON LIE EB B/T CLEARVIEW EXPWY & SPRINGFIELD BLVD,  REPLACEMENT OF OCEANIA ST BRIDGE OVER LIE IN QUEENS COUNTY, NYC (BIN: 1055300) $60,504,272.00 $88,327,756.00
New York X720313 REPLACEMENT OF EAST 138TH STREET BRIDGE OVER MAJOR DEEGAN EXPRESSWAY $27,131,410.00 $52,860,002.00
New York X720393 Rehab of Major Deegan Expy Between W.161st St & Highbridge Interchange (BINS 1067451, 1066840) & Depot Pl Bridge Rehab over MDE (BIN 1067452) in Bronx $112,881,833.00 $128,945,051.00
New York X726993 NEW YORK CITY:REHAB 3 BRIDGES ALONG THE CROSS BRONX EXPRESSWAY HIGH-BRIDGE INTERCHANGE. $45,350,697.00 $84,509,372.00
New York X727163 REPLACEMENT OF RAMP OCH, SHERIDAN BLVD. NORTH TO CBE WEST $39,315,929.00 $49,144,912.00
New York X729773 NEW YORK CITY:KOSCIUSZKO BRIDGE REPLACEMENT - Phase II. $349,186,006.00 $357,780,360.00
New York X731273 BRUCKNER EXPWY-HUTCHINSON PKWY MOBILITY IMPROVEMENT PROJECT, BRONX CO., NYC $19,633,360.00 $38,841,023.00
New York X731453 REHABILITATION OF BRUCKNER BLVD VIADUCT (278I). BRONX, NYC $32,752,000.00 $209,100,000.00
New York X731473 DECK REPLACEMENT OF FIVE BRIDGES ON I-278, KINGS & RICHMOND $51,848,443.00 $80,341,790.00
New York X731493 ARTHUR SHERIDAN ENHANCEMENT (I-895) $41,216,935.34 $51,521,170.34
New York X731613 GOWANUS EXPRESSWAY STEEL REPAIRS & RAMP D DECK REPLACEMENT, KINGS COUNTY $28,725,858.00 $31,917,622.00
New York X731633 HUNTS POINT TRUCK ACCESS  IMPROVEMENT PROJECT PHASE 1, BRONX CO. NYC $331,874,646.00 $571,215,162.00
New York X731653 HUNTS POINT INTERSTATE ACCESS IMPROVEMENT PROJECT, CONTRACT 3, BRONX COUNTY   $481,486,514.00
New York X731683  REHABILITATION OF THE WOOLLEY AVE AND BRADLEY AVE BRIDGES OVER STATEN ISLAND EXPRESSWAY IN RICHMOND COUNTY, NY $10,768,846.00 $32,790,856.00
New York X731733 Gowanus Expressway Viaduct Painting and Steel Repairs, Kings County, NYC $69,004,032.00 $176,738,040.00
New York X735753 NEW YORK CITY:REPLACEMENT OF VAN WYCK EXPRESSWAY. $106,913,765.70 $106,913,765.70
New York X735773 NYC:REPL OF VAN WYCK EXPWY VIADUCTS AT THE KGI, NB VAN WYCK EXPWY/ GRAND CENTRAL PKWY, UNION TPKE & JACKIE ROBINSON PKWY. $109,009,471.00 $138,658,347.00
New York X735803 VAN WYCK EXPRESSWAY VIADUCT REHABILITATION, QUEENS COUNTY $85,043,318.00 $133,064,009.00
New York X735843 X73584 - (DB CONTRACT 3) VAN WYCK EXPRESSWAY CAPACITY IMPROVEMENTS $611,584,776.00 $937,603,543.00
New York X757003 NEW YORK CITY:WILLIS AVENUE OVER THE HARLEM RIVER FOR BRIDGE REPLACEMENT. $217,541,858.00 $537,970,865.00
New York X757533 BROADWAY BRIDGE REHABILITATION (2240137) $88,720,000.00 $110,900,000.00
New York X758863 MADISON AVE. BRIDGE REHAB (BIN 2240079) $21,400,000.00 $30,353,000.00
New York X758923 NEW YORK CITY (QUEENS):ROOSEVELT AVENUE OVER THE VAN WYCK EXPRESSWAY/INTERSTATE 678 FOR BRIDGE REHABILITATION. $53,333,335.00 $70,266,669.00
New York X759193 NYC, ER EVENT 01-02, SEPTEMBERR 11, 2001, RECONSTRUCTION OF WORTH ST, HUDSON ST. TO EAST BROADWAY $12,000,000.00 $95,000,000.00
New York X759213 ER EVENT NY2001-02, 9/11, NYC, MANHATTAN RECONSTRUCTION OF WARREN AND JOHN STREETS. $11,300,000.00 $30,700,000.00
New York X759843 NEW YORK CITY:ROUTE 9A WEST STREET PROMENADE - SITE PROJECT FOR RECONSTRUCTION. $105,415,792.00 $119,050,170.00
New York X759846 NEW YORK CITY:ROUTE 9A NORTH AND WEST PROMENADE PROJECT EXTRA TASKS FOR CONSTRUCTION INSPECTION AND CONSTRUCTION SUPPORT SERVICES. $38,781,817.00 $38,781,817.00
New York X761243 IMPLEMENT PHASE FOUR OF GRAND CONCOURSE SAFETY IMPROVEMENTS $18,456,401.00 $60,566,864.00
New York X761263 REHAB BROOKLYN BRIDGE, MANHATTAN APPROACHES (CONTRACT 7) $53,826,074.00 $159,040,843.00
New York X761264 REHABILITATE THE MANHATTAN APPROACHES TO THE BROOKLYN BRIDGE IN NY COUNTY $39,200,000.00 $41,263,158.00
New York X762074 TMC OPERATIONAL SUPPORT FOR FFY 19 $36,250,000.00 $62,556,415.00
New York X764203 PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES $16,038,203.30 $25,444,626.00
New York X764263 WILLIAMSBURG BRIDGE REHABILITATION CONTRACT # 9 (BIN2240039), NEW YORK COUNTY   $153,495,936.00
New York X770183 NEW YORK CITY:GRAND CONCOURSE IMPROVEMENTS FROM EAST 166th STREET TO EAST 171st STREET. $19,894,600.00 $26,176,750.00
New York X770783 NYC:REPLACEMENT OF CITY ISLAND ROAD BRIDGE OVER EASTCHESTER BAY WITH A SINGLE SPAN CABLE-STAYED STRUCTURE. $99,612,848.00 $124,516,060.00
New York X772433 NEW YORK CITY:UNIONPORT BRIDGE REPLACEMENT $148,897,916.00 $219,825,398.00
New York X772483 NEW YORK CITY:REHABILITATION OF ATLANTIC AVENUE BRIDGE $31,487,749.00 $77,785,932.00
New York X772513 REHABILITATE RIVERSIDE DRIVE BRIDGE/W 158TH STREET (2246720) $53,333,600.00 $82,758,144.00
New York X772563 NEW YORK CITY:REHABILITATE THE WESTCHESTER AVENUE BRIDGE OVER THE HUTCHINSON RIVER PARKWAY. $34,859,000.00 $45,408,750.00
New York X772843 REHABILITATION MANHATTAN BRIDGE STRUCTURAL COMPONENTS (2240028) $37,336,000.00 $73,019,628.00
New York X772863 NEW YORK CITY:THE MACOMBS DAM BRIDGE OVER THE HARLEM RIVER FOR BRIDGE REHABILITATION. $32,109,825.00 $49,652,282.00
New York X773093 BROOKLYN WATERFRONT GREENWAY GOWANUS CONNECTOR   $30,948,284.00
New York X773113 SAFETY IMPROVEMENTS ON 4TH AVENUE IN BROOKLYN (REPURPOSED EARMARK NY650 - PROGRAM CODE RPS9) $6,907,375.00 $50,677,414.00
New York X773363 RECONSTRUCTION OF TILLARY STREET (PHASE 2) (BROOKLYN), NEW YORK CITY. $14,667,000.00 $41,600,000.00
New York X774073 RECONSTRUCTION OF 5TH AVENUE BRIDGE OVER LIRR & SEA BEACH (Bridge NY), KINGS COUNTY   $50,802,516.00
New York X777013 EMERGENCY RELIEF NY2013-01, HURRICANE SANDY, NYCDOT (QUEENS COUNTY) PERMANENT FLOOD REPAIRS TO METROPOLITAN AVE BRIDGE BY CONTRACT $22,600,000.00 $28,250,000.00
New York X777044 ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO MOVEABLE BRIDGES BY CONTRACT FORCES. $41,673,232.00 $52,091,540.00
New York X777114 ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO BATTERY PARK AND WEST STREET UNDERPASSES BY CONTRACT FORCES. $53,418,887.00 $66,773,609.00
New York X777811 ER EVENT NY13-01, HURRICANE SANDY, QUEENS CO., PERMANENT REPAIRS TO PAVEMENT FROM STORM SURGE, ROCKAWAY BEACH BLVD FR 73 TO 88 ST $16,332,765.00 $30,534,013.00
New York XM12533 NEW YORK CITY:BRIDGE CORRECTIVE MAINTENANCE AT VARIOUS LOCATIONS. $26,323,738.00 $71,485,914.00
New York XM16563 BRIDGE EXPANSION JOINTS REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE  LOCATIONS IN NYC $23,289,640.00 $31,963,325.00
New York XM17033 FDR Drive Cleaning and Painting - South Street, NY, NY $4,122,656.00 $38,123,007.00
New York XM22043  BRIDGE PAINTING AT VARIOUS LOCATIONS IN BRONX, KINGS, QUEENS, AND RICHMOND COUNTIES, NYC $8,982,131.00 $41,729,045.00
North Carolina 000S425 Enhancement Beautification Program $29,607,706.00 $37,587,908.00
North Carolina 000S781 Carolinian/Piedmont between Charlotte & Raleigh $37,299,089.00 $54,264,000.00
North Carolina 0012056 Bridge Rehab (Design-Build) - Dare County $117,655,985.00 $154,742,448.00
North Carolina 0012063 Bridge #11 over the Oregon Inlet on NC 12 $239,506,867.00 $311,852,159.00
North Carolina 0016052 NC 16 North of SR 1814(Caldwell Rd) SR 1895(Tower Rd) $35,258,252.00 $66,661,959.00
North Carolina 0017054 US 17 from South of SR 1149 (Price Rd) to South of SR 1536 (Hamilton Beach Rd) $188,595,939.00 $237,645,573.00
North Carolina 0017093 US17 (New Bern Bypass) from US17 S. of New Bern to US70 $37,720,592.00 $46,609,701.00
North Carolina 0017096 US 17/Wilmington Bypass -NC 87 South of Bishop -US 74-76 East of Malmo $59,050,909.00 $76,511,079.00
North Carolina 0017124 US 17 (Wilmington Bypass) from US 74/76 east of Malmo in Brunswick County to SR 1430(Cedar Hill Rd) $45,508,889.00 $115,660,139.00
North Carolina 0017131 US 17(Wilmington Bypass) from SR 1430(Cedar Hill Road) US421 North of Wilmington $53,889,361.00 $170,811,184.00
North Carolina 0024024 Bridge # 116 over CSX railroad, North South railroad land Hillsboro Street on NC 24-87-02 $30,988,936.00 $39,067,853.00
North Carolina 0026015 Major Widening - Henderson County $34,312,353.00 $127,517,850.00
North Carolina 0040033 Pavement Rehabilitation 1 m E I-40 E of SR1143 to .7m E of US 601 $54,043,811.00 $67,564,198.00
North Carolina 0040063 I-40 Pavement Rehab - Buncombe County $7,079,543.00 $39,791,093.00
North Carolina 0040068 Pavement Rehab - Burke County $36,708,865.00 $45,890,750.00
North Carolina 0040074 Rehab & Restoration - Catawba County $27,864,654.00 $39,629,473.00
North Carolina 0040075 Pavement & Bridge Rehabilitation - Duplin County $9,853,146.00 $33,333,000.00
North Carolina 0040097 Pavement Rehabilitation - Buncombe County $15,983,239.00 $27,046,924.00
North Carolina 0040114 New Route - Forsyth County $1,378,595.00 $307,240,802.00
North Carolina 0052057 New Route - Forsyth County $46,221,563.00 $170,594,167.00
North Carolina 0054031 Major Widening - Wake County $35,646,223.00 $72,095,831.00
North Carolina 0055020 DURHAM-NC55 (ALSTON AVE) FROM NC 147 (BUCK DEAN FREEWAY) TO US 70 BUSINESS/NC 98 (HOLLWAY ST) MILES: 1.000/KILOMETERS: 1.609 $65,055,998.00 $92,049,383.00
North Carolina 0059005 Br #22 over I95B / US 301 on NC 59 $26,104,631.00 $32,548,883.00
North Carolina 0063001 NC63 FM SR1615 TO W SR1004 NW ASHVILLE, PE $43,642,052.00 $65,761,531.00
North Carolina 0064216 Replace Bridge# 9 - Dare County $36,000,000.00 $45,000,000.00
North Carolina 0069007 NC 69/US 64 fr Georgia state line to US 64 (Hayesville Byp) $68,791,812.00 $68,941,937.00
North Carolina 0070049 US70 HAVELOCKBYP/N PINEGROVE/N CARTERET CO LI, PE $40,661,691.00 $140,906,133.00
North Carolina 0070106 US 70 (Goldsboro Bypass) E SR 1300 (Salem church Rd) E SR 1556 (Wayne Memorial Dr) $84,752,010.00 $84,942,512.00
North Carolina 0070119 Br # 1830227 over Peace Street on US 70 $57,740,590.00 $83,411,362.00
North Carolina 0070154 US 70 Slocum Road at the Cherry Point Military Base (Planning/Environmental Studies only) $34,635,596.00 $43,551,453.00
North Carolina 0070163 US 70 west SR 2565(Sadisco Rd) west of SR 1915 (Turnage Rd) $46,665,585.00 $93,090,304.00
North Carolina 0070241 US 70 Havelock Byp/ N Pinegrove / N Carteret CO LI $7,381,191.00 $101,847,850.00
North Carolina 0073025 I-73 from NC 68 to the Greensboro Western Loop; Freeway on new location $72,234,046.00 $116,273,455.00
North Carolina 0074137 Charlotte-US 74 (Independence Blvd) from NC 24/27 (Albemarle Rd) to Idlewild Road $6,711,803.00 $58,830,321.00
North Carolina 0074213 Eastern section of nothern beltway in Winston-Salem - Forsyth County $63,497,106.00 $191,038,017.00
North Carolina 0074226 Winston Salem Northern Beltway Eastern Section (Future I-74) US311- I-40   $95,100,000.00
North Carolina 0077016 Rehabilitation & Restoration - Surry County $50,763,840.00 $65,329,802.00
North Carolina 0085003 I-85 fr SR 1113 (Kivett Dr) to .4 mi N of I-85 Bus in High Point - Guilford County $20,178,801.00 $25,286,753.00
North Carolina 0085019 Pavement Rehabilitation $10,713,313.00 $25,505,073.00
North Carolina 0095031 I-95 fr .4 mi N of US 70 Byp to .2 mi N of NC 222 $67,778,950.00 $96,301,561.00
North Carolina 0095057 Major Widening - Cumberland County - INFRA Grant $119,264,000.00 $418,500,000.00
North Carolina 0095071 Design-Build - Cumberland, Halifax, Harnett, Johnston, Nash, Northampton, Robeson, & Wilson Counties $16,600,000.00 $27,666,667.00
North Carolina 0095078 Rehab & Restoration - Robeson County $22,500,000.00 $190,662,500.00
North Carolina 0095079 Rehab & Restoration - Robeson County $8,150,956.00 $123,640,000.00
North Carolina 0100024 Fayetteville - Outer Loop fr S of SR 1003 (Camden Rd) to S of SR 1104 (Strickland Bridge Rd) $45,328,217.00 $220,627,122.00
North Carolina 0107010 NC 107 from SR 1002 (Roger Rd) to NC 281 $26,293,252.00 $54,065,319.00
North Carolina 0129007 New Route - Graham County $27,200,000.00 $27,200,000.00
North Carolina 0129008 New Route - Graham County $60,000,000.00 $60,000,000.00
North Carolina 0143011 New Construction - Graham County $78,000,000.00 $78,600,000.00
North Carolina 0209006 NC 209/US 19-23-74 (Great Smoky Mtn expressway)SR1523 (Old Clyde Rd)Lake Junaluska (includes: R-2210B) $31,161,199.00 $38,960,538.00
North Carolina 0211021 NC 211 from SR 1500 (Midway Rd) to NC 87 $83,801,628.00 $340,064,170.00
North Carolina 0220025 Greensboro-combined with R-2413C see state remarks for more details $40,569,151.00 $51,048,709.00
North Carolina 0220065 I-73/74 from .2 mile southwest of SR 1304(Harrington Rd) to I-73/74 interchange south of Ellerbe $45,326,444.00 $56,818,233.00
North Carolina 0221041 US 221 North of South Fork River to South of NC 194 $57,255,348.00 $91,030,188.00
North Carolina 0261191 I-26 at the NC 191 Interchange $64,272,954.00 $89,406,956.00
North Carolina 0261199 I-26 fr NC 146 (Long Shoals Rd) @ exit 37 to I-40 $84,288,485.00 $319,679,424.00
North Carolina 0261200 I-26 fr US 25 Bus (exit 44) to NC 280 (exit 40) $43,749,125.00 $164,332,625.00
North Carolina 0261202 Major Widening - Henderson County $9,769,808.00 $31,367,238.00
North Carolina 0264067 Rehabilitation & Restoration - Pitt County $4,933,769.00 $26,577,918.00
North Carolina 0273001 Mount Holly-NC 273 (South Main ST) fm. south of CAtawba Drive to Highland Street at Rankin Avenue $21,404,947.00 $29,924,717.00
North Carolina 0277019 Bridge Rehab - Mecklenburg County $21,500,000.00 $29,882,750.00
North Carolina 0277020 Bridge Rehabilitation - Mecklenburg County $18,544,043.00 $32,403,454.00
North Carolina 0301028 Rocky Mount-US 301 Bypass from NC 43-48 (Benvenue rd) to SR 1836 (May Drive) $31,980,041.00 $44,969,303.00
North Carolina 0311023 US 311 N of SR 1929 (Spencer RD) to US 220 / Future I-73 $99,335,547.00 $125,860,553.00
North Carolina 0311032 High Point-US 311 and NC 68 (Eastchester Drive) interchange $17,372,269.00 $38,833,693.00
North Carolina 0401155 I-40 from West of Sr 1224 (Monte Vista Rd) to I-240 in Asheville $38,809,175.00 $49,706,154.00
North Carolina 0401230 Fayetteville-US 401(Raeford Rd) east of US 401 Bypass (Skibo Rd) SR 1007(All-American Freeway) $65,642,570.00 $88,896,185.00
North Carolina 0401249 US 401 fr nc 96 to sr 1103 $30,044,442.00 $66,074,894.00
North Carolina 0401259 I-40 & SR 3015 (Airport Blvd) interchange $22,944,418.00 $55,477,705.00
North Carolina 0401300 Major Widening - Cumberland County $5,789,402.00 $35,903,488.00
North Carolina 0402134 I-40 near mp119 in Burke County/near mp 146 Iredell County $28,008,668.00 $31,405,704.00
North Carolina 0402141 Statesville-I-40/I-77 W. of SR 2003 (Radio Rd) SR 2158 (Old Mocksville Rd) I-77 S. SR 2321 (E. Broad St) SR 2171 (Jane Sower Rd) $27,542,766.00 $31,255,243.00
North Carolina 0402145 I-40 / I-77 Interchange *see state remarks for more detail* $101,835,571.00 $122,660,167.00
North Carolina 0403112 I-40 .3 mile W. of NC 801 Davie County to .3 mile W. ofSR 1122(Summerset Dr) Forsyth County $45,994,174.00 $88,936,560.00
North Carolina 0404139 I-40 from I-440 / US 64 (exit 301) to the US 70 Construction $314,390,520.00 $502,101,512.00
North Carolina 0404140 I-40 West ofSR 1728(Wade Ave,mp 289) East of SR 1319(Jones Franklin Rd,mp 294) $48,706,842.00 $61,993,437.00
North Carolina 0404148 I-40/I-85 to the Durham County Line $16,328,584.00 $308,696,331.00
North Carolina 0404161 I-40/I-85, SR 1107 (Mebane-Oaks Rd) in Mebane $3,828,675.00 $26,126,759.00
North Carolina 0421087 Bridge Replacement - Forsyth  $125,810,399.00 $157,269,302.00
North Carolina 0421088 Design Build - Forsyth County $66,699,329.00 $84,827,761.00
North Carolina 0431024 Rocky Mount Northern Connector from SR 1604 (Hunter Hill Rd) to US 301 $31,444,430.00 $39,442,959.00
North Carolina 0440010 Raleigh-I-440 (Cliff Benson Beltline) Sr 1313 (Walnut St) SR 1728 (Wade Ave) $89,739,967.00 $509,047,891.00
North Carolina 0440013 I-440 /US 64 from the I-40(exit 301) North of US 64/264 (Knightdale Bypass) $186,304,407.00 $207,108,285.00
North Carolina 0440024 Rehab & Restoration - Wake County   $30,345,335.00
North Carolina 0485026 I-485 (Charlotte Eastern Outer Loop) / I-85 $97,522,129.00 $108,340,707.00
North Carolina 0485027 I 485 (Charlotte Outer Loop) East of NC 115 to I-85 North $123,687,202.00 $159,664,006.00
North Carolina 0507003 Fuquay-Varina-North Judd Parkway northwest from NC 55 to NC 42 $8,650,000.00 $25,283,334.00
North Carolina 0540041 New Route - Wake County   $139,498,000.00
North Carolina 0540042 New Route - Wake County   $145,053,000.00
North Carolina 0540045 New Route - Wake County   $287,132,000.00
North Carolina 0540046 Rehab & Restoration - Wake County   $33,400,000.00
North Carolina 0620031 Fayetteville - Outer Loop fr S of US 401 to S of SR 1400 (Cliffdale Rd) - Cumberland County $127,310,056.00 $169,804,645.00
North Carolina 0708053 Greensboro Western Loop from US 220 (Battleground Ave) SR 2303(Lawndale Dr) $81,197,985.00 $101,535,896.00
