Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Geotechnical Engineering

 

Drilled Shaft Soil Excavation Log

(pdf, 21 kb.)

Project Name
 
Page
  of  
FIN Project No.
 
Pier No.
 
Contractor
 
Shaft No.
 
Inspected By
  Date  
Station
 
Approved By
  Date  
Offset
 

Casing Information Soil Auger Diam.  
ID OD Top Elev. Length Bot. Elev. Grnd. Surf. Elev.  
          Water Table Elev.  
          Reference Elev.  
          Drilling Mud  
Notes
 
 

Depth Elevation Time Soil Description & Notes
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out
      In  
      Out

TOC

PDF files can be viewed with the Acrobat® Reader®
Updated: 04/07/2011

FHWA
United States Department of Transportation - Federal Highway Administration