Drilled Shaft Concrete Placement Log
(pdf, 12 kb.)
| Placement Method |
|
Freefall |
Volume in Lines |
# |
ID |
Length |
Volume |
| |
|
Tremie |
|
|
|
|
|
| |
|
Pumped |
|
|
|
|
|
| De-airing Method |
|
Relief Valve |
|
|
|
|
|
| |
|
Tremie Plug |
|
|
|
|
|
| |
|
Tremie Cap |
|
|
|
|
|
| Reference Elev. |
|
|
Total Volume in Lines |
|
| Shaft Top Elev. |
|
|
|
| Top of Rock Elev. |
|
|
|
| Shaft Bottom Elev. |
|
|
|
| Depth to Water Inside |
|
|
|
| OD Casing At Start |
|
|
|
| Rebar Cage Top Elev. |
|
At Start |
|
| |
|
At Finish |
|
| Truck No. |
Concrete Volume |
Arrival Time |
Start
|
Finish Time |
Tremie Depth |
Depth to Concrete |
Notes |
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| Concrete Volume Delivered |
|
| Placement Time (Casing Removed) |
|
| |
OD |
Top Elev. |
Bot. Elev. |
Start |
Finish |
| Casing |
|
|
|
|
|
| Removal |
|
|
|
|
|
| Notes |
|
TOC
|