North Carolina 0708067 Greensboro-Western Loop from south of SR 2137(Old Oak Ridge Rd) to north of US 220(Battleground Ave) $62,069,512.00 $193,774,939.00
North Carolina 0771171 I-77 from South of SR 1125 (Ashbury Church Rd/mp 71) to US 21 $60,406,762.00 $77,645,712.00
North Carolina 0771219 I-77 and SR 2136 (Gilead Rd) interchange $17,022,858.00 $25,078,573.00
North Carolina 0771229 New Construction I-77 from I-277 (Brookshire Freeway)to west Catawba Avenue(exit 28) $105,862,973.00 $136,107,880.00
North Carolina 0771230 New Route - Mecklenburg County $29,600,000.00 $37,002,285.00
North Carolina 0771231 New Route - Mecklenburg County $27,200,000.00 $34,046,870.00
North Carolina 0851113 I-85 / US 321, Geometric Safety Improvements to Interchange $23,386,749.00 $34,228,445.00
North Carolina 0852062 I-85 south of SR 2894 (Speedway-Concord Mills Blvd)Mecklenburg Co./ NC 73 Cabarrus County $143,561,315.00 $171,121,425.00
North Carolina 0852077 I-85 fr NC 73 in Cabarrus County (Exit 55) to Lane St (Exit 63) $254,294,413.00 $328,408,557.00
North Carolina 0852078 I-85 $154,288,272.00 $199,691,445.00
North Carolina 0853197 I-85 from North of SR 2120(Long Ferry Rd,exit 81) Rowan County-North of NC 150 Davidson County $140,526,675.00 $179,139,531.00
North Carolina 0854104 I-85 from Granville County to US 158 $29,821,982.00 $35,428,248.00
North Carolina 0854116 I-85 South of US158-Vance County/SR 1237(Manson Rd) Warren County $87,007,526.00 $110,392,138.00
North Carolina 0854117 I-85 from North of SR 1237(Manson RD) Virginia State Line $58,286,701.00 $73,050,299.00
North Carolina 0918016 Design Build-Winston-Salem-Salem Creek /SR4326(Rams Dr,formerly Stadium Dr) SR 4325(Martin Luther King Jr Dr) $81,267,230.00 $117,794,967.00
North Carolina 0918062 New Route - Forsyth County $24,999,292.00 $41,961,057.00
North Carolina 0918093 Winston-Salem Northern Beltway (Eastern Section ,Future I-74)from US 150 to I-40 Bus/NC421 $101,004,789.00 $187,650,242.00
North Carolina 1118011 New Route - Cumberland County $81,519,123.00 $245,200,734.00
North Carolina 1118012 New Route - Cumberland County $5,520,681.00 $62,722,941.00
North Carolina 1121009 Fayetteville-SR 1121(Ray Rd) fm. NC 210 to SR 1120 (Overhills Rd) $31,643,103.00 $40,624,454.00
North Carolina 1132007 Fayetteville-SR 1132 (Legion Rd) Sr 1363(Elk Rd) SR 1154 (West Mountain Drive) $20,113,864.00 $30,050,522.00
North Carolina 1142011 SR 1142 (Prison Camp Rd) fr NC 903 to SR 1182 (E College Rd) $18,513,342.00 $59,886,895.00
North Carolina 1217006 Kill Devil Hills-SR 1217 (Collington Rd) from US 158 to the Dead End $19,848,131.00 $33,387,970.00
North Carolina 1335004 Replace Bridge Numbers 73 & 96 - Carteret County $10,893,916.00 $54,100,000.00
North Carolina 1820005 High Point-Sr 1820(Skeet Club Rd) fm. East of Sr 1818 (Johnson St) to West of NC 68 (East Chester Dr) $57,275,152.00 $80,610,051.00
North Carolina 1922001 MORGANTON-SR1922-SR1924 FROM I-40 TO NC 18, PE $28,773,272.00 $36,502,981.00
North Carolina 2020001 Bridge Replacement - Statewide $23,000,000.00 $30,000,000.00
North Carolina 4121007 Greensboro-High Point-SR 1486/SR 1421(Greensboro/High Point Rd) SR 4228 (Vickrey Chapel RD) to SR 1424(Hilltop Rd) $22,534,172.00 $38,292,724.00
North Carolina 5238005 Charlotte-SR 2467(Mallard Creek Rd) from SR 2480(Sugar Creek Rd) to SR 2665(Harris Blvd) $32,536,054.00 $42,475,709.00
North Carolina ER19005 Emergency Relief/Permanent Repair - Bladen County $21,386,214.00 $28,870,000.00
North Dakota 1A94078 BISMARCK-MANDAN MEMORIAL BRIDGE - Structure $24,035,401.00 $27,035,441.50
North Dakota 4083111 US 83, Minot Broadway Viaduct; Structural Replacement, Grading, Aggregate Base Course, Concrete Pavement, Curb and Gutter, Retaining Walls, Sidewalk   $20,019,448.33 $25,527,975.99
North Dakota 7085109 US 85, Long X Bridge 2.2 mi S of CMC 2739; Grading, Aggregate Base, HMA, Structure Replacement (new NBI #), Wildlife Crossing Structure (new) & Inc.   $37,528,661.00
North Dakota 7804062 ND 1804, Red Mike Area (W of CMC 5334) to .03 mi W of CMC 5333; Grading, Aggregate Base, Hot Mix Asphalt, Passing Lanes, Lighting, Signing $3,336,428.27 $44,730,547.90
North Dakota 8029173 I-29,  N OF HUNTER SEPARATION TO S OF JCT ND 200 - SB; GRADING, PCC PAVEMENT, MILL & HMA OVERLAY, CULVERTS, FENCING, GUARDRAIL $26,203,695.00 $29,115,216.67
North Dakota 8094092 I-94, West Fargo Horace Interchange (I-94 & Sheyenne St); Grading, Aggregate Base, PCC Pavement, Storm Sewer, Signing, Marking & Lighting $21,492,990.46 $25,030,803.87
North Dakota 9052056 US 52, VARIOUS LOCATIONS FOR INFRA PROJECTS $16,750,000.00 $26,395,406.81
North Dakota 9999500 BUILD GRANT PROJECTS - STATEWIDE, VARIOUS LOCATIONS - FLOOD RESILIENCY PROJECTS $27,115,015.11 $55,875,631.60
North Dakota SB97001 STATE INFRASTRUCTURE BANK FY97, SIB - ACAP $2,540,000.00 $27,106,700.00
Ohio E034667 IR-77 from near Oakes Rd. to IR-480 in Cuyahoga County. GARVEE Bond Project. $76,257,886.37 $112,446,681.03
Ohio E036192 FRA IR 270 2.60 (Recon),Major reconstruction project with pavement replacement. Upgrade drainage, guardrail, GARVEE BOND PROJECT $75,986,388.25 $89,771,593.66
Ohio E036466 FRA IR 270 9.15 $10,994,073.70 $66,558,947.32
Ohio E036702 IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. $77,215,749.91 $105,096,581.75
Ohio E040035 SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. $22,942,024.00 $74,080,622.81
Ohio E040187 US-33 in the vicinity of Carroll in Fairfield County. New interchange. $29,984,540.18 $50,077,288.04
Ohio E040268 IR-75 from 3.4 miles north of Butler County to Montgomery County in Warren County. Reconstruction and added capacity. GARVEE BOND. $57,980,743.61 $139,035,087.49
Ohio E040452 SR-161 from Simpson's Run east to the city of Grandville in Licking County. GARVEE Bond Debt Service for St Proj # 77221. $58,632,228.13 $71,391,326.59
Ohio E040537 US-24 from US-127 to SR-424 in Paulding and Defiance Counties. GARVEE Bond project $61,098,292.87 $77,847,751.06
Ohio E040542 MOT IR 75 11.01, PROVIDE THREE CONTINUOUS LANES AT THE US35 INTERCHANGE. PHASE 1B. GARVEE BOND PROJECT.. $63,480,862.64 $75,490,275.83
Ohio E040549 LUC IR 75 3.99 intrchg Mod P2, Widen and upgrade existing facility and modify interchanges to provide better ingress & egress $23,805,366.36 $153,586,962.00
Ohio E040555 MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes $12,320,264.69 $105,750,588.36
Ohio E040563 SUM IR 0076 10.00. Reconstruct IR-76/77, & change the access points & geometry of Main/Broadway & Wolf Ledges/Grant Interchanges. $107,141,099.22 $122,589,773.61
Ohio E040631 IR-70/71 from Hague to James Rd, city of Columbus in Franklin Cty. Reconstruct I-70/71 Split in Downtown Columbus. Design/Build $224,155,241.36 $247,053,250.01
Ohio E040793 IR-75 from the Great Miami River to Leo St. in the city of Dayton in Montgomery County. Reconstruction. MPI-0042 - GARVEE bond $111,982,256.48 $140,620,721.68
Ohio E040822 IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. $54,215,826.86 $65,011,744.66
Ohio E040889 Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements $17,676,916.19 $90,260,927.77
Ohio E041146 HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, $54,968,466.63 $214,033,776.42
Ohio E050670 JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg $31,735,233.60 $138,678,494.76
Ohio E060287 LUC US 24 6.19 Part 3 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. $60,670,302.46 $77,239,169.93
Ohio E060288 HEN/LUC US 24 15.85 Part 2 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. $55,622,690.13 $70,612,514.21
Ohio E060290 LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports $29,640,014.61 $43,244,586.68
Ohio E060308 IR-70 at US-40 in Belmont County. $18,799,826.37 $26,759,263.67
Ohio E070090 FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. $37,129,619.91 $102,065,835.19
Ohio E070348 HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. $48,316,469.60 $68,705,207.90
Ohio E070405 HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system $96,901,970.54 $131,576,258.81
Ohio E080604 LAK IR 090 21.42, MAJOR REHAB FROM PAINE RD TO THE ASHTABULA COUNTY LINE SFY 2010. GARVEE Bond Project $36,631,817.48 $41,077,161.34
Ohio E080951 FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes $12,815,534.58 $56,128,682.02
Ohio E081090 FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures $26,573,361.84 $48,703,706.96
Ohio E090644 CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge $33,972,708.35 $50,802,929.20
Ohio E100378 LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St $17,565,240.61 $49,751,620.01
Ohio E100386 LOR SR 0057 19.42, Add Lanes in each direction from IR 80 to IR 90, Interchange modifications at I-90. $7,424,241.60 $25,325,753.26
Ohio E100545 LUC IR 75 6.70 widening.the widening and reconstruction of LUC-75 from Lagrange St to I-280; perform necessary related work $7,644,726.32 $72,199,526.00
Ohio E100633 DEL IR 71 11.500, Full depth pavement replacement and addition of 3rd median lane. Widen ML Bridge MRW-71-3.00. $24,424,914.62 $58,884,802.36
Ohio E100634 FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps $21,720,135.53 $91,927,124.83
Ohio E100878 Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. $50,703,082.79 $71,077,582.05
Ohio E100995 HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work $21,969,425.59 $32,114,177.30
Ohio E101051 CUY INNERBELT CCG2 EB Bridge, New structure to replace existng Innerbelt Bridge (1809393). CCG2. Design Build Finance.. $31,940,928.27 $311,215,128.01
Ohio E110266 R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville $33,360,932.28 $56,166,678.34
Ohio E110547 FRA Lazelle Road Ph B $19,715,047.00 $27,992,252.50
Ohio E110820 HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT $62,964,880.43 $154,122,201.53
Ohio E110840 CUY IR 271 00.00 Addlane, Add one (1) lane in each direction along I-271 $127,973,451.17 $147,423,143.78
Ohio E111416 CUY IR 480 18.42 L&R Deck $91,769,188.93 $244,456,419.71
Ohio E120394 MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. $26,967,588.04 $34,155,108.28
Ohio E120441 MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. $16,085,602.06 $32,952,705.70
Ohio E120585 LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges $7,839,647.09 $173,892,384.24
Ohio E120602 LUC IR 75 2.75 Pav Reconst, Bridge repl $10,740,799.64 $30,809,464.00
Ohio E120609 CLA IR 70 10.55/13.98, Ph. 2, Major rehabilitation of the existing lanes and the construction of an additional lane. $55,149,534.67 $56,101,782.39
Ohio E120958 WOO/LUC IR75 30.70/0.00 Major $19,601,169.78 $204,108,241.98
Ohio E120960 JEF SR 7 4.800. Bench exisitng hillside to eliminate rockfall and landslide hazards. OH11-01, DSR JEF-004 $23,015,134.92 $28,768,918.64
Ohio E130382 RIC US 0030 09.13 $58,979,060.80 $72,808,576.00
Ohio E130407 SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures $40,375,314.13 $98,675,027.74
Ohio E130869 STA IR 0077 08.40/VAR $23,694,366.75 $65,533,753.02
Ohio E130952 HAM IR 275 39.81 $7,589,154.88 $35,201,002.87
Ohio E131180 FRA-70-22.61 (FEF 1A), Interchange, Reconstruction $21,824,687.99 $90,596,514.44
Ohio E131492 CUY INNERBELT CCG6B Broadway, Remove and build a new longer bridge for Broadway (SR 14) over IR-77 $29,195,085.47 $33,950,849.53
Ohio E131510 WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange $12,484,629.82 $27,608,042.66
Ohio E140008 PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements $5,894,956.00 $35,573,730.00
Ohio E140305 CUY IR 077 14.35 CCG6A, Replace the mainline IR-77 bridge over IR-490. $25,601,745.30 $29,645,557.59
Ohio E140310 STW - Ohio Bridge Partnership Program Debt Service Authorization $61,822,485.44 $92,921,021.99
Ohio E140985 HAM IR 71 8.42 $17,013,973.02 $36,532,592.56
Ohio E150336 FRA CR 103 2.56 $20,314,959.40 $26,281,003.68
Ohio E150345 SUM IR 0076 05.62 $13,237,774.11 $30,120,387.35
Ohio E150403 LUC IR 475 1.85 @20A Interchnge, Build a new interchange $15,040,920.00 $117,964,212.48
Ohio E150808 GRE IR 675 0.00 - Pt. 1 $23,104,917.00 $25,947,620.00
Ohio E150996 PRE IR 70 0.00 $17,399,864.70 $33,576,000.33
Ohio E161031 FRA-70-14.56 (2G) Parts 1&2 $39,609,396.06 $46,740,518.43
Ohio E170601 SUM Main Street Corridor $13,270,672.00 $34,404,852.00
Ohio E170641 BUT SR 129 25.00 Liberty Way $12,598,610.61 $25,629,546.01
Ohio E170713 HAM IR 75 3.84 $56,075,160.25 $97,753,133.05
Ohio E170961 LAK VROOMAN ROAD $15,759,166.34 $25,062,005.37
Ohio E170982 FRA-71-9.62/9.71 Part 1 & 2 $43,784,842.29 $125,220,203.12
Ohio E171059 FRA IR 670 3.920 $34,141,724.26 $67,451,549.08
Ohio E171457 SUM IR 77/277/US 224 Interchange $9,278,333.24 $60,176,026.67
Ohio E180134 FRA IR 70 14.54 (Proj 2E) $34,787,157.98 $86,325,479.10
Ohio E180347 MAD IR 70 8.620 Major Rehab $35,732,892.11 $51,668,398.49
Ohio E180372 MOT IR 75 7.15 $49,898,997.00 $55,443,330.00
Ohio E180428 SUM IR 0076/0077 8.42/09.74 $43,297,665.61 $183,115,001.00
Ohio E180439 CLE 32-3.50 $26,265,068.50 $65,450,510.00
Ohio E180746 MUS IR 70 10.66 $41,660,499.47 $104,963,980.71
Ohio E180796 FRA IR 71 0.00 $44,057,417.00 $50,328,850.00
Ohio E190121 FRA IR 71 17.46 (Proj 3B) $35,533,902.62 $43,802,190.00
Ohio E190122 FRA-70/71-12.68/15.16 (Proj 4R) $127,123,001.00 $298,346,520.00
Ohio E190184 MOT IR 75 14.74 $37,688,667.50 $42,003,943.00
Ohio E190328 WAY SR 0083 10.81 $25,939,021.80 $32,634,630.00
Ohio E190498 MAH Youngstown Smart 2 Network $20,265,085.08 $27,042,240.63
Ohio E200605 UNI US 33 24.870 $24,764,000.00 $42,755,700.01
Ohio E200851 HAM-71-0.00 - Brent Spence Paint   $32,000,000.00
Ohio E210348 LUC Toledo Build Grant - GCR $23,668,160.00 $57,062,891.86
Ohio E220056 CUY IR 077 00.42 Interchange $24,649,233.72 $37,100,000.00
Oklahoma 019N175 MCINTOSH CO. US-69:FROM SH-9 JCT, NORTH 4.5 MILES $1,949,702.95 $33,658,611.80
Oklahoma 0352176 I-35: 6 LANE FROM RIVER, NORTH 0.34 MI IN NORMAN (SH-9 INTERCHANGE)(DEL FR 09-14, ADD TO 11-14; PROJ STATUS CHANGE) $36,529,245.54 $40,578,226.00
Oklahoma 0352304 CLEVELAND CO. I-35: 6 LANE FR 0.34 MI NORTH OF RIVER, NORTH 0.78 MI IN NORMAN (LINDSEY ST INTERCHANGE) (DEL FR 09-14, ADD TO 11-14; PROJ STATUS $37,215,312.57 $38,420,367.57
Oklahoma 0353125 OKLAHOMA CO. I-35: OVER THE I-240 JCT. RECONSTR INTERCHANGE  (PHASE IB) $43,525,626.81 $43,525,626.81
Oklahoma 0404436 I-40: FROM FROM MILE MARKER 136 TO MILE MARKER 139.83 $46,534,290.24 $46,580,993.00
Oklahoma 0405382 I-40: FR MILE MARKER 165 TO 167, LN ADDS & RECONSTRUCTION OF  CHOCTAW RD INTERCHANGE $36,993,921.00 $41,104,358.00
Oklahoma 0405394 OKLAHOMA CO. I-40: W.B. AND E.B. BRIDGES OVER CRUTCHO CREEK & SE 15TH STREET 2.3 & 2.6  MILES EAST OF JCT. I-35 $37,919,361.28 $47,991,754.42
Oklahoma 101A052 US-59: FR 6.95 MILES NORTH OF WESTVILLE, NORTH 3.48 MILES THRU  WATTS $13,761,284.06 $27,522,569.00
Oklahoma 109B154 CANADIAN CO. US-281: OVER THE SOUTH CANADIAN RV AT THE CADDO C/L $22,810,909.37 $35,705,909.37
Oklahoma 207N085 BRYAN CO. US-69 BEGIN AT SOUTH END OF CALERA AND EXTEND NORTH TO US-70 INTERCHANGE  (FAST LANE) $135,997,350.02 $170,018,957.71
Oklahoma 210C085 CARTER CO. SH-53: FROM 14.8 MIS. E. OF SH 76, EXTEND E. 5.57 THRU I-35 INTERCHANGE $26,308,890.20 $26,308,890.20
Oklahoma 2350004 OKLAHOMA CO. I-235: NW 50TH AND BNSF BRIDGES AND APPROACHES (SEGMENT 4A)  (DEL FROM 11/15 ADD TO 01/16) $13,549,889.33 $62,344,545.08
Oklahoma 2350009 OKLAHOMA CO. I-235: MAINLINE THRU I-44 INTERCHANGE(SEGMENT 8);  I-235 NB TO WB & EB  FLYOVER BRIDGES I-235/I-44 INTERCHANGE(SEGMENT 2B) $95,714,176.15 $119,738,378.02
Oklahoma 2351092 I-235: NW 36TH STREET INTERCHANGE              (SEGMENT 6) $35,486,221.95 $36,007,237.77
Oklahoma 242C079 LOGAN CO. SH 51: OVER E. BEAVER CR. 0.3 MIS. W. OF THE US 77 JCT. $20,663,675.50 $25,829,594.38
Oklahoma 244N052 MCCLAIN CO. US-77 OVER SOUTH CANADIAN RIVER & RAILROAD, IN PURCELL  (DEL FR 07-17, ADD TO 08-17; AS PER T. HURST) $32,928,642.70 $41,410,805.12
Oklahoma 246N027 MCINTOSH CO. US-69: FROM PITTSBURG C/L NORTH APPROX. 5.27 MILES TO JCT SH-9 $23,144,128.28 $28,930,162.11
Oklahoma 248C036 SH-99/US-377 OVER LAKE TEXOMA (WILLIS BRIDGE) (PENDING 50% FROM TXDOT) (DEL FR 05-18, ADD TO 07-18; ROW ISSUES) (80/20 SMC) $22,619,863.00 $45,830,952.00
Oklahoma 251N117 MUSKOGEE CO. US-62: OVER ARKANSAS RIVER, 2.4 MILES EAST OF SH-16 JCT.  (EB & WB) $74,530,958.09 $74,530,958.09
Oklahoma 257N085 OSAGE CO. US-60: BEGIN JCT. US-60/SH-35 & EXTEND EAST 4.96 MILES $25,507,629.28 $31,884,536.60
Oklahoma 261N084 PITTSBURG CO. US-69 CONSTRUCTION INTERCHANGE @ KINKEAD ROAD IN MCALESTER $27,291,210.34 $34,114,012.93
Oklahoma 266B081 ROGERS CO. SH-20: FROM 4 MILES EAST OF TULSA COUNTY LINE EAST TO .65 MILE EAST OF VERDIGRIS RIVER $1,749,122.65 $46,914,657.72
Oklahoma 267B093 SEMINOLE CO. US-270: FROM 1.0 MILE SE OF SH-270A IN SEMINOLE, EAST TO Y AT US-270B  WEST OF WEWOKA $23,129,429.44 $46,258,858.88
