Current Practices In FRP Composites Technology FRP Bridge Decks And Superstructures
NYSDOT Profile Sheet: Route 367 over Bentley Creek
Project Photos (97 kb)
Identification:
- Location: 1/2 north of PA state line, Village of Wellsburg, Chemung County, NY
- Feature Carried: NY State Route 367; Feature Crossed: Bentley Creek
- Bridge Identification Number 6/5 1046800
Stakeholders:
- Owner: New York State Department of Transportation
- Constructor: NYS Region 6 Bridge Maintenance and Maintenance Residency 6-2
- Deck Manufacturer: Hardcore Composites, New Castle, DE
- Engineer-of Record: Wagh Engineers, PC, New York, NY
Construction:
- Project Type: Deck replacement with related bridge rehabilitation & painting
- Removal of concrete deck May 1998. Steel repairs July 1998. Steel grate deck installed Nov.1998
- Painting by contract: July, August 1999
- Removal of steel grate deck: September 7, 1999
- Opened to traffic with FRP deck: October 4, 1999
Site Data:
- Highway Type: Rural major collector
- Traffic Volume: 3248 vehicles per day, 7% trucks
- Land use: Suburban
Structure Data:
- Structure Type: single span Warren truss on concrete abutments
- Bridge Length: 140' Width curb to curb: 24' Skew: 27 degrees
- Deck Type: 32 psf - 14" deep fiber reinforced polymer (FRP) slab supported on floorbeams at 14' c.c.
- Materials: E-glass reinforced vinyl ester composite with "cell core" SCRIMP technology
- Bridge Railing: Double box beam mounted on trusses
- Drainage: Two scuppers with removable grates cast in deck, FRP curb
- Bridge Joints: Pourable silicone sealant
- Wearing Surface: 3/8" epoxy/basalt polymer concrete
Deck Design Criteria:
- Live Load: HS25
- Deflection Limit: L/800
- Analysis Method: Finite Element Model
Performance:
- Truss Load Ratings: Operating level before = H30 (30 tons); after = H85 (85 tons)
- Deck Ratings: Inventory HS85 (154 Tons); Operating HS 115 (207 Tons)
- Load Testing: The structure proved to be stiffer and under less strain than predicted.
- Testing: NYSDOT Engineering Research and Development Bureau, University of Buffalo
- Total Project Cost: $876,000, FRP deck design & fabrication: $429,000 ($121/sf)
Project Leader:
|
More Information
Contact
Lou Triandafilou
Resource Center (Baltimore) 410-962-3648 E-mail Lou
|
| |