Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Structures

<< PreviousContentsNext >>

2007 ABC Workshop Follow up

APPENDIX E - Brainstorm Ideas: Seismic Connection Detailing Focus

CATEGORY/NO. RAW VOTE TALLY CATEGORY BREAKOUT GROUP ASSIGNMENT
B1 1 --- ---
B2 6 A 1
B31 2 D 1
B4 2 D 3
B5 2 D 2
B6 5 B 3
C1 8 A 2
C2 0 --- ---
C3 5 B 4
C4 4 C 2
C5 2 D 4
C6 5 B 1
C7 0 --- ---
C8 4 C 1
C9 0 --- ---
C10 2 D 1
D2 5 B 2
E13 2 D 2
F1/F2² 15 A 3
F3 5 B 3
F6 2 D 3
G1 5 B 4
G2 3 C 4
H3 1 --- ---
H6 6 A 4
  • ¹ No action; pending publication of PCI seismic report.
  • ² Received the most votes, thereby rising to the top of the list.