Oklahoma 3500066 OKLAHOMA CO. I-35: NB & SB OVER DEEP FORK CR. & SERVICE RD. 4.6 MI NORTH OF I-40 $31,813,372.83 $35,348,192.59
Oklahoma 3500081 LOVE CO. I-35: OVER US-77 AND BNSF RR 7.52 MIS. N. OF THE TEXAS STATE LINE N.  APPROX. 0.53 MIS. $24,785,952.04 $34,187,520.06
Oklahoma 3500132 OKLAHOMA CO. I-35: NB & SB BRIDGES OVER 63RD STREET 5.0 MIS. N. OF I-40. $31,977,857.84 $63,955,715.67
Oklahoma 3500134 GARVIN CO. I-35:  FROM 4.21 MI NORTH OF SH-7, NORTH 6.19 MI TO SH-29  (NORTHBOUND ONLY) $26,501,188.02 $33,126,485.03
Oklahoma 4000047 I-40: FROM MILE MARKER 167 EAST TO MILE MARKER 170  (RECONSTRUCT & ADD LANES) $31,043,678.00 $34,492,976.00
Oklahoma 4000076 I-40: FROM MM-292 TO MM-298 (EAST & WESTBOUND) $29,569,635.55 $32,855,150.63
Oklahoma 4000095 OKLAHOMA CO. I-40: E.B. AND W.B. BRIDGES OVER SOONER ROAD 3.1 MILES EAST OF I-35 $21,895,472.49 $31,273,282.95
Oklahoma 4000126 OKLAHOMA CO. I-40: AT DOUGLAS BLVD IN MWC, APPX 6 MILES EAST OF I-35 $53,379,142.87 $66,723,928.59
Oklahoma 4000156 OKLAHOMA CO. I-40: FROM DOUGLAS BLVD IN MWC, EXTEND EAST 5.0 MILES TO THE 240 JCT. $52,099,456.65 $65,124,320.81
Oklahoma 4000248 SEQUOYAH CO. I-40 INTERCHANGE @ US 64 IN SALLISAW  (BR @ US-64 & LITTLE SALLISAW CR) (3-SD)  (90/10 SMC) $31,467,769.42 $31,490,748.10
Oklahoma 4400077 TULSA CO. I-44/US-75  INTERCHANGE RECONSTRUCTION FROM UNION AVE TO THE ARKANSAS RIVER  (WP 1) INFRA GRANT $37,162,417.20 $80,556,570.91
Oklahoma 4440009 TULSA CO. I-444 FROM SH 51 INTERCHANGE NORTH TO INDEPENDENCE  (EAST LEG OF IDL) $27,548,933.58 $27,548,933.58
Oklahoma XTWN048 OKLAHOMA CO. I-40 CROSSTOWN: WP 4.5, GR, DR, BR & SURFACE THE BOULEVARD FROMBNSF EAST TO I-40 $22,662,982.51 $25,198,376.81
Oregon 3410016 US 26: CORNELIUS PASS RD - NW 185TH AVE SUNSET DESIGN FOR ADDING A TRAVEL LANE IN EACH DIRECTION WASHINGTON $29,858,266.14 $35,197,852.03
Oregon 4700076 Foothill Rd. Corridor/Foothill Rd: Delta Waters to Dry Creek $17,289,265.64 $72,312,762.68
Oregon C019180 Old Hwy 99N: Oakland Bridge and Melrose Rd: Conn Ford Bridge $18,855,941.60 $28,274,839.01
Oregon C051099 BURNSIDE ST: WILLAMETTE RIVER BR PAINT & REHAB LOCAL PAINT & REHAB BRIDGE # 00511 MULTNOMAH $26,806,621.81 $29,856,722.19
Oregon C051112 MORRISON STREET: WILLAMETTE RIVER (MORRISON) BR $23,233,361.02 $25,892,523.17
Oregon S001475 I-5: California state line - Ashland $28,407,564.22 $36,351,663.47
Oregon S001478 I-5: Roberts Creek Rd - South Umpqua River  $27,821,524.18 $38,255,556.14
Oregon S001497 I-5: Aurora-Donald Interchange (Exit 278), Phase 1a and phase 2  $8,860,643.12 $30,527,470.85
Oregon S001524 I-5: Garden Valley Blvd - Roberts Creek  $5,878,659.06 $25,897,291.89
Oregon S002241 I-84 (Eastbound): Tooth Rock Tunnel $18,303,117.34 $29,022,793.23
Oregon S004219 US97: OR58 - CALIFORNIA BORDER $21,942,502.31 $37,195,608.17
Oregon S004221 US197: The Dalles (Columbia River) Bridge $20,265,717.87 $43,018,595.92
Oregon S004227 US97 and US20 Bend North Corridor $101,097,500.51 $178,799,587.08
Oregon S006158 I-84: Ladd Canyon freight and culvert improvements $37,673,517.76 $40,854,287.00
Oregon S006163 I-84: Meacham-Kamela paving & Umatilla County signals $1,261,126.93 $48,045,288.22
Oregon S009481 US101: MCCULLOUGH BRIDGE(COOS BAY) BRIDGE PAINTING $37,144,571.51 $41,857,813.95
Oregon S009494 US101: YAQUINA BAY BRIDGE $30,917,676.25 $34,456,342.64
Oregon S017016 US20: Tumalo - Cooley Rd. (Bend) $6,641,030.92 $25,805,880.44
Oregon S045054 OR38: UMPQUA RIVER (SCOTTSBURG) BRIDGE REPLACEMENT $2,645,829.86 $55,804,926.46
Oregon S064052 I-205: JOHNSON CREEK TO GLEN JACKSON BRIDGE-PAVEMEMENT PRESERVATION. SINGLE LIFT INLAY $34,928,066.00 $38,253,628.16
Oregon S064059 I-205:  JOHNSON CREEK - GLENN JACKSON BRIDGE PHASE 2   $33,088,118.21
Oregon S064063 I-205: I-5 to OR213, Phase 1A $1,135,000.00 $559,284,784.10
Oregon S091090 OR99W: I-5  - MC DONALD ST $22,958,784.29 $36,667,054.52
Oregon S144026 OR217: OR10 - OR99W $57,032,874.22 $174,680,347.62
Oregon S171030 FFO-OR212/224:SUNRISE CORRIDOR(I-205-SE 122ND AVE) VARIOUS HIGHWAYS CLACKAMAS COUNTY $58,655,084.59 $65,509,120.99
Oregon S483000 OR18 McMinnville Spur: South Yamhill River Bridge  $1,095,603.82 $37,241,072.17
Oregon SA00182 Southern Oregon Seismic Bridge Retrofit $2,776,443.37 $25,607,940.80
Pennsylvania 1034201 SR 412 Improvement $37,126,135.73 $46,407,671.73
Pennsylvania 1278120 US 30: Walker Ave to Old U.S. 30 in Chambersburg Borough and Guilford Township $21,776,657.40 $29,101,379.40
Pennsylvania 1729102 Broad St. Betterment $21,949,730.98 $27,437,165.98
Pennsylvania 1731101 SR 12 TO US 222, SPRING & CUMRU TOWNSHIPS | CONSTRUCTION OF A 4-LANE DIVIDED HIGHWAY $29,665,590.25 $29,665,590.25
Pennsylvania 2167201 American Parkway Boulevard to Airport Road City of Allentown $39,416,200.10 $39,416,200.10
Pennsylvania T012579 I-90: MP 3.5 to 7 Reconstruct - #1 $58,935,590.00 $72,796,110.00
Pennsylvania T032472 SR 220: PA 287 to West Fourth Street $38,210,393.00 $38,210,393.00
Pennsylvania T035176 CSVT Southern Section Earthwork $63,950,000.00 $91,500,000.00
Pennsylvania T042584 I-84 ov LackRR/Roaring & 435 $122,305,000.00 $122,305,000.00
Pennsylvania T042630 I-81 Mill/Fill Dickson City to Susq County Line $17,239,792.00 $36,909,614.00
Pennsylvania T044239 I-84 E&W I-4R Wayne - E26 $114,222,000.00 $114,222,000.00
Pennsylvania T044249 I-84 E&W I-4R MP 40 - E46 $45,000,000.00 $94,913,000.00
Pennsylvania T044253 I-84 E&W I-4R E26 to E34 $55,129,168.00 $119,361,174.00
Pennsylvania T051461 Interstate 78 (12M) $191,645,877.00 $191,645,877.00
Pennsylvania T051489 I-78-Rt 61 Bridge Replace $138,697,050.00 $138,697,050.00
Pennsylvania T052167 I-80 Rehabilitation $33,964,470.00 $33,964,470.00
Pennsylvania T054306 I-80/Exit 308 Realignment $86,175,977.00 $104,042,739.00
Pennsylvania T061158 I-95, Pennsylvania Turnpike Interchange D10 $99,995,111.00 $99,995,111.00
Pennsylvania T061166 I-95, Section D20 $86,800,000.00 $86,800,000.00
Pennsylvania T062182 SR 202 over AMTRAK Rehabilitation $35,473,862.18 $35,473,862.18
Pennsylvania T064209 RTMC General Contract $32,155,656.00 $40,152,064.00
Pennsylvania T064227 US202:Johnson-Swede   #4 $36,881,211.00 $54,239,000.00
Pennsylvania T065169 I-95N:Columbia-AnnSt N(C) $253,270,478.00 $253,270,478.00
Pennsylvania T065185 I-95 Betsy Ross Bridge and Aramingo Avenue Interchange $157,168,662.78 $157,168,662.78
Pennsylvania T065188 S.R. 0676, Vine Street Expressway Sections PAB and PAA $72,526,199.00 $72,526,199.00
Pennsylvania T065203 I-95 Betsy Ross Ramps and Adams Ave. Connector City of Philadelphia $69,186,000.00 $69,186,000.00
Pennsylvania T065216 I-95S: Columbia-Ann St N $343,305,388.00 $343,305,388.00
Pennsylvania T065220 I-76 Bridge Repair $52,341,000.00 $52,341,000.00
Pennsylvania T065232 I-95: Kennedy-Levick $86,702,546.00 $86,702,546.00
Pennsylvania T065235 I-95: Betsy Ross Rmps A&B $103,000,000.00 $103,000,000.00
Pennsylvania T065253 I-95: Allegheny & Castor Ave Intr Connection $32,000,000.00 $32,000,000.00
Pennsylvania T065259 I-95 Corridor ITS $25,293,082.00 $25,293,082.00
Pennsylvania T065268 I-95: Cottman On-Ramp $47,856,995.00 $55,924,440.00
Pennsylvania T065273 I-95: Margaret-Carver $90,848,671.00 $289,106,117.00
Pennsylvania T065278 Penn's Landing Project Development $68,552,000.00 $225,543,442.00
Pennsylvania T082203 Am Leg Mem Hwy Resurface $28,975,806.00 $28,975,806.00
Pennsylvania T084200 Mount Rose Avenue and I-83 Interchange (Exit 18) $68,954,041.00 $68,954,041.00
Pennsylvania T084431 I-83 Exit 4 $33,348,184.78 $33,348,184.78
Pennsylvania T085167 I83 East Shore Overpasses $37,546,277.00 $37,546,277.00
Pennsylvania T085179 I-83 East Shore Section 1 $119,557,075.00 $119,557,075.00
Pennsylvania T089132 US 22/322 Resurfacing $25,876,924.00 $25,876,924.00
Pennsylvania T092078 I-99 17th St-Grazierville $37,110,360.50 $37,110,360.50
Pennsylvania T111143 Neville Island Bridge $48,676,092.00 $48,676,092.00
Pennsylvania T111155 PA 28/Highland Park Br Interchange $54,103,439.00 $54,103,439.00
Pennsylvania T111165 I-79, Neville Island to I-279 $30,176,641.00 $30,176,641.00
Pennsylvania T111172 Boulevard of Allies Ramps $40,257,102.00 $40,257,102.00
Pennsylvania T111181 Forbes Avenue ov Fern Hollow $25,000,000.00 $25,000,000.00
Pennsylvania T111189 I-79, Moon Run - Neville Island $20,921,734.00 $41,780,970.00
Pennsylvania T111976 279/Ft Duq to Camp Horne $92,174,476.96 $92,174,476.96
Pennsylvania T111986 Elizabeth Bridge $38,871,488.00 $38,871,488.00
Pennsylvania T112280 Koppel Bridge carrying PA 351 over the Beaver River $33,023,075.93 $33,360,524.00
Pennsylvania T112311 Freedom Rd Upgrade - Ph C $25,584,113.00 $25,584,113.00
Pennsylvania T124258 Bentleyville Interchange $77,385,607.11 $77,385,607.11
Pennsylvania T124262 Western section (MPMS 73514) - Interstate 70 from SR 136 (Beau Street) to I-79 South Junction Eastern section (MPMS 75950) - Interstate 70 from I-79 $131,448,119.00 $131,448,119.00
Pennsylvania T125320 LVTIP: PA 819 to Norvelt (PA 981-Q20) $57,836,955.00 $57,836,955.00
Pennsylvania T125337 New Stanton Intrchng $55,425,505.00 $55,425,505.00
Pennsylvania T125346 I-70 @ PA 31 Interchange $74,496,231.51 $74,496,231.51
Pennsylvania T125349 Yukon & Madison Interchanges $103,050,000.00 $103,050,000.00
Pennsylvania T125371 US 119 Youngwood Recon $26,094,000.00 $26,094,000.00
Pennsylvania T125374 I-70 @ PA 51 Interchange $65,000,000.00 $137,930,192.27
Pennsylvania U021001 PA 26/I-80 Interchange $35,110,410.00 $58,517,350.00
Pennsylvania U102102 Freedom Rd (Beaver Co. to Haine School Rd) and Three Degree Road Intersection $25,000,000.00 $29,763,542.00
Pennsylvania X012549 I-90: MP 0 to 3.5 Reconstruct $38,916,356.00 $38,916,356.00
Pennsylvania X012626 Central Bayfront Parkway Multimodal $22,157,833.00 $27,697,292.00
Pennsylvania X015276 PA 8: Barkeyville to Franklin $29,928,511.00 $37,410,640.00
Pennsylvania X035175 CSVT Southern Section Earthwork $35,000,000.00 $35,000,000.00
Pennsylvania X042499 Harrison Avenue Bridge $21,353,483.98 $26,691,854.98
Pennsylvania X042622 SR 6 (Robert P. Casey Highway) to SR 6006 $26,377,598.00 $32,971,999.00
Pennsylvania X043488 Interchange on State Route 81 at Avoca (Exit 178)  Avoca Borough Luzerne County $27,368,288.42 $30,409,210.42
Pennsylvania X043547 South Valley Parkway $24,720,142.00 $30,896,178.00
Pennsylvania X044217 Interstate 84 from Milford to New York State Line Pike County $61,457,331.93 $68,285,925.93
Pennsylvania X044223 Pike I-84 I4R E34 - MP 40 $72,377,000.00 $72,377,000.00
Pennsylvania X051481 SR 222_73 & Genesis Dr $28,768,517.00 $28,768,517.00
Pennsylvania X053302 Coplay-Northampton Bridge Chestnut Street over Norfolk Southern RR, Lehigh River and Ironton Trail Coplay Borough, Whitehall Township $24,308,976.00 $30,386,226.00
Pennsylvania X053311 Tilghman St o/Lehigh & RR $23,819,760.00 $29,774,700.00
Pennsylvania X061253 I-95 from Philadelphia to Scudder Falls $26,972,158.00 $33,715,199.00
Pennsylvania X061258 Route 1 Improvement-South $80,132,211.00 $100,165,267.00
Pennsylvania X061264 PA309:Sellersville Bypass(Parent) $51,914,086.00 $64,892,610.00
Pennsylvania X061268 Route 1 Improvement-North $34,909,000.00 $119,745,322.00
Pennsylvania X062226 State Route 422 Reconstruction $66,103,829.31 $82,629,788.31
Pennsylvania X063232 Market St Over AMTRAK(C) $20,374,543.00 $25,468,180.00
Pennsylvania X063233 US 322:  from US Route 1 in Concord Township to east of Mattson Road/Featherbed Lane near Clayton Park and the Bethel Township line. Bridges include $57,416,001.00 $73,664,697.00
Pennsylvania X063243 I95 Delaware Line-Phila NB(Parent) $43,866,187.00 $48,740,209.00
Pennsylvania X063244 I-95 Delaware Line-Phila SB $32,583,395.00 $36,215,255.00
Pennsylvania X064285 STATE ROUTE 1058, SECTION HAT, IN MONTGOMERY COUNTY IN FRANCONIA, | THE CONSTRUCTION OF A TWO LANE ROADWAY (SR 1058) CONNECTING SU $24,925,104.00 $31,156,381.00
Pennsylvania X064314 US 422 Betzwood Bridge(C) $87,495,026.00 $109,368,798.00
Pennsylvania X064324 Markley St Improvement Project South $22,014,659.00 $27,518,325.00
Pennsylvania X064346 US202:Swede-Morris     #2 $40,033,186.00 $50,041,484.00
Pennsylvania X064362 US202:Morris-Swedesfd  #3 $36,001,318.38 $45,394,151.00
Pennsylvania X064383 309 Cnntr: Allntwn Rd-Souderton Pk $23,753,089.00 $46,569,113.00
Pennsylvania X065293 Improvements to Cottman Avenue, Torresdale Avenue, Princeton Avenue, State Road and New State Road $34,136,730.13 $37,926,700.13
Pennsylvania X065306 Arch, Market, Little Market, Chestnut and 30th Streets over Amtra $54,880,445.86 $68,600,557.86
Pennsylvania X065318 I-95: Columbia - Ann(C) $87,236,141.00 $109,045,180.00
Pennsylvania X065319 SR 95  From: Levick Street To: Bleigh Avenue In: The city of Philadelphia $240,193,911.00 $266,882,127.00
Pennsylvania X065355 Passyunk Avenue Drawbridge over Schuylkill River $31,308,419.66 $39,135,531.66
Pennsylvania X065373 Chestnut St over Lower 30th Street, I-76 (Schuylkill Expressway), Schuylkill River, Schuylkill River Trail, CSX and 24th Street;; and Schuylkill Avenu $91,159,065.00 $113,653,184.00
Pennsylvania X065400 I-95: Allegheny AdvCntrc $24,403,053.00 $27,114,506.00
Pennsylvania X065403 Rsvlt Blvd o/Wayne Junc $76,154,135.48 $97,571,127.75
Pennsylvania X065414 I-95 Bridge Repairs $44,146,329.00 $49,051,477.00
Pennsylvania X085250 PA 283 Reconstruction 3 $78,198,334.00 $97,747,922.00
Pennsylvania X087356 State Rd Interchange-Amtrak $20,791,634.00 $25,989,545.00
Pennsylvania X097072 219 Garrett Erthwk Ln Itm $121,720,375.41 $121,720,375.41
Pennsylvania X097094 US 219 Garrett Paving $63,207,618.00 $63,207,618.00
Pennsylvania X111437 9th Street Bridge Rehab $21,298,807.00 $26,623,511.00
Pennsylvania X111612 6th Street Bridge Rehab $30,426,599.00 $38,033,283.00
Pennsylvania X111919 S.10th St Br (MA11) Rehab $20,716,916.32 $25,896,146.32
Pennsylvania X111947 7th St Br Rehab $22,671,530.00 $28,336,413.00
Pennsylvania X124282 I-79/I-70 Interchange, South Junction $33,780,026.00 $37,533,364.00
Pennsylvania X125319 US 119/PA 819 Interchange $20,241,384.36 $25,301,729.36
Pennsylvania X125351 US 119: Co Line - Crossover Rd $33,620,063.00 $42,025,083.00
Puerto Rico 0002082 PAVEMENT REHABILITATION AND RECONSTRUCTION OF PR-2 FROM KM 185.80 TO KM 195.00, SABANA GRANDE - GUANICA $43,130,600.50 $43,551,650.00
Puerto Rico 0005012 REHABILITATION OF CABLE STAYED BRIDGE NO. 3000 OVER LA PLATA RIVER, KM.18.75, Municipalities of Naranjito and Toa Alta $29,847,882.00 $29,865,132.00
Puerto Rico 0009006 Highway PR-9 From PR-132 to PR-123, Ponce $56,143,258.60 $56,917,100.93
Puerto Rico 0009007 Highway PR-9 From Ave Las Americas to PR-132, Ponce $57,295,464.72 $58,313,314.19
Puerto Rico 0020008 Safety Improvements Highway PR-20, Kilometers: 0.00 to 10.00, Guaynabo $25,706,752.53 $25,734,099.41
Puerto Rico 0021006 Improvements to Highways PR-21, PR-1, PR-176, PR-8838 and Cupey Station Surroundings, Municipality of San Juan $33,307,729.29 $45,076,118.57
Puerto Rico 0034006 Extension of Degetau Avenue, From Luis Munoz Marin Avenue to PR-788, Caguas $24,528,614.80 $25,683,303.62
Puerto Rico 9999151 Reconstruction and Pavement Rehabilitation Highways PR-2 and PR-861 $21,032,368.42 $26,592,247.54
Puerto Rico 9999553 Pavement Reconstruction PR-52 Southbound From Km. 0.00 to Km. 14.20, Municipalities of San Juan - Caguas $19,740,707.32 $28,958,158.63
Rhode Island 0032018 Bridge Group 32 - I-95 Cranston and Providence $18,576,136.55 $25,257,009.01
Rhode Island 0037012 Bridge Group 51A - Rt 37 C-2 $19,763,073.59 $35,931,572.56
Rhode Island 0037014 Design Build for Bridge Group 51B - Rte 37, Contract 3 - Cranston Canyon $3,400,000.00 $65,922,187.50
Rhode Island 0138060 Pell Bridge Ramps Phase 2, Newport $11,005,650.24 $28,989,567.17
Rhode Island 0146030 Design-Build for the Reconstruction of Rte 146, North Smithfield, North Providence & Providence, Bridge Group 96 $12,097,840.00 $115,697,446.00
Rhode Island 0200005 Reconstruction of the Washington Bridge #200, East Providence, Providence, GARVEE added Wash Ped Bridge (03/01/2012) Eng:Pavia $84,641,104.47 $86,259,950.01
Rhode Island 0250010 Replacement of the Sakonnet River Bridge No. 250 - GARVEE; Added Fed Hwy funds 09/21/2011 - GARVEE funds exhausted $166,262,500.95 $341,983,115.77
Rhode Island 0403016 Rel Rte 403 - B 1009 added 7/27/05, For Prev Auth. see FMIS W96A, See State Remarks Field for addtl projects - GARVEE PROJECT $107,432,365.72 $134,302,829.99
Rhode Island 0550003 Replacement of Pawtucket Bridge No. 550 (Engineer: Faraj) $58,596,673.55 $91,392,744.62
Rhode Island 0578005 Design Build Services for the Reconstruction of the I-95 Viaduct Northbound, Providence - GARVEE Funds $16,256,149.84 $148,575,150.00
Rhode Island 0600005 Bridge Group 49 - Henderson. South Angell Street to North Broadway Cities of Providence & East Providence $28,600,000.00 $68,330,415.81
