Drilled Shaft Concrete Placement Log

(pdf, 12 kb.)

Project Name
 
Page
  of  
FIN Project No.
 
Pier No.
 
Contractor
 
Shaft No.
 
Inspected By
  Date  
Station
 
Approved By
  Date  
Offset
 

Placement Method   Freefall Volume in Lines # ID Length Volume
    Tremie          
    Pumped          
De-airing Method   Relief Valve          
    Tremie Plug          
    Tremie Cap          
Reference Elev.     Total Volume in Lines  
Shaft Top Elev.      
Top of Rock Elev.      
Shaft Bottom Elev.      
Depth to Water Inside      
OD Casing At Start      
Rebar Cage Top Elev.   At Start  
    At Finish  

Truck No. Concrete
Volume
Arrival
Time
Start
Finish
Time
Tremie
Depth
Depth to
Concrete
Notes
               
               
               
               
               
               
               
               
               
               
               
               
               
               

Concrete Volume Delivered  
Placement Time (Casing Removed)  

  OD Top Elev. Bot. Elev. Start Finish
Casing          
Removal          
Notes  

TOC