Rhode Island 0700006 Design-Build for I-195 West Bound - Washington Bridge Phase 2 - Bridge Group 57TB-10; Providence & East Providence $4,143,764.55 $32,830,000.00
Rhode Island 1954055 IWAY C7 C9 C8 C6A C10,11 Adv. Sig 9/08, Lscp C-A 8/09, C13 7/10, Lscp B 11/11, Dmnd Grnd. 06/12, C14 11/12, C15 02/13 $358,163,371.96 $561,915,990.58
Rhode Island 2950002 Design-Build Services for I-295 Bridges - Contract 2, Cranston - GARVEE FUNDS $7,383,517.55 $45,979,548.76
Rhode Island 610X001 Design Build Services for the Reconstruction of the US Rte 6/Rte 10 Interchange, Providence - GARVEE Funds $33,396,779.56 $415,000,000.00
Rhode Island 610X003 Design Build Services for the Reconstruction of the US Rte 6/Rte 10 Interchange, Providence - FEDERAL HIGHWAY FUNDS $20,000,000.00 $101,520,584.89
Rhode Island BG14001 Adding the Construction Phase - 08/22/2022 - Right of Way for Bridge Group 14, Route 99, Cumberland, Lincoln & Woonsocket $7,672,720.00 $30,963,684.00
Rhode Island BG39005 Bridge Group 39 - Rte 146, Lincoln & Providence $1,404,450.82 $31,742,767.16
Rhode Island BLDG001 Pell Bridge Ramps Phase 2, Newport $20,000,000.00 $25,000,000.00
Rhode Island BLDG002 Bridge Group 57TB-10 - Design-Build of the Washington Bridge North - Phase 2 $25,000,000.00 $31,250,000.00
Rhode Island BLDG003 Design-Build for Bridge Group 51B - Rte 37, Contract 3, Cranston Canyon $21,329,338.00 $26,661,672.50
Rhode Island FRIP001 GARVEE, Freight Rail Improvement Project, added AMTRAK Force Account, 6/20/2005 $36,183,744.05 $45,122,744.15
Rhode Island INFR001 I-95 Viaduct Northbound - Providence $60,355,000.00 $75,443,750.00
Rhode Island INFR002 Design Build for the Reconstruction of Rte. 146; North Smithfield, Lincoln, North Providence & Providence $65,000,000.00 $81,250,000.00
Rhode Island RESF440 Interstate Resurfacing (I-95 and I-295), Statewide $14,480,000.00 $28,704,084.80
Rhode Island TIGR003 Bridge Group 51A - Rt 37 C-2 $20,000,000.00 $25,000,000.00
South Carolina 0039390 Clements Ferry Road $18,536,000.00 $33,555,002.70
South Carolina 4084120 Leesburg Road (SC 262); Intersection Improvements - SC 262 (Leesburg Road) at Patricia Drive $29,587,373.08 $52,841,958.14
South Carolina 8888860 I-85 (Near MM 77 to near MM 80) & I-85 (Gossett Rd (S-57) to NC State Line) - Gossett Rd (S-57) to SC 18 $318,251,904.91 $597,857,099.65
South Carolina BR10025 SC 174 Br Replacement over Store, Sand, and Russell Creeks north of Edisto - Charleston County $21,942,752.62 $27,428,440.78
South Carolina BR40004 REPLACE US 176 BRIDGE OVER BROAD RIVER BETWEEN S-114 AND S-213 Sufficiency Rating: 35.8 $27,437,679.98 $32,055,442.78
South Carolina BR88044 US 701 over Great Pee Dee River $47,608,527.28 $59,555,755.70
South Carolina BR88056 SC 9 over Broad River, Broad River Canal, S-46 and S-31 $27,538,638.03 $34,743,852.28
South Carolina BR88076 Design Build Package E $48,032,817.69 $57,318,626.76
South Carolina CHMB010 Phase III Berlin Myers Parkway $38,268,921.76 $151,154,932.68
South Carolina EM05025 Port Access Road $8,000,000.00 $388,184,242.27
South Carolina EM13001 Henry Brown Boulevard Extension - Phase I widening of S-136 from Liberty Hall Road( S-529) to Red Bank Road(S-29) $5,039,440.00 $27,956,140.23
South Carolina FLMB006 Widening S-29(South Cashua Dr) from SC 51 ( Second Loop Rd) to S-103(Knollwood Rd) as follows: South Cashua Dr. from SC 51 $20,196,837.13 $25,269,183.82
South Carolina GPAT002 Batesville Rd (S-164) (SC 14 to Roper Mountain Road) $22,267,632.90 $27,670,043.34
South Carolina GRID010 I385 FROM I85 TO US 276(STONE AVE), GR/DR/PAVE/WIDEN 6 LANES/BRIDGES $87,783,660.16 $118,119,611.51
South Carolina GSLA003 CAROLINA BAYS PKWY FR SC9 NR STEPHENS CROSS RDS TO US 501 NEW 6 LANES NEW LOCATION DESIGN BUILD, ROWA, CONSTRUCTION, & PE $177,875,422.76 $295,515,917.74
South Carolina IM23009 I-85 @ I-385 (Design Build) $243,445,286.40 $324,404,081.50
South Carolina IM88030 I-26 (near MM 60 to Near MM 75) $23,191,447.43 $25,768,274.92
South Carolina LSCG005 US 301 over North Edisto River & Swamp $3,228,199.98 $26,158,676.06
South Carolina P026862 US 21 over Harbor River $61,390,365.44 $77,287,956.80
South Carolina P027002 I-77 (I-20 to Killian Road (Exit 22) $68,213,440.97 $101,098,812.04
South Carolina P027003 I-20 Widening (US 378 to Longs Pond) - Design Build $12,500,000.00 $120,716,784.25
South Carolina P027077 I-26 from near Jedburg Road (Exit 194) to near Nexton Parkway (Exit 197) $51,715,591.67 $66,546,021.58
South Carolina P027116 I-85 - Widening from near SC 18 (Exit 96) to near NC State Line (Phase 3) $187,946,637.76 $236,646,604.55
South Carolina P027413 SC 85 over Southern R.R. and S-995 $14,615,279.99 $27,676,475.77
South Carolina P027550 I-95 RECONSTRUCTION (near MM 33 to near MM 64 Northbound/Southbound) $3,614,004.70 $82,750,934.04
South Carolina P027551 I-95 (Near MM 23 to near MM 33) (NB/SB) $22,607,722.99 $25,119,692.21
South Carolina P029208 I-26 widening from near SC 202 (Exit 85) to near US 176 (Exit 101) $431,407,900.81 $512,063,605.52
South Carolina P029263 I-26 from near SC 27 (Exit 187) to near Jedburg Road (Exit 194) $11,789,094.40 $196,114,391.21
South Carolina P029450 Design Build I-20 EB & WB over Wateree River and Wateree Swamp Overflow $27,579,850.82 $103,501,122.68
South Carolina P029503 Clements Ferry Road - Phase II $16,000,000.00 $48,887,327.82
South Carolina P029525 US 78 (US 178 to SC 27S) Widening Phase IIA & US 78 (SC 27 to S-22) Widening Phase IIB $24,641,587.90 $35,148,152.88
South Carolina P029938 I-26 (Near MM 149 to near MM 172) $51,235,837.01 $57,090,539.20
South Carolina P030176 Seamless City Revitalization Project $17,666,966.50 $39,935,597.69
South Carolina P030462 US 76 WB over Wateree River $4,520,000.00 $50,875,705.54
South Carolina P030484 Country Club Road Corridor Project $14,120,431.38 $36,336,549.55
South Carolina P030487 SC 277 NB over I-77 $28,113,902.00 $31,237,668.89
South Carolina P030711 US 1 over I-20 $67,292,880.05 $75,017,250.98
South Carolina P038111 I-85 over Rocky Creek Bridge Design Build $33,054,525.82 $36,817,250.91
South Carolina P038652 I-77 Panther's Interchange (MM81) Design Build $34,597,743.00 $65,500,000.00
South Carolina P039718 I-20/I-26/I-126 - Corridor Improvements - Phase 1 DB Construction $179,190,000.00 $222,546,127.00
South Carolina P039719 I-20/I-26/I-126 - Corridor Improvements - Phase 2 DB Construction $106,259,873.02 $133,958,780.00
South Carolina RU27001 US 17 Widening $35,510,305.52 $62,205,001.57
South Carolina SB02002 FROM US 1 TO I-20 (PHASE 2) - PALMETTO PARKWAY $107,142,636.17 $159,805,376.76
South Carolina SB07001 SC 170 - FROM ROAD S-20 TO SC ROUTE 280. $69,552,973.64 $95,027,499.84
South Carolina SU39002 SC 153 New Construction $26,696,833.44 $33,371,041.80
South Carolina SU40013 Hardscrabble Road (S-83) $45,221,073.89 $90,713,396.04
South Dakota 0014194 Pierre Area ; Replace Structure (Bridge), Intersection Improvements; On the following routes: 014, 014 E, 014 W $39,618,065.98 $54,460,392.51
South Dakota 0046060 County of Clay; Rural Reconstruction, Mill and Surfacing, Structure Replacement, On the following routes: 046 $33,273,980.65 $42,044,542.72
South Dakota 0083074 Winner Area; US83 Reconstruction - South of I-90  $35,359,313.84 $69,998,228.71
South Dakota 0100104 City of Sioux Falls; New roadway construction of Veterans Parkway Hwy 100 $31,087,077.55 $50,995,079.70
South Dakota 0293106 City of Sioux Falls; Modify Interchange, Bent Strengthening; On routes: 029 N, 029 N1, 029 N2, 029 N7, 029 N8, 029 S, 029 S1, 029 S2, 029 S7 $20,738,109.34 $25,247,346.16
South Dakota 0901195 Meade County; Grading, Interchange Recon. (Exit 37), PCC Surfacing, Replace Bridge, Railroad Crossing,Tilford Port of Entry; I90 EBL $30,961,127.97 $38,124,540.62
South Dakota 0908095 County of McCook; Remove and Replace PCC, Pipe Work, Replace Str and Approach Grading, Deck Overlay, Polymer Chip Seal; On the following route I90E $34,745,475.07 $39,150,881.37
South Dakota 0908097 County of McCook; Rural Interstate Reconstruction, Replace Bridge; Structure  On the following routes 090W, 090E.   $74,683,664.33
South Dakota 6480004 Pennington County; Reconstruction of Sheridan Lake Road $12,223,760.59 $25,115,440.87
Texas 0001150 SR-1, Near SR-281 in Cannon County to Centertown in Warren County - Construction New $28,772,789.26 $35,965,985.00
Texas 0001298 SR-1, From East of Kingston Avenue to SR-382 - Widen from 2 lanes to 5 lanes $24,059,896.00 $25,442,120.00
Texas 0004008 SR-4 (US-78), From the Mississippi State Line to South of Shelby Drive - Widen from 4-Lane to 6-Lane $67,670,000.00 $99,671,931.00
Texas 0006083 SR-6, From South of SR-441(Moores Lane) to SR-253 (Concord Road) in Brentwood - Reconstruction and Widen $26,821,756.00 $35,388,438.00
Texas 0009066 SR-9 (US-25W) - Bridge over Clinch River in Clinton LM 10.71 - Bridge Replacement $27,482,824.26 $34,396,279.57
Texas 0010024 SR-10, South of Goose Creek to SR-52 in Lafayette - Widen $26,332,391.00 $27,775,244.00
Texas 0014062 SR-14, East of Old Covington Pike to SR-385 (Paul Barrett Pkwy) - Widen to 5-Lanes $34,658,327.00 $43,199,917.00
Texas 0014063 SR-14 (Austin Peay Hwy), From SR-385 to East of Kerrville-Rosemark Road (IA) - Reconstruction - Widen from 2-ln to 4-ln divided typical section $33,748,270.00 $42,185,337.00
Texas 0015106 SR-15, From Mill Springs Branch to the Waynesboro Bypass - Widen $39,072,031.32 $49,677,307.63
Texas 0015108 SR-15, From Firetower Road to west of Bigbee Branch - Widen $53,133,752.42 $66,460,819.53
Texas 0016054 SR-16(Madison Street), From West of Jenkins Road to Near SR-276 (Thompson Creek Road) - Widen $28,003,423.00 $35,011,718.00
Texas 0019053 SR-19 (Brownsville Bypass), From East of SR-87 to West of Windrow Road (IA) - Widen from 2-lane to 4-lane divided $24,949,506.58 $31,878,284.00
Texas 0026076 SR-26 (Nashville Hwy), From near SR-53 to near SR-96 - Reconstruction $27,145,732.00 $33,962,637.00
Texas 0028031 SR-28(US 127), North of I-40 to Near Potato Farm Road $17,846,478.88 $86,960,881.10
Texas 0028038 SR-28, From near North Lowe Road to near Little Road, north of SR-62 $8,598,658.11 $99,683,454.64
Texas 0029072 SR-29, Olgiati Bridge over Texas River - Widen $27,522,541.30 $34,403,176.75
Texas 0029084 SR-29, From SR-61 in Harriman to South of Whetstone Road in Morgan County - Reconstruction $58,791,103.00 $73,668,871.00
Texas 0029086 SR-29, From South of Whetstone Road to North of SR-328 - Reconstruction and Widening $31,139,148.00 $38,938,341.00
Texas 0033055 SR-33, Knox County Line to South of SR-144 Left - Reconstruction $41,056,024.90 $71,297,645.00
Texas 0035038 SR-35(Newport Bypass), From SR-9 to Saint Tide Hollow Road - Construction - New $64,103,459.00 $80,251,910.00
Texas 0035064 SR-35 - Intersection of SR-92 / Dickey Road to Grapevine Hollow Road - Construction - New - Construct 5th Lane on 4-Lane Divided Road $35,844,942.00 $35,875,733.00
Texas 0050027 SR-50, SR-106(US-431, Franklin Pike) to SR-11(US-31A, Verona Avenue) in Lewisburg - Reconstruction $46,798,094.67 $48,360,229.00
Texas 0052043 SR-52(Corridor "J"), SR-53 to Existing SR-52 - New Construction $29,392,645.00 $36,740,807.00
Texas 0054026 SR-54, Near Rison Street to Near Smith Road - Construction - Widen from 2-Lane to 5-Lane $37,512,612.00 $47,102,176.00
Texas 0056029 SR-56, South of SR-288 Near Magness Road to East Bryant Street in Smithville - Widen 5 Lanes $28,574,417.05 $36,733,470.00
Texas 0056039 SR-56, South of Warren/Dekalb County Line to Near Magness Road - Reconstruction $23,926,892.00 $30,251,971.00
Texas 0060013 SR-60, From 4-Lane North of I-75 (Westlake Drive) to SR-306 - Reconstruction and Widening $29,475,067.38 $77,141,600.00
Texas 0062034 SR-62 (Western Avenue), From Texas Avenue to Major Avenue in Knoxville - Reconstruction - Widen 2 Lane to 5 Lane $8,558,705.58 $52,993,308.96
Texas 0063006 SR-63, From Campbell County Line to Hall Lane - Widen $30,753,246.00 $31,367,955.00
Texas 0063055 SR-63(General Carl W. Stiner Highway), From Near Frontier Road/Woodson Lane to Near Claiborne County Line - Widen from 2-Lane to 5-Lane $25,430,272.00 $25,854,928.00
Texas 0065010 SR-65 - From Old Hwy 431 to Walling Road - Reconstruction $32,739,835.65 $40,941,724.56
Texas 0066044 SR-66REL, North of I-81 at SR-341 in Jefferson County to SR-160 in Morristown - Construction - New $59,845,961.05 $75,012,752.31
Texas 0069053 I-69 PROP, From South of SR-3(US-51) to South of SR-5 - Construction - New $48,375,748.00 $60,827,145.00
Texas 0069097 I-69PROP - From West of SR-21 to SR-3(US-51) Near Mayberry Road (IA) - Construction - New 4-Lane Divided Limited Access Interstate Highway $62,327,712.00 $77,909,640.00
Texas 0073050 SR-73, From SR-2 (US-11) to East of Little Texas River (Ft Loudoun/Tellico Canal) - Reconstruction $61,906,734.00 $78,453,840.00
Texas 0076065 SR-76, From West of Cades-Atwood Road to East of SR-77 - Reconstruction $30,816,347.00 $38,520,433.75
Texas 0092011 SR-92, Bridge over French Broad River, LM 9.16 in Dandridge - Bridge Replacement $29,827,603.00 $37,487,532.00
Texas 0099048 SR-99 (New Salem Highway), From Cason Lane to I-24 in Murfreesboro - Widen $25,003,241.00 $32,344,770.00
Texas 0101016 SR-101, From Firetower Road to East of Lakeview Drive - Reconstruction - Widen from Two Lanes to Multi-Lane Facility $34,396,083.00 $43,387,182.00
Texas 0101017 SR-101(Peavine Road), From Lakeview Drive to East of Westchester Drive / Catoosa Boulevard in Fairfield Glade - Reconstruction $32,546,689.00 $41,166,774.00
Texas 0109031 SR-109, From North of SR-24(US-70) to South of Dry Fork Creek - Reconstruction $30,815,434.00 $38,794,690.00
Texas 0109032 SR-109, From South of Dry Fork Creek to South of Cumberland River - Reconstruction $39,853,985.00 $50,974,068.50
Texas 0112006 SR-112, From SR-12 (Ashland City Highway) to SR-155 (Briley Parkway) -Reconstruction, Widen, Curb and Gutter, Sidewalk, Signalization $39,064,420.26 $51,005,040.00
Texas 0115027 SR-115, South of Topside Road to North of Maloney Road - Widen $63,031,188.00 $78,877,045.00
Texas 0115054 SR-115, From North of Maloney Road to Woodson Drive - Widen from 4 to 6 Lanes $71,945,900.00 $94,316,818.00
Texas 0115057 SR-115 - (Relocated Alcoa Highway), From SR-35 (Hall Road), South of Airport Road to Proposed Interchange at Tyson Boulevard - Widen $57,078,945.00 $71,853,312.00
Texas 0136008 SR-136, SR-111 to I-40 - Widen $48,052,510.27 $63,660,523.00
Texas 0149012 SR-149, From River Road to SR-13; SR-13, SR-149 to Zinc Plant Road - Widen to 5 Lanes $49,753,935.11 $78,589,966.00
Texas 0243090 I-24, Interchanges at SR-2(Broad Street) and SR-58(Market Street) in Chattanooga - Interchange Modification $36,840,728.00 $41,759,295.00
Texas 0243097 I-24, Bridges over Germantown Road, LM 12.08 and Belvoir Avenue, 12.59 in East Ridge - Bridge Replacement $36,112,144.89 $40,124,608.44
Texas 0247009 SR-247(Duplex Road), SR-6 (US-31, Main Street) in Spring Hill to Near I-65 - Widen 2-3 lanes, Correct Vertical Allignment $32,468,219.50 $37,842,230.50
Texas 0249079 I-24, Interchange modification at Hickory Hollow Parkway - Modify Interchange $31,626,364.02 $37,740,840.90
Texas 0266013 SR-266 (Jefferson Pike), From SR-102 to East of I-840 - Widen $14,678,704.00 $74,112,669.00
Texas 0269020 I-269PROP(Paul Barret Parkway), From North of SR-57 in Fayette County to South of Raleigh-Lagrange Road - Stage Construction - New $35,261,150.07 $43,959,254.59
Texas 0317014 SR-317(Apison Pike), From Old Lee Highway to SR-321(Ooltewah-Ringold Road) - Widen $30,760,772.00 $41,494,338.00
Texas 0317017 SR-317, SR-321(Ooltewah-Ringgold Road) to Near Layton Lane - Reconstruction and Widen from 2 Lanes to 5 Lanes $92,923,113.00 $117,999,997.00
Texas 0374010 SR-374 (Warfield Blvd), South of Dunbar Cave Road to West of Stokes Road, in Clarksville - Widen $23,171,685.80 $31,262,551.00
Texas 0396004 SR-396(Saturn Parkway Extension), From SR-6 to SR-247; SR-247, From Cleburne Rd to Town Center Pkwy; and SR-6, Intersection at Stephen P Yokich Pkwy $26,107,686.00 $32,634,608.00
Texas 0397010 SR-397 (Mack Hatcher Parkway West) - From S of SR-96 W of Franklin to E of SR-106 N of Franklin - Construction - New $48,821,165.56 $64,766,993.00
Texas 0401348 I-40, From West of SR-186 (US-45 ByPass) to East of SR-5 (North Highland Avenue) - Widen $62,761,320.65 $78,451,650.81
Texas 0401358 I-40, From West of SR-20 (US-412, Hollywood Drive) to West of SR-186 (US-45 ByPass) (IA) - Widen $33,775,792.00 $42,219,740.00
Texas 0402337 I-40, From East of SR-5(US-45) to East of SR-1(US-70) in Jackson - Widen from 4-Lane to 6-Lane on existing alignment $56,266,400.00 $101,123,062.00
Texas 0405140 I-40, From West of SR-171 to East of SR-109 - Widen $51,528,150.00 $57,253,500.00
Texas 0405142 I-40, From East of SR-109 to East of I-840 - Widen, HOV Lanes, Shoulders, Bridge Widening $35,167,816.31 $43,959,771.00
Texas 0405146 I-40, Donelson Pike Interchange (includes Donelson Pike relocation from taxiway bridges over Donelson Pike to I-40) -Modify Interchange $75,529,551.00 $97,871,241.00
Texas 0406130 I-40, Interchange at Mine Lick Creek Road - Construct New Interchange $28,109,437.00 $32,192,533.00
Texas 0406173 I-40, Westbound near MM 342 to near MM 344 - Slope Stabilization and Resurfacing $13,445,668.00 $47,240,032.00
Texas 0459010 SR-459(Lexington Bypass), From SR-20(US-412) West of Lexington to Near SR-22 South of Lexington - New - Super 2-lane bypass on new alignment $31,854,845.19 $39,818,557.00
Texas 0460010 SR-460PROP (Somerville Beltway), From Near SR-15 (US-64) West of Somerville to Near SR-76 South of Somerville - Stage Construction - New $26,152,624.00 $32,690,780.00
Texas 0551119 I-55 at Crump Boulevard in Memphis - Modify Interchange $108,082,917.19 $120,104,081.00
Texas 0652096 I-65, Interchange at SR-99 (US-412) in Columbia - Modify Interchange $4,564,156.43 $35,795,855.92
Texas 0652113 I-65, Interchange at Buckner Road in Spring Hill (Design Build) - New Interchange $31,928,097.00 $57,800,000.00
Texas 0653113 I-65 (Prop Intch), Existing SR-109 to I-65 (Includes SR-41 Widening) - Widening, Construct New Interchange $52,235,500.00 $65,388,327.00
Texas 0653128 I-65, From near SR-25 (Main Street) to near SR-109 - Section 4 - Widen $127,546,569.00 $159,596,116.00
Texas 0751131 I-75, Interchange at I-24 - Modify Interchange $136,876,258.00 $152,084,732.00
Texas 0751155 I-75, Interchange at I-24, Phase 2 (IA) - Modify Interchange $91,216,998.46 $102,850,000.00
Texas 0983030 I-24 SMART Corridor (Phase II), From I-440 (Exit 53) to SR-10 (Exit 81 / US-231) in Murfreesboro and SR-1 from I-24 to SR-10 in Murfreesboro - ITS $29,548,554.52 $51,554,092.00
Texas 1243081 I-124, From the I-24 Interchange to South of the Texas River Bridge - Widen - Add Lanes $131,563,917.00 $164,459,234.00
Texas 2401290 I-240, From North of SR-385 (South of Poplar Avenue) to North of Walnut Grove Road - Widen $43,962,243.00 $55,086,536.00
Texas 4404084 I-440, From I-40 to I-24 - Reconstruction $134,000,000.00 $167,500,000.00
Texas 6407161 I-640, Interchange at North Broadway (Phase II) in Knoxville - Reconstruction and Relocation of Ramps $5,497,200.00 $30,185,230.00
Texas 8300070 Albert Gallatin Ave/Hatten Track Rd Ext, From SR-109 to SR-174 - New Construction $28,435,790.00 $37,352,392.00
Texas 0095022-02 VARIOUS LOCATIONS IN TARRANT COUNTY, CONGESTION MITIGATION & AIR QUALITY $21,301,440.00 $26,626,800.00
Texas 0108184 IH 10 FROM  W OF ADAMS BAYOU, EAST TO  W OF SABINE RIVER BRIDGE RECONSTRUCT MAIN LANES OF EXISTING 4 LANE FREEWAY $15,079,960.37 $55,519,614.93
Texas 0303125 CONSTRUCT ONE-WAY FRONTAGE ROADS, ENTRANCE AND EXIT RAMPS AND REPLACE BRIDGE AT FM 989 ON IH 30. $55,333,461.40 $68,545,021.19
Texas 0354235 IH 35 FROM  FALLS COUNTY LINE TO  WOODLAWN RD RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE CONGESTION AND ENHANCE SAFETY $121,454,076.60 $138,025,677.73
Texas 0355152 IH 35W FROM IH 820 TO IH 30. RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES $220,313,023.61 $294,794,414.93
Texas 0356438 IH 35E FROM SANDY LAKE RD/WHITLOCK LN TO LOOP 288. RECONST 6 LN TO 8 MAINLANES, 4 CONCURRENT MANAGED/HOV AND FR $397,540,702.04 $1,049,891,743.18
Texas 0451346 IH 45 FROM AT IH 610 S TO CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB $22,644,369.15 $28,472,662.26
Texas 1102012 ON US 290 FROM US 183 TO SH 130.CONSTRUCT 6-LANE TOLLWAY W/ FRT RDS $103,120,000.00 $240,301,000.00
Texas 1102054 US 190 FR. 0.20 MI E OF FM 3470 TO 0.30 MI W OF FM 2410 FR. 3470 TO ROY REYNOLDS . CONSTRUCT OVERPASS AND WIDEN FR 2 TO 4 LNS W/CO $5,980,739.66 $25,842,684.00
Texas 1102319 SH 242 FROM  AT IH 45 TO  . CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH 242 TO SB IH 45 & NB IH 45 TO WB SH 242 ( $1,480,218.39 $31,278,253.00
Texas 1102493 FROM IH 20 TO FM 700. CONSTRUCT NEW RELIEF ROUTE $63,362,556.40 $79,120,364.25
Texas 1102558 ON LP 1 FROM FM 734 (PARMER LANE) TO CESAR CHAVEZ STREET INTERCHANGE. PHASE 1: CONSTRUCT NB AND SB MANAGED LANES_(TOLL) $160,595,203.40 $200,744,004.75
Texas 1402016 RECONSTRUCT CLINTON DRIVE $15,711,497.00 $31,121,001.72
Texas 1402081 IH 69 FR W OF FM 762 TO 0.31 MI W OF FM 2759. WIDEN TO 8 ML, FRTG RDS, ITS, TMS, CONST 2-WAY HOV LNS & INT IMPRVS AT FM 762. $130,353,034.39 $183,422,238.85
Texas 1402183 IH 45 FROM SP 5 TO US 59.  CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE EXISTING US 59 NB AND SB DIRECT CONNECTORS. $31,042,363.63 $38,802,954.54
Texas 1502083 00US 75 FROM PGBT TO PARK BLVD. WIDEN D-C FR PGBT TO NB US75 & SB US75 TO PGBT; EXT DART RR BR & REPL PLANO PKWY O/PASS; AUX LN NB $33,698,196.89 $60,430,306.01
Texas 1502464 US 83 FROM 0.28 MI WEST OF SHOWERS RD TO 0.85 MI E OF FM 886(EL FARO RD). CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY $21,812,000.00 $67,039,536.19
Texas 1502487 IH 45 FROM  FM 739 TO  15TH STREET IN CORSICANA CONSTRUCT PHASE 1 INTERCHANGE AT NEW LOCATION-SH 31 BYPASS $30,416,428.27 $32,690,661.65
Texas 1502488 ON SH 31 FR 3.2 MI W OF FM 2555 TO 3.7 MI E OF IH 45. CONSTR NEW LOC RELIEF RTE; ULTIMATE 4 LN DIV LIM ACC FAC W/IC @ IH45. $14,109,278.72 $88,622,316.45
Texas 1502521 IH35 FR N. STASSNEY LN TO S. WILLIAM CANNON DR ADD SHLDERS, AUX LNS, RAMP IMPRVMTS, PAV REHAB, BIKE & PED IMPRVM, FRT RD INTSE IMP $31,332,261.92 $77,852,159.34
Texas 1502531 ON IH 35E FR US 77 S OF WAXAHACHIE TO US 77 N OF WAXAHACHIE. RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES $112,838,988.92 $147,037,256.15
Texas 1502613 FM 1626 LANE RECONSTRUCTION $3,461,126.10 $25,689,139.16
Texas 1602189 REHAB EXISTING ROADWAY ON IH 40 $11,475,826.98 $28,689,649.86
Texas 1602247 IH 410 AT US 90. RECONSTRUCT INTERCHANGE AND OPERATIONAL IMPROVEMENTS $73,498,308.65 $81,664,787.39
Texas 1602259 SH 358 FROM NILE STREET TO AYERS STREET.  RAMP REVERSAL PHASE II-A, SOUTH SIDE ONLY. $40,996,406.49 $51,245,508.11
Texas 1602427 CONSTRUCT 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND SIDEWALKS ON IH 20 $12,625,395.26 $70,512,006.15
Texas 1602470 WIDEN EXISTING FOUR LANE TO SIX LANE ON IH 10 $42,969,591.46 $53,711,989.33
Texas 1602671 SH 288 AT BW 8 INTERCHANGE.  CONSTRUCT 8 DIRECT CONNECTORS $1,802,655.00 $100,253,318.00
Texas 1702007 IH 10 ADDITIONAL LANE CONSTRUCTION $153,348,307.03 $192,080,905.63
Texas 1702354 CONSTRUCT 0 TO 3/4 COLLECTOR DISTRIBUTOR, RECONSTRUCT 1/3 LANE SOUTHBOUND FRONTAGE ROADS AND RAMP MODIFICATIONS ON IH 35E $67,866,111.88 $84,872,575.32
Texas 1702355 CONSTRUCT 4 LANE BRIDGE AND RAMP MODIFICATIONS ON SH 114 $26,585,626.44 $46,732,033.06
Texas 1702416 FM 521 - WIDEN TO 4-LANE DIVIDED SECTION AND CONSTRUCT GRADE SEPARATION AT UNION PACIFIC RAIL ROAD $20,458,196.69 $25,684,230.42
Texas 1702473 SL 335- CONSTRUCT FRONTAGE ROADS. $19,184,316.02 $31,420,395.03
Texas 1702501 IH 10 INTERCHANGE IMPROVEMENTS $14,441,495.74 $32,825,598.60
Texas 1702506 IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES $94,615,640.22 $118,269,550.27
Texas 1702559 CONSTRUCT 4-LANE DIVIDED URBAN STREET FACILITY ON NEW LOCATION ON AIRPORT BOULEVARD $28,171,736.97 $35,230,786.81
Texas 1702626 RECONSTRUCTION OF DIRECT CONNECTOR ON IH 69 $8,882,098.06 $26,244,997.85
Texas 1702631 CONSTRUCT DIRECT CONNECTOR AND HOV ACCESS TO UPTOWN TRANSIT CENTER ON IH 610 $56,915,556.97 $68,253,926.76
Texas 1702633 IH 610 RECONSTRUCTION $84,164,189.06 $96,426,876.73
Texas 1702650 IH 35 OPERATIONAL IMPROVEMENTS $116,499,570.90 $138,383,967.68
Texas 1702696 WIDEN FREEWAY ON IH 45 $104,378,702.00 $130,473,377.51
Texas 1702730 FM 2181. WIDEN ROADWAY $2,724,755.09 $33,083,435.70
Texas 1702792 SL 1 GRADE SEPARATION OF MAIN LANES $47,550,061.36 $59,058,271.19
Texas 1702818 RECONSTRUCT ROADWAY AT BUFFALO SPEEDWAY $9,796,640.00 $27,975,271.62
Texas 1702839 CONSTRUCT 4 LANE TOLLWAY IN SECTIONS ON SH 249 $154,400,000.00 $309,757,180.00
Texas 1702842 CONVERT REVERSIBLE HOV TO REVERSIBLE EXPRESS LANES, RECONSTRUCT AND WIDEN MAINLANES AND FRONTAGE ROADS ON IH35 E AND US 67 $317,248,899.00 $624,975,805.00
Texas 1802011 WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED, INCLUDING INTERSECTION IMPROVEMENTS ON FM 664. $24,946,752.10 $32,296,841.69
Texas 1802175 IH 610 - RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS AT CAMBRIDGE STREET/ALMEDA ROAD/UNION PACIFIC RAILROAD $65,000,000.00 $84,171,015.81
Texas 1802203 REHABILITATE AND RAISE ROADWAY ON SH 87 $17,531,249.14 $26,443,393.32
Texas 1802325 ROADWAY WIDEN TO A MODIFIED SUPER 2 ON US 67. $5,000,000.00 $53,396,420.94
Texas 1802387 CONSTRUCT GRADE SEPARATION, RECONFIGURE RAMPS AND WIDEN FRONTAGE ROAD TO CONVERT TO ONE WAY ON IH 10 $33,236,451.18 $36,948,609.84
Texas 1802390 EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 $50,100,000.00 $200,648,881.31
Texas 1802395 US 82 - ADD TWO LANES WITH SHOULDERS AND WIDEN FROM 2 LANE TO 4 LANE $64,985,054.86 $81,326,475.57
Texas 1802404 CONSTRUCT MAIN LANES, OVERPASSES, FRONTAGE ROADS AND STRUCTURES ON US 77 $32,383,849.12 $40,479,811.40
Texas 1802412 US 69 - WIDEN FREEWAY FROM 4 TO 6 LANES $27,865,125.15 $34,831,406.44
Texas 1802413 IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES $112,175,146.80 $140,218,933.50
Texas 1802439 WIDEN ROAD - ADD LANES ON SH 97 $59,295,842.78 $70,119,828.47
Texas 1802497 WIDEN TO SIX MAIN LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING; INTELLIGENT TRANSPORTATION SYSTEM ON IH 10 $125,000,000.00 $373,870,824.61
Texas 1802506 US 83 CONSTRUCT OVERPASS, RELOCATE RAMPS, AND REGRADE CURVE. $15,785,536.36 $31,690,442.17
Texas 1802535 REPLACE BRIDGE AND APPROACHES ON IH 35. $33,289,856.53 $37,028,466.97
Texas 1802544 CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS ON IH 30 $37,087,761.59 $46,415,575.34
Texas 1802546 CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION ON US 377 $35,668,539.46 $56,399,568.86
Texas 1802552 WIDEN 2 TO 4 LANE DIVIDED ON FM 156. $45,803,593.63 $57,254,492.03
Texas 1802558 CONSTRUCT GRADE SEPARATION ON US 181 $23,585,793.48 $29,482,241.85
Texas 1802575 RAMPS RECONFIGURATION AND FRONTAGE ROAD EXTENSION ON SL 375 $29,294,331.68 $36,617,914.61
Texas 1802735 CONSTRUCT INTERCHANGES ON US 67. $34,107,050.15 $42,644,067.82
Texas 1902002 WIDEN ROAD - ADD LANES ON SH 36 $7,000,000.00 $98,644,061.78
Texas 1902024 REHABILITATION OF EXISTING ROAD ON OLD SAN ANTONIO ROAD. $41,042,329.50 $51,302,911.87
Texas 1902056 FM 2221. CONSTRUCT CONTROLLED ACCESS FACILITY. $91,218,763.56 $114,516,232.45
Texas 1902057 CONSTRUCT RAMPS ON IH 35. $63,128,251.91 $70,219,374.38
Texas 1902060 REHABILITATIONS AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 85. $10,000,000.00 $40,682,774.72
Texas 1902063 REHABILITATION OF EXISTING ROAD ON SH 123. $21,394,897.17 $26,752,645.11
Texas 1902081 CONSTRUCT 4 LANE DIRECT CONNECTION (FUTURE I-69) ON US 59. $60,440,799.99 $92,628,331.74
Texas 1902105 IH 45 WIDEN ROAD ADD LANES $142,813,404.19 $179,214,098.64
Texas 1902107 REHABILITATION OF EXISTING ROAD ON US 183 $22,000,000.00 $28,720,936.06
Texas 1902148 HAZARD ELIMINATION AND SAFETY ON IH 27 AND US 87. $34,238,802.93 $42,640,057.38
Texas 1902182 FM 2100 WIDEN TO 4 LANE DIVIDED $24,481,834.67 $30,684,149.84
Texas 1902201 INTERCHANGE IMPROVEMENT ON SL 12 AND SS 482. $271,498,670.57 $341,709,166.57
Texas 1902215 WIDEN ROAD AND ADD LANES ON IH 410 $64,126,345.37 $84,896,921.79
Texas 1902268 WIDEN FROM 2 LANE TO 4 LANE WITH A CONTINUOUS LEFT TURN LANE; REPLACE BRIDGE AT SAND CREEK $22,179,337.43 $35,502,514.54
Texas 1902275 HAZARD ELIMINATION AND SAFETY $27,232,864.76 $30,258,738.61
Texas 1902299 CONSTRUCT NEW ROADWAY LANES ON US 281 $66,747,449.27 $83,434,311.59
Texas 1902314 WIDEN FREEWAY - ADD LANES ON IH 10. $80,492,432.23 $100,790,599.37
Texas 1902343 SH 87 - FERRY OPERATION PROJECTS $21,874,049.60 $27,342,562.00
Texas 1902389 WIDEN FREEWAY ON IH 635. $916,159,862.83 $1,720,223,200.00
Texas 1902417 CONSTRUCT INTERCHANGE ON IH 2 AND IH 69C. $152,480,000.00 $300,051,164.00
Texas 1996001 STATEWIDE, STATE INFRASTRUCTURE BANK -ADV CAP $71,726,747.00 $192,462,886.00
Texas 2002040 IH 30 FROM EAST OF SYLVAN AVE TO IH 35E. WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV. $36,234,552.00 $112,449,552.20
Texas 2002632 US CUSTOMS PORT OF ENTRY EXIT TO US 281. CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF) $33,146,456.76 $36,270,895.40
Texas 2005862 US 82 FROM US 82 AT US 281 TO .. CONSTRUCT DIRECT CONNECT INTERCHANGE   $31,139,709.00
Texas 2005994 IH 635 FROM WEBB CHAPEL TO WEST OF US 75 (MERIT DR). IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV/MANAGED LANES $346,160,303.95 $930,082,152.42
Texas 2007405 FM 1314 FROM 1.0 MI S OF SH 242 TO 2.6 MILE NW OF LOOP 494 WIDEN TO 4 LANE DIVIDED RURAL ROAD AND LENGTHEN OR REPLACE $29,683,024.19 $46,093,270.00
Texas 2007688 FM 1484 FROM FM 3083 TO FM 2432. WIDEN TO 4 LANE DIVIDED $18,508,072.78 $33,997,859.93
Texas 2007717 FM 1488 FROM EAST OF FM 149 AT MOSTYN TO FM 2978. WIDEN 2 LANES TO 4-LANE DIVIDED (PTF) $26,026,471.13 $36,148,371.04
Texas 2007869 SS 601 FROM US 54 (PATRIOT FREEWAY) TO LOOP 375 (PURPLE HEART FREEWAY). CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES $244,634,419.55 $359,350,000.00
Texas 2007913 FM 3407 FROM  RM 12 TO  RM 2439 CONSTRUCT 4-LN DIVIDED ROADWAY $32,415,232.10 $41,732,542.58
Texas 2008345 ON SH 199 AT BYPASS CHANNEL IN FTW TO NEAR CBD & TRINITY RIVER. CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL. $36,982,949.80 $48,967,209.40
Texas 2008654 US 79 FROM 79-B E OF TAYLOR TO E OF FM 1063. UPGRADE TO 4-LN DIVIDED RDWY $19,865,925.86 $28,636,441.29
Texas 2008830 IH 20 FROM SH 171; IN WEATHERFORD TO FM 2552; ON EAST AND WEST BOUND FRONTAGE ROADS. RECONSTRUCT AND EXTEND FRONTAGE ROAD. $19,196,974.61 $35,689,114.71
Texas 2009235 FM 646 FROM FM 517 TO FM 1764. WIDEN FROM 2 LANES TO 4-LANE DIVIDED (PTF) $16,115,604.92 $26,866,332.00
Texas 2009513 ENGINEERING, ROW, & CONSTRUCTION OF DFW CONNECTOR ON SH 114 AND SH 121. RECONSTRUCT FREEWAY, FRONTAGE ROADS AND RAMPS $609,278,566.00 $696,394,133.00
Texas 2009656 IH 10 @ LP 375. INTERCHANGE IMPROVEMENTS INCLUDING THE CONSTRUCTION OF DIRECT-CONNECTORS $6,484,439.64 $38,105,549.55
Texas 2009753 ENGINEERING, ROW AND CST OF DFW CONNECTOR ON SH 121 AND SH 114. RECONST FRWY 4 TO 6 W/AUX LNS,FR RDS & RAMPS & ADD COLLECTOR $591,539,254.30 $739,424,067.78
Texas 2009919 IH 820 FROM IH 35W TO SH 121/SH 183. RECONSTRUCT 4 TO 10 W/ HOV/MANAGED LANE, INTERCHANGE AND CONNECTORS $421,105,616.27 $526,087,354.64
Texas 2011591 US 271 FROM 0.3 MI. NORTH OF US 67 TO .7MI SOUTH OF FM 3417. CONSTRUCT FIRST PHASE OF ULTIMATE 4-LANE DIVIDED FREEWAY $50,559,019.54 $87,852,142.31
Texas 2011998 IH 610 FROM TC JESTER TO N OF IH 10 ON IH 610 AND TO 34TH ST ON US 290. RECONSTR US290/IH610 IC, CONSTR INTERCHANGE W/ DC'S W/ TWO $36,665,773.00 $171,036,404.00
Texas 2012125 LP 363 FROM IH 35 NORTH OF TEMPLE TO SH 53. CONSTRUCT NORTHBOUND FRONTAGE ROAD TO PROVIDE INTERIM 4-LANE $28,040,000.00 $39,597,527.26
Texas 2012221 SH 550 @ US 77/83 TO 0.53 MI E OF OLD ALICE RD. CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES $2,300,000.00 $34,495,766.00
Texas 2012232 US 290 FROM WEST OF RM 1826 TO SL 1; RECONSTRUCT 4-LANE TO 6-LANE CONTROLLED ACCESS HIGHWAY AND FRONTAGE ROADS $21,468,853.91 $146,578,873.54
Texas 2012594 US 59 - WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS $84,105,000.00 $120,120,653.85
Texas 2012691 IH 35 FROM S LP 363 IN TEMPLE TO NUGENT AVE. RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES. $233,750,004.59 $275,865,720.60
Texas 2012805 RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE ON MEDICAL DISTRICT DRIVE. $19,376,490.00 $27,202,300.29
Texas 2013082 AT VARIOUS LOCATIONS ON US290, WEST OF FM 529 AND LITTLE YORK.CONSTRUCT FRONTAGE RDS AND ADD AUXILIARY LANES & GRADE SEPARATIONS $69,991,557.83 $87,879,332.83
Texas 2013136 ON IH 610 FROM W OF W 34TH ST ON US 290 TO N AND S OF US 290 ON IH 610.RECONSTRUCT US 290/IH 610 INCLUDING IH10 TO US 290 OUTBOUND $99,132,093.21 $124,346,658.20
Texas 2013163 IH 45 FROM 0.9884 MILES SOUTH OF FM 2351 TO SOUTH OF MEDICAL CENTER DRIVE. WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3-LANE FR $85,185,107.91 $106,749,097.46
Texas 2013218 CONSTRUCT FOUR LANE FREEWAY AT DIBOLL (FUTURE I-69) $14,237,000.00 $171,923,286.00
Texas 2013221 HIGHWAY IMPROVEMENT ON US 59. $813,685.77 $101,174,791.48
Texas 2013226 IH 10 AT SH 87 AND T&NO RR. REPLACE BRIDGE AND APPROACHES $24,578,123.17 $30,722,653.80
Texas 2013287 US 77 FROM CR 16 TO FM 1898. CONSTRUCT MAIN LANES, PARTIAL FRONTAGE ROADS AND OVERPASSES. $68,072,909.39 $85,091,136.74
Texas 2013292 SH183 FROM FM157 TO I35E; LP12 FROM SH183 TO I35E; AND SH114 FROM SH97 TO SH183. RECONSTRUCT & ADD MANAGED LANES $576,221,762.15 $809,451,840.03
Texas 2013307 IH 30 EAST OF SYLVAN AVE TO IH 35E. MARGARET MCDERMOTT BRIDGES. $27,240,122.00 $34,050,152.40
Texas 2013400 US 82 FROM FM 1840 TO SH 98. RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES $9,992,256.47 $27,294,014.40
Texas 2013420 ON SH 365 FROM FM 396 TO US 281. CONSTRUCT 4-LANE CONTROLLED ACCESS TOLLED FACILITY $33,756,881.00 $155,435,862.00
Texas 2013567 CONSTRUCT 6-LANE DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY WITH AUTO PUMP STATION AND RAILROAD LINE WITH UNDERPASSES ON HEMPSTEAD ROAD $32,852,164.82 $61,662,913.46
Texas 2013596 REHABILITATION OF EXISTING ROADWAY AND INTERCHANGE IMPROVEMENTS ON US 175 AND SH 310. $24,000,000.00 $47,506,925.80
Texas 2013734 FM 359 AT US 90A AND UPRR. RAILROAD GRADE SEPARATION (ELEVATED T). $28,028,742.88 $35,075,317.23
Texas 2013737 US 290 FR W OF PINEMONT TO W OF 34TH ST. RECONSTRUCT & WIDEN TO 8 MN LNS WITH 3 REV MANAGED LNS, AUX LNS; 2-2 LN FRTG RDS. $50,689,709.93 $176,105,503.14
Texas 2013740 US 290 - RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES AND TWO 2-LANE FRONTAGE ROADS $90,576,521.07 $194,587,373.84
Texas 2013741 ON US 290 FR E OF W LITTLE YORK TO W OF PINEMONT. RECONSTRUCT & WIDEN TO 8 MN LNS, 3 REV MNG LNS, AUX LNS; 2 2-LN FRTG RDS, GRD SE $102,778,084.87 $189,407,321.74
Texas 2013874 REPLACE BRIDGE AND APPROACHES ON FM 1495. $26,727,976.27 $33,415,139.89
Texas 2013875 CONSTRUCT NEW ROAD ON LP 375. $29,427,716.36 $36,784,645.46
Texas 2013983 US 290 FROM E OF MUESCHKE RD TO E OF TELGE RD. RECON AN WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MAIN LANES, AUX LANES AND 2-LN FR $37,362,073.98 $98,369,741.82
Texas 2013984 CONSTRUCT DIRECT CONNECTOR ON IH 45 AT IH 610 E. $55,043,017.24 $57,720,972.39
Texas 2013991 IH 610 FROM W OF 34TH ST ON US 209 TO IH 610. RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS AND 3-LANE REVERSIBLE $2,830,000.00 $181,761,983.83
Texas 2013996 FM 1957 FROM SH 211 TO LOOP 1604. EXPAND FROM 2 LANES TO 4 LANE DIVIDED. $4,448,000.00 $37,501,000.00
Texas 2014154 SH 26 RECONSTRUCTION $22,499,087.33 $28,634,874.16
Texas 2014211 ON US 59 FROM SP 10 TO W OF FM 762. WIDEN TO 6-LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM W/ GRADE SEPARATION $126,532,655.18 $155,662,867.49
Texas 2014326 CONSTRUCT NEW ROAD ON MCHARD ROAD. $23,966,629.04 $29,959,286.30
Texas 2014444 WIDEN ROAD, ADD LANES, AND SHOULDERS ON US 69 $33,829,736.79 $42,287,170.98
Texas 2014643 SH 105 FROM  AT THE BRAZOS RIVER TO  . REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, STRUCTURES, BASE AND SURFACE $28,167,790.30 $35,209,737.90
Texas 2014669 AT WHITE SETTLEMENT RD IN FTW. CONST 4 LN BRIDGE AT NEW LOC OF PROPOSED BYPASS CHANNEL FOR TRINITY RIVER NEAR CBD OF FTW $6,200,000.00 $33,796,872.18
Texas 2014953 US 290 FR W OF MASON RD TO E OF MUESCHKE RD. RECONST & WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MANAGED LANES, AUX LANES, FRTG RDS. $53,086,121.17 $66,881,090.26
Texas 2015062 ON IH 30 AT FM 3549. RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS AND RAMPS CONSTRUCTION. $16,709,036.80 $26,585,311.57
Texas 2016108 ADD SHOULDERS, AUXILLARY LNS, RAMP IMPROVEMENTS, PAVEMENT REHAB, BIKE AND PED IMPROVEMENTS & FRONTAGE ROAD INTERSECTION IMPROVEMENTS ON IH 35 $43,681,638.29 $48,547,153.65
Texas 2016183 ON IH30 FR 1.0 MI W OF SH360 TO GREAT SOUTHWEST PKWY; AT SIX FLAGS DR. CONST DIR CONN INTCHG AT SH360 & TMS & RECONSTR BRIDGE. $43,206,971.49 $260,791,576.08
Texas 2016326 IH 2 FROM 0.209 MI W OF SP 115 TO 0.203 MI E OF SH 336. INTERCHANGE IMPROVEMENTS @ MAIN STREET & BICENTENNIAL. $44,251,471.79 $49,168,301.99
Texas 2016367 SL 49 CONTROLLED ACCESS TOLL ROAD CONSTRUCTION $3,232,010.98 $66,595,380.24
Texas 2016739 WIDEN 2-LANE UNDIVIDED HIGHWAY TO 4-LANE URBAN FREEWAY WITH GRADE SEPARATED INTERCHANGES AND 0 TO 4-LANE FRONTAGE ON US 287 $56,172,445.12 $71,175,163.79
Texas 2016884 US 175 & IH 45 WIDENING $100,963,387.50 $117,539,821.09
Texas 2017241 IH 45. WIDEN FREEWAY CONSISTING OF GRADING, STRUCTURES, FLEXIBLE BASE, HMA, CONCRETE PAVEMENT, SIGNS AND PAVEMENT MARKINGS $114,881,928.26 $143,602,410.32
Texas 2017368 IH 20. REALIGN EXISTING ROADWAY INCLUDING GRADING, PAVEMENT DRAINAGE, SIGNING, AND ILLUMINATION. $80,121,825.43 $89,828,148.68
Texas 2017592 EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 $78,000,000.00 $199,577,086.75
Texas 2017887 WIDEN FREEWAY FROM FOUR TO SIX LANES ON US 67 $3,022,594.50 $66,270,431.33
Texas 2017906 WIDEN ROADWAY INCLUDING FRONTAGE ROADS, STRIPING AND SIGNING ON IH 45 $63,259,215.23 $94,794,666.94
Texas 2017973 REPLACE SWING BRIDGE ON FM 457 $45,299,774.23 $45,299,774.23
Texas 2017990 IH 10 EXPAND FROM 4 TO 8 LANE EXPRESSWAY $67,089,546.54 $83,861,933.17
Texas 2018201 CONSTRUCT RELIEF ROUTE AROUND DRISCOLL ON US 77. $40,000,000.00 $98,921,208.78
Texas 2018321 IH 820 AND SH 121. RECONSTRUCTION AND WIDENING. $134,591,824.21 $168,259,780.27
Texas 2018359 REPLACE EXISTING APPROACHES AND BRIDGES ON IH 40 $38,088,137.11 $42,320,152.34
Texas 2018375 DEDICATED BUS LANE ON IH 610 $32,250,206.60 $64,107,123.38
Texas 2018416 FM 762 AND FM 2759 - WIDEN TO 4 LANES DIVIDED $27,554,687.76 $34,539,569.58
Texas 2018434 US 377 AT LAKE TEXOMA. BRIDGE REPLACEMENT. $5,000,000.00 $35,234,013.62
Texas 2018456 SH 360 WIDEN AND RECONSTRUCT FROM 6 TO 8 LANES. $50,933,368.17 $64,243,032.73
Texas 2018627 CITY STREET FROM MARSALIS AVENUE TO EWING AVENUE.  CONSTRUCT LOCAL ENHANCEMENTS. $16,000,000.00 $39,388,000.00
Texas 2018774 US 285. ROADWAY WIDENING TO A MODIFIED SUPER 2 $34,325,994.90 $43,366,955.49
Texas 2018811 WIDEN FROM 2 LANES TO 4 LANE ON US 69 $52,977,757.81 $66,222,197.26
Texas 2018842 UPGRADE FROM 4-LANE DIVIDED HWY TO 4-LANE FREEWAY WITH FRONTAGE ROAD BY CONSTRUCTING 4 MAINLANES, INTERCHANGES, AND FRONTAGE ROADS AT SH 44 $26,238,131.10 $32,797,663.88
Texas 2018852 WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES ON SH 146 $81,128,000.00 $253,240,692.19
Texas 2018858 SH 242 AT FM 1314. CONSTRUCT GRADE SEPARATION. $21,168,947.40 $26,532,973.00
Texas 2018873 REHAB AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16 $17,100,000.00 $43,749,069.95
Texas 2018882 ROADWAY WIDENING TO A MODIFIED SUPER 2 ON US 285 $34,066,526.95 $42,583,158.69
Texas 2018907 RECONSTRUCT INTERSECTION ON IH 35. $23,445,433.99 $26,050,482.21
Texas 2018953 CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE ON IH 10 $27,763,717.15 $34,704,646.44
Texas 2018963 RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS ON IH 45 $200,501,389.55 $251,138,652.59
Texas 2018972 SL 1604 - EXPAND FROM 2 LANES TO 4 LANE DIVIDED $23,000,000.00 $41,186,171.87
Texas 2018973 SL 1604 - EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY $42,915,149.12 $53,680,944.44
Texas 2019045 REHABILITATE ROADWAY ON UP 281 $14,075,166.97 $25,191,978.72
Texas 2019047 REHABILITATE EXISTING ROADWAY ON US 83. $58,274,022.74 $72,871,466.30
Texas 2019048 REHABILITATION OF EXISTING HIGHWAY ON US 83. $9,000,000.00 $65,135,678.13
Texas 2019063 BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONS AT INTERSECTIONS ON US 62. $25,000,000.00 $172,354,438.05
Texas 2019106 RECONSTRUCT EXISTING 4-LANE UNDIVIDED ROADWAY TO A 4-LANE DIVIDED ROADWAY ON US 290. $31,604,453.80 $36,332,955.39
Texas 2019166 US 54 FROM LOOP 375, INTERCHANGE IMPROVEMENTS. $89,673,201.39 $112,175,417.14
Texas 2019168 WIDEDN FROM 4 TO 6 LANES ON SL 375. $95,362,990.82 $116,103,738.53
Texas 2019242 CONSTRUCT 2 LANE STRUCTURE TO COMPLETE 4 LANE. FACILITY OPERATIONAL IMPROVEMENT TO ELIMINATE BOTTLENECK ON SH 334. $37,851,101.41 $47,313,876.76
Texas 2019274 REHABILITATION AND WIDEN ROADWAY TO PROVIDE PASSSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16. $20,517,490.45 $25,646,863.06
Texas 2019312 RECONSTRUCTION ON 1H 35 TO INCLUDE WIDENING FROM 6 TO 8 LANES. $185,035,000.00 $374,225,164.70
Texas 2019409 US 54, CONVERT TO SUPER 2 HIGHWAY $19,000,000.00 $38,238,067.66
Texas 2019411 CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY ON SL 335. $41,103,841.85 $51,379,802.32
Texas 2019437 CONSTRUCT FRONTAGE ROADS ON US 59. $17,000,000.00 $38,337,252.61
Texas 2019442 CONSTRUCT NEW INTERCHANGE ON SL 250. $20,067,374.89 $27,084,218.61
Texas 2019507 RAMP REVISIONS,INTERSECTION AND FRONTAGE ROAD OPERATIONAL IMPROVEMENTS ON IH 35. $7,000,000.00 $27,154,425.57
Texas 2019599 WIDEN NON-FREEWAY FROM 2 LANE TO 4 LANE ON US 190 $36,488,767.18 $86,376,750.15
Texas 2019609 RECONSTRUCT EXISTING 4 LANE UNDIVIDED ROADWAY TO A 4 LANE DIVIDED ROADWAY ON US 290. $25,471,516.09 $31,918,362.62
Texas 2019611 US 60 TO WEST OF BOVINA. REHAB OF EXISTING ROADWAY. $11,000,000.00 $28,667,631.21
Texas 2019613 CONSTRUCT TWO NEW COLORADO RIVER 2-LANE FRONTAGE ROAD BRIDGES ON SH 21. $16,000,000.00 $44,777,398.93
Texas 2019626 FM 2100 - WIDEN TO 4-LANE DIVIDED $4,000,000.00 $48,685,047.79
Texas 2019651 WIDEN ROAD AND ADD LANES ON US 190. $23,765,020.86 $29,706,276.07
Texas 2019689 REPLACE BRIDGES AND APPROACHES ON SH 8. $26,204,446.57 $38,992,035.00
Texas 2019797 SH 242 - WIDEN FROM 2 TO 4 LANES $49,090,877.55 $73,431,751.26
Texas 2019822 HIGHWAY IMPROVEMENT ON US 385. $32,906,701.12 $41,133,376.40
Texas 2019834 WIDEN FREEWAY ON IH 35E $101,800,943.70 $128,702,705.70
Texas 2019859 INTERCHANGE IMPROVEMENT ON IH 45. $2,151,964.14 $39,810,234.26
Texas 2019900 BASE REPAIR, SEAL COAT, OVERLAY, AND PAVEMENT MARKINGS ON MAINLANES ON IH 35 AND IH 37. $24,673,647.89 $27,450,088.16
Texas 2019952 SH 242 - WIDEN FROM 2 TO 4 LANES $33,206,352.62 $41,541,414.96
Texas 2019978 CONSTRUCT INTERCHANGE ON US 287. $3,000,000.00 $30,849,400.78
Texas 2019988 FM 3005 - INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL IMPROVEMENTS, APPROX 12 INCH OVERLY AND STRIPING. $17,627,032.68 $39,141,429.85
Texas 2019990 CONSTRUCT NEW SAFETY REST AREA ON IH 10 $32,490,259.77 $36,612,824.72
Texas 2019996 CONSTRUCT BRIDGE AT RM 620. $23,128,441.18 $28,958,721.48
Texas 2020008 US 75 AT US 82 SOUTH OF CENTER STREET WIDEN ROAD. $14,000,000.00 $169,147,954.04
Texas 2020056 WIDEN ROAD - ADD LANES ON SH 36 $33,833,597.74 $51,291,997.17
Texas 2020057 WIDEN ROAD - ADD LANES ON SH 36 $64,840,000.00 $91,254,896.60
Texas 2020115 WIDEN ROAD AND ADD LANES ON IH 10 $20,000,000.00 $164,781,261.91
Texas 2020185 RECONSTRUCT INTERCHANGE AND CONSTRUCT FRONTAGE ROAD ON IH 35. $47,558,158.59 $59,510,187.06
Texas 2020303 WIDEN ROAD - ADD LANES ON FM 2218 $46,532,842.75 $58,166,053.43
Texas 2020314 OSTOS ROAD WIDEN ROAD, ADD LANES, AND SHOULDERS. $19,265,984.48 $26,303,348.60
Texas 2020432 CONSTRUCT NEW ROAD ON PELLICANO DRIVE AT JOE BATTLE BOULEVARD TO DARRINGTON AT BERRYVILLE STREET. $18,464,800.00 $26,520,124.43
Texas 2020451 BRIDGE REPLACEMENT ON US 271 $20,034,841.22 $25,043,551.51
Texas 2020455 WIDEN ROAD ADD LANES AND SHOULDERS TO IH 30. $76,946,054.15 $97,568,095.52
Texas 2020476 REPLACE BRIDGE AND REHABILITATE FRONTAGE ROADS ON IH 20. $6,000,000.00 $33,420,426.78
Texas 2020489 WIDEN FREEWAY ON SH 199. $95,997,373.38 $120,008,399.33
Texas 2020493 WIDEN FREEWAY ON SH 170. $86,961,277.60 $108,701,597.00
Texas 2020496 CONVERT NON-FREEWAY ON US 59. $30,000,000.00 $182,251,470.46
Texas 2020549 HIGHWAY IMPROVEMENT ON IH 40. $22,235,598.98 $27,831,657.31
Texas 2020571 HIGHWAY IMPROVEMENT; ROADWAY RECONSTRUCTION ON US 385. $43,945,315.66 $54,931,644.57
Texas 2020573 REHABILITATION OF EXISTING ROAD ON SH 302 $54,969,534.96 $62,962,918.69
Texas 2020649 CONSTRUCT NEW INTERCHANGE AT NORTH SL 338 AT US 385 $22,391,183.03 $28,353,088.78
Texas 2020652 HIGHWAY IMPROVEMENT ON US 67 $20,582,562.25 $25,826,006.33
Texas 2020751 REHABILITATION OF EXISTING ROAD ON FM 2119 $27,000,000.00 $66,252,295.96
Texas 2020863 CONSTRUCT BRIDGE ON IH 20 $30,674,839.02 $40,343,548.78
Texas 2020864 CONSTRUCT BRIDGE ON SH 302. $25,000,000.00 $60,650,012.18
Texas 2020871 CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 $50,681,059.16 $63,385,134.88
Texas 2020879 WIDEN NON-FREEWAY FACILITY ON FM 2818 $38,019,405.83 $48,166,546.29
Texas 2020944 ADD PASSING LANES ON US 83. $21,996,924.75 $27,552,731.94
Texas 2020950 SURFACING AND ROADWAY RESTORATION ON SH 137 $47,303,780.32 $57,214,901.80
Texas 2020966 WIDEN ROAD - ADD LANES ON IH 10. $46,028,828.08 $57,536,035.10
Texas 2021093 WIDEN ROAD - ADD LANES ON SL 121 $26,337,010.89 $33,070,636.82
Texas 2021189 REHABILITATION OF EXISTING ROAD ON FM 2004 $21,477,838.44 $31,453,621.29
Texas 2021213 BRIDGE REPLACEMENT ON SH 198. $12,000,000.00 $33,163,967.62
Texas 2021310 WIDEN ROAD - ADD LANES ON SH 72. $8,000,000.00 $50,911,818.47
Texas 2021327 WIDEN ROAD AND ADD LANES ON IH 35. $85,000,000.00 $235,087,606.29
Texas 2021339 HIGHWAY IMPROVEMENT ON US 183   $120,001,000.00
Texas 2021404 CONSTRUCT DIRECT CONNECTORS ON IH 410 $84,762,682.49 $105,987,638.80
Texas 2021440 US 59. HIGHWAY IMPROVEMENT. $57,844,043.02 $72,330,053.77
Texas 2021488 WIDEN ROAD-ADD LANES ON SL 1604 $5,000,000.00 $163,323,331.38
Texas 2021492 WIDEN ROAD - ADD LANES ON FM 1463 $48,009,780.66 $60,122,177.87
Texas 2021518 HIGHWAY IMPROVEMENT ON IH 27. $6,000,000.00 $27,358,852.92
Texas 2021536 CONSTRUCT NEW ROADWAY LANES AND INSTALL ILLUMINATION ON US 380. $122,194,673.77 $153,203,526.72
Texas 2021543 CONSTRUCT AND WIDEN ROAD ON FM 60. $8,000,000.00 $39,536,156.51
Texas 2021547 RECONSTRUCT AND WIDEN ROADWAYS ON SH 242 $19,897,876.80 $35,019,355.32
Texas 2021576 CONVERT NON-FREEWAY ON FM 1585 $7,856,000.00 $170,958,500.84
Texas 2021615 HIGHWAY IMPROVEMENT ON SL 1604 AT FM 2696 $8,125,762.13 $40,359,224.86
Texas 2021616 WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. $24,288,838.00 $226,609,058.80
Texas 2021704 WIDEN ROAD AND ADD LANES ON US 82 $43,727,125.65 $54,658,907.06
Texas 2021728 WIDEN ROAD - ADD LANES ON SH 36. $54,784,000.00 $109,072,964.81
Texas 2021745 CONSTRUCT NEW ROAD AT KENNY FORT BOULEVARD.   $28,369,555.49
Texas 2021840 RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES ON FM 2100. $35,214,056.19 $61,875,474.27
Texas 2021858 CONSTRUCT FRONTAGE ROADS ON SL 9. $17,150,518.79 $25,226,148.50
Texas 2021859 CONSTRUCT FRONTAGE ROADS  ON SL 9. $40,738,586.18 $50,948,232.73
Texas 2021864 WIDEN ROAD - ADD SHOULDERS ON US 287 $29,081,956.02 $36,459,683.01
Texas 2021943 CONSTRUCT RAMPS ON SH 6. $48,337,354.80 $60,671,693.50
Texas 2022006 WIDEN ROAD AND ADD LANES ON FM 471.   $28,047,157.35
Texas 2022009 WIDEN ROAD-ADD LANES ON IH 45. $50,000,000.00 $227,644,053.27
Texas 2022013 HIGHWAY IMPROVEMENT ON US 69. $58,983,111.83 $78,831,618.79
Texas 2022027 CONSTRUCT NEW ROADWAY LANES AND RECONSTRUCT EXISTING ROADWAY ON IH 35E $623,356,560.75 $668,302,241.00
Texas 2022053 WIDEN FREEWAY ON IH 10 $166,260,971.09 $237,039,820.10
Texas 2022076 EXPAND FROM 8 LANES TO 14 LANES ON IH 35. EXPRESSWAY-ADD 6 NEW EXPRESS LANES $65,570,351.00 $1,783,218,521.00
Texas 2022153 CONSTRUCT FRONTAGE RAODS ALONG IH 20. $15,000,000.00 $91,848,786.31
Texas 2022160 CONSTRUCT BRIDGE ON SL 360 $43,713,793.38 $68,642,241.73
Texas 2022185 WIDEN ROAD AND ADD LANES ON US 83. $22,284,686.94 $27,965,109.25
Texas 2022340 WIDEN ROAD - ADD LANES ON IH 35 $225,728,405.77 $578,235,425.65
Texas 2022356 INTERCHANGE IMPROVEMENT ON IH 20 $60,596,223.58 $78,885,163.03
Texas 2022386 CONSTRUCT PEDESTRIAN INFRASTRUCTURE- SS 366. $36,497,175.30 $50,837,003.05
Texas 2022402 CONSTRUCT DIRECT CONECTORS ON IH 10 $371,679,466.38 $465,878,473.92
Texas 2022437 WIDEN FREEWAY ON IH 35 $43,908,418.29 $443,962,164.25
Texas 2022446 BRIDGE REPLACEMENT ON SH 21 $25,053,360.94 $31,316,701.18
Texas 2022480 BRIDGE REPLACEMENT ON SH 174 $21,462,755.43 $26,828,444.29
Texas 2022496 ROADWAY WIDENING TO A SUPER 2 HIGHWAY ON SH 302 $32,788,970.36 $41,101,212.96
Texas 2022509 WIDEN ROAD ADD LANES ON SH 36. $6,480,000.00 $57,166,355.42
Texas 2022510 WIDEN ROAD - ADD LANES ON FM 723. $57,744,809.93 $77,181,012.42
Texas 2022512 WIDEN ROAD - ADD LANES ON SH 36 $34,505,471.39 $43,131,839.25
Texas 2022572 CONSTRUCT INSPECTION STATION AT ANZALDUAS INTERNATIONAL BRIDGE PORT OF ENTRY. $18,480,000.00 $56,396,274.77
Texas 2022575 CONSTRUCT BRIDGE ON SH 288. $35,900,416.00 $44,875,520.00
Texas 2022582 SAFTETY IMPROVEMENT ON SH 115 AT FM 181. $24,877,979.85 $27,642,199.85
Texas 2022583 ROADWAY REHABILITATION ON SH 18.   $32,555,038.97
Texas 2022599 ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY ON US 67. $23,400,589.18 $29,250,736.48
Texas 2022615 INTERCHANGE IMPROVEMENT ON US 75. $40,557,316.64 $50,710,215.40
Texas 2022632 BRIDGE REPLACEMENT ON SH 7 $22,917,104.57 $28,647,410.21
Texas 2022653 HIGHWAY IMPROVEMENT AND PREVENTATIVE MAINTENANCE ON SH 137.   $33,385,352.56
Texas 2022675 WIDEN FREEWAY IN VARIOUS LOCATIONS IN THE FORT WORTH DISTRICT TO INCLUDE IH 820, IH 20, US 287 $357,830,773.05 $1,637,220,287.00
Texas 2022793 RECONSTRUCT EXISTING ROADWAY AND BRIDGE REPLACEMENT ON US 80. $32,586,771.00 $121,178,586.74
Texas 2022811 WIDEN ROAD - ADD LANES ON FM 16 $16,788,271.47 $42,314,209.28
Texas 2022901 WIDEN ROADS AND ADD LANES TO SH 46.   $64,037,567.08
Texas 2022926 WIDEN ROAD - ADD LANES ON SH 105. $23,498,452.00 $390,491,813.95
Texas 2022929 CONSTRUCT BRIDGE ON SH 288.   $25,567,473.95
Texas 2023026 WIDEN ROAD AND ADD LANES AND SHOULDERS ON SH 149. $19,496,249.28 $38,354,240.89
Texas 2023121 RESURFACE ROADWAY ON US 90 $29,109,171.81 $36,386,464.77
Texas 2023166 WIDEN FREEWAY ON IH 30 $40,000,000.00 $456,845,192.87
Texas 2B20004 CONSTRUCT SUPER 2, GRADING, BASE, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKING ON US 281. $21,000,000.00 $26,322,526.80
Texas 2B20006 WIDEN ROAD AND INSTALL SIGNS ON SH 114. $25,977,982.83 $35,472,478.54
Texas 2B20010 INFRASTRUCTURE IMPROVEMENTS ON SL 375 $33,600,250.88 $42,000,313.61
Texas 2B20015 CONSTRUCT NEW ROADWAY LANES ON IH 37. $14,000,000.00 $69,791,097.00
Texas 2B20048 WIDEN ROAD AND ADD LANES ON IH 45 $78,971,131.75 $98,859,273.45
Texas 2B20200 NEW LOCATION FREEWAY AND INTERSECTION IMPROVEMENTS ON AVONDALE-HASLET ROAD, HASLET PARKWAY AND FM 156. $33,556,556.01 $49,088,603.58
Texas 2B20250 HIGWAY IMPROVEMENT ON SH 302. $9,000,000.00 $47,343,520.93
Texas 2B20255 WIDEN ROAD (ADD LANES) ON FM 2478. $23,494,713.75 $29,368,392.19
Texas 2B20260 SH 121 - CONSTRUCT NEW ROADWAY LANES. $52,019,160.00 $101,958,550.50
Texas 2B22018 INTERCHANGE IMPROVEMENT ON IH 30. CONSTRUCT NEW ROAD ON IH30. BRIDGE REPLACEMENT ON IH30 $25,278,006.81 $139,578,689.56
Texas NBIS019 STATEWIDE INVENTORY AND INSPECTION OF ON AND OFF-SYSTEM BRIDGES FOR FISCAL YEARS 2019 AND 2020 $52,800,000.00 $66,000,000.00
Texas NBIS022 FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - ON SYSTEM $25,600,000.00 $32,000,000.00
Texas NBIS023 FY 2023/FY 2024 STATEWIDE ROUTINE BRIDGE SAFETY INSPECTIONS - OFF SYSTEM $25,600,000.00 $32,000,000.00
Texas SB97001 STATEWIDE, STATE INFRASTRUCTURE BANK-ADV CAP. $99,562,057.00 $285,168,019.00
Texas X597001 US 181; FROM N. OF THE CORPUS CHRISTI SHIP CHANNEL TO S. OF THE CORPUS CHRISTI SHIP CHANNEL. CONST NEW HARBOR BR OVER SHIP CHANNEL $716,823,258.92 $845,039,286.84
Utah F003728 SR-68; Bangerter Highway through Saratoga Springs; Roadway Widening - EARMARK PROJECT - DESIGN/BUILD $8,563,700.54 $103,362,549.94
Utah F005290 SR-92, Lehi to Highland; ROADWAY WIDENING $7,912,919.60 $161,068,765.68
Utah F006557 SR-114; GENEVA RD, ROADWAY WIDENING; ROADWAY WIDENING - Demo Project; Design/Build $39,689,129.51 $73,518,478.69
Utah F010155 SR-68;  I-215 Interchange Reconstruct.; Choke Point $36,356,545.63 $39,400,000.00
Utah F010782 I-80 & SR-36 BRIDGE REPLACEMENT PROJECT;  I-80; Structure Replacement (MP 101 and 99); Rehabilitation or Replacement $32,778,260.31 $41,697,060.23
Utah F010853 US-40; Strawberry Valley Passing Lane & Pvmt Rehab; Passing Lane $31,587,618.97 $33,867,849.00
Utah F011271 I-15; SR-232 to I-84; Widen Existing Facility $52,515,922.24 $163,758,322.83
Utah F011826 SR-172; 5600 W. Railroad Crossing; Widen Existing Facility $56,439,906.21 $82,625,531.26
Utah F012228 4100 South; Bangerter Highway to 5460 West; Major Rehabilitation - Roadway $11,227,683.00 $26,118,478.41
Utah F012676 SR-68; Village Pkwy. to Grandview in Saratoga Spgs; Widen Existing Facility $21,742,256.71 $28,561,894.80
Utah F012730 US-191; North Moab to Colorado River Bridge; High Volume $13,052,200.00 $32,428,090.00
Utah F013042 SR-30; SR-23 to SR-252; Widen Existing Facility $17,963,267.61 $79,208,320.62
Utah F013049 I-80; 1300 E to 2300 E and I-215; 3300 S to 4500 S; High Volume $115,450,066.88 $142,320,573.84
Utah F013093  I-15; MP 135 to MP 142.5, Climbing Lanes; Passing Lane $15,800,530.00 $39,350,000.00
Vermont 0102016 READSBORO, VT100, BRIDGE NO. 25; SCOPING TO EVALUATE ALTERNATIVES, PENG, REPLACE BRIDGE. $3,053,797.06 $25,050,236.32
Vermont 0134013 WATERBURY, US 2, .14ME INT/VT 100 E.84M, PENG & RECONSTRUCT HIGHWAY $28,292,897.66 $31,747,928.20
Vermont 0193496 BRANDON, US7, BEGINNING AT MM 3.351 EXT. NORTH 1.149 MILES; PENG, ROWA, CONST., RECONSTRUCT EXISTING HIGHWAY. $25,993,039.45 $33,313,663.11
Vermont 0281026 NORTH HERO-GRAND ISLE, US2, BRIDGE NO. 8; PENG, CONST., REPLACE BRIDGE. $74,607,315.59 $97,087,136.28
Vermont 0283026 CABOT-DANVILLE, US 2, 3.93 MILES, PENG, ROWA, CONST., RECONSTRUCT HIGHWAY $25,367,840.85 $27,901,212.63
Vermont 0893066 MILTON, I-89, BRIDGE NO. 81 N&S; PENG, CONST., REPLACE DEFICIENT BRIDGES. $25,038,055.99 $29,461,995.00
Vermont 0911065 BRATTLEBORO, I-91, BRIDGE NOS. 8 N&S AND 9 N&S; PENG, CONST., REPLACE BRIDGES. $60,263,999.99 $66,959,999.99
Vermont 0911066 ROCKINGHAM, I-91, BRIDGE NO. 24 N&S; PENG, CONST., REHAB BRIDGES. $46,259,424.22 $52,193,887.02
Vermont 2945001 WATERBURY-STOWE, VT100, BEGINNING AT MM 0.000 IN WATERBURY EXT NORTHERLY 9.688 MILES; PENG, RESURFACING. $20,782,967.44 $27,369,635.75
Vermont 2971001 WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. $15,317,429.48 $28,306,283.85
Vermont 5000001 BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY $49,269,771.19 $72,837,104.48
Vermont A004152 BRATTLEBORO-HINSDALE, NH, BRIDGE ST.; PENG, REPLACE CONNECTICUT RIVER BRIDGE. $8,460,000.00 $26,320,258.73
Vermont WCRS023 MIDDLEBURY, VERMONT RAILWAY; PENG, ROWA, CONST., LOWER GRADE OF RAILS UNDER VT30/MERCHANTS ROW, TO 21-FT CLEARANCE. $79,837,809.34 $93,167,850.49
Virgin Islands A034002 GARVEE Project for Veterans Drive Improvements of Route 30, St Thomas, VI $23,302,095.83 $46,658,571.43
Virginia 000S321 Statewide $9,374,253.13 $36,634,890.96
Virginia 000S328 Statewide ATMS FY17-20; Sole Source $195,916.00 $29,845,582.00
Virginia 000S338 Statewide ITS maintenance   $49,085,645.00
Virginia 000S343 Statewide Transportation Operations Center for Safety Services Patrol Program  - Eastern, Central, Northern, Northwest and Southwest Regional Offices $12,902,229.00 $238,749,035.00
Virginia 000S345 Statewide - I-95 Express Lanes Extension Exit 160 to Exit 133 $40,000,000.00 $50,000,000.00
Virginia 0015024 Accomack Co, State Rte 175: Bridge over Black Narrows, Chincoteague, & Lewis Creek Channels -- Bridge Replacement (1 of 2 fed #) $54,809,537.00 $75,645,366.00
Virginia 0131067 BUCHANAN COUNTY $147,776,624.10 $178,879,832.00
Virginia 0131069 Buchanan Co; Rt 460 Connector Phase II FR: Rt. 460 Conn Phase I Approx 7 Mi to Rt 121/460 Connection; Design-Build to Rough Grade $108,817,409.00 $120,000,000.00
Virginia 0131087 Buchanan County; Route 460; Corridor Q - 460 Connector Phase II Finish Grade $22,533,255.00 $33,810,731.00
Virginia 0131088 CFX - Poplar Creek Phase B - VDOT Oversight and RW Acq. Cost $13,349,796.00 $25,099,684.00
Virginia 0131089 Buchanan County; Route 460 (Coalfield Expressway); Poplar Creek Phase B    $171,299,543.00
Virginia 0135015 City of Chesapeake: rte 13 - 0.417 Mi W - 0.356 Mi E of Gilmerton Bridge Bridge Replacement $133,825,981.00 $166,271,747.00
Virginia 0327032 Culpeper District - Design Build for CONST INTERCHANGE U.S. RTE 15/17/29 AT U.S. RTE 15/17/29 BUS $7,587,655.89 $35,884,553.41
Virginia 0642150 Richmond DIstrictwwide.- Fr: 0.99 Mi. W. Rt. 623 to 0.38 Mi. W. Rt 292 in Short Pump. - Design Build for Widen from 4 to 6 Lanes $35,403,075.59 $36,923,792.19
Virginia 0643479 Hampton City, I-64: From: Rte 143 To: Rte 199; PE for capacity improvements from Newport News to Williamsburg; also design-build $50,483,798.87 $138,003,915.26
Virginia 0643488 Chesapeake City, I-64; From I-464 to I-664/I-264; Design-Build for Southside widening - including high rise bridge. $33,120,793.00 $558,139,606.00
Virginia 0643498 Hampton Roads Districtwide capacity improvements $118,022,660.00 $261,874,144.00
Virginia 0643499 Henrico County; I-64 $26,707,242.50 $74,343,307.07
Virginia 0643511 City of Newport News-Replace Denbigh Blvd Bridge i-64 and CSX Railroad. $18,676,601.00 $29,529,369.00
Virginia 0643513 Henrico County-RTE 64 replace bridges over RTE 156. $6,917,053.70 $31,637,013.00
Virginia 0643533 City of Hampton; I-64; Hampton Roads express lanes, segment 4C - Phase 1 PE;   $429,754,878.00
Virginia 0661318 Capital Beltway HOT Lanes Project, Route 66 & 495 Access Improvement & Flyover & Pavement Rehab & Other CN $103,860,943.00 $1,792,214,461.00
Virginia 0661341 Prince William Co.- Fr: Rt1 15 To: I-66 DESIGN BUILD to reconstruct interchange at Rt 15 and I-66 $33,460,055.77 $74,588,754.52
Virginia 0661356 NORTHERN VIRGINIA $34,540,258.23 $153,145,784.64
Virginia 0811342 MONTGOMERY COUNTY $42,765,075.94 $53,886,676.00
Virginia 0812302 Roanoke County, I-81; NB auxilary lane $6,432,338.07 $40,091,778.87
Virginia 0812318 #SMART18 - I-81 SB Auxiliary Lane from Exit 143 to 141 $1,652,450.00 $47,892,990.00
Virginia 0812330 Roanoke County: I-81;Corridor Improvement Plan (CIP) ADD LANE IN EACH DIRECTION (ID #39)   $227,671,728.00
Virginia 0812992 Montgomery Co. Fr I81 SB over Rte 8 PE for Rte 81 -SBL Bridge Over Route 8 $31,045,852.00 $34,014,401.00
Virginia 0938026 Warren Co;Rte 340; Fr: .105 Mi. S.Int. 18th St. To: .115 Mi. N. Int. Rte 55;Bridge replacement & approac over South Fork Shenandoah  $46,336,492.71 $55,085,896.14
Virginia 0951335 TOWN OF EMPORIA $22,699,970.29 $27,123,793.00
Virginia 0952523 I-95 HOV/HOT Lanes - PPTA project, and VDOT oversight to manage design and construction of I-95 HOV/HOT Lanes project $36,863,337.00 $1,007,729,883.00
Virginia 0952525 Northern Virginia Region - I95 HOV/HOT Lanes; I95 HOV/HOT Lanes Debt Service $74,504,930.63 $110,089,071.24
Virginia 0952537 STAFFORD COUNTY $54,685,093.90 $232,090,029.33
Virginia 0952545 I-95 Rappahannock River Crossing - Northbound $41,201,366.00 $127,000,000.00
Virginia 2646106 I-264/Witchduck Road interchange and ramp $23,707,384.00 $126,028,464.00
Virginia 3954190 I-395 Design Build $87,093,966.00 $602,647,237.00
Virginia 4601005 Buchanan Co Rte 460 Connector Phase 1-KY State Line approx 1 mile to Rte 460 Connector Phase II=Design Build PE, RW, CN $98,959,280.00 $129,218,501.26
Virginia 5104230 DESIGN BUILD PROJECT FOR 29 SOLUTIONS PROJECTS $90,746,013.55 $185,572,992.00
Virginia 5104296 #SGR19LB - RT 20 - BRIDGE REPLACEMENT $621,978.00 $31,088,610.00
Virginia 5111235 City of Fredericksburg-I95 Southbound-Rappahannock River Crossing $83,481,071.00 $143,660,762.00
Virginia 5118209 Lynchburg - 1.6 Mi W, to: 0.6 Mi W Rte 501 - DB: extend OddFellows Rd to new intrchnge w/ Rte 29/460 & related options on Odd F.Rd $22,155,960.88 $57,124,063.54
Virginia 5127932 COMMERCE ROAD - WIDENING $4,436,705.00 $25,697,515.00
Virginia 5128326 Botetourt County – Fr South of Int. Rte 43 To Int. Rte 727; PE, RW, CN for Route 220 Reconstruction and Safety – Ph. 1, 2, & 3 $78,025,833.03 $80,450,448.00
Virginia 5138172 Frederick County - Route 277 - Widen to 5 lanes $9,281,307.67 $57,997,116.87
Virginia 5150184 Montgomery Co; Rte 460; Fr: .156 Mi. W. Int. Southgate Dr To: .799 Mi. E. Int. Southgate Dr.; CN: Interchange & Connector $31,291,811.20 $44,596,240.00
Virginia 5401571 NORTHERN VA DISTRICTWIDE: FR: ROUTE 28 TO: POLAND ROAD - CN for 6-LANE WIDENING- DESIGN BUILD $38,228,546.00 $94,912,504.00
Virginia 5403989 City of Norfolk: Rte 337- Fr. 0.005 KM N Rogers Ave - 0.011 KM S "B" Ave Reconstruction $27,543,727.00 $66,639,279.00
Virginia 5A01165 Loudoun Co. - From Old Ox Road, Rt. 621 to Rt. 267, All phases Rte 606,, Dulles Loop. Design Build $23,263,136.00 $118,470,918.00
Virginia 5A01181 Fredericksburg Dist.; D-B job on Fall Hill Ave., 0.12 mi W of Gordon Shel. Blvd. to Int. of Mary W.Blvd. & Rte.1, incl. I-95 BR $17,964,198.92 $52,841,781.78
Virginia 5A01509 Prince William County - Fr 0.198 S. of Infrantry Ln To Linton Hall Rd; CN for Rt 28 - Widen to Four Lanes & Rt 215 Realignment $23,466,455.00 $30,393,040.00
Virginia 5A01553 Loudun Co; CN For Rte 7; Fr:0.7 Mi. W. Of Rte 659 To:0.8 Mi. E. of Rte 659 $16,248,900.82 $62,737,749.00
Virginia 5A01569 Arlington Co;Rte 27;Fr: 0.50 Mi. N. of Columbia Pike To: 0.60 Mi. to the intersection w. Rte 12-Memorial Dr.;CN: Major bridge reh $13,477,884.14 $29,024,382.50
Virginia 5A01583 Loudoun Co; Rte 659; Fr: Hay Rd To: Gloucester Parkway; CN : Reconstruct to 4 lanes: Design Buildi $1,831,436.00 $51,449,852.72
Virginia 5A01644 Prince William County $47,534,343.00 $59,490,380.00
Virginia 5A01704 Town of Leesburg; Route 7 Interchange at Battlefield Parkway $11,335,520.00 $77,288,540.00
Virginia 5A01717 Fairfax County, Rte 8102 $8,647,569.00 $51,281,516.00
Virginia 5A01745 HB2 FY17 RTE 7 CORRIDOR IMPROVEMENTS - PHASE 1 and PHASE 2 $58,300,035.95 $224,560,741.67
Virginia 5A01790 Fairfax County - FY17 Route 7 Corridor Improvements - Phase 2 $61,453,399.67 $132,323,861.68
Virginia 5A01907 Potomac Town Center Garage $17,127,010.00 $66,332,355.90
Virginia 5A01917 Route 29 Widening - Phase II $2,208,446.00 $179,315,134.00
Virginia 5A01992 SPRINGFIELD CBC COMMUTER PARKING GARAGE $40,132,000.00 $54,140,000.00
Virginia 5A03632 CITY OF VIRGINIA BEACH-FROM E STRAFORD RD TO VISTA CIRCLE. CN FOR LESNER BRIDGE REPLACEMENT PROJECT. $8,688,303.00 $95,885,692.00
Virginia 5A03662 CITY OF VIRGINIA BEACH-FROM 0.207 MI NORTH OF DAM NECK RD TO 0.152 MI SOUTH OF NIMMO PWY. CN FOR HOLLAND RD-UPGRADE TO 4 LANES.   $30,722,001.00
Virginia 5A03755 City of Norfolk; Military Highway; Design Build $47,140,247.57 $105,193,209.68
Virginia 5A03761 City of Suffolk Rte 58; From Rte 58/13/32 bypass to .7 Mi West of Manning Bridge Rd: RW for Holland Rd Corridor Improvements. $1,202,164.52 $132,927,677.26
Virginia 5A03794 CITY OF VIRGINIA BEACH  $700,008.00 $26,927,288.00
Virginia 5A03857 City of Newport News - #HB2 Atkinson Boulevard - 4 lanes $37,095,844.00 $60,537,493.00
Virginia 5A03950 #SMART18 - Laskin Road Phase 1-A $27,754,965.00 $49,616,391.00
Virginia 5A03956 #HB2.FY17 RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY $12,515,031.00 $43,711,511.00
Virginia 5A03972 #SMART18 - SKIFFES CREEK CONNECTOR $29,481,144.00 $36,851,433.00
Virginia 5A03992 I-64 HRBT Expansion Project - Design-Build Contract $164,913,763.99 $3,935,409,912.00
Virginia 5A27328 Chesterfield Co, FR: 1.73 Miles W TO: 0.27 MIles E of Rte 618 (Old Bermuda Hundred Road), Rte 10 Major Widening $25,892,882.32 $69,631,465.57
Virginia 5B01078 Widen Route 28 from 4 to 6 Lanes Divided $28,159,471.35 $73,982,000.00
Virginia 5B01104 NORTHSTAR BLVD EXTENSION SHREVEPORT DR TO ROUTE 50 $25,000,000.00 $89,996,999.40
Virginia 5B01135 #HB2.FY17 WIDEN ROUTE 1 TO SIX LANES $9,004,516.64 $39,492,681.00
Virginia 9611099 City of Bristol; Various Locations I-81 $13,199,225.76 $38,971,863.16
Virginia 9655057 Hampton Rds PPTA: Midtown tunnel corridor & Martin Luther King Freeway Extension - PPTA Project development & management and ROW $44,734,791.00 $86,770,331.00
Virginia 9655077 Hampton Rds Districtwide - Rte 58 - Downtown & Midtown Tunnels; extension of MLK to I-264 - PE for DT/MT/MLK Primary Debt Service $372,243,663.38 $564,265,078.23
Virginia 9655079 Hampton Rds PPTA: Interstate/Primary Design/ROW/Upgrade and Construction of Downtown & Midtown Tunnels; extension of MLK to I-264   $2,139,358,000.00
Virginia 9655086 I-64 Districtwide;From:1.05 Mi West of Rte 199 to 0.54 Miles East of Rte 238;PE for I-64 Capacity Improvements (HRTAC Project)   $189,707,675.00
Virginia PM00216 Statewide: Contract for Pavement data collection -- condition of roadway - Multi-year contract $26,265,838.00 $40,499,999.00
Virginia PM01337 Bristol Districtwide Paving  $10,530,759.13 $57,192,918.50
Virginia PM01339 Bristol Districtwide Paving  $5,122,946.00 $98,000,000.00
Virginia PM01348 Bristol Districtwide Paving $4,495,958.00 $95,000,000.00
Virginia PM02458 Salem Districtwide Paving; Interstate and Secondary $41,720,746.00 $52,220,829.00
Virginia PM02459 Salem Districtwide Paving; Primary $47,683,100.00 $49,460,600.52
Virginia PM02461 Salem Districtwide Paving - Plant mix $7,285,670.92 $98,000,000.00
Virginia PM02477 Salem Districtwide Paving $1,602,122.00 $95,000,000.00
Virginia PM03369 Lynchburg Districtwide Paving $59,743,478.30 $90,000,000.00
Virginia PM03371 Lynchburg Districtwide Paving $2,576,347.00 $56,000,000.00
Virginia PM03380 Lynchburg Districtwide Paving   $60,000,000.00
Virginia PM04473 Richmond Districtwide Paving; Interstate and Secondary $36,363,339.00 $47,304,117.16
Virginia PM04474 Richmond Districtwide Paving; Primary $62,980,300.00 $90,148,885.85
Virginia PM04498 Richmond Districtwide Paving: Interstate and Primary $5,222,957.00 $84,000,000.00
Virginia PM04499 Richmond Districtwide Paving: Secondary   $40,000,000.00
Virginia PM04516 Richmond Districtwide Paving $1,925,540.00 $95,000,000.00
Virginia PM05443 Hampton Roads Districtwide Paving $426,660.00 $90,000,000.00
Virginia PM05462 Hampton Roads Districtwide Paving $1,339,223.15 $98,000,000.00
Virginia PM05521 Hampton Roads Districtwide Paving $2,116,283.00 $90,000,000.00
Virginia PM06398 Fredericksburg Districtwide Paving $6,451,529.73 $39,880,371.73
Virginia PM06399 Fredericksburg Districtwide Paving $5,554,397.00 $98,000,000.00
Virginia PM06403 Fredericksburg Districtwide Paving   $90,000,000.00
Virginia PM07314 Culpeper Districtwide Paving $45,275,193.00 $47,711,814.12
Virginia PM07318 Culpeper Districtwide Paving   $70,000,000.00
Virginia PM07325 Culpeper Districtwide Paving   $60,000,000.00
Virginia PM08451 Staunton Districtwide Paving $72,955,400.00 $90,000,000.00
Virginia PM08452 Staunton Districtwide Paving $5,123,765.91 $90,000,000.00
Virginia PM08465 Staunton Districtwide Paving $2,400,000.00 $95,000,000.00
Virginia PM09356 Northern Virginia Districtwide Paving; Interstate and Primary; NHS Routes $23,629,711.00 $52,604,908.17
Virginia PM09357 Northern Virginia Districtwide Paving; Secondary   $90,000,000.00
Virginia PM09360 Northern Virginia Districtwide Paving: Interstate and Primary $7,205,564.00 $85,000,000.00
Virginia PM09361 Northern Virginia Districtwide Paving: Secondary   $90,000,000.00
Virginia PM09369 Northern Virginia Districtwide Paving   $90,000,000.00
Virginia PM09370 Northern Virginia Districtwide Paving   $90,000,000.00
Virginia TS00252 Statewide- Multiple Districts- Various Locations- Project to support Statewide TOCs, SSP, and ITS $268,734,142.33 $286,253,236.00
Virginia TS00263 Statewide;Multiple Districts; Statewide TOC, SSP, & ITS Devices Contract-Statewide Task Order   $67,392,068.00
Virginia TS05271 CITY OF HAMPTON-FROM HRBT SOUTH SHORE NORFOLK TO HRBT NORTH SHORE-HAMPTON. CN FOR HRBT SWITCHGEAR INSTALLATION. $15,739,002.00 $26,633,756.00
Virginia TS05293 Tunnels and Movable Bridge Staff Augmentation $8,120,900.00 $87,500,000.00
Virginia TS05305 CONTROL ROOM & FIELD OPS FOR MONITOR MERRIMAC BRIDGE TUNNEL   $35,816,875.00
Virginia TS05306 CONTROL ROOM & FIELD OPS FOR HAMPTON RDS BRIDGE TUNNEL   $55,083,125.00
Washington 0003129 SR 3/Chico Creek - Remove Fish Barrier $2,244,794.06 $56,437,659.50
Washington 0053971 I-5 / SB S 320TH ST TO DUWAMISH RIVER BRIDGE - CONCRETE PAVEMENT REHAB $26,656,342.07 $27,033,214.07
Washington 0053974 I-5/ NB MARTIN LUTHER KING JR WY TO NE RAVENNA BR - PAVEMENT REPAIR AND MORE $37,281,734.83 $53,938,167.83
Washington 0053977 I-5/S Bailey St Ramp to I-90 W-S Ramp - Deck Overlay & Expansion Joints $25,023,469.16 $25,625,787.74
Washington 0053981 I-5/SB Denny Way to NE 117th St - Pavement, Deck & Expansion Joint $196,840,913.00 $285,894,951.80
Washington 0099097 SR99 / ALASKAN WAY VIADUCT (HOLGATE ST. TO S. KING ST.- VIADUCT REPLACEMENT) STAGE 2  (AWV) $165,412,375.91 $269,605,331.00
Washington 0099111  SR99 / ALASKAN WAY TUNNEL ALTERNATIVE -TUNNEL DESIGN/BUILD (S. KING ST VIC TO ROY ST VIC) (AWV) $467,065,190.10 $1,604,833,271.76
Washington 0099122 SR 99/TUNNEL ALTERNATIVE, NORTH ACCESS CONNECTION SR 99 MP 32.55 TO MP 34.12 $5,948,153.00 $69,430,438.01
Washington 0099137 SR 99/Aurora Ave - George Washington Memorial Br 99/560 (Stage 2) $22,498,333.13 $35,892,280.92
Washington 0101307 SR101 / SHORE ROAD TO KITCHEN-DICK ROAD - WIDENING $47,779,159.00 $54,233,065.00
Washington 0101361 US 101/SIEBERT CREEK - REMOVE FISH BARRIER $33,254,966.28 $33,871,875.89
Washington 0101378 US 101/Elwha River Bridge - Bridge Replacement $36,845,128.24 $38,157,573.63
Washington 0104025 HOOD CANAL BRIDGE RETROFIT AND REPLACEMENT EAST $310,956,527.17 $435,435,346.17
Washington 0104033 HOOD CANAL BRIDGE RETROFIT AND REPLACEMENT EAST DEBT SERVICE PAYMENT $71,447,045.75 $101,273,802.00
Washington 0167055 SR 167/SR 410 to SR 18 - Congestion Management $19,539,831.39 $33,807,279.97
Washington 0167057 SR 167/I-5 to SR 509 - Corridor Construction $14,679,770.00 $476,196,441.82
Washington 0290025 SR 290 / Spokane River E Trent Br- Replace Bridge $7,678,661.58 $25,778,677.77
Washington 0302013 SR 302(SPUR)/SR 302 to N of 154th St NW - Paving $22,742,395.70 $34,730,487.49
Washington 0509034 SR 509/I-5 & SR 516 I/C to 28th/24th Ave S - Widening and Toll Lanes $82,164,340.00 $347,278,086.46
Washington 0520047 SR 520 / I-5 TO MEDINA - STGE 1 EVERGREEN POINT FLOATING BRIDGE AND LANDINGS $139,007,369.80 $824,557,570.80
Washington 0520053 SR 520/WEST APPROACH BRIDGE NORTH (WABN) $53,146,501.19 $258,739,830.23
Washington 0524011 196th Street SW (SR 524) $8,990,000.00 $34,977,965.00
Washington 0701063 Index Galena Rd MP 6.4 to MP 6.9    $21,571,681.00 $27,622,618.00
Washington 0901490 I-90 / 468TH AVE SE TO W SUMMIT RD EB - REHAB CONCRETE $34,384,270.69 $51,387,993.89
Washington 0901496 I-90/468th Ave SE to W Summit Rd WB - Rehab Concrete $28,278,170.55 $28,907,437.11
Washington 1402003 SR 530/SKAGLUND HILL VIC TO C-POST VIC - ER ROADWAY RECONSTRUCTION $27,836,112.28 $27,967,980.76
Washington 1499002 East Marginal Way Heavy Haul Corridor $2,900,000.00 $63,325,890.00
Washington 1613005 Fairview Ave. Bridge Replacement $10,000,000.00 $34,016,606.00
Washington 1615005 Rainier Ave S Corridor Improvements - Phase 4 $19,074,850.00 $30,143,356.00
Washington 2012028 WSF SYSTEMWIDE VESSEL PRESERVATION & IMPROVEMENTS (MAP-21) $28,259,161.02 $28,259,161.02
Washington 2015086 SR 305 / BAINBRIDGE ISLAND FERRY TERMINAL - PEDESTRIAN LOADING BRIDGE REPLACEMENT $9,010,000.00 $25,805,493.00
Washington 2016024 WSF SYSTEMWIDE VESSEL PRESERVATION & IMPROVEMENTS (FFY 2016) $42,400,241.48 $43,309,210.48
Washington 2411003 West Sammamish River Bridge $13,063,994.00 $40,386,560.00
Washington 3440001 Duportail Street Bridge $2,695,821.77 $39,906,386.77
Washington 4123005 Barker Rd/BNSF Grade Separation $15,740,070.00 $26,913,000.00
Washington 9917036 West Seattle Corridor Bridges $37,650,600.00 $67,048,691.00
Washington 9927056 Port of Tacoma Interchange - Phase 1 $14,726,500.00 $38,792,740.00
Washington 9932062 Geiger Boulevard Infrastructure Improvements $14,300,000.00 $41,567,271.00
Washington F045001 West Cashmere Bridge Replacement $18,350,000.00 $26,389,954.00
West Virginia 0002578 WHEELING STREETSCAPE $7,600,000.00 $36,047,000.00
West Virginia 0002608 WV 2 PROCTOR-KENT  $9,400,000.00 $108,367,000.00
West Virginia 0002628 PARKERSBURG-ST. MARYS RD  $3,206,072.91 $32,060,729.17
West Virginia 0010226 LOGAN, WV 10, 0.70 MI S CO 14-1.36 MI N I/S RELOC WV 10., GR, DR $ RET WALLS. $34,722,843.20 $43,403,554.00
West Virginia 0035202 PUTNAM, US 35, WV 869-0.52 MILES SOUTH CO 40, UPGR 4 LN. $173,743,322.67 $217,179,153.34
West Virginia 0051050 INWOOD PHASE 2 $854,855.62 $25,712,020.00
West Virginia 0052361 MTN VIEW TO GILBERT $5,475,358.70 $54,753,587.02
West Virginia 0064406 CULLODEN INTERCHANGE  $3,655,098.00 $36,550,980.00
West Virginia 0119447 ROCK CK I/C $28,555,525.16 $28,555,525.16
West Virginia 0121016 WYOMING, WV 121, MULLENS CON - .15 MILES EAST CO 12/1, WV 54 - WV 121 @ MP 14.65, GR DR. $48,632,500.00 $51,132,500.00
West Virginia 0121132 WELCH - WV 16 I/C $15,875,027.41 $158,750,274.17
West Virginia 0223010 WELLSBURG BR $97,718,689.60 $161,338,397.00
West Virginia 0484241 DAVIS, TUCKER, US 48, 0.7 MI E WV 32-6.2 MI W WV 32, CONST 4 LN. $53,778,381.00 $67,781,521.00
West Virginia 0484246 TUCKER US 48, GRANT WV 1, 6.2 MI W WV 42 - WV 93 CONN, CONST 4 LN. $74,979,127.00 $94,474,291.00
West Virginia 0484316 KERENS -  US 219 CONNECTOR $248,183,921.17 $248,183,921.17
West Virginia 0484326 US 219 CONNECTOR -WV 72 $20,000,000.00 $33,866,661.77
West Virginia 0484329 CHEAT RIVER BRIDGE  $117,081,291.50 $167,081,291.50
West Virginia 0484331 US 219 CONN-WV 72 I/C $101,553,548.00 $191,553,548.00
West Virginia 0484334 WV 72 I/C - PARSONS $60,000,000.00 $63,345,270.82
West Virginia 0522045 BERKELEY SPRINGS BYPASS $20,000,000.00 $67,599,646.20
West Virginia 0522047 NORTHERN CONN +1(FAIRVIE CONNECTOR) $16,209,272.95 $57,500,000.00
West Virginia 0601010 JEFFERSON ROAD  $43,277,839.91 $53,174,429.70
West Virginia 0641399 US 35/I-64 I/C - NITRO I/C $50,406,735.01 $244,683,660.00
West Virginia 0641400 MERRITTS CREEK- BARBOUSVILLE  $62,513,680.00 $78,142,100.00
West Virginia 0642164 CARTER BR-BROOKS ST I/C  $37,661,934.98 $37,661,934.98
West Virginia 0793240 MORGANTOWN, MONONGALIA, I-79, 0.7 MILES NORTH US 19 - 0.4 MILES SOUTH CR 19/24, CONST NEW I/C. $25,271,282.71 $28,079,203.00
West Virginia 0793305 S. FAIRMONT-PLEASANT VALLEY $72,551,016.28 $72,551,016.28
West Virginia 0793309 I-79 BRIDGE REHAB $66,961,042.80 $72,178,936.44
West Virginia 0793313 I-79 BRIDGE REPLACEMENTS $35,995,027.51 $39,994,475.00
West Virginia 0811124 I-81 BR/POTOMAC RI & WIDENING TO US 11 $34,197,340.80 $42,746,676.00
West Virginia 0H22001 Statewide, Enhancement Program. $32,822,975.47 $32,985,615.47
West Virginia 0Q22001 STATEWIDE, ENHANCEMENT PROGRAM $26,861,203.53 $32,815,209.04
West Virginia 2117061 GARVEE 17 BOND PAYMENTS $175,666,054.00 $295,674,809.00
West Virginia 2217048 TOM WILLIAMS FAMILY+3( WESTMORELAND OP, CORA ST OP, DANNER RD OP) $16,093,081.65 $26,821,361.00
Wisconsin 2014260 MOUNT HOREB -  MADISON VERONA ROAD TO SEMINOLE HIGHWAY CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING $31,622,274.18 $62,852,387.02
Wisconsin 2014302 USH 10 - USH 10/STH 441 COUNTY CB - ONEIDA STREET LLBDM BRIDGE B-70-403 LET - CONTRACT VIA BID LETTING $34,452,016.39 $43,933,110.70
Wisconsin 2015473 ZOO IC, ZOO INTERCHANGE PHASE 2 LINCOLN-BLUEMOUND, 121ST TO 70TH CONST/RECONSTRUCTION, EXPANSION LET - CONTRACT VIA BID LETTING $83,999,093.48 $337,692,497.52
Wisconsin 2016337 ILLINOIS STATE LINE - MADISON S.DANE CTY LINE TO E.CHURCH RD,NB CONST OPS/RECSTE PVMNT/STRCT/INTRCH LET - CONTRACT VIA BID LETTING $24,228,503.66 $32,383,971.22
Wisconsin 2017186 HUDSON - BALDWIN STH 35 NORTH TO USH 12 CONSTRUCTION/RECONSTRUCTION LET - CONTRACT VIA BID LETTING $24,411,513.93 $30,513,724.34
Wisconsin 2017327 ILLINOIS STATE LINE - MADISON CTH O TO USH 14 INTERCHANGE NORTH CONST OPS/RECSTE PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING $30,054,242.00 $40,845,407.45
Wisconsin 2017338 MOUNT HOREB - MADISON CTH PD TO RAYMOND RD/STG 2/PHASE 2 CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING $5,895,183.38 $29,475,916.74
Wisconsin 2017398 ILLINOIS STATE LINE - MADISON HART ROAD TO WOODMAN ROAD CONST OPS/RECSTE PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING $26,526,297.26 $33,517,728.01
Wisconsin 2017452 108TH STREET (HALES CORNERS) COLLEGE AVE - LAYTON AVE CONST/RECONSTRUCTION LET - CONTRACT VIA BID LETTING $13,567,034.36 $27,313,283.05
Wisconsin 2017512 WAUKESHA BYPASS GENESEE RD TO FIDDLERS CREEK DR CONST/RECONSTRUCT, PAVING LET - CONTRACT VIA BID LETTING $38,165,539.88 $47,947,775.04
Wisconsin 2017518 HUDSON - MENOMONIE 250TH STR TO WILSON CREEK (EB & WB) CONSTRUCTION/PVRPLA/8 BRIDGES LET - CONTRACT VIA BID LETTING $29,824,445.73 $33,138,273.02
Wisconsin 2018157 USH 10 - USH 10/STH 441 COUNTY CB - ONEIDA STREET STH 441 SB MAINLINE MIDWAY RD-EPL LET - CONTRACT VIA BID LETTING $32,688,775.23 $40,863,679.91
Wisconsin 2018329 N-S FREEWAY, STH 20 TO CTH K MAINLINE (SOUTH) RECONST/RECONSTRUCT LET - CONTRACT VIA BID LETTING $19,362,784.36 $29,595,867.31
Wisconsin 2018330 N-S FREEWAY, CTH E INTERCHANGE MAINLINE & RAMPS CONST/RECONST LET - CONTRACT VIA BID LETTING $18,725,000.00 $25,914,629.38
Wisconsin 2018333 N-S FREEWAY, STH 11 INTERCHANGE MAINLINE & RAMPS CONST/RECNST LET - CONTRACT VIA BID LETTING $38,129,418.37 $47,682,121.08
Wisconsin 2018383 N-S FREEWAY, 7 MILE RD INTERCHANGE MAINLINE & RAMPS CONSTR/RECONSTRUCT LET - CONTRACT VIA BID LETTING $20,870,109.02 $26,087,636.27
Wisconsin 2018433 ILLINOIS STATE LINE - MADISON EAST CHURCH RD TO CHURCH ST-SB CONST OPS/RECSTE/PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING $6,270,052.86 $25,211,345.81
Wisconsin 2018438 MOUNT HOREB - MADISON CTH PD TO RAYMOND RD/STG 2/PHASE 3 CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING $7,364,087.60 $36,155,756.91
Wisconsin 2019001 ILLINOIS STATE LINE - MADISON USH 14 INT NORTH TO KENNEDY ROAD CONST OPS/RECSTE/PVMNT/STRCT/INTRCH LET - CONTRACT VIA BID LETTING $90,651,982.70 $121,823,470.11
Wisconsin 2019015 HUDSON - MENOMONIE STH 128 TO 250TH STREET (EB & WB) CONSTR/PAVEMENT REPLACEMNT/6 BRIDGS LET - CONTRACT VIA BID LETTING $56,828,077.37 $63,142,308.18
Wisconsin 2019200 ILLINOIS STATE LINE - MADISON KENNEDY ROAD TO KNUTSON ROAD CONST OPS/RECSTE PAVEMENT/STRUCTURE LET - CONTRACT VIA BID LETTING $33,983,893.77 $68,613,892.49
Wisconsin 2019496 ILLINOIS STATE LINE - MADISON IH 43 INTERCHANGE CORE CONST OPS/INTERCHANGE IMPROVEMENTS LET - CONTRACT VIA BID LETTING $84,176,008.63 $121,158,399.58
Wisconsin 2019498 ILLINOIS STATE LINE - MADISON CTH AB TO USH 12/18 INTCHG - RECSTE CONST OPS/RECSTE LET - CONTRACT VIA BID LETTING $18,096,908.26 $26,007,782.80
Wisconsin 2019634 SHAWANO - GREEN BAY CTH VV INTERCHANGE DSGN/ BUILT GRANT FUNDING C/E - CONSULTANT DELIVERY (PRELIM OR CONST ENGINEERING) $19,757,899.00 $29,238,789.00
Wisconsin 2019801 IH 43 ROCK FREEWAY ROCK COUNTY LINE TO USH 12 CONST/DIAMOND GRIND-BRRHB LET - CONTRACT VIA BID LETTING $23,547,689.35 $29,434,611.67
Wisconsin 2020384 RACINE STREET BRIDGE, C OF MENASHA FOX RIVER BRIDGE AND APPROACHES CONST/BRIDGE REPLACE 84.10 BRIDGE LET - CONTRACT VIA BID LETTING $23,362,374.00 $36,329,456.09
Wisconsin 2020466 ZOO IC, USH 45 SWAN BLVD TO BURLEIGH STREET CONST/RECONSTRUCT W/ ADDL LANES LET - CONTRACT VIA BID LETTING $81,824,589.01 $177,684,354.56
Wisconsin 2021019 MADISON - CAMBRIDGE WHITNEY WAY TO IH 39/90 CONST/RESURFACE BOTH ROADWAYS LET - CONTRACT VIA BID LETTING $34,000,000.00 $48,270,820.41
Wisconsin 2021031 75TH ST, C KENOSHA/V PLEASANT PRAIR IH 94 TO 74TH AVE CONST / RECONSTRUCT WITH EXPANSION LET - CONTRACT VIA BID LETTING $51,960,325.62 $66,889,353.23
Wisconsin 2021032 75TH ST, C KENOSHA/V PLEASANT PRAIR 74TH AVE TO 43RD AVE CONST / RECONSTRUCT WITH EXPANSION LET - CONTRACT VIA BID LETTING $26,472,154.66 $33,466,494.26
Wisconsin 2021226 IH 43 NORTH SOUTH FREEWAY CAPITOL DR-2100 FT N OF HAMPTON AVE CONST / BRIDGE REPLACEMENT LET - CONTRACT VIA BID LETTING $53,223,447.13 $66,529,308.91
Wisconsin 2021227 FOND DU LAC - PLYMOUTH USH 151-SEVEN HILLS ROAD CONST/GRADE/BASE/PAVE    R/W-YES LET - CONTRACT VIA BID LETTING $22,000,000.00 $38,158,450.77
Wisconsin 2021264 STH 76-NEW LONDON WI CENTRAL RR-CTH JJ CONST/RECSTE NEW BYPASS LET - CONTRACT VIA BID LETTING $21,758,836.14 $27,198,545.15
Wisconsin 2022007 I-43 NORTH SOUTH FREEWAY HIGHLAND ROAD TO STH 60 CONST/RECONSTRUCTION W/EXPANSION LET - CONTRACT VIA BID LETTING $79,735,105.87 $118,677,604.36
Wisconsin 2022106 I-43 NORTH SOUTH FREEWAY W COUNTY LINE RD INTERCHANGE CONST/RECONSTRUCT W/EXPANSION LET - CONTRACT VIA BID LETTING $39,016,349.65 $56,476,689.09
Wisconsin 2022372 HUDSON - BALDWIN IH 94 SWEF 61 HUDSON CONSTRUCTION/SWEF LET - CONTRACT VIA BID LETTING $18,600,000.00 $25,274,819.23
Wisconsin 2022535 STH 23 - LONE ROCK WISCONSIN RIVER/B-25-192,B-52-279 DES/BLD FINAL DES/CONST/RDWY/BRRPL LET - CONTRACT VIA BID LETTING   $40,137,137.00
Wisconsin 2023002 I-43 NORTH SOUTH FREEWAY UNION PACIFIC RR BRIDGE B-40-921 CONST/PHASE 3 RECST W/ EXPANSION LET - CONTRACT VIA BID LETTING   $25,610,167.65
Wisconsin 2023003 I-43 NORTH SOUTH FREEWAY BENDER ROAD TO BROWN DEER ROAD CONST/RECONSTRUCTION W/ EXPANSION LET - CONTRACT VIA BID LETTING   $150,266,934.09
Wisconsin 2023004 MOUNT HOREB - MADISON TOWN HALL ROAD TO CTH PD CONST/RESURF EB-WB RDWYS/RSRF30 LET - CONTRACT VIA BID LETTING $21,234,510.74 $27,781,346.70
Wyoming 0261020 LARAMIE STREETS - CLARK/LEWIS STREETS VIADUCTS. $34,364,144.00 $37,975,628.00
Wyoming 0901091 NORTH SHERIDAN INTERCHANGE-I-90, GRADING, DRAINING, MILLING, PLANT MIX, REMOVAL AND REPLACEMENT OF STRUCTURES $46,826,021.00 $50,496,833.00
Wyoming 2000058 PE WY 22, JACKSON - WILSON TETON COUNTY $3,996,157.00 $33,962,286.00
Wyoming HPP0418 US 212 / BEARTOOTH HIGHWAY $25,903,000.00 $26,936,679.00
Wyoming I254160 CASPER MARGINAL $31,662,851.37 $43,209,167.19
Wyoming I254168 CASPER-KAYCEE / MIDWEST SECTION / I-25 $12,675,000.00 $28,803,596.00
Wyoming I802204 ROCK SPRINGS - RAWLINS / ROCK SPRINGS EAST $25,413,431.15 $27,396,971.24
Wyoming I802208 ROCK SPRINGS - RAWLINS / ROCK SPRINGS EAST $23,330,226.15 $25,171,150.49
Wyoming I802209 LYMAN-GREEN RIVER / LITTLE AMERICA / I-80 $12,300,000.00 $27,270,485.00
Wyoming I804271 I-80 WINTER FREIGHT IMPROVEMENT PROJECT $27,750,285.00 $34,709,551.00
Wyoming I904143 SUNDANCE MARGINAL / I-90 $8,167,461.00 $35,039,419.00
Wyoming N103103 THAYNE - ALPINE JCT. / ETNA NORTH. **WIDEN TO 5 LANES** $33,823,009.00 $37,377,622.00
Wyoming N104066 HOBACK JUNCTION - JACKSON ROAD / SNAKE RIVER SECTION **RECONSTRUCTION / TURNOUT** $77,840,321.77 $84,901,890.03
Wyoming N104083 HOBACK JUNCTION - JACKSON / SNAKE RIVER SECTION 2. $36,407,124.58 $39,632,184.02